Macmahon Holdings Limited Overview
Macmahon is a Perth-headquartered, ASX 300-listed mining and civil infrastructure contractor with more than 60 years of operating history. It generated record FY26 revenue of A$2.62bn and underlying EBIT(A) of A$190.1m. It provides surface mining (drill-and-blast, load-and-haul, crushing), underground mining (development, production, shaft sinking, raise drilling, cablebolting) and, through its Decmil subsidiary, civil construction for the resources, government infrastructure and renewables sectors. About 90% of revenue is earned in Australia and 10% in Southeast Asia, chiefly Indonesia. Gold accounts for 52% of revenue by commodity. Management's strategy since 2018 has been to shift the mix away from capital-intensive surface load-and-haul. Underground and civil work now make up half of revenue, and ROACE has risen to 22% against a 25% target. With a A$5.9bn order book and a A$25bn tender pipeline, the group is now moving up the value chain into engineering and minerals processing via the pending A$75m Aspect Engineering acquisition.
Company's own description (FY26 Annual Report)
In its FY26 Annual Report, Macmahon calls itself a diversified services provider with leading capabilities in surface and underground mining and in civil construction and infrastructure. It says it services many of the largest resources projects in Australia and Southeast Asia. Its end-to-end services run from mine development and materials delivery through engineering, civil construction, on-site mining, rehabilitation and site remediation, to training, equipment maintenance and refurbishment. The Operational and Financial Review states that revenue comes from surface and underground mining plus mining support and civil infrastructure. Those support activities include civil design and construction (mainly on mine sites), equipment refurbishment and maintenance, training, design and fabrication of mining infrastructure, and mine-site maintenance and rehabilitation.
Independent characterisation
Macmahon is a contract mining and civil services company. It is essentially a service business with an embedded equipment-ownership model. Revenue is earned under multi-year contracts, typically 3–7 years and in some cases life-of-mine. Those contracts are priced on schedule-of-rates, cost-reimbursable-plus-margin or alliance-style bases, and usually include rise-and-fall clauses for cost escalation. Historically, the economic engine was surface mining. That business requires heavy upfront capex on owned fleets (Caterpillar, Hitachi, Liebherr and Epiroc excavators, haul trucks and drills), which produces high EBITDA margins (15–18%) but much lower EBIT margins (6–7%) after depreciation.
The strategic pivot since FY18, when surface mining was about 90% of revenue, has been towards two lower-capital-intensity businesses:
Underground mining: It uses smaller, more mobile fleets (Sandvik, Epiroc, Caterpillar) and is labour- and expertise-intensive. It earns higher EBIT margins per dollar of capital.
Civil infrastructure: It is people- and subcontractor-intensive with very low fleet capital, so it earns lower EBITDA margins but higher return on capital.
The result is visible in FY26. Underlying EBITDA margin fell to 15.0% (FY25: 16.0%) while EBIT(A) margin rose to 7.3% (FY25: 7.1%) and ROACE rose to 22.0%. This is exactly the mix effect management describes.
Revenue model mix
| Revenue type | Description | Approximate weight (FY26) |
|---|---|---|
| Contract mining services (surface) | Multi-year mining services contracts; schedule-of-rates / alliance; owned or client fleet | ~50% of revenue (division chart) |
| Contract mining services (underground) | Development and production contracts; specialist services (shafts, raise boring, cablebolting) | ~24% |
| Civil construction and infrastructure (Decmil) | Lump-sum, schedule-of-rates and framework-agreement construction contracts | ~26% |
| Equipment hire, maintenance, refurbishment, training (RTO) | Embedded within divisions; not separately reported | — |
| Product sales / subscriptions / licensing | None material | 0% |
Value-chain position
Macmahon sits in the execution layer of the mining value chain. It is engaged by mine owners after resource definition and feasibility, to develop, operate and maintain mines and associated infrastructure. Historically it has been absent from front-end engineering, feasibility studies and process plant engineering. The September 2026 Aspect Engineering acquisition is explicitly intended to close that gap. It creates what Macmahon calls an "integrated pathway" from concept through engineering, construction, mining, minerals processing and maintenance.
Customer types and concentration (FY26 Annual Report, revenue by client)
| Client | % of FY26 revenue |
|---|---|
| AngloGold Ashanti (Tropicana JV) | 18 |
| Vault Minerals (King of the Hills, Daisy Milano, Deflector) | 11 |
| QCoal (Byerwen) | 9 |
| Talison Lithium (Greenbushes) | 8 |
| Greatland (Telfer) | 8 |
| HanRoy Iron Ore (Marble Bar Road, civil) | 7 |
| Genesis Minerals (Leonora, completed May 2026) | 6 |
| Civil – others | 17 |
| Surface – others | 10 |
| Underground – others | 6 |
The top seven named clients account for 67% of revenue. Concentration is material but typical for the sector.
End-markets (FY26 revenue by commodity)
| Commodity | % of FY26 revenue |
|---|---|
| Gold | 52 |
| Other (civil infrastructure, government, renewables, iron ore civil, etc.) | 21 |
| Metallurgical coal | 12 |
| Lithium | 8 |
| Copper/gold | 7 |
Strategy
Stated strategy (FY26 Annual Report, "Vision, Values and Strategy")
Vision (paraphrased): to deliver integrated solutions across the mining value chain and become the preferred mining and civil infrastructure services partner.
Values: Pride, Integrity, Courage, United.
