IREN Limited

Company Profile Analysis

Ticker: IREN

ESOMAR 23 Corporate BadgeISO Certifications Badge
IREN Limited - Company showcase

Year Founded & Workforce

2018

685 Employees

IREN Limited logo

IREN Limited Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

IREN Limited Overview

IREN is a former Australian-founded Bitcoin miner that has reinvented itself as a vertically integrated AI cloud provider. It owns and operates all three layers of the AI infrastructure stack: grid-connected land, power and data centers; GPU compute; and, since the August 2026 Mirantis acquisition, orchestration software and enterprise support. Its strategic asset is roughly 5GW of secured grid-connection capacity across Texas, Oklahoma, British Columbia, South Australia and Spain, which is scarce in an industry constrained by power. The company has signed anchor contracts with Microsoft (US$9.7bn) and NVIDIA (US$3.4bn), cites US$4bn of contracted ARR for 2026 capacity, and is winding down Bitcoin mining by end-2026. It is financing a very large build-out through customer prepayments, investment-grade GPU financing and about US$6.3bn of FY26 convertible issuance. The equity is therefore a high-beta, execution-dependent bet on converting contracted capacity into recognised revenue.


Company's own description (Form 10-K FY2026)

IREN describes itself as "a vertically integrated AI Cloud Services platform, delivering data centers, compute and software for AI training and inference." The 10-K sets out three layers:

Data center layer: Land, power, substations, buildings and cooling. IREN develops, owns and operates its data centers, including grid connections and substations. It prefers grid-connected over behind-the-meter power for reliability and diversity of generation.

Compute layer: GPUs, CPUs, servers, storage and networking. At 30 Jun 2026, installed and on-order GPUs included AMD MI350X and NVIDIA H100, H200, B200, B300, GB300 and VR200 systems. These are offered as dedicated bare metal or managed cloud, with NVIDIA InfiniBand NDR/XDR interconnects.

Software layer: Managed services and enterprise support, strengthened by Mirantis, whose k0rdent AI platform handles GPU provisioning, cluster templating, orchestration, monitoring, metering and lifecycle management.

At 30 Jun 2026, operating AI Cloud capacity was about 40MW. Grid connection agreements or equivalents totalled about 5GW across the US, Canada, Spain and Australia, with a further multi-GW pipeline.

The company still runs a Bitcoin mining business. It had 23.2 EH/s installed at 30 Jun 2026, using about 380MW of data center capacity. Management aims to substantially complete the transition from mining to AI Cloud by 31 Dec 2026. Mined Bitcoin is generally sold daily, and no Bitcoin was held at 30 Jun 2026.

Business model and revenue model

Revenue lineModelFY2026 revenue (USD Mn)Share of FY2026 revenue
AI Cloud ServicesService/subscription-like reserved-capacity contracts, mostly multi-year, priced per GPU-hour, often with customer prepayments of 20–55% of GPU capex. Bare metal and managed cloud. Software and support from Mirantis from Aug 2026128.818.2%
Bitcoin MiningProof-of-work hashrate contributed to a pool; block rewards and fees sold for fiat. Exposed to Bitcoin price, difficulty and power cost578.281.8%
Total—707.0100%

Source: FY26 results release, 27 Aug 2026.

The mix is moving quickly. In Q4 FY26, AI Cloud revenue of US$70.5m overtook Bitcoin mining revenue of US$66.7m for the first time. Contracted AI revenue is recognised only after delivery, commissioning and, where applicable, customer acceptance. The 10-K stresses that ramp periods, service credits and testing conditions can delay or reduce recognised revenue relative to headline ARR.

Key commercial metrics disclosed (FY26 release and 10-K FY2026):

  • Operating ARR was about US$1bn at 26 Aug 2026.

  • Contracted ARR for 2026 capacity was about US$4bn, and the target is to have it operational by 31 Dec 2026, subject to commissioning and acceptance.

  • Recent 3-year contracts bring in more than US$20m of revenue per MW (IT), with an estimated payback of about two years. Active discussions are at about US$25m per MW (IT).

  • Recent customer prepayments equal 45–55% of GPU capex.

  • Cumulative capacity targets are about 0.3GW (IT) in 2026 and about 0.8GW (IT) in 2027. Earlier July 2026 framing put this at 480MW gross in 2026 and 1.2GW gross in 2027.

Value-chain position

IREN sits between power and hardware suppliers on one side and AI model builders and enterprises on the other.

Upstream: utilities and grid operators (BC Hydro, ERCOT, Public Service Company of Oklahoma, ElectraNet), GPU and system vendors (NVIDIA, AMD, Dell, Lenovo, Supermicro, Gigabyte) and EPC contractors.

Midstream: IREN owns land, substations and buildings, unlike many neoclouds that rely on third-party colocation.

Downstream: it sells compute directly or through channel partners that resell IREN capacity on a white-label basis.

Customer types and end-markets

The 10-K FY2026 lists four customer segments:

  1. Hyperscalers, e.g. Microsoft.

  2. Enterprises.

  3. AI developers and frontier labs, e.g. Together AI, Fluidstack, Fireworks AI, Perplexity, Figure AI, Fal AI, Hume AI, Cohere, Prometheus, Higgsfield AI, an unnamed "leading frontier AI lab", and NVIDIA for its internal research workloads.

  4. Channel partners.

End-markets are AI model training, AI inference and, in wind-down, Bitcoin network security.

Independent characterisation

IREN is best understood as a power-and-real-estate developer that has moved up the stack into GPU cloud. Its competitive edge rests on three things: grid capacity secured early; self-built, purpose-designed facilities (Horizon liquid-cooled halls at Childress); and a demonstrated, if dilutive, ability to raise capital at scale. About US$19bn was raised in the year to Aug 2026 across prepayments, GPU financing, convertibles and equity (Blockspace, citing FY26 disclosures).

Three features distinguish it from pure-play neoclouds such as CoreWeave and Nebius. First, it owns its data center real estate. Second, it carried a legacy cash-generating mining business that funded the pivot. Third, its software layer is new and still being integrated.

The key analytical tension is that reported GAAP revenue (US$707m in FY26) is a fraction of contracted ARR (US$4bn). That leaves FY2027 as the year in which the conversion thesis is either validated or impaired.

Strategy

Stated strategy (10-K FY2026 and FY26 release themes)

  1. Own all three layers of the stack (data center, compute, software) to bring compute online "quickly and at scale" and give customers more certainty than platforms that depend on third parties.

