Jameson Resources Limited - Company showcase

Year Founded & Workforce

2007

Jameson Resources Limited logo

Jameson Resources Limited Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

Jameson Resources Limited Overview

Jameson Resources is an ASX-listed, pre-production steelmaking coal developer whose value rests almost entirely on one asset: the Crown Mountain Hard Coking Coal Project in British Columbia's Elk Valley, the most important seaborne hard coking coal district outside Queensland. It holds the project through a majority-owned Canadian subsidiary in partnership with Bathurst Resources. The 2025 Feasibility Update confirmed a 57.5 Mt run-of-mine reserve and a 15-year mine life. It reported a pre-tax NPV10 of US$942 million and a post-tax NPV of US$527 million against pre-production capital of US$394 million. In May 2026, Crown Mountain became the only Canadian steelmaking coal project to reach the final joint provincial-federal environmental assessment stage. Jameson's investment case is therefore a permitting-and-funding story. It has no revenue, funds itself through frequent small equity raises, and has a market capitalisation of under A$50 million against a project NPV more than ten times larger. That gap reflects regulatory, Indigenous-consent, financing and coal-market risk.


Company's own description. In its half-year report for the period ended 31 December 2025, Jameson describes itself as focused on developing a potentially low-cost, high-quality steelmaking coal operation from its Crown Mountain Project in south-east British Columbia. It says it is being progressed through permitting toward a Final Investment Decision and eventual development together with a subsidiary of Bathurst Resources Limited (ASX: BRL). Earlier corporate descriptions call Jameson an independent, growth-oriented steelmaking coal developer specialising in low-cost, high-quality open-cut mining. Market Index describes the company more broadly as focused on acquiring, exploring and developing strategic coal projects in western Canada.

Independent characterisation. Jameson is a single-asset, permitting-stage development company. It does not mine, process or sell coal. Its operations consist of:

  1. Managing and funding the environmental assessment (EA) of Crown Mountain under joint British Columbia and federal Canadian processes.

  2. Negotiating consent and benefit agreements with the Yaq̱it ʔa·knuqⱡi'it First Nation (YQT), on whose unceded territory the project sits.

  3. Maintaining and updating the technical case (the 2020 Bankable Feasibility Study, the 2021 Yield Optimisation Study and the 2025 Feasibility Update).

  4. Marketing future production to steelmakers (Japanese, Korean and Indian mills are named in 2025–26 quarterly reports) for offtake and possibly equity.

  5. Raising equity capital to fund all of the above.

Business model. Jameson currently has no business model in the operating sense. Its implied future model is that of a seaborne metallurgical coal producer. It would sell premium hard coking coal (HCC) FOB Vancouver under term contracts and spot sales, priced off the benchmark Premium Low-Vol HCC index. Before Final Investment Decision (FID), value would be realised through project equity sell-downs, strategic investment, offtake-linked prepayments or a corporate transaction.

Revenue model mix. Product: 0%. Service: 0%. Subscription: 0%. Licensing: 0%. Reported "revenue" consists entirely of interest and other minor income: A$47.9 thousand in FY2025 (TipRanks, extracted from the FY2025 Annual Report).

Value-chain position. Upstream (resource ownership and development). Once operational, Crown Mountain would cover mining, coal handling and preparation, and rail and port logistics through third-party infrastructure (Canadian Pacific rail lines and British Columbia's west-coast deepwater coal terminals).

Customer types and end-markets. The future customer base is integrated blast-furnace steelmakers, chiefly in Asia (Japan, Korea and India) as identified in 2025–26 marketing activity. Jameson's August 2026 investor presentation specifically emphasises demand growth in India. The end-market is global blast-furnace (BF-BOF) steel production.

Strategy

Stated strategic themes (FY2025–FY2026 reporting and the August 2026 investor presentation):

  1. Advance Crown Mountain, described as Canada's most advanced premium steelmaking coal project, through final environmental approval.

  2. Build long-term partnerships with Indigenous Nations, specifically YQT, moving from the EA Process and Consent Agreement to a Shared Prosperity Agreement and a Joint Partnership Agreement.

