Lycopodium Limited Overview
Lycopodium is a Perth-headquartered, mid-cap engineering and project delivery group whose franchise rests on mineral processing plant design and delivery, especially gold processing plants in West Africa, where it is widely regarded as a market leader. It works across the full project lifecycle, from scoping, pre-feasibility and definitive feasibility studies through front-end engineering design (FEED), engineering-procurement-construction management (EPCM), selective lump-sum EPC, commissioning and asset management. Its specialist subsidiary Orway Mineral Consultants (OMC) is a recognised global authority in comminution circuit design. Adjacent businesses cover rail infrastructure engineering in Australia and industrial processes (cement, lime, manufacturing, energy). The model is capital-light and service-led, carries minimal debt, holds a large cash balance (A$106.2m at 30 June 2026), and targets a ~10% NPAT margin. Since 2024 Lycopodium has pursued deliberate geographic diversification into the Americas via Toronto, Vancouver and the 60%-owned Argentine engineering firm SAXUM, building toward a step-change FY2027.
The company's own description
In its FY2026 results release (19 August 2026), Lycopodium describes itself as a global leader in integrated engineering, project, construction and asset management, with expertise ranging from feasibility studies and advisory services to the delivery of complex multidisciplinary projects. It operates across the Resources, Industrial Processes and Rail Infrastructure sectors, delivering bespoke solutions across all commodity types, with offices in Australia, Canada, the USA, Argentina, Brazil, Peru, South Africa, Namibia, Botswana, Tanzania, Ghana and the Philippines.
The 1H FY2026 investor presentation adds that Lycopodium was founded in 1992, provides integrated engineering, project, construction and asset management expertise across the project lifecycle, and is built upon long-serving teams of high-calibre people.
Independent characterisation
Lycopodium is best understood as a specialist minerals-processing engineering house with lifecycle reach. Its competitive edge is not scale but metallurgical and process-plant design depth, a long track record on gold carbon-in-leach (CIL) plants, and recurring relationships with mid-tier miners who prefer an engineer that can carry a project from study through construction.
The business converts studies into execution mandates. Recent awards show this pattern clearly. Doropo (Resolute) followed the NI 43-101 technical report in 2023, a DFS update in 2025 and FEED. Nyanzaga (Perseus) followed the PFS, DFS and FEED. Pilgangoora P2000 (PLS) followed FEED. Blackwater (Artemis) followed the feasibility study and Phase 1A.
Business model and revenue model
| Revenue type | Description | Margin/risk character |
|---|---|---|
| Studies and advisory | Scoping, PFS, DFS, FEED, technical reports (e.g. NI 43-101), metallurgical testwork interpretation via OMC | High margin, short duration, pipeline-feeding |
| EPCM services | Engineering, procurement management, construction management on a reimbursable or fee basis; client owns construction contracts | Core earnings engine; lower balance-sheet risk |
| EPC (lump-sum) projects | Selective fixed-price delivery, historically including via the Mondium JV with Monadelphous | Higher revenue per project, higher risk; management describes a "balanced EPCM and EPC portfolio" |
| Asset management and operational support | Post-commissioning optimisation, plant audits, OMC operational support | Recurring, smaller |
| Rail infrastructure services | Design, engineering, technical advisory, Rail Infrastructure Management (RIM) for government and private rail owners in Australia | Recurring, multi-year frameworks |
| Adjacent operating services | LPN Dry Mining Services JV (modular dry mining for Namdeb in Namibia, two-year contract) | Management frames as "recurring revenue streams" |
Product vs. service vs. subscription vs. licensing mix: Lycopodium is effectively 100% services. It has no material product, subscription or licensing revenue. A precise split between studies, EPCM and EPC revenue is not publicly disclosed in the sources reviewed. Management stated that FY2025 revenue was "predominantly driven by EPCM", a shift from FY2023–FY2024 when EPC projects supplied supplementary revenue (FY2025 investor presentation; 1H FY2025 earnings call).
Value chain position
Lycopodium sits in the owner's engineer / EPCM contractor layer of the mining capital-projects value chain. It is upstream of construction contractors, equipment OEMs (mills, crushers, flotation, CIL tanks) and fabricators, and downstream of exploration and resource definition. Its leverage point is that process-plant design largely sets project capex and operating performance.
