Kingston Resources Limited Overview

Kingston Resources is a single-asset Australian junior metals company whose entire operating footprint is the 100%-owned Mineral Hill gold–copper–polymetallic mine near Condobolin in the southern Cobar Basin of New South Wales. Having transformed itself between 2022 and 2025 from a PNG-focused gold developer into a small producer — first via tailings retreatment, then open-pit mining at the Pearse pits — it monetised its flagship Misima Gold Project to Ok Tedi Mining for A$95 million in headline consideration in 2025 and became debt-free. That trajectory was abruptly interrupted on 1 June 2026, when a wall failure at the Pearse South pit ended open-pit mining, forced the processing plant into care and maintenance and triggered heavy redundancies and a deeply discounted A$12.9 million equity raise. Kingston is now a pre-restart developer/explorer pursuing a 25,000 m drill-out to underpin an enlarged (up to 700 ktpa) underground restart, with a strategic review led by Argonaut and a board renewal under way.


Company's own description

In its FY2025 Annual Report the company describes itself as an Australian-based ASX-listed company whose principal activity is mineral production and exploration. Its "About Kingston" boilerplate (June 2026 Quarterly) states that it is focused on building scale and future throughput rates at Mineral Hill, extending mine life through organic growth and considering regional deposits that could be processed through the Mineral Hill plant.

Independent characterisation

Kingston is best characterised today as a brownfield restart developer with a permitted processing hub, not a producer. Its value rests on four pillars:

  1. Permitted infrastructure. The Mineral Hill plant is described by management as the only polymetallic plant in the southern Cobar region capable of producing multiple flotation concentrates plus gold doré via a CIL circuit. Nameplate capacity is reported at 350–400 ktpa with approvals for expansion to 700 ktpa (company profile via roic.ai; 11 June 2026 announcement targets a 700 ktpa future operation). Existing declines, ventilation, power, water and surface facilities are in place.

  2. A growing but low-confidence resource. 12.07 Mt total Mineral Resource (June 2026), of which 56% is Measured and Indicated, but only a 0.70 Mt Probable Ore Reserve at the Southern Ore Zone (SOZ).

  3. Residual Misima consideration. A$10 million payable on Ok Tedi's Final Investment Decision (FID) plus a 0.5% uncapped gross revenue royalty after the first 500 koz of gold (buy-back right for A$25 million). These were carried at a fair value of A$23.96 million at 31 December 2025.

  4. Exploration upside within its mining leases and exploration licences EL1999 and EL8334.

Business model and revenue model

Revenue model: 100% product sales (commodity sales at market prices). No service, subscription or licensing revenue. Historically: gold-silver doré sold to ABC Refineries (FY2025 Annual Report) and, from July 2025, gold and copper-gold concentrates sold to undisclosed customers, partly under concentrate advance arrangements (A$1.38 million concentrate advance at 31 Dec 2025).

Revenue mix (FY2025): Gold-equivalent represented about 90% of revenue, alongside silver (company profile via roic.ai). FY2025 gross metal sales were about A$55 million versus statutory sales of A$48.08 million (the difference reflects pre-commercial-production revenue capitalised in Q1 FY2025 and other adjustments).

Current status: Since June 2026 there is no operating revenue; the plant is in care and maintenance.

Value-chain position

Upstream: exploration → mining (owner-operated open pit and underground) → processing (crush/grind, flotation, CIL) → sale of doré and concentrate to refiners/smelters/traders. Kingston has historically emphasised an owner-operator model (FY2025 Chairman's Letter), meaning it owns or leases the mining fleet rather than using a mining contractor.

Customer types and end-markets

Customers: precious-metals refiner (ABC Refineries, doré); concentrate offtakers (not named).

End-markets: gold and silver (investment, jewellery, central banks, industrial silver); copper (electrification, construction); lead and zinc (batteries, galvanising) once the polymetallic circuits operate.

Strategy

Stated strategy — themes

Pre-June 2026 (FY2025 Annual Report and H1 FY2026): (1) owner-operated activities to retain cost control; (2) transition from open-pit to underground mining at SOZ funded by Pearse South cash flow; (3) commence copper production in 2026; (4) grow gold and copper production in Australia, including evaluating Australia-based acquisitions; (5) extend the six-year LOM via resource conversion.

Post-June 2026 ("Mineral Hill through the Drill Bit", 16 June 2026 presentation; June 2026 Quarterly; 27 Aug 2026 drilling update): (1) defer underground production in favour of an intensive drill-out to build a larger mining inventory; (2) 25,000 m of infill, extensional and exploration drilling in FY2027 — described by management as the largest program at Mineral Hill since the 1980s; (3) update resources for SOZ and Jack's Hut, deliver an updated Ore Reserve; (4) engineering studies to "right-size" the plant toward an expanded (700 ktpa) operation; (5) reach a decision to recommence underground mining; (6) board renewal and a strategic review of all alternatives via Argonaut.

