Kalina Power is a micro-cap ASX-listed power project developer that has pivoted from its heritage as owner and licensor of the KALiNA Cycle® — a proprietary ammonia-water thermodynamic cycle for converting low-to-medium-grade heat into electricity — to a developer of gas-fired generation in Alberta, Canada, aimed squarely at the AI data-centre boom. Through its wholly owned subsidiary KALiNA Distributed Power, it holds a portfolio of five secured project sites of roughly 200 MW each, designed to supply co-located "behind-the-meter" power under long-term tolling power purchase agreements, with optional carbon capture and sequestration. In FY2026 the company validated the commercial value of its grid-access positions by selling a 180 MW load allocation for C$18 million to a customer of the Greenlight Electricity Centre (later identified by the company as Meta), producing its first statutory profit (A$15.8m) and a debt-free, cash-rich balance sheet. It remains pre-revenue, with value contingent on converting sites into financed, contracted projects.
Company's own description
In its most recent filings and announcements, Kalina Power describes itself as an ASX-listed company focused on delivering cost-effective power projects that generate constant baseload electricity with a low carbon footprint. Its operating activity is carried out by KDP, which the company describes as developing a portfolio of five Alberta projects intended to provide data centres with co-located, behind-the-meter electricity from KDP's planned natural gas-fired power plants. The company states that its team has around 20 GW of global power project development experience, of which about 3.5 GW was developed by the Alberta team, and that KDP's business model rests on fully contracted, long-term tolling power purchase agreements with co-located data centres (ASX announcement, 5 November 2025).
The segment note in the FY2026 Appendix 4E describes two reportable segments: "Investments", which provides administrative support and holds the group's investment activities, and "Power and technology development business", located in the US, Canada and the UK, which manages the group's power business (FY2026 Appendix 4E, note 2).
Independent characterisation
Kalina Power is best understood as an early-stage greenfield independent power producer (IPP) developer with an option-like asset base, not an operating utility and not (any longer) primarily a technology licensor. Its economic assets are:
-
Secured land and development rights at five Alberta sites (Clairmont, Saddle Hills, Alsike, Myers, Gilby), each of roughly 200 MW nameplate ambition, progressing through the Alberta Electric System Operator (AESO) generation interconnection process with targeted in-service dates of mid-2029 (June 2026 quarterly report).
-
Queue position and regulatory know-how in a jurisdiction where grid access for large loads has become scarce and therefore valuable. The C$18m sale of a 180 MW load allocation in 2025 demonstrated that these positions can be monetised before construction.
-
Commercial frameworks, notably the February 2025 multi-year framework agreement with Crusoe (AI data-centre developer), which is non-binding as to specific projects.
-
Legacy intellectual property in the KALiNA Cycle, now of secondary strategic importance; FY2026 patent costs were nil (FY2025: A$131), suggesting the patent estate is no longer being actively maintained at meaningful cost (FY2026 Appendix 4E).
Business and revenue model
| Revenue model element | Status | Evidence |
|---|---|---|
| Electricity sales under long-term tolling PPAs (target ≥15 years) to co-located data centres | Target model; no PPA executed | Crusoe framework (Feb 2025); 5 Nov 2025 announcement |
| Merchant sales into the Alberta power pool / virtual PPAs | Optionality cited in project design | "KALiNA Expands Land Position in Alberta" announcement (2025) |
| Monetisation of grid allocations / site development rights | Realised once: C$18m (A$19.6m) recognised as other income in FY2026 | FY2026 Appendix 4E note 4(a) |
| Site sales (data-centre-ready sites co-located with power) | Marketing campaigns with TwelveSix (Calgary) | September 2025 quarterly |
| Technology licensing / engineering services (KALiNA Cycle) | Historical; no material income in FY2025–FY2026 | FY2025–FY2026 accounts (revenue nil) |
| Management fees | Immaterial (A$32k FY2026) | FY2026 Appendix 4E |
Mix: Statutory revenue from ordinary activities was nil in both FY2025 and FY2026. All FY2026 income was classified as "other income" (A$19.63m) and finance income (A$0.29m). There is therefore no product/service/subscription/licensing revenue mix to report.