Customer types and end-markets
| End-market | Commodity / sub-sector examples (FY2025–FY2026) | Representative clients |
|---|---|---|
| Gold | CIL processing plants in West and East Africa, Canada, Australia | Newmont, Perseus Mining, Resolute Mining, Montage Gold, Orezone, Artemis Gold, FG Gold, Osino Resources, KEFI Gold and Copper, Ausgold, Managem Group |
| Copper / copper-gold | Yanqul (Oman), Winu (Western Australia) | Mazoon Mining, Rio Tinto |
| Lithium / battery minerals | Pilgangoora P2000, Chemical Grade Plant #3 | PLS Group, Talison Lithium |
| Silver | San Cristóbal Silver Oxide Project (Bolivia) | Minera San Cristóbal S.A. |
| Diamonds | Dry mining pilot (Namibia) | Namdeb Diamond Corporation |
| Rail | Network upgrades, crossing loops, agricultural supply chain | Australian Rail Track Corporation (ARTC), Arc Infrastructure |
| Industrial processes / energy | Cement, lime, manufacturing, oil and gas (largely via SAXUM) | Not individually disclosed |
Client profile: predominantly listed mid-tier and major miners, with a strong skew to repeat clients. Management emphasises "high-quality, repeat clients" (FY2026 results webinar summary, Quartr).
Strategy
Stated strategic themes (FY2025–FY2026 materials)
-
Geographic diversification, specifically growth in the Americas. Management describes it as "beginning to deliver results" (FY2026 release).
-
Regional operating model with three hubs (Perth, Toronto, Cape Town) to leverage local expertise and enable "structured growth".
-
Resources core plus adjacencies. The resources "core remains robust", supported by expanding infrastructure demand.
-
Lifecycle integration. Studies feed EPCM, which feeds asset management.
-
Risk-managed, capital-light delivery with a "balanced EPCM and EPC portfolio" (1H FY2026 presentation).
-
New recurring revenue streams in adjacent fields, e.g. LPN Dry Mining Services.
-
Energy transition exposure through lithium, copper and battery minerals.
-
Margin discipline. Long-term ~10% NPAT margin target.
-
Safety leadership. Zero LTIFR across 9 million controlled service hours in FY2026.
Initiatives in the last 24 months
| Initiative | Date | Detail |
|---|---|---|
| SAXUM acquisition (60%) | Completed Feb 2025 | US$7.1m; entry into Latin America, USA, cement and lime |
| Vancouver office | FY2025 | Supports Canadian growth |
| ADP rebrand to Lycopodium | Jun 2025 | Unifies African operations under one brand |
| Regional hub model | FY2026 | APAC / Americas / Africa |
| LPN Dry Mining Services JV | FY2026 | Namdeb pilot, two-year contract |
| Sustainability Report 2025 | 13 Nov 2025 | Annual ESG disclosure |
| Dividend policy reset | FY2025–FY2026 | One-off 28c SAXUM funding allocation in FY2025; 60% payout restored in FY2026 |
Guidance and targets
| Item | Guidance |
|---|---|
| FY2027 revenue | A$540–580 million |
| FY2027 NPAT | A$54–58 million |
| NPAT margin target | ~10% long term |
| Committed contracts (Aug 2026) | A$661 million |
| Share of FY2027 revenue committed | Nearly 70% |
| Potential revenue opportunity pipeline | ~A$1.4 billion |
| Next guidance update | AGM, 12 November 2026 |
Products & Services
Resources
| Offering | Description | Target customer | Flagship examples (latest) |
|---|---|---|---|
| Scoping and pre-feasibility studies | Early-stage process and infrastructure definition, capex/opex estimation | Juniors and mid-tiers | Not individually disclosed |
| Definitive feasibility studies and technical reports | Bankable DFS, NI 43-101 technical reports | Developers seeking finance | Doropo NI 43-101 (2023) and DFS update (2025); Nyanzaga PFS/DFS |
| Front-End Engineering Design (FEED) | Detailed definition prior to execution | Pre-FID projects | Doropo FEED; Nyanzaga FEED; Pilgangoora P2000 Wet Plant FEED |
| EPCM services | Engineering, procurement management, construction management, commissioning | Developers and majors | Doropo (~A$196m); Blackwater EP2 (~A$93m); Nyanzaga (~A$48m); San Cristóbal (~A$37m) |
| Detailed engineering services | Engineering-only packages | Majors and expanding producers | Pilgangoora P2000 Wet Plant (~A$22m) |
