Lake Resources N.L. Overview

Lake Resources is a single-asset, pre-revenue lithium developer. Its value rests almost entirely on the Kachi lithium brine project in Catamarca Province, in Argentina's "Lithium Triangle."

Kachi is designed around Lilac Solutions' ion-exchange direct lithium extraction (DLE) rather than evaporation ponds. Lilac holds a 20% project interest. Phase One targets 25,000 tpa of battery-grade lithium carbonate over a 25-year life, supported by a total resource of 11.1 Mt LCE.

The August 2025 DFS Addendum reports:

  • Capex of US$1,157M

  • Opex of US$5,895/t LCE

  • Pre-tax NPV10 of US$1,469M

  • Pre-tax IRR of 22.5%

On 29 September 2026 Kachi received its Exploitation Environmental Impact Declaration (DIA), the company's most important permitting milestone to date.

The equity story is now one of financing and partnering. Lake must secure a strategic partner, offtake and project debt for a US$1.16B build. It holds only about A$10M of pro-forma cash and is funded through an Acuity Capital at-the-market (ATM) facility, which implies material dilution risk.


What the company does

Lake Resources explores for and develops lithium brine resources in Argentina, with the aim of producing high-purity (>99.5%) battery-grade lithium carbonate on site, without third-party refining. The company has no operating mine, no product sales and no recurring revenue.

Its reported "revenue" consists of other income, such as:

  • interest

  • foreign-exchange items

  • gains on asset sales (for example, the 2024 sale of Jujuy tenements)

Company self-description

In its latest disclosures, Lake describes itself as a clean lithium developer. It aims to produce high-purity lithium from its flagship Kachi Project in Catamarca Province, within the Lithium Triangle, using DLE technology. The goals it cites are reduced freshwater use, no evaporation ponds and reinjection of processed brine.

Independent characterisation

Lake is a permitting-and-financing-stage, single-asset brine developer with a technology-partner model. The economic value chain is expected to look like this:

  1. Upstream extraction: wells pump brine from the Carachi Pampa salar basin.

  2. DLE: brine passes through Lilac ion-exchange modules, with more than 95% of processed brine reinjected into the aquifer.

  3. Concentration and conversion: on-site conversion to battery-grade lithium carbonate.

  4. Offtake: sales to battery, cathode or trading counterparties.

Lake has no downstream integration.

Revenue model

Revenue typeCurrentPlanned
Product sales—Lithium carbonate sales under offtake contracts (Phase One target 25,000 tpa)
Services——
Subscription / licensing—None (Lake is a licensee of Lilac technology, not a licensor)
Other incomeInterest, FX, asset-sale proceeds—

Customers and end markets

There are no current customers. In 2022 Lake signed non-binding offtake frameworks with SK On (South Korea) and WMC Energy (Netherlands). These were discontinued in July 2024 to support the strategic partnering process.

Target end markets are:

  • electric-vehicle batteries

  • stationary energy storage

  • broader lithium-ion supply chains, particularly North American, European and Asian buyers seeking non-Chinese supply

Strategy

Stated strategy themes

From the FY2025 Annual Report and 2025–26 investor presentations:

  1. "De-risking Kachi through strategic advancement": permitting, resource/reserve quality and engineering.

  2. Positioning Kachi as a "tier one" asset with first-quartile operating costs.

  3. Sustainable lithium via DLE: no evaporation ponds, brine reinjection, >90% freshwater reduction.

  4. Securing strategic partners, offtakers and export credit agencies, via a Goldman Sachs-led process, to fund Phase One.

  5. Financial discipline and runway preservation.

Initiatives in the last 24 months

InitiativeDateDescriptionStatus
Strategic alternatives / partnering process (Goldman Sachs)2024–ongoingOptions range from a project-level partner to partial or full sale of Kachi, or of the companyOngoing. DIA strengthens negotiating position.
DFS Addendum (Hatch)Aug 202516% capex reduction; Gen4 IXCompleted
Power FEED and alternatives2025–26YPF Luz grid study; FEED for grid power; evaluation of alternative and grid optionsFEED complete; optimisation ongoing
Ramsar North Subsite management planDec 2025Zonification enabling regulated productive useCompleted
Exploitation EIA → DIAMar 2024 – Sep 2026Final environmental approvalGranted 29 Sep 2026
RIGI application2,026Seeking Argentina's large-investment incentive regime (tax, customs and FX stability)In progress
FEED and long-lead procurementFrom Oct 2026Pre-FID engineeringCommencing
Cost reduction / right-sizing2024–26Two rounds of headcount cuts in 2024; calendar-2025 outlays down ~45%; further right-sizing flagged for 2026Ongoing
Shareholder loyalty optionsOct 20251:10 options at A$0.05, expiring 14 Oct 2028Issued

Management guidance and targets

FID: expected 9–12 months after strategic partner selection (H1 FY2026 guidance). Earlier targets were FID in 2025, then 2026.

