Icon Energy Limited

Company Profile Analysis

Ticker: ICN.AX

ESOMAR 23 Corporate BadgeISO Certifications Badge
Icon Energy Limited - Company showcase

Year Founded & Workforce

1993

Icon Energy Limited logo

Icon Energy Limited Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

Icon Energy Limited Overview

Icon Energy is a micro-capitalisation, pre-revenue Queensland gas explorer whose value depends almost entirely on one tenure: ATP 855 (about 1,671 km²) in the Nappamerri Trough of the Cooper-Eromanga Basin, now the subject of Petroleum Lease application PL-1144. A joint venture drilled the permit between 2012 and 2016 with Beach Energy and Chevron, spending roughly A$165 million. It established a very large unconventional (shale, tight and basin-centred) gas resource and, in 2014, a conventional gas resource in naturally fractured, fault-associated reservoirs that the company calls the Keppel Gasfield. Icon has dropped the unconventional play and now targets non-fracked conventional development. It has no revenue, negative equity of A$4.5m, a A$4.9m well-restoration liability, and depends on funding from its founder-chairman. Its ASX listing lapsed in January 2026. Value therefore rests on a binary regulatory outcome: grant of PL-1144 under Queensland's one-off Lake Eyre Basin transition window.


Company's own description (AR25, paraphrased). During FY2025 the principal activity was securing renewal of Authority to Prospect (ATP) 855 and advancing the application for Petroleum Lease PL-1144 over the whole ATP 855 area. No field operations were undertaken. The company's stated overall strategy is to move responsibly from explorer to gas producer. It describes the Keppel conventional gas resource as able to support Australia's 2050 emissions-transition pathway and help offset the forecast east-coast gas shortfall.

Business model. Icon is a single-asset upstream gas explorer. It has no product, service, subscription or licensing revenue. Its intended model is upstream gas production from PL-1144 and sale into the eastern Australian gas market, either directly or through a farm-in partner. AR25 says the company will pursue farm-in opportunities and strategic partnerships to fund development and reduce funding risk.

Revenue mix.

Value-chain position. Upstream exploration and appraisal, at the earliest point of the gas value chain. Icon holds no midstream, processing or marketing assets. The Cooper Basin's Moomba processing hub and the South West Queensland pipeline network (owned and operated by third parties) would be the natural route to market. Icon has not disclosed any processing or transport arrangements.

Customer types and end-markets. None contracted today. No extension beyond 30 June 2018 was found. Target end-markets are east-coast domestic gas buyers (industrial users, retailers, gas-fired generators) and indirectly the Gladstone LNG export complex. HY22 notes that management had identified "several eastern states markets" for ATP 855 gas.

Independent characterisation. Icon is best described as a dormant-to-reactivating option on a single Queensland gas tenure, wrapped in a distressed corporate shell. The asset has real technical substance: six JV wells encountered gas, and Halifax-1 achieved what was then the highest shale-gas flow rate recorded in the Cooper Basin, 4.5 MMscf/d (PESA, 2017). The corporate vehicle, however, has:

  • negative net assets of A$4.51m;

  • a working-capital deficit of A$4.06m;

  • a material-uncertainty going-concern opinion in every year reviewed (FY2021–FY2025);

  • a three-person board;

  • no remunerated executives;

  • reliance on its founder for loans, equity and premises.

The business is not an operating company in any conventional sense. It is a regulatory-tenure play with a contingent rehabilitation liability roughly 3.8 times its total assets.

Strategy

Stated strategy themes (AR25, paraphrased).

  1. Secure the ATP 855 renewal and grant of PL-1144 over the whole permit area.

  2. Carry out the Initial Development Plan in stages once the PL is granted: 3D seismic, then initial wells, aiming for production within two years.

  3. Focus only on conventional gas in naturally fractured Keppel reservoirs; no hydraulic fracturing.

  4. Seek farm-in partners and strategic partnerships to fund development and reduce funding risk.

  5. Keep corporate costs to a minimum, with the board running operations directly and external providers engaged as needed.

  6. Seek ASX reinstatement once ATP 855 uncertainty is resolved. This was overtaken by removal from the list on 12 Jan 2026.

  7. Overall aim: move from explorer to gas producer.

Initiatives in the last 24 months (Oct 2024 – Oct 2026).

Medium-term financial targets and guidance. None issued. No production, revenue, capex or cost guidance has been published. The only quantified plan elements are the IDP well counts and timing.

Products & Services

Icon has no commercial products or services. Its "portfolio" is its petroleum tenure. Below is every asset held in the last five years and its status.

