KPa-BM Holdings Limited Overview
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
| Employees at year end (number) | 164 | 198 | 217 | 219 | 214 |
| Total employee benefit expense (HK$ M) | 66.1 | 73.1 | 80.1 | 83.2 | 76.5 |
| Female share of workforce (%) | — | 20.7 | — | 21.5 | 21.5 |
Source: AR FY2023–AR FY2026, "Employees and Remuneration Policies" and Corporate Governance Report gender tables.
KPa-BM Holdings is a small-cap, founder-controlled Hong Kong specialist subcontractor that designs, supplies and installs the steel "skin and skeleton" of buildings and infrastructure: architectural façades, roof cladding, structural steelwork, canopies and highway noise barriers, delivered predominantly on a design-and-build basis for main contractors. A secondary building-materials arm supplies, installs and trades roofing systems, acrylic noise-barrier panels, curtain-wall fixings and fall-arrest products, supported by a Shenzhen processing and drawing base. The Group's credentials are anchored by Development Bureau approved-contractor status for structural steelwork and noise-barrier panels, and a landmark track record including the roof cladding of the Kai Tak Sports Park Main Stadium. Revenue is project-lumpy, highly concentrated and wholly Hong Kong-sourced. After a FY2024–FY2025 peak, revenue fell 41% in FY2026 as large contracts completed; a rebuilt HK$688 million order book weighted to Northern Metropolis public works now defines the recovery thesis, underpinned by a net-cash balance sheet.
The company's own description
In its latest annual report, the Group describes itself as principally engaged in two activities: the provision of structural engineering works in Hong Kong with a focus on design-and-build projects, and the supply of building material products together with installation services and trading of building material products in Hong Kong (AR FY2026, Business Activities). Until FY2025 the materials activity was reported as two separate segments ("Supply and Installation of Building Material Products" and "Trading of Building Material Products"); from FY2026 these were combined into a single reportable segment (RA FY2026, note 4).
Independent characterisation
KPa-BM is best understood as a specialist building-envelope and structural-steel subcontractor positioned between the architect/main contractor and the fabricator/installer tiers of the Hong Kong construction value chain. Its core value-add is engineering: developing structural designs, calculations and shop drawings; procuring materials (aluminium, steel, glass, roofing systems, acrylic sheets) mainly from Hong Kong, the PRC and Germany; and managing subcontracted installation crews. The Group does not retain direct installation labour for structural engineering works and instead subcontracts installation project by project (TOL 2017, Subcontractors). This makes the model asset-light (property, plant and equipment of only HK$28.6 million at 31 March 2026, much of it right-of-use leases) but places execution, safety and cost-estimation risk on project management capability.
Business and revenue model
| Revenue stream | Recognition basis | FY2026 revenue (HKD Mn) | Share of FY2026 revenue (%) | Character |
|---|---|---|---|---|
| Structural engineering works (design and build) | Over time (input method, costs incurred / total estimated costs) | 356.6 | 90.9 | Project / contract revenue, lump-sum or remeasurement contracts |
| Supply and installation of building material products | Over time | 17.3 | 4.4 | Small contracts, service-plus-product |
| Trading of building material products | Point in time | 18.3 | 4.7 | Product sales; part distribution of third-party brands, part own brands |
Source: RA FY2026, note 5. There is no subscription or licensing revenue. The mix is therefore approximately 95% contracted service/construction revenue and 5% product revenue.
Contract mechanics disclosed in filings: customers typically retain 5%–10% of contract value as retention money, released after a one- to two-year defect liability period; credit terms of 30–60 days; progress billing monthly against certified work done; surety bonds issued by banks on certain contracts (HK$28.1 million outstanding at 31 March 2024) (RA FY2024 notes 11 and 15; RA FY2026 note 11).
Value-chain position
| Stage | KPa-BM role |
|---|---|
| Client / developer / government department | Indirect: end owners include government departments (Highways, Drainage), public utilities, airport operator, private developers |
| Main contractor | Principal customer; KPa-BM generally acts as nominated or domestic subcontractor |
| Specialist design and build | Core: structural design, calculations, shop drawings, procurement, project management |
| Fabrication / processing | Partly in-house via BuildMax (SZ) in Shenzhen; partly third-party fabricators |
| Installation | Subcontracted to specialist installation firms |
| After-sales / defect liability | Retained by KPa-BM through the retention period |
Customer types and end-markets
Customers are primarily main contractors on public and private projects, plus property occupiers for smaller façade or roofing jobs (TOL 2017). End-markets disclosed across filings include highways (noise barriers), public utilities (Lamma Island power station structural steel and roofing), sports and recreation facilities (Kai Tak Sports Park; Kennedy Town Swimming Pool), airport infrastructure (cargo hub, canopies), sewage treatment facilities, universal-accessibility facilities (footbridges, lifts), commercial office redevelopment (Central tower façade), hotels and residential (AR FY2023–FY2026 project tables). Historically named top customers included Paul Y. Construction, Chun Wo Construction & Engineering, Kwan On-China Geo Joint Venture, Dao Kee Construction and Unistress Building Construction (TOL 2017, FY2015–FY2017 data).
Customer concentration
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
| Largest customer share of revenue (%) | 46.0 | 51.1 | 56.6 | 37.3 | 14.8 |
| Top five customers share of revenue (%) | 80.1 | 84.4 | 84.3 | 64.4 | 47.6 |
| Top five suppliers share of purchases (%) | 47.9 | 40.4 | 51.5 | 44.3 | 45.9 |
| Top five subcontractors share of subcontracting charges (%) | 66.4 | 67.2 | 73.3 | 61.6 | 63.3 |
Source: AR FY2023, AR FY2025, AR FY2026 Directors' Reports. Concentration fell sharply in FY2026 only because the dominant FY2024–FY2025 contracts (Kai Tak Sports Park and Central tower façade) completed; it is not evidence of structural diversification.
