HAZER GROUP LIMITED Overview
Hazer Group is a Perth-based, pre-commercial climate-technology licensor that owns the Hazer Process, a patented methane-pyrolysis route that splits natural gas or biogas into hydrogen and solid synthetic graphite, using low-cost iron ore as the catalyst. Because the carbon leaves the process as a solid rather than as carbon dioxide, the technology offers low-emissions hydrogen without carbon capture and storage, and without the large renewable-electricity requirement of electrolysis. Hazer has completed a commercial demonstration plant in Western Australia and, with KBR, a commercial-scale Process Design Package for a 30,000 tonne-per-annum hydrogen plant. Its business model is capital-light: engineering services and studies now, licence fees and royalties once customer plants are built, plus graphite monetisation. With roughly A$10.7 million in cash, no debt, a ~A$90 million market capitalisation and immaterial customer revenue, Hazer is a binary, milestone-driven commercialisation story whose value hinges on converting studies into a first licence.
What the company does
Hazer develops and licenses the Hazer Process. The process is a thermo-catalytic decomposition of methane in a fluidised-bed reactor. Methane contacts iron-ore catalyst particles at high temperature, decomposing into hydrogen gas and carbon. The carbon deposits on the iron ore particles as graphitic material. The output streams are:
-
Hydrogen gas — the primary product, positioned for ammonia, methanol, refining, steelmaking, low-carbon liquid fuels, power generation and chemicals (e.g., hydrogen peroxide).
-
Synthetic graphite — a co-product with potential use as a concrete and asphalt additive, a steelmaking carbon source (recarburiser, sintering, electric-arc-furnace inputs), and, after purification, battery-related applications.
The company's own description (FY2026 Annual Report, paraphrased)
The FY2026 Directors' Report describes the principal activities as research and development of novel graphite-and-hydrogen production technology together with business development to commercialise it. It states the Group holds intellectual property rights to the Hazer Process, which produces hydrogen from methane with negligible carbon dioxide emissions alongside a high-purity graphite product. The Managing Director's Report characterises FY2026 as the transition from technology validation to commercial execution, and describes the business model as moving from technology development towards licensing and project support services.
Business model and revenue model
| Revenue stream | Stage | Mechanism | FY2026 status |
|---|---|---|---|
| Engineering services and paid studies | Live | Fees for pre-feasibility, process design and engineering support to prospective licensees | A$19,571 recognised in FY2026 (FY2025: A$614,239, from FortisBC) |
| Technology licence fees | Pre-revenue | Upfront and milestone licence fees on customer plants | None to date; management has cited ~A$80–100 million licensing revenue potential from a single 50,000 tpa deal (Q2 FY2026 investor commentary, per secondary summaries) |
| Production royalties | Pre-revenue | Ongoing royalties once licensed plants operate | None to date |
| Graphite sales / offtake | Pre-revenue | Supply or marketing of graphite co-product from licensed plants or partner projects | Frameworks only (Green Steel of WA LOI up to 85,000 t over 10 years; Hallett Group binding MoU) |
| Government grants and R&D rebates | Non-operating | ARENA, WA Government (JTSI / Department of Energy and Economic Diversification) grants; Australian R&D Tax Incentive refundable offset at 43.5% | A$2.85 million recognised in FY2026 (R&D rebate A$2.35 million; ARENA A$0.50 million) |
Mix assessment: On a strict customer-revenue basis, Hazer is effectively 100% services today (engineering/studies). The intended steady-state mix is licensing plus royalties plus graphite, with no product manufacturing. There is no subscription component.
Value-chain position
Hazer sits at the technology-licensor layer of the low-emissions hydrogen value chain — upstream of engineering, procurement and construction (EPC) contractors and plant owners, and downstream of feedstock (natural gas, biogas) and catalyst (iron ore) suppliers. Through the KBR alliance, KBR acts as the global marketing, licensing and engineering partner, while Hazer owns the core process IP. This is analogous to how process licensors (e.g., KBR itself in ammonia) monetise IP without owning plants.
Customer types and end-markets
| Customer type | Example counterparties (disclosed) | Hydrogen use / graphite use |
|---|---|---|
| Gas and energy utilities | FortisBC (Canada); tier-1 Japanese power utility (unnamed); Chubu Electric (Japan) | Low-emissions hydrogen for gas networks and power generation |
| Steelmakers and steel developers | POSCO (Korea); M Resources (Whyalla bid); Green Steel of WA | Hydrogen for direct reduced iron; graphite as carbon source |
| Energy storage / hydrogen hub developers | EnergyPathways (UK, MESH project) | Large-scale hydrogen and graphite production |
| Chemicals | Kemira (Finland) | Hydrogen for hydrogen peroxide production |
| Clean fuels developers | Continual Renewable Ventures (Western Australia) | Hydrogen for sustainable aviation fuel and renewable diesel |
| Construction materials | Hallett Group (South Australia) | Graphite as concrete/asphalt additive |
| Engineering partners | KBR (alliance), Chiyoda (Japan), PSRI (US) | Delivery and scale-up partners rather than end customers |
Independent characterisation
Hazer is best characterised as a pre-revenue deep-tech licensing company with a funded runway of roughly two to three years at current burn, whose principal assets are (i) its patent estate, (ii) operating data from a commercial demonstration plant, (iii) a commercial-scale process design package co-owned in practice with KBR, and (iv) a pipeline of studies and memoranda of understanding. Its distinguishing features versus other hydrogen developers are the use of cheap iron ore as catalyst, the absence of a requirement for CO2 storage, and a saleable solid carbon co-product. Its principal weaknesses are scale-up risk (the process has not run at full commercial scale), dependence on third-party final investment decisions, a reliance on equity markets and government support for funding, and the fact that the large majority of its "revenue" line consists of tax rebates and grants rather than customer income.