First lithium: the company continues to reference 2027, with ramp-up to nameplate by about year 2. Given FID timing, an independent view is that first production before 2028–29 is unlikely.

No medium-term financial targets: (revenue, EBITDA) have been issued beyond DFS projections.

Products & Services

Lake has no commercial products. Its "portfolio" is a set of projects and a planned product.

Kachi Lithium Brine Project (flagship)

AttributeDetailSource
LocationCarachi Pampa salar, Antofagasta de la Sierra, Catamarca, ArgentinaReporte Minero (Feb 2026); El Ancasti (Jul 2026)
Land package~165,000 hectares controlled in CatamarcaEl Ancasti (Jul 2026)
OwnershipLake 80% / Lilac Solutions 20% (project level)Redimin (Sep 2026)
Total resource11.1 Mt LCE (Measured 4.2 Mt; M&I 8.2 Mt)ASX 3 Jun 2025; FY2025 Annual Report
Ore ReserveUpdated 4 Aug 2025, supporting 25,000 tpa; ~98% of production from Measured ResourcesASX 4 Aug 2025; H1 FY2026 summary
Design-basis grade249 mg/L Li (up from 205 mg/L in the original DFS)DFS Addendum presentation
ProductBattery-grade lithium carbonate (>99.5%), produced on siteCompany disclosures
Phase One capacity25,000 tpa LCE; nameplate targeted in year 2 of operationsDFS Addendum; Reporte Minero
Mine life25 years, with expansion potentialDFS / DFS Addendum
Capex (Phase One)US$1,157M (down 16% vs US$1.38B in Dec 2023 DFS)DFS Addendum, 4 Aug 2025
OpexUS$5,895/t LCE (down 3%)DFS Addendum
NPV10Pre-tax US$1,469M; post-tax US$1,011MDFS Addendum
IRR / payback22.5% pre-tax; 4.5-year paybackDFS Addendum; H1 FY2026 summary
Price deckBenchmark Mineral Intelligence Q2 2025 LOM average of ~US$20,500/t battery-grade carbonateDFS Addendum presentation
TechnologyLilac Gen4 ion exchange in DFS Addendum; Gen5 now referenced. Recovery ~80% to ~90% (Gen4); over 96% cited in later disclosures.DFS Addendum; FY2025 Annual Report
Environmental design>95% brine reinjection; no evaporation ponds; freshwater use cut by >90%; processing isolated from local freshwaterASX Dec 2025; ASX Aug 2026
PowerGrid interconnection FEED completed (YPF Luz study); alternative and grid-based power options under evaluationFY2025 Annual Report; June 2026 quarterly
PermittingExploitation DIA granted 29 Sep 2026, with 200 m surficial lagoon exclusion zone and US$1M contribution to the Catamarca provincial mining trustASX 29 Sep 2026; Redimin
Fiscal regimeApplying to Argentina's RIGI (large investment incentive regime)El Ancasti (Jul 2026)
Next stageFEED, long-lead procurement, construction planning, then FIDASX 29 Sep 2026

DFS Addendum efficiency improvements (vs original DFS):

  • DLE capex down 39%; DLE opex down 40%

  • ~22% fewer wells

  • ~50% fewer DLE modules

  • 15–20% smaller plant footprint

Divested and non-core assets

AssetProvinceStatus
Paso de JamaJujuySold to Austroid Corporation (Nov 2024, part of US$9M package)
OlarozJujuySold to Austroid (Nov 2024)
CauchariJujuySold to Austroid (Nov 2024)
Ancasti (hard-rock)CatamarcaMarketed for sale (Jul 2024)

Pricing model

Not applicable until production. Offtake pricing terms are not publicly disclosed.