Initiative register (last 24 months)

InitiativeDateDetailStatus
Misima global sale processNov 2024 – Jul 2025Argonaut-run process inviting 100+ parties; A$95m headline dealCompleted
Flotation circuit commissioningQ4 FY2025 – Jul 2025Flotation-first, CIL-tail flowsheet for sulphide oreCompleted; plant now in care and maintenance
Plant debottleneckingLate H1 FY2026Additional processing equipment; A$1.25m Q2 and A$0.90m Q4 upgradesPaused
SOZ underground restartH1–H2 FY2026Fleet procured and financed, magazine approved, ventilation drives, raisebore; long-hole stoping planned April 2026Paused June 2026
TSF2 construction / TSF3 approvalsFY2026A$4.66m in Q2; A$1.5m in Q4TSF2 completed/lifted; TSF3 approvals in progress
Regional explorationH1 FY2026RC drilling at Bogong and Long Panel; geophysics and soils on EL8334Ongoing
FY2027 drill-outJun 2026 →25,000 m with underground rig(s) plus a planned surface rig; targets SOZ, Jack's Hut depth, Red Terror north, Parker's Hill EastUnder way (4,384 m drilled in June quarter; 1,978 m in June alone)
Plant expansion studyFY2027Right-sizing/configuration toward 700 ktpaPlanned
Board renewalJul 2026 →External search for new Chair and directorsIn progress; outcome not disclosed as of research date
Strategic reviewJul 2026 →Argonaut to assess all alternatives to maximise shareholder valueIn progress; no outcome announced
Sustainability reportingFY2024–FY2025Second annual Sustainability Report; adoption of ESG reporting aligned to AASB sustainability standards notedOngoing

Medium-term targets and guidance

  • No formal production or cost guidance is in force following the June 2026 suspension.

  • Previously published LOM (30 Sep 2024): 2.2 Mt mined for 207 koz AuEq payable over six years (85% gold and copper), underground to 2031 — this plan is superseded in practice by the strategic pivot.

  • Operational target: future operation at up to 700 ktpa (11 June 2026 announcement). No timeline or capex estimate disclosed.

Products & Services

Kingston has no branded products; its "portfolio" is its metal products and its mineral deposits/projects. Both are catalogued below.

Metal products

ProductDescriptionProcess routeStatus / latest yearCustomerPricing
Gold-silver doréUnrefined bullion barsCIL circuitProduced FY2025–FY2026 (oxide and CIL tail)ABC RefineriesSpot price at sale (unhedged per H1 FY2025 commentary; a small hedging reserve of −A$0.18m appeared at 31 Dec 2025)
Gold concentrateSulphide flotation concentrateFlotation-first, CIL-tail flowsheetFrom July 2025; final shipment June 2026—Market-linked payables; concentrate advances used
Copper-gold concentrateCu flotation concentrateFlotationFinal copper and gold concentrate shipped June 2026—Market-linked
Silver (by-product)In doré/concentrateCIL/flotationFY2026 sales: 25,039 / 27,974 / 75,578 / 32,687 oz in Q1–Q4As aboveSpot
Lead concentrate (planned)Pb flotationPlanned separate Pb circuitPlanned for underground polymetallic restart——
Zinc concentrate (planned)Zn flotationPlanned separate Zn circuitPlanned for underground polymetallic restart——

The June 2026 Quarterly states that upon commencement of underground polymetallic production the company will operate separate copper, lead and zinc flotation circuits producing three concentrates plus precious-metal doré.

Deposits and projects (Mineral Hill, NSW — 100%)

DepositTypeResource (June 2026)Key gradesStatus
Southern Ore Zone (SOZ)Underground polymetallic Cu-Au-Pb-Zn-Ag6,538 kt (M 629 / I 2,418 / Inf 3,490)1.08 g/t Au, 0.83% Cu, 1.13% Pb, 1.09% Zn, 14 g/t Ag; 227 koz Au, 54 kt CuOnly Ore Reserve: 700 kt Probable @ 1.40 g/t Au, 0.8% Cu, 1.9% Pb, 1.6% Zn, 20 g/t Ag. Underground development paused June 2026
Jack's HutUnderground Au-Cu1,640 kt (I 608 / Inf 1,032)1.25 g/t Au, 0.91% Cu; 66 koz AuDrilling results pending; surface drilling applications lodged
Red TerrorUnderground Au-Cu214 kt (I 83 / Inf 131)1.07 g/t Au, 1.48% CuMaiden resource Nov 2025; July 2026 hits incl. 8.55 m @ 23.80 g/t Au, 0.91% Cu (KSNDDH080)
Parker's HillPolymetallic3,566 kt (I 2,923 / Inf 643)0.17 g/t Au, 0.98% Cu, 1.67% Pb, 0.83% Zn, 43 g/t AgMining studies contemplated; Parker's Hill East a new FY2027 exploration target
Pearse SouthOpen-pit gold113 kt residual (I 77 / Inf 36)3.41 g/t Au, 65 g/t AgMining ceased permanently after 1 June 2026 wall failure
Pearse NorthOpen-pit gold-silverLargely mined out (H1 FY2026)—Completed
Regional: Bogong, Long Panel, EL8334 targetsExploration——RC drilling and geophysics in H1 FY2026

Total Mineral Hill Mineral Resource (June 2026): 12,071 kt @ 0.85 g/t Au, 0.90% Cu, 1.23% Pb, 0.93% Zn, 23 g/t Ag (332 koz Au, 107 kt Cu, 147 kt Pb, 111 kt Zn, 9.1 Moz Ag); expressed as 873 koz at 2.2 g/t AuEq or 323 kt at 2.7% CuEq (24 Jun 2026 announcement; June 2026 Quarterly). Note: the 16 June 2026 presentation quotes a 790 koz AuEq resource, which predates the 24 June SOZ upgrade.