Value-chain position, customers and end-markets
Kalina sits at the front end of the power value chain — origination, permitting, interconnection, gas-supply arrangements, and commercial structuring — with the intention of owning and operating plants once financed. Target customers are hyperscalers, AI cloud/data-centre developers (e.g., Crusoe), and potentially industrial loads; secondary customers include power marketers and the Alberta pool. The single end-market is Alberta electricity, specifically large-load (data-centre) supply. Gas producers and pipeline operators (NGTL) are key suppliers; the AESO and the Alberta Utilities Commission are gatekeepers.
Strategy
Stated strategic themes (paraphrased from FY2025–FY2026 communications)
-
Speed to market is identified by management as the most important criterion for hyperscalers and data centres; the portfolio is positioned to serve that priority (June 2026 quarterly, MD commentary).
-
A geographically dispersed Alberta portfolio is a deliberate strategy to mitigate gas supply, transmission congestion and municipal zoning risks (June 2026 quarterly).
-
Optionality on CCS: every site is located with access to CCS infrastructure but can proceed with or without CCS, letting the company match offtakers who prioritise speed versus long-run cost (June 2026 quarterly).
-
Contracted, long-term tolling PPAs with creditworthy counterparties as the core economic model (5 Nov 2025 announcement).
-
Prudent cash management while regulations were finalised, preserving ~A$14.3m and avoiding dilutive raises (June 2026 quarterly).
Initiatives in the last 24 months
| Initiative | Date | Detail | Status |
|---|---|---|---|
| Crusoe framework agreement | Feb 2025 | Up to three co-sited AI data centres; PPAs ≥15 years; separate Project Development Agreements required; Crusoe to fund certain interconnection security payments | Framework only; no PDA announced |
| Land expansion (Crossfield and others) | 2,025 | Additional secured land for Power-CCS + data-centre configurations | Partly superseded |
| 180 MW allocation sale | Jun–Nov 2025 | C$18m realised | Completed |
| Financing arrangements with PEI Global Partners and Moneta Securities | Sep 2025 quarter | Engaged for project/capital formation | Ongoing; no financing closed |
| TwelveSix site-sales mandate | 2,025 | Marketing certain sites to data-centre buyers | Ongoing |
| AESO LLAP working group membership | 2,026 | One of nine stakeholders shaping BYOG rules | Ongoing |
| Interconnection progression | 2,026 | Clairmont to Cluster 2 with C$2.6m LoC; four sites in Cluster 3; Saddle Hills 100 MW Cluster 3 application | Filed |
| Gas supply | 2,026 | Regulated and unregulated sources; NGTL bidding for Alsike, Myers, Gilby | In progress |
| Investment bank engagement | 2,026 | Meetings with major investors; management "confident" in near-term funding | No transaction announced |
| Evaluation of two additional sites | 2,026 | Includes Rocky View County alternatives to Lone Pine | Early stage |
Guidance and targets
Kalina does not provide earnings or revenue guidance. The only quantitative forward markers are: targeted in-service dates of mid-2029 for the AESO-queued projects; a theoretical phased build-out of up to ~1.7 GW across the portfolio (ShareCafe, Oct 2025); and capex of ~C$1bn per CCS-equipped project before incentives (Feb 2025). No medium-term financial targets, cost programs with numerical targets, or ESG targets have been published.
Products & Services
Power and technology development segment
| Project | Indicative capacity | Status (June 2026 quarter) | Gas supply | Notes |
|---|---|---|---|---|
| Clairmont Energy Park | ~200 MW | Elected into AESO Cluster 2; ~C$2.6m letter of credit posted with AESO; ATCO Electric engaged for facilities application (A$0.55m prepayment at 30 June 2026); targeted in-service mid-2029 | Unconstrained area — can apply for gas at any time | Most advanced site |
| Saddle Hills | Originally up to 64 MW (2 × Siemens SGT-600 22 MW gas turbines plus KALiNA Cycle bottoming modules with 10 MW Baker Hughes vapour turbines); Cluster 3 application filed for 100 MW interconnection | Described in early 2025 as fully permitted to construct and operate; Cluster 3 | Unconstrained area | Only project with explicit KALiNA Cycle integration; excluded from Crusoe framework |
| Alsike | ~200 MW | AESO Cluster 3; mid-2029 target | NGTL bidding process under evaluation | — |
| Myers | ~200 MW | AESO Cluster 3; mid-2029 target | NGTL bidding process under evaluation | Associated with Crusoe in third-party trackers (Baxtel "Crusoe: Myers Energy Park") |