  2. Grid-connected power in renewable-rich regions, with geographic diversification across North America, Europe and APAC to reduce single-jurisdiction exposure and serve sovereignty and data-residency needs.

  3. Diversify the customer base across hyperscalers, enterprises, AI developers, frontier labs and channel partners. Management describes deliberately allocating capacity to avoid over-concentration.

  4. Contract structuring for financeability: credit quality, prepayments, contract duration and payback shape capacity allocation. Prepayments plus GPU financing are designed to fund 90–100%+ of GPU capex.

  5. Move up the value chain into managed services and software through Mirantis, with shorter-duration contracts and on-demand offerings as revenue upside.

  6. Build a global brand through sponsorships, events and community programmes.

  7. Exit Bitcoin mining by 31 Dec 2026.

Strategic initiatives, last 24 months

InitiativeDateDescriptionTargets / status
Microsoft AI Cloud contractNov 2025US$9.7bn, about 5-year GB300 contract at Childress Horizon 1–4Horizon 1 accepted Aug 2026; Horizons 2–4 by Q4 2026
Dell equipment purchase (Microsoft)Nov 2025About US$5.8bn of GB300 systems (per contemporaneous reporting; not re-verified)Delivering 2026
Microsoft GPU financingFeb–May 2026US$3.6bn investment-grade USPP + DDTL at about 6.0% weighted averageTogether with prepayments, funds 96% of GPU capex
Kiowa, Oklahoma campusFeb 20261.6GW campusRamp from 2028
Sweetwater 1 energisationApr 20261.4GW substation energisedInitial phase supports the NVIDIA contract
NVIDIA contractMay 2026US$3.4bn, 5-year, air-cooled Blackwell at ChildressTranches from early 2027
NVIDIA 5GW DSX partnershipMay 2026Deploy up to 5GW of DSX-aligned AI factories; NVIDIA rights to invest up to US$2.1bn for 30m shares, subject to delivery of up to 600,000 GPUsMulti-year
Mirantis acquisitionMay–Aug 2026Software and services layerClosed 4 Aug 2026
Nostrum Group acquisitionMay–Jun 2026European development platformClosed 12 Jun 2026
Bundey, South AustraliaJun 2026800MW; more than 200 ongoing jobs and more than 500 construction jobs expectedEnergisation from 2028
US$2.8bn new contractsJul 2026Prometheus, Perplexity, Together AI and othersARR target above US$4bn
Frontier AI lab contractAug 2026Multi-year AI Cloud contract (counterparty unnamed)Part of US$4bn contracted ARR
Mackenzie GPU financingAug 2026US$2.4bn financing led by Blue Owl and PIMCO (as adviser) at 9.0% fixedFunds 90% of GPU capex
BC liquid-cooled retrofits2,027Mackenzie, Canal Flats and Prince GeorgePlanned
Security and compliance programmeOngoingSOC 2 for parts of the organisation; working toward organisation-wide SOC 2 and ISO/IEC 27001In progress
Community programmesOngoingIREN Scholarships & Bursaries; grants in Prince George, Mackenzie, Sweetwater and Childress; IREN Ignite paid summer programmeOngoing

Management targets and guidance

TargetValueSource
Operating ARR (26 Aug 2026)About US$1bnFY26 release
Contracted ARR for 2026 capacityAbout US$4bn, targeted operational by 31 Dec 2026FY26 release
2026 capacityLargely sold outFY26 release
2027 capacityLate-stage discussions with a range of new customers over a significant portionFY26 release
2028 capacityCustomer and financing discussions progressingFY26 release
Cumulative IT capacityAbout 0.3GW (2026); about 0.8GW (2027)FY26 release
Contract economicsMore than US$20m per MW (IT) for 3-year deals; about 2-year paybackFY26 release
Capital resourcesAbout US$14bn of cash, committed GPU financing and prepaymentsFY26 release
Bitcoin exitSubstantially complete by 31 Dec 202610-K FY2026

No formal GAAP revenue or EBITDA guidance for FY2027 was identified. Management communicates through ARR and capacity targets and cautions that recognised revenue "may be materially lower" than ARR.

Products & Services

AI Cloud Services — Compute offerings

OfferingDescription / key specificationsTarget customerStatus / timingPricing model
NVIDIA GB300 NVL72 (liquid-cooled)Rack-scale Blackwell Ultra systems in Horizon 1–4, four 50MW (IT) direct-to-chip liquid-cooled halls at Childress. NVIDIA Exemplar Cloud designation awarded Aug 2026 after NVIDIA testing at Horizon 1Hyperscaler (Microsoft)Horizon 1 delivered and accepted Aug 2026. Horizon 2 commissioning. Horizons 3–4 targeted for Q4 2026Multi-year reserved; US$9.7bn total contract value through 2031; 20% prepayment per tranche
NVIDIA HGX B300Air-cooled Blackwell Ultra; Exemplar Cloud statusAI developers, frontier labs, enterprisesDeployed and expanding (2026)GPU-hour; reserved contracts
NVIDIA B200 / Blackwell air-cooledAir-cooled Blackwell clusters. The NVIDIA internal-workload contract uses air-cooled Blackwell at Childress (Dell systems of about US$1.6bn, start planned early 2027)NVIDIA (internal AI/research), AI developersTranches over 5 yearsUS$3.4bn total contract value (NVIDIA)
NVIDIA H200 / H100Hopper-generation clusters, mainly at Prince George and the British Columbia sites; IREN's first AI cloud fleet (from FY2024)AI developers, inference customersOperatingGPU-hour; shorter-dated contracts
NVIDIA VR200 (Vera Rubin)Next-generation systems on order at 30 Jun 2026Frontier labs / hyperscalersOn order; timing not disclosed—
AMD MI350XAMD Instinct accelerators installed or on orderDiversified customersInstalled/on order at 30 Jun 2026—
InfiniBand NDR/XDR fabricsHigh-bandwidth, low-latency GPU interconnect for distributed trainingTraining customersStandard in large clustersBundled
High-performance storageA range of storage tiers for different throughput and scalability needsAll AI Cloud customersOperatingIncluded in ARR as "storage and ancillaries"
Bare metal deliveryDedicated single-tenant clustersHyperscalers, labsCore offeringReserved capacity
Managed cloudMulti-tenant or managed environments with orchestration and supportEnterprises, AI developersExpanding with MirantisReserved and, prospectively, on-demand

AI Cloud Services — Software & Services (Mirantis, acquired 4 Aug 2026)

ProductDescriptionNotes
k0rdent AIOpen-source-based platform for GPU provisioning and lifecycle management, template-based cluster and service deployment, workload orchestration and scheduling, monitoring and logging, cost and consumption visibility, and multi-cluster operations. Integrated with NVIDIA DSX OS componentsMirantis is an inaugural partner of the NVIDIA AI Cloud Ready Initiative (10-K FY2026)
Mirantis Kubernetes Engine (MKE)Enterprise Kubernetes distributionPer Converge Digest profile
Mirantis Container CloudMulti-cluster lifecycle managementPer Converge Digest profile
OpenStack-based cloud solutionsPrivate cloud infrastructureLegacy Mirantis franchise
Enterprise technical support and managed services24/7 support and operations for more than 1,500 enterprise customers globallyBasis for the managed-services upsell

Revenue contribution from Mirantis has not been disclosed. Analysts (VanEck) estimated the deal at about 4–5x Mirantis revenue, which implies roughly US$125–155m of annual revenue. That is an estimate only and is not company-disclosed.

