Investigator Silver Limited Overview
Investigator Silver is a single-asset, pre-revenue silver developer. It is advancing the 100%-owned Paris Silver Project on South Australia's central Eyre Peninsula, about 70 km north of Kimba. The company describes Paris as Australia's only pure-play primary silver project of development scale.
The February 2026 DFS declared a maiden Probable Ore Reserve of 12 Mt at 88 g/t Ag for 33 Moz. It outlined a 1.5 Mtpa open-pit, whole-ore cyanide leach and Merrill–Crowe operation producing about 30 Moz of silver in doré over about 11 years, at an AISC of A$39.70/oz. The study shows a development funding requirement of A$260m and a pre-tax NPV8 of A$618m (consensus pricing) to A$1,154m (US$80/oz spot pricing).
After raising about A$63m in FY2026, the company holds about A$59m in cash and no debt. It lodged its Mining Lease Application in August 2026. Its stated ambition is to become Australia's next primary silver producer. Its equity value, however, trades at a steep discount to DFS NPV, reflecting funding, permitting and silver-price risk.
Company's own description (paraphrased). In the FY2026 Annual Report, the directors describe Investigator as a metals explorer focused on silver-lead, copper-gold and other metal discoveries, whose principal activity during the year was mineral exploration. The Chair and Managing Director's letter frames FY2026 as the year Paris moved from development concept to a financeable project. They describe every workstream as aligned to a single objective: production, with the company becoming "Australia's next primary silver producer" (FY2026 AR, Chair and MD letter).
Independent characterisation. IVR is a late-stage development company, no longer a grassroots explorer. The economic substance of the business is now one asset:
-
the Paris deposit, with a JORC 2012 Mineral Resource of 24 Mt at 73 g/t Ag and 0.41% Pb for 57 Moz Ag and 99 kt Pb (5 July 2023 estimate)
-
a declared Ore Reserve
-
a lodged Mining Lease Application
-
a defined capital estimate
A secondary exploration portfolio sits around it:
-
the 15 km Paris Silver Corridor (Apollo, Athena, Hestia, Manto, Perseus and others)
-
the Uno/Morgans tenements in East Eyre
-
the Curnamona tenements (copper-gold)
-
a 40% interest in the Bonya joint venture in the Northern Territory, operated by Arafura Rare Earths
Business and revenue model.
Operating model under the DFS.
Mining: contract mining. Golding Contractors priced the schedule of rates.
Processing: owner-operated 1.5 Mtpa plant. Three-stage crushing, single 5.75 MW ball mill to a P80 of about 53 µm, about 42 hours of leach residence, CCD (three thickeners), Merrill–Crowe zinc precipitation, and peroxide cyanide destruction.
Tailings: conventional wet tailings storage facility integrated with the waste rock landform.
Power: hired diesel gensets with about 16.5 MW connected load.
Water: saline groundwater from the Hector Paleochannel borefield (11 bores).
Strategy
Stated strategy themes (paraphrased from the FY2026 AR and the DFS release).
-
Move Paris rapidly and methodically from study to construction-ready status, then make a development decision. Management frames this as converting the DFS into firm execution packs and lender-ready documentation.
-
De-risk financing by drilling the first roughly three years of the mine plan to grade-control density, to support lender due diligence, pricing and covenants.
-
Progress permitting: Mining Lease Application (lodged August 2026), Program for Environment Protection and Rehabilitation (in preparation), and a Native Title Mining Agreement with the Gawler Ranges Aboriginal Corporation.
-
Build an owner's team capable of financing, building and operating a mine.
-
Use Paris as a hub-and-spoke platform. Plant, TSF and services are sized with expansion headroom; the TSF has about 20 Mt capacity, more than 4 years beyond the DFS case.
-
Recycle capital from non-core assets into precious metals.
Initiative register (last 24 months).
Medium-term targets and guidance.
- No financial guidance.
Operational targets: Mining Lease Application by the September 2026 quarter (achieved 19 Aug 2026). The MD's LTI hurdles imply Mining Lease grant and FID by 1 July 2028.
Schedule implied by the DFS: payback of 34 months from first capital versus 11 months from first production implies roughly 23 months from first capital to first production. This is a derived figure; the DFS timeline chart was not reproduced in sources reviewed.
ESG commitments: none formally quantified beyond heritage avoidance, progressive rehabilitation and evaluation of hybrid power.