Three strategic pillars: 1. Growing: increase revenue and earnings by expanding the service offering, from single services to fully integrated services.
-
Improving: increase margins and returns through operational performance, contract management, systems, technology and innovation.
-
Reinforcing: deepen client partnerships through safe, reliable delivery, extend existing contracts and broaden the service offering.
CEO framing: expand the addressable market via adjacent services (organic and inorganic). Position Macmahon as a life-of-mine partner offering an end-to-end solution. Continue to reduce capital intensity.
FY27–FY31 growth strategy: referenced in the Aspect announcement, with specific emphasis on accelerating engineering and minerals processing capabilities.
Strategic initiatives (last 24 months)
| Initiative | Date | Description / target |
|---|---|---|
| Decmil integration | August 2024 – FY26 | Legacy civil merged under Decmil. FY26 was the first full year as an integrated unit (A$672m revenue). |
| ROACE target raised to 25% | August 2025 | Up from 20%. FY26 achieved 22.0%. |
| Underground growth target | FY24 → FY28 | Originally ">50% growth over 2–3 years" (August 2024). Now a A$750m annual run rate by end-FY28. |
| Dividend policy uplift | August 2025 and August 2026 | Payout range 10–25% (FY22) → 30–45% (FY26) → 35–45% of underlying EPS from FY27. |
| Engineering and minerals processing entry | 18 September 2026 | Aspect Engineering acquisition (EV A$75m; about 6.2% EPS-accretive; base-case IRR 40.4% before synergies). |
| International expansion | FY26 | Indonesia underground (Freeport, PT TTN); New Zealand (Snowy River); Malaysia (Langkawi seven-year extension). |
| Rio Tinto Pilbara Earthworks Panel | FY26 | Framework-agreement access to Rio Tinto Pilbara civil work. A$201m of awards to date (Brockman 4 MEM A$81m, WASP A$120m). |
| East Coast civil expansion | FY26 | Victoria (Ison Road extension, Yan Yean Road) and NSW (Mamre Road). |
| Together.Works. EVP | 2,026 | Group-wide employee value proposition to address skilled labour shortages. |
| Evotix HSEQ platform | FY26 | Group-wide HSEQ system of record. Refreshed critical risk framework. |
| Climate disclosure | FY26 | First AASB S2 mandatory climate-related financial disclosures, with limited assurance. Preliminary Scope 3 baseline ahead of FY27 disclosure. |
| Macmahon Foundation Community Grants | FY26 | Nine grants in the inaugural year. |
| Martu First Nations Dump Truck Training Academy | FY26 | At Telfer. |
Management guidance and medium-term targets
| Target | Value | Status |
|---|---|---|
| FY27 revenue guidance | A$2.85bn – A$3.05bn | Issued 18 August 2026. Excludes Aspect and future cost-escalation recoveries. A$2.2bn secured. |
| FY27 underlying EBIT(A) guidance | A$205m – A$225m | Midpoint implies +13% YoY and a 7.4% margin. |
| ROACE | 25% long term | 22.0% FY26 |
| Underground revenue run rate | A$750m p.a. by end-FY28 | About A$629m FY26 (derived) |
| Dividend payout | 35–45% of underlying EPS from FY27 | 41% FY26 |
| Tender pipeline | A$25bn, of which A$13.8bn is expected to be awarded within 12 months | As at 11 August 2026 |
Products & Services
Macmahon sells services, not products. The catalogue below is organised by division and drawn from the FY26 Annual Report "Our Capabilities" section and the project register. Pricing is contract-specific and not publicly disclosed. Contract values are given where announced.
Surface Mining
| Service line | Description / capability | Target customer | Flagship contracts (FY26) |
|---|---|---|---|
| Mine planning and analysis | Pit design, scheduling and optimisation support | Mid-tier and major miners | Integrated in all full-service contracts |
| Bulk and selective mining | Waste stripping and selective ore mining with owned fleet | Gold, coal, lithium, copper miners | Tropicana (AngloGold Ashanti, life-of-mine); Telfer (Greatland, life-of-mine; A$485m 42-month extension August 2026) |
| Drill and blast | Production and pre-split drilling and blasting | Open-pit operators | Telfer West Dome Stage 7 scope expansion |
| Load and haul | Excavators, dump trucks, front-end loaders, dozers | Open-pit operators | Byerwen (QCoal; A$792m 3-yr extension, option to A$1.32bn); Greenbushes (Talison Lithium, seven-year contract); King of the Hills (Vault; load-and-haul being internalised by client in 2026) |
| Crushing and screening / crusher feed | Run-of-mine feed and contract crushing | Coal, lithium, gold | Byerwen, Greenbushes |
| Fixed plant maintenance | Maintenance services for client processing plant | Mine owners | Batu Hijau (Indonesia) |
| Water management | Dewatering and surface water control | Open-pit operators | Bundled into contracts |
| Equipment supply and hire | Wet and dry hire of fleet | Coal and gold miners | Foxleigh (equipment hire and maintenance; completed November 2025) |
| Equipment maintenance, refurbishment and support | Component rebuilds at the Perth workshop; in-field maintenance | Internal and external clients | Perth Airport workshop |
| Quarrying | Full quarry operations | Cement producers | Langkawi Limestone Quarry (YTL Cement, Malaysia; seven-year extension in 2026, about A$32m) |
| Integrated Indonesian mining services | Mining and bulk earthworks, TSF embankments, pioneering works | Indonesian miners | Batu Hijau (Amman, life-of-mine, Phase 8 to about June 2028); Martabe (PT Agincourt); Awak Mas (Masmindo, seven years, about A$463m); Poboya (PT Citra Palu, completing November 2026) |
