Magnetite Mines Limited Overview
Magnetite Mines is a pre-revenue South Australian iron ore developer. Its flagship asset is the 100%-owned Razorback Iron Ore Project in the Braemar Iron Province, about 240 km north-east of Adelaide. The company reports a global JORC Mineral Resource of about 6.6 billion tonnes across Razorback (3.84 Bt), Ironback Hill (1.19 Bt) and Muster Dam (1.55 Bt). Razorback also carries a Probable Ore Reserve of about 2.0 Bt. The company positions Razorback as one of the few undeveloped projects globally able to produce 67.5–68.5% Fe "direct-reduction-grade" magnetite concentrate at scale. That product is the feedstock for gas- or hydrogen-based DRI and electric arc furnace steelmaking.
Razorback holds federal Major Project Status (since 11 Feb 2026), and a 5 Mtpa Mining Lease Proposal is under South Australian assessment. However, the company has a micro-capitalisation, a going-concern qualification and no binding strategic partner. In May 2026 it pivoted to a "strategic reset": cost cutting, staged development, and secondary exploration for rare earths, copper-silver and gold.
Company's own description
The company describes itself as an ASX-listed iron ore company. It is focused on developing magnetite iron ore resources in the Braemar Iron Formation of South Australia. It holds a 100%-owned Mineral Resource of 6.6 billion tonnes and is developing Razorback, about 240 km from Adelaide. It argues Razorback is one of the few undeveloped magnetite projects globally capable of producing premium DR-grade concentrate at scale, a key feedstock for green iron and lower-emissions steel (standard "About Magnetite Mines" boilerplate, July 2026). Since 2025 the boilerplate also cites a substantial South Australian tenement portfolio prospective for rare earth elements, copper, silver and gold. The FY2025 Directors' Report defines the principal activity as "mineral exploration in Australia".
Business model
Stage: pre-development / exploration and evaluation. There is no production and no operating revenue.
Revenue model (current): - Nil operating revenue.
- "Income" consists of bank interest, R&D tax incentive refunds, fuel tax credits and occasional asset-sale gains. FY2025 interest and other income was A$226,151, against A$371,856 in FY2024.
Intended future revenue model: sale of premium magnetite concentrate under long-term offtake agreements, initially 5 Mtpa of concentrate. Customers would be integrated steelmakers and DRI/HBI producers moving to EAF routes.
Intended corporate structure: an unincorporated joint venture with "motivated investors and offtake partners", with Magnetite Mines as operator. The FY2025 Annual Report sets out this preferred model, which is common for large Australian resource projects. It shares capital burden and aligns offtake with equity.
Funding model to date: equity issues (rights issues, placements), unsecured convertible notes (C/M Capital, January 2025) and director fee-for-equity swaps. Royalty funding (via ProspEx) and Chinese strategic investment are under evaluation (Q4 FY2026).
Value-chain position
| Stage | MGT involvement |
|---|---|
| Exploration / resource definition | Core activity (Razorback, Iron Peak, Ironback Hill, Muster Dam, REE / Cu-Ag / Au prospects) |
| Mining and beneficiation (crush, grind, magnetic separation, flotation) | Planned (Razorback 5 Mtpa concentrate) |
| Logistics (haul road → Hillgrange intermodal → rail → port) | Planned with partners (Aurizon rail; Flinders Ports at Port Pirie; CSL transhipment) |
| Pelletising / DRI / HBI | Not intended to be owned by MGT. Envisaged by Green Iron SA to be built by third-party steelmakers at Port Pirie by the early 2030s. |
| EAF steelmaking | End customer |
Upstream: mine and concentrator.
Customer types and end-markets (prospective)
Customer types: - Japanese, Korean, Chinese and other Asian integrated steelmakers converting to EAF/DRI. JFE Shoji was the lead counterparty until 31 Dec 2025.
-
Trading houses.
-
Prospective Australian green-iron producers in South Australia's "Iron Triangle" (Whyalla, Port Augusta, Port Pirie).
End-markets: seaborne high-grade iron ore (65%+ Fe) and DR-grade pellet feed (67.5%+ Fe). For the exploration portfolio: rare earth oxides (Nd/Pr magnet metals), copper, silver and gold.