| EPC (lump-sum) delivery | Fixed-price design-and-construct, selectively and partly via Mondium | Mid-tiers wanting price certainty | Katanning Gold Project (preferred EPC contractor; early works) |
| Brownfield / expansion engineering | Plant expansions and footprint reduction | Operating mines | Blackwater Phase 1A, EP2, Phase 3; Bomboré Stage 2; North Concentrator Footprint Reduction (completed FY2025) |
| Modular engineering | Modular plant solutions; management cites "bespoke and modular engineering capabilities" | Remote or fast-track projects | Not individually disclosed |
Orway Mineral Consultants (OMC)
| Offering | Description |
|---|---|
| Comminution circuit design | Crushing and grinding circuit selection and sizing |
| Flowsheet development | Process flowsheet definition from testwork |
| Process optimisation and audits | Operational benchmarking and debottlenecking post-commissioning |
| Beneficiation and hydrometallurgy | Specialist process consulting |
| Orway IQ (50% JV) | Analytics/digital extension (details not disclosed) |
Rail Infrastructure
| Offering | Description | FY2026 examples |
|---|---|---|
| Rail design and engineering | Track, civil and systems design for greenfield and brownfield | Arc Infrastructure: track design for Carnamah–Mingenew upgrades (Agricultural Supply Chain Improvements Project) |
| Technical advisory and feasibility | Concept and feasibility studies | ARTC: feasibility and concept design for two crossing-loop upgrades on the Broken Hill line, NSW (Network Investment Program) |
| Rail Infrastructure Management (RIM) | Ongoing asset management services | Three-year contract awarded July 2023 |
Industrial Processes and energy
| Offering | Description |
|---|---|
| Cement and lime engineering | Largely via SAXUM; management called the SAXUM deal transformational for its cement exposure (1H FY2025 call) |
| Manufacturing and process industries | Multidisciplinary engineering |
| Oil and gas | Via SAXUM |
| Energy transition | Hydrogen, battery minerals and battery materials work cited in FY2023 results |
Adjacent services
| Offering | Description |
|---|---|
| LPN Dry Mining Services | JV with Piacentini & Son. Establishing and operating a modular dry mining facility for overburden stripping for Namdeb Diamond Corporation in Namibia under a two-year contract |
Pricing models: Lycopodium does not publish pricing. Contract values are disclosed per award. EPCM is generally fee/reimbursable; EPC is lump-sum. No launch-year or version data applies to a services business of this type.
Financial Narrative
Income statement
Sources: FY2023 results (FY2022 and FY2023 columns); FY2024 figures via Kalkine/Business News reporting of FY2024 results; FY2025 results release and Appendix 4E; FY2026 results release. FY2025 EBITDA is derived from the FY2026 disclosure that EBITDA fell 13% to A$59.5m (SmallCaps). Margins are derived. FY2025 DPS of 35c excludes 28c that management allocated to funding SAXUM; the "normalised" FY2025 dividend was 63c.
Gross profit and operating income (EBIT) are not presented as separate lines in the sources reviewed; Lycopodium reports on a revenue/EBITDA/NPAT basis.
Revenue CAGR FY2022–FY2026: ~12.9% (derived). NPAT CAGR FY2022–FY2026: ~10.3% (derived).
Half-yearly progression
First-half figures are disclosed; second-half figures are derived (full year minus first half).
Commentary: income statement
FY2023 inflection. Revenue jumped 41% and NPAT 72% as a cluster of large West African gold projects and battery-minerals work moved into execution, supplemented by EPC revenue. This established a new earnings base.
FY2024 peak profitability. Record NPAT of A$50.7m and EBITDA margin above 22% reflected high utilisation and favourable project close-outs. The market nonetheless sold the stock off more than 12% on result day, likely reflecting concerns over the forward pipeline.
FY2025 normalisation. Revenue dipped 2.7% and NPAT fell 16.8%. Management attributed this to a shift toward a predominantly EPCM mix (less EPC pass-through) and a margin "normalising to sustainable levels". The miss on certain large copper projects (1H FY2025 call) weighed on utilisation in the second half, when the NPAT margin fell below 10%.
