Company ProfilePremium

Hitachi Energy India Limited (formerly ABB Power Products and Systems India Limited)

Company Profile Analysis

Tickers: POWERINDIA.NS, 543187.BO

ESOMAR 23 Corporate BadgeISO Certifications Badge
Hitachi Energy India Limited - Company showcase

Year Founded & Workforce

2019

Hitachi Energy India Limited logo

Hitachi Energy India Limited Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

Hitachi Energy India Limited Overview

Hitachi Energy India Limited is the listed Indian arm of Hitachi Energy, the world's largest grid-technology franchise (≈USD 20 billion revenue, 56,000+ employees in 60 countries per the parent's boilerplate). Demerged from ABB India in 2019, the company designs, manufactures and services the high-voltage backbone of India's power system: HVDC converter stations, power and traction transformers, gas- and air-insulated switchgear, FACTS and power-quality systems, substation automation, protection and SCADA, plus lifecycle services. It sits at the epicentre of India's transmission super-cycle, with Hitachi technology in more than half of India's commissioned HVDC links and a share of both 6 GW HVDC corridors awarded in 2024-25 (Khavda–Nagpur and Bhadla–Fatehpur). FY2026 revenue grew 27.6% to INR 8,147.7 crore, PAT rose 157% to INR 987.8 crore, and the order backlog reached INR 32,222.1 crore by June 2026—roughly four years of revenue. The stock trades at a premium (~117–121x trailing earnings) reflecting this visibility.


What the company does

Hitachi Energy India provides products, systems, software and services across the electricity value chain, with a centre of gravity in transmission. Its portfolio, as described in its own disclosures and parent-company product architecture, spans: (i) grid integration—HVDC (line-commutated and voltage-source converter technologies), FACTS (SVC, STATCOM), power-quality equipment, grid connections and turnkey substations; (ii) high-voltage products—gas-insulated switchgear (GIS), live/dead-tank circuit breakers, disconnectors, instrument transformers, surge arresters, generator circuit breakers; (iii) transformers—large power transformers up to 765 kV and above, converter transformers, traction transformers, dry-type and distribution transformers, bushings (including RIP bushings), insulation and components; (iv) grid automation—substation automation, protection and control relays, SCADA/energy management, communication networks, cybersecurity and asset-management software; and (v) service—installation and commissioning, maintenance and lifecycle agreements, retrofit, refurbishment and upgrades. In Q1 FY2027 it added battery energy storage systems (BESS) to its booked portfolio with a first 165 MW / 330 MWh order (PR, 7 Aug 2026).

Company's own description (paraphrased from BRSR FY2025-26 and exchange profiles): the company serves a diverse customer base across utilities, industrial sectors, transportation and data centres, supplying engineering, products, solutions and services in power technology, with an extensive manufacturing base, a countrywide marketing and service presence, and a growing role in global markets through exports. Exports contributed 26.19% of turnover in FY2025-26 (BRSR FY2025-26, filed 31 Jul 2026).

Business model and revenue model

Revenue model elementEvidenceCharacterisation
Long-cycle projects (HVDC, substations, grid connections)HVDC orders dominate Q3 FY2025 (Khavda–Nagpur) and Q1 FY2026 (Bhadla–Fatehpur) intakeLumpy, milestone-based; advances fund working capital
Short/medium-cycle products (transformers, HV products, relays)Bulk PGCIL order for 30 x 765 kV 500 MVA single-phase transformers (Q1 FY2026)Capacity-constrained; pricing power in current cycle
ServicesService share of orders: 11% ex-HVDC (Q3 FY2025); 23.9% (Q4 FY2026); 4.3% of Q3 FY2026 order bookGrowing annuity; higher margin; includes SCADA upgrades, AMCs, retrofit
Software/licensingSCADA integration, asset management platforms (parent IP)Embedded in automation orders; not separately disclosed
Exports (to Hitachi Energy group and third parties)26.19% of FY2026 turnover; shareholder approval for related-party sales with Hitachi Energy Sweden up to INR 2,000 crore in FY2026Captive channel into group global projects

HEIL is a project-plus-product engineering business with a growing service annuity. Revenue is recognised over time on large engineered projects (HVDC, substations, FACTS) and at a point in time on standard products (transformers, breakers, relays). Mix disclosures are partial:

A product vs. service vs. subscription revenue split is not publicly disclosed.

Value-chain position

HEIL is an OEM and technology integrator positioned between raw-material/component suppliers (copper, CRGO electrical steel, insulating oil/pressboard, semiconductors for valves and relays) and asset owners (central and state transmission utilities, private TBCB developers, renewable developers, railways/metros, data-centre operators and heavy industry). It is vertically integrated into select critical components (bushings, transformer insulation/pressboard at Mysuru and Halol) and draws core IP (HVDC valves, control and protection, relay platforms) from the global Hitachi Energy organisation.

Customer types and end-markets

End-marketRepresentative customers / projects (public)Notes
Transmission utilities (central)Power Grid Corporation of India (Khavda–Nagpur HVDC via Khavda V-A Power Transmission Ltd; 765 kV transformers)Largest segment by order book (Q1 FY2026 PR)
Private transmission (TBCB)Adani Energy Solutions (Bhadla–Fatehpur HVDC via Rajasthan Part I Power Transmission Ltd; Mumbai Aarey–Kudus VSC HVDC)Private developers increasingly dominant
State utilities / discomsSCADA upgrades, bay extensions, substation automationService-heavy
RenewablesLargest SCADA integration order for an RE developer (Q3 FY2026); grid connectionsLinked to 500 GW (2030) and 900 GW (FY2036) targets
Data centresLeading order contributor in Q4 FY2026 and Q1 FY2027Fastest-emerging segment
Rail & metroTraction transformers; second-largest contributor in Q1 & Q4 FY2026Electrification of transport
IndustryPower quality, transformers, servicesCement, metals, chemicals, oil & gas
Energy storageFirst BESS order, 165 MW/330 MWh, Andhra Pradesh (Q1 FY2027)New
ExportsEurope, North America, APAC, South Asia, Africa33.6% of Q1 FY2027 orders ex-HVDC

Independent characterisation

Analytically, HEIL is best understood as India's highest-technology grid OEM with a near-duopoly in HVDC, attached to a parent that is capacity-constrained globally and therefore uses India both as a domestic growth engine and as an export manufacturing hub. The investment case has shifted since FY2024 from "margin recovery" to "backlog conversion": the order backlog quadrupled from INR 7,229.5 crore (Mar 2024) to INR 32,222.1 crore (Jun 2026), and the question is no longer demand but execution capacity, margin mix (lower-margin HVDC vs. higher-margin products/services) and competitive intensity (Chinese-linked entrants permitted from mid-2026).