Products & Services
IVR sells no products today. Its portfolio is a set of mineral assets at different stages of maturity.
Flagship: Paris Silver Project (EL6347, 100%)
| Attribute | Detail (source: DFS, 27 Feb 2026, unless stated) |
|---|---|
| Location | Central Eyre Peninsula, SA; about 70 km north of Kimba; about 535 km north-west of Adelaide (about 7 hours by road); entirely within Buckleboo Station pastoral lease |
| Geology | Flat-lying, intensely argillic-altered polymictic volcanic breccias of the Gawler Range Volcanics, over dolomitic marble basement. Strike about 1,900 m; width up to 700 m; formed about 1,594–1,590 Ma. Silver occurs as acanthite/argentite, jalpaite and native silver. |
| Mineral Resource (Jul 2023, 25 g/t cut-off) | Indicated 17 Mt at 75 g/t (41 Moz Ag, 85 kt Pb); Inferred 7.2 Mt at 67 g/t (16 Moz, 14 kt Pb); Total 24 Mt at 73 g/t for 57 Moz Ag and 99 kt Pb |
| Ore Reserve (Feb 2026) | Probable 12 Mt at 88 g/t for 33 Moz Ag. Domain cut-offs: BT 28.5 g/t, BTM 23 g/t, DOL 24 g/t. Optimisation price A$70/oz. |
| Production target | 13.395 Mt mined and processed at 91 g/t Ag; 78% recovery (77.7% weighted); about 30.3 Moz Ag in doré; 86% Indicated, 14% Inferred (under 1% in the payback window) |
| Throughput / life | 1.5 Mtpa; construction plus 108 operating months (about 11-year schedule); mining about 81 months followed by about 30 months of stockpile reclaim |
| Grade profile | Years 1–2 of processing about 131 g/t (about 4.7 Moz pa); single-fleet phase about 95 g/t (about 3.7 Moz pa); reclaim phase about 52 g/t (about 1.9 Moz pa) |
| Strip ratio | 5.96:1 (79.8 Mt waste, including 7.6 Mt mineralised waste at 21 g/t containing 5.1 Moz) |
| Domain recoveries | BT 67%, BTM 82.5%, DOL 86.5%, Oxide treated as waste |
| AISC | A$39.70/oz (US$27.39/oz) |
| Development funding | A$260m (US$180m) maximum negative cash, including A$23m contingency and working capital |
| Economics: consensus case | US$60.18/oz: NPV8 A$618m; IRR 61%; payback 13 months; net project cash flow A$1,038m |
| Economics: spot case | US$80/oz: NPV8 A$1,154m; IRR 93%; payback 11 months; net project cash flow A$1,866m |
| Breakeven | About US$37.35/oz including capital repayment |
| Sensitivity | +US$1/oz adds about A$27m NPV8 and about A$42m life-of-project pre-tax cash flow |
| By-product | Lead (99 kt in resource) excluded; 2023 ALS flotation testwork did not justify a lead circuit |
| Status | Mining Lease Application lodged 19 Aug 2026; PEPR in preparation; FEED and engineering partner engaged; pre-FID infill drilling under way |
| Pricing model | Spot-linked doré sales (not yet contracted) |
Paris Silver Corridor (about 15 km, near-plant growth)
| Prospect | Key result disclosed | Tenure | Status |
|---|---|---|---|
| Apollo | 8 m at 1,262 g/t Ag from 149 m, incl. 3 m at 3,167 g/t (PPRC826) | EL6347 (100%) | Highest-grade intercept outside Paris; follow-up planned |
| Athena | 20 m at 160 g/t Ag from 69 m, incl. 5 m at 493 g/t (12BWRC020) | Black Hill tenements (Alliance Resources), IVR earning in | FY2026 AR calls it a compelling untested target |
| Hestia | 25 m at 57 g/t Ag from 57 m (13BHRC001) | Black Hill tenements, IVR earning in | Early stage |
| Manto | 3 m at 86 g/t Ag from 90 m (PLAC284) | EL6347 | Early stage |
| Perseus | Named in FY2026 AR; results not detailed | EL6347 area | Early stage |
| Paris East / North / West | Multiple high-grade intersections outside the DFS pit (ASX 1 Sep 2026) | EL6347 | Pit expansion and resource conversion |
Other exploration assets
| Project | Tenements (FY2026 AR) | Commodity focus | FY2026 activity |
|---|---|---|---|