  3. Secure offtake agreements and equity partnerships with steelmakers, with emphasis on India's growing demand.

  4. Position for consolidation in the steelmaking coal sector. The former chair cited more than US$20bn of steelmaking coal M&A in the 12 months to May 2025, arguing that producers have limited organic growth options.

  5. Maintain a lean corporate structure, focusing capital on the single asset (Dunlevy surrender, February 2026).

ESG commitments. The company frames the project around ESG principles and "proactive environmental strategies" (Investor Presentation, August 2026). Quantified emissions or water targets are not publicly disclosed in the sources retrieved.

Medium-term targets / guidance:

  • Final Revised Environmental Application submission: originally October 2026, later described as "late 2026" / "by end of 2026".

  • Effects Assessment phase: legislated 150-day period to develop the draft Assessment Report and Environmental Assessment Certificate.

  • Environmental Certificate target: first half of 2027.

  • Financial targets (production, revenue, margins): not publicly disclosed beyond feasibility-study parameters.

Products & Services

Jameson has no commercial products or services. Its "portfolio" is a set of mineral assets and a single intended future product.

Product quality. Jameson markets Crown Mountain output as premium hard coking coal, comparable in rank to other Elk Valley products. Detailed coal-quality specifications (CSR, volatile matter, ash, sulphur, fluidity) are in the 2020 BFS and 2025 update.

Production rate. Annual saleable production at steady state is not confirmed in the sources retrieved in this research and is marked not publicly disclosed here. It can be derived from the reserve, yield and mine-life figures: 57.5 Mt × 52.9% ÷ 15 years ≈ 2.0 Mt per year. This is an analyst back-calculation, not a company figure.

Product Portfolio

Asset / intended productDescriptionKey specificationsTarget customerStatus / latest versionPricing modelSource

Crown Mountain premium hard coking coal

Open-cut mine, coal handling and preparation plant, rail load-out in the Elk Valley coalfield, BC

ROM reserve 57.5 Mt; 15-year mine life; processing yield 52.9%; pre-production capex US$394m; cash operating cost US$102.79/t FOB Vancouver

Asian integrated steelmakers (Japan, Korea, India named)

2025 Feasibility Update (May 2025); EA final stage

Benchmark-linked seaborne HCC pricing; study assumes US$225/t benchmark

2025 Feasibility Update (ASX 9 May 2025); Mining Weekly

Crown Mountain coal licences

Coal licences in the Elk Valley coalfield (licence summary table in half-year reports)

Low holding cost (annual licence fees)

—

Held

—

Half-Year Report Dec 2024

Dunlevy metallurgical coal property (NE BC)

Formerly 100%-owned exploration property, outside the Bathurst arrangement

Early stage

—

Surrendered Feb 2026

—

Half-Year Report Dec 2025

Financial Narrative

Income statement

EPS calculated by analyst as net income ÷ weighted average shares. Gross, operating, EBITDA and net margins and revenue CAGR are not meaningful, because the "revenue" line consists of interest income on cash balances.

Commentary. The P&L of a capitalising explorer reflects only corporate overhead. Most project expenditure (EA studies, engineering, Indigenous engagement) is capitalised to the exploration and evaluation asset, not expensed. Expensed costs peaked in FY2023 at about A$1.9m, likely reflecting the intensive run-up to the January 2024 EA submission and associated corporate activity. They then settled at about A$1.24–1.28m in FY2024–FY2025. The fall in loss per share from FY2023 to FY2025 is driven mainly by dilution: weighted shares rose 64% over two years. It does not reflect improved economics. Interest income rose in FY2025 because cash balances were temporarily higher after the August 2024 and May 2025 raises. The half-year loss to December 2025 (A$655k, up 27% on the prior period) indicates FY2026 corporate costs running at about A$1.3m annualised, broadly flat.