Strategy

Stated strategy themes (paraphrased from FY2026 and Q1 FY2027 communications)

  1. Pre-empting the electricity-era surge: management says it laid out a long-term strategy across all businesses ahead of the demand surge from energy transition and energy security (PR, 7 Aug 2026).

  2. Operational efficiency and execution excellence: repeated emphasis on efficiency "across all spheres" and on-time project implementation, exemplified by the Mumbai HVDC infeed (PR, 25 May 2026).

  3. Capacity expansion under 'Make in India': cumulative INR 4,000 crore capex; 20th factory at Karjan; Tamil Nadu expansion.

  4. Growth segment focus: renewables, HVDC, data centres, electrification of transport, BESS, smart grids and EV infrastructure (PRs Jul 2024, Aug 2026).

  5. Exports as a structural pillar: export share of orders 25–37% ex-HVDC; India as a hub for the parent's global supply.

  6. Sustainability: 2030 goals aligned with the parent's carbon-neutral-operations ambition; EconiQ SF6-free portfolio.

  7. Policy advocacy: management calls for a level-playing-field procurement policy for domestic and global players (PR, 7 Aug 2026)—a pointed reference to Chinese-linked entrants.

Strategic initiatives (last 24 months)

DateInitiativeScope / targetStatus
7 Oct 2024INR 2,000 crore capex programmeExpand power transformer, traction transformer and component capacityUnder execution
Nov 2024 – Jun 2025HVDC mega-project wins with BHELKhavda–Nagpur and Bhadla–Fatehpur, ±800 kV/6 GW each; completion FY2029–30EExecution
Jan–Mar 2025Fundraise up to INR 4,200 crore authorised; ~INR 2,520 crore QIP completedFund capex and working capitalProceeds being deployed
2,025World-first 765/400 kV 250 MVA natural-ester transformerSustainability/technology leadershipTested
Oct/Nov 2025Mysuru insulation plant expansion (INR 30 crore)Double capacity; ultra-low-carbon pressboard; by mid-2027Under execution
Q2 FY2026First EconiQ (SF6-free) order in IndiaLaunch of eco-efficient HV portfolio locallyBooked
25 May 2026Additional INR 2,000 crore capex (cumulative INR 4,000 crore)Includes greenfield Karjan LPT plantApproved
Jun 2026Karjan LPT plant construction startCompletion FY2028; HVDC, AI data centre, industrial applicationsUnder construction
7 Jul 2026Tamil Nadu MoU, INR 1,000 croreEngineering, R&D, digital and manufacturing; ~1,000 roles over 3–5 yearsSigned
Q1 FY2027Entry into BESS165 MW/330 MWh project, Andhra PradeshBooked

Cost programmes

No formal cost-reduction programme with quantified targets has been announced.

Medium-term financial targets / guidance

The company does not publish numerical revenue or margin guidance. Qualitative signals: management targets continued double-digit Operational EBITDA margin and conversion of the record backlog into revenue (Oct 2026 analyst call digest, ScanX); management expects a decision on the next 6 GW (Barmer) HVDC project within roughly 3–6 months (same source; unconfirmed). Sell-side (HDFC Securities, May 2026) maintains an ADD rating while describing strong performance as "priced in" (paraphrased).

Products & Services

Note: HEIL sells the global Hitachi Energy portfolio; it does not disclose product-level revenue, launch dates or pricing. "Launch/latest version year" refers to India milestones where public; otherwise "not publicly disclosed". Pricing is project/tender-based for all lines.

Grid Integration

Product / solutionDescription & key capabilitiesTarget customerIndia milestone / flagshipPricing model
HVDC Classic (LCC)Line-commutated converter stations up to ±800 kV/6,000 MW; scope includes converter transformers, thyristor valves, AC/DC control & protection, auxiliariesPower Grid, TBCB developersKhavda–Nagpur (awarded Nov 2024) and Bhadla–Fatehpur (booked Q1 FY2026), both ±800 kV/6 GW with BHEL; Raigarh–Pugalur (2020)Turnkey EPC, milestone billing
HVDC Light (VSC)Voltage-source converter HVDC for city infeed, offshore and weak-grid applicationsUrban utilities, offshore windMumbai Aarey–Kudus ±320 kV/1,000 MW—India's first HVDC city-centre infeed, commissioned Q4 FY2026Turnkey EPC
HVDC refurbishment & control upgradesReplacement of control & protection on legacy linksPower GridHVDC control system refurbishment orders (Q4 FY2026)Project
FACTS (SVC, STATCOM, series compensation)Dynamic reactive power and voltage supportTransmission utilities, RE parksGrid connection and power-quality orders recurrent across FY2025–FY2027Project
Power quality (capacitors, filters, air-core reactors)Harmonic filtering and reactive compensationIndustry, utilities, exportsAir-core reactor for an HVDC project (Q2 FY2026); export orders to Europe/N. America (Q1 FY2027)Product/project
Grid connections & substationsTurnkey AIS/GIS substations, RE grid connections, 765/400 kV grid interfacesRE developers, data centres765/400 kV grid connections within HVDC scopesEPC
Battery energy storage (BESS)Integrated storage systems with power conversion and controlUtilities, RE developersFirst order: 165 MW / 330 MWh, Andhra Pradesh (Q1 FY2027)Project