Divested product line — Misima Gold Project (PNG)

Sold to Ok Tedi Mining in July 2025. At the time of sale: Mineral Resource 169 Mt @ 0.71 g/t Au, 4.1 g/t Ag (3.9 Moz Au, 22.1 Moz Ag); Probable Ore Reserve 75.6 Mt @ 0.8 g/t Au (1.9 Moz Au, 10.9 Moz Ag) (FY2025 Annual Report, Tables 5–6). Kingston retains contingent economic exposure only.

Financial Narrative

Income statement: notes and sources

Sources: FY2024 and FY2025 Annual Reports (statements of profit or loss; five-year table in FY2025 Remuneration Report); StockAnalysis and TipRanks for FY2021–FY2023 line items. EBITDA FY2024–FY2025 derived as pre-tax result + interest expense − interest income + depreciation + amortisation from the audited statements; FY2021–FY2023 EBITDA from TipRanks.

Margins and growth

Revenue CAGR: FY2022–FY2025 59.3% (from a part-year FY2022 base, so overstated); FY2023–FY2025 3.7%.

Half-year FY2026 snapshot: notes and sources

Source: H1 FY2026 Half-Year Financial Statements (3 Mar 2026). Underlying H1 FY2026 result excluding the Misima gain was approximately −A$0.26m (derived).

Quarterly FY2026 operating revenue

Q3 revenue is derived from the June 2026 Quarterly statement that Q4 revenue of A$11.02m was a 55% decrease on the previous quarter. Implied FY2026 unaudited revenue is c.A$69.4m (derived; StockAnalysis TTM to Dec 2025 shows A$68.92m on a different basis). The audited FY2026 result, which will include the A$34.8m Misima gain, Pearse South closure costs, A$2.4m redundancy payments and possible impairments, was not located.

Balance sheet

Sources: FY2025 Annual Report (FY2024 comparatives); FY2023 equity and cash from FY2025/FY2024 statements of changes in equity and cash flows. FY2025 working capital includes the A$46.62m Misima "asset held for sale"; excluding it, working capital was −A$3.78m. The fall in capitalised exploration from A$49.76m to A$5.82m reflects reclassification of Misima to held-for-sale.

At 31 December 2025 (H1 FY2026): total assets A$159.64m; cash A$24.91m plus A$7.42m environmental bonds; borrowings A$2.25m (insurance premium funding A$0.87m and concentrate advance A$1.38m; zero term debt); lease liabilities A$2.24m; deferred Misima consideration A$10.0m (current) and contingent consideration A$23.96m (non-current); net assets A$132.81m; accumulated losses reduced to A$18.79m.

At 30 June 2026 (unaudited, June 2026 Quarterly and Appendix 5B): unrestricted cash A$11.74m; restricted rehabilitation bond A$7.47m; loan facilities of A$7.0m reported as fully drawn (nature not detailed; likely linked to underground fleet financing finalised in H1 FY2026 — not confirmed). Post-quarter cash rose to approximately A$22.7m after the A$10m Misima payment and Entitlement Offer proceeds, net of redundancy costs.

Cash flow

FY2025 net borrowings combine A$4.59m proceeds and A$4.05m repayments.

H1 FY2026: operating cash flow A$2.61m; capex A$16.98m (PP&E A$11.76m, mine development A$4.32m, exploration A$0.89m); Misima proceeds A$49.9m less A$2.95m disposal costs; debt repaid A$15.2m. Q4 FY2026: operating cash outflow A$3.12m; investing outflow A$12.99m (incl. A$9.2m SOZ development); financing inflow A$2.42m.

Ratios

All ratios derived from audited statements; averages use opening and closing balances where both are available. ROIC uses EBIT (≈ −A$0.07m in FY2025) over equity plus debt. Cash conversion cycle: not meaningful/not publicly disclosed (inventory A$4.49m and receivables A$0.75m at FY2025; payables A$13.64m implies a negative working-capital cycle typical of a doré seller).

Commentary on trends, inflections and drivers

FY2022–FY2023 — acquisition and tailings cash machine. The January 2022 Mineral Hill acquisition converted Kingston from a pure developer into a producer. The tailings retreatment project was a low-capital, high-margin operation: FY2023 delivered 16,520 oz gold, a 53% gross margin and the company's only clean statutory profit (c.A$9.8m). This cash flow funded Misima studies and Mineral Hill restart work.

FY2024 — transition trough. Tailings depletion (11,818 oz) and the pivot to hard-rock mining cut revenue 12% and returned the company to a small loss, while capex of A$23.4m (plant refurbishment, pre-strip) drove free cash flow to −A$17.1m. The company financed this with A$14.5m of equity and the PURE facility.

FY2025 — open-pit ramp-up. Open-pit production (12,060 oz produced, 11,538 oz sold at A$4,456/oz) lifted sales 22% to A$48.1m with a restored 53% gross margin, but a doubling of employee costs (owner-operator model), higher D&A (A$10.4m) and interest (A$2.7m) produced a A$2.5m loss. AISC rose through the year (A$2,814/oz in Q2 to A$3,759/oz in Q4) as recoveries fell from 89% to 61% with sulphide ore.