| Mine restarts | Recommissioning of mothballed open pits | Restart owners | Mount Carlton (Wolfram/Bumi Resources; A$150m, 34 months); Wonawinta Silver (Manuka Resources; A$190m five-year LOI) |
| Technology solutions partnering | Fleet management and telematics through partner OEMs | All | Technology Roadmap (surface and underground) |
| Workforce programs | Apprenticeships, graduate engineers, new-to-industry operators | Internal | Martu First Nations Dump Truck Training Academy at Telfer |
Underground Mining
| Service line | Description / capability | Target customer | Flagship contracts |
|---|---|---|---|
| Mine development | Decline and lateral development, portal establishment | Gold, copper, lithium developers | Snowy River (Endura, New Zealand; A$406.2m, five years from October 2026); Ravensthorpe (Medallion Metals; preferred contractor, about A$240m, 36 months); Groundrush (Central Tanami JV; A$38m, 14 months) |
| Mine production | Long-hole stoping, bogging, trucking | Operating mines | Boston Shaker (Tropicana JV); Daisy Milano and King of the Hills underground (Vault); Majestic (Black Cat Syndicate; A$55m + 12-month extension); Mt Marion (Mineral Resources; A$355m, three years) |
| Vertical development / shaft sinking | Shaft sinking, lining, remote shaft lining, fit-out | Deep mines | Fosterville (Agnico Eagle); Poboya shaft (Indonesia) |
| Raise drilling | Raise boring for ventilation and ore passes | Major miners | Olympic Dam (BHP, 30+ years) |
| Cablebolting and ground support | Cablebolting, shotcreting, meshing | Major miners | Granny Smith (Gold Fields); Fosterville |
| Paste and backfill | Paste plant and fill reticulation | Underground operators | Poboya paste plant |
| Specialist engineering and fabrication | Ore pass liners, winder refurbishment, emergency egress, pump stations, conveying and crushing | Major miners | Olympic Dam ore bin replacement and shaft rehabilitation |
| International underground | Development and exploration declines | Indonesian miners | Kucing Liar (PT Freeport Indonesia; 34 months, A$36m first 12 months); Toka Tindung (PT TTN; A$33m, 32 months); Tujuh Bukit (finishing December 2026); Poboya underground |
| Restart underground | Rehabilitation and dewatering of legacy workings | Restart owners | Mount Carlton underground LOI (about A$100m) |
Civil Infrastructure (Decmil brand)
| Service line | Description | Target customer | Flagship contracts |
|---|---|---|---|
| Bulk earthworks and mine civil | Earthworks, haul roads, drainage, TSFs | Iron ore, coal, gold miners | West Angelas Sustaining Project, Western Hill (Rio Tinto, A$120m); Rolleston (Glencore, A$12m); Perdaman urea plant bulk earthworks (Saipem Clough JV); Telfer TSF 7 and 8 |
| Road design and construction | Regional and urban roads | Miners and state road agencies | Marble Bar Road (HanRoy; A$104m Sections 2B/5 plus Section 3); Yan Yean Road Northern Package (MRPV, A$86m); Mamre Road Stage 2 early works (Transport for NSW, A$50m); Ison Road extension and rail overpass (Victoria) |
| Non-process infrastructure | Workshops, offices, warehouses | Miners and energy companies | Brockman 4 MEM Workshop (Rio Tinto/Hamersley, A$81m); Girrahween facility (Arrow Energy); WASP NPI hub and medical centre (Robe River) |
| Camps and accommodation villages | Design-and-construct remote villages | Miners and energy utilities | Jerriwah Village Stage 2A (Hamersley Iron, A$28m); Eva Copper 454-person village; Borumba Pumped Hydro camps (Queensland Hydro; second camp suspended) |
| Renewables balance of plant | Wind turbine foundations, tracks, cabling, switch rooms | Renewable developers and OEMs | Waddi Wind Farm 108MW (Tilt Renewables; Decmil share A$51m, JV with RJE Global); Warradarge Wind Farm Stage 2 (Vestas) |
| Water infrastructure | Dams, creek diversions, levees | Miners and governments | Various |
| Rehabilitation | Topsoil, revegetation, closure works | Miners | Peak Downs and Saraji (about 56 ha) |
| Rail, airport, bridgeworks, train loading facilities | Transport infrastructure | Governments and miners | Ison Road Rail Overpass |
| Federal-funded head contracting | Office of the Federal Safety Commissioner accreditation | Commonwealth-funded projects | Enables government tendering |
Training and support services
| Offering | Description |
|---|---|
| Registered Training Organisation (RTO) | Based at the Perth Airport facility. Simulator-based operator training, national traineeships, apprenticeships, high-risk work licences, leadership development. |
| Strong Minds, Strong Mines | Industry mental-health program, now in its seventh year. Won the 2026 Australian Mental Health Award for Best Practice in the Workplace. Delivered to 2,100+ workers at 17 sites in FY26. |
| Advisory / operational improvement | Coaching, cultural change programs and performance optimisation for mine owners. |
Pending: Engineering and Minerals Processing (Aspect Engineering Solutions)
Announced 18 September 2026; completion status not yet confirmed. Aspect provides front-end engineering, detailed engineering, project delivery, minerals processing, and operations and maintenance from Perth, supported by a licensed engineering hub in Vietnam. FY26 revenue was about A$75m, EBIT about A$15m, with more than 295 direct workers. It is to be run as a standalone business that retains its brand.