High Voltage Products

ProductDescriptionTarget customerFlagship / notesPricing
Gas-insulated switchgear (GIS)Compact switchgear up to 765 kV class; EconiQ SF6-free variantsUrban substations, data centresFirst EconiQ (SF6-free) order in India (Q2 FY2026)Product/tender
Air-insulated substation (AIS) equipmentLive-tank/dead-tank circuit breakersUtilitiesAIS & GIS extensions booked as service orders (Q2 FY2026)Product
DisconnectorsHV isolation switchesUtilities, exportsDisconnector supply in Q4 FY2026 order bookProduct
Instrument transformersCurrent/voltage transformers for metering & protectionUtilities—Product
Surge arrestersOvervoltage protectionUtilities, rail—Product
Generator circuit breakersProtection for generator step-upPower generationGlobal portfolio; India availability not separately disclosedProduct

Transformers

ProductDescriptionTarget customerFlagship / notesPricing
Large power transformersUp to 765 kV and above; single-phase banksPower Grid, state transcos, REBulk order for 30 x 765 kV, 500 MVA single-phase units from Power Grid (Q1 FY2026); new Karjan LPT plant (completion FY2028)Tender
Natural-ester filled transformersBiodegradable-fluid EHV transformersUtilities with sustainability mandatesDeveloped and tested a world-first 765/400 kV, 250 MVA natural-ester transformer (2025)Tender
HVDC converter transformersSpecialised units for LCC stationsHVDC projectsIncluded in Khavda and Bhadla scopesProject
Traction transformersOn-board transformers for locomotives/EMUsIndian Railways, metro OEMsCapacity expansion under the Oct 2024 capexProduct
Dry-type & distribution transformersIndoor/urban, data centre and industrial distributionData centres, industry, metrosDry distribution transformer factory in GujaratProduct
Bushings (incl. RIP)Resin-impregnated paper bushings up to 400 kVTransformer OEMs (internal & external)India's first RIP bushing factory, Vadodara (May 2022)Product
Transformer insulation & componentsPressboard and insulation materialsInternal and third-party transformer makers, exportsMysuru expansion (INR 30 crore) to double capacity with ultra-low-carbon pressboard, by mid-2027; Halol componentsProduct

Grid Automation

ProductDescriptionTarget customerFlagship / notesPricing
Substation automation systems (SAS)IEC 61850-based automation and controlUtilitiesSAS extension packages (Q3 FY2026)Project
Protection & control relaysNumerical protection IEDs (Relion family globally)Utilities, industry—Product
SCADA / network managementControl-centre SCADA/EMS, RE plant SCADAState utilities, RE developersLargest-ever SCADA integration order for an RE developer (Q3 FY2026)Project + licence
Communication networksUtility-grade telecom (e.g., FOX platform globally)Utilities, rail—Product
CybersecurityOT security for grid assetsUtilitiesParent publishes product cybersecurity advisoriesService/licence
Asset & work management softwareAPM/EAM (Lumada portfolio globally)Utilities, industryNot separately disclosed in IndiaLicence/subscription

Service

OfferingDescriptionEvidence
Install & commissionBay extension, switchyard commissioningQ1 FY2027 service orders
Maintenance / AMCsAnnual maintenance contractsQ1 FY2026 service orders
Upgrade, repair & extendSCADA upgrades, HVDC control refurbishment, GIS/AIS extensions, repair & retrofitQ2–Q4 FY2026 PRs
Lifecycle servicesLong-term service agreements for utilities, data centres, transmission and industryQ4 FY2026 PR
EconiQ consulting / decarbonisationSF6-free migrationQ2 FY2026 first EconiQ order

Financial Narrative

Income statement (INR crore)

Sources: FY2024–FY2025 – AR FY2025 Board's Report (revenue 6,384.93/5,237.49; PBT 516.39/221.70; PAT 383.98/163.78; EPS 90.36/38.64). FY2026 – PR 25 May 2026 (revenue 8,147.7; PAT 987.8 per NiftyTrader summary of filing); total income 8,387.63 and EBITDA from AnandRathi data; FY2026 PBT is the sum of reported quarterly PBT (176.9 + 352.9 + 347.8 + 443.4). FY2023 – AR FY2024 (total income 4,483.65; EPS 22.16). FY2022 – PR 27 May 2022 and Moneycontrol summary. Diluted = basic (no ESOPs or convertibles; Secretarial Audit Report FY2025). DPS: FY2023 INR 3.40 (PR 24 May 2023), FY2024 INR 4.00 (AR FY2024), FY2026 INR 8.00 (PR 25 May 2026); FY2025 INR 6.00 and FY2022 INR 3.00 derived from dividend cash payments in the following year (ROIC.ai payment series; FY2025 equity dividend paid INR 16.95 crore = INR 4 x 4.24 crore shares reconciles). Discrepancy: one aggregator (TradingView/SmartWay note) cites a FY2025 dividend of INR 10 and revenue of INR 5,215 crore; these conflict with the AR and are disregarded.

Gross profit and operating income (12-month years only)

Source: StockAnalysis (S&P-derived) standardised statements; gross profit = revenue − cost of materials. Aggregator classifications; not company-reported line items.

Margins and growth

Revenue CAGR (FY2023→FY2026, 3 years, comparable 12-month periods): 22.2% (derived). PAT CAGR over the same period: ~119% (derived; consistent with Fyers' reported 3-year profit CAGR of 119%).

Company-defined Operational EBITDA margin (quarterly, % of revenue from operations):

Sources: quarterly PRs and Arihant/NiftyTrader summaries. Discrepancy: Investing.com's Q1 FY2027 call summary cites a year-ago margin of 11.5% vs. 11.1% in the Q2 FY2026 coverage. Operational EBITDA excludes forex/commodity timing differences (Q1 FY2027: loss of INR 36.37 crore) and depreciation.