Strategy
Stated strategy themes (latest annual report)
The FY2026 annual report frames the forward strategy around two pillars, which management names as "Rigorous Cost Control and Diversifying Job References" (AR FY2026, Future Prospects). In substance:
-
Cost discipline: reducing discretionary bonuses, managing overhead, and minimising borrowing (finance costs fell 56% in FY2026).
-
Diversifying track record ("job references"): broadening qualification references across project types (airport, sewage, accessibility, new-town roofing and façades) to widen tender eligibility.
-
Pivot to public infrastructure: the Chairman's Statement describes a proactive shift toward emerging public infrastructure sectors, with major wins within the Northern Metropolis plan replenishing the order book (AR FY2026).
-
Balance-sheet prudence: no FY2026 final dividend in order to preserve liquidity for execution of newly won projects.
Evolution of strategy over 24 months
| Period | Strategic emphasis | Source |
|---|---|---|
| FY2024 | Refrain from excessive price competition; target Lantau Tomorrow Vision, Northern Metropolis, Kai Tak Sports City, Kowloon East CBD; leverage Highways Department, power-generation and recreational-facility references | RA FY2024 |
| FY2025 | Adjust bidding strategy to prioritise smaller projects; optimise resource allocation and efficiency | AR FY2025 |
| H1 FY2026 | Secured about HK$297 million of new projects in six months amid fewer tenders | IR H1 FY2026 |
| FY2026 | Cost control, diversified references, Northern Metropolis pivot, liquidity preservation | AR FY2026 |
Initiatives register (last 24 months)
| Initiative | Type | Status / evidence |
|---|---|---|
| Revised tendering approach (smaller projects, then selective public infrastructure) | Commercial | Order book recovered from HK$369 million (Mar 2025) to HK$688 million (Mar 2026) |
| Reallocation of design and project staff to tendering | Organisational | Disclosed as reason for reclassification of costs to marketing (FY2026) |
| Insourcing of company secretarial function | Governance / cost | Effective 1 Apr 2025 |
| Board refresh with structural-engineering INED | Governance | Dr Koon from 1 Jan 2025 |
| Lease renewals for premises | Operational | Lease liabilities up to HK$21.0 million |
| Dividend suspension | Capital allocation | No FY2026 interim or final dividend |
Transformation programmes, platform investments, partnerships, quantified cost-saving targets, sustainability commitments and medium-term financial targets: none publicly disclosed. Management provides no numerical revenue, margin or return guidance.
Products & Services
The company does not publish a product price list or version history; launch years and pricing are therefore "not publicly disclosed" unless stated. The catalogue below is reconstructed from TOL 2017 (the most detailed product disclosure) and the project tables in AR FY2023–AR FY2026. Brand and distributorship details date from 2017 and may be outdated.
Structural Engineering Works segment
| Offering | Description and capabilities | Target customer | Flagship / named references | Pricing model |
|---|---|---|---|---|
| Façade works (curtain wall, tower façade, glass box, external cladding) | Structural design, calculations, shop drawings, procurement, supervision of subcontracted installation, after-sales | Main contractors on commercial and institutional buildings | Tower façade for office redevelopment in Central (HK$151.0 million recognised FY2025; HK$49.1 million FY2026; completed); glass box and footbridge upgrade at a Central commercial building (HK$49.5 million FY2024); curtain walls for a Wan Chai commercial building (HK$41.8 million FY2025) | Lump-sum or remeasurement contract |
| Roof cladding and canopies | Design, supply and fixing of roofing systems, dome roofs, plaza and bridge canopies | Main contractors on public venues and transport | Kai Tak Sports Park Main Stadium roof cladding (HK$259.5 million FY2023, HK$285.8 million FY2024, part of HK$97.6 million FY2025); Main Plaza and Western Bridge canopies (HK$62.7 million FY2024); dome roof for commercial development near the airport (HK$24.7 million FY2023) | Lump-sum |
| Structural steelwork | Planning, design, fabrication and on-site erection of structural steel | Utilities, infrastructure, airport | Lamma Island Unit 12 (HK$56.9 million FY2023) and Unit 13 (HK$41.9 million FY2026, completion expected Q4 2026); structural steel for infrastructure in Kowloon City (HK$65.6 million FY2025); airport canopy and steel works (HK$38.8 million FY2025); airport cargo hub steel, metal, aluminium, roof and façade (ongoing, Q4 2026) | Lump-sum / remeasurement |
| Noise barriers | Design and installation of highway noise barrier systems incl. transparent panels | Highways Department contractors | Anderson Road (awarded Feb 2017, extended; HK$24.9 million FY2026; Q1 2027); Fanling North Development Area (HK$29.1 million FY2026; Q4 2026); Po Lam Road (HK$32.7 million FY2026; completed); Kwu Tung North (Northern Metropolis; Q1 2029); Tuen Mun Town Centre and Fu Tei (2016–2018) | Remeasurement contracts common |
| Louvres, aluminium and metalworks for utilities | Design, supply, installation for sewage and drainage facilities | Drainage / utility contractors | Louvres, aluminium, steel and metal works for certain sewage facilities (ongoing, Q4 2026) | Lump-sum |
| Universal-accessibility works | Metal works, steel works and glazing for footbridges and lift towers | Highways Department contractors | Universal accessibility facilities contract (outstanding >HK$20 million at Mar 2025; Q3 2026) | Lump-sum |
| Roofing and façade for new-town developments | Design, supply, fabrication, coordination and erection | Northern Metropolis contractors | Hung Shui Kiu roofing and façade (Q1 2027) | Lump-sum |
| Minor works and renovation | Registered Minor Works (Class II and III) incl. alterations, signboard and finishes | Property occupiers, hotels | Hotel guestroom and corridor renovation in Tsim Sha Tsui (HK$26.9 million FY2023) | Quotation |
Building Materials segment (supply, installation and trading)
| Product line | Description | Brand status | Target customer |
|---|---|---|---|
| Metal roofing systems | Aluminium and stainless steel sheeting, galvanised and plastic-coated steel sheets, sandwich panels, trapezoidal roofing sheets, standing-seam roofing | Third-party international brands (distributor) | Main contractors, roofing subcontractors |
| Noise barrier panels | Acrylic (polymethyl methacrylate) sheets for transparent noise barriers | Own brands AcouGlas, AcouSafe, AcouGuard (trademarks held by AcouSystem Limited) plus third-party products | Highway contractors |
| Curtain-wall fixing components | Fittings and brackets for façade panel systems | Third-party | Façade contractors |
| Fall-arrest systems | Roofing kits, anchors, lifelines for working at height | Third-party, some supplied with installation | Building owners, contractors |
| Flagpoles, banner poles, decorative poles | Aluminium and stainless steel poles; shop drawings and installation | Own brand BM-POLES | Institutions, developers |
| Processed and fabricated materials (PRC) | Processing, fabrication and manufacturing of building materials in Shenzhen | BuildMax (SZ) | Group internal use plus PRC customers |
| Fabrication drawing services (PRC) | Shop and fabrication drawing production | KPa (SZ) | Group internal |
As at October 2017, the Group was authorised distributor of six international building-material brands in Hong Kong, Macau and/or the PRC, four of them on an exclusive basis, sourced mainly from Germany, the United Kingdom and the United States (TOL 2017). Brand names were not disclosed and current status is not publicly disclosed.