Balance sheet

Source: Stockopedia (extracted from Annual Reports, IFRS). Equity and working capital calculated by analyst. Total debt is shown as zero because no borrowings are evident in the sources retrieved. The roughly A$7–11m of non-current liabilities has a composition that is not publicly disclosed in the sources retrieved. It may comprise deferred tax liabilities on the capitalised E&E asset, or partner-related balances. It should be verified against the notes to the accounts. Net debt is therefore treated as negative (net cash) in every year, equal to the cash balance.

Commentary. The balance sheet consists almost entirely of the capitalised Crown Mountain exploration and evaluation asset, which grew from A$33.0m to A$52.2m over FY2021–FY2025. The FY2025 step-up of A$9.1m was the largest, as EA response work and the feasibility update were capitalised. Liquidity has been chronically thin. Year-end cash has never exceeded A$2.8m. Cash fell to A$1.313m at 30 September 2025 (Quarterly Report, Sep 2025). Working capital fell to almost zero at June 2025, as current liabilities jumped to A$2.93m, consistent with accrued EA consultancy costs. This pattern explains the run of capital raisings from December 2025 to September 2026.

Cash flow

The actual FY2021 investment was not computed in this research. Free cash flow is structurally negative and is funded by equity. Known gross equity raised by fiscal year:

  • FY2025: about A$8.75m (A$5.25m in August 2024 plus A$3.5m in May 2025).

  • FY2026: at least A$4.5m (A$1.5m KGI placement in December 2025 plus A$3m placement in April 2026).

The June 2026 quarterly reported exploration and evaluation outflows of A$2.905m. Aggregator summaries are ambiguous about whether that figure is quarterly or year-to-date. Net cash flow for the quarter was reported as -A$156k.

Ratios

Calculated by analyst from the tables above. ROIC, net debt/EBITDA, interest coverage, asset turnover and cash conversion cycle are not meaningful for a pre-revenue, debt-free developer with negative EBITDA and no inventory or receivables cycle.

Commentary. Returns are small negatives because the overhead loss is small relative to a large capitalised asset base. They say nothing about value creation. The single most important trend is the collapse of the current ratio from 5.4x to 1.0x in FY2025. It flags that the company now funds itself raise-to-raise. Going-concern language ("operational continuity and funding prospects") appears in the June 2026 quarterly, and the market has priced this in.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Group Entities

EntityRoleOwnershipSource

Jameson Resources Limited (Australia)

ASX-listed parent

—

ASX

Crown Mountain Resources Ltd (Canada), formerly referred to as NWP Coal Canada Limited

Project holding and operating subsidiary

Jameson 80% / Bathurst subsidiary 20% (per Aug 2026 presentation coverage)

Kalkine Media, Aug 2026

Crown Mountain Hard Coking Coal Project

Asset

Crown Mountain Resources owns 90% (per Aug 2026 presentation coverage)

Kalkine Media, Aug 2026

Results by Segment and Revenue by Segment (%)

MetricFY2023FY2024FY2025

Segment revenue – interest and other income (AUD K)

5.18.547.9

Segment operating income (AUD K)

-1,900-1,240-1,240

Segment pre-tax income (AUD K)

-1,870-1,350-1,150

Contribution to total revenue (%)

100100100

Income Statement and Share Count (M)

MetricFY2021FY2022FY2023FY2024FY2025

Revenue – interest and other income (AUD K)

35.10.65.18.547.9

Gross profit (AUD K)

31.1-2.71.78.547.9

Operating expenses (AUD K)

986.61,0301,9101,2401,280

Operating income (AUD K)

-951.5-1,030-1,900-1,240-1,240

EBITDA (AUD K)

-951.7-905.8-1,870-1,350-1,240

Depreciation and amortisation (AUD K)

4.03.23.42.93.9

Pre-tax income (AUD K)

-955.7-909.0-1,870-1,350-1,150

Net income (AUD K)

-841.4-860.6-1,810-1,250-1,050

Weighted average shares (M)

300.5329.5376.6417.8618.3

EPS basic (AUD cents)

-0.28-0.26-0.48-0.30-0.17

EPS diluted (AUD cents)

-0.28-0.26-0.48-0.30-0.17

Dividends per share (AUD cents)

