Hot Chili Limited Overview
Hot Chili Limited is a Perth-headquartered, ASX/TSXV dual-listed developer whose value is concentrated in a single, large, low-altitude copper-gold hub in Chile's coastal Atacama: Costa Fuego. The hub consolidates the Cortadera, Productora, Alice and San Antonio deposits. A March 2025 NI 43-101/JORC Pre-Feasibility Study outlines a 20-year operation producing about 116 ktpa copper-equivalent over 14 primary years, for US$1.27 billion start-up capital and a US$1.2 billion post-tax NPV8 at US$4.30/lb copper. Two features differentiate the company from most junior peers. The first is a rapidly growing third porphyry discovery, La Verde, which has been drilled but sits outside the PFS. The second is a controlling 80% interest in Huasco Water, holder of the only granted maritime seawater concession in the Huasco Valley. Glencore is a cornerstone shareholder and prospective offtaker. OR Royalties holds royalties purchased for US$30 million in total. Management describes Costa Fuego as one of roughly five independent copper developments globally capable of exceeding 100 ktpa CuEq.
What the company does. Hot Chili explores, evaluates and seeks to develop copper-gold-molybdenum-silver porphyry deposits in Chile's coastal range. It also develops water infrastructure, through its Huasco Water subsidiary, to supply its own mine and potentially third-party industrial and agricultural users. It has no producing operations. The ASX Listing Rule 5.3.2 statement in the June 2026 quarterly confirms there was no substantive mining production or development activity.
Business model. The current model is to create value through the development pipeline:
-
convert drilled mineralisation into Mineral Resources and Reserves;
-
de-risk through engineering studies (PEA → PFS → revised PFS → DFS) and permitting (EIA);
-
monetise through some combination of strategic partnering, royalty and stream sales, offtake pre-sales, project debt, equity, or outright sale.
The June 2026 quarterly cautionary statement explicitly lists these options: "debt financing, a sale or partial sale of its interest in the Costa Fuego Copper Project and/or Huasco Water, sale of further royalties and/or streaming rights, sale of non-committed offtake rights, and sale of non-core assets."
Revenue model (prospective).
Value-chain position. Hot Chili is upstream: mine development, with planned processing to concentrate and cathode. Through Huasco Water it is also a prospective utility-style midstream infrastructure owner (seawater intake, pumping and a 64 km pipeline).
Customer types and end-markets (prospective). Customers would be smelters, refiners and traders (Glencore being the identified counterparty), plus regional miners and agriculture for water. Copper end-markets are electrical grids, construction, transport and EVs, renewable generation, and data-centre infrastructure.
Company's own description. The company describes itself as a developer "focused on advancing large-scale copper and water assets." It describes Costa Fuego as "an advanced development asset projected to produce 116kt per annum of copper equivalent over 14 years of primary production." It describes Huasco Water as holding "the only granted maritime concession for seawater extraction and treatment in the Huasco Valley" (company description as reproduced on financialfilings.com). In the June 2026 quarterly it frames the current year as a transition "from an exploration-focused company to a project development and delivery organisation."
Independent characterisation. Hot Chili is best understood as a single-jurisdiction, single-hub copper development option with three distinct value layers:
-
A permitted-in-part, PFS-stage base case (Cortadera/Productora/Alice/San Antonio).
-
An unbudgeted growth layer (La Verde), which management expects to reshape the mine plan by providing a higher-grade, near-surface starter pit.
-
An infrastructure layer (Huasco Water) whose strategic value depends on a second maritime concession that has now been in process for about five years.
The investment case therefore rests less on near-term cash flow than on three things: resource conversion at La Verde, the revised PFS (PFS2), EIA lodgement, and whether the BMO-run partnering process crystallises a transaction that funds or validates the roughly US$1.27 billion capital requirement.
Strategy
Stated strategic themes (FY2026 Annual Report summary, quarterlies and presentations):
-
"Integrate La Verde" — convert La Verde to a maiden MRE and embed it in an "enhanced and upscaled" Costa Fuego as a higher-grade, near-surface starter pit.
-
"From explorer to developer" — establish a project delivery organisation under a single governance framework.
-
"Permit in parallel" — split permitting into EIA 1A (Huasco Water, targeted late 2026) and EIA 1B (Costa Fuego, targeted Q2 CY2027).