FY2026 — windfall then shock. The Misima completion produced a A$34.8m accounting gain and eliminated debt, and record gold prices (A$7,212/oz average in Q3) lifted quarterly revenue to an estimated A$24.5m. But metallurgical problems from carbonaceous/graphitic shale at Pearse South (recoveries collapsing to 44–46% in H2) and the 1 June 2026 wall failure ended production. Management quantified roughly A$39m of forecast gross revenue lost between June and September 2026. Heavy capital spending on underground readiness (c.A$9.2m on SOZ in Q4 alone, TSF2 construction A$4.66m in Q2) was stranded in the short term. The audited FY2026 accounts are likely to show material closure costs and may carry impairment of Pearse-related assets; this cannot be confirmed until the report is obtained.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Income Statement and Per-Share Data

MetricFY2021FY2022FY2023FY2024FY2025

Revenue – sales (AUD Mn)

011.9044.7539.2848.08

Cost of sales (AUD Mn)

—10.8220.9921.7022.56

Gross profit (AUD Mn)

—1.0923.7717.6025.55

Operating income – aggregator definition (AUD Mn)

-1.93-3.1511.051.580.21

EBITDA – derived (AUD Mn)

-1.92-1.9314.267.3010.36

Depreciation and amortisation (AUD Mn)

0.041.224.456.7110.42

Interest expense (AUD Mn)

——0.781.342.74

Pre-tax income (AUD Mn)

-1.95-2.099.79-0.72-2.47

Net income (AUD Mn)

-1.95-2.099.79-0.72-2.47

EPS basic (A$ cents)

-0.76-0.672.37-0.14-0.32

EPS diluted (A$ cents)

-0.76-0.672.37-0.14-0.32

Dividends per share (A$ cents)

00000

Margin Analysis (%)

MetricFY2022FY2023FY2024FY2025

Gross margin (%)

9.253.144.853.1

EBITDA margin (%)

-16.231.918.621.5

Operating margin – aggregator (%)

-26.524.74.00.4

Net margin (%)

-17.521.9-1.8-5.1

Revenue growth YoY (%)

—276.1-12.222.4

Income Statement and Per-Share Data (Half-Yearly)

MetricH1 FY2025H1 FY2026

Sales revenue (AUD Mn)

14.4735.28

Gross profit (AUD Mn)

10.2818.87

Gain on sale of subsidiary – Misima (AUD Mn)

034.76

Employee expenses (AUD Mn)

6.328.90

Depreciation + amortisation (AUD Mn)

4.608.38

Interest paid (AUD Mn)

1.430.32

Net profit / (loss) (AUD Mn)

-2.5234.51

Basic EPS (A$ cents)

-0.364.11

Income Statement and Operating Metrics (oz)

MetricQ1 FY2026Q2 FY2026Q3 FY2026Q4 FY2026

Revenue – unaudited incl. concentrate receivables (AUD Mn)

15.8018.0524.4911.02

Gold sales (oz)

2,7712,5642,0111,158

Silver sales (oz)

25,03927,97475,57832,687

Average gold price (A$/oz)

5,3896,3537,2126,403

Processing recovery (%)

70704644

Balance Sheet

MetricFY2023FY2024FY2025

Total assets (AUD Mn)

—121.62135.15

Cash and equivalents (AUD Mn)

18.218.366.15

Short-term borrowings (AUD Mn)

—0.170.76

Long-term borrowings (AUD Mn)

—9.1013.93

Total borrowings excl. leases (AUD Mn)

—9.2814.69

Lease liabilities (AUD Mn)

—0.440.81

Net debt excl. leases (AUD Mn)

—0.928.54

Total equity (AUD Mn)

76.4590.7897.57

Goodwill (AUD Mn)

—00

Capitalised exploration (AUD Mn)

—49.765.82

Mine and resource development (AUD Mn)

—22.8729.42

Working capital (AUD Mn)

—-2.3842.84

Rehabilitation provision (AUD Mn)

—7.477.47

Cash Flow

MetricFY2021FY2022FY2023FY2024FY2025

Operating cash flow (AUD Mn)

——15.06.2912.90

Capex – PP&E (AUD Mn)

———13.6910.62

Capex – exploration and mine development (AUD Mn)

———9.7212.69

Total capex (AUD Mn)

———23.4123.31

Free cash flow (AUD Mn)

———-17.12-10.41

Dividends paid (AUD Mn)

00000

Share buybacks (AUD Mn)

00000

Equity issued – gross (AUD Mn)

———14.538.40

Net borrowing proceeds / (repayments) (AUD Mn)

———-0.040.55

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2023FY2024FY2025

ROE (%)

—-0.9-2.6

ROA (%)

——-1.9

ROIC (%)

——-0.1

Current ratio (x)

—0.833.71

Current ratio excl. held-for-sale (x)

—0.830.76

Debt / equity (x)

—0.100.15

Net debt / EBITDA (x)

—0.130.82

EBITDA / interest expense (x)

18.35.43.8

Asset turnover (x)

——0.37

Revenue by Region and Region Margins & Growth (%)

RegionFY2023FY2024FY2025

Australia (AUD Mn)

44.7539.2848.08

Papua New Guinea (AUD Mn)

000

Australia revenue growth (%)

276.1-12.222.4

Per-Share Data

MetricFY2021FY2022FY2023FY2024FY2025

Share price at 30 June (A$ cents)

21.58.17.88.213.5

Period return (to c.Aug 2026, derived)