Independent characterisation
Magnetite Mines is best characterised as a single-asset, large-tonnage, low-grade-head / high-grade-product magnetite development company. It is in a severe funding squeeze. The geological endowment is genuinely large. The project has meaningful regulatory momentum, including the MLP, EPBC accreditation, Major Project Status and an approved Australian Industry Participation Plan.
However, the project's DFS remains unfunded. The flagship strategic partner (JFE Shoji Australia) allowed its non-binding HoA to lapse on 31 December 2025. Equity value has collapsed from about A$248M market capitalisation at June 2021 to about A$4M.
Several factors create an extreme valuation disconnect between the project's stated scale and its market capitalisation:
-
capital intensity of close to A$2 billion (DISR estimate);
-
a 10–12 GL/yr water requirement;
-
a slowdown in global green-steel investment.
The May 2026 strategic reset concedes this. It reorients toward staged, lower-capex pathways such as dry magnetic separation and early-revenue options, and adds critical-minerals optionality to sustain market interest.
Strategy
Stated strategy (themes)
FY2025 Annual Report:
-
Develop Razorback as a cornerstone supplier of premium magnetite for low-carbon steelmaking.
-
Develop via a JV with investors and offtakers, with MGT as operator.
-
Secure DFS funding via a binding transaction.
-
Complete MLP assessment and land access.
-
De-risk water supply.
-
Run low-cost, disciplined exploration for gold and critical minerals.
May 2026 strategic reset. The reset responds to funding constraints, inflation and a slower-than-expected green-steel transition. Its pillars are:
-
A staged, capital-efficient Razorback pathway, including early-revenue options and dry magnetic separation to cut capital intensity.
-
Accelerated strategic funding, partnership and offtake engagement.
-
Further cost-base reduction through workforce optimisation and austerity.
-
Preservation of approvals and optionality.
-
Greater emphasis on REE, copper and gold value.
-
Pursuit of non-debt funding and government support for infrastructure.
-
Advocacy for magnetite to be recognised as a Critical Mineral in Australia.
Initiatives (last 24 months)
| Initiative | Date | Description | Status (Oct 2026) |
|---|---|---|---|
| JFE Shoji Australia HoA | Jul 2024 – Dec 2025 | DFS funding for up to 10% Stage 1 offtake over 15 years | Lapsed 31 Dec 2025 |
| Green Iron SA consortium | Oct 2024 → | With Aurizon, Flinders Ports, GHD; CSL added Nov 2025. Port Pirie export and green-iron hub. | Active; Port Pirie export concept released Mar 2026 |
| Saline-water flotation | Jul 2024 → | Proprietary process; provisional patent Apr 2025 | Optimisation testwork |
| Board / cost restructure | Sep 2024 | Board cut from five NEDs to two; over A$600k annual savings | Completed |
| C/M Capital convertible notes | Jan 2025 | Up to A$7M; A$3.54M drawn | A$2.714M outstanding; maturities extended 12 months (Aug 2026) |
| MLP lodgement | Mar 2025 | 5 Mtpa, plus four Miscellaneous Purposes Licences | Validity assessment done Nov 2025; public consultation completed; regulatory assessment ongoing |
| Multi-commodity exploration | Aug 2025 → | REE (Ironback Hill), Cu-Ag (Mutooroo Ridge), Au (Manna Hill) | Active, low-cost |
| ZEN Energy MoU | Renewed Dec 2025 | Energy / green-iron collaboration with MGT as raw-material supply partner (details limited) | Active (non-binding) |
| Major Project Status | Feb 2026 | Federal facilitation via the Major Projects Facilitation Agency, three years | Active to Feb 2029 |
| Australian Industry Participation Plan | Approved 9 Mar 2026 | Required under the Australian Jobs Act | Approved |
| GC Partners Asia mandate | May–Aug 2026 | China-focused strategic investor engagement | Concluded after initial three months |
| ProspEx royalty evaluation | 2,026 | Digital fractional royalty platform for wholesale investors | Under evaluation |
| Staged / low-capex study update | 2,026 | Development options, beneficiation tech, water solutions | Market update promised on completion |
Guidance / targets
There are no financial guidance or medium-term financial targets; the company is pre-revenue.