-
"Water as a strategic asset" — use Huasco Water both to de-risk Costa Fuego and as a potential standalone multi-user utility, with value crystallisation through the partnering process.
-
"Partner, don't go it alone" — run an asset-level strategic partnering process, with BMO Capital Markets as adviser, for Costa Fuego and/or Huasco Water.
-
"Non-dilutive funding first" — royalties (OR, US$30M total), offtake (Glencore) and asset-level funding to minimise equity dilution.
Strategic initiative register (last 24 months)
Management medium-term targets.
-
La Verde maiden MRE: late 2026, with management aspiring to about 500 Mt.
-
PFS2 thereafter: management expects NPV to move toward about US$2B, post-tax IRR toward the mid-30s %, and payback to shorten from about 4.5 to about 2.5 years. These are management expectations, not study outputs.
-
EIA 1B: Q2 CY2027.
-
Final Investment Decision: targeted 2029.
-
First production: guided for 2031.
This guidance implies slippage relative to earlier messaging. The 2025 PFS announcement targeted "first production before the end of the decade," and older material referenced feasibility in early 2025 and production in 2027.
Products & Services
Hot Chili sells no products today. The "portfolio" is its development assets and the products they are designed to yield.
5.1 Costa Fuego Copper-Gold Project (flagship). Source: PFS, 27 Mar 2025; NI 43-101 Technical Report, 9 May 2025.
Mineral Resource and Reserve.
More than 99% of the PFS production schedule is drawn from Indicated material.
5.2 La Verde Copper-Gold Porphyry (growth asset; pre-resource).
5.3 Huasco Water (water infrastructure; 80% Hot Chili). Source: Huasco Water PFS, 31 Mar 2025.
5.4 Regional exploration and option portfolio. This comprises Domeyko (Porfiada Sur, CF Sur and Cazurro concessions), Cordillera, El Fuego and San Antonio, Cometa, and multiple untested porphyry targets. The July 2026 presentation references a "Tricolor Exploration Target." Approximate landholding at 30 Jun 2026 by project: Cortadera ~19,377 ha; Productora ~17,276 ha; Domeyko ~17,855 ha; San Antonio ~3,725 ha; Cordillera ~776 ha.
Product Portfolio
| Parameter | Value |
|---|---|
Location | Coastal range, Atacama Region, Chile; average elevation ~740 m; ~60 km from port; Pan-American Highway and grid access |
Deposits in PFS | Cortadera, Productora, Alice, San Antonio |
Mine life | 20 years (14 years of primary production) |
Average production | ~116 ktpa CuEq over primary years; ~95 ktpa Cu and ~48 koz/yr Au over the first 14 years |
LOM copper | ~3.3 billion lb |
Process routes | Sulphide flotation concentrator; oxide heap leach; low-grade sulphide leach (seawater-based processing) |
Start-up capex | US$1.27B; capital intensity US$14,079/t of average annual CuEq |
Expansion capex | ~US$1.3B |
Post-tax NPV8 | US$1.2B (range US$786M–1.62B) |
Post-tax IRR | 19% (range 15–22%) |
Payback | ~4.5 years |
LOM post-tax free cash flow | ~US$3.86B |
Price deck | Cu US$4.30/lb; Au US$2,280/oz; Mo US$20/lb; Ag US$25/oz (study deck); reserves use Ag US$27/oz |
Spot sensitivity | At US$5.30/lb Cu (spot, 26 Mar 2025): NPV8 US$2.2B, IRR 30%. Each +US$0.10/lb adds ~US$100M of NPV. |
Total funding requirement | ~US$1.27B including pre-production, working capital and financing charges (company cautionary statement) |
Study author | Wood Australia Pty Ltd, with independent QPs |
| Category | Tonnes | Grade | Effective date |
|---|---|---|---|
Indicated Resource (100% basis, incl. reserve) | 798 Mt | 0.45% CuEq | 26 Feb 2024 |
Inferred Resource | 203 Mt | 0.31% CuEq | 26 Feb 2024 |
Contained metal (Indicated, approx.) | 2.9 Mt Cu; 2.6 Moz Au; 12.9 Moz Ag; 68 kt Mo | — | Stockhead reporting of company data |
Mineral (Ore) Reserve | 502 Mt | 0.37% Cu; 0.10 g/t Au; 0.49 g/t Ag; 97 ppm Mo | 27 Mar 2025 |
| Attribute | Detail |
|---|---|
Location | ~30–35 km south of the planned Costa Fuego hub, within the Domeyko district |