| Gilby | ~200 MW | AESO Cluster 3; mid-2029 target | NGTL bidding process under evaluation | — |
| Lone Pine (Rocky View County, near Airdrie) | ~200 MW with data centre | Rezoning pre-application withdrawn April 2026; AESO interconnection cancelled; alternative nearby sites being considered | — | Community opposition |
| Crossfield | ~170 MW Power-CCS concept with co-located data centre | Featured in 2025 land-expansion announcement; not named in the June 2026 project list | — | Status not confirmed |
| Two additional locations | — | Under investigation | — | June 2026 quarterly |
| Offering | Description | Target customer | Status |
|---|---|---|---|
| KALiNA Cycle for industrial waste heat to power (WHP) | Ammonia-water binary cycle, variable boiling temperature mixture; claimed efficiency gains of up to ~50% over organic Rankine cycles at low-to-medium temperatures (historic company claim) | Cement, steel, refineries, gas compression, gas turbine exhaust | Licensing/engineering; no material income in FY2025–26 |
| KALiNA Cycle for geothermal | Same cycle applied to low-enthalpy geothermal | Geothermal developers | Legacy reference plants (e.g., Húsavík, Iceland) |
| Eco-Gen micro units | Micro-packaged units for low-temperature applications such as Japanese hot springs | Small geothermal hosts | Historic; status not disclosed |
| KALiNA Cycle bottoming modules | Integration with gas turbines (Saddle Hills design) | Own projects | Embedded in Saddle Hills concept |
(a) KDP Alberta power projects (core offering)
Sources: June 2026 quarterly; Modern Power Systems (Feb 2025); Baxtel; FY2026 Appendix 4E note 7.5.
Design specification: plants were originally conceived as ~170 MW natural-gas combined-cycle units with post-combustion carbon capture and sequestration ("Power-CCS"), with capex of roughly C$1bn per project before government incentives (company clarification, Feb 2025). Following the May 2026 Canada–Alberta Implementation Agreement, CCS is optional; plants can connect without CCS and pay the prescribed carbon price. Target in-service: mid-2029. Pricing model: long-term tolling PPAs (≥15 years) with creditworthy counterparties; pricing not disclosed.
(b) Grid-allocation and development-rights monetisation
The 180 MW AESO interim large-load allocation (for 2027/28) was sold for C$18m in 2025. This is not a repeatable product line in the same form — the AESO has stated that outstanding large-load applications carry no priority absent a tethering agreement — but the transaction is an exemplar of a "develop and sell" capability (June 2026 quarterly).
(c) Site sales
KDP engaged TwelveSix, a Calgary firm specialising in data-centre site acquisition and financial assessment, to run sales campaigns for certain sites (September 2025 quarterly). No completed site sale was disclosed.
(d) KALiNA Cycle® technology (legacy)
Investments segment
No external products. Provides administration and holds legacy investments; FY2025 included a A$9,200 impairment of an equity investment.
Financial Narrative
Income statement
Sources: FY2026 Appendix 4E (FY2025–FY2026); FY2024 Appendix 4E (FY2023–FY2024 PBT and attributable loss); FY2022 net loss and FY2022–FY2024 operating loss from aggregators (Kalkine, Stoxray) — flagged as secondary. EBITDA and operating profit for FY2025–26 derived: PBT + finance costs − finance income (+ D&A A$5k).
Margins: gross, operating, EBITDA and net margins are not meaningful (nil revenue). Revenue CAGR: not meaningful.
Commentary. For four consecutive years (FY2022–FY2025) Kalina ran a remarkably stable cash-consuming cost base of roughly A$4–5m per year, with attributable losses between A$4.0m and A$4.7m. FY2026 is a genuine inflection, but it is one-off in nature: the A$19.60m "income from sale of MW allocation" accounts for essentially all of the A$15.8m profit. Underlying costs actually rose modestly — employee costs +29% (A$1.66m vs A$1.28m), travel +78% (A$0.12m vs A$0.07m) — while engineering and professional fees fell 27% (A$1.75m vs A$2.40m) and legal fees fell 60% (A$0.09m vs A$0.24m), reflecting a deliberate slowdown of discretionary project spending while Alberta regulations were finalised. Excluding the MW sale, interest income and FX, the FY2026 underlying pre-tax loss was approximately A$4.1m (derived), confirming that the business model has not yet generated recurring income.
Balance sheet
Sources: FY2026 and FY2024 Appendix 4E (FY2023–FY2026 equity, FY2025–26 full balance sheet); StockAnalysis (FY2022–FY2024 cash, assets, current liabilities, long-term payable). FY2022 total equity and total liabilities derived from StockAnalysis line items. Net debt and working capital derived.