Financial Narrative
All figures A$m unless stated. Sources: FY22–FY26 results announcements and annual reports. FY22 revenue is reported only in rounded form ("$1.7bn"). Figures in the FY23 and FY24 columns use Business News/Morningstar exact revenue where available. "NA" means not disclosed in the sources reviewed.
Margins and growth
Commentary. Three distinct phases are visible.
-
FY22–FY23: scale without returns. Revenue grew, but EBIT(A) margins stayed at about 6% because of COVID-era labour shortages, WA cost inflation and heavy growth capex (FY22 capex A$279m, of which A$131m was growth). Statutory profit was depressed by write-offs and adjustments (FY22 adjustments of A$35.6m).
-
FY24: margin inflection. Revenue grew only 6.5%, but EBIT(A) rose 20% to a 6.9% margin as the business pivoted to underground work and exited Dawson South. Statutory NPAT (A$53.2m) was hit by the A$31.8m Calidus Resources impairment.
-
FY25–FY26: diversified growth. The Decmil acquisition added about A$400m of civil revenue in FY25, pushing revenue up 19%. In FY26 the mix shift produced the signature "EBITDA margin down, EBIT margin up" pattern. Underlying EBITDA grew just 1.7% while EBIT(A) grew 10.9%, as depreciation fell A$12.4m and lower-capex civil and underground work expanded. FY26 was the tenth consecutive year of meeting or beating guidance.
Statutory-to-underlying conversion has improved markedly. Statutory NPAT was 43% of underlying NPAT(A) in FY22 and 88% in FY26, which indicates fewer one-offs.
Balance sheet
FY25 net working capital and inventory are derived from FY26 percentage movements (NWC −20.7%; inventory +6.0%). The short-term/long-term debt split was not available in the sources reviewed. Borrowings include finance leases (FY26 lease-funded capex A$59.1m).
Commentary. The balance sheet has strengthened steadily. Net debt fell 45% from A$201.9m (FY23) to A$111.1m (FY26), and gearing fell from about 19% to 13%. FY25 net debt rose temporarily on Decmil acquisition funding before falling more than 30% from the 1H25 peak. Intangibles are small (about A$56m) relative to equity, because the Decmil price (EV A$127m) was largely backed by working capital, property and tax losses rather than goodwill. Total liabilities fell A$48.9m in FY26 because the group made its final FY25 tax payment after becoming a full Australian taxpayer. That cash-tax step-up was a key reason FY26 free cash flow fell 27%.
Cash flow
FY22/FY24/FY25 cash conversion is derived. FY23 and FY26 are company-reported. No buyback activity was identified for FY25–FY26.
Commentary. Capex intensity has fallen from about 16% of revenue in FY22 to about 7.8% in FY26, which validates the "capital-light" narrative. Free cash flow peaked in FY25 at A$140.7m before the tax normalisation. Dividends absorbed 39% of FY26 free cash flow, with the rest applied to debt reduction.
Returns and ratios
FY23 ND/EBITDA is derived (201.9/308.7). ROIC is proxied by the company's ROACE: underlying EBIT(A) ÷ average (total assets excluding cash − current liabilities excluding debt).
Commentary. ROACE progression (17.2% → 20.5% → 22.0%) is the central KPI. The long-term target is 25%, raised from 20% at FY25. Management also links executive incentives to ROACE. The 6.2x interest cover and 0.28x leverage mean the balance sheet is no longer a constraint. That explains why the group can fund the Aspect deal (A$30m upfront) from cash.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Revenue
| Segment | Revenue FY26 (AUD Mn) | Underlying EBIT(A) FY26 (AUD Mn) | EBIT(A) margin FY26 (%) | % of group revenue |
|---|---|---|---|---|
Mining (Surface + Underground) | 1,930 | 157 | 8.1 | 74 |
Civil Infrastructure (Decmil) | 672 | 37 | 5.5 | 26 |
Corporate / eliminations (derived) | 17 | -4 | — | — |
Group | 2,619.2 | 190.1 | 7.3 | 100 |
Revenue by Segment (%) and Revenue by Segment
| Division (AUD Mn) | FY24 | FY25 | FY26 |
|---|---|---|---|
Surface Mining revenue (FY26 derived from 50% share) | — | — | 1,310 |
Underground Mining revenue (FY24 derived from 26% share; FY26 from 24% share) | 530 | — | 629 |
Civil Infrastructure revenue (reported FY26) | — | — | 672 |
Underground + Civil combined revenue (FY25 derived from 42% share) | — | 1,019 | 1,301 |
Group revenue | 2,039.5 | 2,427.4 | 2,619.2 |
Division share of revenue (%)
| Division share of revenue (%) | FY24 | FY25 | FY26 |