Strategy
Stated strategy themes (FY2026 Annual Report and FY2026 results release, paraphrased)
-
Commercial deployment via KBR — use the completed PDP and KBR's global sales network to convert opportunities into feasibility studies, licences and deployments.
-
Convert pipeline to revenue — advance existing projects (FortisBC, Chubu/Chiyoda, EnergyPathways, Whyalla) and turn near-term opportunities into revenue-generating activities.
-
Expand into new hydrogen markets — steel, power generation, clean liquid fuels, chemicals and data centres beyond the ammonia/methanol core.
-
Accelerate graphite commercialisation — monetise graphite across construction materials, steelmaking, industrial carbon and battery-related markets to improve project economics.
-
Capital discipline — maintain a capital-light licensing model, minimise cash burn, use equity-based remuneration, and lean on non-dilutive grants and R&D rebates.
-
IP protection — continue global patent filings in key markets (recent grant in Japan).
Strategic initiatives — last 24 months
| Date | Initiative | Type | Detail |
|---|---|---|---|
| 5 May 2025 | KBR strategic alliance | Partnership / go-to-market | Exclusive global licensing partner in ammonia and methanol; KBR A$3 million work-program contribution; target of multiple licence deals within ~6 years; terminable if licensing metrics not met |
| 10 Jun 2025 | PSRI partnership | Technology scale-up | Fluidised-bed scale-up expertise |
| Jun–Jul 2025 | ~A$10.7 million capital raise | Funding | A$8.1 million placement + A$2.6 million SPP |
| Jul 2025 | Alliance hubs in Australia, UK, US | Organisation | Joint workstreams on scale-up, licensing, customer engagement |
| FY2025 | Mitsui partnership extended | Partnership | Joint investigation activities |
| Sep 2025 | FGR MoU | Partnership | Scope not detailed in sources reviewed |
| Nov 2025 | Hazer Graphite Pte Ltd (Singapore) | New business vehicle | Graphite commercialisation |
| H1 FY2026 | POSCO partnership extension | Partnership | Following successful graphite testing |
| H1 FY2026 | M Resources MoU / Whyalla bid | Project | Hazer technology integrated into M Resources' Whyalla bid; graphite for EAF |
| H1 FY2026 | EnergyPathways (UK) | First revenue-generating Hazer–KBR transaction | Licensed ~20,000 tpa plant concept at MESH (per Q2 FY2026 webinar summaries) |
| FY2026 | Kemira evaluation | Partnership | Moving to licensing/offtake discussions for hydrogen peroxide |
| FY2026 | CRV MoU | Partnership | Low-carbon liquid fuels (SAF/RD) in Kwinana, WA |
| 3 Mar 2026 | Concrete and asphalt qualification | Graphite | Boral Labs testing |
| 19 Mar 2026 | Green Steel of WA LOI | Graphite offtake | Up to 85,000 t over 10 years, non-binding |
| 15 Apr 2026 | PDP completed | Technology | 30,000 tpa design basis |
| 25 May 2026 | Graphite pelletisation | Product development | Enables steelmaking applications |
| 15 Jun 2026 | Hallett Group binding MoU | Graphite | Exclusive SA concrete rights to January 2027 |
| 13 Jul 2026 | Battery-grade purification | Product development | >99.99% purity |
| 17 Aug 2026 | Japanese utility paid study | Commercial | First KBR-originated paid study post-PDP |
| Cost program | 30% reduction in cash operating costs in FY2026 | Cost discipline | Achieved; no forward numeric target published |
Sustainability commitments
No formal emissions targets or sustainability-linked financing disclosed. The company's ESG position is primarily expressed through its product (low-emissions hydrogen and solid carbon).
Medium-term targets and guidance
The FY2026 Directors' Report expressly withholds detailed likely-developments information on grounds of unreasonable prejudice. No numeric revenue, earnings or licence-count guidance has been issued. Qualitative FY2027 priorities: advance projects to commercial deployment and revenue, expand into new hydrogen markets, accelerate graphite commercialisation. The KBR alliance carries an internal target of multiple firm licences within the initial term (6-year horizon cited in the May 2025 announcement). Management has cited a single 50,000 tpa licence as worth roughly A$80–100 million in licensing revenue (Q2 FY2026 investor commentary as reported by secondary summaries — not formal guidance).
Products & Services
Hazer has one technology platform with several commercial offerings. All sit within the single reported segment.
