Kalina Power Limited Overview

Kalina Power is a micro-cap ASX-listed power project developer that has pivoted from its heritage as owner and licensor of the KALiNA Cycle® — a proprietary ammonia-water thermodynamic cycle for converting low-to-medium-grade heat into electricity — to a developer of gas-fired generation in Alberta, Canada, aimed squarely at the AI data-centre boom. Through its wholly owned subsidiary KALiNA Distributed Power, it holds a portfolio of five secured project sites of roughly 200 MW each, designed to supply co-located "behind-the-meter" power under long-term tolling power purchase agreements, with optional carbon capture and sequestration. In FY2026 the company validated the commercial value of its grid-access positions by selling a 180 MW load allocation for C$18 million to a customer of the Greenlight Electricity Centre (later identified by the company as Meta), producing its first statutory profit (A$15.8m) and a debt-free, cash-rich balance sheet. It remains pre-revenue, with value contingent on converting sites into financed, contracted projects.


Company's own description

In its most recent filings and announcements, Kalina Power describes itself as an ASX-listed company focused on delivering cost-effective power projects that generate constant baseload electricity with a low carbon footprint. Its operating activity is carried out by KDP, which the company describes as developing a portfolio of five Alberta projects intended to provide data centres with co-located, behind-the-meter electricity from KDP's planned natural gas-fired power plants. The company states that its team has around 20 GW of global power project development experience, of which about 3.5 GW was developed by the Alberta team, and that KDP's business model rests on fully contracted, long-term tolling power purchase agreements with co-located data centres (ASX announcement, 5 November 2025).

The segment note in the FY2026 Appendix 4E describes two reportable segments: "Investments", which provides administrative support and holds the group's investment activities, and "Power and technology development business", located in the US, Canada and the UK, which manages the group's power business (FY2026 Appendix 4E, note 2).

Independent characterisation

Kalina Power is best understood as an early-stage greenfield independent power producer (IPP) developer with an option-like asset base, not an operating utility and not (any longer) primarily a technology licensor. Its economic assets are:

  1. Secured land and development rights at five Alberta sites (Clairmont, Saddle Hills, Alsike, Myers, Gilby), each of roughly 200 MW nameplate ambition, progressing through the Alberta Electric System Operator (AESO) generation interconnection process with targeted in-service dates of mid-2029 (June 2026 quarterly report).

  2. Queue position and regulatory know-how in a jurisdiction where grid access for large loads has become scarce and therefore valuable. The C$18m sale of a 180 MW load allocation in 2025 demonstrated that these positions can be monetised before construction.

  3. Commercial frameworks, notably the February 2025 multi-year framework agreement with Crusoe (AI data-centre developer), which is non-binding as to specific projects.

  4. Legacy intellectual property in the KALiNA Cycle, now of secondary strategic importance; FY2026 patent costs were nil (FY2025: A$131), suggesting the patent estate is no longer being actively maintained at meaningful cost (FY2026 Appendix 4E).

Business and revenue model

Revenue model elementStatusEvidence
Electricity sales under long-term tolling PPAs (target ≥15 years) to co-located data centresTarget model; no PPA executedCrusoe framework (Feb 2025); 5 Nov 2025 announcement
Merchant sales into the Alberta power pool / virtual PPAsOptionality cited in project design"KALiNA Expands Land Position in Alberta" announcement (2025)
Monetisation of grid allocations / site development rightsRealised once: C$18m (A$19.6m) recognised as other income in FY2026FY2026 Appendix 4E note 4(a)
Site sales (data-centre-ready sites co-located with power)Marketing campaigns with TwelveSix (Calgary)September 2025 quarterly
Technology licensing / engineering services (KALiNA Cycle)Historical; no material income in FY2025–FY2026FY2025–FY2026 accounts (revenue nil)
Management feesImmaterial (A$32k FY2026)FY2026 Appendix 4E

Mix: Statutory revenue from ordinary activities was nil in both FY2025 and FY2026. All FY2026 income was classified as "other income" (A$19.63m) and finance income (A$0.29m). There is therefore no product/service/subscription/licensing revenue mix to report.

Value-chain position, customers and end-markets

Kalina sits at the front end of the power value chain — origination, permitting, interconnection, gas-supply arrangements, and commercial structuring — with the intention of owning and operating plants once financed. Target customers are hyperscalers, AI cloud/data-centre developers (e.g., Crusoe), and potentially industrial loads; secondary customers include power marketers and the Alberta pool. The single end-market is Alberta electricity, specifically large-load (data-centre) supply. Gas producers and pipeline operators (NGTL) are key suppliers; the AESO and the Alberta Utilities Commission are gatekeepers.

Strategy

Stated strategic themes (paraphrased from FY2025–FY2026 communications)

  • Speed to market is identified by management as the most important criterion for hyperscalers and data centres; the portfolio is positioned to serve that priority (June 2026 quarterly, MD commentary).

  • A geographically dispersed Alberta portfolio is a deliberate strategy to mitigate gas supply, transmission congestion and municipal zoning risks (June 2026 quarterly).

  • Optionality on CCS: every site is located with access to CCS infrastructure but can proceed with or without CCS, letting the company match offtakers who prioritise speed versus long-run cost (June 2026 quarterly).

  • Contracted, long-term tolling PPAs with creditworthy counterparties as the core economic model (5 Nov 2025 announcement).

  • Prudent cash management while regulations were finalised, preserving ~A$14.3m and avoiding dilutive raises (June 2026 quarterly).