Commentary. The balance sheet transformed from a net deficiency of A$3.43m (FY2025) to net assets of A$11.47m (FY2026). Two nuances matter for analysts. First, the company describes itself as having "nil debt", which is correct in the sense of having no bank or financing facilities (Appendix 4C, item 7), but it carries a A$2.65m unsecured, 10%-interest payable to outside shareholders of New Energy Asia, repayable only when NEA has a year's working capital in hand — economically a contingent quasi-debt instrument. Second, roughly A$1.91m of the A$14.24m "cash" is a term deposit pledged as collateral for a letter of credit (the C$2.6m AESO Cluster 2 security for Clairmont) and is not accessible unless the letter of credit is cancelled. Accumulated losses of A$118.75m against issued capital of A$132.68m illustrate the long history of capital consumption.
Cash flow
Sources: FY2026 Appendix 4E (FY2025–26); FY2024 Appendix 4E (FY2023–24 investing and financing); Stoxray (FY2022 equity proceeds, secondary). FY2023 and FY2024 operating cash flow derived from opening/closing cash less investing and financing flows (includes minor FX effects).
Commentary. FY2026 operating cash flow of A$13.05m is entirely attributable to the C$17m balance receipt (receipts A$18.55m). Payments to suppliers and employees increased to A$5.49m, but this includes GST paid of A$0.98m associated with the MW sale (June 2026 Appendix 4C, item 1.8) — underlying cash costs were closer to A$4.5m. Investing outflows comprised the A$1.91m restricted term deposit and A$0.58m deposit to ATCO Electric for stage 3–4 interconnection work. Run-rate burn has since compressed: the June 2026 quarter showed operating outflow of only A$0.96m, of which A$0.71m was Alberta development and A$0.48m was paid to directors (overlapping categories) — the Appendix 4C estimates ~14 quarters of funding at that rate.
Ratios
Derived from figures in 6.1–6.2. Negative-equity years render debt/equity meaningless (blank). ROIC, asset turnover and cash conversion cycle are not meaningful for a pre-revenue developer and are omitted rather than fabricated.
Commentary. Ratios swing violently because the denominators are tiny; they should not be extrapolated. The key solvency observation is that FY2023–FY2025 current ratios below 1.0 and negative equity reflected a company dependent on frequent small, dilutive raises (at 0.8–1.0 cents). FY2026's current ratio of 15x removes near-term going-concern risk, but the scale of capital needed to build even one plant (company estimate ~C$1bn with CCS) means the balance sheet is a development budget, not construction capacity.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Entity | Role | Ownership | Source |
|---|---|---|---|
Kalina Power Limited | ASX-listed parent; Australian head office; "Investments" segment | — | FY2026 Appendix 4E |
KALiNA Distributed Power Limited (KDP) | Alberta project developer; core operating subsidiary | 100% | Quarterly reports |
New Energy Asia Ltd (NEA) | Legacy Asian vehicle; owes ~A$2.65m to key outside shareholders under a contingent loan agreement; source of large non-controlling interest deficit | Partially owned (shareholding previously decreased by 5.10%) | FY2026 Appendix 4E notes 10, 13.4 |
KCT Power Ltd | Legacy entity; excess consideration over NCI recorded in "other reserve" | — | FY2026 Appendix 4E note 13.4 |
Exergy Inc | Associate that holds KPO shares (treated as treasury shares, A$0.45m) | Associate | FY2026 Appendix 4E note 13.1 |
US / UK entities | Part of the power and technology segment (legacy Kalina Cycle operations) | — | FY2026 Appendix 4E note 2 |
“—” = not publicly disclosed.