Hazer® Process licence (core technology)
| Attribute | Detail |
|---|---|
| Description | Methane pyrolysis in a fluidised-bed reactor using iron ore as catalyst, producing hydrogen and synthetic graphite |
| Feedstock | Natural gas, biogas (CDP used biogas from Woodman Point wastewater facility) |
| Catalyst | Unprocessed / low-cost iron ore |
| Key claimed capabilities | Low-emissions hydrogen without CCS; low electricity requirement versus electrolysis; solid carbon co-product rather than CO2; "bolt-on" brownfield or greenfield deployment |
| Commercial design basis | 30,000 tpa hydrogen plant (PDP completed 15 April 2026 with KBR) |
| Target customers | Ammonia, methanol, steel, refining, clean fuels, power, chemicals |
| Pricing model | Licence fees and royalties; terms not publicly disclosed |
| Latest version | Commercial-scale PDP, April 2026 |
Process Design Package (PDP) — Hazer–KBR
A standardised, commercial-scale engineering design package for a 30,000 tpa hydrogen plant, aligned with global engineering standards, enabling customers to evaluate integration and run feasibility studies. Completed 15 April 2026. It is the basis for KBR-led marketing. Pricing: not separately priced; underpins paid studies and licences.
Engineering services and feasibility studies
| Offering | Description | Disclosed engagements |
|---|---|---|
| Pre-feasibility studies | Integration assessment for customer sites | Tier-1 Japanese power utility (30,000 and 300,000 tpa cases; initial-phase revenue ~A$65,000; completion expected by end-2026); Chubu Electric / Chiyoda Nagoya PFS (completed) |
| Process design and scale-up engineering | Site-specific design basis | FortisBC 2,500 tpa facility (Canada); EnergyPathways MESH (UK) |
| Technology evaluation programs | Testing for specific applications | Kemira hydrogen peroxide evaluation (moving to commercial discussions) |
Hazer Graphite (co-product platform)
| Product form / application | Specification / status | Validation | Year |
|---|---|---|---|
| Concrete and asphalt additive | Meets Australian infrastructure specifications and relevant international standards | Boral Labs independent testing | Mar 2026 |
| Steelmaking carbon (recarburiser, sintering, EAF) | Tested across several steelmaking applications | POSCO testing; Green Steel of WA LOI; M Resources EAF application | 2025–2026 |
| Pelletised graphite | Optimum inert binder identified; powder or agglomerated forms | Internal pelletisation program | May 2026 |
| Battery-grade purified graphite | Upgradeable to >99.99% purity via thermal purification | ANZAPLAN (Dorfner Group) | Jul 2026 |
| Specialist backfill | Potential drop-in market | Referenced in qualification commentary | 2,026 |
Graphite pricing: not publicly disclosed.
Hydrogen product applications (via licensees)
| Application | Status |
|---|---|
| Ammonia and methanol | KBR exclusive licensing markets; pipeline opportunities |
| Green/low-emissions steel (DRI) | Whyalla (M Resources bid), POSCO, Green Steel of WA |
| Power generation | Japanese utility study; Chubu Electric |
| Gas networks | FortisBC |
| Clean liquid fuels (SAF, renewable diesel) | CRV MoU (Kwinana) |
| Hydrogen peroxide | Kemira |
| Data centres | Referenced in pipeline sectors (FY2026 MD Report) |
Financial Narrative
Income statement
Sources: FY2026 Annual Report (FY2025–FY2026 statements; five-year summary of net loss, net assets, EPS, share price). FY2022–FY2024 operating income and write-downs from StockAnalysis (aggregator; standardised presentation). FY2025–FY2026 operating income and EBITDA computed by the analyst from reported line items (revenue excluding interest, less expenses excluding finance costs; EBITDA adds back depreciation and amortisation of A$0.103 million FY2025 and A$0.108 million FY2026). Diluted EPS equals basic because options are anti-dilutive in loss years.
Margins
Gross margin is 100% only because Hazer has no cost of sales; margins are not economically meaningful for a pre-revenue licensor and are shown for completeness only.
Expense structure (FY2025 vs FY2026)
Commentary: Cash operating expenses fell 30% in FY2026, driven by the wind-down of the CDP test program (consulting and research down 51%) and lower headcount (employee benefits down 22%). The headline loss nevertheless widened by 36% because (i) the FY2025 comparative contained a A$3.8 million one-off grant and (ii) non-cash share-based payments more than doubled to A$3.27 million following the November 2025 option grants, which the company frames as substituting equity for cash remuneration.
Balance sheet
Sources: FY2026 Annual Report (statement of financial position, statement of changes in equity, cash flow statement opening balance for FY2024 cash, lease note). Equity FY2022–FY2023 from five-year summary.
Commentary: The balance sheet is simple and debt-free; the Board's stated capital policy is to keep net debt negative. The CDP (gross cost ~A$37.2 million) is carried at nil after R&D offsets, grant offsets and full impairment, so book equity is essentially cash plus receivables. Accumulated losses of A$94.2 million against issued capital of A$100.0 million illustrate how much capital has been consumed to reach commercial readiness. The FY2023 trough in equity (A$3.9 million) preceded the FY2024 recapitalisation.
Cash flow
Commentary: Gross cash burn (payments to suppliers and employees) fell 30% to A$10.5 million in FY2026. Net operating outflow was flat at ~A$5.2 million because the FY2025 grant receipt did not recur. Capex has effectively ceased with the CDP program complete. The FY2026 equity inflow of A$3.7 million largely reflects the tail of the mid-2025 placement/SPP and December 2025 director participation.