FY2026 volume up, margin down. Revenue reached a record A$377.5m (+11%), but EBITDA fell 13% and NPAT 5%. Margin compression reflects investment in the Americas hub, SAXUM integration and headcount growth (from ~1,400 to ~1,500) ahead of FY2027 work, plus delayed project awards. Management attributed the delays to the extended Middle East conflict and the resulting uncertainty, which slowed client decision-making. FY2026 guidance was trimmed in February 2026, but the final result landed inside the revised range.
Balance sheet
FY2022–FY2023 cash from FY2023 results. FY2023 equity (~A$113m) is from a third-party summary of company materials and not primary-verified. FY2025 equity is derived from the disclosed 13% rise to A$170.7m in FY2026. NTA per share from the FY2025 Appendix 4E and FY2026 results.
Interim cash at 31 December 2023 was A$69.0m (1H FY2024 release), showing the intra-year working-capital swings typical of project businesses.
Cash flow
Lycopodium is structurally capital-light, so capex is typically small relative to EBITDA. Buybacks: none identified in FY2022–FY2026.
Ratios
Derived from NPAT ÷ closing equity using the equity figures above. A ROE of 42.2% was cited as management-reported in third-party commentary for FY2024 but is not primary-verified. The FY2026 payout ratio of 60% is from the FY2026 results release. FY2025's normalised payout was also 60% (63c normalised).
Overall financial trend assessment
The five-year record shows a business that more than doubled its earnings base between FY2022 and FY2024, then digested that growth through two years of margin normalisation while it invested in geographic expansion. Returns remain high for a services firm (ROE of ~24% even at the FY2026 trough), the balance sheet is net cash, and the dividend policy (60% payout) is well covered.
The critical forward question is whether FY2027 guidance converts. The guidance (A$540–580m revenue, A$54–58m NPAT) implies ~48% revenue growth and ~39% NPAT growth at midpoints, which would set a new record by a wide margin.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Hub Details
| Hub | Base | Role |
|---|---|---|
APAC | Perth, Australia | Group HQ; services WA projects and continues to serve African clients |
Americas | Toronto, Canada | Rapidly growing; several major projects in delivery from Toronto; supported by Vancouver, SAXUM (Argentina, Brazil, USA) and Lima |
Africa | Cape Town, South Africa | Supports projects across the continent, including Namibia |
Group Entities
| Entity | Interest | Role | Source |
|---|---|---|---|
Orway Mineral Consultants (OMC) | 100% | Comminution circuit design, flowsheet development, process optimisation, audits | FY2026 results |
SAXUM (SAXUM Engineering Pty Ltd, Australia; SAXUM Ingeniería S.A., Argentina; SAXUM Consultoria e Engenharia Ltda, Brazil; SAXUM Engineering LLC, USA) | 60% | Multidisciplinary engineering and project management for mineral processing, cement and lime, manufacturing, infrastructure, oil and gas | 1H FY2026 Appendix 4D |
Mondium Pty Ltd | 40% | JV with Monadelphous for mineral processing EPC projects | FY2025 Appendix 4E |
ECG Engineering Pty Ltd | 31% | Associate (electrical/control engineering; scope not detailed in sources reviewed) | FY2025 Appendix 4E |
Kholo Marine & Minerals Pty Ltd | 49% | Associate (marine/minerals; scope not detailed) | FY2025 Appendix 4E |
Orway IQ Pty Ltd | 50% | Joint arrangement (OMC-related digital/analytics; scope not detailed) | FY2025 Appendix 4E |