Tenure | Option with SLM Los Dominiceros. Payments: US$320K paid at grant; US$680K within 12 months; US$1.0M within 24 months (scheduled by 25 Oct 2026); exercise payment US$6.89M by 25 Oct 2027. Total ~US$8.89M. |
Discovery footprint | Initial geophysical target ~1.4 km × 1.2 km; mineralisation drilled to ~800 m depth (FY2026 report) |
Best intercepts | DKD039: 725 m @ 0.42% CuEq from 18 m. DKD044: 391 m @ 0.51% CuEq from surface. DKD060: 472 m @ 0.41% CuEq from 49 m, including 105.8 m @ 0.70% CuEq. DKP053: 250 m @ 0.50% CuEq from 64 m. DKP058: 182 m @ 0.50% CuEq from 24 m. |
CuEq basis | Cu US$4.50/lb, Au US$3,150/oz; Cortadera recoveries used as proxy (83% Cu, 56% Au) |
Status | Three rigs (a fourth arriving per Aug 2026 interview); second ISO laboratory added; maiden MRE targeted late 2026 |
Management aspiration | Maiden resource of ~500 Mt (MD interview, Aug 2026). This is a management expectation, not a JORC estimate. |
Royalty | Now covered by an OR Royalties NSR (Jul 2026 A&R agreement) |
| Stage | Scope | Capex | Post-tax NPV8 | IRR | Payback | Status |
|---|---|---|---|---|---|---|
Stage 1 | 500 L/s untreated seawater to Costa Fuego via 64 km pipeline; 20-year MOU offtake | US$151M | US$122M | 19% | 4.5 yrs | Concession granted; land access, easements and grid connection secured; EIA 1A targeted late 2026 |
Stage 2 | Expansion to 1,300 L/s of desalinated water for multiple users | ~US$1.4B | US$977M | 19% | ~4 yrs | Requires second maritime licence (application lodged 12 Apr 2024; delayed by change of government) |
Stage 3 | Conceptual expansion to 2,300 L/s of desalinated water | — | — | — | — | Conceptual study only |
“—” = not publicly disclosed.
Financial Narrative
Sources: FY2021–FY2025 figures from EOD Historical Data via Kalkine and TipRanks (the TipRanks columns are mislabelled "Dec" but reconcile to June year-ends by cash balance). FY2026 figures from the FY2026 Annual Report summary (Quartr, 29 Sep 2026) and the June 2026 Appendix 5B. All figures A$ millions, fiscal years ending 30 June.
6.1 Income statement
Notes:
-
The FY2025 EBITDA (-9.07) and EPS (-0.05) are aggregator TTM values (labelled CAD by Kalkine, but they match the AUD financials).
-
Gross, operating, EBITDA and net margins are not meaningful because revenue is nil.
-
Revenue CAGR is not applicable.
6.2 Balance sheet
Notes:
-
FY2025 equity is derived as total assets less total liabilities.
-
FY2021 showed net debt of A$1.395M, linked to Cortadera acquisition obligations.
-
Debt-to-equity has been below 0.01 since the FY2022 balance sheet (lease liabilities only).
-
Simply Wall St reported total assets of A$245.06M, equity of A$241.5M and cash of A$19.03M at an interim date (approx. 31 Dec 2024).
-
Post-balance date: cash of approx. A$46M after the US$15M (A$21.4M) OR receipt in July 2026.
6.3 Cash flow
Notes:
-
FY2026 FCF is computed from the Appendix 5B: operating outflow plus tenement, PP&E and E&E investing outflows.
-
FY2024 investing inflow includes the US$15M Osisko royalty proceeds received on 24 Jul 2023.
-
FY2026 investing includes a A$1.292M CMP recoup.
6.4 Ratios
Notes:
-
Current ratios are TipRanks values mapped to fiscal years using cash and net-current-asset reconciliation; treat them as indicative.
-
ROE and ROA are computed using FY2025 net loss including NCI over FY2025 equity and total assets.
-
ROIC, net debt/EBITDA, interest coverage, asset turnover and cash conversion cycle are not meaningful for a pre-revenue, debt-free developer.
6.5 Commentary on trends, inflections and drivers
Hot Chili's financial profile is that of a capital-consuming developer. Accounting losses are modest (A$5–12M per year) because the bulk of expenditure is capitalised to exploration and evaluation assets under AASB 6. Capitalised E&E rose from A$235.8M to A$262.5M in FY2026. Economic burn is therefore better captured by free cash flow, which has run at A$20–55M per year.