Liquidity runway (analyst estimate): Cash A$10.67 million + R&D rebate receivable A$2.30 million + unearned WA grant milestones A$2.3 million ≈ A$15.3 million of funding capacity, against FY2026 free cash outflow of A$5.4 million, implies roughly 2.5–3 years of runway at FY2026 burn, excluding any increase in commercial spending or new revenue. The A$2.3 million grant is milestone-contingent.
Ratios
ROIC, net debt/EBITDA, interest coverage and cash conversion cycle are not meaningful for a debt-free, negative-EBITDA company with no inventory; cells left blank intentionally.
Trend synthesis
FY2022–FY2024 were the build-and-test years: CDP construction, commissioning and testing drove losses of A$12–19 million per year, punctuated by write-downs as capitalised CDP costs were impaired. FY2025 was the inflection: test program complete, costs down 17%, a large grant receipt and first customer revenue produced the smallest loss in five years. FY2026 shows continued cash-cost discipline but a higher accounting loss, as the company shifted from grant-funded technology work to commercial engagement that has not yet produced material revenue. The key financial inflection still ahead is the first licence fee.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Entity | Domicile | Role | Notes |
|---|---|---|---|
Hazer Group Limited | Australia | Listed parent; IP owner; operating company | ASX: HZR |
Canadian subsidiary (name not disclosed in sources reviewed) | Canada | Supports North American activity (FortisBC project) | Disclosed in Note 3 |
Hazer Graphite Pte Ltd | Singapore | Graphite commercialisation vehicle | Control gained 7 November 2025 |
Results by Segment and Segment Margins & Growth (%)
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Segment revenues from ordinary activities incl. other income (AUD Mn) | 3.79 | 8.51 | 3.31 |
Segment customer (engineering services) revenue (AUD Mn) | 0 | 0.614 | 0.020 |
Segment pre-tax loss (AUD Mn) | -19.07 | -7.62 | -10.38 |
YoY growth in revenues from ordinary activities (%) | 39.9 | 124.6 | -61.1 |
Contribution to Group revenue (%) | 100 | 100 | 100 |
Revenue by Segment
| Metric | FY2025 | FY2026 |
|---|---|---|
Engineering services revenue (AUD Mn) | 0.614 | 0.020 |
Interest income (AUD Mn) | 0.392 | 0.441 |
Grant income JTSI Lower Carbon Grant Gorgon Fund (AUD Mn) | 3.833 | 0 |
Grant income ARENA (AUD Mn) | 0.500 | 0.500 |
R&D tax rebate (AUD Mn) | 3.173 | 2.352 |
Total revenues from ordinary activities (AUD Mn) | 8.512 | 3.313 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansIncome Statement and Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenues from ordinary activities as reported incl. other income (AUD Mn) | 1.30 | 2.71 | 3.79 | 8.51 | 3.31 |
Customer engineering services revenue (AUD Mn) | 0 | 0 | 0 | 0.614 | 0.020 |
Revenue growth as reported (%) | -51.1 | 108.5 | 39.9 | 124.6 | -61.1 |
Gross profit (AUD Mn) | 1.30 | 2.71 | 3.79 | 8.51 | 3.31 |
Operating income excl. write-downs and interest (AUD Mn) | -6.19 | -11.99 | -15.80 | -7.94 | -10.76 |
EBITDA excl. write-downs (AUD Mn) | — | — | — | -7.84 | -10.65 |
Asset write-downs (AUD Mn) | -9.60 | -0.15 | -3.57 | 0 | 0 |
Share-based payments expense (AUD Mn) | — | — | — | 1.40 | 3.27 |
Pre-tax income (AUD Mn) | -16.41 | -12.21 | -19.07 | -7.62 | -10.38 |
Net income (AUD Mn) | -16.41 | -12.21 | -19.07 | -7.62 | -10.38 |
EPS basic (AUD cents) | -10.38 | -7.19 | -9.28 | -3.30 | -3.93 |
EPS diluted (AUD cents) | -10.38 | -7.19 | -9.28 | -3.30 | -3.93 |
Dividends per share (AUD cents) | 0 | 0 | 0 | 0 | 0 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansMargin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Gross margin (%) | 100 | 100 | 100 | 100 | 100 |
Operating margin on reported revenues (%) | -476 | -442 | -417 | -93 | -325 |
Net margin on reported revenues (%) | -1,262 | -451 | -503 | -90 | -313 |
Revenue CAGR FY2022 to FY2026 reported basis (%) | — | — | — | — | 26.4 |
Income Statement
| Metric | FY2025 | FY2026 |
|---|---|---|
Employee benefits expense (AUD Mn) | 7.89 | 6.15 |
Consulting and research expenses (AUD Mn) | 4.39 | 2.15 |
Administration (AUD Mn) | 2.28 | 1.95 |
Share-based payments (AUD Mn) | 1.40 | 3.27 |
Depreciation and amortisation (AUD Mn) | 0.10 | 0.11 |
Finance costs (AUD Mn) | 0.07 | 0.06 |
Total expenses (AUD Mn) | 16.13 | 13.69 |
Cash operating expenses excl. SBP and D&A (AUD Mn) | 14.62 | 10.31 |
Balance Sheet
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total assets (AUD Mn) | — | — | — | 17.75 | 13.55 |