Quarterly trajectory (last five quarters, INR crore)

Sources: quarterly PRs (7 Aug 2026, 25 May 2026, 4 Nov 2025, 30 Jul 2025, Feb 2026). Discrepancy note: Q1–Q3 FY2026 press releases headline "revenue" that equals total income (Q1 INR 1,529.8 crore; Q2 INR 1,915.2 crore; Q3 INR 2,168.0 crore). Revenue from operations for Q1 (INR 1,478.9 crore, per Q1 FY2027 PR) and Q3 (INR 2,082.2 crore, per HDFC Securities) are reported; Q2 is derived as the FY2026 residual. Q3 orders derived (see §4.3).

Orders and backlog (annual)

Sources: PRs 24 May 2023; AR FY2024 and AR FY2025 Board's Reports; PR 25 May 2026.

Balance sheet (INR crore, 31 March)

Sources: StockAnalysis balance sheet (INR mn converted); total assets derived as the sum of listed asset lines; total debt derived as cash minus reported net cash; equity derived as reported book value per share (Bajaj Broking/aggregators: 267.07, 286.63, 320.72, 944.87, 1,160.53) x shares outstanding, and cross-checked by roll-forward (FY2025: 1,359 + 384 PAT − 17 dividend + ~2,490 net QIP ≈ 4,216; FY2026: 4,211 + 988 − 27 ≈ 5,172). The company states it has no debt securities and only short-term bank borrowings (AR FY2025); the residual "debt" is predominantly lease liabilities. Short-/long-term debt split and working capital (current liabilities) are not publicly available in the sources reviewed; current ratio of 1.72x is reported by Upstox (TTM, May 2026).

Cash flow (INR crore)

Source: StockAnalysis cash-flow statement (FY2022 column appears to be a 12-month Apr 2021–Mar 2022 recast); capex derived as OCF − FCF; dividends derived from DPS x shares and AR FY2025 appropriation (16.95/14.41). Discrepancy: MarketScreener reports FY2026 operating cash flow rising to INR 17.5bn from INR 16.5bn, which conflicts with StockAnalysis (INR 12.4bn vs. 14.9bn); the audited cash-flow statement in AR FY2025-26 should be treated as authoritative.

Ratios

All derived. FY2022 ratios on a 15-month base. ROE on average equity: FY2024 12.7%, FY2025 13.8%, FY2026 21.1%. ROCE for FY2026 reported at 24.84% (InCred Money); ROIC not publicly disclosed.

Commentary on trends, inflections and drivers

Revenue. After a flat-to-down FY2023 (on a comparable basis, +14% vs. the trailing twelve months per the company, but below the 15-month FY2022 absolute), revenue compounded at 17%, 22% and 28% in FY2024–FY2026. The acceleration is backlog-driven: the backlog stood at only ~1.4 years of revenue in March 2024 but ~3.6 years in March 2026. Q4 FY2026 revenue of INR 2,754.1 crore (+46.2% YoY) and Q1 FY2027 revenue of INR 2,493.7 crore (+68.6% YoY) show conversion is now accelerating as HVDC milestones begin to bill.

Profitability inflection. The decisive inflection came in Q2 FY2026, when PBT nearly quintupled (INR 352.9 crore vs. INR 70.6 crore) and Operational EBITDA margin reached 15.2%. Management attributes the improvement to execution of good-margin orders (many priced in the 2023-24 up-cycle), product mix, export momentum and operating leverage on a largely fixed manufacturing base. Gross margin expanded ~520 bps from FY2024 to FY2026 (34.3% → 39.5%) while operating margin expanded ~910 bps—evidence of both pricing and leverage. Q4 FY2026 margin was dampened by a higher share of lower-margin HVDC revenue and a forex loss of ~INR 31.5 crore (HDFC Securities).

Other income as a profit driver. Interest income on QIP proceeds and customer advances lifted other income to INR 239.9 crore in FY2026 (~18% of PBT), versus INR 9.3 crore in FY2024. This is a quality-of-earnings consideration: as capex draws down the cash pile (INR 4,000 crore programme), this tailwind will fade.

Balance sheet transformation. The March 2025 QIP (~INR 2,520 crore) plus large HVDC advances turned a small net-debt position into net cash of INR 4,603 crore by March 2026 (~38% of total assets). The company remained unutilised on QIP proceeds through FY2025 (AR FY2025) and is now deploying them into the Karjan LPT plant and other expansions.

Cash flow. FY2025 OCF (INR 1,494 crore) was inflated by HVDC advances (the Business Standard Q3 FY2025 report explicitly credits advances from the HVDC project for the solid cash position). FY2026 OCF of INR 1,245 crore still exceeded PAT, but FCF halved as capex quadrupled to ~INR 509 crore. Receivable days remain elevated (~150 days), typical of utility/EPC businesses.

Returns. ROE recovered to ~19% on closing equity in FY2026 despite the heavily diluted equity base post-QIP and the large idle cash balance; ex-cash returns on operating capital are materially higher.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Revenue by Segment and Segment Margins & Growth (%)

MetricFY2022FY2023FY2024FY2025FY2026

Segment revenue from operations (INR Cr)

4,883.04,468.55,237.56,384.98,147.7

Segment PBT (INR Cr)

276.0130.0221.7516.41,321.0

Segment PBT margin (%)

5.72.94.28.116.2

YoY revenue growth (%)

0017.221.927.6

Contribution to total revenue (%)

100100100100100

Order Intake by Quarter

QuarterOrder intake (INR Cr)Lead segment(s) per PRExports % of ordersService % of orders

Q2 FY2025

1,952.0

HV products, grid integration

22.012

Q3 FY2025

11,594.3

Khavda–Nagpur HVDC; transmission

40 (ex-HVDC)

11 (ex-HVDC)

Q1 FY2026

11,339.2

Bhadla–Fatehpur HVDC; transmission, rail & metro, data centres

24.7 (ex-HVDC)

n.d. (service orders +91% YoY)