Financial Detail

Income Statement and Per-Share Data

MetricFY2022FY2023FY2024FY2025FY2026

Product revenue (AUD Mn)

00000

Other income (AUD Mn)

6.958.83—5.681.54

Operating expenses (AUD Mn)

11.9755.6251.7128.03—

EBITDA (AUD Mn)

-4.94-46.40-53.16-22.02—

Pre-tax income (AUD Mn)

-4.99-46.81-54.01-21.07—

Income tax (AUD Mn)

0.690.450.020—

Net income attributable (AUD Mn)

-5.68-45.75-52.46-19.55-23.49

EPS basic (AUD)

-0.01-0.03-0.04-0.0113-0.0106

EPS diluted (AUD)

-0.01-0.03-0.04-0.0113-0.0106

Dividends per share (AUD)

00000

Weighted avg shares (M)

1,1201,4001,4901,730—

Key Financials

MetricFY2022FY2023FY2024FY2025FY2026

Cash and short-term investments (AUD Mn)

175.4489.2222.9012.376.67

Total debt (AUD Mn)

00000

Net debt (AUD Mn)

-175.17-87.54-20.52-10.85-6.17

Net tangible assets (AUD Mn)

218.83171.25———

Net receivables (AUD Mn)

5.731.941.881.75—

Cash Flow

MetricFY2022FY2023FY2024FY2025FY2026

Operating cash flow (AUD Mn)

-8.68-27.73-39.80-25.77—

Investing cash flow (AUD Mn)

-25.37-24.06-18.0010.79—

Capex incl. capitalised exploration (AUD Mn)

———5.12—

Free cash flow (AUD Mn)

-32.89-95.49-79.72-30.89—

Financing cash flow (AUD Mn)

183.831.7714.033.84—

Dividends paid (AUD Mn)

00000

Buybacks (AUD Mn)

00000

Returns & Leverage Ratios (%)

RatioFY2022FY2023FY2024FY2025FY2026

ROE (%)

———-14.59—

Debt / equity (x)

00000

Geographic Revenue

MetricFY2024FY2025FY2026

Product revenue Argentina (AUD Mn)

000

Product revenue Australia (AUD Mn)

000

Product revenue Other (AUD Mn)

000

Valuation Snapshot

MetricValueSource / note

Share price (early Oct 2026)

~A$0.037 (derived from €0.021 Munich quote, 6 Oct 2026)

MarketScreener; FX-derived estimate

YTD 2026 change

~ -72.6% (EUR quote)

MarketScreener

Price at 18 Dec 2025

A$0.097

InvestSMART release price

Price at 27 Feb 2026

~A$0.10

Motley Fool

Price Jun–Jul 2026

~A$0.043–0.05

InvestSMART

52-week high / low (as of late 2025 / early 2026)

A$0.16 / A$0.025

Simply Wall St

Price during June 2025 strategic review

A$0.034 (market cap ~A$63M)

Mining.com

3-year / 5-year

Substantially negative from 2022 highs above A$1

Historical; exact returns not computed

Market capitalisation

~A$95–100M

MarketScreener, Oct 2026

Enterprise value

~A$90M

MarketScreener; net cash ~A$6.2M

P/B

Below 1x on E&E assets of A$139.8M (Dec 2025)

—

EV / post-tax NPV10

~0.06x (US$ basis, ~US$60M EV vs US$1,011M NPV, 100% project basis)

Analyst calculation; does not adjust for 20% Lilac interest or funding risk

Share Price

MetricJun2025Dec2025Feb2026Jun2026Oct2026

Share price (A$ approx)

0.0340.0970.100.0450.037

Capital Markets

ItemDetail

Dividends

None; no dividend policy

Buybacks

None authorised

Credit ratings

Not rated by Moody's, S&P or Fitch

Debt maturity profile

No debt

Capital Instruments

InstrumentDetail

Ordinary shares

~2.40B at Feb 2026, plus subsequent ATM issues. Estimated ~2.5–2.6B at Oct 2026.

Placement options

271.66M exercisable at A$0.05

Loyalty options

1:10, exercisable at A$0.05, expiring 14 Oct 2028

Acuity ATM

Established Aug 2018; A$52.2M cumulative raised; A$28.2M unused at 30 Jun 2026, less subsequent draws of A$3.8M, A$1.1M and A$3.0M

Analyst Conclusions

Management guidance

  • Enter FEED following the DIA.