The FY2022 peak (A$54.9M FCF outflow) reflected the final US$15M Cortadera acquisition payment and intensive resource drilling. FY2023–FY2024 burn of about A$20M per year funded PEA, PFS and EIA baseline work.
The FY2025 cash trough is the key inflection. Cash fell to A$5.2M at 30 Jun 2025, an uncomfortable liquidity position for a company of this asset size, coinciding with a share price low near A$0.40 in April 2025. It was resolved through three steps:
-
a A$14.1M entitlement offer in August 2025;
-
a A$40M placement in February 2026, priced roughly four times higher than the 2025 lows;
-
US$15M of non-dilutive royalty funding in July 2026.
FY2026 net loss improved to A$10.1M from A$11.1M despite a A$1.8M share-based payment charge. However, cash burn accelerated: Q2 CY2026 relevant outgoings were A$9.5M, implying roughly A$38M per year at a three-rig run-rate. On the A$46M post-OR balance this is a runway of approximately 4–5 quarters before the costs of PFS2, EIA lodgement, the US$6.89M La Verde exercise payment (due Oct 2027) and other option exercises. A further capital event, or a partnering transaction, is therefore a structural feature of the 12–18 month outlook.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Results by Segment
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Exploration & Evaluation segment revenue (AUD Mn) | 0 | 0 | 0 |
Total income incl. interest (AUD Mn) | — | 0.484 | 0.443 |
Consolidated net loss (AUD Mn) | -7.781 | -11.59 | -10.1 |
Entity / asset
| Entity / asset | Ownership | Content |
|---|---|---|
Sociedad Minera El Corazón SpA | 100% Hot Chili | Chilean holding company |
Sociedad Minera La Frontera SpA ("Frontera") | 100% via El Corazón | Cortadera, San Antonio (El Fuego option), Domeyko, La Verde option, Cordillera, and parts of Productora |
Sociedad Minera El Aguila SpA ("SMEA") | 80% Hot Chili / 20% CMP | Productora deposit (central processing hub site) |
HW Aguas para El Huasco SpA ("Huasco Water") | 80% Hot Chili / 20% CMP | Maritime seawater concession, coastal land access, pipeline easements, grid connection |
Asset Portfolio
| Asset | Role in development plan | Resource / status |
|---|---|---|
Cortadera | Largest deposit; open pit plus block cave in PFS. PFS2 is assessing a large open-pit alternative for later years. | Part of 798 Mt Indicated Costa Fuego MRE |
Productora (incl. Alice) | Open pit; site of planned central processing hub | 2016 JORC reserve; now within 2025 combined reserve |
San Antonio | Open pit satellite | Held under option; US$2.0M exercise payment due by 30 Sep 2026 (exercise status not confirmed at cut-off) |
La Verde | Third porphyry; potential higher-grade starter pit | Pre-resource; maiden MRE targeted late 2026 |
Huasco Water | Seawater supply (Stage 1) and desalination (Stages 2–3) | PFS complete; EIA 1A targeted late 2026 |
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue from operations (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Total other income incl. interest (AUD Mn) | — | — | — | 0.484 | 0.443 |
Net interest income (AUD Mn) | -2.408 | 0.123 | 0.227 | 0.428 | — |
EBITDA (AUD Mn) | — | — | — | -9.07 | — |
Net loss incl. NCI (AUD Mn) | -7.279 | -5.424 | -7.781 | -11.59 | — |
Net loss attributable to members (AUD Mn) | -7.147 | -5.225 | -7.569 | -11.138 | -10.1 |
Share-based payments expense (AUD Mn) | — | — | — | — | 1.8 |
Total expenses (AUD Mn) | — | — | — | — | 11.0 |
Basic EPS (AUD) | — | — | — | -0.05 | — |
Dividends per share (AUD) | 0 | 0 | 0 | 0 | 0 |
Balance Sheet
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Cash and equivalents (AUD Mn) | 23.722 | 2.949 | 33.742 | 5.189 | 24.948 |