| Uno/Morgans (East Eyre) | EL5845 Uno Range, EL5933 Morgans, EL6724 Corunna, EL6753 Nonning South, EL6725 Yardea, EL5913 Harris Bluff, EL6953 Eurilla Hill | Silver, zinc, base metals. Historic results: 12 m at 240 g/t Ag (Twelve Mile); 123 m at 0.48% Zn (Uno North) | Geological assessment, geophysics, geochemistry; drilling proposed for FY2027 |
| Curnamona | EL5938 Wiawera, EL6345 Treloars, EL6253 Olary/Bulloo Creek | Copper, gold, silver, base metals | Partial drilling at Treloars (stopped by wet weather); reconnaissance mapping |
| Bonya JV (NT) | EL29701 (IVR 40%, Arafura Rare Earths 60%) | Not specified | Sole remaining NT asset |
Divested or exited assets (last 5 years)
| Asset | Exit |
|---|---|
| Molyhil (W-Mo, NT, 25%) | Sold to Tivan (completed 19 Jan 2026) |
| Molyhil fluorite rights | Sold to Tivan (A$875k, of which A$450k received) |
| Stuart Shelf JV and tenements | Sold in FY2025 (A$0.95m profit) |
| White Spur (Tasmania) | Sold in FY2025 |
| Fowler Domain tenements | Farmed out to Osmond in 2021; not in the FY2026 tenement list |
Financial Narrative
Basis. Audited consolidated accounts (A$) from the FY2022 and FY2026 Annual Reports, which also carry FY2021 and FY2025 comparatives. FY2023 and FY2024 values marked as aggregator figures come from InvestSMART (rounded to A$0.1m or A$1m). IVR has no revenue, gross profit, dividends or debt, so many institutional metrics are structurally not meaningful (NM).
Income statement
Notes:
-
FY2022 share-based payments were embedded in employee expense (Note 6); FY2026 SBP is a separate line.
-
FY2023 and FY2024 results are aggregator figures.
-
FY2021 comparatives (FY2022 AR): net loss A$1.979m; basic EPS -0.17c.
-
Gross, operating, EBITDA and net margins and revenue CAGR are NM because there is no revenue.
Commentary.
Loss pattern: Annual losses are small, A$2–4m, because IVR capitalises nearly all exploration and evaluation spend under AASB 6.
FY2022 loss: The A$4.13m loss was driven by a A$2.97m write-off of every non-Paris exploration asset.
FY2025 profit: The A$0.23m profit was non-recurring. It came from A$1.46m of gains on selling Stuart Shelf, the NT fluorite interest and White Spur.
FY2026 loss: The A$2.49m loss reflects a step-up in corporate cost as the company moved into development:
-
share-based payments of A$1.22m, mostly the MD's performance rights
-
administrative expenses up 69% to A$1.41m, including company promotion of A$0.45m versus A$0.03m in FY2025
-
partly offset by interest income of A$0.80m on the enlarged cash balance
Balance sheet
Notes:
-
FY2023 equity is an aggregator figure.
-
FY2024 cash, exploration asset, equity and shares on issue are taken from the FY2025/FY2026 opening balances in the FY2026 AR.
-
FY2021 comparatives: cash A$11.587m; total assets A$33.210m; equity A$32.259m.
-
Net debt here = lease liabilities minus cash.
Commentary.
Cash: The FY2026 balance sheet is transformed: cash rose more than elevenfold to A$58.8m.
-
A$40.0m was held in term deposits of up to 3 months and A$18.75m as cash at bank (Note 9).
-
Cash now exceeds the exploration asset carrying value of A$39.6m.
Book value per share: was about A$0.038 at June 2026 (derived), close to the share price.
Other items: - Deferred consideration receivable from Tivan: A$1.13m (present value).
- Unused tax losses not recognised: A$83.7m, a potential A$20.9m tax benefit at 25% if continuity-of-ownership or same-business tests are passed.
Cash flow
Notes:
-
FY2023 and FY2024 values are rounded aggregator figures.
-
FY2021 comparatives: OCF -A$0.826m; exploration payments -A$4.839m; net financing +A$14.856m.
Commentary.
Burn rate: Group burn has historically run at A$5–7m a year. It is set to rise sharply as FEED, permitting, pre-FID drilling and early works proceed.