Segment Overview
| Segment | Contents | Products/services |
|---|---|---|
Investments | Corporate administration, head office, investment activities | No external products |
Power and technology development business | KDP Alberta development portfolio; legacy KALiNA Cycle technology operations in US/UK | Power project development, grid-allocation monetisation, (legacy) licensing/engineering |
Results by Segment and Segment Assets & Liabilities
| Metric | FY2025 | FY2026 |
|---|---|---|
Investments — segment other income (AUD Mn) | 0.041 | 0.033 |
Power and technology — segment other income (AUD Mn) | 0.002 | 19.890 |
Total segment other income (AUD Mn) | 0.042 | 19.922 |
Investments — segment profit/loss (AUD Mn) | -1.792 | -0.980 |
Power and technology — segment profit/loss (AUD Mn) | -2.911 | 16.781 |
Total segment profit/loss (AUD Mn) | -4.703 | 15.801 |
Investments — segment assets (AUD Mn) | 0.492 | 0.233 |
Power and technology — segment assets (AUD Mn) | 1.194 | 14.727 |
Investments — segment liabilities (AUD Mn) | 0.732 | 0.624 |
Power and technology — segment liabilities (AUD Mn) | 4.385 | 2.872 |
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue from ordinary activities (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Other income incl. MW sale (AUD Mn) | — | — | — | 0.036 | 19.629 |
Finance income (AUD Mn) | — | — | — | 0.006 | 0.291 |
Employee benefits expense (AUD Mn) | — | — | — | 1.281 | 1.657 |
Engineering and professional fees (AUD Mn) | — | — | — | 2.397 | 1.745 |
Operating profit/loss excl. net finance (AUD Mn) | -5.330 | -5.014 | -4.017 | -4.568 | 15.639 |
EBITDA (AUD Mn) | — | — | — | -4.563 | 15.644 |
Finance costs (AUD Mn) | — | — | — | 0.141 | 0.129 |
Profit/loss before tax (AUD Mn) | — | -4.924 | -4.041 | -4.703 | 15.801 |
Net profit/loss total (AUD Mn) | -5.063 | -4.924 | -4.041 | -4.703 | 15.801 |
Net profit/loss attributable to parent (AUD Mn) | -4.664 | -4.659 | -3.972 | -4.673 | 15.838 |
Basic EPS (A$ cents) | — | — | — | -0.2 | 0.5 |
Diluted EPS (A$ cents) | — | — | — | -0.2 | 0.5 |
Dividends per share (A$ cents) | 0 | 0 | 0 | 0 | 0 |
Balance Sheet
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total assets (AUD Mn) | 5.49 | 0.88 | 0.46 | 1.686 | 14.961 |
Cash and equivalents (AUD Mn) | 2.95 | 0.71 | 0.255 | 1.524 | 12.331 |
Short-term investments / restricted term deposits (AUD Mn) | 2.40 | 0 | 0 | 0 | 1.907 |
Total current assets (AUD Mn) | 5.46 | 0.85 | 0.44 | 1.677 | 13.045 |
Total current liabilities (AUD Mn) | 0.77 | 1.02 | 0.75 | 2.510 | 0.844 |
Short-term debt (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Long-term interest-bearing payable — NEA loan (AUD Mn) | 2.16 | 2.30 | 2.42 | 2.607 | 2.651 |
Net debt incl. NEA payable, excl. restricted deposit (AUD Mn) | -3.19 | 1.59 | 2.17 | 1.08 | -9.68 |
Total liabilities (AUD Mn) | 2.97 | 3.32 | 3.17 | 5.117 | 3.495 |
Total equity (AUD Mn) | 2.52 | -2.447 | -2.715 | -3.431 | 11.465 |
Equity attributable to parent (AUD Mn) | — | — | 8.925 | 7.924 | 22.830 |
Non-controlling interest (AUD Mn) | — | — | -11.641 | -11.355 | -11.365 |
Goodwill and intangibles (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Working capital (AUD Mn) | 4.69 | -0.17 | -0.31 | -0.833 | 12.201 |
Accumulated losses (AUD Mn) | — | — | -129.917 | -134.590 | -118.752 |
Issued capital (AUD Mn) | — | — | 130.720 | 132.676 | 132.677 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | — | -4.70 | -3.87 | -3.464 | 13.055 |
Receipts from other income (AUD Mn) | — | — | — | 0.075 | 18.546 |
Payments to suppliers and employees (AUD Mn) | — | — | — | -3.530 | -5.489 |
Capex — plant and equipment (AUD Mn) | — | — | — | -0.003 | -0.005 |
Free cash flow (AUD Mn) | — | — | — | -3.467 | 13.050 |
Investing cash flow (AUD Mn) | — | 2.455 | 0.001 | 1.110 | -2.248 |
Financing cash flow (AUD Mn) | 8.60 | 0.002 | 3.412 | 3.622 | 0.001 |