00000

Balance Sheet

MetricFY2021FY2022FY2023FY2024FY2025

Cash and short-term investments (AUD Mn)

2.611.742.511.982.80

Total receivables (AUD Mn)

0.1260.0510.140.0940.081

Total current assets (AUD Mn)

2.831.892.762.172.98

Net PP&E incl. capitalised exploration and evaluation (AUD Mn)

33.037.641.243.152.2

Total assets (AUD Mn)

37.041.145.446.757.0

Total current liabilities (AUD Mn)

0.6250.2620.4180.4032.93

Total liabilities (AUD Mn)

7.729.9010.712.313.7

Total equity incl. non-controlling interests (AUD Mn)

29.331.234.734.443.3

Working capital (AUD Mn)

2.211.632.341.770.05

Total debt (AUD Mn)

00000

Goodwill and intangibles (AUD Mn)

00000

Cash Flow

MetricFY2021FY2022FY2023FY2024FY2025

Increase in capitalised E&E/PP&E – capex proxy (AUD Mn)

04.63.61.99.1

Dividends paid (AUD Mn)

00000

Share buybacks (AUD Mn)

00000

Returns & Leverage Ratios (%) and Financial Ratios (x)

MetricFY2021FY2022FY2023FY2024FY2025

ROE (%)

-2.87-2.76-5.22-3.63-2.42

ROA (%)

-2.27-2.09-3.99-2.68-1.84

Current ratio (x)

4.537.216.605.381.02

Debt to equity (x)

00000

Results by Region

RegionFY2023FY2024FY2025

Australia – interest and other income (AUD K)

5.18.547.9

Americas – sales revenue (AUD K)

000

EMEA – sales revenue (AUD K)

000

APAC excluding Australia – sales revenue (AUD K)

000

Share Price

MetricFY2020FY2021FY2022FY2023FY2024

Share price at 30 June (AUD)

0.1150.0850.070.0590.036

Share Price History

PeriodReference priceChange

1-year

About A$0.100 (31 Oct 2025)

About -60%

3-year

A$0.059 (30 Jun 2023)

About -32%

5-year

A$0.085 (30 Jun 2021)

About -53%

Valuation Snapshot

MultipleValueComment

P/B

About 1.0–1.2x

Market cap c. A$36–43m against FY2025 book equity of A$43.3m (incl. NCI) plus subsequent raises

Market cap / project post-tax NPV (attributable)

About 0.1x

Market cap c. A$40m (about US$26m) against Jameson's look-through share (about 72–78%) of US$527m post-tax NPV (about US$380–410m)

Capital Markets

ItemDetailSource

Dividends

None paid; no dividend policy (development stage)

Annual Reports

Credit ratings (Moody's/S&P/Fitch)

Not rated

—

Debt maturity profile

No borrowings identified

Stockopedia

Share Price & Returns

DateAmount (AUD Mn)Price (AUD)Investors

Aug 2024

5.25——

May 2025

3.50.035

Placement

Dec 2025

1.50.06

King George Investments

Apr 2026

3.0—

Placement

Sep 2026

5.3 (institutional + placement) + retail (up to about A$1m)

0.035

KGI, M Resources, Tribeca, others

Analyst Conclusions

Management guidance:

  1. Submit the Final Revised Environmental Application by the end of 2026.

  2. Complete the 150-day Effects Assessment, leading to the draft Assessment Report and Environmental Assessment Certificate.

  3. Obtain the Environmental Certificate in H1 2027.

  4. Pursue offtake and equity partnerships.

No financial guidance has been given. Consensus growth expectations: none published.

Bull case:

  1. Permitting asymmetry. Crown Mountain is the only Canadian steelmaking coal project at the final joint EA stage. A certificate in H1 2027 would turn it into a scarce, permitted Tier-1-jurisdiction HCC asset just as incumbents lack organic growth. More than US$20bn of recent sector M&A shows that buyers pay for such assets.

  2. Deep value against NPV. A market cap of about A$40m against an attributable post-tax NPV of roughly US$380–410m implies large re-rating potential as each risk retires. The May 2025 feasibility update alone moved the stock about 33% in a day.