Non-financial targets historically stated:
-
DFS completion: originally "end of 2022", later contingent on partner funding.
-
Production timing: "2024" in 2021–2022 materials, now indefinite.
-
Green Iron SA aspiration: DRI/HBI from Port Pirie by the early 2030s.
Products & Services
Magnetite Mines sells no products today. Its "portfolio" consists of mineral projects and a planned concentrate product. Each is catalogued below.
Planned product: DR-grade / premium magnetite concentrate (Razorback)
| Attribute | Detail |
|---|---|
| Description | Premium-grade magnetite concentrate, targeted at 67.5%–68.5% Fe |
| Specification targets | DR-grade (low silica/alumina) suitable for DR pelletising and DRI-EAF steelmaking. The Iron Peak composite achieved DR-grade in fresh and saline water. Razorback composites achieved DR-grade in fresh water and high but more variable grades in saline water (FY2025 AR). |
| Planned scale | 5 Mtpa concentrate under the MLP (Stage 1). A 2023 expansion option ran from 5 to 10 Mtpa after five years. |
| Mine life | About 38–39 years (DISR: 38-year operation; Mining Weekly: 39-year scenario) |
| Target customers | EAF/DRI steelmakers in Japan, Korea, China, Europe and Australia; Port Pirie green-iron hub participants |
| Pricing model | Not disclosed. It would likely be priced off a 62% / 65% Fe index with a high-grade / DR premium. |
| Status | Pre-DFS. The PFS-level work dates from 2021, with optimisation in 2023. |
Mineral projects
| Project | Commodity | Key data | Stage | Source |
|---|---|---|---|---|
| Razorback deposit (Razorback Ridge, EL 6353 etc.) | Magnetite | MRE 3,230 Mt @ 14.56% eDTR; 17.43% Fe (8% eDTR cut-off) | Resource and reserve; MLP lodged | FY2025 AR |
| Iron Peak deposit | Magnetite | MRE 607 Mt @ 17.70% eDTR; 17.24% Fe. Maiden Probable Reserve 362 Mt (Jun 2023, 16.8% recovery). Prioritised for early production. | Resource and reserve | FY2025 AR; Mining Monthly |
| Razorback Project (combined) | Magnetite | MRE 3,837 Mt (1,973 Mt Indicated, 1,864 Mt Inferred) @ 15.05% eDTR; Probable Ore Reserve about 2.0 Bt | MLP under assessment; Major Project Status | FY2025 AR |
| Ironback Hill | Magnetite | 1,187 Mt Inferred @ 23.2% Fe (no cut-off) | Resource | FY2025 AR |
| Ironback Hill REE | Clay-hosted REE | Re-assays 356–1,153 ppm TREO (Aug 2025). 2026 air-core drilling (37 holes) peaked at 1m @ 4,937 ppm TREO (969 ppm Nd2O3). 9m @ 1,569 ppm TREO in PLAC0015. | Early exploration | Q4 FY2026 report |
| Braemar Creek (EL7100) | REE (drainage extension) | Granted Jan 2026; secures downstream drainage systems | Early exploration | Q4 FY2026 report |
| Muster Dam (EL 6746) | Magnetite | 1,550 Mt Inferred @ 18.7% Fe (10% mass recovery cut-off) | Resource | FY2025 AR |
| Mutooroo Ridge (EL 6877) | Copper-silver | Re-assay of 1970s core: 11m @ 1.4% Cu; 8m @ 38.5 g/t Ag. Located in the Broken Hill Domain, Curnamona Province. | Early exploration | Australian Mining; ASX 17 Mar 2026 |
| Manna Hill (EL7106) | Gold | Desktop review identified historical workings and quartz-sulphide veins. 171 historical RC samples (Boomerang prospect) submitted for re-assay. | Desktop / early | Q4 FY2026 report |
| Other ELs (Pualco EL6126, Red Dragon EL6127, Dragon's Tail EL5902, Sister's Dam EL6037, Braemar EL6788, Lipson EL6745, Manunda North EL6878) | Magnetite / multi-commodity | Part of the about 2,500 km² tenement package | Exploration | Q4 FY2026 report |
Global Mineral Resource total: about 6,574 Mt Indicated and Inferred (FY2025 AR).