|---|---|---|---|
Surface Mining | — | 58 | 50 |
Underground Mining | 26 | — | 24 |
Civil Infrastructure | — | — | 26 |
Underground + Civil | — | 42 | 50 |
Income Statement and Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue (AUD Mn) | 1,700 | 1,914.7 | 2,039.5 | 2,427.4 | 2,619.2 |
Revenue growth (%) | — | 12.6 | 6.5 | 19.0 | 7.9 |
Underlying EBITDA (AUD Mn) | 291.4 | 308.7 | 351.7 | 387.4 | 393.8 |
Reported EBITDA (AUD Mn) | — | — | 313.4 | 364.9 | 386.0 |
Underlying EBIT(A) (AUD Mn) | 100.8 | 116.6 | 140.3 | 171.4 | 190.1 |
Reported EBIT (AUD Mn) | — | — | 101.7 | 143.0 | 176.4 |
Depreciation excl. customer contract amortisation (AUD Mn) | — | — | — | 215.7 | 203.3 |
Net finance costs (AUD Mn) | — | — | — | — | 30.6 |
Underlying NPAT(A) (AUD Mn) | 63.0 | 67.6 | 91.9 | 102.4 | 114.8 |
Statutory NPAT (AUD Mn) | 27.4 | 57.7 | 53.2 | 73.9 | 101.1 |
Basic EPS statutory (A cents) | — | — | — | — | 4.72 |
Underlying EPS derived (A cents) | — | — | — | — | 5.32 |
Dividends per share (A cents) | 0.65 | 0.75 | 1.05 | 1.50 | 2.20 |
Dividend payout ratio of underlying EPS (%) | — | — | — | 31 | 41 |
Effective tax rate (%) | — | — | — | 32.3 | 30.6 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansMargin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Underlying EBITDA margin (%) | 17.2 | 16.2 | 17.2 | 16.0 | 15.0 |
Underlying EBIT(A) margin (%) | 5.9 | 6.1 | 6.9 | 7.1 | 7.3 |
Underlying NPAT(A) margin (%) | 3.7 | 3.5 | 4.5 | 4.2 | 4.4 |
Statutory net margin (%) | 1.6 | 3.0 | 2.6 | 3.0 | 3.9 |
CAGR metric (FY22–FY26) | Value (%) | — | — | — | — |
Revenue CAGR (derived) | 11.4 | — | — | — | — |
Underlying EBITDA CAGR (derived) | 7.8 | — | — | — | — |
Underlying EBIT(A) CAGR (derived) | 17.2 | — | — | — | — |
Underlying NPAT(A) CAGR (derived) | 16.2 | — | — | — | — |
Statutory NPAT CAGR (derived) | 38.6 | — | — | — | — |
DPS CAGR (derived) | 35.6 | — | — | — | — |
Balance Sheet and Per-Share Data
| Metric | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
Cash and equivalents (AUD Mn) | — | — | 263.9 | 309.7 |
Gross borrowings incl. leases (AUD Mn) | — | — | 426.3 | 420.7 |
Net debt (AUD Mn) | 201.9 | 146.6 | 162.5 | 111.1 |
Net assets / equity (AUD Mn) | — | — | 692.3 | 740.1 |
Net tangible assets (AUD Mn) | — | — | 630.7 | 684.1 |
Goodwill and intangibles derived (AUD Mn) | — | — | 61.6 | 56.0 |
NTA per share (A cents) | — | — | 29.3 | 31.7 |
Net working capital invested (AUD Mn) | — | — | 93.3 | 74.0 |
Inventory (AUD Mn) | — | — | 104.2 | 110.4 |
Current trade and other receivables (AUD Mn) | — | — | 455.4 | 422.5 |
Current trade and other payables (AUD Mn) | — | — | 466.3 | 458.9 |
Cash plus undrawn facilities (AUD Mn) | — | — | 538.4 | 566.3 |
Cash Flow and Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Underlying operating cash flow excl. interest and tax (AUD Mn) | 269.8 | 306.0 | 301.0 | 407.4 | 387.4 |
Cash conversion from underlying EBITDA (%) | 92.6 | 99.1 | 85.6 | 105.2 | 98.4 |
Capex on PP&E total (AUD Mn) | 279 | — | — | 221.2 | 204.3 |
of which funded in cash (AUD Mn) | — | — | — | 178.5 | 145.2 |
of which via finance leases (AUD Mn) | — | — | — | 42.7 | 59.1 |
Free cash flow after capex, interest, tax (AUD Mn) | — | — | 74.5 | 140.7 | 103.1 |
Dividends paid (AUD Mn) | — | — | — | 24.5 | 40.7 |
Share buybacks (AUD Mn) | — | — | — | 0 | 0 |
Margin Analysis (%) and Financial Ratios (x)
| Ratio | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
ROACE company definition (%) | — | 17.2 | 20.5 | 22.0 |
ROE company definition, underlying NPAT(A) (%) | — | — | 15.4 | 16.0 |
Gearing ND/(ND+E) (%) | — | 18.8 | 19.0 | 13.1 |
Net debt / underlying EBITDA (x) | 0.65 | 0.42 | 0.42 | 0.28 |
Interest cover EBIT(A)/net finance costs, derived (x) | — | — | — | 6.2 |
Region revenue (AUD Mn)
| Region revenue (AUD Mn) | FY2025 | FY2026 |
|---|---|---|
Australia | 2,225.7 | 2,359.3 |
Indonesia | 198.1 | 256.1 |
Other international (Malaysia, New Zealand, other) | 3.6 | 3.8 |
Group | 2,427.4 | 2,619.2 |
Region growth and share (%)
| Region growth and share (%) | FY2026 YoY growth (%) | FY2026 share (%) |
|---|---|---|
Australia | 6.0 | 90.1 |
Indonesia | 29.3 | 9.8 |
Other international | 5.6 | 0.1 |
Region half-year revenue FY26 (AUD Mn) | 1H26 | 2H26 |
Australia | 1,178.1 | 1,181.2 |
Indonesia | 127.1 | 129.0 |
Other international | 1.8 | 2.0 |
Segment Overview