Licences and qualifications underpinning the portfolio (as at 2017)
| Licence / registration | Holder | Authority | Scope |
|---|---|---|---|
| List of Approved Suppliers of Materials and Specialist Contractors for Public Works | KPa Engineering | Development Bureau | Structural steelwork |
| Same list | KPa Engineering | Development Bureau | Transparent panels for noise barriers in highways |
| Registered Minor Works Contractor (Class II and III) | KPa Engineering | Buildings Department | Types A, C and F minor works |
| Registered Subcontractor | KPa Engineering | Construction Industry Council | Structural steelwork, aluminium windows/louvres, curtain wall, stainless steel, metal roof/skylight/cladding/space frame, glazing, false ceiling, renovation |
| ISO 9001 | Group | Certification body not disclosed | Quality management |
Source: TOL 2017; company profile. Renewal status after 2019 is not publicly disclosed in the documents reviewed.
Financial Narrative
All figures HK$ million unless stated; fiscal years end 31 March. Sources: AR FY2023 (FY2022–FY2023), RA FY2024 (FY2024), AR FY2026 and RA FY2026 (FY2025–FY2026).
Income statement
Note: there is no separately reported "operating income" line; EBIT is presented as profit before tax plus finance costs. Basic and diluted EPS are identical because no dilutive instruments exist.
Margins and growth
Revenue CAGR (analyst-derived): FY2022–FY2026: -5.6% per year. FY2022–FY2025: +10.6% per year. FY2016–FY2026 (ten years, HK$343.8 million to HK$392.2 million): +1.3% per year.
Commentary on trends and inflections.
FY2022 trough: gross margin of 12.3% reflected idle labour and plant costs during COVID-19 site disruptions and a spike in material prices from supply-chain disruption (AR FY2023). H2 FY2022 was loss-making on a derived basis (see 6.7).
FY2023–FY2024 recovery and peak: resumption of normal site progress, lower material prices and the Kai Tak Sports Park roof (HK$545 million recognised across FY2023–FY2024) lifted gross margin to 17.7% and net profit to a record HK$46.4 million in FY2024. FY2023 profit included HK$2.1 million of non-recurring COVID-19 Employment Support Scheme subsidies; normalised profit was HK$35.0 million (RA FY2024).
FY2025 plateau with quality erosion: revenue held flat at HK$667.7 million but gross margin fell to 16.0% on intensified competition, and a HK$16.5 million credit-loss provision (mostly a customer group in liquidation) plus a HK$4.0 million increase in directors' discretionary bonus cut net profit 22% (AR FY2025).
FY2026 volume cliff: revenue fell 41.3% as contracts outstanding at March 2025 (only HK$369 million) completed and new awards came too late to contribute. Gross margin optically improved to 17.6% because tendering staff costs were reclassified out of cost of revenue; underlying project margins are not separately disclosed (RA FY2026).
Balance sheet
Notes: Bank borrowings were short-term trade finance and supplier-finance arrangements repayable on demand, unsecured and guaranteed by the Company, at 5.6%–9.3% per annum at 31 March 2024 (RA FY2024 note 14). The FY2026 facility utilisation of about HK$35.8 million with zero borrowings implies use for guarantees or surety bonds (analyst inference). Company distributable reserves were HK$40.6 million (FY2023), HK$68.4 million (FY2024), HK$40.6 million (FY2025) and HK$24.2 million (FY2026) (Directors' Reports).
Cash flow
Commentary. Cash generation is driven overwhelmingly by working-capital timing rather than profit. FY2023's weak HK$4.7 million reflected contract-asset build-up on Kai Tak and other large projects; FY2024's HK$109.5 million inflow reflected billing and collection on the same projects and a HK$21 million rise in contract liabilities. Across FY2023–FY2026, cumulative operating cash flow of about HK$169 million broadly funded cumulative dividends of HK$109 million and the January 2023 buyback, while net cash fell from HK$151 million (FY2024 peak) to HK$91 million (FY2026). FY2025 shareholder distributions of HK$66.8 million were 1.85x that year's net profit, which explains much of the subsequent cash decline and the FY2026 dividend suspension.
Returns, leverage and efficiency ratios
ROIC methodology (analyst-derived): NOPAT = (PBT + finance costs − bank interest income) × (1 − effective tax rate); invested capital = equity + total debt incl. leases − cash, at year-end. FY2022 excludes interest income, which was not separately obtained.