Quarterly evidence: June 2026 quarter exploration and evaluation spend was A$2.8m (FilingReader). Cash moved from A$50.9m at 31 March 2026 to A$58.8m at 30 June 2026, reflecting receipt of Tranche 2.
Runway: Against roughly A$59m of cash, the company says it has no immediate need for further funding for near-term development objectives (FY2026 AR). However, the A$260m development funding requirement is about 4.4 times current cash.
Ratios
ROIC, net debt/EBITDA, interest coverage, asset turnover and cash conversion cycle are not meaningful for a pre-revenue company with no borrowings and negative EBITDA.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating revenue (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Other income incl. tenement sale gains (AUD Mn) | 0.234 | — | — | 1.462 | 0 |
Interest income (AUD Mn) | 0.041 | — | — | 0.072 | 0.798 |
Employee benefit expense, net of capitalisation (AUD Mn) | 0.608 | — | — | 0.353 | 0.519 |
Administrative expenses (AUD Mn) | 0.831 | — | — | 0.834 | 1.410 |
Share-based payment expense, separately disclosed (AUD Mn) | 0.139 | — | — | 0.034 | 1.215 |
Exploration impairment / write-off (AUD Mn) | 2.970 | — | — | 0.085 | 0.187 |
Operating result excluding interest income (AUD Mn) | -4.175 | — | — | 0.156 | -3.283 |
Pre-tax profit / (loss) (AUD Mn) | -4.134 | -2.6 | -2.0 | 0.228 | -2.485 |
Net profit / (loss) after tax (AUD Mn) | -4.134 | -2.6 | -2.0 | 0.228 | -2.485 |
Basic EPS (A$ cents) | -0.31 | — | — | 0.01 | -0.12 |
Diluted EPS (A$ cents) | -0.31 | — | — | 0.01 | -0.12 |
Dividends per share (A$ cents) | 0 | 0 | 0 | 0 | 0 |
Balance Sheet and Share Count (M)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Cash and equivalents (AUD Mn) | 6.222 | — | 4.529 | 5.066 | 58.760 |
Total current assets (AUD Mn) | 6.361 | — | — | 5.153 | 59.879 |
Exploration and evaluation asset (AUD Mn) | 23.117 | — | 31.152 | 33.999 | 39.623 |
Total assets (AUD Mn) | 29.937 | — | — | 39.530 | 101.050 |
Total liabilities (AUD Mn) | 1.526 | — | — | 0.736 | 2.883 |
Lease liabilities, the only debt-like item (AUD Mn) | 0.142 | — | — | 0.166 | 0.315 |
Bank / bond debt (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Net debt / (net cash) (AUD Mn) | -6.080 | — | — | -4.900 | -58.445 |
Total equity (AUD Mn) | 28.412 | 30.7 | 33.967 | 38.795 | 98.167 |
Goodwill and intangibles (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Working capital (AUD Mn) | 4.929 | — | — | 4.509 | 57.221 |
Shares on issue (M) | 1,332.3 | — | 1,583.9 | 1,732.7 | 2,601.5 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | -1.058 | -1.40 | -1.17 | -1.541 | -0.998 |
Exploration payments, the capex proxy (AUD Mn) | -4.249 | — | — | -3.757 | -6.068 |
PP&E payments (AUD Mn) | -0.012 | — | — | 0 | -0.101 |
Free cash flow: OCF + exploration + PP&E (AUD Mn) | -5.319 | — | — | -5.298 | -7.167 |
Proceeds from asset / tenement sales (AUD Mn) | 0 | — | — | 1.525 | 0.875 |
Net investing cash flow (AUD Mn) | -4.499 | -5 | -4 | -2.232 | -5.554 |
Equity raised, gross incl. options (AUD Mn) | 0.192 | — | — | 4.681 | 63.202 |
Capital raising costs (AUD Mn) | 0 | — | — | -0.371 | -2.956 |
Net financing cash flow (AUD Mn) | 0.192 | 4 | 5 | 4.311 | 60.246 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2022 | FY2025 | FY2026 |
|---|---|---|---|
ROE on average equity (%) | -13.6 | 0.6 | -3.6 |
ROA on closing total assets (%) | -13.8 | 0.6 | -2.5 |
Current ratio (x) | 4.44 | 7.99 | 22.53 |
Lease debt to equity (x) | 0.005 | 0.004 | 0.003 |
Cash as % of total assets | 20.8 | 12.8 | 58.1 |
Geographic Revenue
| Region | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Australia revenue (AUD Mn) | 0 | 0 | 0 |