Data center platform (internal capability, monetised through AI Cloud)

Asset/designDescription
Horizon liquid-cooled halls50MW (IT) per hall, direct-to-chip, closed-loop, low-water designs at Childress. Four halls (200MW IT) are dedicated to Microsoft
Air-cooled modular hallsFree-air and chilled-coil cooling, used in British Columbia and for air-cooled Blackwell
DSX-aligned AI factoriesPlanned deployments aligned to the NVIDIA DSX reference design across up to 5GW (partnership May 2026)
Liquid-cooled retrofits at BC sitesNew liquid-cooled deployments planned at Mackenzie, Canal Flats and Prince George during 2027 to use power headroom (FY26 release)

Bitcoin Mining (in wind-down)

ItemDetail
Installed hashrateAbout 23.2 EH/s at 30 Jun 2026, versus about 50 EH/s in mid-2025
Power allocatedAbout 380MW at 30 Jun 2026
FleetBitmain ASICs, chiefly S21-series (S21 XP and others).
Treasury policySell mined Bitcoin daily; zero Bitcoin held at 30 Jun 2026
TargetSubstantially complete the transition to AI Cloud by 31 Dec 2026
FY26 impairmentsUS$638.8m in the year, mostly from decommissioning mining hardware

Pricing disclosures

  • ARR is calculated as GPU-hour pricing for commissioned, contracted GPUs × 8,760 hours, plus storage and ancillaries.

  • 3-year contracts bring in more than US$20m of revenue per MW (IT), with negotiations at about US$25m per MW (IT). Management says this is more than double late-2025 levels.

  • Microsoft is expected to average about US$1.94bn of annual revenue; NVIDIA about US$0.7bn per year; Prince George deployments about US$0.4–0.5bn of ARR (Q2 and Q3 FY26 releases).

Financial Narrative

Basis. FY2023–FY2026 are US GAAP. FY2022 is as originally reported under IFRS, so line items are only partly comparable. FY2021 revenue was US$8.5m and net loss US$60.4m (Stock Analysis) and is shown for context only. Figures are in US$ millions unless stated.

Income statement: notes and sources

Sources: FY26 release (FY2025–FY2026); Stock Analysis (FY2022–FY2024 revenue, cost of revenue, SG&A, operating income, pre-tax, net income); ChartRow/SEC index (EPS). Because FY2022 was reported under IFRS, its operating-line data is omitted.

Margin profile (%)

Derived. Revenue CAGR FY2022–FY2026 is about 86% (four-year, derived); revenue CAGR FY2023–FY2026 is about 112% (derived).

Commentary.

FY2022–FY2023: These were crisis years. A collapsing hashprice, the equipment-financing default and impairments produced large losses even though revenue grew.

FY2024: The business inflected as Childress ramped and mining efficiency improved, taking revenue to US$187.2m and nearly breakeven at the pre-tax line.

FY2025: This was the peak year for mining. About 50 EH/s and strong Bitcoin prices drove revenue up 168% to US$501.0m, with the first net profit (US$86.9m), helped by US$77.5m of unrealised gains on capped calls and the prepaid forward.

FY2026: the reinvention year: - Revenue still grew 41%, but operating income swung to a loss of US$1,046.7m because of three forces:

1. US$638.8m of impairments, mostly from retiring ASICs.

2. D&A more than doubled to US$417.7m as GPUs entered service.

3. SG&A tripled to US$449.1m, including US$205.0m of stock-based compensation and the cost of building a global sales, product and security organisation.
  • Below the operating line, US$558.5m of unrealised gains on capped calls and prepaid forwards offset much of the loss. A US$111.8m debt conversion inducement and a US$110.6m fair-value write-down of assets held for sale added to it.

  • Adjusted EBITDA fell only 9% to US$245.7m. The Q4 run-rate of US$19.2m (14% margin) shows the trough before AI revenue ramps.

Balance sheet

Sources: FY26 release balance sheet (FY2025–FY2026); Stock Analysis (cash, goodwill and net cash FY2022–FY2024; total debt FY2022–FY2024 derived from cash less net cash). Negative net debt means net cash. FY2025 total debt includes about US$1.5m of operating leases.

Commentary.

Scale-up: The balance sheet grew more than fivefold in FY2026, from US$2.9bn to US$15.8bn of total assets.

Cash and liabilities: The US$7.6bn of total cash includes US$1.67bn restricted to the Microsoft GPU financing. US$1.84bn of deferred revenue, mostly long-term, reflects customer prepayments that are effectively interest-free funding.

Debt mix: Gross debt of about US$7.8bn is mostly convertible notes, about US$6.3bn issued in FY26, plus a US$938m drawn financing facility.

Intangibles: Goodwill of US$36.6m and intangibles of US$317.4m relate mainly to the Nostrum acquisition and to capitalised intangibles, including US$107.6m of intangible-asset payments. Mirantis closed after year-end and will add further goodwill in FY2027.

Cash flow

Source: FY26 release cash flow statement.

Commentary. Reported FY26 operating cash flow of US$2.1bn is flattered by US$1.84bn of prepayments, most of it in Q4 (US$1.72bn). Excluding prepayments, underlying operating cash flow was flat at about US$0.26bn. Free cash flow was deeply negative at −US$2.2bn, and investing outflows totalled US$4.7bn. The funding model has three legs: prepayments cover 20–55% of GPU capex; GPU financing covers 90–96% when combined with prepayments; and corporate-level equity and convertibles fund land, power and shells.