Initiatives in the last 24 months

InitiativeDateDetailStatus
Crusoe framework agreementFeb 2025Up to three co-sited AI data centres; PPAs ≥15 years; separate Project Development Agreements required; Crusoe to fund certain interconnection security paymentsFramework only; no PDA announced
Land expansion (Crossfield and others)2,025Additional secured land for Power-CCS + data-centre configurationsPartly superseded
180 MW allocation saleJun–Nov 2025C$18m realisedCompleted
Financing arrangements with PEI Global Partners and Moneta SecuritiesSep 2025 quarterEngaged for project/capital formationOngoing; no financing closed
TwelveSix site-sales mandate2,025Marketing certain sites to data-centre buyersOngoing
AESO LLAP working group membership2,026One of nine stakeholders shaping BYOG rulesOngoing
Interconnection progression2,026Clairmont to Cluster 2 with C$2.6m LoC; four sites in Cluster 3; Saddle Hills 100 MW Cluster 3 applicationFiled
Gas supply2,026Regulated and unregulated sources; NGTL bidding for Alsike, Myers, GilbyIn progress
Investment bank engagement2,026Meetings with major investors; management "confident" in near-term fundingNo transaction announced
Evaluation of two additional sites2,026Includes Rocky View County alternatives to Lone PineEarly stage

Guidance and targets

Kalina does not provide earnings or revenue guidance. The only quantitative forward markers are: targeted in-service dates of mid-2029 for the AESO-queued projects; a theoretical phased build-out of up to ~1.7 GW across the portfolio (ShareCafe, Oct 2025); and capex of ~C$1bn per CCS-equipped project before incentives (Feb 2025). No medium-term financial targets, cost programs with numerical targets, or ESG targets have been published.

Products & Services

Power and technology development segment

ProjectIndicative capacityStatus (June 2026 quarter)Gas supplyNotes
Clairmont Energy Park~200 MWElected into AESO Cluster 2; ~C$2.6m letter of credit posted with AESO; ATCO Electric engaged for facilities application (A$0.55m prepayment at 30 June 2026); targeted in-service mid-2029Unconstrained area — can apply for gas at any timeMost advanced site
Saddle HillsOriginally up to 64 MW (2 × Siemens SGT-600 22 MW gas turbines plus KALiNA Cycle bottoming modules with 10 MW Baker Hughes vapour turbines); Cluster 3 application filed for 100 MW interconnectionDescribed in early 2025 as fully permitted to construct and operate; Cluster 3Unconstrained areaOnly project with explicit KALiNA Cycle integration; excluded from Crusoe framework
Alsike~200 MWAESO Cluster 3; mid-2029 targetNGTL bidding process under evaluation—
Myers~200 MWAESO Cluster 3; mid-2029 targetNGTL bidding process under evaluationAssociated with Crusoe in third-party trackers (Baxtel "Crusoe: Myers Energy Park")
Gilby~200 MWAESO Cluster 3; mid-2029 targetNGTL bidding process under evaluation—
Lone Pine (Rocky View County, near Airdrie)~200 MW with data centreRezoning pre-application withdrawn April 2026; AESO interconnection cancelled; alternative nearby sites being considered—Community opposition
Crossfield~170 MW Power-CCS concept with co-located data centreFeatured in 2025 land-expansion announcement; not named in the June 2026 project list—Status not confirmed
Two additional locations—Under investigation—June 2026 quarterly
OfferingDescriptionTarget customerStatus
KALiNA Cycle for industrial waste heat to power (WHP)Ammonia-water binary cycle, variable boiling temperature mixture; claimed efficiency gains of up to ~50% over organic Rankine cycles at low-to-medium temperatures (historic company claim)Cement, steel, refineries, gas compression, gas turbine exhaustLicensing/engineering; no material income in FY2025–26
KALiNA Cycle for geothermalSame cycle applied to low-enthalpy geothermalGeothermal developersLegacy reference plants (e.g., Húsavík, Iceland)
Eco-Gen micro unitsMicro-packaged units for low-temperature applications such as Japanese hot springsSmall geothermal hostsHistoric; status not disclosed
KALiNA Cycle bottoming modulesIntegration with gas turbines (Saddle Hills design)Own projectsEmbedded in Saddle Hills concept

(a) KDP Alberta power projects (core offering)

Sources: June 2026 quarterly; Modern Power Systems (Feb 2025); Baxtel; FY2026 Appendix 4E note 7.5.

Design specification: plants were originally conceived as ~170 MW natural-gas combined-cycle units with post-combustion carbon capture and sequestration ("Power-CCS"), with capex of roughly C$1bn per project before government incentives (company clarification, Feb 2025). Following the May 2026 Canada–Alberta Implementation Agreement, CCS is optional; plants can connect without CCS and pay the prescribed carbon price. Target in-service: mid-2029. Pricing model: long-term tolling PPAs (≥15 years) with creditworthy counterparties; pricing not disclosed.

(b) Grid-allocation and development-rights monetisation

The 180 MW AESO interim large-load allocation (for 2027/28) was sold for C$18m in 2025. This is not a repeatable product line in the same form — the AESO has stated that outstanding large-load applications carry no priority absent a tethering agreement — but the transaction is an exemplar of a "develop and sell" capability (June 2026 quarterly).

(c) Site sales

KDP engaged TwelveSix, a Calgary firm specialising in data-centre site acquisition and financial assessment, to run sales campaigns for certain sites (September 2025 quarterly). No completed site sale was disclosed.