Cash and cash equivalents (AUD Mn) | — | — | 12.82 | 12.53 | 10.67 |
Of which restricted cash ARENA (AUD Mn) | — | — | — | 1.27 | 0.81 |
Trade and other receivables incl. R&D rebate (AUD Mn) | — | — | — | 4.59 | 2.32 |
Short-term debt borrowings (AUD Mn) | — | — | — | 0 | 0 |
Long-term debt borrowings (AUD Mn) | — | — | — | 0 | 0 |
Lease liabilities total (AUD Mn) | — | — | 0.223 | 0.220 | 0.104 |
Net debt incl. leases (AUD Mn) | — | — | -12.60 | -12.31 | -10.57 |
Total liabilities (AUD Mn) | — | — | — | 4.04 | 3.20 |
Total equity (AUD Mn) | 12.45 | 3.94 | 13.57 | 13.71 | 10.35 |
Issued capital (AUD Mn) | — | — | 88.73 | 95.21 | 100.00 |
Accumulated losses (AUD Mn) | — | — | -77.68 | -85.25 | -94.16 |
Goodwill and intangibles incl. CDP carrying value (AUD Mn) | — | — | 0 | 0 | 0 |
Working capital (AUD Mn) | — | — | — | 15.27 | 11.39 |
Cash Flow
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Operating cash flow (AUD Mn) | — | -5.15 | -5.24 |
Payments to suppliers and employees (AUD Mn) | — | -15.05 | -10.47 |
R&D tax rebate received (AUD Mn) | — | 5.07 | 4.58 |
Grant income received (AUD Mn) | — | 3.83 | 0 |
Capex payments for CDP (AUD Mn) | — | -1.45 | -0.16 |
Free cash flow (AUD Mn) | — | -6.60 | -5.40 |
Proceeds from share issues gross (AUD Mn) | — | 7.07 | 3.68 |
Share issue costs (AUD Mn) | — | -0.63 | -0.01 |
Lease repayments (AUD Mn) | — | -0.14 | -0.14 |
Dividends paid (AUD Mn) | 0 | 0 | 0 |
Share buybacks (AUD Mn) | 0 | 0 | 0 |
Net change in cash (AUD Mn) | — | -0.29 | -1.87 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2025 | FY2026 |
|---|---|---|
ROE on average equity (%) | -55.9 | -86.3 |
ROA on average assets (%) | — | -66.3 |
Current ratio (x) | 7.63 | 6.43 |
Debt to equity incl. leases (x) | 0.016 | 0.010 |
Asset turnover on reported revenues (x) | — | 0.21 |
Revenue by Region
| Region | FY2024 | FY2025 |
|---|---|---|
Australia customer revenue (AUD Mn) | 0 | 0 |
North America customer revenue (AUD Mn) | 0 | 0.614 |
Europe UK customer revenue (AUD Mn) | 0 | 0 |
Asia customer revenue (AUD Mn) | 0 | 0 |
Region Overview
| Region | Disclosed opportunities | Momentum |
|---|---|---|
Australia | Whyalla (SA, via M Resources); Hallett Group (SA); Green Steel of WA; CRV (Kwinana, WA) | Rising — South Australia described by management as increasingly strategic |
North America | FortisBC 2,500 tpa (Canada); KBR priority region | Steady; commercial framework under negotiation |
Japan / North Asia | Japanese tier-1 utility study; Chubu Electric / Chiyoda Nagoya; POSCO (Korea) | Rising — new paid study and Japan patent in 2026 |
Europe | EnergyPathways MESH (UK); Kemira (Finland) | Steady; first Hazer–KBR revenue-generating transaction |
Middle East | KBR priority region; no named counterparty | Early stage |
Share Price and Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Share price at fiscal year end (AUD) | 0.76 | 0.63 | 0.37 | 0.30 | 0.30 |
YoY change in fiscal-year-end share price (%) | — | -17.1 | -41.3 | -18.9 | 0.0 |
Market capitalisation at FY end approx (AUD Mn) | — | — | — | — | 80 |
Performance Window Details
| Performance window | Return | Basis |
|---|---|---|
1 year (30 Jun 2025 to 30 Jun 2026) | 0.0% | Annual Report FY-end prices |
3 years (30 Jun 2023 to 30 Jun 2026) | −52.4% | Annual Report FY-end prices |
4 years (30 Jun 2022 to 30 Jun 2026) | −60.5% | Annual Report FY-end prices |
5 years to 16 Jan 2026 | −69.8% | Simply Wall St |
1 year to 16 Jan 2026 | +19.2% | Simply Wall St |
52-week range at 16 Jan 2026 | A$0.27–0.62 | Simply Wall St |
Since IPO (A$0.20) to ~A$0.335 | ~+68% | Analyst calculation from IPO price and early-September 2026 price |
Latest retrieved price | ~A$0.33–0.335 | — |
Valuation Snapshot
| Multiple | Value | Comment |
|---|---|---|
Market capitalisation | ~A$89 million | — |
Enterprise value | ~A$78 million | Market cap less net cash A$10.57 million (30 Jun 2026) |
EV/Sales (reported revenues incl. rebates) | ~24x | On A$3.31 million FY2026 |
P/B | ~8.6x | On A$10.35 million equity |
Capital Markets
| Item | Status |
|---|---|
Dividend history | None ever declared (Annual Report: no dividends paid; nil dividends in five-year table) |
Dividend policy | None; loss-making growth company |
Credit ratings (Moody's, S&P, Fitch) | Not rated |
Debt maturity profile | No borrowings; lease liabilities A$0.069 million current and A$0.035 million 1–5 years |
Capital Instruments
| Instrument | Number | Terms |
|---|---|---|
Ordinary shares | ~265.6 million | ASX-quoted |
Unquoted options (grant 24 Nov 2022) | 4,100,000 | Exercise A$0.001; expiry 22 Dec 2027 (MD) |