Period return (to c.Aug 2026, derived)Value

1-year (from 13.5c at 30 Jun 2025 to c.3.3c)

c. −76%

3-year (from 7.8c at 30 Jun 2023)

c. −58%

5-year (from 21.5c at 30 Jun 2021)

c. −85%

Capital Markets

ItemValue

Shares on issue 31 Dec 2025

840,216,145

Option exercises Jan–Feb 2026

c.1.1m

June 2026 placement (A$4.4m at A$0.035)

c.125.7m

Entitlement Offer (A$8.47m at A$0.035)

c.242m

July 2026 option exercises

c.4.2m

Estimated shares on issue (Aug 2026)

c.1.21 billion

Market capitalisation at A$0.032

c.A$39m (InvestSMART agrees)

Cash 31 Jul 2026 (company estimate)

c.A$22.7m

Loan facilities drawn (Appendix 5B)

A$7.0m

Indicative enterprise value

c.A$23m (derived; excludes leases and restricted bonds)

Misima contingent consideration (fair value, 31 Dec 2025)

A$23.96m

Analyst Conclusions

Management guidance

No production, cost or capex guidance is current. Management's near-term deliverables are: 25,000 m of drilling in FY2027; updated resources for SOZ and Jack's Hut; an updated Ore Reserve; plant right-sizing engineering studies; and a decision on recommencing underground mining. The September 2026 quarterly report (due by 31 October 2026) and the FY2026 Annual Report/AGM (likely November 2026) are the next formal disclosures.

Consensus growth expectations

Not available (no consensus identified).

Bull case

  1. Asset-backed downside. Cash of c.A$22.7m (July 2026) plus Misima contingent value of c.A$24m roughly equals the market capitalisation, implying the market pays little for a permitted polymetallic plant and a 12 Mt, 873 koz AuEq resource.

  2. Drill-bit leverage. Recent intercepts (Red Terror 8.55 m @ 23.8 g/t Au; SOZ 22.1 m @ 7.61% CuEq) and a 50% SOZ resource increase from just 26 holes suggest the 25,000 m program could materially expand and upgrade the resource.

  3. Strategic scarcity. Few permitted processing plants exist in the southern Cobar Basin; a corporate transaction via the Argonaut review could crystallise value, while Ok Tedi's FID or royalty buy-back could add up to A$35m of non-dilutive cash.

Bear case

  1. Credibility deficit. Two geotechnical failures and recoveries below 50% undermine confidence in the technical team and any future restart plan; investors may require independent studies before re-rating.

  2. Funding and dilution. Cash will be consumed by drilling, care and maintenance and studies; any restart requiring significant capex will likely need further equity at depressed prices, after a c.44% share-count increase in mid-2026.

  3. Thin reserve and timing risk. With only 0.7 Mt of Probable Reserve and no restart date, value depends on long-dated resource conversion; Misima's FID timing is controlled by Ok Tedi.

Key catalysts and monitorables (next 12 months)

CatalystExpected timingWhy it matters
FY2026 Annual Report (audited result, impairments, closure costs, going-concern language)Overdue/Sep–Oct 2026Resets book value and liability picture
September 2026 quarterlyBy 31 Oct 2026Cash burn and assay flow
AGM and new Chair/director appointmentsLate 2026Governance reset; Farjoy representation
Argonaut strategic review outcomeUnspecifiedPotential sale, merger or partnership
Jack's Hut and SOZ assay results; surface drilling startRolling through FY2027Resource growth evidence
Updated SOZ/Jack's Hut MRE and Ore ReserveFY2027Basis for restart decision
Plant right-sizing studyFY2027Restart capex and scale
Ok Tedi Misima FIDUncertainA$10m payment trigger
PURE warrant exercise price adjustmentsOngoingDilution overhang
Gold/copper price trendsContinuousRestart economics and royalty value

Concluding analyst verdict

Kingston Resources has travelled an unusually compressed arc. In barely four years it bought a distressed NSW polymetallic mine, turned tailings into its only meaningful profit, restarted open-pit mining, sold its PNG flagship for a headline A$95 million, repaid all term debt — and then, within eleven months of that high point, lost its sole source of cash flow when the Pearse South wall failed. The June 2026 recapitalisation at A$0.035 per share, roughly a quarter of the price at which the company began calendar 2026, crystallised that reversal and handed a 25% stake to a single cornerstone investor.

The investment question is no longer about operating execution in the near term; it is about whether Mineral Hill's latent value — a permitted multi-circuit plant with approval to double throughput, an expanding 12 Mt resource, existing underground access, and real high-grade intercepts — can be realised before cash runs short, and who will realise it. At late-July prices the market capitalisation approximately equalled cash plus the carrying value of the Misima contingent consideration, which means the market is attributing little to Mineral Hill itself. That is the core of the bull argument, and it is why the board has engaged Argonaut to assess all alternatives.

Against that, the company's technical credibility has been damaged by repeated geotechnical and metallurgical shortfalls, its reserve base is thin, and any genuine restart at scale will need capital that a A$39 million company cannot easily raise without further heavy dilution. Board refreshment is overdue and still incomplete.