PL-1144 Initial Development Plan (the "flagship offering").

Technical track record. The JV encountered petroleum in all six wells it drilled, and five flowed gas to surface. Halifax-1 reached 4.5 MMscf/d from a shale-gas zone (PESA, Apr 2017). PESA separately says Beach drilled seven wells, so the well count differs between sources. On exit, Beach described a dry gas prospect with high CO2, high pressure and high temperature, which makes the subsurface technically challenging.

Product Portfolio

AssetBasin / locationAreaInterestTarget / descriptionStatus (latest)Source

ATP 855 / PL-1144 (Keppel Gas Project)

Cooper-Eromanga, Nappamerri Trough, SW Queensland at the SA border

1,671 km² (AR25); 1,679 km² in earlier filings

100%, operator

Conventional gas in naturally fractured, fault-associated reservoirs (Keppel Gasfield, identified 2014). The unconventional resource behind PCAs 172–179 will not be pursued and no fracking is planned

Renewal under assessment and treated as valid (s 83 P&G Act). PL-1144 applied 30 Aug 2024; Notice of Proposed Grant 6 Feb 2025; further information requested 8 Aug 2025. Grant not confirmed in any public source located

AR25; HY25

PCAs 172–179 (within ATP 855)

As above

Part of ATP 855

100%

Eight Potential Commercial Areas declared over the unconventional tight, shale and basin-centred gas resource

Notified as expired 1 Nov 2022; unconventional development abandoned

AR23; AR25

ATP 594

Cooper-Eromanga, eastern flank, Queensland

1,230 km²

100%, operator

Oil

Expired 16 Apr 2021. Environmental Authority surrender application ruled invalid (11 Aug 2023); a valid surrender still outstanding at 30 Jun 2025

HY22; AR25 Note 19

PEP 170

Gippsland, Victoria

804 km²

100%

Conventional gas

Surrendered (consent Aug 2022)

HY22; AR23

PEP 172

Gippsland, Victoria

1,312 km²

100% (pending grant)

Gas

Renewal offer declined (FY2023)

HY22; AR23

PEP 173

Gippsland, Victoria

1,220 km²

100% (pending grant)

Gas

Renewal offer declined (FY2023)

HY22; AR23

PRLs 35, 37, 38, 41, 43, 44, 45, 48, 49 (formerly PEL 218, post-Permian)

Cooper-Eromanga, South Australia

857 km²

33.33% (operator Beach Energy)

Oil

Icon withdrew after the other JV parties withdrew; notice served 23 Aug 2022

HY22; AR23

ElementDetailSource

Resource target

Conventional gas in fractured formations, Keppel Gasfield

AR25

Drilling

2 wells in year 1, then 4 wells a year in years 2–5 (HY25). AR25 also describes 4 wells a year over the initial 5-year term; the filings differ slightly

HY25; AR25

Seismic

3D seismic over the entire PL to map faults and fracture halos

AR25

Production timing

Target first gas within 2 years of PL grant

AR25

Lease term

Up to 30 years, renewable for further terms of up to 30 years

HY25

Hydraulic fracturing

None planned

AR25; HY25

Estimated development cost

A$34.75m (cost of developing ATP 855, as reported in the QSC judgment summary)

QSC

Historical sunk JV spend

About A$165m by Icon and JV partners

Ashurst commentary on QSC

Resource volumes

Contingent or prospective resource volumes not disclosed in the sources reviewed

—

Pricing model

Not disclosed (no gas sales agreement)

—

Financial Narrative

Income statement

Notes: - FY2021 expense lines, EBIT and EBITDA are from unaudited UA21, which reported a net loss of A$5,271.4k and EPS of -0.88c. The audited net loss of A$6,919.3k is shown above; the A$1,647.9k gap is unexplained in the sources reviewed but matches UA21's disclosed JV asset balance. FY2021 EPS of -1.16c is computed from the audited loss over 597.6m shares.

  • FY2021 impairment = A$4,159.6k exploration impairment plus A$153.8k inventory write-down.

  • FY2023 write-off = full derecognition of the ATP 855 exploration asset after the permit expired.

  • FY2024 finance costs include A$208.8k unwinding of the restoration-provision discount.

  • FY2025 opex is net of a A$19.0k favourable restoration-provision movement.

  • Gross, operating, EBITDA and net margins and revenue CAGR are not meaningful because revenue was zero throughout.

  • Sources: UA21, AR23, AR25 (FY2024 comparatives).