| Segment | Australia | Indonesia | Malaysia | New Zealand |
|---|---|---|---|---|
Surface | Tropicana, Telfer, Greenbushes, King of the Hills, Byerwen, Mount Carlton, Wonawinta (LOI) | Batu Hijau, Martabe, Awak Mas, Poboya | Langkawi Quarry | — |
Underground | Boston Shaker, Daisy Milano, King of the Hills, Majestic, Mt Marion, Ravensthorpe (preferred), Groundrush, Granny Smith, Fosterville, Olympic Dam, Mount Carlton (LOI) | Kucing Liar (Freeport), Toka Tindung, Tujuh Bukit, Poboya | — | Snowy River (from October 2026) |
Civil (Decmil) | WA Pilbara (Rio Tinto panel), Marble Bar Road, Waddi/Warradarge wind, Victoria (Ison Road, Yan Yean Road), NSW (Mamre Road), Queensland (Eva Copper, Borumba, Peak Downs) | Poboya shaft and paste plant (civil scope) | — | — |
Share Price & Returns
| Reference point | Price (AUD) | Source |
|---|---|---|
Release of FY24 results (20 August 2024) | about 0.22–0.29 | Stockopedia (A$0.29, mid-2024); market cap about A$636m reported August 2024 |
Release of FY25 results (19 August 2025) | 0.360 | InvestSMART |
9 June 2026 | 0.93 | FNArena |
6 August 2026 | 1.04 | Director trade price |
18 September 2026 (Aspect announcement) | 0.99 → 1.063 | InvestSMART / Grafa |
52-week range (to about September 2026) | 0.265 – 1.030 (intraday highs later about 1.06) | SmallCaps |
Total price return (approximate) | Value (%) | — |
1-year (Sep 2025 → Sep 2026) | about 145–190 | — |
Valuation Multiples
| Multiple | Macmahon (derived, FY26 actuals) | Macmahon (derived, FY27 guidance midpoint) |
|---|---|---|
P/E statutory (x) | 22.5 | — |
P/E underlying (x) | 19.9 | — |
EV/underlying EBITDA (x) | 6.1 | — |
EV/underlying EBIT(A) (x) | 12.6 | 11.2 |
EV/Sales (x) | 0.92 | 0.81 |
P/B (x) | 3.1 | — |
Dividend yield FY26 DPS (%) | 2.1 | — |
Analyst Ratings & Targets
| Broker | Rating / target | Date |
|---|---|---|
Canaccord Genuity | Buy; target raised to A$0.82 from A$0.49 | After 1H26 (February 2026) |
Bell Potter | Positive on Indonesian underground awards; flagged Vault roll-off | 2026 |
FNArena consensus | Target A$0.70 (−24.7% vs A$0.93) | June 2026 snapshot |
TipRanks (stale) | Buy, A$0.37 target | August 2025 |
Dividend (A cents, fully franked)
| Dividend (A cents, fully franked) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Interim DPS | 0.30 | — | 0.45 | — | 0.95 |
Final DPS | 0.35 | — | 0.60 | — | 1.25 |
Total DPS | 0.65 | 0.75 | 1.05 | 1.50 | 2.20 |
Capital Markets
| Item | Status |
|---|---|
Buyback authorisation | None current identified |
Credit ratings (Moody's / S&P / Fitch) | No public credit rating identified; not publicly disclosed |
Debt facilities | Revised bank facilities implemented end-FY25; diversified financiers. Effective borrowing cost about 6.72% (Simply Wall St). |
Gross borrowings (incl. leases) at 30 June 2026 | A$420.7m |
Undrawn facilities at 30 June 2026 (derived) | about A$256.6m (A$566.3m liquidity − A$309.7m cash) |
Debt maturity profile | Not publicly disclosed in sources reviewed (see FY26 financial statements, financial risk note) |
Analyst Conclusions
Management guidance
FY27 guidance, issued 18 August 2026:
-
Revenue of A$2.85–3.05bn (+9% to +16%), with A$2.2bn already secured (about 75% of the midpoint).
-
Underlying EBIT(A) of A$205–225m (+8% to +18%).
Guidance excludes Aspect, future cost-escalation recoveries, the Medallion award (announced 12 August) and short-term churn work. This suggests modest upside, as subsequent wins such as Telfer (A$485m) add to coverage.
Consensus expectations
Mid-2026 broker targets (A$0.70–0.82) sat below the prevailing share price (about A$1.00–1.06). This implies either pending upgrades or a valuation-stretch risk.
Bull case
-
Compounding ROACE. Every incremental dollar of revenue is coming from lower-capital underground, civil and (soon) engineering work. ROACE moved from 17.2% to 22.0% in two years. Reaching the 25% target at FY27 guidance would support further rerating towards peer multiples.
-
Visibility and pipeline conversion. The A$5.9bn order book plus about A$1.5bn of post-balance-date wins, and A$13.8bn of tenders due within 12 months, give credible line-of-sight to the A$750m underground target and to FY28 revenue above A$3bn.
-
Capital-return capacity plus accretive M&A. At 0.28x leverage, Macmahon can fund Aspect (about 6.2% EPS accretion at about 5x EBIT), raise payouts to 35–45%, and still pursue bolt-ons.