Commentary. Return metrics are highly cyclical and track volume: ROIC exceeded 30% at the FY2024 peak because invested capital is small (the business is net cash and asset-light), but fell to about 7% in FY2026. The deterioration in the cash conversion cycle from about 20 days to 74 days in FY2026 is the most important balance-sheet warning: trade receivables over 90 days old rose from HK$12.7 million to HK$37.4 million, gross trade receivables carry a HK$36.3 million loss allowance (26% of gross), and the Group stretched payables less as subcontract activity fell (RA FY2026 notes 11–12). Leverage is negligible; the only debt is HK$21.0 million of leases.
Half-yearly pattern
Sources: IRAs H1 FY2022–H1 FY2026; H2 derived as full year minus H1. H2 FY2026 net profit of only about HK$1.1 million on HK$174.5 million of revenue shows how close the Group came to breakeven at the bottom of the cycle.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Subsidiary | Incorporation | Principal activity | Directors |
|---|---|---|---|
Light Dimension Limited | BVI | Investment holding | Yip, Wai |
AcouSystem Limited | Hong Kong | Trademark holding | Yip, Wai |
KPa Engineering Limited (應力工程) | Hong Kong | Structural engineering works | Yip, Wai |
KPa Engineering (HK) Limited (應力工程(香港)) | Hong Kong | Structural engineering works | Yip, Wai |
BuildMax Limited (彪域有限公司) | Hong Kong | Supply, installation and trading of building materials | Yip, Wai, Liu, Chan |
Hillford Trading Limited (恆富貿易) | Hong Kong | Investment holding | Yip, Wai, Liu, Chan |
BuildMax Technology (Shenzhen) Co. (彪域科技(深圳)) | PRC | Processing, fabrication, manufacturing and trading of building materials | Yip, Wai, Liu |
KPa Hillford Design Trading (Shenzhen) Co. (應力恒富設計貿易(深圳)) | PRC | Fabrication drawing services | Liu |
Segment (As Reported) Overview
| Segment (as reported) | Period | Content |
|---|---|---|
Structural Engineering Works | All years | Structural engineering works for public and private sectors in Hong Kong, mainly as subcontractor: façade, roof, canopy, structural steelwork, noise barriers |
Supply and Installation of Building Material Products | To FY2025 | Supply of materials with installation in Hong Kong (roofing, fall-arrest, flagpoles) |
Trading of Building Material Products | To FY2025 | Sales of materials to third parties in Hong Kong, PRC and overseas without installation |
Supply, Installation and Trading of Building Material Products | From FY2026 | Merger of the two materials segments above |
Segment revenue (HKD Mn)
| Segment revenue (HKD Mn) | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
Structural Engineering Works | 521.1 | 616.5 | 597.0 | 356.6 |
Supply and Installation of Building Materials | 42.6 | 26.9 | 33.5 | 17.3 |
Trading of Building Materials | 4.8 | 22.6 | 37.3 | 18.3 |
Building Materials combined | 47.4 | 49.5 | 70.7 | 35.6 |
Total revenue | 568.5 | 666.0 | 667.7 | 392.2 |
Segment profit (HKD Mn)
| Segment profit (HKD Mn) | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
Structural Engineering Works | 80.2 | 87.7 | 60.8 | 40.7 |
Supply and Installation of Building Materials | 14.1 | 7.6 | — | — |
Trading of Building Materials | 2.3 | 7.5 | — | — |
Building Materials combined | 16.4 | 15.1 | 21.7 | 14.7 |
Total segment profit | 96.5 | 102.8 | 82.5 | 55.4 |
Unallocated corporate admin and other expenses | 52.3 | 49.8 | 48.8 | 43.7 |
Segment profit margin on external revenue (%) — analyst-derived (%)
| Segment profit margin on external revenue (%) — analyst-derived (%) | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
Structural Engineering Works | 15.4 | 14.2 | 10.2 | 11.4 |
Building Materials combined | 34.6 | 30.5 | 30.7 | 41.2 |
Segment YoY revenue growth (%) — analyst-derived
| Segment YoY revenue growth (%) — analyst-derived | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Structural Engineering Works | 18.3 | -3.2 | -40.3 |
Supply and Installation | -36.7 | 24.3 | -48.2 |
Trading | 366.3 | 65.2 | -51.0 |
Total | 17.2 | 0.3 | -41.3 |
Contribution to total revenue (%)
| Contribution to total revenue (%) | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Structural Engineering Works | 91.7 | 92.6 | 89.4 |
Supply and Installation | 7.5 | 4.0 | 5.0 |
Trading | 0.9 | 3.4 | 5.6 |
Structural engineering revenue by work type (HKD Mn)
| Structural engineering revenue by work type (HKD Mn) | FY2015 | FY2016 | FY2017 |
|---|---|---|---|
Façade, roof and related works | 144.7 | 224.6 | 240.9 |
Structural steelwork and noise barriers | 33.3 | 111.0 | 127.3 |
Flagpoles and related works | 5.9 | 2.0 | 1.8 |
Trading of building material products | 13.5 | 6.2 | 11.4 |
Total revenue | 197.4 | 343.8 | 381.4 |
Gross margin by segment (%)