Ratio analysis

All ratios are derived. ROIC is not meaningful for FY2026: NOPAT is negative and invested capital is dominated by assets still under construction. The cash conversion cycle is not meaningful because receivables are small (US$21.1m), inventories are immaterial and payables are construction-driven (US$1.83bn).

Ratio commentary. Leverage metrics look stretched against trailing EBITDA (net debt/Adj. EBITDA of 7.9x). That is typical at this stage of a build-out: debt and capex arrive 6–18 months before contracted revenue. The right forward test is net debt against end-2026 operating ARR of about US$4bn (target), where implied leverage falls well below 1x if EBITDA margins resemble AI Cloud contribution margins. That outcome depends entirely on execution. The convertibles are low-coupon (0–3.5%), and the 2033 notes pay 1.00%, which keeps cash interest modest relative to the debt quantum.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Income Statement and Per-Share Data

MetricFY2022FY2023FY2024FY2025FY2026

Revenue (USD Mn)

59.075.5187.2501.0707.0

Cost of revenue excl. D&A (USD Mn)

—39.487.1159.0219.7

Gross profit excl. D&A (USD Mn)

—36.1100.1342.0487.3

SG&A (USD Mn)

—49.070.4136.5449.1

Stock-based compensation (USD Mn)

———42.6205.0

Depreciation & amortisation (USD Mn)

———181.1417.7

Impairment of assets (USD Mn)

———7.2638.8

Operating income (loss) (USD Mn)

—-157.2-27.217.3-1,046.7

Adjusted EBITDA (USD Mn)

———269.7245.7

Finance expense (USD Mn)

———11.059.3

Interest income (USD Mn)

0.10.95.87.580.6

Unrealised gain on financial instruments (USD Mn)

———77.5558.5

Debt conversion inducement expense (USD Mn)

———0111.8

Pre-tax income (loss) (USD Mn)

-417.1-169.4-25.593.5-708.7

Net income (loss) (USD Mn)

-419.8-171.8-28.986.9-702.6

Diluted EPS (USD)

———0.39-2.22

Dividends per share (USD)

00000

Margin Analysis (%)

MetricFY2022FY2023FY2024FY2025FY2026

Gross margin excl. D&A (%)

—47.853.568.368.9

Operating margin (%)

—-208.2-14.53.5-148.0

Adjusted EBITDA margin (%)

———53.834.8

Net margin (%)

-710.9-227.6-15.417.3-99.4

Revenue growth YoY (%)

595.727.9147.9167.641.1

Balance Sheet

MetricFY2022FY2023FY2024FY2025FY2026

Cash & cash equivalents (USD Mn)

110.068.9404.6564.55,895.6

Restricted cash, current + non-current (USD Mn)

00001,724.0

Total current assets (USD Mn)

———641.27,886.1

Property, plant & equipment, net (USD Mn)

———1,930.66,753.2

Goodwill + intangibles (USD Mn)

0.6000354.0

Total assets (USD Mn)

———2,940.315,790.0

Debt, current (USD Mn)

———0169.4

Debt, non-current (USD Mn)

———962.87,423.6

Finance lease liabilities (USD Mn)

———0243.8

Total debt incl. leases (USD Mn)

108.31.41.3964.27,836.8

Net debt excl. restricted cash (USD Mn)

-1.7-67.5-409.8399.71,941.2

Net debt incl. restricted cash (USD Mn)

———399.7217.2

Deferred revenue, total (USD Mn)

——2.60.91,842.6

Total liabilities (USD Mn)

———1,122.811,604.4

Shareholders' equity (USD Mn)

———1,817.54,185.6

Working capital (USD Mn)

———491.95,665.0

Cash Flow

MetricFY2025FY2026

Net cash from operating activities (USD Mn)

245.92,100.4

of which: increase in deferred revenue (USD Mn)

-1.71,841.7

Operating cash flow excl. deferred revenue (USD Mn)

247.6258.7

Payments for PP&E excl. hardware (USD Mn)

573.52,998.0

Payments for computer hardware (USD Mn)

799.21,335.1

Total capex, PP&E + hardware (USD Mn)

1,372.74,333.1

Free cash flow, OCF − capex (USD Mn)

-1,126.8-2,232.7

Payment for acquisition of subsidiaries (USD Mn)

092.5

Proceeds from ordinary share issuance (USD Mn)

601.84,742.8

Proceeds from convertible notes (USD Mn)

701.26,299.6

Cash paid for induced conversion of notes (USD Mn)

01,623.5

Payment for capped calls (USD Mn)

0448.9

Proceeds from financing facility (USD Mn)

0938.0

Net cash from financing activities (USD Mn)

1,294.79,680.1

Dividends paid (USD Mn)

00

Share buybacks (USD Mn)

00

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2025FY2026

ROE, net income / year-end equity (%)

4.8-16.8

ROE, net income / average equity (%)

—-23.4

ROA, net income / year-end total assets (%)

3.0-4.4

ROA, net income / average total assets (%)

—-7.5

Current ratio (x)

4.293.55

Debt incl. leases / equity (x)

0.531.87

Net debt excl. restricted cash / Adjusted EBITDA (x)

1.487.90

Adjusted EBITDA / finance expense (x)

24.54.1

Asset turnover, revenue / year-end total assets (x)

0.170.04

Region (Asset Location) Overview

Region (asset location)Revenue streamsFY2024–FY2026 qualitative trend

Canada, British Columbia (Canal Flats 30MW, Prince George 50MW, Mackenzie 80MW)

Bitcoin mining (historic core); AI Cloud (H100/H200/B200/B300 at Prince George and others)

Mining declining as ASICs are retired. AI Cloud rising: Prince George about US$0.4–0.5bn of contracted ARR. The Mackenzie air-cooled expansion is financed by the US$2.4bn Blue Owl/PIMCO facility

United States, Texas (Childress 750MW)

Bitcoin mining (large share of FY2025–FY2026 hashrate); AI Cloud (Horizon 1–4 for Microsoft; air-cooled Blackwell for NVIDIA)

Fastest-growing region from FY2027 as Microsoft ramps. Mining being wound down

United States, Texas (Sweetwater 1 1,400MW, Sweetwater 2 600MW)

Pre-revenue

Sweetwater 1 substation energised Apr 2026; Sweetwater 2 targeted late 2027. Included in ERCOT Batch Zero as Base Load (Sep 2026)

United States, Oklahoma (Kiowa 1,600MW)

Pre-revenue

Capacity ramp from 2028

Australia (Bundey 800MW)

Pre-revenue

Energisation from 2028

Spain (Badajoz about 300MW, plus Nostrum pipeline)