Q2 FY2026

2,217.1

Utilities, industries; HVDC-related reactors

—

n.d. (service orders +35% YoY)

Q3 FY2026

~2477 (derived)

Transmission; SCADA

—

4.3 (of order book)

Q4 FY2026

2,422.5

Data centres, rail & metro

36.823.9

Q1 FY2027

5,096.5

HVDC (European wind evacuation), data centres, industries, renewables

33.6 (ex-HVDC)

—

Income Statement and Per-Share Data

MetricFY2022FY2023FY2024FY2025FY2026

Revenue from operations (INR Cr)

4,883.04,468.55,237.56,384.98,147.7

Other income (INR Cr)

67.915.19.357.2239.9

Total income (INR Cr)

4,950.94,483.75,246.86,442.18,387.6

EBITDA incl. other income (INR Cr)

377.6251.1358.3653.01,438.0

Profit before tax (INR Cr)

276.0130.0221.7516.41,321.0

Tax expense (INR Cr)

73.036.057.9132.4333.2

Net income / PAT (INR Cr)

203.493.9163.8384.0987.8

EPS basic (INR)

47.9922.1638.6490.36221.63

EPS diluted (INR)

47.9922.1638.6490.36221.63

Dividend per share (INR)

3.03.44.06.08.0

Income Statement and Margin Analysis (%)

MetricFY2023FY2024FY2025FY2026

Gross profit (INR Cr)

1,569.01,795.82,366.53,216.7

Operating income ex-other income (INR Cr)

183.3259.3505.11,149.2

Depreciation & amortisation (INR Cr)

79.689.590.9104.3

Gross margin (%)

35.134.337.139.5

Operating margin (%)

4.15.07.914.1

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Margin Analysis (%)

MetricFY2022FY2023FY2024FY2025FY2026

EBITDA margin on revenue (%)

7.75.66.810.217.6

PBT margin (%)

5.72.94.28.116.2

Net margin (%)

4.22.13.16.012.1

Effective tax rate (%)

26.427.726.125.625.2

Revenue growth YoY (%)

0017.221.927.6

PAT growth YoY (%)

0074.4134.4157.2

Margin Analysis (%) (Quarterly)

MetricQ2FY2025Q4FY2025Q1FY2026Q2FY2026Q4FY2026Q1FY2027

Operational EBITDA margin (%)

8.112.511.115.216.416.0

Income Statement

MetricQ1FY2026Q2FY2026Q3FY2026Q4FY2026Q1FY2027

Revenue from operations (INR Cr)

1,478.91,832.52,082.22,754.12,493.7

PBT (INR Cr)

176.9352.9347.8443.4389.5

PAT (INR Cr)

131.6264.4261.4330.5294.2

Order intake (INR Cr)

11,339.22,217.12,477.72,422.55,096.5

Order backlog, period end (INR Cr)

29,125.329,412.629,872.229,555.332,222.1

Income Statement and Financial Ratios (x)

MetricFY2022FY2023FY2024FY2025FY2026

Order intake (INR Cr)

06,817.25,536.318,173.818,456.5

Closing order backlog (INR Cr)

4,672.37,071.07,229.519,246.029,555.3

Book-to-bill (x)

01.531.062.852.27

Backlog / revenue (years)

0.961.581.383.013.63

Balance Sheet

MetricFY2022FY2023FY2024FY2025FY2026

Total assets (INR Cr, derived)

3,521.73,915.04,704.38,586.012,012.2

Cash & equivalents (INR Cr)

85.9163.2128.03,806.64,689.2

Total debt incl. leases (INR Cr, derived)

190.0334.3213.688.586.1

Net debt (INR Cr; negative = net cash)

104.1171.185.6-3,718.1-4,603.1

Shareholders' equity (INR Cr, derived)

1,131.91,214.71,359.24,211.45,172.5

Goodwill & intangibles (INR Cr)

33.432.932.432.932.9

Trade receivables (INR Cr)

1,549.91,722.32,306.82,463.83,355.4

Inventories (INR Cr)

707.3817.9887.9925.71,485.0

Total current assets (INR Cr)

2,681.33,071.93,828.87,581.010,357.9

Property, plant & equipment (INR Cr)

737.5729.1725.1749.4976.2

Cash Flow

MetricFY2022FY2023FY2024FY2025FY2026

Operating cash flow (INR Cr)

-101.45.4252.31,493.81,244.8

Capital expenditure (INR Cr)

133.911.989.3128.2509.2

Free cash flow (INR Cr)

-235.3-6.6163.01,365.6735.6

Dividends paid (INR Cr)

8.512.714.417.026.7

Share buybacks (INR Cr)

00000

Equity raised (INR Cr)

0002,520.00

Returns & Leverage Ratios (%) and Financial Ratios (x)

MetricFY2022FY2023FY2024FY2025FY2026

ROE on closing equity (%)

18.07.712.19.119.1

ROA on closing assets (%)

5.82.43.54.58.2

Debt / equity (x)

0.170.280.160.020.02

Net debt / EBITDA (x)

0.280.680.24-5.69-3.20

Interest coverage (x)

7.74.35.812.5104.2

Asset turnover on closing assets (x)

1.391.141.110.740.68

Receivable days on revenue

116141161141150

Inventory days on revenue

5367625367

Region Overview

RegionFY2026

Exports share of turnover (%)

26.19

Domestic (India) share of turnover (%)

73.81

Exports revenue, approx. (INR Cr, derived)

2,133.9

Domestic revenue, approx. (INR Cr, derived)

6,013.8

Export Share of Orders by Quarter

QuarterExport share of ordersDestinations named by company

Q2 FY2025

22%

Europe, Africa (HV products, grid integration)

Q3 FY2025

40% ex-HVDC

Australia, Indonesia, Canada, Croatia, Azerbaijan

Q1 FY2026

24.7% ex-HVDC

Not specified

Q4 FY2026

36.8%

US, Europe, APAC

Q1 FY2027

33.6% ex-HVDC

Europe, North America, South Asia (grid integration, power quality); large European wind evacuation (HVDC) order