| Gross margin by segment (%) | FY2015 | FY2016 | FY2017 |
|---|---|---|---|
Structural engineering works | 18.3 | 19.1 | 17.4 |
Trading of building materials | 38.2 | 46.9 | 42.8 |
Group | 19.6 | 19.6 | 18.1 |
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue (HKD Mn) | 494.2 | 568.5 | 666.0 | 667.7 | 392.2 |
Cost of revenue (HKD Mn) | 433.5 | 467.7 | 550.8 | 560.6 | 323.4 |
Gross profit (HKD Mn) | 60.7 | 100.8 | 115.2 | 107.1 | 68.9 |
Other income (HKD Mn) | 1.3 | 3.7 | 7.2 | 10.6 | 7.3 |
Credit-loss provisions, net (HKD Mn) | 1.2 | 2.3 | 10.3 | 16.5 | 3.4 |
Admin and other operating expenses (HKD Mn) | 41.9 | 52.6 | 50.1 | 54.3 | 49.4 |
Finance costs (HKD Mn) | 1.2 | 2.1 | 3.5 | 2.5 | 1.1 |
Profit before tax (HKD Mn) | 14.6 | 45.3 | 55.8 | 41.3 | 16.4 |
Income tax (HKD Mn) | 3.1 | 8.2 | 9.4 | 5.1 | 3.7 |
Net profit (HKD Mn) | 11.5 | 37.1 | 46.4 | 36.2 | 12.8 |
EBIT = PBT + finance costs (HKD Mn, analyst-derived) | 15.8 | 47.4 | 59.2 | 43.8 | 17.5 |
Depreciation (HKD Mn) | — | 8.8 | 9.3 | 8.7 | 8.9 |
EBITDA (HKD Mn, analyst-derived) | — | 56.2 | 68.5 | 52.5 | 26.4 |
EPS basic and diluted (HK cents) | 1.92 | 6.28 | 8.33 | 6.49 | 2.29 |
Dividends per share declared for the year (HK cents) | 1.5 | 3.0 | 8.0 | 7.0 | 0.0 |
Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Gross margin (%) | 12.3 | 17.7 | 17.3 | 16.0 | 17.6 |
EBIT margin (%) | 3.2 | 8.3 | 8.9 | 6.6 | 4.5 |
EBITDA margin (%) | — | 9.9 | 10.3 | 7.9 | 6.7 |
Net margin (%) | 2.3 | 6.5 | 7.0 | 5.4 | 3.3 |
Revenue growth YoY (%) | 7.8 | 15.0 | 17.2 | 0.3 | -41.3 |
Net profit growth YoY (%) | -77.1 | 222.9 | 24.8 | -22.0 | -64.7 |
Effective tax rate (%) | 21.3 | 18.0 | 16.8 | 12.4 | 22.2 |
Balance Sheet
| Metric (at 31 March) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total assets (HKD Mn) | 402.1 | 498.0 | 526.6 | 437.8 | 385.7 |
Cash and bank balances incl. fixed deposits (HKD Mn) | 105.4 | 124.9 | 170.2 | 120.0 | 112.2 |
Bank borrowings, short-term (HKD Mn) | 2.5 | 45.9 | 9.3 | 0.0 | 0.0 |
Lease liabilities, current (HKD Mn) | 7.5 | 5.5 | 5.3 | 6.5 | 9.2 |
Lease liabilities, non-current (HKD Mn) | 6.2 | 3.4 | 4.2 | 6.5 | 11.7 |
Total debt incl. leases (HKD Mn) | 16.2 | 54.8 | 18.8 | 13.0 | 21.0 |
Net debt, negative = net cash (HKD Mn) | -89.2 | -70.1 | -151.4 | -107.0 | -91.2 |
Total equity (HKD Mn) | 247.4 | 263.8 | 292.4 | 261.4 | 259.1 |
Total liabilities (HKD Mn) | 154.8 | 234.2 | 234.3 | 176.4 | 126.6 |
Goodwill (HKD Mn) | 0.6 | 0.6 | 0.6 | 0.6 | 0.6 |
Other intangibles (HKD Mn) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
Net current assets / working capital (HKD Mn) | 226.5 | 246.7 | 276.6 | 243.4 | 236.3 |
Contract assets (HKD Mn) | 90.7 | 113.4 | 45.4 | 71.0 | 64.7 |
Trade receivables, net (HKD Mn) | — | 95.5 | 134.9 | 126.2 | 100.9 |
Retention receivables, net (HKD Mn) | — | 101.4 | 98.1 | 42.1 | 41.3 |
Contract liabilities (HKD Mn) | 27.8 | 55.5 | 76.4 | 42.4 | 38.1 |
Banking facilities available (HKD Mn) | — | 245.0 | 256.0 | 207.0 | 167.0 |
Banking facilities unutilised (HKD Mn) | — | 199.1 | 246.7 | 207.0 | 131.2 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Net cash from operating activities (HKD Mn) | — | 4.7 | 109.5 | 33.1 | 21.6 |
Purchase of PP&E, capex (HKD Mn) | — | — | — | 1.0 | 5.4 |
Free cash flow = CFO − capex (HKD Mn, analyst-derived) | — | — | — | 32.1 | 16.2 |
Lease principal paid (HKD Mn) | — | — | — | 6.3 | 7.2 |
Dividends paid (HKD Mn) | 33.0 | 9.0 | 16.7 | 66.8 | 16.7 |
Share buybacks (HKD Mn) | 0.0 | 10.5 | 0.0 | 0.0 | 0.0 |
Additions to non-current assets incl. right-of-use (HKD Mn) | — | 4.2 | 10.8 | 10.9 | 20.3 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROE, company-reported (%) | 4.7 | 14.1 | 15.9 | 13.8 | 4.9 |
ROA, company-reported (%) | 2.9 | 7.5 | 8.8 | 8.3 | 3.3 |
ROIC, after-tax, year-end invested capital (%, analyst-derived) | 7.9 | 19.8 | 32.6 | 22.2 | 7.3 |
Current ratio (times) | 2.5 | 2.1 | 2.2 | 2.4 | 3.1 |
Gearing: total debt / equity, company definition (%) | 6.6 | 20.8 | 6.4 | 5.0 | 8.1 |
Net debt / EBITDA (times; negative = net cash) | — | -1.2 | -2.2 | -2.0 | -3.5 |
Interest coverage: EBIT / finance costs (times) | 13.6 | 22.4 | 17.0 | 17.5 | 16.0 |
Asset turnover: revenue / year-end total assets (times) | 1.23 | 1.14 | 1.26 | 1.53 | 1.02 |
Days sales outstanding, trade receivables (days) | — | 61 | 74 | 69 | 94 |
Days inventory (days, on cost of revenue) | — | 14 | 10 | 13 | 19 |
Days payables outstanding (days, on cost of revenue) | — | 54 | 64 | 46 | 39 |
Cash conversion cycle, excl. contract assets and retentions (days) | — | 21 | 20 | 36 | 74 |
Income Statement
| Metric | FY2016 | FY2017 | FY2018 | FY2019 | FY2020 | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|---|---|---|---|---|---|