Pre-revenue

Development stage

Global (Mirantis software and support)

Software/support revenue from FY2027

New; size not disclosed

Value by Reference

ReferenceValueSource / date

IPO price (Nov 2021)

28.00

IPO prospectus / contemporaneous reports

52-week low

28.93

AD HOC NEWS, as of 7 Oct 2026

52-week high

76.87

Nov 2025 (AD HOC NEWS; The Block)

Close, 19 May 2026

47.74

24/7 Wall St

Close, 3 Aug 2026

39.75

Stock Analysis

Close, 4 Sep 2026

44.68

Stock Analysis

Close, 25 Sep 2026

44.13

TIKR

Close, 2 Oct 2026

41.76

ChartRow

Close, 7 Oct 2026

38.69

AD HOC NEWS

Valuation Multiples

MultipleIRENBasis

Market capitalisation (USD Bn)

15.3

Price × shares

Enterprise value excl. restricted cash (USD Bn)

17.2

Market cap + US$7.84bn debt incl. leases − US$5.90bn cash

Enterprise value incl. restricted cash (USD Bn)

15.5

Also subtracts US$1.72bn restricted cash

EV/Adjusted EBITDA (FY2026) (x)

70.0

17.2 / 0.2457

EV/Sales (FY2026) (x)

24.3

17.2 / 0.707

EV/Operating ARR (about US$1bn) (x)

17.2—

EV/Contracted 2026 ARR (about US$4bn) (x)

4.3—

P/B (FY2026 year-end equity) (x)

3.7

15.3 / 4.19

Valuation Snapshot

MetricValueSource

Consensus rating

Buy (20 analysts)

Stock Analysis via AD HOC NEWS, 7 Oct 2026

Average 12-month price target

US$78.14

Same

Rating distribution

1 Strong Buy, 16 Buy, 3 Hold, 1 Sell

MarketBeat, Sep 2026

Notable recent action

Rothschild & Co Redburn: initiated Neutral, PT US$40 (21 Sep 2026)

TIKR

Notable recent action

A Buy with PT US$79 (broker not identified in source)

MarketBeat, Sep 2026

Next earnings

5 Nov 2026 (Q1 FY27); consensus EPS −US$0.46

ChartRow

Last surprise

Q4 FY26 EPS −US$0.41 vs −US$0.50 consensus

ChartRow

Capital Markets

ItemStatus

Dividend history

None ever paid

Dividend policy

No current intention to pay (10-K FY2026)

Buyback authorisation

None disclosed

Corporate credit ratings (Moody's / S&P / Fitch)

No public issuer ratings identified. The US$3.6bn Microsoft-backed GPU financing is described as investment-grade rated at instrument level

Capital Instruments

InstrumentCouponMaturityPrincipal outstanding at 30 Jun 2026Notes

2029 convertible senior notes

3.50%2029—

Originally about US$440m (Dec 2024)

2030 convertible senior notes

3.25%2030—

Issued Jun 2025

2031 convertible notes

—20311,000

Issued 14 Oct 2025

2032 convertible notes

—

1 Jun 2032

1,150

Issued 8 Dec 2025

2033 (Jun) convertible notes

—

1 Jun 2033

1,150

Issued 8 Dec 2025

2033 (Dec) convertible notes

1.00%

1 Dec 2033

3,000

Issued 14 May 2026; 32.5% conversion premium; capped call cap US$110.30

GPU financing facility (Microsoft; USPP + DDTL)

About 6.0% weighted average

—

938 drawn at 30 Jun 2026 (financing facility proceeds)

US$3.6bn committed

GPU financing (Mackenzie; Blue Owl/PIMCO-led)

9.0% fixed

—

Committed post-year-end

US$2.4bn

Finance leases

—

Various

243.8—

Total debt + leases (balance sheet)

——

7836.8

Debt US$7,593.0m + leases US$243.8m

Maturity bucket

Principal (US$m, convertibles and known facilities)

———

Within 12 months (current debt + leases)

294.7———
2,0311,000———
2,0321,150———
2,0334,150———

Analyst Conclusions

Management guidance recap

  • About US$4bn of contracted ARR for 2026 capacity, targeted operational by 31 Dec 2026; about US$1bn operating at 26 Aug 2026.

  • Cumulative IT capacity of about 0.3GW in 2026 and about 0.8GW in 2027, plus liquid-cooled BC retrofits in 2027.

  • Horizons 2–4 delivered to Microsoft by Q4 2026.

  • Bitcoin mining exit substantially complete by 31 Dec 2026.

  • About US$14bn of available capital, including committed GPU financing and prepayments.

Consensus expectations

  • Near-term consensus is for continued losses: Q1 FY27 EPS of −US$0.46 against −US$0.34 a year earlier.

  • The sell side's average PT of about US$78 implies it underwrites largely full conversion of the US$4bn ARR during calendar 2027.

Bull case

  1. Contracted conversion. If even 75% of the US$4bn ARR is billing by mid-2027, annualised revenue would be about US$3bn, roughly 4x FY26. AI Cloud contribution margins (86.9% in FY26) would support EBITDA above US$2bn, implying about 8x current EV.

  2. Rising unit economics and cheap capital. More than US$20m per MW (IT) with about 2-year paybacks, funded 90–96% by prepayments plus GPU financing, means incremental equity needs per MW are falling sharply.

  3. Pipeline optionality. About 5GW of secured power plus NVIDIA's 5GW DSX alignment could support more than 10x today's capacity. Against private-market values for powered land, that may be under-reflected in an EV of about US$15–17bn.

Bear case

  1. Execution and timing. Only about 40MW was operating at FY-end. Acceptance tests, ramp periods and Texas regulatory delays (Batch Zero audit) could push revenue well into 2027–2028 while depreciation and interest start immediately. Q4 FY26 Adjusted EBITDA was just US$19.2m.

  2. Dilution and capital structure. US$4.74bn of equity and US$6.3bn of convertibles were raised in FY26, and further raises will be needed for 2028 capacity. Combined with NVIDIA's rights over 30m shares, per-share value creation could lag enterprise growth.

  3. Counterparty and obsolescence risk. Outside Microsoft and NVIDIA, the customer base includes venture-funded AI developers. GPU generations turn over every 12–18 months, and FY26's US$638.8m mining impairment shows how quickly hardware value can be written off.