  3. Strategic register forming. KGI, M Resources and Tribeca entered in 2025–26, alongside Bathurst at project level. These investors could become cornerstone funders or acquirers, and Japanese and Indian steelmaker engagement offers an offtake-linked funding route.

Bear case:

  1. Funding treadmill. Cash of A$1.3m (September 2025) and near-zero working capital (June 2025) force raises every few months at falling prices (A$0.06 to A$0.035). Even with an EA certificate, the US$394m capex is more than ten times the market cap. Equity value per share could be heavily diluted at FID.

  2. Permitting and consent risk. Timelines have already slipped, and Elk Valley selenium issues invite strict conditions. YQT consent is not assured until after the EA, and the federal decision adds another layer.

  3. Price and structural demand risk. Economics depend on a US$225/t benchmark. Lower prices, project-cost inflation or faster steel decarbonisation would compress NPV, while coal's ESG exclusion shrinks the pool of potential financiers.

Analyst verdict. Jameson Resources is a binary-leaning, single-asset option on the permitting of Crown Mountain. It is not a business to be valued on earnings. The company has done the hard, slow work that most juniors never finish: a bankable feasibility study, two economic updates, a formal consent framework with the YQT, and, as of May 2026, passage through Application Review into the final joint assessment stage. No other Canadian steelmaking coal project is that far along. The 2025 Feasibility Update produced robust numbers: US$527m post-tax NPV, a 37% IRR and a US$102.79/t cash cost. On paper, the asset is worth roughly ten times the company's market capitalisation.

That discount is not irrational. The balance sheet is very thin, and shareholders have funded the permitting programme through repeated discounted placements, the latest at A$0.035 against A$0.06 nine months earlier. The independent chair departed in November 2025, leaving the MD in both roles. Timelines have slipped by at least a quarter. The final hurdles (EA conditions on selenium and fish habitat, YQT consent, federal sign-off and a US$394m+ financing in a coal-averse capital market) are each capable of destroying most of the equity value.

On balance, the investment case has improved structurally through 2026, with the Section 27 Notice and the arrival of strategic investors. Per-share value creation, however, remains hostage to funding terms. A meaningful re-rating requires three things, likely in this order: the YQT partnership terms, the Environmental Certificate in H1 2027, and a strategic funding or offtake partner that crystallises value at the project level instead of through further micro-cap dilution. Monitoring priorities are the FY2026 going-concern disclosures, the clarified ownership structure and the EA timetable.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameTitleTenurePrior roles / backgroundEducationSource

Michael John Gray

Managing Director & CEO; Interim (Executive) Chairman since 26 Nov 2025

MD since 1 Mar 2021

30+ years as a resources executive; former director of Resource Generation Limited (ASX: RES, from 30 Nov 2018); elected to the Coal Association of Canada board (2025)

BE (Civil), MBA; GAICD

Simply Wall St; AFY24 Directors' Report; TipRanks

—

Non-Executive Director

—

30+ years in the resources industry

—

AFY24 Directors' Report

Other directors

——

Board average tenure 4.8 years (Simply Wall St)

—

Simply Wall St

Nicole Maree Hollows (former)

Independent Non-Executive Chairman; Nomination & Remuneration Committee; previously chaired Audit, Risk & Sustainability Committee

Mar 2020 – 25 Nov 2025

Former CFO then CEO of Macarthur Coal; MD of AMCI Australia & SE Asia; CEO of SunWater; NED of Downer EDI (2018–Nov 2024) and Qube Holdings

B.Bus (Accounting), Grad Dip Advanced Accounting (QUT); Harvard PMD

AFY24 Directors' Report; DCN; MarketScreener

Directors' Remuneration

MetricFY2021FY2022FY2023FY2024FY2025

Total remuneration (AUD K)

100349357477392

Salary component (AUD K)

86258261273281

Major Shareholders

HolderTypeStakeSource

Bathurst Resources Limited (via subsidiary)

Strategic partner (project level, not parent)

—

Mining Weekly May 2025; Kalkine Aug 2026

King George Investments Pty Ltd

Brisbane-based strategic resource investor

—

ASX 14 Jul 2026; ShareCafe Sep 2026

M Resources

Strategic investor (new, Sep 2026)

—

ShareCafe Sep 2026

Tribeca Global Natural Resources fund

Institutional investor (new, Sep 2026)

—

ShareCafe Sep 2026

Top 10 holders / substantial holders (complete list)

—

Not publicly disclosed in sources retrieved

—

Insider ownership (aggregate)

—

Not publicly disclosed in sources retrieved

—

“—” = not publicly disclosed.