(d) KALiNA Cycle® technology (legacy)

Investments segment

No external products. Provides administration and holds legacy investments; FY2025 included a A$9,200 impairment of an equity investment.

Financial Narrative

Income statement

Sources: FY2026 Appendix 4E (FY2025–FY2026); FY2024 Appendix 4E (FY2023–FY2024 PBT and attributable loss); FY2022 net loss and FY2022–FY2024 operating loss from aggregators (Kalkine, Stoxray) — flagged as secondary. EBITDA and operating profit for FY2025–26 derived: PBT + finance costs − finance income (+ D&A A$5k).

Margins: gross, operating, EBITDA and net margins are not meaningful (nil revenue). Revenue CAGR: not meaningful.

Commentary. For four consecutive years (FY2022–FY2025) Kalina ran a remarkably stable cash-consuming cost base of roughly A$4–5m per year, with attributable losses between A$4.0m and A$4.7m. FY2026 is a genuine inflection, but it is one-off in nature: the A$19.60m "income from sale of MW allocation" accounts for essentially all of the A$15.8m profit. Underlying costs actually rose modestly — employee costs +29% (A$1.66m vs A$1.28m), travel +78% (A$0.12m vs A$0.07m) — while engineering and professional fees fell 27% (A$1.75m vs A$2.40m) and legal fees fell 60% (A$0.09m vs A$0.24m), reflecting a deliberate slowdown of discretionary project spending while Alberta regulations were finalised. Excluding the MW sale, interest income and FX, the FY2026 underlying pre-tax loss was approximately A$4.1m (derived), confirming that the business model has not yet generated recurring income.

Balance sheet

Sources: FY2026 and FY2024 Appendix 4E (FY2023–FY2026 equity, FY2025–26 full balance sheet); StockAnalysis (FY2022–FY2024 cash, assets, current liabilities, long-term payable). FY2022 total equity and total liabilities derived from StockAnalysis line items. Net debt and working capital derived.

Commentary. The balance sheet transformed from a net deficiency of A$3.43m (FY2025) to net assets of A$11.47m (FY2026). Two nuances matter for analysts. First, the company describes itself as having "nil debt", which is correct in the sense of having no bank or financing facilities (Appendix 4C, item 7), but it carries a A$2.65m unsecured, 10%-interest payable to outside shareholders of New Energy Asia, repayable only when NEA has a year's working capital in hand — economically a contingent quasi-debt instrument. Second, roughly A$1.91m of the A$14.24m "cash" is a term deposit pledged as collateral for a letter of credit (the C$2.6m AESO Cluster 2 security for Clairmont) and is not accessible unless the letter of credit is cancelled. Accumulated losses of A$118.75m against issued capital of A$132.68m illustrate the long history of capital consumption.

Cash flow

Sources: FY2026 Appendix 4E (FY2025–26); FY2024 Appendix 4E (FY2023–24 investing and financing); Stoxray (FY2022 equity proceeds, secondary). FY2023 and FY2024 operating cash flow derived from opening/closing cash less investing and financing flows (includes minor FX effects).

Commentary. FY2026 operating cash flow of A$13.05m is entirely attributable to the C$17m balance receipt (receipts A$18.55m). Payments to suppliers and employees increased to A$5.49m, but this includes GST paid of A$0.98m associated with the MW sale (June 2026 Appendix 4C, item 1.8) — underlying cash costs were closer to A$4.5m. Investing outflows comprised the A$1.91m restricted term deposit and A$0.58m deposit to ATCO Electric for stage 3–4 interconnection work. Run-rate burn has since compressed: the June 2026 quarter showed operating outflow of only A$0.96m, of which A$0.71m was Alberta development and A$0.48m was paid to directors (overlapping categories) — the Appendix 4C estimates ~14 quarters of funding at that rate.

Ratios

Derived from figures in 6.1–6.2. Negative-equity years render debt/equity meaningless (blank). ROIC, asset turnover and cash conversion cycle are not meaningful for a pre-revenue developer and are omitted rather than fabricated.

Commentary. Ratios swing violently because the denominators are tiny; they should not be extrapolated. The key solvency observation is that FY2023–FY2025 current ratios below 1.0 and negative equity reflected a company dependent on frequent small, dilutive raises (at 0.8–1.0 cents). FY2026's current ratio of 15x removes near-term going-concern risk, but the scale of capital needed to build even one plant (company estimate ~C$1bn with CCS) means the balance sheet is a development budget, not construction capacity.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Group Entities

EntityRoleOwnershipSource

Kalina Power Limited

ASX-listed parent; Australian head office; "Investments" segment

—

FY2026 Appendix 4E

KALiNA Distributed Power Limited (KDP)

Alberta project developer; core operating subsidiary

100%

Quarterly reports

New Energy Asia Ltd (NEA)

Legacy Asian vehicle; owes ~A$2.65m to key outside shareholders under a contingent loan agreement; source of large non-controlling interest deficit

Partially owned (shareholding previously decreased by 5.10%)

FY2026 Appendix 4E notes 10, 13.4

KCT Power Ltd

Legacy entity; excess consideration over NCI recorded in "other reserve"

—

FY2026 Appendix 4E note 13.4

Exergy Inc

Associate that holds KPO shares (treated as treasury shares, A$0.45m)

Associate

FY2026 Appendix 4E note 13.1

US / UK entities

Part of the power and technology segment (legacy Kalina Cycle operations)

—

FY2026 Appendix 4E note 2

“—” = not publicly disclosed.