Half-year datapoints. H1 FY2024 loss A$644.1k; H1 FY2025 loss A$537.7k (which included a A$156.7k impairment offset by a A$157.0k restoration-provision release). Cash was A$697.9k at 31 Dec 2023 and A$455.2k at 31 Dec 2024 (HY24; HY25).

Commentary. The P&L shows a shell steadily cutting costs between two large non-cash write-downs:

FY2021: an A$4.16m impairment when ATP 855 was revalued (independent valuer range A$3.5–8.7m, preferred A$6.1m) after the restoration asset was increased.

FY2023: a A$3.94m write-off when ATP 855 lapsed.

Underlying cash costs fell from about A$1.47m (FY2023, inflated by litigation) to about A$1.0m in FY2025. The main drivers were the suspension of all directors' fees from 1 October 2023 (KMP pay fell from A$414k in FY2022 to A$77.6k in FY2024 and nil in FY2025) and rent-free premises. Tenement expenditure rose 51% in FY2025 to A$345.9k because of PL-1144 regulatory and native-title work.

Balance sheet

Notes: - FY2021 total assets, E&E asset, total liabilities and working capital are from unaudited UA21. FY2021 equity is the audited opening balance (1 Jul 2021) from AR23; UA21 showed A$3,423.8k.

  • FY2023 onward debt is entirely interest-free, unsecured lending from Chairman R. James and his superannuation fund, carried at amortised cost: the A$520k March 2023 loan plus the A$300k Stage 3 loan in FY2025. Earlier years' "debt" is office-lease liabilities only.

  • The restoration provision is a debt-like obligation and is excluded from net debt above. Including it, FY2025 adjusted net debt is about A$5,234k.

  • Sources: UA21, AR23, AR25.

Commentary. The balance sheet inflected in FY2023, when the ATP 855 carrying value was written off and the A$4.75m well-restoration obligation became current. Equity went from +A$1.78m to -A$2.96m and has deteriorated each year since, to -A$4.51m. Liquidity is thin: unrestricted cash of A$431k covers roughly five to six months of the FY2025 operating burn (A$915.5k a year). The A$743k performance bond is restricted surety for Queensland environmental obligations. The going-concern case rests on four director assumptions (AR25 Note 1):

  • the ATP 855 renewal and the PL grant each have at least a 50% chance of success;

  • regulators will not require rehabilitation before those decisions;

  • the chairman will continue to provide support;

  • capital can be raised or a farm-out secured once tenure is confirmed.

Cash flow

Notes: FY2021 operating cash flow included well-rehabilitation spending (the Halifax-1 and Redland-1 program from 30 Dec 2020). FY2024 investing included a A$21.5k redemption of financial assets, so net investing was +A$17.7k. FY2025 "net equity raised" of A$600k includes A$300k that the related party first advanced as a loan in Sept 2024 and then converted to shares (Stage 1) under the 11 Oct 2024 agreement. Sources: UA21, AR23, AR25.

Ratios

Notes: Blank cells are not meaningful: negative equity from FY2023, negative EBITDA, zero revenue, and interest-free debt. FY2022 ROA uses unaudited FY2021 total assets. The cash conversion cycle is not applicable (no revenue, inventory or receivables cycle). Runway = year-end cash ÷ (annual operating cash outflow ÷ 12). Computed from UA21, AR23 and AR25.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Group Entities

EntityRoleOwnership

Icon Energy Limited

Parent, permit holder (ATP 855 / PL-1144 applicant)

Unlisted public company (delisted Jan 2026)

Icon Drilling Pty Ltd

Dormant drilling subsidiary

100%

Results by Segment and Revenue by Segment (%)

MetricFY2021FY2022FY2023FY2024FY2025

Segment revenue (AUD K)

00000

Segment other income (AUD K)

113.742.046.3164.729.7

Segment pre-tax result (AUD K)

-6,919.3-1,468.1-5,537.8-1,156.1-1,078.5

Segment share of group revenue (%)

100100100100100

Income Statement and Per-Share Data

MetricFY2021FY2022FY2023FY2024FY2025

Revenue (AUD K)

00000

Other income incl. interest and gains (AUD K)

113.742.046.3164.729.7

Gross profit (AUD K)

00000

Administration expenses (AUD K)

619.8612.5840.6550.3540.5

Employee benefits expense (AUD K)

217.5211.6239.2229.9161.8

Tenement expenditure (AUD K)

143.8306.0392.2228.6345.9

Depreciation and amortisation (AUD K)

82.8374.8116.92.31.8

Impairment and asset write-offs (AUD K)

4,313.403,937.010.10

Operating income / EBIT (AUD K)