Competitive Landscape

Key Competitors

CompanyCategoryRelevance to JamesonComparative data

Elk Valley Resources (Glencore 77%; Nippon Steel and POSCO minorities)

Incumbent Elk Valley producer

Dominant neighbour and logistics user; natural acquirer; operator of regional selenium water-treatment programme

—

Conuma Resources

NE BC met coal producer

Canadian peer producer

Revenue not publicly disclosed (private)

Bathurst Resources (ASX: BRL)

NZ coal producer; Jameson's project partner

Partner and possible consolidator

—

Northback Holdings (Grassy Mountain, Alberta)

Developer

Competing Canadian greenfield met coal project; Alberta regulatory history

Pre-revenue

Montem Resources (Tent Mountain, Alberta)

Developer

Competing Canadian project

Pre-revenue

Whitehaven Coal

Australian producer

Acquired BMA's Daunia and Blackwater mines (2024, up to US$4.1bn); competitor for seaborne HCC

—

BHP Mitsubishi Alliance (BMA)

Queensland premium HCC

Global price setter

—

Anglo American Steelmaking Coal

Queensland

Asset sale process; agreed sale to Peabody announced 2024 and later terminated

—

Peabody Energy

US/Australian producer

Acquirer in met coal

—

Coronado Global Resources

US/Australian producer

Seaborne HCC competitor

—

Stanmore Resources

Queensland producer

Seaborne competitor

—

Bowen Coking Coal

Queensland developer/producer

Junior peer

—

Peer Comparison FY2025

MetricJameson (Crown Mountain)Source

Revenue (AUD Mn, FY2025)

0.05 (interest only)

TipRanks

Pre-production capex (USD Mn)

394

2025 Feasibility Update

Cash cost FOB (USD/t)

102.79

2025 Feasibility Update

Post-tax NPV (USD Mn)

527

2025 Feasibility Update

Post-tax IRR (%)

37

2025 Feasibility Update

R&D intensity (%)

0

Annual Reports

Recent Developments

--

Company Snapshot

2007

Founded

Sydney, Australia

Headquarters

SWOT Analysis

Strengths

  • Permitting lead: the Section 27 Notice (28 May 2026) makes Crown Mountain the only Canadian steelmaking coal project at the final joint assessment stage (ASX, 28 May 2026).
  • Robust headline economics: post-tax NPV of US$527m and post-tax IRR of 37% (2025 Feasibility Update).
  • Reconfirmed reserve: 57.5 Mt ROM, with a competent person's letter of assurance (Mining Weekly, May 2025).
  • Competitive cost: cash cost of US$102.79/t FOB Vancouver (2025 Feasibility Update).
  • Formal Indigenous consent framework: EA Process and Consent Agreement with the YQT, plus the June 2026 Early Training and Employment Initiative.
  • Infrastructure advantage: proximity to CP rail, the grid, gas, all-season roads and three west-coast deepwater ports (company materials via ROIC.ai).

Weaknesses

  • No revenue: FY2025 income of A$47.9k is interest only (TipRanks).
  • Thin liquidity: cash of A$1.313m at 30 September 2025, and working capital near zero at 30 June 2025 (Quarterly Report; Stockopedia).
  • Serial dilution: weighted shares rose from 300.5m (FY2021) to 618.3m (FY2025), and to about 950m+ after September 2026 (TipRanks; Appendix 3B).
  • Falling raise prices: A$0.06 (December 2025) to A$0.035 (September 2026) (ASX).
  • Governance gap: chair and CEO roles combined since 26 November 2025 (Half-Year Report).
  • Capex of US$394m (+28% versus BFS) is about 13 times Jameson's market capitalisation (2025 Feasibility Update).