Segment Overview

SegmentContentsProducts/services

Investments

Corporate administration, head office, investment activities

No external products

Power and technology development business

KDP Alberta development portfolio; legacy KALiNA Cycle technology operations in US/UK

Power project development, grid-allocation monetisation, (legacy) licensing/engineering

Results by Segment and Segment Assets & Liabilities

MetricFY2025FY2026

Investments — segment other income (AUD Mn)

0.0410.033

Power and technology — segment other income (AUD Mn)

0.00219.890

Total segment other income (AUD Mn)

0.04219.922

Investments — segment profit/loss (AUD Mn)

-1.792-0.980

Power and technology — segment profit/loss (AUD Mn)

-2.91116.781

Total segment profit/loss (AUD Mn)

-4.70315.801

Investments — segment assets (AUD Mn)

0.4920.233

Power and technology — segment assets (AUD Mn)

1.19414.727

Investments — segment liabilities (AUD Mn)

0.7320.624

Power and technology — segment liabilities (AUD Mn)

4.3852.872

Income Statement and Per-Share Data

MetricFY2022FY2023FY2024FY2025FY2026

Revenue from ordinary activities (AUD Mn)

00000

Other income incl. MW sale (AUD Mn)

———0.03619.629

Finance income (AUD Mn)

———0.0060.291

Employee benefits expense (AUD Mn)

———1.2811.657

Engineering and professional fees (AUD Mn)

———2.3971.745

Operating profit/loss excl. net finance (AUD Mn)

-5.330-5.014-4.017-4.56815.639

EBITDA (AUD Mn)

———-4.56315.644

Finance costs (AUD Mn)

———0.1410.129

Profit/loss before tax (AUD Mn)

—-4.924-4.041-4.70315.801

Net profit/loss total (AUD Mn)

-5.063-4.924-4.041-4.70315.801

Net profit/loss attributable to parent (AUD Mn)

-4.664-4.659-3.972-4.67315.838

Basic EPS (A$ cents)

———-0.20.5

Diluted EPS (A$ cents)

———-0.20.5

Dividends per share (A$ cents)

00000

Balance Sheet

MetricFY2022FY2023FY2024FY2025FY2026

Total assets (AUD Mn)

5.490.880.461.68614.961

Cash and equivalents (AUD Mn)

2.950.710.2551.52412.331

Short-term investments / restricted term deposits (AUD Mn)

2.400001.907

Total current assets (AUD Mn)

5.460.850.441.67713.045

Total current liabilities (AUD Mn)

0.771.020.752.5100.844

Short-term debt (AUD Mn)

00000

Long-term interest-bearing payable — NEA loan (AUD Mn)

2.162.302.422.6072.651

Net debt incl. NEA payable, excl. restricted deposit (AUD Mn)

-3.191.592.171.08-9.68

Total liabilities (AUD Mn)

2.973.323.175.1173.495

Total equity (AUD Mn)

2.52-2.447-2.715-3.43111.465

Equity attributable to parent (AUD Mn)

——8.9257.92422.830

Non-controlling interest (AUD Mn)

——-11.641-11.355-11.365

Goodwill and intangibles (AUD Mn)

00000

Working capital (AUD Mn)

4.69-0.17-0.31-0.83312.201

Accumulated losses (AUD Mn)

——-129.917-134.590-118.752

Issued capital (AUD Mn)

——130.720132.676132.677

Cash Flow

MetricFY2022FY2023FY2024FY2025FY2026

Operating cash flow (AUD Mn)

—-4.70-3.87-3.46413.055

Receipts from other income (AUD Mn)

———0.07518.546

Payments to suppliers and employees (AUD Mn)

———-3.530-5.489

Capex — plant and equipment (AUD Mn)

———-0.003-0.005

Free cash flow (AUD Mn)

———-3.46713.050

Investing cash flow (AUD Mn)

—2.4550.0011.110-2.248

Financing cash flow (AUD Mn)

8.600.0023.4123.6220.001

Gross equity raised (AUD Mn)

8.60——4.0800.001

Dividends paid (AUD Mn)

00000

Share buybacks (AUD Mn)

00000

Financial Ratios (x) and Returns & Leverage Ratios (%)

MetricFY2022FY2023FY2024FY2025FY2026

Current ratio (x)

7.090.830.590.6715.45

Debt (NEA payable) to total equity (x)

0.86———0.23

ROE on parent equity (%)

———-55103

ROA on average total assets (%)

———-437190

Interest coverage — EBIT / finance costs (x)

———-32121

Net debt / EBITDA (x)

————-0.62

Results by Region and Region Assets & Liabilities

MetricFY2024FY2025FY2026

Revenue — all regions (AUD Mn)

000

Other income attributable to Canada (AUD Mn)

—0.00219.890

Other income attributable to Australia (AUD Mn)

—0.0410.033

Non-current assets — Australia (AUD Mn)

—0.00830.0086

Non-current assets — Canada (AUD Mn)

—0.00090

Non-current assets — USA (AUD Mn)

—00

Operating Metrics (M) and Per-Share Data

MetricFY2024FY2025FY2026

Shares on issue at year end (M)

2,486.42,933.02,933.0

Options on issue at year end (M)

162.1451.1326.1

NTA per share (A$ cents)