-5,263.5-1,462.9-5,522.7-893.7-1,012.1

EBITDA (AUD K)

-5,180.8-1,088.1-5,405.8-891.5-1,010.3

EBITDA excl. impairments and write-offs (AUD K)

-867.4-1,088.1-1,468.8-881.4-1,010.3

Finance costs (AUD K)

7.85.215.1262.366.4

Pre-tax income (AUD K)

-6,919.3-1,468.1-5,537.8-1,156.1-1,078.5

Income tax (AUD K)

00000

Net income (AUD K)

-6,919.3-1,468.1-5,537.8-1,156.1-1,078.5

EPS basic and diluted (AUD cents)

-1.16-0.21-0.72-0.15-0.13

Dividends per share (AUD cents)

00000

Weighted average shares (millions)

597.6733.3765.5768.0822.0

Balance Sheet and Share Count (millions)

MetricFY2021FY2022FY2023FY2024FY2025

Total assets (AUD K)

8,116.37,038.12,412.61,471.21,295.1

Cash and equivalents (AUD K)

1,581.71,845.51,480.9448.7431.4

Restricted performance guarantee bonds (AUD K)

756.2756.2756.2743.5743.5

Exploration and evaluation asset (AUD K)

5,558.94,296.2000

Goodwill and intangibles (AUD K)

00000

Short-term debt incl. leases (AUD K)

76.041.300281.8

Long-term debt incl. leases (AUD K)

47.50393.5445.4447.8

Total debt (AUD K)

123.541.3393.5445.4729.6

Net debt (AUD K)

-1,458.2-1,804.1-1,087.5-3.4298.2

Restoration provision (AUD K)

4,353.75,032.04,746.04,954.84,935.9

Total liabilities (AUD K)

4,692.55,257.05,369.75,582.85,802.9

Total equity (AUD K)

1,775.91,781.1-2,957.1-4,111.6-4,507.8

Working capital (AUD K)

1,370.01,703.0-2,577.6-3,671.5-4,065.0

Shares on issue (millions)

597.6754.8768.0768.0868.0

Cash Flow

MetricFY2021FY2022FY2023FY2024FY2025

Operating cash flow (AUD K)

-3,892.4-1,121.8-1,501.7-1,049.9-915.5

Capex incl. exploration (AUD K)

-2.6-5.10-3.7-1.8

Free cash flow (AUD K)

-3,895.0-1,126.9-1,501.7-1,053.6-917.3

Net equity raised (AUD K)

01,473.3658.50600.0

Related-party borrowings received (AUD K)

00520.00300.0

Lease repayments (AUD K)

-64.5-82.6-41.300

Net financing cash flow (AUD K)

-64.51,390.71,137.20900.0

Dividends paid (AUD K)

00000

Share buybacks (AUD K)

00000

Net change in cash (AUD K)

-3,959.4263.8-364.5-1,032.2-17.3

Returns & Leverage Ratios (%) and Financial Ratios (x)

MetricFY2021FY2022FY2023FY2024FY2025

ROE (%)

—-82.6———

ROA on average assets (%)

—-19.4-117.2-59.5-78.0

Current ratio (x)

5.708.570.480.290.24

Debt to equity (x)

0.070.02———

Asset turnover (x)

00000

Cash runway at FY operating burn (months)

4.919.711.85.15.7

Geographic Revenue

RegionFY2023FY2024FY2025

Australia – Queensland revenue (AUD K)

000

Australia – Victoria revenue (AUD K)

000

Australia – South Australia revenue (AUD K)

000

International revenue (AUD K)

000

Share Price and Market Valuation

MetricFY2021FY2022FY2023FY2024FY2025

Closing share price (AUD)

0.0140.0140.0040.0060.006

Implied market cap at year end (AUD K)

8,366.510,566.83,072.14,608.15,208.1

Dividends per share (AUD)

00000

Valuation Snapshot

MetricValueComment

Implied market cap

A$5.21m

868.0m × A$0.006

Enterprise value

A$5.51m

  • A$729.6k related-party debt − A$431.4k cash

EV incl. restoration provision

A$10.44m

  • A$4,935.9k debt-like provision

P/E

n/m

Loss-making

EV/EBITDA

n/m

Negative EBITDA

EV/Sales

n/m

No revenue

P/B

n/m

Negative book value (-A$4.51m)

EV per km² of tenure

~A$3.3k (A$5.51m / 1,671 km²)

Crude asset-based yardstick

Historical independent valuation of ATP 855

A$3.5–8.7m (preferred A$6.1m) at 30 Jun 2021

UA21; before expiry and the PL route

Capital Markets

ItemStatus

Analyst coverage / consensus

None. Not covered by any major broker (Market Index)