Opportunities

  • Environmental Assessment Certificate targeted for H1 2027 (Investor Presentation, August 2026).
  • Consolidation appetite: more than US$20bn of steelmaking coal M&A in 12 months (Hollows, May 2025).
  • Indian demand growth and engagement with Indian steelmakers (Quarterly Mar 2026; Investor Presentation August 2026).
  • Strategic investor entry: KGI, M Resources and Tribeca joined the register in 2025–26 (ShareCafe, September 2026).
  • YQT Joint Partnership Agreement Terms Sheet (expected Q3 2026), which could include equity participation and strengthen the case for consent.
  • Improving regional political sentiment toward coal (2025 quarterly; Crowsnest Pass referendum).

Threats

  • Selenium and water-quality regulation in the Elk Valley, which could impose costly conditions or delays (industry context; EA fish habitat and water work in filings).
  • Repeated timeline slippage: the final application moved from October 2026 to "late/end 2026" (ASX May 2026 versus July–September 2026).
  • Coal-price sensitivity: economics rest on a US$225/t benchmark, up from US$165/t (2025 Feasibility Update).
  • Funding risk: the September 2026 offer was not underwritten, and the June 2026 quarterly flagged a need for further funding.
  • Strategic investor hesitation: KGI declined its A$0.06 option in July 2026, citing "changing market conditions".
  • Long-term structural decline in BF-BOF steelmaking as decarbonisation advances.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
23 Apr 2025March 2025 quarterly: site visits and additional field studies completed; MD elected to Coal Association of Canada board; Crowsnest Pass (Alberta) referendum favourable to coal Quarterly Report; TipRanksPositive shift in regional political sentiment
9 May 20252025 Feasibility Update: reserve reconfirmed; pre-tax NPV10 US$942m; post-tax NPV US$527m; IRR 37%; capex US$394m (+28%); opex US$102.79/t (+15%) ASX; Mining Weekly; StockLightMajor re-rating of project value; shares rose about 33% on the day
May 2025A$3.5m placement at A$0.035 (~100m shares) ROIC.aiFunds technical EA studies
30 Jul 2025June 2025 quarterly report InvestSMARTRoutine
29–30 Sep 2025FY2025 Annual Report released StockLight; Market IndexNet loss about A$1.05m; cash about A$2.8m at 30 June 2025
31 Oct 2025September 2025 quarterly: cash A$1.313m; engagement with Japanese and Korean investors; YQT IBA negotiations Quarterly ReportLiquidity tightening
25 Nov 2025Chairman Nicole Hollows resigns Half-Year Report Dec 2025Loss of highly credentialed independent chair
26 Nov 2025Michael Gray appointed Interim Chairman Half-Year Report Dec 2025Chair/CEO roles combined
Dec 2025A$1.5m placement to King George Investments at A$0.06 plus option over 25m shares ASX 14 Jul 2026Strategic investor at a premium to later raises
Dec 2025Tranche 1 new shares issued Half-Year Report Dec 2025Capital in
30 Jan 2026December 2025 quarterly report InvestSMARTRoutine
Feb 2026Decision to surrender the Dunlevy tenure Half-Year Report Dec 2025Single-asset focus
13 Mar 2026Half-year report: loss after tax A$655,419 (prior period A$516,751) Half-Year ReportOverhead creeping up
9 Apr 2026Trading halt (share price A$0.080 at the halt) InvestSMARTPrecedes capital raise
Apr 2026A$3m placement completed Quarterly Mar 2026; Quarterly Jun 2026Funds EA and Indigenous engagement
22 Apr 2026Cleansing notice InvestSMARTPlacement shares tradeable
30 Apr 2026March 2026 quarterly: BC ministers met; federal Information Request responses submitted; JPA negotiations progressed; Japanese and Indian steelmaker engagement; lower spend guided Quarterly ReportRegulatory progress at both government levels
28 May 2026Section 27 Notice issued by BC EAO; Application Review complete ASX AnnouncementKey permitting milestone; only Canadian steelmaking coal project at this stage
Jun 2026Early Training and Employment Initiative signed with YQT Investor Presentation Aug 2026Tangible Indigenous partnership deliverable
25 Jun 2026Results of meeting (general meeting) InvestSMART–
14 Jul 2026KGI declines option over 25m shares at A$0.06 because of changing market conditions; discussions continue; KGI site visit planned ASX AnnouncementNegative signal on price but continuing strategic interest
14–15 Jul 2026Application for quotation of securities; cleansing notice InvestSMARTPlacement-related
31 Jul 2026June 2026 quarterly: Section 27 milestone; A$3m funding; net cash flow -A$156k; company considering further raising Quarterly ReportFunding need flagged
5 Aug 2026Investor presentation "Major Milestones toward permitting": EA Certificate targeted H1 2027; YQT Terms Sheet expected Q3 2026; India emphasis Investor Presentation; StockLightTimeline reset; shares fell about 5.5%
2 Sep 2026Up to A$5m non-underwritten 1-for-5.5 ANREO at A$0.035 (up to 144,208,654 new shares) launched; trading halted ASX Announcement; Appendix 3BLarge discount to recent trading
4 Sep 2026Institutional offer plus placement raise A$5.3m (including an extra A$1.59m placement); KGI, M Resources and Tribeca support; shares resume ex-entitlement ASX Announcement; ShareCafeStrategic validation; dilution
9 Sep 2026Retail offer opens (closes 18 Sep); shares close down 13.6% at A$0.04 StockLightMarket cap about A$36m
23–25 Sep 2026Scheduled retail offer results and issue ASX timetable–
29 Sep 2026FY2026 Annual Report scheduled InvestSMART calendar–