Total assets (AUD Mn) | — | — | — | 244.8 | — |
Total liabilities (AUD Mn) | — | — | — | 5.17 | — |
Shareholders' equity (AUD Mn, derived) | — | — | — | 239.6 | — |
Capitalised exploration and evaluation (AUD Mn) | — | — | — | 235.8 | 262.5 |
Borrowings (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Net debt (AUD Mn; negative = net cash) | -23.722 | -2.949 | -33.742 | -5.189 | -24.948 |
Goodwill and intangibles (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | -6.01 | -5.25 | -5.45 | -6.97 | -8.549 |
Investing cash flow (AUD Mn) | -48.88 | -15.50 | 6.55 | -21.34 | -21.959 |
Financing cash flow (AUD Mn) | 75.48 | -0.147 | 29.37 | -0.195 | 50.417 |
Free cash flow (AUD Mn) | -54.89 | -20.75 | -20.19 | -30.97 | -31.80 |
E&E payments (AUD Mn) | — | — | — | — | 18.819 |
Tenement payments (AUD Mn) | — | — | — | — | 4.234 |
Equity raised, gross (AUD Mn) | — | — | — | — | 54.189 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Financial Ratios (x) and Returns & Leverage Ratios (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Current ratio (x) | 3.63 | 2.07 | 11.20 | — | — |
Debt to equity (x) | 0 | 0 | 0 | 0 | 0 |
ROE (%) | — | — | — | -4.8 | — |
ROA (%) | — | — | — | -4.7 | — |
Estimated quarters of funding at year end (Appendix 5B) | — | — | — | — | 2.64 |
Geographic Revenue
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Revenue Chile (AUD Mn) | 0 | 0 | 0 |
Revenue Australia (AUD Mn) | 0 | 0 | 0 |
Revenue Other (AUD Mn) | 0 | 0 | 0 |
Capital Markets Data (AUD) and Operating Metrics (shares)
| Metric | CY2024 | CY2025 | CY2026YTD |
|---|---|---|---|
Period start price (AUD) | — | 0.71 | 1.39 |
Period end / latest price (AUD) | 0.71 | 1.39 | 1.60 |
Period high (AUD) | — | 1.40 | 2.19 |
Period low (AUD) | — | 0.3975 | 1.16 |
Average daily volume (shares) | — | 356,725 | 649,759 |
Share Price and Margin Analysis (%)
| Metric | FY2026 | FY2027YTD |
|---|---|---|
Start price (AUD) | 0.585 | 1.98 |
End / latest price (AUD) | 1.99 | 1.60 |
Change (%) | 240.2 | -19.2 |
Capital Markets
| Measure | Value | Basis |
|---|---|---|
P/E | n/m | Loss-making |
EV/EBITDA | n/m | Negative EBITDA |
EV/Sales | n/m | No revenue |
P/B | ~1.35x | — |
Enterprise value | ~A$278M | Claude estimate: market cap ~A$324M less ~A$46M cash (post-OR) |
EV per tonne contained CuEq (resource) | ~A$66/t (~US$46/t) | Claude estimate: ~4.2 Mt CuEq total (Indicated 798 Mt × 0.45% plus Inferred 203 Mt × 0.31%), 100% basis, excluding La Verde |
Market cap / PFS NPV8 | ~0.19x | Claude estimate: A$324M versus US$1.2B (≈A$1.7B at the ~0.70 AUD/USD implied by OR conversion); before funding, minorities and execution risk |
Capital Markets — Dividend history
| Item | Status |
|---|---|
Dividend history | None ever paid; no dividend policy (pre-revenue) |
Credit ratings (Moody's / S&P / Fitch) | Not rated |
Debt maturity profile | No borrowings; no financing facilities (Appendix 5B section 7) |
Contingent cash commitments (option payments, US$) | ~US$1.1M due Oct–Nov 2026; ~US$6.99M in 2027; ~US$7.18M in 2028 |
Dilutive instruments | 1.21M options at A$2.145 (expire Aug 2028); 4.74M performance rights; 0.45M service rights |
Capital Markets Data and Returns & Leverage Ratios
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Net financing inflow (AUD Mn) | 75.48 | -0.147 | 29.37 | -0.195 | 50.417 |
Non-dilutive royalty proceeds (USD Mn) | 0 | 0 | 15 | 0 | 0 |
Analyst Conclusions
Consensus growth expectations. Not available. There is no verified sell-side consensus, and revenue is not expected before about 2031.