Dividend history and policy

No dividends declared or paid in any disclosed year; directors recommend none

Buyback authorisations

None; no on-market buy-back in FY2021–FY2025

Credit ratings (Moody's / S&P / Fitch)

Not rated

Debt maturity profile

A$520k James loan: contractual maturity 13 Sep 2025, deferred until the company can pay. A$300k Stage 3 loan: convert or repay by 31 Dec 2025 (outcome undisclosed). Carrying values: A$447.8k non-current and A$281.8k current at 30 Jun 2025

Options / convertibles

None on issue apart from the Stage 3 loan's conversion feature

Analyst Conclusions

Management guidance (AR25).

  • Expects a decision on PL-1144.

  • If granted, will begin staged IDP implementation (initial wells and 3D seismic), pursue farm-ins and strategic partnerships, and seek reinstatement to quotation.

  • The financial outlook depends on the PL outcome and on external funding.

No quantitative guidance has been given, and there is no consensus because there is no coverage.

Bull case

  1. Scarce grandfathered tenure. The 2024 Lake Eyre Basin rules give existing ATP holders a one-off PL window. If PL-1144 is granted (Notice of Proposed Grant already issued), Icon holds a 30-year lease over about 1,671 km² that cannot be replicated.

  2. Balance-sheet re-rating on grant. HY25 Note 5 says the A$4.94m restoration liability would become non-current on grant. Working capital would swing from -A$4.06m to roughly +A$0.9m with no cash change, which would ease the going-concern uncertainty and support a farm-out.

  3. Macro tailwind and sunk data. AEMO's forecast southern shortfalls from 2028–29 and about A$165m of sunk JV data make a farm-in by a Cooper Basin incumbent with Moomba access economically plausible for a conventional, no-frack project with an estimated A$34.75m development cost.

Bear case

  1. Binary regulatory and native-title risk. The 8 Aug 2025 information request, two native-title parties and no disclosed grant almost a year later all point to delay or refusal. A refusal would leave the A$4.94m rehabilitation obligation against about A$1.3m of total assets.

  2. Corporate fragility. Five consecutive going-concern uncertainty opinions, negative equity, five to six months of runway at FY2025 and total dependence on one 32-year incumbent director. Delisting removes the main funding route and reduces minority-shareholder protections.

  3. Reservoir quality. Beach and Chevron exited a high-CO2, HPHT play after spending heavily. The conventional fractured-reservoir thesis is untested at development scale and depends on 3D seismic that Icon cannot currently fund.

Key catalysts and monitorables (next 12 months).

Concluding analyst verdict. Icon Energy Limited is no longer an investable listed equity in the usual sense. It is an unlisted, founder-funded shell holding one contingent regulatory asset. The record from primary filings is unambiguous:

  • no revenue in any disclosed year;

  • cumulative losses of about A$109.4m;

  • negative equity of A$4.51m;

  • a A$4.94m well-restoration liability that dwarfs its A$1.30m asset base;

  • a going-concern emphasis in every audit reviewed;

  • removal from the ASX on 12 January 2026 after its allowable suspension period ran out.

Against that, the asset is real. ATP 855 sits in Australia's most prolific onshore gas basin. It carries about A$165m of sunk JV appraisal, a record shale flow test, and a conventional fractured-reservoir concept that avoids hydraulic fracturing. Management has also won a significant administrative-law victory ([2023] QSC 227) and obtained a Notice of Proposed Grant for PL-1144 under a transition window that new entrants can no longer use. With AEMO forecasting southern supply gaps from 2028, a granted 30-year lease could attract a Cooper Basin incumbent as farm-in partner or acquirer.

The investment case is therefore a single binary option on PL-1144, made worse by governance concentration and the absence of a trading market. On the information available at 10 October 2026, nothing has been publicly disclosed since January 2026, and neither the PL grant nor the native-title agreements are confirmed. Existing holders face illiquidity and probable dilution in any funding solution. A grant would likely produce a farm-out or sale at a value well above the last implied A$5.2m. A refusal would likely end in a solvency event driven by the rehabilitation obligation.