Catalysts and monitorables (next 12 months)

Catalyst / monitorableTiming
Q1 FY27 results; operating ARR update5 Nov 2026
2026 proxy (DEF 14A) and AGM: board, compensation, B Class mattersOct–Nov 2026
Horizons 2–4 delivery and Microsoft acceptanceQ4 2026
Operating ARR reaching about US$4bnBy 31 Dec 2026
Completion of Bitcoin exit; further impairmentsH2 CY2026
ERCOT Batch Zero verification outcome and Sweetwater energisation pathLate 2026 – 2027
2027 capacity contracting (late-stage talks) and named frontier-lab disclosureH1 CY2027
NVIDIA investment-rights exercise tied to GPU deliveries2026–2027
Mirantis revenue disclosure and managed-services attach ratesFY2027 reporting
New financing (GPU, corporate) and dilutionOngoing

Analyst verdict

IREN has carried out one of the most complete strategic pivots in the listed digital-infrastructure universe. In about 18 months, a Bitcoin miner earning almost all its revenue from hashrate has become a vertically integrated AI cloud provider. It holds a US$9.7bn Microsoft contract, a US$3.4bn NVIDIA contract, about US$4bn of contracted ARR for 2026 capacity, and roughly 5GW of secured grid power across four countries.

The FY2026 accounts show the cost of that pivot. The company lost US$702.6m, impaired US$638.8m of mining hardware, spent US$4.3bn of capex and raised about US$11bn of equity and convertible capital. Operating AI capacity at year-end was only about 40MW.

The investment debate is therefore about timing and conversion, not about demand. Management's claims that 2026 capacity is largely sold out and that 3-year contract pricing has more than doubled are corroborated by named counterparties and by investment-grade financing terms (about 6%). Those terms would be hard to obtain without credible offtake.

At about US$15–17bn of EV, the market pays roughly 4x contracted 2026 ARR but about 17x operating ARR. That valuation implicitly assumes most of the backlog bills during 2027 at margins close to the 87% AI contribution margin seen in FY26, before depreciation.

The risks are real and specific: Texas grid politics, acceptance-driven revenue lags, a growing convertible stack, a founder-weighted governance structure, and customer concentration with Microsoft. Even so, IREN's ownership of land, power and buildings, its NVIDIA alignment and its proven access to capital put it among the better-positioned second-tier neoclouds.

Our synthesis is constructive but execution-gated. The next three quarters are a binary test. Delivery of Horizons 2–4, reaching about US$4bn of operating ARR by December 2026, and visible contracting of 2027 capacity would support a re-rating toward consensus targets. Slippage on any of these would leave the equity exposed to further dilution and multiple compression.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Executive Leadership Team

NameTitleTenurePrior roles / backgroundEducationAge

Daniel Roberts

Co-Founder, Co-CEO, Executive Director

Since 2018

———

William Roberts

Co-Founder, Co-CEO, Executive Director

Since 2018

———

Anthony Lewis

Chief Financial Officer (from 8 Sep 2025); Chief Capital Officer from 1 Jul 2025

Since Jul 2025

22 years at Macquarie Group, most recently Co-Treasurer covering global funding, liquidity, capital management and regulatory reporting

Not disclosed in reviewed sources

49 (8-K, Sep 2025)

Kent Draper

Chief Commercial Officer

Multi-year (title per prior disclosures)

———

John Gross

Chief Innovation Officer

Since Feb 2026

About two decades in data center engineering; senior roles at ASHRAE

——

Kambiz Aghili

Chief Product Officer

Since Jul 2026

VP Products at Oracle Cloud Infrastructure, led the multi-cloud platform across AWS, Azure and GCP

——

Michael Nudelman

Chief Development Officer

Since Jul 2026

More than 20 years in data center development, energy and finance; senior roles at Google, CyrusOne and Beale Infrastructure

——

Eric Hammersley

Chief Information Security Officer

Since 15 Jul 2026

VP Engineering and Chief Product Security Officer at Nutanix; product security architecture for NVIDIA HPC; Chief Engineer supporting the Joint Chiefs of Staff (J6); US Navy veteran

——

Chief Marketing Officer

—2,026

Referenced in 10-K FY2026 as a recent appointment

——

Alex Freedland

Founder & CEO, Mirantis (subsidiary)

Mirantis since its founding

Mirantis founder

——

Board of Directors

DirectorRoleIndependenceNotes

David Bartholomew

Chair

Independent (as previously disclosed)

—

Daniel Roberts

Executive Director

Not independent

Co-founder

William Roberts

Executive Director

Not independent

Co-founder

Christopher Guzowski

Non-executive Director

Independent (prior disclosure)

—

Michael Alfred

Non-executive Director

Independent (prior disclosure)

—

Sunita Parasuraman

Non-executive Director

Independent (prior disclosure)

—

Major Shareholders

HolderSharesStake (approx., of 394.1m)Source/date

Situational Awareness LP

11,698,8353.0%

MarketBeat, Sep 2026 (13F-based)

Bank of America Corp

2,138,6190.5%

MarketBeat, Sep 2026

NVIDIA (investment rights)

Up to 30,000,000 shares via rights, subject to GPU-delivery and regulatory conditions

Up to about 7% if exercised

10-Q Q3 FY26; 10-K FY2026

Institutional ownership (total)

—41.08%

MarketBeat, Sep 2026

Competitive Landscape

Competitors by Segment

SegmentCompetitorPositioning vs IREN

Hyperscale cloud

Microsoft Azure

Customer and competitor; sets price and quality benchmarks

Hyperscale cloud

Amazon Web Services

Largest cloud; custom silicon (Trainium)

Hyperscale cloud

Google Cloud

TPUs; vertically integrated

Hyperscale cloud

Oracle Cloud Infrastructure

Aggressive AI capacity build; large multi-GW contracts

Specialised neocloud

CoreWeave

Scale leader among neoclouds; strong software (Weights & Biases acquisition)

Specialised neocloud

Nebius

Software-rich full stack; commands premium pricing per MW (per analyst commentary)

Specialised neocloud

Crusoe

Power-first developer and cloud

Specialised neocloud

Lambda

Developer-focused GPU cloud

Specialised neocloud

Nscale

European neocloud

Other (named in 10-K)

SpaceX

Named by IREN as a competitor in AI cloud

Miner-to-AI converters

Cipher Mining, TeraWulf, Core Scientific, Hut 8, Applied Digital, Galaxy Digital, Bitfarms

Compete for power, sites and hyperscale leases. Many lease shells (colocation) rather than operate GPU clouds

Bitcoin mining (legacy)

MARA Holdings, Riot Platforms, CleanSpark, Cipher

Being exited by IREN

Peer Comparison FY2026

MetricIREN (FY Jun-2026)CoreWeave (CY2024)Nebius (CY2024)Core Scientific (CY2024)

Revenue (USD Mn)

707.01,915.4117.5510.7

Revenue growth (%)

41.17374622

Adjusted EBITDA margin (%)

34.8

Not compared

Not compared

Not compared

Net margin (%)

-99.4-45

Loss-making

Loss-making

R&D intensity (%)

—

Not compared

Not compared

Not compared

“—” = not publicly disclosed.