-0.11-0.120.39

Share Price & Returns

Reference pointPrice (AUD)Source

31 Oct 2025 (price at Sep-quarter release)

0.021

InvestSMART

5 Nov 2025

0.022

InvestSMART

Jan–Feb 2026 range

~0.01–0.02

Motley Fool AU

29 Apr 2026 (price at Mar-quarter release)

0.011

InvestSMART

June 2026 range

0.012–0.015

InvestSMART

24 Jul 2026

0.021

InvestSMART

29 Jul 2026 (last verified close)

0.018

InvestSMART

52-week range (StockLight, 2026)

0.009–0.023

StockLight

FY2021 52-week range

0.016–0.040 (split-adjusted basis per StockLight)

StockLight

Valuation Snapshot

MultipleValueBasis

Market capitalisation

~A$52.8m

2,933.0m × A$0.018

Enterprise value

~A$41.2m

Mkt cap − A$14.24m cash + A$2.65m NEA payable

P/E (FY2026)

~3.3x

One-off profit; not meaningful for valuation

EV/EBITDA (FY2026)

~2.6x

One-off; not meaningful

EV/Sales

n/m

Nil revenue

P/B (total equity)

~4.6x

A$11.47m

P/B (parent equity)

~2.3x

A$22.83m

EV per MW of queued generation (~1,000 MW)

~A$41k/MW

Analyst illustration

Capital Markets

ItemStatus

Analyst consensus

None — 0 analysts cover KPO (Simply Wall St)

Dividend history / policy

No dividends paid FY2022–FY2026; none proposed for FY2026

Buybacks

None authorised

Credit ratings (Moody's/S&P/Fitch)

Not rated

Debt maturity profile

No bank debt; A$2.65m NEA payable with contingent repayment (no fixed maturity)

Option overhang (post-Oct 2026)

Tranche 2: 85.0m at 1.0c expiring 12 Nov 2026 (~A$0.85m if exercised); tranche 3: 10.0m at 2.0c expiring 22 Oct 2026; tranches 7–8: 96.87m at 2.2c (3 years from vesting)

Analyst Conclusions

Management guidance

No financial guidance. Management characterises regulatory momentum as accelerating, reports expanded negotiations with hyperscalers, data-centre developers, power marketers and gas producers, expresses confidence in near-term funding via its investment bankers, and refers to "significant near-term value catalysts" (June 2026 quarterly). Project in-service dates remain mid-2029.

Consensus

No sell-side coverage; no consensus estimates exist.

Bull case

  1. Scarcity value is real and now codified. Alberta's BYOG tethering requirement for data centres above 75 MW, against >16 GW of 2029–2030 requests, makes interconnection-advanced generation sites strategic. KPO has five, including Clairmont in Cluster 2.

  2. Valuation anchored by precedent. The company sold 180 MW of allocation for C$18m (~C$100k/MW). The current EV of ~A$41m implies roughly A$41k per MW of a ~1 GW pipeline — a discount to the only disclosed comparable, albeit for a different type of right.

  3. Funded optionality. ~A$14.2m cash, quarterly burn under A$1m and no bank debt let management negotiate from strength rather than distress for the first time in years.

Bear case

  1. Capital gap. A C$1bn-per-plant capex estimate means KPO must bring in partners at project level; equity value accruing to KPO shareholders may be modest after developer-fee or carried-interest structures.

  2. One-off profit. FY2026 earnings are non-recurring; underlying losses (~A$4m/yr) resume, and the AESO has said outstanding large-load applications carry no priority, reducing scope for repeat allocation sales.

  3. Execution and governance. No PPA in 18 months under the Crusoe framework; a withdrawn site; executive-heavy board with significant related-party payments and large option grants; a retail-dominated register with no institutional anchor.

Catalysts and monitorables (next 12 months)

CatalystTimingWhy it matters
AESO final BYOG/LLAP rules and first intake cycleAug 2026 onward (status to verify)Determines tethering economics and demand for KPO sites
September 2026 quarterly / 4CBy ~31 Oct 2026Cash, burn, commercial updates
AGM and FY2026 annual report (remuneration, risks, auditor)Oct–Nov 2026Governance disclosure
Tranche 2 option expiry (85m at 1.0c)12 Nov 2026Small cash inflow / dilution
Crusoe PDA or any binding PPA / term sheetAny timeConverts framework into contracted value
NGTL gas supply allocation for Alsike, Myers, Gilby2026–27Feasibility of three sites
Project-level equity or site saleAny timeValidates valuation; funds development
Replacement site for Lone Pine2026–27Portfolio breadth
Interim report H1 FY2027~26 Feb 2027First post-windfall underlying half

Analyst verdict

Kalina Power has, after a decade of disappointment as a licensor of a technically elegant but commercially marginal heat-to-power cycle, stumbled into one of the most valuable niches in North American energy: shovel-ready, interconnection-queued generation sites in a jurisdiction that now legally requires data centres to bring their own power. The FY2026 accounts confirm that this niche can be monetised — the C$18m allocation sale turned a balance sheet with a A$3.4m net deficiency into one with A$11.5m of net assets and roughly A$14m of cash, without bank debt. Management has, sensibly, slowed discretionary spending while Alberta's rules crystallised, and the June 2026 quarter's burn of under A$1m gives multi-year runway.