Rating stance: Speculative / Not rated. The position suits only special-situations capital that can engage directly with the board and the Queensland regulator. Priority diligence items are the status of PL-1144 and the native-title agreements, the FY2026 accounts, and any refreshed rehabilitation estimate.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleTenurePrior roles / experienceEducationShares held

Raymond Swinburn James

Chairman (since 6 Oct 2023); Company Secretary (since 21 Oct 2022); director since 1 Feb 1993

32+ years

Icon MD 1993–2019. Chevron (Perth and Houston) 1969–74; Gulf Oil 1974–80; MD Australian Hydrocarbons 1980–81; MD Omega Oil 1987–91; APPEA director 1999–2007 and Vice Chairman 2003–05; former FAICD

BSc Physics (Geology, Maths), UNSW; T.C. University of Sydney; Honorary Fellowship, Griffith University Institute for Glycomics (2022)

150,462,657 (incl. indirect)

Jeffrey Royce Marvin

Managing Director (since 6 Oct 2023); director since 31 Mar 2023

3.5 years

25+ years in resource project origination and finance (CSG, mineral sands, gold, coal); founding shareholder and executive of an Australian advanced-recycling technology company. Non-executive director of Greenwing Resources (ASX: GW1) since June 2015; director of Nexus Communities (non-profit) since April 2025

BSc Business Administration – Finance, San Diego State University

Nil

Peter Marshall Wilson

Independent non-executive director (since 8 Sep 2023)

3 years

42+ years in coal mining and contracting as GM, Director and COO. Operations Director, Mine2Port Limited (since Feb 2021); Director, Mine2Port Global (since Jun 2025); Director/Owner, Herb Hero Pty Ltd (since Jun 2018); NED Kazera Global Plc (AIM) Apr 2023–Oct 2024

HTC Construction Management, Bradford Technical College

Nil

Executive Leadership Team

NameFY2023 totalFY2024 totalFY2025 totalNotes

Stephen Barry (former Chairman)

93,70423,5320

Retired 8 Sep 2023

Ray James

122,79230,8370

Fees suspended from 1 Oct 2023

Keith Hilless

34,69700

Retired 30 Nov 2022

Jeffrey Marvin

17,47918,9490

No pay as MD

Peter Wilson

04,3270

Appointed Sep 2023

Natalia Fraser (former CFO)

95,52000

Includes A$58,346 termination benefits

Total KMP

364,19277,6450

No STI, LTI, options or performance rights in any year

Major Shareholders

RankHolderShares%
1

Ray James

150,076,93717.29
2

HK Prosperous Technology Limited

80,318,3939.25
3

BNP Paribas Noms Pty Ltd (FY2023 filing identifies the beneficial holder as Mr Ching-Tang Li via LGT Bank AG)

60,534,0206.97
4

Saba Super Pty Ltd (Saba Superannuation Fund A/C)

45,000,0005.18
5

Mr Eddie Saba

23,813,0672.74
6

Mr Daniel Saba

21,000,0002.42
7

Howard Lu (former director)

16,068,1811.85
8

Citicorp Nominees Pty Limited

15,761,7451.82
9

Holder name not legible in extracted filing text

15,000,0001.73
10

Willaton Properties Pty Ltd

15,000,0001.73

Competitive Landscape

Key Competitors

CompetitorRelevance to IconPositioningRevenue (latest available)

Santos (ASX: STO)

Cooper Basin JV operator and owner of the Moomba hub; natural processing and offtake counterparty

Integrated major

—

Beach Energy (ASX: BPT)

Former ATP 855 partner and operator; Cooper Basin JV participant

Mid-cap integrated producer

FY2025 sales revenue A$1,997m (BPT)

Origin Energy (ASX: ORG)

East-coast gas buyer and seller; APLNG interest

Integrated utility

—

Senex Energy (private; POSCO/Hancock)

Queensland gas producer (Surat) competing for domestic contracts

Private producer

—

Vintage Energy (ASX: VEN)

Cooper Basin junior gas explorer and producer

Junior

—

Metgasco (ASX: MEL)

Cooper-Eromanga junior gas explorer and producer

Junior

—

Red Sky Energy (ASX: ROG)

Cooper-Eromanga junior explorer

Junior

—

Pure Hydrogen / former Real Energy (ASX: PH2)

Formerly held Windorah basin-centred gas in the Cooper

Junior

—

Strike Energy (ASX: STX)

Former southern Cooper Basin gas explorer; now Perth Basin

Junior/mid

—

Elixir Energy (ASX: EXR); Omega Oil & Gas

Queensland Taroom Trough gas explorers competing for farm-in capital

Juniors

—

Tamboran Resources (NYSE/ASX: TBN)

Beetaloo shale gas; competes for east-coast supply narrative and capital

Developer

—

“—” = not publicly disclosed.