LPN Dry Mining Services | JV with Piacentini & Son (share not disclosed in sources) | Modular dry mining services; Namdeb pilot in Namibia | FY2026 results |
Revenue by Segment
| Segment | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Group revenue (AUD Mn) | 348.9 | 339.6 | 377.5 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansIncome Statement and Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue (AUD Mn) | 232.2 | 327.6 | 348.9 | 339.6 | 377.5 |
Revenue growth (%) | — | 41.1 | 6.5 | -2.7 | 11.2 |
EBITDA (AUD Mn) | 45.4 | 70.5 | 77.1 | 68.4 | 59.5 |
NPAT attributable (AUD Mn) | 27.2 | 46.8 | 50.7 | 42.2 | 40.2 |
NPAT growth (%) | — | 72.1 | 8.3 | -16.8 | -4.7 |
EPS basic (A cents) | 68.4 | 117.7 | — | 106.2 | 101.1 |
DPS total (A cents) | — | 81 | 77 | 35 | 59 |
EBITDA margin (%) | 19.6 | 21.5 | 22.1 | 20.1 | 15.8 |
NPAT margin (%) | 11.7 | 14.3 | 14.5 | 12.4 | 10.6 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansIncome Statement and Margin Analysis (%) (Half-Yearly)
| Metric | 1H FY2023 | 2H FY2023 | 1H FY2024 | 2H FY2024 | 1H FY2025 | 2H FY2025 | 1H FY2026 | 2H FY2026 |
|---|---|---|---|---|---|---|---|---|
Revenue (AUD Mn) | 159.9 | 167.7 | 177.8 | 171.1 | 167.4 | 172.2 | 174.5 | 203.0 |
NPAT (AUD Mn) | 20.0 | 26.8 | 30.0 | 20.7 | 25.2 | 17.0 | 18.3 | 21.9 |
NPAT margin (%) | 12.5 | 16.0 | 16.9 | 12.1 | 15.1 | 9.9 | 10.5 | 10.8 |
Balance Sheet and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Cash and equivalents (AUD Mn) | 100.9 | 82.4 | — | — | 106.2 |
Total equity (AUD Mn) | — | 113 | — | 151.1 | 170.7 |
NTA per share (A cents) | — | — | 305 | 363 | 392 |
Financial Analysis
| Item | Status |
|---|---|
Total debt (short/long split) | Not separately verified. Management describes "minimal debt" at 30 June 2026 (SmallCaps / FY2026 materials); lease liabilities likely make up most of it |
Net debt | Net cash. Cash of A$106.2m vs minimal debt at FY2026 |
Per-Share Data
| Metric | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
Dividends declared per share (A cents) | 81 | 77 | 35 | 59 |
Returns & Leverage Ratios (%)
| Ratio | FY2023 | FY2025 | FY2026 |
|---|---|---|---|
ROE on closing equity (%) | 41.4 | 27.9 | 23.5 |
Dividend payout ratio (%) | — | — | 60 |
Financial Analysis — Debt/equity
| Ratio | Assessment |
|---|---|
Debt/equity | Effectively nil (minimal debt) |
Net debt/EBITDA | Negative (net cash ~A$106m vs EBITDA A$59.5m, i.e. roughly -1.8x on a cash basis, derived) |
Interest coverage | Not meaningful (net interest income position; FY2025 revenue included interest income of ~A$3.4m, derived from total revenue A$339.6m vs revenue ex-interest A$336.2m) |
Region Overview
| Region | FY2026 |
|---|---|
Americas revenue (AUD Mn) | 40 |
Americas share of revenue (%) | 11 |
Region Overview (2)
| Region | Activity | Trend |
|---|---|---|
West Africa (Côte d'Ivoire, Ghana, Burkina Faso, Senegal, Sierra Leone) | Gold EPCM: Doropo, Koné, Bomboré Stage 2, Baomahun; completed Ahafo North, Boto, Bomboré Stage 1 | Historic core; still the largest exposure by project count |
East Africa (Tanzania, Ethiopia) | Nyanzaga (Perseus), Tulu Kapi (KEFI) | Growing |
Southern Africa (Namibia, Botswana, South Africa) | Twin Hills (Osino), Namdeb dry mining (LPN), Cape Town hub | Stable-to-growing |
Australia (WA, NSW) | Winu (Rio Tinto), Pilgangoora P2000 (PLS), Katanning (Ausgold), CGP3 (Talison, completed), rail work | Management cites significant work "closer to home" |