Yet investors should be clear-eyed about what they own. Kalina is a pre-revenue developer whose only profitable year came from a single, explicitly non-recurring transaction. Its projects require capital several orders of magnitude larger than its market capitalisation, and its framework with Crusoe has not yielded a binding agreement in eighteen months. The AESO's statement that legacy load applications confer no priority reduces the likelihood of a repeat windfall of the same kind. Governance warrants attention: related-party director payments consumed about half of the latest quarter's operating outflow, and large option grants followed the windfall.

The investment case therefore reduces to a binary-leaning option on management's ability to convert sites into financed, contracted projects — or to sell them to better-capitalised developers — during the window that Alberta's BYOG regime has opened. At an implied enterprise value near A$41k per queued megawatt, the market is pricing meaningful scepticism. A binding PPA, a project-level equity partnership, or a site sale at or near the 2025 precedent would likely re-rate the stock; prolonged silence through the first LLAP intake cycle would suggest the window is being captured by incumbents. Stance: speculative; event-driven; suitable only for risk capital, with position sizing reflecting execution and dilution risk.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleTenureBackground (as disclosed)Age / birth yearSource

Ross (John Ross) MacLachlan

Managing Director, CEO, Executive Director (previously also Acting/Interim Chairman)

Since 29 Jun 2015

Over 30 years in technology development and commercialisation across conventional and alternative energy; corporate finance, business development, strategy

Born 1954 (~72)

Market Index; Yahoo; MarketScreener; Simply Wall St

Stephen (Steve) White

Non-Executive Chairman

Since 1 Sep 2022

Canada-based; chaired the Nov 2025 AGM from Canada

—

InvestSMART; AGM address

Timothy (Tim) Horgan

Executive Director; investor contact

—

B.A., LL.B.

—

Yahoo; quarterly reports

Matthew Jenkins

Director (role per annual report to be verified)

—

19 years in corporate finance, investment and power development

—

Motley Fool AU

Malcolm Jacques

Director (non-executive, to be verified)

———

Motley Fool AU director trades

Peter Littlewood

Director (non-executive, to be verified)

———

Motley Fool AU director trades

Jeffry M. Myers

———

Born 1959

Yahoo Finance

Keshwaran (Kesh) Thurairasa

Financial Controller & Company Secretary

——

Born 1954

Yahoo; InvestSMART

Robert William Rosine, P.Eng.

General Manager, KALiNA Distributed Power

~3.3 years (as of Nov 2025)

Professional engineer

—

Yahoo; Simply Wall St

Man Yin Chea

———

Born 1962

Yahoo Finance

“—” = not publicly disclosed.

Directors' Remuneration

ExecutiveDisclosed pay (AUD)Source

Ross MacLachlan (CEO)

~320,190 (Simply Wall St: 321,300 total, ~87% salary)

Yahoo; Simply Wall St

Robert Rosine (GM, KDP)

~261,140 (SWS: 298,220)

Yahoo; Simply Wall St

Tim Horgan (Exec Director)

~221,000

Yahoo

Kesh Thurairasa (FC & Co Sec)

~187,850

Yahoo

Jeffry Myers (Exec Director)

~121,000

Yahoo

Man Yin Chea

~23,130

Yahoo

Major Shareholders

HolderStakeSource / date

John Ross MacLachlan

~4.41%

Motley Fool AU (Morningstar data)

Invia Custodian Pty Limited

~1.70% (and 1.63% second account)

Motley Fool AU

Citicorp Nominees Pty Limited

~1.10%

Motley Fool AU

Exergy Inc (associate)

Holds KPO shares carried as treasury shares at A$0.45m; % not disclosed

FY2026 Appendix 4E note 13.1

Free float

~56.8%

MarketScreener

Competitive Landscape

Key Competitors

CompetitorRelevanceRelative scale vs KPO

Pembina Pipeline / Kineticor (Greenlight Electricity Centre)

Developer of 932 MW phase 1 (1.8 GW buildout) serving Meta

Orders of magnitude larger (multi-billion C$ enterprise)

Capital Power (TSX: CPX)

Major Alberta IPP; LLAP working-group member

Multi-billion C$ revenue IPP

TransAlta (TSX: TA)

Major Alberta IPP; in talks with data-centre operators; LLAP member

Multi-billion C$ revenue IPP

Beacon AI Centers

Alberta data-centre/power developer; LLAP member

Private

ATCO / Canadian Utilities

Alberta utility, power and gas; also KPO's interconnection counterparty

Large-cap

Pine Cliff Energy

Signed a 25-year behind-the-meter supply deal with a data centre (late 2024/early 2025)

Small/mid-cap producer

Imperial Oil, Dow Chemical

Industrial self-generators; LLAP members

Large-cap

IREN Ltd, eStruxture

Data-centre operators/developers; potential customers and competitors for sites

Mid/large-cap

O'Leary "Wonder Valley" and other private mega-campus proponents

Competing BYOG campus concepts

Private

Key Competitors — Ormat Technologies

CompetitorTechnology

Ormat Technologies (NYSE: ORA)

Organic Rankine cycle, geothermal and recovered energy

Turboden (Mitsubishi Heavy Industries group)

ORC systems

Exergy International

Radial outflow ORC turbines

Baker Hughes

ORC and heat-recovery turbomachinery (also a KPO equipment supplier)

Kalex LLC

Second-generation Kalina-type cycles

Peer Comparison FY2026

DimensionKalina PowerCapital PowerTransAltaPembina (Greenlight)

FY revenue

Nil (FY2026)

Multi-billion C$

Multi-billion C$

Multi-billion C$ (midstream)