Technology / IP "products"
| Item | Description | Year | Status |
|---|---|---|---|
| Saline-water flotation process | Proprietary reagent regime and flowsheet adaptation enabling seawater use in magnetite flotation. It could reduce or avoid freshwater or desalination needs. | Provisional patent lodged April 2025 | Optimisation testwork ongoing. Fresh water remains the base case. |
| Dry magnetic separation pathway | Lower-capex beneficiation concept cited in the May 2026 reset | 2,026 | Under evaluation; no study published |
| "foresight" sustainability platform | Company ESG / stakeholder framework | Launched Jun 2023 | Active |
Financial Narrative
Basis:
-
FY2021–FY2023 figures are from third-party aggregators (Kalkine, MarketScreener, InvestSMART), which draw on annual reports.
-
FY2024–FY2025 figures are from the FY2025 Annual Report and the Dec-2025 Interim FS.
-
FY2026 figures are Appendix 5B cash flows only.
Income statement
Notes:
-
Margins (gross, operating, EBITDA, net) are not meaningful with zero revenue. Aggregators show net margins of about -2,270% to -2,573% only because they treat other income as revenue.
-
A revenue CAGR is not meaningful.
-
Sources conflict on EPS. MarketScreener's adjusted EPS (shown) differs from InvestSMART's (-4.9c FY23, -4.0c FY24, -2.4c FY25) because of different share-count bases.
-
Half-year EPS was -1.14c (H1 FY2026) against -2.03c (H1 FY2025).
Half-year to 31 Dec 2025 (Interim FS, A$):
Commentary: Losses peaked in FY2023 at -A$5.33M, when optimisation studies and an expanded team were being funded. They have declined since, through FY2024 (-A$4.85M), FY2025 (-A$4.19M) and the H1 FY2026 run-rate (-A$1.88M for six months). The drivers are the September 2024 board downsizing (over A$600k a year saved), a CFO departure that was not backfilled, director fees part-paid in shares, and the May 2026 reset. Most project spend is capitalised to exploration and evaluation (E&E), so the P&L understates cash burn.
Balance sheet
Sources: Kalkine/MarketScreener aggregator for FY2021–FY2023 and for net debt. FY2024–FY2025 figures are from company statements, including the Interim FS comparatives.
31 Dec 2025 snapshot (Interim FS):
-
Cash A$2.818M
-
E&E asset A$39.683M
-
Total assets A$43.298M
-
Convertible notes A$2.376M
-
Total liabilities A$3.496M
-
Equity A$39.802M
-
Contributed equity A$102.58M
-
Accumulated losses A$78.52M
-
Working capital deficit A$0.337M
30 Jun 2026: cash A$2.014M (Appendix 5B). Convertible notes with a face value of A$2.714M were outstanding.
Commentary:
-
The balance sheet is dominated by capitalised E&E: about 92–94% of total assets.
-
Liquidity has deteriorated structurally. Current assets fell from A$20.1M (FY2022) to A$1.4–1.7M (FY2024–FY2025).
-
The company moved from net cash to net debt in FY2025 when it drew the C/M Capital notes.
-
There is impairment risk to the A$39.7M E&E carrying value if the project is deferred or tenure lapses. The FY2026 strategic reset makes this a key item to watch in the FY2026 audit.