On balance, Kingston is best viewed as a special-situation option on corporate activity and drilling success, not a production story. Outcomes are skewed: a credible acquirer, a Misima FID or a strong resource upgrade could re-rate the shares sharply, while a prolonged review and steady cash burn would likely force another dilutive raise. Prudent monitoring should focus on the delayed FY2026 accounts, the September quarter cash position, board appointments and the Argonaut process.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleAppointedBackgroundEducation

Mick (Michael) Wilkes

Independent Non-Executive Chair (intends to step down once successor appointed — 27 Jul 2026)

NED 6 Jul 2018; Chair 1 Dec 2020

Mining engineer, 40+ years; President & CEO of OceanaGold 2011–2020; EGM Operations at OZ Minerals (Prominent Hill); GM Sepon (Oxiana, Laos); 10 years in PNG project development. NED of Andromeda Metals; formerly Dacian Gold (Chair) and Genesis Minerals NED (Oct 2022–May 2025). Chairs Sustainability Committee.

BEng (UQ), MBA (Deakin), GAICD

Andrew Corbett

Managing Director & CEO (executive)

4 Jul 2016

Mining engineer, 30+ years; GM at Orica Mining Services (Germany); Co-Portfolio Manager, Global Resource Fund at Perpetual Investments; mine management roles

BEng (Mining, Hons), MBA, MAICD

Anthony Wehby

Independent Non-Executive Director; Chair of Audit & Risk Committee

Chair 4 Jul 2016–1 Dec 2020; NED since

19 years a partner at PricewaterhouseCoopers/Coopers & Lybrand; financial consulting practice since 2001; Chair of Variscan Mines; former Chair of Aurelia Metals and Tellus Resources

—

Stuart Rechner

Independent Non-Executive Director; Chair of Remuneration & Nomination Committee

Executive Director 23 Feb 2015; NED 4 Jul 2016

Geologist and lawyer; former Australian diplomat (Beijing, Jakarta); Director of Strategic Energy Resources since 2014

BSc, LLB, MAIG, MAusIMM, FAICD

“—” = not publicly disclosed.

Executive Leadership Team

NameRoleSinceNotes

Andrew Corbett

Managing Director

Jul 2016

See above

Vinod (Vinodkumar) Manikandan

CFO and Company Secretary

Company Secretary since 22 Jan 2024

CPA, AGIA; postgraduate Applied Corporate Governance; BCom

Melanie McCarthy

General Manager, Mineral Hill

Appointed H1 FY2026

Ex-GM Costerfield (Mandalay Resources, now Alkane); chemical engineer, mining engineer, First-class Mine Manager's certificate. Status following June 2026 restructure not disclosed.

Stephanie Gelland

GM People & Culture

—

NSW Minerals Council Diversity & Inclusion Champion 2025

Stuart Hayward

Geology / Competent Person

—

Listed as a Kingston employee in FY2025–H1 FY2026; by June 2026 listed as of 360 Geoscience Pty Ltd (consultant)

Directors' Remuneration

KMPSalary & feesBonusSuperLSLOptions (equity)Cash-settled SBPTotal FY2025Total FY2024

Mick Wilkes

98,24001,380045,8300145,450177,345

Andrew Corbett

363,878308,58430,00010,243455,60050,4221,218,727729,976

Anthony Wehby

64,25207,389030,5540102,195110,397

Stuart Rechner

149,46101,380030,5540181,395110,386

Total

675,831308,58440,14910,243562,53850,4221,647,7671,128,104

Major Shareholders

HolderStakeDate / source

Farjoy Pty Limited

25.09% (after Entitlement Offer sub-underwriting; 19.9% at 30 Jun 2026)

June 2026 Quarterly

Delphi Unternehmensberatung AG

Substantial holder; underwrote Jan 2025 SPP (took 10.54m shortfall shares).

FY2025 Annual Report

Quintana Resources Holdings LP

11,764,705 shares (1.40% — stale figure, pre-2026 dilution)

fool.com.au

PURE Asset Management

130.4m warrants (exercise 8.16c–8.79c, subject to anti-dilution adjustment), expiring 2027–2028

H1 FY2026 Report

Multiple "change in substantial holding" notices

—

ASX, 21–29 Jul 2026

Competitive Landscape

Key Competitors

CompetitorSegment overlapKey asset(s)Relative positioning vs Kingston

Aurelia Metals (ASX: AMI)

Cobar Basin polymetallic/gold

Peak Mine, Federation

Larger established Cobar producer; potential consolidator

Polymetals Resources (ASX: POL)

Cobar Basin polymetallic restart

Endeavor mine (Cobar)

Direct analogue: brownfield polymetallic restart

Metals Acquisition Ltd (NYSE/ASX: MAC)

Cobar copper

CSA copper mine

Much larger copper producer in the basin

Evolution Mining (ASX: EVN)

NSW gold

Cowal (near Condobolin), Northparkes

Tier-1 neighbour; competes for labour in Central West NSW

Alkane Resources (ASX: ALK)

NSW gold; Costerfield (Vic)

Tomingley

Mid-tier NSW gold producer; source of Kingston's GM

Peel Mining (ASX: PEX)

Cobar Basin base metals exploration

Mallee Bull, Wagga Tank

Explorer; potential feed partner

Regis Resources (ASX: RRL)

Gold

Tropicana, Duketon; McPhillamys (NSW)

Larger gold producer

Andromeda/others with shared directors

——

Not competitors; governance links only

Other junior gold producers (e.g., small ASX open-pit/underground operators)

Gold

Various

Competing for investor capital

Competitor Detail

MetricKingston (FY2025)