Unquoted options (grant 9 Aug 2024) | 3,095,114 | Exercise A$0.001; expiry 1 Jul 2028 |
Unquoted options (grant 26 Sep 2025) | 4,184,827 | Exercise A$0.001; expiry 30 Jun 2030 |
Unquoted options (grant 18 Nov 2025) | 750,000 | Exercise A$0.001; expiry 10 Dec 2030 |
Unquoted options (grant 18 Nov 2025, MD) | 7,900,000 | Exercise A$0.001; expiry 10 Dec 2030; performance-based |
Unquoted options (grant 18 Nov 2025, NEDs) | 4,020,000 | Exercise A$0.534; expiry 10 Dec 2030 |
Total options | 24,049,941 | ~9% of shares on issue |
Analyst Conclusions
Management guidance
No quantitative guidance. FY2027 priorities (FY2026 results release, 25 August 2026): convert opportunities into commercial deployments and revenue-generating activities; expand into new low-emissions hydrogen markets; accelerate graphite commercialisation. Funding position A$13.0 million (cash A$10.7 million plus A$2.3 million unearned grant), with receipt of the FY2026 R&D rebate (A$2.30 million receivable) expected in coming months.
Consensus expectations
No published consensus revenue or EPS forecasts. Single disclosed price target A$0.70 (Investing.com; broker unidentified).
Bull case
-
Licence conversion: With the PDP complete and KBR's sales force engaged, one large licence (management cites ~A$80–100 million for a 50,000 tpa plant) would be worth roughly the entire current enterprise value of ~A$78 million.
-
Japan optionality: The tier-1 utility study spans up to 300,000 tpa, and Chubu/Chiyoda's Nagoya facility gives Hazer two credible Japanese pathways in a market where it has just secured patent protection.
-
Graphite upside: Validated concrete/asphalt, steel and battery-grade applications plus offtake frameworks (up to 85,000 t with Green Steel of WA) could make graphite a meaningful economic lever for licensees and Hazer.
Bear case
-
Revenue still absent: FY2026 customer revenue was A$19,571; after more than a decade, no licence has been signed, and memoranda of understanding and LOIs are largely non-binding.
-
Funding and dilution: Free cash outflow of A$5.4 million versus A$10.7 million cash implies a likely capital raise within 12–24 months unless licence revenue arrives; the share price (~A$0.30–0.34) is near multi-year lows.
-
External dependency: Key catalysts (Whyalla, FortisBC FID, EnergyPathways MESH) depend on third-party decisions, policy support and financing outside Hazer's control; Whyalla's blast furnace has been abandoned and the bidder outcome is uncertain.
Catalysts and monitorables — next 12 months
| Catalyst | Expected timing | Why it matters |
|---|---|---|
| Whyalla preferred bidder decision (M Resources vs Jindal; BlueScope right of last offer) | Late 2026 (was due by end-September 2026) | Validation of Hazer in a flagship green-steel project |
| Japanese utility PFS completion | By end-2026 | Potential progression to larger engineering scope |
| FortisBC commercial framework | FY2027 | First-of-a-kind North American deployment |
| First licence agreement under KBR alliance | Not guided | The key value-unlock event |
| AGM and September/December quarter 4Cs | Oct 2026 – Jan 2027 | Cash burn and pipeline updates |
| Receipt of FY2026 R&D rebate (~A$2.3 million) | H1 FY2027 | Liquidity |
| Earning remaining A$2.3 million WA grant milestones | FY2027 | Non-dilutive funding |
| Hallett testing program and SA concrete exclusivity expiry | By January 2027 | First binding graphite commercial terms |
| Kemira licensing/offtake discussions | FY2027 | Chemicals market entry |
| Capital raising | Possible in FY2027 | Dilution risk |
Analyst verdict
Hazer Group has done most of what a deep-tech licensor can do without a paying licensee. Over FY2025–FY2026 it completed its demonstration program, signed a global alliance with KBR — arguably the most credible ammonia-process licensor in the world — finished a commercial-scale process design package, validated its graphite co-product in several markets, and cut cash operating costs by 30%. The balance sheet is clean and debt-free, governance is orderly, and insiders bought stock in December 2025.
Yet the financial statements remain those of a research company. Customer revenue was A$19,571 in FY2026; 86% of reported revenue came from tax rebates and grants; the net loss widened to A$10.4 million; and cumulative losses now approach the A$100 million of capital raised. Every commercial relationship short of the Japanese paid study and EnergyPathways is a memorandum, letter of intent or evaluation. The company itself flags that the process has not been proven at full commercial scale.