Cash flow
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Revenue
| Segment | Contents | Revenue FY2023 (AUD Mn) | Revenue FY2024 (AUD Mn) | Revenue FY2025 (AUD Mn) | Pre-tax result FY2025 (AUD Mn) | Share of total |
|---|---|---|---|---|---|---|
Mineral exploration – Australia | All projects (Razorback, Iron Peak, Ironback Hill, Muster Dam, REE / Cu-Ag / Au prospects) | 0 | 0 | 0 | -4.19 | 100% |
Results by Segment
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Exploration segment operating revenue (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Interest and other income (AUD Mn) | 0.02 | 0.195 | 0.213 | 0.372 | 0.226 |
Group Entities
| Entity | Ownership | Country | Role |
|---|---|---|---|
Magnetite Mines Limited | Parent (ASX-listed) | Australia | Holding / corporate |
Razorback Iron Pty Ltd | 100% | Australia | Razorback tenure / project entity |
Razorback Operations Pty Ltd | 100% | Australia | Intended operating entity |
Red Dragon Mining Pty Ltd | 100% | Australia | Tenement holder (Red Dragon EL 6127 area) |
Ironback Pty Ltd | 100% | Australia | Ironback Hill tenure |
Income Statement and Per-Share Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Operating revenue (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Interest and other income (AUD Mn) | 0.02 | 0.195 | 0.213 | 0.372 | 0.226 |
Gross profit (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
EBITDA (AUD Mn) | -1.669 | -3.547 | -5.4 | -4.846 | -4.055 |
EBIT / operating income (AUD Mn) | -1.686 | -3.599 | -5.466 | -4.908 | -4.104 |
Pre-tax income (AUD Mn) | -1.733 | -3.662 | -5.331 | -4.848 | -4.188 |
Net income (AUD Mn) | -1.733 | -3.662 | -5.331 | -4.848 | -4.188 |
EPS basic, adjusted (A$ cents) | -3.17 | -5.7 | -7.03 | -5.4 | -3.7 |
Dividends per share (A$ cents) | 0 | 0 | 0 | 0 | 0 |
Financial Analysis
| Line item | H1 FY2026 | H1 FY2025 |
|---|---|---|
Net finance income | 50,674 | 28,128 |
Other income (R&D benefit of 85,223) | 108,278 | 170,830 |
Employee benefits (incl. share-based 655,208) | -1,325,946 | -1,581,801 |
Other expenses | -407,167 | -659,384 |
Fair value loss on convertible notes | -198,662 | 0 |
Net loss | -1,881,536 | -2,194,163 |
Balance Sheet
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Total assets (AUD Mn) | 29.702 | 45.792 | 38.971 | 38.226 | 41.302 |
Total current assets (AUD Mn) | 16.761 | 20.086 | 5.409 | 1.37 | 1.673 |
Cash and equivalents (AUD Mn) | — | — | — | 1.213 | 1.486 |
Capitalised E&E asset (AUD Mn) | — | — | — | 36.312 | 39.017 |
Total liabilities (AUD Mn) | 2.81 | 6.443 | 3.661 | 1.382 | 4.312 |
Convertible notes, current (AUD Mn) | 0 | 0 | 0 | 0 | 2.857 |
Lease liabilities (AUD Mn) | — | — | — | — | 0.339 |
Net debt (AUD Mn) | -14.613 | -17.135 | -2.71 | -1.14 | 1.71 |
Total equity (AUD Mn) | 26.892 | 39.349 | 35.31 | 36.844 | 36.989 |
Goodwill and intangibles (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Net working capital (AUD Mn) | — | — | — | — | -2.49 |
Cash Flow
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | — | — | -3.87 | -3.67 | -2.809 | -2.229 |
Investing cash flow (AUD Mn) | — | — | -10 | -4 | -2.906 | -1.31 |
Capitalised E&E spend (AUD Mn) | — | — | — | — | 2.709 | 1.334 |
Financing cash flow (AUD Mn) | — | — | — | 3 | 5.988 | 4.067 |
Free cash flow, OCF + investing (AUD Mn) | — | — | -13.87 | -7.67 | -5.715 | -3.539 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 | 0 |
Buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
ROE (%) | — | — | -15.1 | -13.2 | -11.3 |
ROA (%) | -5.8 | -8 | -13.7 | -12.7 | -10.1 |
Current ratio (x) | — | — | — | 1.02 | 0.4 |
Debt / equity (%) | — | — | — | — | 8.6 |
Price / book (x) | 9.23 | 2.02 | 0.83 | 0.71 | 0.27 |
Geographic Revenue
| Metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Australia operating revenue (AUD Mn) | 0 | 0 | 0 |
Americas operating revenue (AUD Mn) | 0 | 0 | 0 |
EMEA operating revenue (AUD Mn) | 0 | 0 | 0 |
APAC ex-Australia operating revenue (AUD Mn) | 0 | 0 | 0 |
Market Valuation and Financial Ratios (x)
| Metric | FY2020 | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|---|
Market cap at 30 June (AUD Mn) | 6.734 | 248.2 | 79.63 | 29.2 | 26.09 | 10.04 |
Enterprise value (AUD Mn) | 7.98 | 233.6 | 62.49 | 26.49 | 24.99 | 11.75 |
Price / book (x) | 0.83 | 9.23 | 2.02 | 0.83 | 0.71 | 0.27 |
EV / EBITDA (x) | -7.22 | -140 | -17.6 | -4.91 | -5.16 | -2.9 |
Tranche Details
| Tranche | Face (AUD) | Original maturity | Post-extension maturity (Aug 2026) |
|---|---|---|---|
| 1 | 186,000 | 24 Jan 2027 | ~24 Jan 2028 |
| 2 | 1,404,000 | 7 Mar 2027 | ~7 Mar 2028 |
| 3 | 810,000 | 19 May 2027 | ~19 May 2028 |
| 4 | 314,280 | 30 Jun 2027 | ~30 Jun 2028 |
Total | 2,714,280 | — | — |
Analyst Conclusions
Management guidance:
-
No financial guidance.