Competitive Advantages & Vulnerabilities

Advantages (evidence)Vulnerabilities (evidence)

About 5GW of secured grid capacity across four countries (10-K FY2026)

Small operating base: about 40MW of AI capacity at 30 Jun 2026 versus multi-hundred-MW operating peers

Owned land, substations and buildings, so no colocation margin leakage (10-K)

Customer concentration: Microsoft is about US$1.94bn of the roughly US$3.7–4bn ARR (Q3 FY26 release)

Validated by Microsoft (US$9.7bn) and NVIDIA (US$3.4bn plus up to US$2.1bn equity)

Software layer only just acquired; integration risk

Investment-grade GPU financing at about 6% (US$3.6bn)

Non-investment-grade deployments financed at 9% (US$2.4bn)

Rising unit economics: more than US$20m per MW (IT), about 2-year payback

Heavy dilution: shares outstanding rose to about 394m; US$4.74bn of equity issued in FY26

Exemplar Cloud status on GB300 NVL72 and B300

Texas regulatory overhang (SB 6, Batch Zero audit)

Recent Developments

--

Company Snapshot

$707M

Revenue

685

Employees

$15,300M

Market Cap

2018

Founded

Sydney, Australia

Headquarters

SWOT Analysis

Strengths

  • Secured power at scale. About 5GW is under executed grid connection agreements or equivalents across the US, Canada, Spain and Australia (10-K FY2026), a scarce asset in a power-constrained industry.
  • Blue-chip anchor contracts. Microsoft (US$9.7bn through 2031) and NVIDIA (US$3.4bn, 5 years). Horizon 1 has been accepted by Microsoft (Aug 2026).
  • Contracted visibility. About US$4bn of contracted ARR for 2026 capacity, which is "largely sold out" (FY26 release).
  • Efficient project financing. US$3.6bn investment-grade GPU financing at about 6.0%. Combined with prepayments it funds 96% of Microsoft GPU capex (FY26 release).
  • Liquidity. US$5.90bn of unrestricted cash plus US$1.72bn restricted at 30 Jun 2026; about US$14bn including committed financing and prepayments.
  • High AI contribution margins. AI Cloud contribution margin before D&A was 86.9% in FY26 (derived from the FY26 release).

Weaknesses

  • Large GAAP losses. FY26 net loss of US$702.6m and operating loss of US$1,046.7m.
  • Collapsing near-term EBITDA. Q4 FY26 Adjusted EBITDA was US$19.2m (14% margin), down from US$91.7m in Q1.
  • Concentration. Microsoft's expected US$1.94bn per year is about half of targeted ARR (Q3 FY26 release); the 10-K flags "significant customer concentration."
  • Small operating AI footprint today. About 40MW was operating at 30 Jun 2026 (10-K).
  • Deeply negative free cash flow. −US$2.23bn in FY26; capex of US$4.33bn.
  • Founder control mechanics. B Class shares give enhanced director-election rights, which limits outside shareholder influence.

Opportunities

  • Pricing tailwind. 3-year contracts at more than US$20m per MW (IT), more than double late-2025 levels, with about US$25m per MW (IT) in discussion.
  • 2027–2028 capacity. About 0.8GW (IT) of cumulative capacity targeted for 2027, with Sweetwater, Kiowa, Bundey and Badajoz adding more from 2028.
  • Managed services upsell through Mirantis's 1,500+ enterprise customers and k0rdent AI.
  • NVIDIA equity infusion of up to US$2.1bn, linked to deliveries of up to 600,000 GPUs.
  • APAC and EU sovereignty demand. Bundey has submarine fibre to Singapore, Indonesia, South Korea and Japan; Badajoz serves the EU.
  • Freed-up power. Retiring 23.2 EH/s of mining releases about 380MW for AI by end-2026.