Revenue (HKD Mn) | 343.8 | 381.4 | 378.4 | 415.0 | 733.3 | 458.5 | 494.2 | 568.5 | 666.0 | 667.7 | 392.2 |
Net profit attributable (HKD Mn) | 25.0 | 31.0 | 26.2 | 28.3 | 53.8 | 50.2 | 11.5 | 37.1 | 46.4 | 36.2 | 12.8 |
Income Statement (FY2022–FY2026)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
H1 revenue (HKD Mn) | 263.3 | 292.6 | 317.9 | 387.5 | 217.7 |
H2 revenue, derived (HKD Mn) | 230.8 | 275.9 | 348.1 | 280.2 | 174.5 |
H1 net profit (HKD Mn) | 19.5 | 23.4 | 24.2 | 25.1 | 11.6 |
H2 net profit, derived (HKD Mn) | -8.0 | 13.7 | 22.2 | 11.1 | 1.1 |
Revenue by geography (HKD Mn)
| Revenue by geography (HKD Mn) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Hong Kong | 494.2 | 568.5 | 666.0 | 667.7 | 392.2 |
PRC and overseas | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
Hong Kong revenue growth YoY (%)
| Hong Kong revenue growth YoY (%) | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
Hong Kong | 15.0 | 17.2 | 0.3 | -41.3 |
Segment revenue in Hong Kong (HKD Mn)
| Segment revenue in Hong Kong (HKD Mn) | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
Structural Engineering Works | 521.1 | 616.5 | 597.0 | 356.6 |
Building Materials combined | 47.4 | 49.5 | 70.7 | 35.6 |
Specified non-current assets (HKD Mn)
| Specified non-current assets (HKD Mn) | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
Hong Kong | 9.5 | 5.5 | 11.1 | 14.2 |
PRC (Shenzhen) | 9.1 | 13.9 | 9.8 | 18.2 |
Share Price & Returns
| Reference point | Price (HKD) | Source |
|---|---|---|
GEM placing price, Oct 2015 | 0.300 | Prospectus 2015 |
Repurchase price paid to co-founder, 18 Jan 2023 | 0.245 | AR FY2023 |
Early Dec 2025 | 0.27 | Stoxray |
25 Jun 2026 (day before FY2026 results) | 0.34 | TipRanks |
10 Jul 2026 | 0.47 | Stoxray |
17 Jul 2026 | 0.49 | MarketScreener |
18–20 Sep 2026 (latest observed) | 0.395 | MarketScreener; Investing.com |
Valuation Multiples
| Multiple | KPa-BM | Build King (240) | Yuanda China (2789) |
|---|---|---|---|
Market capitalisation | HK$220 M | ≈HK$1,860 M (HK$1.50 × 1.24 bn shares, 29 Jul 2026) | ≈HK$1,000 M (HK$0.162 × 6.21 bn shares, 29 Jul 2026) |
P/E (trailing) | 17.2x | ≈4.1x | ≈2.6x |
EV/EBITDA | 4.9x | not computed | not computed |
EV/Sales | 0.33x | not computed | not computed |
P/B | 0.85x | not computed | not computed |
Dividend per share declared for the year (HK cents)
| Dividend per share declared for the year (HK cents) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|---|
Interim / special interim | 0.0 | 0.0 | 0.0 | 0.0 | 4.0 | 0.0 |
Final | 5.5 | 1.5 | 3.0 | 4.0 | 3.0 | 0.0 |
Special (with final) | 0.0 | 0.0 | 0.0 | 4.0 | 0.0 | 0.0 |
Total | 5.5 | 1.5 | 3.0 | 8.0 | 7.0 | 0.0 |
Payout ratio (%, analyst-derived) | 66 | 78 | 45 | 96 | 108 | 0 |
Capital Markets
| Item | Detail |
|---|---|
Buyback authorisations | General repurchase mandate renewed at AGM 14 Aug 2026; only executed buyback was 43.07 million shares (HK$10.5 million) on 18 Jan 2023 |
Credit ratings (Moody's / S&P / Fitch) | None; the Company is unrated |
Bank borrowings | Nil at 31 March 2025 and 2026 |
Lease liability maturity at 31 March 2026 (present value, HKD Mn) | Within 1 year |
Lease liabilities | 9.2 |
Analyst Conclusions
Management guidance
No quantitative guidance is provided. Qualitatively, management describes subtle signs of recovery near the end of FY2026, a higher total value of contracts secured (particularly Northern Metropolis), a gradual path to full market recovery, and continued prudence on liquidity (AR FY2026 Chairman's Statement and Future Prospects).
Analyst framework for FY2027 (not company guidance)
-
Remaining performance obligations of HK$428.8 million are expected to be recognised within 12 months of 31 March 2026, versus HK$230.5 million a year earlier (RA FY2026 note 5). Adding typical in-year awards and materials trading, FY2027 revenue plausibly recovers toward the HK$450–550 million range, though timing slippage is common.
-
At an 11%–12% structural-engineering segment margin, a 35%–40% materials margin and HK$44–48 million of corporate overhead, the implied net profit range spans roughly breakeven to the high-teens of HK$ millions; the outcome is acutely sensitive to volume and credit losses.
-
No consensus exists to test these against.
Bull case
-
Visible rebound: order book up 86.6% to HK$688 million with HK$428.8 million convertible within a year, more than double the prior year's equivalent, should lift revenue from the FY2026 trough and restore operating leverage.
-
Policy tailwind in KPa-BM's niches: public-site construction output grew 17.8% YoY in Q1 2026, and three of six major outstanding contracts are in Northern Metropolis new towns where noise barriers, roofing and façades are recurring needs over the next decade.