  • Progress commercial negotiations with strategic partners, offtakers and ECAs.

  • Pursue RIGI admission and optimise power supply.

  • FID 9–12 months after partner selection.

  • Continue cost discipline, with further right-sizing flagged.

No consensus revenue or EBITDA forecasts exist for the near term.

Bull case

  1. Permit-driven re-rating. With the DIA secured, Kachi is one of few fully environmentally permitted, large DLE brine projects in Argentina. At an EV of roughly A$90M against a post-tax NPV10 of US$1,011M (100% basis), a credible partner deal could crystallise a multiple of current value.

  2. Cost position. Opex of US$5,895/t and a capex cut to US$1,157M give Kachi resilience if prices stabilise near the DFS deck or Barrenjoey's ~US$19,000/t 2031 view.

  3. Strategic scarcity. Majors have paid for Argentine brine (Rio Tinto/Arcadium). Kachi's 11.1 Mt resource, ESG-aligned DLE design and RIGI eligibility make it a logical target for partial or full acquisition.

Bear case

  1. Funding gap. About A$10M of pro-forma cash against a US$1.16B build means Lake's 80% equity share may be heavily diluted at project or parent level before FID.

  2. Track record of slippage. EIA and FID timelines have moved repeatedly since 2023, and the 2027 first-lithium target looks unrealistic. Partner talks have run since 2023–24 without a signed deal.

  3. Technology and price risk. Commercial-scale Lilac IX has not been proven at 25,000 tpa. A further lithium price downturn would push FID out again.

Catalysts and monitorables (next 12 months)

CatalystTiming
September 2026 quarterly report23 Oct 2026 (scheduled)
Strategic partner / offtake announcementUnscheduled; key value trigger
RIGI approvalPending
FEED award and progress; long-lead procurementFrom Q4 CY2026
ECA engagement and project-finance mandates2,027
Lithium carbonate price trajectoryContinuous
ATM usage and option exercises (A$0.05 strike vs share price)Continuous
Lilac commercial milestones (Utah facility, Fernley IX output)2026–27
Further organisational right-sizing2026–27

Analyst verdict

Lake Resources has just achieved what its managing director described as the most important milestone in its history: the Exploitation DIA for Kachi. That approval removes the largest outstanding regulatory risk and converts Kachi from a permitting story into a financing story.

The asset quality appears genuine. It has an 11.1 Mt LCE resource with a high Measured share, a design grade upgraded to 249 mg/L, and a DFS Addendum showing US$1,157M capex, US$5,895/t opex and a 22.5% pre-tax IRR. It also has a technology partner holding 20% equity at project level.

The equity, however, trades at a deep discount to project NPV, at roughly 6% of post-tax NPV10 on a crude 100%-project basis. That discount reflects an existential funding problem rather than any doubt about the geology.

The balance sheet is the crux. Cash was A$6.67M at 30 June 2026, about A$10.5M pro-forma, against a US$1.16B Phase One capex. The company funds itself through an at-the-market facility whose capacity depends on a share price that has fallen about 70% in 2026. FY2026 losses widened to A$23.5M.

Management's history of schedule slippage across EIA, FID and first production means guidance should be heavily discounted. The 2027 first-lithium target looks implausible. FID in 2027 with first production in 2029 is a more realistic base case, contingent on a partner.

Bottom line. The investment case now rests almost entirely on a single binary catalyst: a credible strategic partner or acquirer, using the DIA as leverage, on terms that preserve meaningful value for existing shareholders. This is an option-like, high-risk position.

The key near-term signal is the October 2026 quarterly. It will show cash runway after the September raises, any FEED commitments, and commentary on partner negotiations following the DIA.

Verdict: speculative. Upside is credible, but it is contingent on a financing transaction that has eluded the company for more than two years.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Executive Leadership Team

NameTitleTenureBackgroundNotes

David Dickson

Managing Director & CEO

CEO since 15 Sep 2022

US-based energy and industrial executive; advisory board member of Quantum Energy Partners

Bought ~9.0M shares on-market 7–11 Nov 2025 at A$0.034–0.038

Bárbara Cozzi

Country Manager, Argentina

—

Leads in-country government and community engagement

Met Catamarca Governor Raúl Jalil, Jul 2026

Michael Gabora

Director of Geology & Hydrogeology

—

Leads resource drilling and hydrogeology

Named in drilling releases

Mark Anning

General Counsel & Company Secretary

From 9 Jan 2023

Former GC/CoSec at Ellume, Tritium and Vita Group; ex-Holding Redlich partner

Current status should be verified against the FY2026 Annual Report

“—” = not publicly disclosed.