Peer Comparison FY2025

MetricIcon Energy FY2025Beach Energy FY2025

Revenue (AUD Mn)

01,997

Revenue growth YoY (%)

n/m

13

Underlying EBITDA (AUD Mn)

-1.0

~1,100

EBITDA margin (%)

n/m

57 (underlying)

Underlying NPAT (AUD Mn)

-1.1451

R&D intensity (%)

0—

“—” = not publicly disclosed.

Recent Developments

Disclosure has been sparse, and since delisting in January 2026 no public disclosures have been located.

A TipRanks auto-generated item titled "Icon Energy Secures Key Lease…" says Icon secured a production lease. The company's own AR25 (30 Sep 2025) says PL-1144 had not** been granted and remained in the approval process. The primary filing is preferred.

Company Snapshot

1993

Founded

Bundall, Australia

Headquarters

SWOT Analysis

Strengths

  • 100% interest and operatorship of ATP 855 / PL-1144 (~1,671 km²), so no partner consents are needed (AR25 tenement table).
  • Proven gas presence: six JV wells all encountered petroleum, and Halifax-1 flowed 4.5 MMscf/d, a Cooper Basin shale record at the time (PESA 2017).
  • About A$165m of sunk JV investment in seismic, wells and tests that Icon can use (Ashurst on QSC).
  • A favourable precedent: [2023] QSC 227 set aside the refusal to accept the renewal and confirmed that financial capability can include future investment (QSC; HopgoodGanim).
  • A Notice of Proposed Grant of PL-1144 (6 Feb 2025), the step that precedes grant (HY25).
  • A conventional, no-fracking development concept that reduces social-licence and regulatory friction (AR25).

Weaknesses

  • Negative equity of -A$4.51m and a working-capital deficit of A$4.06m at 30 Jun 2025 (AR25).
  • Cash of A$431k against a A$915k annual operating burn, about 5.7 months of runway (AR25).
  • A A$4.94m current restoration provision for six un-decommissioned wells (AR23/AR25).
  • A material going-concern uncertainty flagged by the auditor in every year FY2021–FY2025 (UA21; AR23; AR25).
  • Extreme governance concentration: the chairman is also company secretary, 17.3% holder, sole lender and landlord. There is one independent director and the Remuneration and Nominations Committee was dissolved in Feb 2024 (AR25).
  • Environmental compliance lapses: penalties of A$17,231 for the ERC breach (FY2023) and an invalid ATP 594 EA surrender that still had not been validly re-lodged at 30 Jun 2025 (AR23; AR25).

Opportunities

  • AEMO forecasts southern ECGM shortfalls from 2028 and annual gaps from 2029, which support demand for new eastern supply (AEMO GSOO 2025).
  • Scarcity value: the 2024 Lake Eyre Basin rules prevent new entrants, which raises the strategic value of grandfathered PLs (HY25).
  • A farm-out to a Cooper Basin incumbent (Santos or Beach) with nearby infrastructure. AR25 states explicitly that farm-ins will be pursued.
  • Rehabilitation could be deferred: on PL grant the A$4.94m provision would be reclassified as non-current, improving the balance sheet immediately (HY25 Note 5).
  • A possible re-listing or private capital raise once tenure is confirmed, since the directors say capital can be raised after renewal (AR25 Note 1).
  • Optional diversification through the Consolidated Resources Pte Ltd collaboration into other energy and critical minerals (HY24), currently dormant.

Threats

  • Refusal or further delay of PL-1144. The Department requested more information on 8 Aug 2025 and no grant has been disclosed (AR25).
  • If the PL fails, the restoration liability (~A$4.9m) could be enforced in a company with A$1.3m of total assets (AR25).
  • Native-title negotiations with two groups, including a new claimant (Yandruwandha Yawarrawarrka), could stall the RTN process (HY25).
  • Loss of the ASX listing (12 Jan 2026) removes access to public equity and liquidity for 4,390 shareholders (InvestSMART; AR25).
  • Key-person dependency on Ray James, who has 32+ years on the board and a career stretching back to Chevron in 1969 (AR25).
  • Reservoir risk: high CO2 and HPHT conditions contributed to the exits of Beach and Chevron (PESA 2017).