At roughly A$78 million enterprise value, the market is pricing Hazer as an option on a first licence. That pricing appears broadly rational: a single 50,000 tpa licence at management's cited economics would justify the valuation, while continued slippage would force a dilutive raise within roughly two years. The most important near-term signals are binary — the Whyalla preferred-bidder decision, conversion of the Japanese study into larger engineering scope, and a FortisBC commercial framework.
Our synthesis is that Hazer is a high-risk, catalyst-driven speculative holding. The investment case should be reassessed on hard evidence — a signed licence with upfront fees — rather than further partnership announcements. Until then, the burden of proof remains with management, and funding risk is the dominant consideration for position sizing.
SOURCES CONSULTED
-
Hazer Group FY2026 Appendix 4E and Annual Report — Primary filing — 25 Aug 2026
-
Hazer Group FY2026 results release and shareholder snapshot — Primary — 25 Aug 2026
-
Hazer–KBR Alliance paid study with Japanese power utility — ASX announcement — 17 Aug 2026
-
Appendix 4C, quarter ended 30 June 2026 — Primary filing — 20 Jul 2026
-
Hazer Expands Patent Protection in Japan — ASX announcement — 3 Jun 2026
-
Hallett Group binding MoU summary — InvestSMART / ASX — 15 Jun 2026
-
March 2026 quarterly summary — InvestSMART / ASX — 20 Apr 2026
-
PDP completion summary — InvestSMART / ASX — 15 Apr 2026
-
H1 FY2026 results release — ASX — 24 Feb 2026
-
KBR alliance update — ASX — 15 Oct 2025
-
FY2025 results release — ASX — 26 Aug 2025
-
KBR global engagement strategy — ASX — 7 Jul 2025
-
KBR alliance announcement coverage (Hydrocarbon Processing, Chemical Online, H2 Tech, Biofuels Digest) — Trade press — May 2025
-
H1 FY2025 results release — ASX — 24 Feb 2025
-
Australian Manufacturing; Process Online; Biofuels Digest coverage of Japanese study — Trade press — Aug 2026
-
StockAnalysis income statement (FY2021–FY2025) — Aggregator — 2026
-
Simply Wall St ownership, price history, coverage — Aggregator — Jan–Mar 2026
-
Investing.com price target — Aggregator — Aug 2026
-
TipRanks earnings call summary and capital-raise notes — Aggregator — 2025–2026
-
Quartr event summaries — Aggregator — 2026
-
Parqet (ISIN, WKN, webinar summaries) — Aggregator — 2026
-
Business News (IPO December 2015) — Press — 2015
-
CSIRO HyResearch (CDP, ARENA funding) — Government database — 2019
-
InDaily, AAP, RenewEconomy, AIST, Industrial Info (Whyalla process) — Press — May–Sep 2026
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Director since | Independence | Committees | Qualifications | Prior roles | Other listed boards |
|---|---|---|---|---|---|---|---|
Tim Goldsmith | Non-Executive Chairman | 24 Jul 2017 | Independent | Audit and Risk (member); Remuneration and Nomination (member) | BCom (Polytechnic of North London); CA ANZ | PwC partner 20+ years and Global Mining Leader; CEO Rincon Ltd and Rincon Mining (lithium project sold to Rio Tinto 2022); Executive Chairman Natural Soda | Pantera Resources (NED); Odessa Mineral (Chair). Former: Costa Group |
Danielle Lee | Non-Executive Director | 16 Sep 2015 | Independent | Audit and Risk (Chair); Remuneration and Nomination (member) | BEc, LLB (Hons) UWA; Grad Dip Applied Finance | Corporate lawyer and adviser, 25+ years | None current. Former: Openn Negotiation, Rare Foods Australia |
Andrew Hinkly | Non-Executive Director | 21 Apr 2021 | Non-independent (AP Ventures) | — | MBA (Manchester); BSc Civil Engineering (Loughborough) | Founding Managing Partner AP Ventures; Anglo American (Anglo American Platinum Exec Committee); Ford Motor Company (North American Exec Committee) | — |
Dr Jack Hamilton | Non-Executive Director | 1 Nov 2021 | Independent | Remuneration and Nomination (Chair); Audit and Risk (member) | BEng (Chem), PhD (Melbourne); FAIE; FAICD | Director North West Shelf Ventures, Woodside Energy | Iondrive Ltd (NED) |
Glenn Corrie | Managing Director and CEO | CEO 10 Oct 2022; MD 3 Apr 2023 | Executive | Attends committees by invitation | MBA (Chicago Booth); Hons Geophysics (Adelaide); BSc Geophysics (QUT) | Executive board member Staatsolie (Suriname); founding CEO NEO Energy (UK); CEO/MD Sino Gas and Energy (ASX); Ophir Energy; Temasek; Shell International 1998–2010 | TMK Energy (NED) |
Directors' Remuneration