-
Downside cushioned by balance sheet: net cash of HK$91 million equals about 41% of market capitalisation, and the stock trades at about 0.85x book and roughly 5x EV/EBITDA on trough earnings; mid-cycle profit of HK$35–45 million (FY2023–FY2025 average HK$39.9 million) would imply a single-digit P/E at today's price.
Bear case
-
Structural volume risk: FY2026 showed the business can lose 41% of revenue in a year; a backlog of HK$688 million is still below the HK$899–1,144 million levels that supported FY2023–FY2025 revenue, and H2 FY2026 profit was only about HK$1.1 million.
-
Credit quality and cash conversion deteriorating: over-90-day receivables nearly tripled to HK$37.4 million, the cash conversion cycle widened to about 74 days, and a customer-group liquidation already cost HK$16.5 million; further contractor distress in a weak market could erode the net-cash cushion.
-
Capital return constrained and governance concentrated: distributable reserves at the holding company are only HK$24.2 million, the dividend is suspended, the float is about 27%, there is no analyst coverage, and two founders in their late sixties control 72.9% with no disclosed succession plan.
Catalysts and monitorables (next 12 months)
| Expected timing | Catalyst / monitorable | What to watch |
|---|---|---|
| ~20 Nov 2026 | H1 FY2027 interim results | Revenue run-rate vs HK$217.7 million prior H1; segment margin; new awards; backlog trend from HK$688 million |
| Nov 2026 | Interim dividend decision | Signal of confidence in cash generation |
| Ongoing | Contract awards in Northern Metropolis, airport, Highways programmes | Size and margin of wins; tender success rate |
| Ongoing | Receivables and liquidation recoveries | Over-90-day balance; loss allowance movements |
| Quarterly | C&SD construction output data | Public vs private site trends |
| Q4 2026 – Q1 2027 | Completion of Lamma Unit 13, Fanling North, airport cargo hub, sewage contracts | Final account settlements, variation orders, retention releases |
| Jun 2027 | FY2027 annual results and final dividend | Return to dividend; distributable reserve rebuild |
| Any time | Board / succession changes; use of repurchase mandate | Governance and capital allocation signals |
Concluding analyst verdict
KPa-BM Holdings is a competent, conservatively financed Hong Kong specialist contractor whose fortunes are dictated almost entirely by the timing of a few large contracts. The FY2023–FY2025 period, powered by the Kai Tak Sports Park roof and a Central tower façade, demonstrated what the platform can earn at scale: HK$570–670 million of revenue, 16%–18% gross margins, 14%–16% ROE and ROIC above 20%. FY2026 demonstrated the opposite: when the order book thinned to HK$369 million, revenue fell 41%, H2 profit approached zero, and the Board suspended dividends after two years of distributions that exceeded earnings.
The investment question is therefore one of cycle timing rather than franchise quality. The evidence for a turn is tangible: an HK$688 million order book, HK$428.8 million of it due within a year, increasingly anchored in Northern Metropolis and airport public works where approved-list status and track record matter. Gross margins held up through the trough, debt is negligible, and the market value is underpinned by HK$91 million of net cash and a sub-book valuation.
Against that, investors must accept real risks that the filings make plain: concentrated customers, rising overdue receivables after a counterparty liquidation, a thin holding-company reserve base that limits near-term payouts, founder-concentrated control with ageing leadership, a recent switch to a smaller audit firm, and a shallow, illiquid float with no external research. Execution of lump-sum contracts through subcontracted labour adds an ever-present risk of margin slippage.
On balance, KPa-BM screens as a deep-value, high-volatility recovery situation. Confirmation should come from the November 2026 interim: revenue clearly above the prior H1, stable segment margins, controlled credit losses and continued order intake. Absent that, the stock's July 2026 rally may prove premature, and the net-cash floor, rather than earnings, will remain the primary valuation support.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Age (FY2026 AR) | Education | Background |
|---|---|---|---|---|---|
Mr Yip Pak Hung (葉柏雄) | Chairman, Executive Director, compliance officer | Director 15 May 2015; Chairman 26 Jun 2015; joined Group 16 Jan 1993 | 67 | BA, Faculty of Science and Mathematics, University of Windsor, Canada (1983) | About 8 years in sales across industries (1984–1992); over 30 years in structural engineering and construction; re-elected at AGM 14 Aug 2026 |
Mr Wai Yat Kin (韋日堅) | Executive Director and Chief Executive Officer; co-founder | Director 15 May 2015; CEO 26 Jun 2015; director of KPa Engineering since 14 Jan 1992 | 66 | Secondary education, Hong Kong (1978) | Sales manager, waterproofing and skylight/metal work products, Tak Cheong (Yau Kee) Engineering (Nov 1988 – Jan 1992); over 35 years in the industry |
Ms Lai Pik Chi, Peggy (黎碧芝) | Independent Non-Executive Director; Audit Committee chair | 22 Sep 2015 | 61 | MBA, University of Manchester (2010); FCCA; HKICPA associate | Over 30 years in audit and finance; INED of China Environmental Resources Group (1130) and China Beidahuang Industry Group (0039); company secretary of China Tian Yuan Healthcare (557); INED of Wuxi Life International (8148) |
Mr Lam Chi Wai, Peter (林志偉) | INED; Remuneration Committee chair | 22 Sep 2015 | 66 | Diploma and BBA, Hong Kong Shue Yan University | Over 30 years in timepiece sales and marketing; former executive director of China Trustful Group (8265) |
Dr Yeung Kit Ming (楊傑明) | INED; Nomination Committee chair | 22 Sep 2015 | 68 | BSc, University of Hong Kong (1981); PhD, University of California San Diego (1987) | Lecturer and later teaching fellow, Chinese University of Hong Kong (1990–2004); re-elected at AGM 14 Aug 2026 |
Dr Koon Chi Ming, Sebastian (灌志明) | INED | 1 Jan 2025 | 70 | Associateship and MSc, Hong Kong Polytechnic; PhD Civil Engineering, University of Queensland (2004) | Buildings Department 1980–2016, rising to Assistant Director; FHKIE; First Class Registered Structural Engineer (PRC); director of Mega Elite Consultants and Allied Technik Construction |
Executive Leadership Team
| Name | Role | Age | Background |
|---|---|---|---|
Mr Liu Yuen Wai (廖遠維) | General Manager, building materials trading | 53 | Diploma in civil engineering technology, Humber College (1994); over 30 years in building materials |
Mr Chan Chi Ming (陳志明) | Commercial Director; site works, quality and safety | 55 | Joined as draftsman Aug 1992; project manager from May 2004 |
Ms Cheung Ka Wai (張嘉慧), CPA | Company Secretary (from 1 Apr 2025); Financial Controller since 2018 | — | HKICPA member; BBA (Hons) Accountancy, City University of Hong Kong |
“—” = not publicly disclosed.