Bear case
-
Quality of earnings growth. FY26 EBITDA grew just 1.7%. EBIT growth came largely from falling depreciation, which cannot continue indefinitely. Civil margins of 5.5% may cap blended margin expansion.
-
Roll-off and insourcing risk. Genesis (6%) has ended and Vault (11%) is internalising surface load-and-haul. Gold is 52% of revenue, so a gold-price retracement would slow restart and development awards (Mount Carlton, Wonawinta, Ravensthorpe) and pressure junior-client credit, as Calidus showed.
-
Valuation already discounts success. At about 20x underlying P/E and about 3x book, after a roughly 145–190% one-year rally, the stock is priced well above mid-2026 broker targets. Any execution miss (safety event, civil lump-sum overrun, fuel-cost recovery lag) could trigger de-rating.
Key catalysts and monitorables (next 12 months)
| Catalyst / monitorable | Expected timing |
|---|---|
| 2026 AGM: guidance reaffirmation, Aspect completion update, director elections (Pervan, Quinn, Sidarto) | 23 October 2026 |
| Completion of Aspect acquisition and integration plan | Q4 CY2026 |
| Snowy River mobilisation (October 2026) and first gold (December 2026) | Q4 CY2026 |
| Ravensthorpe contract execution (preferred → formal) and start (December quarter 2026) | Q4 CY2026 |
| Mount Carlton underground LOI conversion to contract | Near term |
| 1H FY27 results: run-rate to A$205–225m EBIT(A); civil margin trend | About February 2027 |
| Rio Tinto panel award flow; East Coast civil wins | Ongoing |
| Amman's shareholding intentions after the board-seat reduction | Ongoing |
| Fuel-cost pass-through and labour availability | Ongoing |
| Safety performance after the Fosterville fatality | Ongoing |
| FY27 results; ROACE versus 25% target; underground run rate | August 2027 |
Analyst verdict
Macmahon in late 2026 is a markedly different business from the capital-hungry, surface-heavy contractor that nearly fell to CIMIC in 2017. Management has executed a disciplined, decade-long repositioning. Surface mining has fallen from about 90% of revenue in FY18 to 50% in FY26. Underground and civil now make up the other half. Capex intensity has roughly halved since FY22. ROACE has climbed to 22%, net debt has fallen to A$111m, and dividends have more than tripled in four years. The record of ten consecutive years meeting or beating guidance is rare in Australian contracting and deserves a quality premium.
The FY26 result showed both the strengths and the limits of the model. Earnings growth was real (EBIT(A) +11%, statutory NPAT +37%), but it relied more on mix and lower depreciation than on top-line momentum. Underlying EBITDA was almost flat. The FY27 guidance midpoint implies a return to double-digit growth, underwritten by an order book that has been replenished aggressively since balance date: Telfer, Snowy River, Mt Marion and Ravensthorpe together total about A$1.5bn. Against that, the client book is concentrated (top seven at 67%), the commodity mix is gold-heavy (52%), and identifiable roll-offs (Genesis, Vault surface, Poboya surface, Tujuh Bukit) must be backfilled.
The Aspect acquisition is strategically logical and financially modest (A$30m upfront, roughly 5x EBIT). It moves Macmahon earlier into the project lifecycle, but it is small relative to group scale. Its main value is optionality and client access rather than immediate earnings.
On valuation, the stock has rerated sharply, to about 20x underlying earnings and 12–13x EV/EBIT(A). That multiple now prices in continued delivery. Our assessment: fundamentally improving, financially robust, and strategically well directed, but fairly valued after the rally. The risk/reward from here depends on Macmahon reaching the 25% ROACE target and the A$750m underground run rate while expanding civil margins. Investors should watch 1H FY27 EBITDA growth and civil margins closely, as these will show whether the growth is organic and durable rather than driven by accounting mix.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Background | Committees | Shares held (FY26 AR) |
|---|---|---|---|---|---|
Greg Evans | Independent Non-Executive Chair | Director 1 November 2024; Chair 24 October 2025 | 25+ years in financial services and capital markets; 10+ years as Partner/Principal Director, KPMG Australia M&A. BCom (Econ), GradDipAppFin, GAICD. NED of Yandal Resources. | Chair, Nomination | 64,100 (plus 64,100 share rights) |
Michael Finnegan | Managing Director & CEO | MD 1 October 2019 | 25+ years in mining; 20 years in senior line management on both Australian coasts and across Asia. BSc (Mining). | Member, Nomination | 12,557,328 (plus 14,423,392 share rights) |
Dharma Chandran | Independent NED | 1 February 2024 | Chief People and Corporate Services Officer, Toll Group; ex-Chief People Officer, ABC; ex-CHRO, Leighton Holdings. BCom, LLB, MCom. | Chair, Remuneration & Culture; Nomination | 364,348 |
Suzan Pervan | Independent NED | 1 November 2025 | Chartered Accountant; ex-EY and PwC; co-founder of Gooding Pervan. Ex-NED, Pioneer Credit. BBus, CA, GAICD. | Chair, Audit & Risk; Remuneration & Culture; Nomination | Nil |