Board of Directors

NameRoleSinceBackground

Stuart (Stu) Geoffrey Crow

Non-Executive Chairman

Director Nov 2016; Executive Chairman Jun–Dec 2022; NE Chairman from Dec 2022 / Jan 2023

~40 years in financial services, corporate finance and investor relations. Ex-Atlantic Lithium (Senior Independent NED to 2023). Pulsar Helium NED. Appointed Independent NED of DGR Global, 30 Jul 2026.

David Dickson

Managing Director & CEO

2022

See above

Dr Robert Trzebski

Non-Executive Director

Dec 2019

Ex-Rio Tinto, WMC, Inco, Falconbridge, Schlumberger and Phelps Dodge; Argentina experience; Austmine

Cheemin Bo-Linn

Non-Executive Director

5 Dec 2022

Technology and governance background (appointed in the 2022 board refresh)

Howard Atkins

Non-Executive Director

5 Dec 2022

Senior finance executive (appointed in the 2022 board refresh)

Major Shareholders

Holder typeDetail

Top 10 institutional holders

Not publicly verified at cut-off (see FY2026 Annual Report top-20 holders list). The register is understood to be retail-heavy.

Index inclusion

Subject of S&P DJI All Ordinaries rebalance (March 2026)

Insider ownership

Directors hold well under 5% of ~2.5–2.6B shares. Chairman ~34.9M shares plus 30M options; CEO ≥9.0M shares from Nov 2025 purchases.

Strategic holders

Lilac Solutions holds 20% at project level (not at parent level)

Competitive Landscape

Key Competitors

CompetitorSegment / assetRelevance to Lake

Rio Tinto (incl. ex-Arcadium Lithium)

Fénix (Catamarca, Hombre Muerto), Rincon (Salta); DLE operations

Dominant Catamarca operator; benchmark acquirer of Argentine brine

Galan Lithium

Hombre Muerto West (Catamarca)

ASX peer in same province; competes for funding

Eramet

Centenario-Ratones (Salta), DLE

Operating DLE brine benchmark

POSCO

Sal de Oro (Hombre Muerto)

Korean integrated player; potential partner-type

Ganfeng / Lithium Argentina

Cauchari-Olaroz (Jujuy)

Operating brine benchmark

Zijin Mining

3Q project (Catamarca)

Chinese capital in Catamarca

Standard Lithium

Smackover DLE (US)

DLE developer competing for Western offtake and ECA funding

Vulcan Energy

Geothermal DLE (Germany)

DLE peer competing for European offtake

Lilac Solutions (own Utah project)

Great Salt Lake DLE

Technology partner that is also a supply competitor

Lithium South / Argentina Lithium & Energy

Junior Argentine brine explorers

Juniors competing for capital

Peer Comparison FY2026

DimensionLake ResourcesRio Tinto (lithium)Galan LithiumEramet (lithium)

Stage

Permitted, pre-FID

Producing / expanding

Developing (Phase 1 construction / financing)

Producing (ramp-up)

Revenue

Nil

Material (group level)

Nil / minimal

Ramp-up revenue

Technology

Lilac IX DLE

Conventional plus DLE

Conventional evaporation

Proprietary DLE

Funding

ATM-dependent; ~A$10M pro-forma cash

Balance sheet

Project finance / offtake prepay

Balance sheet

Recent Developments

--

Company Snapshot

Australia

Headquarters

SWOT Analysis

Strengths

  • Large resource: 11.1 Mt LCE total, with Measured 4.2 Mt (ASX, 3 Jun 2025).
  • Full environmental permit: Exploitation DIA granted 29 Sep 2026.
  • Low cost: DFS Addendum opex of US$5,895/t LCE, positioned in the first quartile (ASX, 4 Aug 2025).
  • Robust project economics: pre-tax NPV10 US$1,469M, IRR 22.5%, 4.5-year payback.
  • Improved resource quality: design grade raised to 249 mg/L from 205 mg/L.
  • Clean balance sheet: no debt at 30 Jun 2026 (June 2026 quarterly).
  • Aligned technology partner: Lilac holds a 20% project stake and has built a 200 tpa IX media line.