Gross equity raised (AUD Mn) | 8.60 | — | — | 4.080 | 0.001 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Financial Ratios (x) and Returns & Leverage Ratios (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Current ratio (x) | 7.09 | 0.83 | 0.59 | 0.67 | 15.45 |
Debt (NEA payable) to total equity (x) | 0.86 | — | — | — | 0.23 |
ROE on parent equity (%) | — | — | — | -55 | 103 |
ROA on average total assets (%) | — | — | — | -437 | 190 |
Interest coverage — EBIT / finance costs (x) | — | — | — | -32 | 121 |
Net debt / EBITDA (x) | — | — | — | — | -0.62 |
Results by Region and Region Assets & Liabilities
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Revenue — all regions (AUD Mn) | 0 | 0 | 0 |
Other income attributable to Canada (AUD Mn) | — | 0.002 | 19.890 |
Other income attributable to Australia (AUD Mn) | — | 0.041 | 0.033 |
Non-current assets — Australia (AUD Mn) | — | 0.0083 | 0.0086 |
Non-current assets — Canada (AUD Mn) | — | 0.0009 | 0 |
Non-current assets — USA (AUD Mn) | — | 0 | 0 |
Operating Metrics (M) and Per-Share Data
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Shares on issue at year end (M) | 2,486.4 | 2,933.0 | 2,933.0 |
Options on issue at year end (M) | 162.1 | 451.1 | 326.1 |
NTA per share (A$ cents) | -0.11 | -0.12 | 0.39 |
Share Price & Returns
| Reference point | Price (AUD) | Source |
|---|---|---|
31 Oct 2025 (price at Sep-quarter release) | 0.021 | InvestSMART |
5 Nov 2025 | 0.022 | InvestSMART |
Jan–Feb 2026 range | ~0.01–0.02 | Motley Fool AU |
29 Apr 2026 (price at Mar-quarter release) | 0.011 | InvestSMART |
June 2026 range | 0.012–0.015 | InvestSMART |
24 Jul 2026 | 0.021 | InvestSMART |
29 Jul 2026 (last verified close) | 0.018 | InvestSMART |
52-week range (StockLight, 2026) | 0.009–0.023 | StockLight |
FY2021 52-week range | 0.016–0.040 (split-adjusted basis per StockLight) | StockLight |
Valuation Snapshot
| Multiple | Value | Basis |
|---|---|---|
Market capitalisation | ~A$52.8m | 2,933.0m × A$0.018 |
Enterprise value | ~A$41.2m | Mkt cap − A$14.24m cash + A$2.65m NEA payable |
P/E (FY2026) | ~3.3x | One-off profit; not meaningful for valuation |
EV/EBITDA (FY2026) | ~2.6x | One-off; not meaningful |
EV/Sales | n/m | Nil revenue |
P/B (total equity) | ~4.6x | A$11.47m |
P/B (parent equity) | ~2.3x | A$22.83m |
EV per MW of queued generation (~1,000 MW) | ~A$41k/MW | Analyst illustration |
Capital Markets
| Item | Status |
|---|---|
Analyst consensus | None — 0 analysts cover KPO (Simply Wall St) |
Dividend history / policy | No dividends paid FY2022–FY2026; none proposed for FY2026 |
Buybacks | None authorised |
Credit ratings (Moody's/S&P/Fitch) | Not rated |
Debt maturity profile | No bank debt; A$2.65m NEA payable with contingent repayment (no fixed maturity) |
Option overhang (post-Oct 2026) | Tranche 2: 85.0m at 1.0c expiring 12 Nov 2026 (~A$0.85m if exercised); tranche 3: 10.0m at 2.0c expiring 22 Oct 2026; tranches 7–8: 96.87m at 2.2c (3 years from vesting) |
Analyst Conclusions
Management guidance
No financial guidance. Management characterises regulatory momentum as accelerating, reports expanded negotiations with hyperscalers, data-centre developers, power marketers and gas producers, expresses confidence in near-term funding via its investment bankers, and refers to "significant near-term value catalysts" (June 2026 quarterly). Project in-service dates remain mid-2029.
Consensus
No sell-side coverage; no consensus estimates exist.
Bull case
-
Scarcity value is real and now codified. Alberta's BYOG tethering requirement for data centres above 75 MW, against >16 GW of 2029–2030 requests, makes interconnection-advanced generation sites strategic. KPO has five, including Clairmont in Cluster 2.
-
Valuation anchored by precedent. The company sold 180 MW of allocation for C$18m (~C$100k/MW). The current EV of ~A$41m implies roughly A$41k per MW of a ~1 GW pipeline — a discount to the only disclosed comparable, albeit for a different type of right.