Revenue (AUD Mn)

48.08

Revenue growth (%)

22.4

Gross margin (%)

53.1

EBITDA margin (%)

21.5

R&D intensity (%)

0 (exploration/dev 26.4)

Company Snapshot

214

Employees

1985

Founded

North Sydney, Australia

Headquarters

SWOT Analysis

Strengths

  • Permitted polymetallic plant with expansion approval — flotation + CIL, nameplate 350–400 ktpa, approvals to 700 ktpa (company profile; 11 Jun 2026 announcement).
  • Resource growth momentum — total resource up 22% to 12.07 Mt in June 2026; SOZ up 50% to 6.54 Mt; M&I SOZ up 38% (24 Jun 2026).
  • High-grade drill intercepts — e.g., 8.55 m @ 23.80 g/t Au at Red Terror; 22.1 m @ 7.61% CuEq at SOZ (July 2026).
  • No term debt after August 2025 — A$15m PURE facility repaid (H1 FY2026 Report).
  • Non-dilutive contingent value — Misima A$10m FID payment and royalty, fair value A$23.96m at 31 Dec 2025.
  • Cornerstone support — Farjoy committed c.A$7.6m across the June–July 2026 raise and holds 25.09%.

Weaknesses

  • No production — plant in care and maintenance since June 2026 (June 2026 Quarterly).
  • Small reserve — only 0.70 Mt Probable Ore Reserve (June 2026).
  • Poor metallurgical performance — recoveries 44–46% in H2 FY2026 due to carbonaceous material (June 2026 Quarterly).
  • Repeated geotechnical failures — two Pearse South incidents (late 2025, 1 Jun 2026).
  • History of losses — four of five years FY2021–FY2025 loss-making; accumulated losses A$53.7m at FY2025.
  • Board stagnation until 2026 — no new director since 2018; all-male board (FY2025 Sustainability Report).

Opportunities

  • Enlarged underground restart — 700 ktpa target with polymetallic three-concentrate flowsheet.
  • Misima FID — Ok Tedi refining DFS/ESIA; FID would trigger A$10m cash.
  • Royalty monetisation — Ok Tedi buy-back right at A$25m.
  • Corporate transaction via Argonaut review — sale, merger or partnering (27 Jul 2026).
  • Regional feed / hub strategy — company states aim to process regional deposits through Mineral Hill.
  • New discoveries — Parker's Hill East, Jack's Hut depth, SOZ south (KSNDDH017 legacy hit) in the 25,000 m program.

Threats

  • Funding gap — c.A$22.7m cash (31 Jul 2026) versus drilling, care-and-maintenance, studies and eventual restart capex (undisclosed).
  • Further dilution — share count rose c.44% in June–July 2026 (derived from 840m to c.1.21bn).
  • Control dynamics — Farjoy at 25.09% may influence or block outcomes.
  • Commodity price reversal — economics heavily geared to record gold prices (A$6,000–7,200/oz in FY2026).
  • Labour re-hiring risk — 111 redundancies; skilled crews dispersed.
  • Rehabilitation and closure liabilities — A$7.47m provision with cash-backed bonds of A$7.47m; closure of Pearse South may increase obligations (not yet disclosed).

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
20 May 2025Binding agreement to sell Misima to Ok Tedi for A$95mTransformational liquidity event
20 May 2025Misima Sale Price Maximisation options vest for MD (3.36m)Remuneration linked to deal
3 Jun 2025SOZ drilling: 12.15 m @ 30.80 g/t Au, 1.39% Cu (KSNDDH032)Confirms high-grade G Lode stope
Jun 2025Pearse North enters sulphide zone; flotation transitionRecoveries fall (61% in Q4 FY2025)
23 Jun 2025MH Project Goal Performance options issued (6.48m)Incentive alignment
3 Jul 2025PNG ICCC approval receivedFinal condition met
10–11 Jul 2025Misima completion; A$49.9m receivedCompany debt-capable of repayment
Jul 2025Concentrate production commencesNew product stream
23 Jul 2025Further SOZ results incl. 14 m @ 19.35 g/t Au (KSNDDH041)Extends high-grade zone
1 Aug 2025Option exercise raises A$0.88m; 31.7m options lapseMinor equity
8 Aug 2025A$15m PURE facility repaidDebt-free
29 Aug 2025FY2025 Annual Report: loss A$2.47m on sales A$48.1mBase-year disclosure
Oct 2025September quarter revenue A$15.8m (+10% QoQ)Improved prices
H1 FY2026Melanie McCarthy appointed GM Mineral HillOperational leadership change
13 Nov 2025Resource update: total +29% to c.10 Mt; maiden Red TerrorResource growth
26 Nov 2025AGM; all resolutions passed by pollGovernance
Late 2025Geotechnical hazard at Pearse South NW wall; redesign, extra wasteFirst warning sign
Jan 2026December quarter revenue A$18.05m (+14%); high-grade Pearse South ore commencesPeak operating momentum
3 Mar 2026H1 FY2026 statutory profit A$34.5m (Misima gain); cash A$24.9mStrong interim balance sheet
15 Apr 2026SOZ drilling incl. 21.4 m @ 3.28% CuEq (KSNDDH062)Polymetallic extensions
Apr 2026March quarter revenue c.A$24.5m (derived); recovery only 46%Record revenue but metallurgy deteriorating
6 May 2026RIU Sydney Resources Round-Up presentationInvestor marketing
1 Jun 2026Pearse South wall failure; trading haltProduction ends
11 Jun 2026Permanent cessation of Pearse South; ~A$39m forecast revenue lost; c.120 redundancies plus 18 contractors (later stated as 111); proposed A$11.6m raise at A$0.07Strategic pivot; share price collapse
12–18 Jun 2026Second halt, suspension, reinstatement; raise restructured to A$12.9m at A$0.035Deep discount (−60% vs pre-halt A$0.087)
16 Jun 2026"Mineral Hill through the Drill Bit" presentationNew strategy articulation
24 Jun 2026SOZ MRE +50% to 6.54 Mt; total 12.07 MtPartially offsets negative news
25 Jun 2026A$4.4m placement completed; Prospectus for A$8.47m 1-for-4 Entitlement OfferRecapitalisation
30 Jun 2026Farjoy reaches 19.9%Cornerstone emerges
2 Jul 2026Red Terror: 8.55 m @ 23.80 g/t Au (KSNDDH080)High-grade extension
9 Jul 2026SOZ extension: 22.1 m @ 7.61% CuEq (KSNDDH085)Extends SOZ east/south
13 Jul 2026A$10m deferred Misima payment receivedLiquidity
21–24 Jul 2026Entitlement Offer results: c.43% take-up; 133.26m shortfall shares placed; Farjoy to 25.09%Control-relevant shift
27 Jul 2026Chair to step down; board renewal; Argonaut appointed for strategic alternativesPotential corporate action
31 Jul 2026June quarter: revenue A$11.02m; cash A$11.74m (c.A$22.7m post-quarter)Transition to explorer
27 Aug 2026FY2027 25,000 m drilling strategy; Parker's Hill East targetExecution of pivot
Sep 2026FY2026 Annual Report expected (Investing.com listed 11 Sep 2026 as next earnings date)Not located in this research