Rest of world revenue (AUD Mn) | 0 | 0 | 0 |
Per-Share Data and Share Count (M)
| Metric | FY2018 | FY2019 | FY2020 | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|---|---|---|---|
Share price at 30 June (A$ cents) | 1.1 | 1.1 | 1.7 | 8.1 | 3.7 | 4.5 | 4.7 | 2.2 | 4.6 |
Shares on issue at 30 June (M) | — | — | 845.7 | 1,323.9 | 1,332.3 | — | 1,583.9 | 1,732.7 | 2,601.5 |
Market cap at 30 June (AUD Mn, derived) | — | — | 14.4 | 107.2 | 49.3 | — | 74.4 | 38.1 | 119.7 |
Valuation Snapshot
| Metric | Value | Basis |
|---|---|---|
Market cap | About A$100–125m | 2,622.9m shares × A$0.039–0.048 |
Enterprise value | About A$45–70m | — |
P/B | About 1.0–1.3x | Against A$98.2m equity at 30 June 2026 |
EV / resource ounce | About A$0.8–1.2/oz Ag | Against 57 Moz MRE |
P/NPV (consensus NPV8 A$618m, pre-tax, ungeared, 100%) | About 0.16–0.20x on market cap | Before financing dilution and tax |
Company's own peer comparison (Oct/Nov 2025) | EV about A$1.80/oz | Presentations, 30 Oct and 26 Nov 2025 |
Capital Markets
| Item | Status |
|---|---|
Dividend history / policy | No dividends ever paid or declared (FY2022 and FY2026 ARs) |
Buybacks | None ("no current on-market share buy-back", FY2026 AR Note 18) |
Credit ratings (Moody's / S&P / Fitch) | None; unrated |
Debt maturity profile | No borrowings. Lease liabilities A$0.315m (A$0.101m current). A$50k credit card facility. |
Equity raised FY2021–FY2026 (gross) | FY2021 A$15.26m; FY2022 A$0.19m; FY2025 A$4.68m; FY2026 A$63.20m |
Potentially dilutive securities | 462.6m listed options (A$0.042, March 2028); 6.5m unlisted options; 14.25m MD performance rights (Mining Lease and FID hurdles) |
Analyst Conclusions
Management guidance. There is no earnings or production guidance. Stated FY2027 priorities (FY2026 AR):
-
advance permitting and approvals: Mining Lease grant, PEPR, production NTMA
-
progress financing discussions
-
complete execution planning and FEED
-
position Paris for a development decision
-
continue corridor exploration
Implicit milestones are Mining Lease grant and FID before 1 July 2028 (MD LTI hurdles).
Bull case
-
Valuation gap. At about A$100–125m market cap, IVR trades at roughly 0.2x the DFS consensus-case NPV8 of A$618m and roughly 0.1x the spot-case NPV8 of A$1,154m. It also trades at about 1x book value while holding about A$59m in cash. Permitting and financing milestones could narrow that gap materially.
-
Fundable project. Low capital intensity (A$260m), payback within about a year, and an early stockpile inventory (about A$120m net realisable value by the end of year 1, peaking at A$493m) form a lender-friendly package. That supports a debt-heavy funding mix and limits further equity dilution.
-
Asymmetric upside. About A$42m of cash flow per US$1/oz of silver, a pit design that barely changes with price, 5.1 Moz of permitted mineralised waste, and a 15 km corridor with bonanza-grade intercepts give upside beyond the base case.
Bear case
-
Funding gap and dilution. Roughly A$200m+ remains unfunded. With shares down about 50% from the A$0.086 placement price, any equity component of project finance would be highly dilutive, and 462.6m listed options add an overhang.
-
Price sensitivity. The 64% spot-case margin assumes US$80/oz. Silver swung between about US$70 and US$115 in H1 2026. At consensus pricing (US$60.18/oz) the NPV roughly halves, and the breakeven including capital is about US$37/oz.
-
Technical and governance execution. 67% recovery in the dominant BT domain, 14% Inferred feed, steep grade decline after year 2, diesel power, and a three-person board without committees all heighten execution and governance risk through financing and construction.