Weaknesses

  • No revenue: cumulative net losses of about A$147M over FY2022–FY2026.
  • Thin liquidity: cash of A$6.67M at 30 Jun 2026 (~A$10.5M pro-forma) against a US$1,157M capex need.
  • ATM dependence: remaining A$28.2M capacity is notional and price-dependent.
  • Schedule credibility: repeated slippage. EIA approval was expected in H1 2025, then H1 2026, then Q3 2026. First production was once targeted earlier, then pushed to 2027.
  • Single-asset concentration following the 2024 Jujuy divestment.
  • Loss of offtake counterparties: SK On and WMC frameworks terminated in July 2024.
  • Share price volatility: about –72.6% year-to-date in 2026 on German quotes.

Opportunities

  • A strategic partner or sale, via the Goldman Sachs process, improved by the DIA.
  • RIGI incentives (application in progress).
  • Further capex and opex reductions flagged from plant design optimisation and Gen5 IX.
  • Expansion beyond Phase One, given the 25-year life uses a fraction of the 11.1 Mt resource.
  • Export credit agency debt, with the DIA cited as elevating ECA discussions.
  • Lithium price recovery: a >79% rebound reported Nov 2025–Feb 2026, and Barrenjoey's deficit thesis.
  • Up to ~A$13M+ potential proceeds if loyalty and placement options (A$0.05) are exercised, at current share counts.

Threats

  • Lithium price relapse below the DFS deck of ~US$20,500/t.
  • Argentine political, FX or provincial regulatory changes, including conditions under the DIA.
  • DLE performance risk at commercial scale.
  • Highly dilutive capital raising at depressed prices (October 2025 placement at A$0.036).
  • Competing Catamarca projects backed by majors (Rio Tinto, Zijin, POSCO).
  • Community and water concerns in the Ramsar-designated High Andean wetlands; the 200 m exclusion zone is a binding constraint.
  • Key-person and partner concentration on Lilac technology.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
Q1 CY2025March quarterly: no debt; EIA approval expected H1 2025 (later slipped)First of several EIA timing slips
3 Jun 2025Resource upgrade to 11.1 Mt LCE (Measured 4.2 Mt)Strengthens bankability; ~98% of Phase One from Measured
Jun 2025Strategic review includes possible sale of Kachi or company; shares ~A$0.034, market cap ~A$63MSignals openness to change of control
4 Aug 2025DFS Addendum and updated Ore ReserveCapex US$1,157M; IRR 22.5%
Aug 2025A$2.5M capital raiseLiquidity
26 Aug 2025Amended DFS Addendum presentation (Exploration Target footnotes)Disclosure compliance
26 Sep 2025FY2025 Annual Report: net loss A$19.55M; cash A$12.4MLosses down 63%
Oct 2025Placement of 265.2M shares at A$0.036 plus director tranche (68.2M shares) and 271.7M A$0.05 options; ~A$12.0MDilutive funding at low price
16 Oct 2025Replacement prospectus for loyalty options (1:10, A$0.05, expiring Oct 2028)Shareholder engagement; future funding if exercised
23 Oct 2025September quarterlyImproved economics narrative
6–11 Nov 2025Chairman and CEO on-market purchasesInsider alignment signal
12–14 Nov 2025Noosa Mining Conference presentation (Chairman)Investor marketing
Nov 2025–Feb 2026Lithium price rebound; share price rises to ~A$0.10Re-rating with sector
18 Dec 2025Ramsar North Subsite Management Plan and SEA completedKey pre-DIA milestone
30 Jan / 4 Feb 2026December quarterly (amended): cash A$15.3M incl. term deposit; A$75.3M unused ATM capacityLiquidity peak
12 Feb 2026Bell Potter Unearthed conference presentation; EIA approval "now expected in 2026"Timing reset
1 / 16 Mar 2026Half-year results: net loss A$13.05M; E&E A$139.8M; investor presentationLoss widened vs pcp (A$5.7M)
Mar 2026S&P DJI All Ordinaries rebalance involving LKEIndex flows
Apr 2026March quarterly: formal observations from Catamarca Mining Ministry; target approval Q3 CY2026; Lilac completes Fernley IX line (200 tpa)Permitting progress; tech scale-up
May–Jun 2026Share price falls from ~A$0.077 to ~A$0.043; unquoted securities notifications; quotation applicationsSharp de-rating
21 Jul 2026CEO and Country Manager meet Catamarca Governor Raúl Jalil; RIGI application discussedPolitical support
28 Jul 2026June quarterly: cash A$6.67M; A$3.8M ATM post-quarter (pro-forma ~A$10.5M); A$28.2M unused ATMLiquidity tight
3 Aug 2026Public consultation opens (to 31 Aug); DIA targeted by 30 Sep 2026Final administrative step
Aug–Sep 2026A$1.1M ATM raise; public hearing completedFunding; process completion
24 Sep 2026A$3M ATM placement to Acuity CapitalFunding
Late Sep 2026FY2026 results: net loss A$23.49M; EPS –A$0.0106; other income A$1.54MLoss up 20%
29 Sep 2026DIA granted; 200 m lagoon exclusion; US$1M provincial trust; project enters FEED; shares up ~11%Most important milestone in company history (per MD)
23 Oct 2026 (scheduled)September 2026 quarterly reportNext disclosure event