-
Funded optionality. ~A$14.2m cash, quarterly burn under A$1m and no bank debt let management negotiate from strength rather than distress for the first time in years.
Bear case
-
Capital gap. A C$1bn-per-plant capex estimate means KPO must bring in partners at project level; equity value accruing to KPO shareholders may be modest after developer-fee or carried-interest structures.
-
One-off profit. FY2026 earnings are non-recurring; underlying losses (~A$4m/yr) resume, and the AESO has said outstanding large-load applications carry no priority, reducing scope for repeat allocation sales.
-
Execution and governance. No PPA in 18 months under the Crusoe framework; a withdrawn site; executive-heavy board with significant related-party payments and large option grants; a retail-dominated register with no institutional anchor.
Catalysts and monitorables (next 12 months)
| Catalyst | Timing | Why it matters |
|---|---|---|
| AESO final BYOG/LLAP rules and first intake cycle | Aug 2026 onward (status to verify) | Determines tethering economics and demand for KPO sites |
| September 2026 quarterly / 4C | By ~31 Oct 2026 | Cash, burn, commercial updates |
| AGM and FY2026 annual report (remuneration, risks, auditor) | Oct–Nov 2026 | Governance disclosure |
| Tranche 2 option expiry (85m at 1.0c) | 12 Nov 2026 | Small cash inflow / dilution |
| Crusoe PDA or any binding PPA / term sheet | Any time | Converts framework into contracted value |
| NGTL gas supply allocation for Alsike, Myers, Gilby | 2026–27 | Feasibility of three sites |
| Project-level equity or site sale | Any time | Validates valuation; funds development |
| Replacement site for Lone Pine | 2026–27 | Portfolio breadth |
| Interim report H1 FY2027 | ~26 Feb 2027 | First post-windfall underlying half |
Analyst verdict
Kalina Power has, after a decade of disappointment as a licensor of a technically elegant but commercially marginal heat-to-power cycle, stumbled into one of the most valuable niches in North American energy: shovel-ready, interconnection-queued generation sites in a jurisdiction that now legally requires data centres to bring their own power. The FY2026 accounts confirm that this niche can be monetised — the C$18m allocation sale turned a balance sheet with a A$3.4m net deficiency into one with A$11.5m of net assets and roughly A$14m of cash, without bank debt. Management has, sensibly, slowed discretionary spending while Alberta's rules crystallised, and the June 2026 quarter's burn of under A$1m gives multi-year runway.
Yet investors should be clear-eyed about what they own. Kalina is a pre-revenue developer whose only profitable year came from a single, explicitly non-recurring transaction. Its projects require capital several orders of magnitude larger than its market capitalisation, and its framework with Crusoe has not yielded a binding agreement in eighteen months. The AESO's statement that legacy load applications confer no priority reduces the likelihood of a repeat windfall of the same kind. Governance warrants attention: related-party director payments consumed about half of the latest quarter's operating outflow, and large option grants followed the windfall.
The investment case therefore reduces to a binary-leaning option on management's ability to convert sites into financed, contracted projects — or to sell them to better-capitalised developers — during the window that Alberta's BYOG regime has opened. At an implied enterprise value near A$41k per queued megawatt, the market is pricing meaningful scepticism. A binding PPA, a project-level equity partnership, or a site sale at or near the 2025 precedent would likely re-rate the stock; prolonged silence through the first LLAP intake cycle would suggest the window is being captured by incumbents. Stance: speculative; event-driven; suitable only for risk capital, with position sizing reflecting execution and dilution risk.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Tenure | Background (as disclosed) | Age / birth year | Source |
|---|---|---|---|---|---|
Ross (John Ross) MacLachlan | Managing Director, CEO, Executive Director (previously also Acting/Interim Chairman) | Since 29 Jun 2015 | Over 30 years in technology development and commercialisation across conventional and alternative energy; corporate finance, business development, strategy | Born 1954 (~72) | Market Index; Yahoo; MarketScreener; Simply Wall St |
Stephen (Steve) White | Non-Executive Chairman | Since 1 Sep 2022 | Canada-based; chaired the Nov 2025 AGM from Canada | — | InvestSMART; AGM address |
Timothy (Tim) Horgan | Executive Director; investor contact | — | B.A., LL.B. | — | Yahoo; quarterly reports |
Matthew Jenkins | Director (role per annual report to be verified) | — | 19 years in corporate finance, investment and power development | — | Motley Fool AU |
Malcolm Jacques | Director (non-executive, to be verified) | — | — | — | Motley Fool AU director trades |
Peter Littlewood | Director (non-executive, to be verified) | — | — | — | Motley Fool AU director trades |
Jeffry M. Myers | — | — | — | Born 1959 | Yahoo Finance |
Keshwaran (Kesh) Thurairasa | Financial Controller & Company Secretary | — | — | Born 1954 | Yahoo; InvestSMART |
Robert William Rosine, P.Eng. | General Manager, KALiNA Distributed Power | ~3.3 years (as of Nov 2025) | Professional engineer | — | Yahoo; Simply Wall St |
Man Yin Chea | — | — | — | Born 1962 | Yahoo Finance |
“—” = not publicly disclosed.