Tom Quinn | Independent NED | 16 March 2026 | Multi-sector executive (mining, E&C, manufacturing, oil and gas). Chair, Nagambie Resources. BSc (MechEng), MBA (Monash). | Audit & Risk; Nomination | Nil |
Grahame White | Independent NED | 1 February 2024 | Construction, energy and resources executive with Asian infrastructure experience. NED, Metals X. BE (MechEng). | Audit & Risk; Remuneration & Culture; Nomination | 500,000 |
Arief Sidarto | Non-Independent NED (Amman nominee) | 29 April 2026 | President Director of PT Amman Mineral Internasional Tbk; 30+ years in finance, restructuring and capital markets. Wharton (finance and engineering), Harvard MBA. | Nomination | 2,619,447 |
Executive Leadership Team
| Name | Title | Tenure / background |
|---|---|---|
Michael Finnegan | MD & CEO | See above |
Ursula Lummis | Chief Financial Officer | Joined 2018 as Group Financial Controller; CFO since 1 November 2021. 20+ years at KPMG South Africa and Australia. CA, BCom (Hons). |
Peter Pollard | Chief Corporate Development Officer | Joined August 2020 as CFO; CCDO since November 2023. 40+ years in contracting. Leads M&A (Decmil, Aspect). |
Nicola Hamilton | Chief People Officer | Joined February 2021; 25+ years in HR with global resources companies. |
Maha Chaar | General Counsel & Company Secretary | Joined 2021; GC January 2022; Company Secretary January 2024. LLM, LLB (Hons), BSc. |
Bryn Vaughan | Executive GM HSSEQT | Ex-Decmil and CPB Contractors; appointed December 2025. |
Jason McCallum | MD – Surface Mining Australia | Joined June 2023; MD since October 2024. Ex-BHP, Vale Coal, Yancoal. |
Luke Reymond | MD – Underground Mining Australia | 25 years in surface and underground, including six years in Africa and Asia. |
Deon Baddock | MD – Civil Infrastructure West | Ex-Decmil; appointed September 2025. Chartered professional engineer. |
Simon Barnes | MD – Civil Infrastructure East | Ex-Decmil, Acciona and Lendlease Engineering; appointed September 2025. |
Douglas Hamilton | GM – Asia; President Director, Indonesian business | Joined 2016; 23 years previously at Leighton Asia. |
Major Shareholders
| Holder | Stake | Notes |
|---|---|---|
PT Amman Mineral Internasional Tbk group (via Amman Mineral Contractors (Singapore)) | About 44% at issuance (2017). | Described as "Macmahon's largest shareholder" on 1 September 2026. Entitled to nominate up to two directors; currently nominates one. |
Michael Finnegan (CEO) | 12.56m shares (~0.6%) | Plus 14.4m share rights |
Arief Sidarto | 2.62m shares | Amman nominee |
Other directors combined | About 0.93m shares | — |
Competitive Landscape
Competitors by Segment
| Segment | Competitor | Type | Notes |
|---|---|---|---|
Surface mining | Thiess (incl. former MACA) | Private (CIMIC/Elliott) | Largest global contract miner; strong in Australian coal and Indonesia |
Surface mining | NRW Holdings (Golding, NRW Mining) | ASX: NWH | FY26 revenue A$4.29bn; mining, civil, MET and EMIT pillars |
Surface mining | Perenti (Ausdrill / Perenti Mining) | ASX: PRN | Surface and underground; Africa exposure |
Surface mining | Mineral Resources (MinRes Mining Services) | ASX: MIN | Captive and third-party services; also a Macmahon client (Mt Marion) |
Surface mining | Emeco Holdings | ASX: EHL | Equipment rental (sold underground contracting to Macmahon) |
Underground | Barminco (Perenti) | Part of ASX: PRN | Largest Australian underground miner |
Underground | Byrnecut | Private | Major Australian and international underground contractor |
Underground | Pybar Mining Services | Private | WA underground specialist |
Underground | Redpath Australia | Private (Redpath / ATS) | Shafts, raise boring and underground |
Civil infrastructure | NRW Civil | ASX: NWH | FY26 civil revenue A$862.5m |
Civil infrastructure | Monadelphous | ASX: MND | FY26 revenue A$2.98bn (incl. JV share); engineering construction and maintenance |
Civil infrastructure | Civmec, SRG Global, BMD, Georgiou | ASX / private | WA and East Coast civil peers |
Civil infrastructure | Downer, CPB Contractors, Acciona | ASX / private / global | Large-scale transport civil |
Indonesia mining | PT Pamapersada Nusantara (United Tractors) | IDX | Dominant Indonesian contract miner |
Indonesia mining | BUMA (Delta Dunia) | IDX | Coal-focused; also in Australia via BUMA Australia |
Indonesia mining | Petrosea | IDX | Mining and engineering services |
Engineering (Aspect adjacency) | Lycopodium, GR Engineering Services, Sedgman (CIMIC), Mincore | ASX / private | Front-end and process plant engineering |
Peer Comparison FY2027
| Metric FY26 | Macmahon | NRW Holdings | Monadelphous |
|---|---|---|---|
Revenue (AUD Mn) | 2,619.2 | 4,293.3 | 2,980 |
Revenue growth (%) | 7.9 | 31.4 | 31.5 |
Underlying EBITA / EBIT(A) (AUD Mn) | 190.1 | 288.6 | — |
Underlying EBITA margin (%) | 7.3 | 6.7 | — |
Underlying EBITDA (AUD Mn) | 393.8 | 486.2 | — |
Underlying NPAT (AUD Mn) | 114.8 | 182.7 | — |
FY27 revenue guidance midpoint (AUD Mn) | 2,950 | 4,700 | — |
FY27 EBITA guidance midpoint (AUD Mn) | 215 | 325 | — |
Order book (AUD Bn) | 5.9 | 7.5 | — |
Recent Developments
--