Americas (Canada, USA, Argentina, Brazil, Peru, Bolivia) | Blackwater Phase 1A, EP2 and Phase 3 (Artemis); San Cristóbal (Bolivia); SAXUM industrial work | Fastest-growing; "marked increase in activity" over the past 12 months |
Middle East (Oman) | Yanqul copper-gold (Mazoon Mining) | Active; regional conflict cited as delaying wider award timing |
Asia (Philippines) | Office presence; project scope not detailed | Not quantified |
Valuation Snapshot
| Metric | Value | Source / date |
|---|---|---|
Recent price | ~A$22.03 | InvestSMART, early October 2026 |
Market capitalisation | ~A$875m (InvestSMART); ~A$924m (Fintel, 2 Oct 2026) | Sources differ by price date |
52-week range | A$11.49 – A$23.50 | Stocklight |
1-year price change | ~+98% | Fintel |
CY2026 opening price | A$13.92 | InvestSMART |
Price at 1H FY2026 result (18 Feb 2026) | A$14.84 | InvestSMART |
FY2026 result-day reaction | ~+12–13% | Parqet / Stocklight |
Valuation Multiples
| Multiple | Trailing (FY2026) | Forward (FY2027 guidance midpoint) |
|---|---|---|
P/E | ~21.8x | ~15.6x |
EV/EBITDA (EV ≈ A$769m, net of A$106.2m cash) | ~12.9x | Not computed (no EBITDA guidance) |
EV/Sales | ~2.0x | ~1.4x |
P/B | ~5.1x | — |
Dividend yield (59c) | ~2.7% fully franked | — |
Analyst Ratings & Targets
| Broker | Rating | Date |
|---|---|---|
Taylor Collison | Outperform (maintained) | 18 Feb, 11–12 Jun, 21 Aug 2026 |
Consensus average target | A$24.01 (raised ~20%) | Fintel, 2026 |
Coverage breadth | ~2 analysts (Simply Wall St) | — |
Earlier rating (Aug 2025) | Buy, A$12.50 target | TipRanks |
Per-Share Data — Interim DPS
| Metric | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
Interim DPS (A cents) | 36 | 37 | 10 | 22 |
Final DPS (A cents) | 45 | 40 | 25 | 37 |
Total DPS (A cents) | 81 | 77 | 35 | 59 |
Capital Markets
| Item | Status |
|---|---|
Buyback authorisations | None identified |
Credit ratings (Moody's / S&P / Fitch) | Unrated |
Debt maturity profile | Not applicable (minimal debt) |
Analyst Conclusions
Management guidance
FY2027 guidance is revenue of A$540–580m and NPAT of A$54–58m, consistent with the ~10% NPAT margin target. Nearly 70% of revenue is already committed, against committed contracts of A$661m and a ~A$1.4bn opportunity pipeline. Management says results should surpass recent years, with an update due at the 12 November 2026 AGM.
Consensus
The average price target of A$24.01 implies modest upside from ~A$22.
Bull case
-
Record secured workload. A$661m of committed contracts and ~70% of FY2027 revenue already locked in make the guidance unusually well underwritten for a project business.
-
Operating leverage. If NPAT margin holds at ~10% on a ~48% revenue increase, NPAT of ~A$56m would exceed the FY2024 record (A$50.7m) by about 10%. The stock trades at ~15.6x that figure while holding ~A$106m net cash.
-
Americas optionality. Blackwater EP2, San Cristóbal and SAXUM provide a second growth engine that de-risks African concentration and could earn a higher multiple.
Bear case
-
Margin trajectory. NPAT margin has fallen for two consecutive years (14.5% to 12.4% to 10.6%). A larger, more EPCM- and EPC-heavy portfolio could push margins below target.
-
Timing risk. Management has already blamed the Middle East conflict for award delays. FID-dependent work (San Cristóbal, Pilgangoora P2000) could slip and compress FY2027 into FY2028.
-
Valuation already reflects recovery. The share price has roughly doubled in 12 months to ~5x book and ~22x trailing earnings, leaving little room for a guidance miss, as February 2026 showed.