Catalysts and monitorables (next 12 months)
| Catalyst | Expected timing | Why it matters |
|---|---|---|
| September 2026 quarterly (cash, burn, drilling) | ~26 Oct 2026 | Liquidity runway; early-works spend |
| FY2026 AGM | Nov 2026 | New LTI grant under revised MD package; board renewal |
| Pre-FID infill and extensional drilling results | Q4 2026–H1 2027 | Lender confidence; Inferred-to-Indicated conversion; possible MRE update |
| Production NTMA with GRAC | 2026–2027 | Key permitting prerequisite |
| PEPR submission and Mining Lease grant | 2027 (company targets not quantified) | Unlocks 20% of MD LTI; gate to FID |
| FEED / updated capex estimate | 2,027 | Tests the A$260m estimate against escalation |
| Debt mandate, offtake or streaming term sheet | Unconfirmed | Defines funding mix and dilution |
| Silver price and AUD/USD | Continuous | Primary value driver |
| Tivan deferred payments; placement default recovery | Sep 2027 / Sep 2028; ongoing | Minor cash items |
| Any strategic or corporate approach | Unconfirmed | Single-asset developers are frequent targets |
Analyst verdict
Investigator Silver has done what the market typically asks of a junior. It took a long-dormant greenfields discovery through a reserve-backed DFS, lodged a Mining Lease Application within six months, recycled non-core assets into cash, and raised enough equity (about A$63m in FY2026) to fund the period up to final investment decision. The DFS describes a conventional, shallow, open-pit project with no novel technology. Its development funding requirement of A$260m is small against even the consensus-price NPV8 of A$618m, payback is about a year from first production, and the stockpile strategy is designed with lenders in mind. Management's recent development record at Kanmantoo is directly relevant.
The market's verdict has nonetheless been harsh. After the DFS, the stock fell from A$0.12 to about A$0.04, below the A$0.086 placement price, as silver retreated from its January 2026 record. At roughly A$45–70m enterprise value, the market is pricing Paris at a fraction of its study value. Three things explain that discount:
-
uncertainty over how about A$200m of remaining capital will be financed
-
the technical caveats in the study: BT recovery of 67%, 14% Inferred feed, and declining late-life grade
-
governance that remains sized for an explorer rather than a developer
The investment case therefore rests on execution through milestones rather than on headline economics. The key steps are the native title agreement, Mining Lease grant, FEED validation of capex, infill drilling that confirms early-year grades, and a debt-led funding package.
If those land while silver holds above roughly US$60/oz, the gap between price and value should narrow materially. If silver weakens or funding requires a large discounted equity raise, dilution could absorb much of the upside.
Verdict: Speculative positive, high risk. This is a well-defined, funded-to-FID option on silver with clear catalysts, but sizing should reflect the single-asset concentration, the funding gap and the commodity volatility.
Data integrity statement
-
All financial figures are in A$ from audited annual reports unless flagged as aggregator data (FY2023 and FY2024 items).
-
They are marked as such rather than estimated.
-
Derived metrics (market cap, enterprise value, P/B, P/NPV, ratios) are calculations from verified inputs and are labelled as derived.