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

3 charts
Revenue by Segment (%): Contribution to total revenue held from 100% in FY2023 to 100% in FY2025.
Jameson Resources Limited — Revenue by Segment (%)
Series (%)FY2023FY2024FY2025
Contribution to total revenue100100100

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. Jameson Resources ASX announcements via InvestSMART: Quarterly Reports (Jul 2025, Oct 2025, Apr 2026, Jul 2026); Section 27 Notice (28 May 2026); Investor Presentation (5 Aug 2026).
  2. Jameson Resources Half-Year Financial Reports for periods ended 31 Dec 2024 and 31 Dec 2025 (announcements.asx.com.au).
  3. Jameson Resources FY2024 Financial Report incl. Directors' Report (announcements.asx.com.au, 30 Sep 2024).
  4. Jameson Resources Quarterly Report, June 2024 (minedocs.com).
  5. ASX announcements of 2 Sep 2026 (entitlement offer, Appendix 3B, cleansing notice), 4 Sep 2026 and 14 Jul 2026 (bulletin.webull.com).
  6. Mining Weekly, "Jameson confirms reserve and doubles project NPV in Crown Mountain study update", 9 May 2025.
  7. Kalkine Media, Jameson Resources Aims for Environmental Certificate in H1 2027 (Aug 2026).
  8. ShareCafe, Jameson Resources Completes A$5.3 Million Institutional Capital Raise (Sep 2026); Entitlement Offer coverage (2 Sep 2026).
  9. Finance News Network; TXF News (Sep 2026).
  10. StockLight: JAL announcements and annual reports listing.
  11. Market Index: JAL company page (auditor, historical prices, former names).
  12. TipRanks: JAL income statement and revenue; company announcement summaries.
  13. Stockopedia: JAL balance sheet.
  14. Simply Wall St: JAL management and remuneration.
  15. ROIC.ai: JAL company description and capital-raising history.
  16. MarketScreener: Nicole Maree Hollows insider profile.
  17. Daily Cargo News: Qube board appointment (Hollows biography).
  18. NZX / BusinessDesk: Downer EDI director retirement (Sep 2024).
  19. MiningNews.net: Executive Outcomes (Gray appointment).
  20. Business News WA: Arthur Palm appointment (Aug 2013).

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.