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

2 charts
Income Statement: Revenue & Gross Profit: Revenue – sales rose from AUD 0 Mn in FY2021 to AUD 48.1 Mn in FY2025.
Kingston Resources Limited — Income Statement: Revenue & Gross Profit
Series (AUD Mn)FY2021FY2022FY2023FY2024FY2025
Revenue – sales011.944.839.348.1
Cost of sales—10.82121.722.6
Gross profit—1.123.817.625.6

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. Kingston Resources, Annual Financial Report FY2024/25 (ASX, 29 Aug 2025) (announcements.asx.com.au)
  2. Kingston Resources, Half-Yearly Financial Statements to 31 Dec 2025 (ASX, 3 Mar 2026) (announcements.asx.com.au)
  3. Kingston Resources, Annual Financial Report FY2024 (ASX, 13 Sep 2024) (announcements.asx.com.au)
  4. Kingston Resources, Annual Financial Report FY2023 (ASX, 14 Sep 2023) (announcements.asx.com.au)
  5. Kingston Resources, Annual Financial Report FY2022 (ASX, 19 Sep 2022) (asx.com.au)
  6. Kingston Resources, Half-Yearly Financial Statements to 31 Dec 2024 (announcements.asx.com.au)
  7. Kingston Resources, Quarterly Report for period ending 30 Jun 2026 (31 Jul 2026) (investorpa.com)
  8. Kingston Resources, Board Renewal and Appointment of Financial Advisor (27 Jul 2026) (investorpa.com)
  9. Kingston Resources, Mineral Hill Drilling Update (27 Aug 2026) (bulletin.webull.com)
  10. Kingston Resources, Mineral Hill through the Drill Bit presentation (16 Jun 2026) (bulletin.webull.com)
  11. InvestSMART announcement summaries and price data (Jun–Jul 2026) (investsmart.com.au)
  12. InvestSMART, Prospectus summary (25 Jun 2026) (investsmart.com.au)
  13. InvestSMART, Appendix 5B summary (31 Jul 2026) (investsmart.com.au)
  14. FilingReader, Kingston halts mining (11 Jun 2026) (filingreader.com)
  15. Grafa, Kingston Resources halts mining following pit wall failure (grafa.com)
  16. SmallCaps, Pearse South setback (smallcaps.com.au)
  17. Kalkine Media, June 2026 quarter coverage (kalkinemedia.com)
  18. Mining Technology, Misima sale to Ok Tedi (mining-technology.com)
  19. Mining Technology, A$50m Misima payment (mining-technology.com)
  20. SmallCaps, Ok Tedi ownership and Misima deal (smallcaps.com.au)
  21. Creamer Media Mining Weekly, Kingston clears debt (11 Jul 2025) (newsletter.mw.creamermedia.com)
  22. Argonaut, Misima sale deal sheet (argonaut.com)
  23. StockAnalysis, KSN income statement (stockanalysis.com)
  24. TipRanks, Kingston Resources (RZZ) income statement (tipranks.com)
  25. IBISWorld, Kingston Resources enterprise profile (ibisworld.com)
  26. Investing.com, Kingston Resources (il.investing.com)
  27. Simply Wall St, board refreshment and deal advisers (simplywall.st)
  28. roic.ai, KSN company profile (roic.ai)
  29. fool.com.au, KSN share price history and holders (fool.com.au)
  30. FNN, Mineral Hill acquisition and PURE facility (finnewsnetwork.com.au)

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.