Bull case:
-
La Verde changes the project's shape. Near-surface intercepts such as 391 m @ 0.51% CuEq from surface and 182 m @ 0.50% CuEq from 24 m support a higher-grade starter pit. If management's targets hold (NPV toward ~US$2B, IRR mid-30s %, payback ~2.5 years), the current ~0.19x market cap/NPV ratio looks anomalous for a top-five independent copper development.
-
Strategic interest is tangible. Glencore equity and offtake, two OR royalty tranches (the second bought over a pre-resource asset), and multiple non-binding partnering proposals under due diligence point to a credible path to an asset-level transaction that crystallises value without a large rights issue.
-
Water is a hidden second business. Huasco Water's Stage 1 is effectively funded within the PFS. A second maritime licence would unlock a Stage 2 desalination business with an NPV8 of US$977M serving neighbouring majors in a water-scarce valley, a strategic chokepoint few peers possess.
Bear case:
-
Funding gap versus market capitalisation. US$1.27B of start-up capital against roughly US$225M of market cap, with Q2 CY2026 burn of about A$9.5M per quarter and roughly US$15M of option payments over 2026–2028, implies continued dilution or asset-level concessions (partner earn-ins, additional royalties and streams) that cap per-share upside.
-
Timelines keep slipping. "First production before end of decade" (Mar 2025) has become FID in 2029 and production in 2031 (Aug 2026). The second maritime licence has been pending about five years and was delayed again by the 2026 government change. EIA 1B is not targeted until Q2 2027.
-
Low grade, high sensitivity and an encumbered structure. A 0.37% Cu reserve grade, an NPV range as low as US$786M, a layered royalty stack (OR plus vendor NSRs), 20% CMP minorities in Productora and Huasco Water, and an ASX-requested retraction of in-situ valuation claims all argue for a valuation discount.
Catalysts and monitorables (next 12 months):
-
Payment of the La Verde US$1.0M option instalment (25 Oct 2026) and confirmation of the El Fuego/San Antonio exercise (due 30 Sep 2026).
-
September 2026 quarterly (29 Oct 2026): cash, burn and partnering update.
-
La Verde maiden MRE: tonnage versus the ~500 Mt aspiration, the Indicated proportion, and starter-pit grade.
-
EIA 1A (Huasco Water) lodgement in late 2026.
-
Decision on the second maritime licence.
-
Any binding partnering transaction (Costa Fuego and/or Huasco Water).
-
PFS2 timing and results, including the Cortadera open-pit versus block-cave choice.
-
Funding: a further equity raise, royalty or stream, or offtake prepayment.
-
Board refresh and remuneration outcomes at the 2026 AGM.
-
Copper and gold price trajectory versus the US$4.30/lb and US$2,280/oz PFS deck.
Analyst verdict. Hot Chili offers rare exposure to a large, low-altitude, coastal Chilean copper-gold development with an attached water infrastructure franchise. After a 240% share price gain in FY2026 and a roughly 20–25% pullback since July 2026, the company is priced at about A$324M against a PFS NPV8 of about US$1.2B (about A$1.7B). That roughly 0.2x market-to-NPV ratio is typical of PFS-stage developers with a billion-dollar-plus funding gap. The discount reflects real issues rather than neglect: low reserve grade, a five-year-old maritime licence application, minorities and royalties that leak value, a lengthening timeline (FID 2029, production 2031), and a disclosure episode in which ASX required the company to withdraw in-situ valuation claims.
What has changed is the balance sheet and the asset mix. Approximately A$46M of cash and no debt removes the near-term solvency overhang that defined mid-2025. La Verde's drilling, including multiple 100–700 m intercepts at 0.4–0.7% CuEq from or near surface, gives credible grounds to expect PFS2 to improve front-end grade and payback. OR's willingness to pay US$15M for a royalty over a pre-resource deposit is a meaningful third-party technical endorsement, and Glencore's equity and offtake provide marketing alignment.