| Name | Cash salary and fees | Cash bonus | Superannuation | Share-based payments | Total FY2026 | Total FY2025 |
|---|---|---|---|---|---|---|
Tim Goldsmith | 90,000 | 0 | 10,800 | 102,401 | 203,201 | 182,402 |
Danielle Lee | 53,750 | 0 | 6,450 | 60,562 | 120,762 | 120,661 |
Andrew Hinkly | 0 | 0 | 0 | 0 | 0 | 0 |
Jack Hamilton | 60,200 | 0 | 0 | 60,562 | 120,762 | 120,661 |
Glenn Corrie | 573,750 | 0 | 29,963 | 1,243,934 | 1,847,647 | 1,179,038 |
Total KMP | 777,700 | 0 | 47,213 | 1,467,459 | 2,292,372 | 1,602,762 |
Directors' Shareholdings
| Name | Shares | Options |
|---|---|---|
Tim Goldsmith | 3,194,232 | 1,920,000 |
Danielle Lee | 1,007,371 | 1,050,000 |
Andrew Hinkly (indirect, AP Ventures) | 11,907,191 | 0 |
Jack Hamilton | 824,555 | 1,050,000 |
Glenn Corrie | 1,863,873 | 12,000,000 |
Total | 18,797,222 | 16,020,000 |
Major Shareholders
| Rank | Holder | Shares | Stake (%) | Source / date |
|---|---|---|---|---|
| 1 | AP Ventures (attributed to Anglo American plc by aggregators) | 11,907,191 | 4.48 | Annual Report FY2026; Simply Wall St Mar 2026 |
| 2 | Tim Goldsmith | 3,194,232 | 1.20 | Annual Report FY2026 |
| 3 | Netwealth Investments Ltd (platform/nominee) | 2,615,674 | 0.98 | Simply Wall St |
| 4 | Glenn Corrie | 1,863,873 | 0.70 | Annual Report FY2026 |
| 5 | Geoffrey Richard Pocock | 1,787,340 | 0.67 | Simply Wall St |
| 6 | Adrian McTiernan | 1,616,129 | 0.61 | Simply Wall St |
| 7 | Mark Edwards | 1,353,276 | 0.51 | Simply Wall St |
| 8 | Purusha Holdings Pty Ltd | 1,163,906 | 0.44 | Simply Wall St |
| 9 | Robert Webb | 1,149,951 | 0.43 | Simply Wall St |
| 10 | CVCV Pty Ltd | 1,096,774 | 0.41 | Simply Wall St |
Competitive Landscape
Key Competitors
| Competitor | Country | Technology | Status / positioning vs Hazer |
|---|---|---|---|
Monolith | US | Plasma methane pyrolysis producing carbon black + hydrogen | Most advanced commercial-scale pyrolysis operator (Nebraska); carbon black focus; private |
BASF | Germany | Methane pyrolysis (moving-bed, electrically heated) | Pilot plant at Ludwigshafen; corporate R&D, not a licensor competitor today |
Ekona Power | Canada | Pulsed methane pyrolysis | Private; named by CB Insights as a Hazer competitor |
Hycamite | Finland | Catalytic methane decomposition producing hydrogen and carbon | Private; European competitor with graphite-type carbon focus |
C-Zero | US | Molten-salt methane pyrolysis | Private; venture-backed |
Modern Hydrogen | US | Distributed methane pyrolysis | Private |
Graforce | Germany | Plasma-based pyrolysis | Private |
Levidian (LOOP) | UK | Microwave plasma methane cracking producing graphene | Private |
Aurora Hydrogen | Canada | Microwave-based pyrolysis | Private |
Molten Industries | US | Methane pyrolysis for hydrogen and graphite | Private |
Competitors by Segment
| Category | Representative players | Competitive dynamic |
|---|---|---|
SMR/ATR with carbon capture (blue hydrogen) licensors | Topsoe, Johnson Matthey, Air Liquide, Air Products, KBR (own ATR/ammonia tech) | Mature, bankable; requires CO2 storage; Hazer avoids CCS |
Electrolyser manufacturers (green hydrogen) | ITM Power, Nel, Plug Power, thyssenkrupp nucera, Siemens Energy | Need large renewable power; sector has faced cost and scale setbacks (management cites this as a tailwind for Hazer) |
Natural/synthetic graphite producers (non-China) | Syrah Resources, Novonix, Talga Group, Renascor Resources | Hazer graphite is a by-product, potentially low marginal cost, but volumes are tied to hydrogen plant deployment |
Chinese synthetic graphite | Multiple | China dominates battery graphite supply chains; Western supply-security policy supports alternatives |
Peer Comparison FY2026
| Attribute | Hazer Group | Monolith | Hycamite | Ekona Power |
|---|---|---|---|---|
Ownership | ASX-listed | Private | Private | Private |
Latest revenue | A$3.3m reported FY2026 (A$0.02m customer) | — | — | — |
Growth | −61% reported FY2026 | — | — | — |
Margins | Loss-making | — | — | — |
R&D intensity | R&D-led (consulting/research 65% of reported revenue) | — | — | — |
Carbon product | Synthetic graphite | Carbon black | Graphitic carbon | Solid carbon |
Catalyst / energy | Iron ore; thermal | Plasma; electric | Catalytic | Pulsed; thermal |
Licensing partner | KBR (exclusive) | Own plants | — | — |
“—” = not publicly disclosed.
Recent Developments
--