Share Price History

DatePrice (INR)Event

30 Mar 2020

714

All-time low post-listing

28 Jan 2025

8,738

52-week low

13 Mar 2025

~11,503 (implied)

QIP allotment

12 Aug 2025

21,785

Record high (then)

3 Dec 2025

22,837

Record high (then)

16 Jan 2026

16,104

52-week low

1 Jun 2026

38,800

All-time high

3 Jul 2026

~30,500–30,900

China-tender exemption sell-off

7 Aug 2026

32,600

Q1 FY2027 results

28 Sep 2026

30,525

−8.5% over one month

1 Oct 2026

31,290

Latest full reference (market cap ~INR 1.39 lakh crore)

Valuation Snapshot

MultipleValueBasis

P/E (TTM)

~117–121x

InCred Money (116.8x at INR 31,290); INDmoney (121.2x); derived TTM EPS ~INR 258

P/B

~26x

AnandRathi (17 Sep 2026)

EV/EBITDA (FY2026)

~93x

Derived: EV ~INR 1,34,400 crore / EBITDA INR 1,438 crore

EV/Sales (TTM)

~14.7x

Derived: TTM revenue ~INR 9,162 crore

Dividend yield

~0.03%

Aggregators

Per-Share Data and Returns & Leverage Ratios (%)

MetricFY2022FY2023FY2024FY2025FY2026

Dividend per share (INR)

3.03.44.06.08.0

Payout ratio (%)

6.315.310.46.63.6

Analyst Conclusions

Management guidance

No numerical guidance. Qualitative: continued double-digit Operational EBITDA margin, conversion of the record backlog, momentum in data centres, BESS, smart grids and renewables, and a decision on the Barmer 6 GW HVDC within roughly 3–6 months (Oct 2026 commentary; unconfirmed).

Consensus expectations

A formal consensus is not publicly verified. Backlog arithmetic suggests revenue can grow 20–30% annually through FY2028 if execution holds (analyst inference: backlog ≈ 3.5x trailing revenue).

Bull case

  1. Backlog conversion plus operating leverage: INR 32,222 crore backlog and 16% Operational EBITDA margin could compound EPS well above revenue as HVDC milestones bill and fixed costs are absorbed.

  2. New HVDC and adjacent wins: Barmer 6 GW, further VSC schemes, the European wind evacuation win, and a first BESS order widen the runway.

  3. Capacity ahead of competitors: INR 4,000 crore capex funded from net cash positions HEIL to capture transformer demand from FY2028.

Bear case

  1. Valuation leaves no margin of safety: at ~120x TTM earnings and ~93x EBITDA, any slippage in execution or orders could trigger sharp de-rating (−21% from the June high already).

  2. Competitive erosion: China-linked entrants target the most profitable product lines; even a limited exemption may cap pricing in tenders.

  3. Earnings mix headwinds: rising HVDC revenue share and falling treasury income as cash funds capex could compress PBT margins from the FY2026 peak of 16.2%.

Catalysts and monitorables (next 12 months)

CatalystExpected timing
Q2 FY2027 results (date not yet announced)Likely early Nov 2026
Barmer 6 GW HVDC award~Q4 FY2027 per management commentary (unconfirmed)
Progress on Khavda–Nagpur and Bhadla–Fatehpur milestonesOngoing
Implementation outcome of China-linked bidder exemption in tendersOngoing (2-year window)
Karjan LPT plant construction progressThrough FY2028
Data-centre and BESS order flowQuarterly
FY2027 annual results and dividendMay 2027

Analyst verdict

Hitachi Energy India has completed a transformation few Indian industrials can match: in three years it moved from a 2% net-margin, backlog-light equipment supplier to a 12% net-margin, net-cash business holding roughly four years of revenue in firm orders. The drivers are structural rather than cyclical—India's need to wire 900 GW of non-fossil capacity into the grid, a global shortage of transformers and HVDC capacity that the parent is channelling partly through India, and new demand pools in data centres, rail and storage. Execution so far has been credible: margins inflected in Q2 FY2026 and have held at around 16% despite a heavier HVDC mix, and the Mumbai VSC infeed was delivered on schedule.

The investment debate, however, is now almost entirely about price and durability. At roughly 120x trailing earnings and over 90x EBITDA, the market is already capitalising several years of backlog conversion and margin stability. Three cracks deserve close monitoring. First, competition: the June 2026 exemption for four China-linked OEMs is limited in scope and time, but it signals that procurement policy can shift, and it targets precisely the GIS and transformer lines where pricing power is highest. Second, earnings quality: almost a fifth of FY2026 pre-tax profit came from other income, which will fade as the INR 4,000 crore capex consumes cash. Third, concentration: two mega-HVDC projects with a single consortium partner dominate the backlog, so any execution issue would be visible in both revenue and cash flow.

On balance, HEIL is a high-quality, strategically indispensable franchise whose fundamentals justify a premium. At current levels the risk-reward is balanced rather than compelling; investors should track margin resilience as HVDC billing ramps, the Barmer award, tender outcomes involving Chinese bidders, and conversion of advances into free cash flow.


End of dossier. All data as of 18 October 2026.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Executive Leadership Team

NameTitleTenurePrior roles / educationLatest compensation

N. Venu (Nuguri Venu)

Managing Director & CEO

MD since 2 Dec 2019; reappointed for 5 years from 2 Dec 2022 (to Dec 2027)

Long ABB India career in power grids (details per AR)

FY2025: ~INR 11.81 crore; FY2024: ~INR 7.87 crore (Simply Wall St from AR)

Ajay Singh

Chief Financial Officer

CFO since demerger era

27+ years at ABB; Division CFO, Power Grids India; also Region Finance Director, South Asia; started at High Tech Electronics, Kolkata (1992); Associate, ICMAI; PG diploma in Systems Management

—

Poovanna Ammatanda (A. C. Poovanna)

General Counsel & Company Secretary, Compliance Officer

Since listing era

Legal/secretarial

—

“—” = not publicly disclosed.