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Income Statement

2 charts
Income Statement: Other income fell from AUD 7 Mn in FY2022 to AUD 1.5 Mn in FY2026.
Lake Resources N.L. — Income Statement
Series (AUD Mn)FY2022FY2023FY2024FY2025FY2026
Other income78.8—5.71.5
Operating expenses1255.651.728—
EBITDA-4.9-46.4-53.2-22—
Pre-tax income-5-46.8-54-21.1—
Income tax0.70.500—
Net income attributable-5.7-45.8-52.5-19.6-23.5

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. Lake Resources ASX announcements: DFS Addendum (4 Aug 2025); Mineral Resource update (3 Jun 2025); Ramsar Management Plan (18 Dec 2025); EIA public consultation (3 Aug 2026); DIA grant (29 Sep 2026); Quarterly Activities / Appendix 5B (Dec 2025, Mar 2026, Jun 2026); Half-Year Report H1 FY2026; Annual Reports FY2023, FY2025, FY2026
  2. Lake Resources FY2025 Annual Report (announcements.asx.com.au)
  3. Lake Resources FY2023 Annual Report (asx.com.au)
  4. Bell Potter Unearthed presentation (12 Feb 2026) (bellpotter.com.au)
  5. SmallCaps – DIA granted (smallcaps.com.au)
  6. SmallCaps – Kachi approvals Q3 2026 (smallcaps.com.au)
  7. SmallCaps – Tech validations and bridge liquidity (smallcaps.com.au)
  8. Redimin – DIA coverage (redimin.cl)
  9. SMM – Kachi environmental approval (news.metal.com)
  10. Kalkine – June 2026 quarterly cash (kalkinemedia.com)
  11. Kalkine – EIA public consultation (kalkinemedia.com)
  12. FilingReader – Q4 FY2026 cash (filingreader.com)
  13. RTTNews – FY2026 results (rttnews.com)
  14. Quartr – H1 FY2026 summary (quartr.com)
  15. Barchart – income statement (barchart.com)
  16. TipRanks – stock analysis (tipranks.com)
  17. Kalkine – company data (kalkine.com.au)
  18. MarketScreener (ca.marketscreener.com)
  19. Mining.com – resource and sale talks (mining.com)
  20. Mining Technology – Austroid sale (mining-technology.com)
  21. PR Newswire / AAP – Austroid sale (aap.com.au)
  22. AAP – Operational update 1 Jul 2024 (aap.com.au)
  23. Argus Media – Kachi delay (argusmedia.com)
  24. AAP – EIA submission (Mar 2024) (aapnews.aap.com.au)
  25. FNN – Dec 2023 DFS (finnewsnetwork.com.au)
  26. InvestorPA – DFS Addendum (investorpa.com)
  27. El Ancasti – Governor meeting (Jul 2026) (elancasti.com.ar)
  28. Reporte Minero – 2026 FID outlook (reporteminero.cl)
  29. Panorama Minero – public hearing (panorama-minero.com)
  30. Market Index – Stuart Crow holdings (marketindex.com.au)
  31. InvestSMART – announcements and director trades (investsmart.com.au)
  32. Lawyers Weekly – Mark Anning appointment (lawyersweekly.com.au)
  33. Kallanish – June 2022 leadership change (api.kallanish.com)

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.