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
Sep 2024A$300k interest-free loan from Paradise Marine (later converted) AR25Bridge liquidity
11 Oct 2024A$900k Debt Conversion and Conditional Placement Agreement announced AR25Funding lifeline from founder
22 Oct 2024September-quarter activities and 5B report InvestSMARTRoutine disclosure under suspension
29 Nov 2024AGM (virtual): Stage 1/2 issues and remuneration report (94.98%) approved AR25; TipRanksJames' stake rises to 17.3%
29 Jan 2025December-quarter activities report InvestSMARTRoutine
6 Feb 2025Notice of Proposed Grant of PL-1144 (s 29 Native Title Act) HY25; TipRanksMost important regulatory step since the 2023 court win
26 Feb 2025Native-title notification day; three-month RTN window opens HY25Clock starts on native-title process
14 Mar 2025H1 FY2025 report: loss A$537.7k; cash A$455.2k; working-capital deficit A$4.06m HY25Going-concern uncertainty reaffirmed
26–31 Mar 2025Stage 3 restructured as a A$300k convertible loan (due 31 Dec 2025) AR25Avoids immediate dilution and the 19.99% threshold
Apr 2025MD Marvin joins the board of Nexus Communities (non-profit) AR25Minor; competing time commitments
30 Apr 2025March-quarter activities and 5B report Market IndexRoutine
c. 26 May 2025Native-title RTN notification period ends (three months from 26 Feb) HY25 (derived)Negotiation outcome not disclosed
Jun 2025Director Wilson appointed Director of Mine2Port Global AR25Minor
30 Jun 2025FY2025 year end: cash A$431.4k; equity -A$4.51m AR25Continued erosion
8 Aug 2025Department requests additional PL-1144 information; Icon seeks extension to 16 Dec 2025 AR25Grant timetable slips
13 Sep 2025A$520k director loan matures; James agrees not to call it until funds allow AR25Avoids default
30 Sep 2025FY2025 accounts, Corporate Governance Statement and Appendix 4G released; auditor William Buck flags material going-concern uncertainty AR25; TipRanksConfirms dependence on PL grant
30 Oct 2025September-quarter activities and 5B report Market Index–
26 Nov 20252025 AGM held virtually TipRanks–
16 Dec 2025Extended deadline for PL-1144 additional information AR25Compliance not publicly confirmed
31 Dec 2025Stage 3 loan conversion or repayment deadline AR25Outcome not disclosed
Jan 2026ASX's allowable suspension period ends AR25Triggers delisting
12 Jan 2026Removed from ASX Official List InvestSMARTLoss of liquidity and market price discovery; disclosure obligations end
13 Jan 2026Last indicative price A$0.006 InvestSMARTImplied market cap about A$5.2m
Jan–Oct 2026No further public disclosure located (PL-1144 grant, native-title agreement, financing, FY2026 accounts) Searches conducted 10 Oct 2026Information vacuum

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

2 charts
Revenue by Segment (%): Segment share of group revenue held from 100% in FY2021 to 100% in FY2025.
Icon Energy Limited — Revenue by Segment (%)
Series (%)FY2021FY2022FY2023FY2024FY2025
Segment share of group revenue100100100100100

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. FY2025 Full Year Accounts (announcements.asx.com.au)
  2. FY2024 Full Year Accounts (announcements.asx.com.au)
  3. FY2023 Full Year Accounts (announcements.asx.com.au)
  4. Half-year to 31 Dec 2024 (announcements.asx.com.au)
  5. Half-year to 31 Dec 2023 (announcements.asx.com.au)
  6. Half-year to 31 Dec 2021 (asx.com.au)
  7. Unaudited FY2021 Accounts (asx.com.au)
  8. 2023QSC 227 (queenslandjudgments.com.au)
  9. Queensland Reports editor's note on the judgment (queenslandjudgments.com.au)
  10. Ashurst commentary (ashurst.com)
  11. InvestSMART (delisting; removal from Official List 12 Jan 2026) (investsmart.com.au)
  12. InvestSMART share page (investsmart.com.au)
  13. Market Index ICN (marketindex.com.au)
  14. Simply Wall St ICN (simplywall.st)
  15. Morningstar ICN (morningstar.com.au)
  16. PESA, "Icon takes the shale baton solo" (3 Apr 2017) (pesa.com.au)
  17. Business News Australia (Beach dispute, settlement, Halifax-1, ATP 855 grant) (businessnewsaus.com.au)
  18. Offshore-Energy.biz (Shantou LNG; Beach undertaking) (offshore-energy.biz)
  19. World Coal (2010 Sinogas MOU) (worldcoal.com)
  20. Upstream (LNG deadline extension) (upstreamonline.com)
  21. TipRanks (2025 AGM notice; PL notice; lease headline) (tipranks.com)
  22. AEMO 2025 GSOO media release (aemo.com.au)
  23. Beach Energy FY25 results (announcements.asx.com.au)
  24. NNTT ILUA register (Gunaikurnai–Icon) (database.atns.net.au)