Board of Directors

NameRoleCategorySinceBackground

Ismo Antero Haka

Chairman

Non-Executive, Non-Independent (promoter nominee)

Director ~2021; Chairman from 20 Aug 2025

Former CFO of Hitachi Energy; earlier ABB CFO roles (Power Grids, Power Products division, North America/USA, Process Automation); MSc Economics, Hanken School of Economics, Finland

N. Venu

MD & CEO

Executive

2019

See above

Jan Niklas Persson

Director

Non-Executive, Non-Independent

20 Aug 2025 (shareholder approval via postal ballot)

EVP, Grid Integration Business, Hitachi Energy (since 2019); boards of several power-industry companies

Akila Krishnakumar

Director

Independent

~2019/2020; second term from 2025

Technology/business leader (details per AR)

Mukesh Butani

Director

Independent

~2019/2020; second term from 2025

Tax and regulatory lawyer (details per AR)

Meena Ganesh

Director

Independent

24 May 2023 – 23 May 2028

Entrepreneur; chairs board committees per Aug 2025 reconstitution

Board & Management Changes

DateChangeContext

24 May 2023

Meena Ganesh appointed Independent Director

Board refresh

20 Aug 2025

Achim Michael Braun (Head of HR, Hitachi Energy) resigned as Chairman and director; Ismo Haka appointed Chairman

Parent-level leadership rotation; Haka's finance background aligns with capex/QIP deployment phase

20 Aug 2025

Jan Niklas Persson appointed Additional Director

Brings Grid Integration (HVDC) global leadership onto the board as HVDC becomes the largest backlog component

2025

Akila Krishnakumar and Mukesh Butani reappointed for second terms

Continuity

Shareholding Trend

Holder categoryMar 2026Jun 2026Source

Promoter – Hitachi Energy Ltd (%)

71.3171.31

MarketsMojo; AnandRathi

FIIs (%)

11.688.93

MarketsMojo (681 FIIs, Mar 2026); AnandRathi (Jun 2026)

Mutual funds (%)

4.33—

MarketsMojo (41 schemes)

Total DIIs (%)

—6.33

AnandRathi

Individual / retail (%)

8.258.25

MarketsMojo; AnandRathi

Competitive Landscape

Competitors by Segment

SegmentNamed competitors

HVDC (LCC/VSC)

GE Vernova T&D India (won Khavda–South Olpad ±500 kV VSC for Adani), Siemens Energy India, BHEL (consortium partner and potential competitor)

Power transformers (EHV/765 kV)

GE Vernova T&D India, Siemens Energy India, CG Power & Industrial Solutions, BHEL, Transformers & Rectifiers (India) Ltd (TARIL), Toshiba T&D India (unlisted), TBEA Energy (India) (China-linked), Atlanta Electricals

GIS / HV switchgear

GE Vernova T&D India, Siemens Energy India, Taikai Electric (India) (China-linked; GIS shells for 400/765 kV), Nanjing Electric India, New Northeast Electric India

Grid automation / SCADA

Siemens, GE Vernova, Schneider Electric Infrastructure, ABB India (distribution automation)

Traction transformers

CG Power, BHEL, Siemens

Power quality / FACTS

GE Vernova, Siemens Energy, ABB India (LV/MV)

BESS

Domestic integrators and global OEMs (fragmented)

Peer Comparison FY2026

CompanyFY revenue (INR Cr)Revenue growth (%)EBITDA margin (%)PAT (INR Cr)PAT margin (%)Backlog (INR Cr)

Hitachi Energy India (FY2026)

8,147.727.617.6987.812.1

29,555 (Mar 26); 32,222 (Jun 26)

GE Vernova T&D India (FY2026)

~6,210

~45

~27

~1,233

~19.9

~21,460 (Mar 26)

CG Power & Industrial Solutions

———

~1,206

——

Company Snapshot

$940.8M

Revenue

2019

Founded

Bengaluru, India

Headquarters

SWOT Analysis

Strengths

  • Record visibility: backlog INR 32,222.1 crore (Jun 2026) ≈ 3.5x trailing revenue (PR, 7 Aug 2026).
  • Margin inflection proven: Operational EBITDA margin 16.0–16.4% in Q4 FY2026–Q1 FY2027 vs 8.1% in Q2 FY2025.
  • Net cash INR 4,603 crore and D/E of 0.02 at Mar 2026 (StockAnalysis; derived).
  • HVDC leadership: Hitachi tech in >50% of India's HVDC links; part of both 6 GW TBCB HVDC awards (2024-25).
  • Export engine: 26.19% of FY2026 turnover; 33.6–36.8% of recent quarterly orders.
  • Execution credentials: India's first HVDC city-centre infeed (Mumbai) commissioned on schedule (PR, May 2026).

Weaknesses

  • Margin gap vs peer: FY2026 EBITDA margin ~17.6% vs ~27% at GE Vernova T&D India.
  • Earnings quality: other income INR 239.9 crore ≈ 18% of FY2026 PBT, largely interest on cash that will be spent on capex.
  • Working-capital intensity: receivable days ~150 (FY2026, derived).
  • Low transparency: single-segment reporting; no R&D or product-line disclosure.
  • FCF compression: FY2026 FCF INR 736 crore vs INR 1,366 crore in FY2025 as capex rose to ~INR 509 crore.
  • Dependence on parent IP and RPTs: shareholder approval needed for up to INR 2,000 crore of transactions with Hitachi Energy Sweden in FY2026 alone.

Opportunities

  • Barmer 6 GW HVDC and further corridors to integrate 900 GW non-fossil capacity by FY2036.
  • Data centres: leading order segment in Q4 FY2026 and Q1 FY2027.
  • BESS: first 165 MW/330 MWh order opens a new product line.
  • Capacity: Karjan LPT plant (FY2028) and Tamil Nadu expansion to relieve bottlenecks.
  • SF6-free and natural-ester products as utilities adopt sustainability specifications.
  • Service annuity: service orders reached 23.9% of Q4 FY2026 intake.