The next six to nine months are therefore binary-leaning. A La Verde MRE that meaningfully approaches management's ~500 Mt aspiration with a demonstrable higher-grade starter zone, combined with a binding partnering transaction or the second maritime licence, would justify a material rerating toward the 0.3–0.5x NAV range more typical of de-risked developers. A smaller or lower-confidence MRE, further permitting slippage, or another dilutive raise at a discount would likely see the shares consolidate.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Background (public sources) |
|---|---|---|---|
Stuart James Mathews | Non-Executive Chairman | 12 May 2025 | Bought 200,000 shares on-market at A$1.26 on 18 Dec 2025. |
Christian Easterday | Managing Director & CEO; executive director | Founder (2008); has led the company since its 2010 listing | Geologist (MAIG); Competent Person for exploration results. Buys on-market regularly, most recently 20,958 shares at A$1.63 in Aug 2026. |
Roberto de Andraca Adriasola | Non-Executive Director | 5 Aug 2013 | Chilean business executive associated with the CAP group (CMP's parent). Bought 180,000 shares in Apr 2026. |
Fiona Van Maanen | Independent NED; Chair, Audit & Risk Committee | 17 Mar 2025 | 30+ years in mining finance and governance; NED of Westgold Resources, Wildcat Resources and Pantoro |
Executive Leadership Team
| Name | Role | Since | Notes |
|---|---|---|---|
Christian Easterday | MD & CEO | 2008 | Founder |
Ryan Finkelstein | Chief Financial Officer | 15 Jul 2024 | Succeeded interim CFO Deborah Le Moignan, who remained as Financial Controller |
Carol Marinkovich | Company Secretary | 1 Jul 2024 (initially interim) | 25+ years in mining company secretarial work |
David Bayona | Project Director, Costa Fuego | 2026 | Leads the new project development team covering EIA, PFS2, engineering and permitting |
Graham Farrell | Investor and Public Relations | — | — |
Major Shareholders
| Holder | Stake | Source / date |
|---|---|---|
Glencore (Glencore Australia Holdings Pty Ltd) | ~7.5% per MD (Aug 2026). The last substantial-holder notice shown was 11,235,497 shares (7.78% at the time). | Crux interview Aug 2026; InvestSMART |
Blue Spec entities (Blue Spec Mining Pty Ltd and Blue Spec Drilling Pty Ltd; Murray Black-associated) | Top-3 holder group. Historic combined stake ~5.3% (2024); a register line showed 6,441,716 shares (5.88% at the time) for Murray Edward Black. | Simply Wall St 2024; InvestSMART |
GS Group Australia Pty Ltd | Top-3 holder. 8,386,681 shares (5.53%) at 2024 register. | Simply Wall St |
CAP S.A. | ~1.3M shares (0.87% at 2024) | Simply Wall St |
David Field | ~2.3M shares (1.52% at 2024) | Simply Wall St |
Jaerica Pty Ltd | ~1.3M shares (0.85% at 2024) | Simply Wall St |
Inversiones Pimpolleda Limitada | Seller of 250,000 shares (Oct 2025 – Aug 2026) | Simply Wall St |
Institutions (aggregate) | 2.36% (4.79M shares) | Simply Wall St, Sep 2026 |
Individual insiders (aggregate) | 5.93% (12.02M shares) | Simply Wall St, Sep 2026 |
Top 25 holders (aggregate) | 27.92% | Simply Wall St, Sep 2026 |
Competitive Landscape
Key Competitors
| Peer | Project / jurisdiction | Relevance |
|---|---|---|
Los Andes Copper | Vizcachitas, Chile | Large Chilean porphyry developer competing for capital |
Marimaca Copper | Marimaca oxide, Antofagasta coast, Chile | Coastal Chilean developer; lower-capex oxide model |
SolGold | Cascabel/Alpala, Ecuador | Large-scale copper-gold porphyry developer; check current ownership status |
Western Copper and Gold | Casino, Canada | Large Cu-Au-Mo porphyry developer |
Arizona Sonoran Copper | Cactus, USA | Mid-scale developer |
Aldebaran Resources | Altar, Argentina | Large porphyry with major-miner earn-in (Nuton/Rio Tinto, 2024) |
Faraday Copper | Copper Creek, USA | Developer competing for capital |
Northern Dynasty Minerals | Pebble, USA | Large Cu-Au developer (permitting-challenged) |
Capstone Copper (producer) | Santo Domingo development, Atacama, Chile | Nearby Atacama developer; competes for the infrastructure corridor |
Teck / Newmont NuevaUnión (major JV) | Huasco Valley, Chile | Major project in the same valley; potential Huasco Water customer and competitor for permits |
Peer Comparison FY2026
| Metric | Hot Chili | Marimaca Copper |
|---|---|---|
Revenue | Nil (pre-revenue) | Nil |
Study stage | PFS (2025); PFS2 underway | — |
Elevation advantage | ~740 m | Coastal |