Threats

  • Texas regulatory audit. The Governor's directive (3 Aug 2026) and PUCT extensions (20 Aug 2026) could delay energisation.
  • Hardware obsolescence and impairments. US$638.8m of FY26 impairments were mostly mining hardware, but GPUs carry similar long-run risk.
  • Counterparty risk among AI start-ups. Several customers (e.g. Prometheus, Fal AI, Higgsfield AI) are venture-funded.
  • Dilution and conversion overhang. About US$6.3bn of FY26 convertibles are outstanding, partly mitigated by capped calls up to US$110.30 on the 2033 notes.
  • Competition from hyperscalers and well-funded neoclouds (CoreWeave, Nebius, Oracle, Crusoe) for power, GPUs and customers.
  • Sentiment and beta. Beta was 4.28 (MarketBeat, Sep 2026), and the stock traded about 50% below its 52-week high in Oct 2026.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
Jun 2025Issued 3.25% convertible notes due 2030; reached about 50 EH/sPeak mining scale; funding for AI pivot
1 Jul 2025Became a US domestic filer; Anthony Lewis joined as Chief Capital OfficerIndex eligibility, US GAAP, capital-markets depth
Aug 2025AI Cloud GPU fleet expanded to about 10.9k GPUs; US$200m of GPU financingEarly AI scaling
28 Aug 2025FY2025 10-K: revenue US$501.0m, net income US$86.9mFirst profitable year
8 Sep 2025Lewis appointed CFO; Nucifora departedFinance leadership for multi-billion-dollar raises
14 Oct 2025US$1bn 2031 convertible notes issuedCapital for Horizon build
3 Nov 2025US$9.7bn Microsoft contractTransformational anchor contract
6 Nov 2025Q1 FY26: revenue US$240.3m, net income US$384.6m; ARR target US$3.4bn by end-2026; 140k GPU expansion target; US$400m of total GPU financingRecord quarter, aided by fair-value gains
Nov 2025Induced conversion of part of the 2029 and 2030 notes (US$1.62bn cash paid; US$111.8m inducement expense)Simplified capital structure; expensive
Nov 2025Share price reached a 52-week high of US$76.87Peak valuation
24 Nov 2025AGM results; director, officer and compensation matters (8-K)Governance
8 Dec 2025US$2.3bn of 2032 and 2033 (Jun) convertible notesFurther funding
5 Feb 2026Q2 FY26: revenue US$184.7m, net loss US$155.4m; US$3.6bn GPU financing at under 6%; Kiowa 1.6GW campusInvestment-grade financing milestone
17 Feb 2026John Gross appointed Chief Innovation OfficerLiquid-cooling leadership
Apr 2026Sweetwater 1 substation energised on scheduleDe-risks 1.4GW
4–5 May 2026Mirantis acquisition agreed (about US$625m in stock)Software layer
6 May 2026Nostrum Group acquisition agreedEurope entry
7 May 2026Q3 FY26: revenue US$144.8m, net loss US$247.8m. US$3.4bn NVIDIA contract; 5GW DSX partnership; NVIDIA rights to invest up to US$2.1bn; ARR target US$3.7bn; 2027 expansion to 1.2GW in buildValidation by NVIDIA
12–14 May 2026US$3.0bn 1.00% convertible notes due Dec 2033 priced and closed (upsized from US$2.0bn; 32.5% conversion premium; capped calls up to US$110.30)Largest single raise
May 2026Shares rose about 40% in the month (S&P Global data via Motley Fool)Re-rating
3 Jun 2026800MW Bundey campus announcedAPAC entry
12 Jun 2026Nostrum acquisition closedEurope operational
2 Jul 2026CPO (Kambiz Aghili) and CDO (Michael Nudelman) appointedProduct and development depth
15 Jul 2026CISO (Eric Hammersley) appointedSecurity credibility for enterprise and hyperscale customers
20 Jul 2026US$2.8bn of new contracts (Prometheus, Perplexity, Together AI and others); ARR target raised to more than US$4bn (about 85% contracted); 480MW gross of 2026 capacityCustomer diversification
3 Aug 2026Texas Governor ordered an ERCOT and PUCT audit of all data centers in the interconnection queueRegulatory risk for Texas expansion
4 Aug 2026Mirantis acquisition closed (final value about US$544m)Platform complete
Aug 2026Horizon 1 delivered to and accepted by Microsoft; NVIDIA Exemplar Cloud for GB300 NVL72Key execution milestone
20 Aug 2026PUCT granted ERCOT good-cause exceptions, extending Batch Zero timelines by several monthsPossible energisation delays
27 Aug 2026FY26 results: revenue US$707.0m, net loss US$702.6m (US$638.8m impairments); new frontier AI lab contract; US$4bn contracted ARR; US$2.8bn of new GPU financings including US$2.4bn from Blue Owl/PIMCO at 9%. 10-K filedPivot quantified
1 Sep 2026Co-CEO Daniel Roberts interviewed on CNBC about customers and GPU financingInvestor outreach
Sep 2026Sweetwater Hub (2GW) included in ERCOT Batch Zero as Base LoadMitigates Texas interconnection risk
21 Sep 2026Rothschild & Co Redburn initiated at Neutral, PT US$40Valuation debate
7 Oct 2026Shares fell 6.27% to US$38.69 (about 50% below the 52-week high)High beta; sentiment-driven
5 Nov 2026 (scheduled)Q1 FY27 results; consensus EPS −US$0.46 (3 estimates)Next catalyst

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

1 chart
Income Statement: Revenue & Gross Profit: Revenue rose from USD 59 Mn in FY2022 to USD 707 Mn in FY2026.
IREN Limited — Income Statement: Revenue & Gross Profit
Series (USD Mn)FY2022FY2023FY2024FY2025FY2026
Revenue5975.5187.2501707
Cost of revenue excl. D&A—39.487.1159219.7
Gross profit excl. D&A—36.1100.1342487.3

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. IREN Limited, Form 10-K for fiscal year ended 30 June 2026 (filed 27 Aug 2026) (sec.gov)
  2. IREN, "IREN Reports FY26 Results" (27 Aug 2026) (irisenergy.gcs-web.com)
  3. IREN, Form 10-Q for quarter ended 31 Mar 2026 (sec.gov)
  4. IREN, "Business Update and Q3 FY26 Results" (7 May 2026) (irisenergy.gcs-web.com)
  5. IREN, "IREN Reports Q2 FY26 Results" (5 Feb 2026) (iren.gcs-web.com)
  6. IREN, "IREN Reports Q1 FY26 Results" (6 Nov 2025) (irisenergy.gcs-web.com)
  7. IREN, 8-K: "IREN Closes $3.0 Billion Convertible Notes Offering" (14 May 2026) (sec.gov)
  8. IREN, 8-K: pricing of US$2.6bn convertible notes (12 May 2026) (sec.gov)
  9. IREN, 8-K: Appointment of Anthony Lewis as CFO (8 Sep 2025) (sec.gov)
  10. IREN, "Appoints Chief Product Officer and Chief Development Officer" (2 Jul 2026) (iren.gcs-web.com)
  11. IREN, "Appoints Chief Information Security Officer" (15 Jul 2026) (iren.gcs-web.com)
  12. IREN, "Announces First Australian Data Center Campus – 800MW in South Australia" (3 Jun 2026) (irisenergy.gcs-web.com)
  13. Pulse 2.0, "IREN Signs $2.8 Billion In AI Cloud Contracts…" (Jul 2026) (pulse2.com)
  14. The Block, "IREN snaps up Mirantis in $625 million all-stock deal" (May 2026) (theblock.co)
  15. Nasdaq / Motley Fool, "Why IREN Limited Rallied Almost 40% in May" (nasdaq.com)
  16. Blockspace, "IREN targets FY27 AI cloud capex" (blockspace.media)
  17. Stock Analysis, IREN income statement and balance sheet · stockanalysis.com
  18. ChartRow, IREN filings index and earnings calendar · chartrow.com
  19. MarketBeat, IREN trading note (16 Sep 2026) (marketbeat.com)
  20. AD HOC NEWS, "IREN stock fell 6.27 percent on October 7" (8 Oct 2026) (ad-hoc-news.de)
  21. TIKR, IREN stock note (28 Sep 2026) (tikr.com)
  22. Börse Express, John Gross CIO appointment (Feb 2026) (boerse-express.com)
  23. Robbins LLP, Iris Energy class action notice (2024) (robbinsllp.com)
  24. Rosen Law Firm, Iris Energy class action notice (Dec 2022) (businesswire.com)
  25. Fierce Network, "What you need to know about neocloud hotshot IREN" (fierce-network.com)