Operating assets

—

Large fleet

Large fleet

Midstream + JV power under construction

Growth driver

Converting 5 sites to contracts

Fleet + contracts

Fleet + data-centre deals

Greenlight expansion

Margins

n/m

Positive

Positive

Positive

R&D intensity

n/m

Low

Low

Low

Market share in Alberta generation

0%

Major

Major

Entering

Company Snapshot

1950

Founded

Hawthorn, Australia

Headquarters

SWOT Analysis

Strengths

  • Cash of ~A$14.24m and no financing facilities drawn at 30 June 2026 (June 2026 Appendix 4C), versus A$0.26m two years earlier (FY2024 Appendix 4E).
  • Proven monetisation: C$18m realised for a 180 MW allocation, recognised as A$19.60m other income (FY2026 Appendix 4E note 4(a)).
  • Five secured Alberta sites, all through the AESO process, with Clairmont in Cluster 2 backed by a ~C$2.6m letter of credit (June 2026 quarterly).
  • Seat on the nine-member AESO LLAP working group alongside Capital Power, TransAlta and Imperial Oil (June 2026 quarterly).
  • Low run-rate burn: A$0.96m operating outflow in the June 2026 quarter, implying ~14 quarters of funding (Appendix 4C item 8.5).
  • CCS optionality at every site following the May 2026 Implementation Agreement (June 2026 quarterly).

Weaknesses

  • Nil revenue in every year FY2022–FY2026 (Appendix 4E filings).
  • Underlying pre-tax loss ~A$4.1m in FY2026 excluding the MW sale (derived from Appendix 4E).
  • No executed PPA or Crusoe PDA; Crusoe framework imposes no obligation (Feb 2025 clarification).
  • Accumulated losses of A$118.75m against A$132.68m issued capital (FY2026 Appendix 4E).
  • Contingent quasi-debt of A$2.65m owed to NEA outside shareholders at 10% interest (Appendix 4E note 10), and a A$11.36m NCI deficit complicating the capital structure.
  • Governance concentration: executive-heavy board; A$482k related-party payments in one quarter, ~50% of operating outflow (June 2026 Appendix 4C).

Opportunities

  • BYOG tethering rule for data centres >75 MW creates mandatory demand for new generation partners (June 2026 quarterly).
  • 16 GW of 2029–2030 data-centre load requests versus limited new supply (June 2026 quarterly).
  • Meta/Greenlight precedent (C$13bn / C$4.6bn) establishes hyperscaler appetite for Alberta gas-fired BYOG (June 2026 quarterly).
  • Levy differential (1% vs 2%, nil off-grid) favours co-located supply structures (June 2026 quarterly).
  • Further site or allocation sales could recur, given active TwelveSix mandate (Sep 2025 quarterly).
  • Project-level equity from infrastructure investors via engaged investment bankers (June 2026 quarterly).

Threats

  • Capital intensity: ~C$1bn per CCS-equipped plant (Feb 2025) dwarfs a ~A$53m market capitalisation, implying heavy dilution or loss of control at project level.
  • Municipal opposition: Lone Pine withdrawn April 2026; Rocky View Technology Park rejected Sept 2025 (Baxtel).
  • AESO states outstanding large-load applications no longer carry priority without tethering (June 2026 quarterly) — prior queue positions are less valuable.
  • Gas supply constraints at Alsike, Myers and Gilby, which depend on an NGTL bidding process (June 2026 quarterly).
  • Incumbent competition (Capital Power, TransAlta, Pembina/Kineticor) with stronger balance sheets.
  • Policy reversal risk: the CER abeyance is conditional (June 2026 quarterly).