Directors' Remuneration
| Executive | Disclosed pay (AUD) | Source |
|---|---|---|
Ross MacLachlan (CEO) | ~320,190 (Simply Wall St: 321,300 total, ~87% salary) | Yahoo; Simply Wall St |
Robert Rosine (GM, KDP) | ~261,140 (SWS: 298,220) | Yahoo; Simply Wall St |
Tim Horgan (Exec Director) | ~221,000 | Yahoo |
Kesh Thurairasa (FC & Co Sec) | ~187,850 | Yahoo |
Jeffry Myers (Exec Director) | ~121,000 | Yahoo |
Man Yin Chea | ~23,130 | Yahoo |
Major Shareholders
| Holder | Stake | Source / date |
|---|---|---|
John Ross MacLachlan | ~4.41% | Motley Fool AU (Morningstar data) |
Invia Custodian Pty Limited | ~1.70% (and 1.63% second account) | Motley Fool AU |
Citicorp Nominees Pty Limited | ~1.10% | Motley Fool AU |
Exergy Inc (associate) | Holds KPO shares carried as treasury shares at A$0.45m; % not disclosed | FY2026 Appendix 4E note 13.1 |
Free float | ~56.8% | MarketScreener |
Competitive Landscape
Key Competitors
| Competitor | Relevance | Relative scale vs KPO |
|---|---|---|
Pembina Pipeline / Kineticor (Greenlight Electricity Centre) | Developer of 932 MW phase 1 (1.8 GW buildout) serving Meta | Orders of magnitude larger (multi-billion C$ enterprise) |
Capital Power (TSX: CPX) | Major Alberta IPP; LLAP working-group member | Multi-billion C$ revenue IPP |
TransAlta (TSX: TA) | Major Alberta IPP; in talks with data-centre operators; LLAP member | Multi-billion C$ revenue IPP |
Beacon AI Centers | Alberta data-centre/power developer; LLAP member | Private |
ATCO / Canadian Utilities | Alberta utility, power and gas; also KPO's interconnection counterparty | Large-cap |
Pine Cliff Energy | Signed a 25-year behind-the-meter supply deal with a data centre (late 2024/early 2025) | Small/mid-cap producer |
Imperial Oil, Dow Chemical | Industrial self-generators; LLAP members | Large-cap |
IREN Ltd, eStruxture | Data-centre operators/developers; potential customers and competitors for sites | Mid/large-cap |
O'Leary "Wonder Valley" and other private mega-campus proponents | Competing BYOG campus concepts | Private |
Key Competitors — Ormat Technologies
| Competitor | Technology |
|---|---|
Ormat Technologies (NYSE: ORA) | Organic Rankine cycle, geothermal and recovered energy |
Turboden (Mitsubishi Heavy Industries group) | ORC systems |
Exergy International | Radial outflow ORC turbines |
Baker Hughes | ORC and heat-recovery turbomachinery (also a KPO equipment supplier) |
Kalex LLC | Second-generation Kalina-type cycles |
Peer Comparison FY2026
| Dimension | Kalina Power | Capital Power | TransAlta | Pembina (Greenlight) |
|---|---|---|---|---|
FY revenue | Nil (FY2026) | Multi-billion C$ | Multi-billion C$ | Multi-billion C$ (midstream) |
Operating assets | — | Large fleet | Large fleet | Midstream + JV power under construction |
Growth driver | Converting 5 sites to contracts | Fleet + contracts | Fleet + data-centre deals | Greenlight expansion |
Margins | n/m | Positive | Positive | Positive |
R&D intensity | n/m | Low | Low | Low |
Market share in Alberta generation | 0% | Major | Major | Entering |