-
DFS economics are pre-tax, ungeared and on a 100% basis, as reported by the company.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Background and qualifications |
|---|---|---|---|
Dr Richard Hillis | Non-Executive Chair | NED and Chair from 1 Jan 2022 | BSc (Hons) Geology, Imperial College (1985); PhD, Edinburgh (1989). Former Mawson Professor of Geology and Pro Vice-Chancellor, University of Adelaide. CEO of Deep Exploration Technologies CRC 2010–18. Founding director of Petratherm and KCL/Highfield Resources. SA Scientist of the Year 2018. |
Lachlan Wallace | Managing Director and CEO | 1 Jul 2025 | BEng (Mining), MBA, MSc, GAICD. About 25 years across the project lifecycle. CEO/MD of Hillgrove Resources (ASX: HGO) to July 2024, where he led redevelopment of the Kanmantoo copper mine (SA) into an underground operation. |
Andrew Shearer | Non-Executive Director | 14 Jul 2020; acting MD 3 Mar–30 Jun 2025 | BSc (Hons), Adelaide; MBA, UniSA. Former senior resource analyst (PAC Partners, Phillip Capital, Austock). Early career at Mount Isa Mines, Glengarry, SA Government. Executive Chair of ACDC Metals (ASX: ADC); former director of Osmond Resources (resigned 9 Sep 2024). |
Executive Leadership Team
| Name | Role | Since | Notes |
|---|---|---|---|
Lachlan Wallace | MD and CEO | 1 Jul 2025 | See above |
Joe Sutanto | CFO and Joint Company Secretary | 7 Sep 2026 | 20+ years across accounting, commodity trading, corporate finance and mining operations |
Anita Addorisio | Company Secretary | Joint secretary since at least FY2022 | Masters in Accounting; FCPA; Fellow of the Governance Institute |
Jason Murray | Exploration Manager / Competent Person (exploration) | KMP from 1 Aug 2020 to 30 Jun 2025 | No longer classified as KMP from 1 Jul 2025 |
Directors' Remuneration
| Person | Cash salary / fees | Cash bonus | Leave | Super | LSL | Equity-settled | Total |
|---|---|---|---|---|---|---|---|
R. Hillis | 67,873 | 0 | 0 | 8,145 | 0 | 44,780 | 120,798 |
A. Shearer | 53,061 | 0 | 0 | 6,367 | 0 | 44,780 | 104,208 |
L. Wallace | 353,500 | 94,500 | 28,729 | 38,500 | 475 | 1,079,892 | 1,595,596 |
Total KMP | 474,434 | 94,500 | 28,729 | 53,012 | 475 | 1,169,452 | 1,820,602 |
Major Shareholders
| Holder | Shares | % | Date / source |
|---|---|---|---|
Citicorp Nominees Pty Limited (custodian) | 273,950,143 | 15.81% of then 1,732.7m | FY2025 AR top-20 (via Market Index) |
Jupiter Asset Management Limited (substantial holder) | 222,574,089 | 14.00% | — |
Mapt Pty Limited | 11,238,946 | 0.65% | FY2025 AR |
Willow Glenn Pty Limited | 9,418,890 | 0.54% | FY2025 AR |
Shipbark Pty Limited | 9,000,000 | 0.52% | FY2025 AR |
Competitive Landscape
Key Competitors
| Company (ticker) | Flagship / jurisdiction | Stage | Relative positioning vs IVR |
|---|---|---|---|
Silver Mines Ltd (ASX: SVL) | Bowdens silver, NSW | Advanced developer, permitting/legal history | — |
Sun Silver Ltd (ASX: SS1) | Maverick Springs, Nevada | Resource-stage explorer | Larger contained resource but lower grade; US jurisdiction |
Andean Silver Ltd (ASX: ASL) | Cerro Bayo, Chile | Restart/exploration | Former producing district; restart thesis |
Iltani Resources (ASX: ILT) | Orient silver-indium, Queensland | Resource definition | Earlier stage; polymetallic |
Unico Silver (ASX: USL) | Santa Cruz, Argentina | Exploration/resource | Emerging-market jurisdiction |
Manuka Resources (ASX: MKR) | Wonawinta silver, NSW | Former producer, care and maintenance / restart | Small-scale Australian silver comparator |
Aya Gold & Silver (TSX: AYA) | Zgounder, Morocco | Producer | Global pure-silver producer benchmark |
Vizsla Silver (TSX/NYSE: VZLA) | Panuco, Mexico | Developer | High-grade developer valuation benchmark |
First Majestic Silver (TSX/NYSE: AG) | Mexico / US | Major producer | Sector valuation anchor |
Pan American Silver (TSX/NYSE: PAAS) | Americas | Major producer | Sector anchor |
Hecla Mining (NYSE: HL) | US / Canada | Major producer | Sector anchor |
Coeur Mining (NYSE: CDE) | US / Mexico (incl. ex-SilverCrest Las Chispas) | Major producer | Sector anchor |
Peer Comparison FY2026
| Metric | IVR (verified) | Silver Mines (SVL) | Sun Silver (SS1) | Vizsla Silver (VZLA) |
|---|---|---|---|---|
Study stage | DFS plus Probable Reserve (Feb 2026) | — | — | — |
Jurisdiction | South Australia (Tier 1) | New South Wales | Nevada, USA | Sinaloa, Mexico |
Product | Silver doré (pure play) | — | Silver (+gold) | Silver-gold |
Recent Developments
--