Threats

  • Chinese competition: four China-linked firms permitted to bid (Jun/Jul 2026); stock fell up to ~9.6% intraday on 3 Jul 2026.
  • Valuation risk: P/E ~117–121x TTM (Oct 2026); stock fell ~21% from its 1 Jun 2026 high to late Sep.
  • HVDC execution risk on two concurrent ±800 kV projects with FY2029–30 completion.
  • Input-cost and FX volatility: INR ~31.5 crore forex loss in Q4 FY2026; INR 36.37 crore forex/commodity timing loss in Q1 FY2027.
  • Geopolitics: management cites supply-chain disruption and crude-price pressure (PR, May 2026).
  • Parent capacity elsewhere could redirect export volumes over time.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
14 May 2025FY2025 results: revenue INR 6,384.9 crore (+21.9%), PAT INR 384.0 crore (+134%), orders INR 18,173.8 crore, backlog INR 19,246 croreConfirmed backlog step-change post Khavda HVDC
14 May 2025Stock hits record INR 16,981 (48% above QIP price within two months)Re-rating begins
Q1 FY2026Bhadla–Fatehpur ±800 kV HVDC booked (Adani SPV, with BHEL)Second 6 GW HVDC in backlog
Q1 FY2026Power Grid bulk order: 30 x 765 kV 500 MVA single-phase transformersValidates EHV transformer franchise
Mid-2025World-first 765/400 kV natural-ester transformer testedTechnology leadership
30 Jul 2025Q1 FY2026: orders INR 11,339.2 crore (+365%), backlog INR 29,125.3 crore; PAT INR 131.6 croreRecord backlog
12 Aug 2025Stock record high INR 21,784.80Momentum
20 Aug 2025AGM (Bengaluru); Haka named Chairman; Persson joins board; auditor reappointedGovernance continuity
30 Sep 2025Stock falls ~7% to INR 17,904 on heavy volumeVolatility
Oct–Nov 2025Mysuru insulation plant expansion (INR 30 crore)Component self-sufficiency
3–4 Nov 2025Q2 FY2026: revenue +23.3%, PBT +400%, PAT INR 264.4 crore, Op EBITDA margin 15.2%; first EconiQ order in IndiaMargin inflection
11 Nov 2025Stock up 32% in 10 sessions to record INR 22,054.65Re-rating on margins
3 Dec 202552-week/all-time high (at the time) INR 22,837.45Peak before correction
Jan 2026Ministry of Power seeks exemption for China-linked firms with Indian factories to bid on critical power projectsEarly warning of competitive risk
16 Jan 202652-week low INR 16,104 (~−29% from Dec high)Sector de-rating
5 Feb 2026Q3 FY2026: revenue INR 2,082 crore (ops) / INR 2,168 crore (total income), PAT +90% to INR 261.4 crore; largest-ever SCADA integration order for an RE developerSustained growth
Q4 FY2026India's first HVDC city-centre infeed commissioned in MumbaiExecution credential
25 May 2026FY2026 results: revenue INR 8,147.7 crore (+27.6%), PAT INR 987.8 crore (+157%), backlog INR 29,555.3 crore; dividend INR 8; additional INR 2,000 crore capexRecord year
26–27 May 2026Earnings call; HDFC Securities maintains ADD, says strong performance is priced in (paraphrased)Valuation debate
1 Jun 2026All-time high INR 38,800Peak valuation (~INR 1.73 lakh crore market cap, derived)
12 Jun 2026Formal announcement of ~INR 2,000 crore Karjan LPT factory; completion FY2028Capacity
Jun 2026Construction begins on 20th manufacturing unitExecution of capex
24 Jun / 3 Jul 2026Ministry of Finance two-year exemption for TBEA Energy, Nanjing Electric India, New Northeast Electric India and Taikai Electric (India) to bid on critical power tenders; HEIL falls up to ~9.6% intraday on 3 JulCompetitive-intensity shock
6 Jul 2026Nomura calls sector sell-off an overreaction (does not cover HEIL); stock rebounds ~4%Partial recovery
7 Jul 2026Tamil Nadu MoU, INR 1,000 croreExpansion
31 Jul 2026Integrated Annual Report and BRSR FY2025-26 filed; exports 26.19% of turnoverDisclosure
7 Aug 2026Q1 FY2027: revenue +68.6% to INR 2,493.7 crore, PAT +123.5% to INR 294.2 crore, orders INR 5,096.5 crore, backlog INR 32,222.1 crore; first BESS order; insider-trading code amendedStrong start to FY2027
18 Aug 2026Stock at INR 35,275 (~INR 1.57 lakh crore market cap)Post-results rally
24 Aug 2026S&S Power Switchgear unit wins >INR 8 crore order from HEILSupply-chain localisation
15 Sep 2026Parent Hitachi Energy announces new transformer facility in Gallman, Mississippi (USA)Global capacity race; could moderate export pull over time
27 Sep 2026FY2026 dividend (INR 8) payableShareholder return
28 Sep 2026Stock down 8.5% over one month to ~INR 30,525 vs. BSE Capital Goods −5.3%Sector correction
Oct 2026Analyst call recording uploaded; management flags Barmer 6 GW HVDC decision in ~3–6 months and double-digit margin focus; SEBI Reg. 74(5) certificate for Sep 2026 quarter filedPipeline signal

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

4 charts
Revenue by Segment: Segment revenue from operations rose from INR 48,830 Mn in FY2022 to INR 81,477 Mn in FY2026.
Hitachi Energy India Limited — Revenue by Segment
Series (INR Mn)FY2022FY2023FY2024FY2025FY2026
Segment revenue from operations48,83044,68552,37563,84981,477
Segment PBT2,7601,3002,2175,16413,210

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.