Catalysts and monitorables (next 12 months)
| Catalyst | Timing |
|---|---|
| AGM guidance update | 12 Nov 2026 |
| Pilgangoora P2000 FID (PLS) | TBC |
| San Cristóbal FID | TBC |
| Katanning EPC conversion from preferred contractor status to contract | TBC |
| Nyanzaga first gold (Perseus target) | Q1 CY2027 |
| 1H FY2027 results | ~Feb 2027 |
| Headcount and utilisation trends | Ongoing |
| Middle East conflict resolution | Macro |
| SAXUM performance in Argentina | Ongoing |
Analyst verdict
Lycopodium enters FY2027 at the strongest point in its order book in its 34-year history. Committed contracts of A$661m and roughly 70% revenue coverage underpin guidance that implies a ~48% revenue increase and a new profit record. The FY2025–FY2026 period should be read as a deliberate consolidation phase. Margins compressed from an unusually rich FY2024 while the company spent on SAXUM, a Toronto-led Americas hub and ~200 additional staff. That investment is now converting. The Americas already contribute ~11% of revenue, and the Blackwater EP2 and San Cristóbal awards show the new regional model winning work Lycopodium could not previously have accessed.
The franchise remains anchored in gold processing plants, where its study-to-execution conversion rate and repeat client relationships (Perseus, Artemis, PLS, Orezone) form a credible moat. The net-cash balance sheet, 60% fully franked payout and ROE in the mid-20s at a margin trough describe a high-quality, capital-light compounder rather than a cyclical contractor.
The risks are real and largely about timing and margin rather than solvency. Management has already missed its own initial FY2026 guidance once, citing geopolitical delays. Two significant awards remain FID-contingent, and a ~50% volume ramp tests recruitment and execution simultaneously. Governance, with three executive directors and a founder NED on a seven-person board, is stable but not best-practice independent.
At ~A$22, the shares trade near 15–16x FY2027 guided earnings net of cash, a reasonable but no longer cheap multiple after a near-doubling in twelve months. Our synthesis is constructive, with execution-dependent upside. Delivery at or above the guidance midpoint, confirmed at the November AGM and the February 2027 half, would validate a re-rating toward the ~A$24 consensus target and beyond. Another mid-year downgrade would likely see the multiple compress sharply. Investors should key on half-year NPAT margin (≥10%), FID outcomes and Americas revenue share.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Notes |
|---|---|---|
Rod Leonard | Chairman | — |
Peter De Leo | Managing Director & CEO | — |
Michael (Mick) Caratti | Non-Executive Director | Founding partner; at the helm for 30+ years; transitioned roles as noted in FY2023 results |
Steven Chadwick | Non-Executive Director | — |
Louise Bower | Non-Executive Director | — |
Bruno Ruggiero | Executive Director | — |
Karl Cicanese | Executive Director | — |
Justine Campbell | Chief Financial Officer | Co-presented FY2026 results webinar |
Major Shareholders
| Holder type | Detail |
|---|---|
Insider ownership | Historically significant, given founder/partner origins and executive directors on the board. |
ETF holders | Three ETFs hold LYL (InvestSMART) |
Competitive Landscape
Key Competitors
| Competitor | Listing / ownership | Overlap with Lycopodium | Relative positioning |
|---|---|---|---|
GR Engineering Services | ASX: GNG | Gold processing plant EPC/EPCM, Perth-based | Closest listed peer; more lump-sum EPC weighted |
Ausenco | Private (formerly ASX-listed) | Minerals processing EPCM, Americas and Australia | Larger; strong in the Americas, where LYL is expanding |
Hatch | Private (Canada) | Mining and metals engineering, EPCM | Much larger, global; strong in majors' projects |
Worley | ASX: WOR | Resources and energy engineering | Global scale; less focused on mid-tier gold |
DRA Global | Private (formerly ASX/JSE-listed) | Africa minerals EPCM | Direct African competitor |
Sedgman (CIMIC Group) | Subsidiary of CIMIC | Mineral processing EPC | Backed by a large contractor balance sheet |
Primero (NRW Holdings) | ASX: NWH subsidiary | Lithium and mineral processing EPC | Strong in WA lithium |
Monadelphous | ASX: MND | Construction and engineering; also Mondium JV partner | Partner and competitor |
Fluor | NYSE: FLR | Large mining EPCM | Mega-project tier |
Wood | LSE: WG. | Minerals and energy consulting | Global; restructuring |
SAXUM's local Latin American peers | Various | Industrial engineering in Argentina and Brazil | Fragmented |
Competitor Detail
| Metric | Lycopodium |
|---|---|
Latest FY revenue | A$377.5m (FY2026) |
Revenue growth | +11% |
NPAT margin | 10.6% |