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
10 Apr 20255.48m shares issued at 0.8c FY2026 Appendix 4EContinued micro-raises
7 May 202538.75m shares issued at 0.8c; director participation and option issues/expiries Appendix 4E; Motley FoolInsider support during cash squeeze
18 Jun 202525,971 options exercised at 2.0c Appendix 4EImmaterial
End Jun 2025C$1m non-refundable deposit received for 180 MW transfer 5 Nov 2025 announcementFirst validation of allocation value
30 Jun 2025FY2025 year end: cash A$1.52m; net deficiency A$3.43m FY2026 Appendix 4EPre-windfall low point
3 Jul 2025Deposit conditions fulfilled; non-refundable Appendix 4E note 8De-risks transaction
Jul–Sep 2025Financing arrangements with PEI Global Partners and Moneta Securities; TwelveSix sales campaigns September 2025 quarterlyCapital formation
c. late Sep 2025FY2025 annual report lodged StockLightStatutory
Sep 2025Rocky View County rejects separate Rocky View Technology Park proposal (non-KPO) BaxtelSignal of municipal resistance near Calgary
8 Oct 2025Trading halt then confirmation that Greenlight signed DTS agreement with AESO; 180 MW transferred ShareCafe; StockLightFinal condition satisfied
21 Oct 202518.27m options at 2.2c granted Appendix 4EIncentives
31 Oct 2025September quarter report; cash ~A$20m pro forma after receipts InvestSMART summaryFunding position transformed
5 Nov 2025C$17m balance received (~A$18.6m) ASX announcementCash windfall
Nov 2025Canada–Alberta MOU on energy and climate framework June 2026 quarterlyRegulatory pathway for unabated gas
28 Nov 2025AGM; Chairman's address; 78.6m options granted to directors at 2.2c AGM address; Appendix 4EGovernance/incentives
29 Jan 2026December quarter report InvestSMARTOngoing development
29 Jan 202625,000 options exercised Appendix 4EImmaterial
27 Feb 2026Half-year report to 31 Dec 2025 (profit ~A$15m for the half) InvestSMART; Simply Wall StWindfall recognised
31 Mar 202619.2m MacLachlan options expire Market IndexInsider position
Apr 2026Lone Pine rezoning pre-application withdrawn Baxtel; June 2026 quarterlyPortfolio setback; social licence risk
28–29 Apr 2026March quarter report; cessation of options notice InvestSMART; financialfilingsRegulatory delay acknowledged
16 May 2026Canada–Alberta Implementation Agreement; CER placed in abeyance in Alberta June 2026 quarterlyCCS no longer mandatory
20–21 May 2026KPO announcement on major regulatory agreement; further options cessation notice InvestSMART; financialfilingsPositive repositioning
9 Jun 2026Alberta Data Centre Regulation (AR 117/2026) in force Bennett JonesBYOG codified
24 Jun 2026AESO stakeholder session on LLAP draft; tethering requirement for data centres >75 MW June 2026 quarterlyIncreases value of generation developers
2 Jul 2026Pembina FID on Greenlight phase 1 (932 MW) The LogicValidates BYOG model
8 Jul 2026Meta announces C$13bn Alberta AI data centre powered by Greenlight June 2026 quarterlyHyperscaler demand confirmed; KPO identifies Meta as 180 MW buyer
29 Jul 2026June quarter: ~A$14.3m cash; Clairmont Cluster 2 with ~C$2.6m LoC; Saddle Hills 100 MW application June 2026 quarterlyProject progression
Aug 2026Key regulatory catalyst
26 Aug 2026FY2026 Appendix 4E: A$15.84m attributable profit; NTA 0.39c/shareFirst statutory profit
19 Sep 2026Potential small inflow
c. 29 Sep 2026Audited accounts, remuneration report
9 Oct 2026Expiry of tranches 4–6 (96.46m options at 2.0c) Appendix 4E note 12Overhang reduction

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

2 charts
Results by Segment: Total segment other income rose from AUD 0 Mn in FY2025 to AUD 19.9 Mn in FY2026.
Kalina Power Limited — Results by Segment
Series (AUD Mn)FY2025FY2026
Total segment other income019.9
Total segment profit/loss-4.715.8
Investments — segment other income00
Power and technology — segment other income019.9
Investments — segment profit/loss-1.8-1
Power and technology — segment profit/loss-2.916.8

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. Kalina Power Limited, Appendix 4E Preliminary Final Report FY2026 (26 Aug 2026) (bulletin.webull.com)
  2. Kalina Power Limited, Appendix 4E Preliminary Final Report FY2024 (28 Aug 2024) (announcements.asx.com.au)
  3. Kalina Power Limited, Quarterly Activities Report & Appendix 4C, quarter ended 30 June 2026 (29 Jul 2026) (investorpa.com)
  4. Kalina Power Limited, Quarterly Activities Report, quarter ended 30 September 2025 (bulletin.webull.com)
  5. Kalina Power Limited, "KALiNA Reports CAD$18m MW Transfer Agreement Completed" (5 Nov 2025) (bulletin.webull.com)
  6. Kalina Power Limited, AGM Chairman's address (28 Nov 2025) (announcements.asx.com.au)
  7. Kalina Power Limited, "KALiNA Expands Land Position in Alberta" (quoteapi.com)
  8. ShareCafe, MW transfer confirmation (sharecafe.com.au)
  9. InvestSMART announcement summaries and price history · investsmart.com.au · investsmart.com.au
  10. StockAnalysis balance sheet (stockanalysis.com)
  11. Simply Wall St profile and management · simplywall.st
  12. MarketScreener (ca.marketscreener.com)
  13. Morningstar AU (morningstar.com.au)
  14. Motley Fool AU (directors, holders) (fool.com.au)
  15. Market Index (Ross MacLachlan) (marketindex.com.au)
  16. Yahoo Finance profile (au.finance.yahoo.com)
  17. financialfilings.com (ISIN, LEI) (financialfilings.com)
  18. IBISWorld company record (img3.ibisworld.com)
  19. PitchBook profile (pitchbook.com)
  20. Kalkine company data (kalkine.com.au)
  21. Stoxray (stoxray.com)
  22. StockLight announcements and annual reports · stocklight.com
  23. Kalkine Media (June 2026 quarter summary) (kalkinemedia.com)
  24. SmallCaps · smallcaps.com.au
  25. DatacenterDynamics (Crusoe–Kalina) (datacenterdynamics.com)
  26. Baxtel (Crusoe/KDP sites; Lone Pine) · baxtel.com · connect.baxtel.com
  27. Modern Power Systems (Saddle Hills specification) (modernpowersystems.com)
  28. TipRanks (Crusoe clarification; funding) · tipranks.com
  29. The Logic (Greenlight FID) (thelogic.co)
  30. Bennett Jones (Alberta BYOG framework) (bennettjones.com)
  31. Government of Alberta, data centres and the grid (alberta.ca)
  32. AESO Engage, Large Load Integration Phase 2A feedback (aesoengage.aeso.ca)
  33. ThinkGeoEnergy (Wasabi Energy / Global Geothermal history) · thinkgeoenergy.com
  34. Wikipedia, Kalina cycle (en.wikipedia.org)