Directors' Remuneration
| Director | Latest disclosed pay | Period | Source |
|---|---|---|---|
Each of Yip, Wai and Lui (then executive) | HK$2,543,000 total emoluments each | FY2017 | TOL 2017 |
Each original INED | HK$180,000 annual fee on appointment | From Oct 2015 | TOL 2017 |
Executive directors, FY2026 salary/bonus/total | — | FY2026 | — |
Directors' Remuneration (Annual)
| Attribute | Status (FY2026) |
|---|---|
Board size | 6 (2 executive, 4 independent non-executive) |
Independence | 67% INEDs |
Chair / CEO | Separate individuals (Yip / Wai), though both are executive directors and joint controlling shareholders |
Gender | 1 of 6 directors female (16.7%) |
INED tenure | Three of four INEDs have served since September 2015 (11 years); the Board acknowledged the nine-year threshold and added Dr Koon in 2025 |
Audit Committee | Lai (chair), Lam, Yeung, Koon; 3 meetings in FY2026, full attendance |
Nomination Committee | Yeung (chair), Lai, Lam, Koon; 2 meetings; terms updated in FY2026 |
Remuneration Committee | Lam (chair), Lai, Yeung, Koon; 2 meetings |
Board meetings | 4 in FY2026, 100% attendance |
Internal audit | No in-house function; external consultant reviews internal controls annually |
CG Code compliance | Company states compliance with all code provisions in FY2026 |
Board & Management Changes
| Date | Change |
|---|---|
FY2025 | Auditor changed from BDO Limited to Beijing Xinghua Caplegend CPA Limited |
1 Jan 2025 | Dr Koon Chi Ming appointed INED |
1 Apr 2025 | Ms Cheung Ka Wai replaces Mr Chan Sun Kwong as company secretary (insourcing) |
FY2026 | Nomination Committee terms of reference updated |
14 Aug 2026 | Yip and Yeung re-elected; auditor reappointed; general issue and repurchase mandates renewed |
Major Shareholders
| Holder | Shares | % of issued | Nature |
|---|---|---|---|
Success Wing Investments Limited (BVI) | 325,930,000 | 58.52 | Beneficial owner; owned 43.97% each by Wai and Yip |
Mr Wai Yat Kin | 40,320,000 | 7.24 | Beneficial owner |
Mr Yip Pak Hung | 39,750,000 | 7.14 | Beneficial owner |
Concert party aggregate (Wai, Yip, Success Wing) | 406,000,000 | 72.90 | Deemed interest; spouses Ms Lam Suk Lan Bonnie and Ms Wu Janet each deemed interested |
Public float | ≈150,930,000 | ≈27.1 | Includes all other holders |
Competitive Landscape
Key Competitors
| Competitor | Segment overlap | Listing | Latest revenue | Relative positioning vs KPa-BM |
|---|---|---|---|---|
Far East Global Group | Façade / curtain wall design-and-build, Hong Kong and international | HKEX 830 (controlled by a state-owned construction group, per general knowledge) | — | Much larger, international reference list; competes for premium façades |
Yuanda China Holdings | Curtain wall design, production, installation; PRC and overseas | HKEX 2789 | RMB2,814.6 million (FY Dec 2025, +27.2%); net profit RMB352.5 million | Global scale, vertically integrated; limited direct Hong Kong overlap |
Build King Holdings | Civil engineering and building main contracting | HKEX 240 | HK$13,843 million (FY Dec 2025, -3.7%); profit HK$449.9 million | Main contractor (potential customer) and public-works competitor for value capture |
Gammon Construction | Main contractor with in-house façade and steel capabilities | Private (Jardine / Balfour Beatty JV, per general knowledge) | — | Can self-perform specialist packages |
China State Construction Engineering (Hong Kong) | Main contractor | Subsidiary of HKEX-listed CSCI (3311) | — | Dominant public-works main contractor; customer and potential self-performer |
Chun Wo Construction (Asia Allied Infrastructure) | Civil and building main contractor | HKEX 711 parent | — | Historic KPa customer |
Paul Y. Construction | Main contractor | Private (formerly listed) | — | Historic top customer |
Private specialist steel/façade/noise-barrier subcontractors | Direct like-for-like competitors | Unlisted | — | Price competition on public tenders |
PRC curtain-wall subcontractors entering Hong Kong | Façade and roofing | Various | — | Low-cost competition (a Guangdong curtain-wall subcontractor applied for GEM listing in 2026 citing a highly fragmented PRC market) |
“—” = not publicly disclosed.
Peer Comparison FY2026
| Metric | KPa-BM (FY Mar 2026) | Build King (FY Dec 2025) | Yuanda China (FY Dec 2025) |
|---|---|---|---|
Revenue | HK$392.2 M | HK$13,843 M | RMB2,814.6 M |
Revenue growth YoY | -41.3% | -3.7% | +27.2% |
Gross margin | 17.6% | 7.5% | 26.1% |
Net margin | 3.3% | 3.3% | 12.5% |