-
Near-term operational priorities, per the Q4 FY2026 report and the May 2026 reset:
-
Complete and publish the staged / low-capex Razorback study update.
-
Secure non-debt funding: a strategic investor, possibly Chinese, and/or a royalty.
-
Progress MLP approval with Major Projects Facilitation Agency support.
-
Complete Ironback Hill assays and REE metallurgical scoping.
-
Validate Manna Hill gold and Mutooroo Ridge Cu-Ag.
-
Hold the cost base at reduced levels.
-
-
No consensus estimates exist.
Bull case:
-
Asymmetric scale. A 2.0 Bt reserve within a 6.6 Bt resource, with Major Project Status, an MLP under assessment and an approved AIP Plan, trades at about A$4M. That is a fraction of sunk exploration spend (A$39.7M carrying value). A single binding partner or royalty deal could re-rate the equity materially.
-
Policy tailwinds. Federal and SA green-iron funds, Port Pirie hub planning, advocacy for critical-mineral status and an integrated logistics consortium (Aurizon, Flinders Ports, GHD, CSL) all lower the external execution burden.
-
Optionality. High-grade REE clay assays (up to 4,937 ppm TREO), historic Cu-Ag at Mutooroo Ridge and gold at Manna Hill provide catalysts independent of the iron ore cycle.
Bear case:
-
Funding cliff. With A$2.0M of cash, a A$0.9M per quarter burn and a failed rights issue (about 29% take-up), a further highly dilutive raise appears near-unavoidable. The note conversion floor (A$0.02) sits close to the share price.
-
Partner credibility gap. JFE's two-year engagement ended without a binding deal, and GC Partners Asia's mandate concluded after three months. This suggests counterparties are unwilling to fund a A$2B-class magnetite project at current green-steel momentum.
-
Structural economics. Low mass recovery (about 15%), 10–12 GL/yr of water, desalination permitting and magnetite's history of capex blowouts, together with new high-grade supply such as Simandou, may keep Razorback uneconomic for years. That risks E&E impairment and tenure attrition.
Analyst verdict. Magnetite Mines owns one of the largest undeveloped magnetite endowments in the Western world. It has assembled an impressive regulatory and stakeholder scaffold around Razorback: an MLP through validity, state-accredited EPBC assessment, Major Project Status, an approved AIP Plan, a Ngadjuri partnering agreement and a blue-chip logistics consortium. These are non-trivial achievements for a company that has never had a market capitalisation above about A$250M.
Yet the investment case is now dominated by financing rather than geology. The 2024–2025 strategy depended on JFE Shoji converting a non-binding HoA into DFS funding. When that HoA lapsed on 31 December 2025, the company lost its central de-risking event. The following quarter's A$0.04 rights issue raised only about 29% of target, revealing exhausted retail support.
The May 2026 reset is a rational response but carries costs. It brought new leadership with extensive restructuring and capital-markets experience, aggressive austerity, a pivot to staged and low-capex development, and amplification of critical-minerals exploration. It also concentrates power in an executive chair, leaves no CFO, and implicitly concedes that the PFS-era 5 Mtpa / about A$2B concept is not financeable in current markets.
At about A$4M of market capitalisation against A$39.7M of capitalised E&E and roughly 2.1 quarters of cash, the equity behaves like a long-dated, deeply out-of-the-money option on a partner transaction. Investors should expect further dilution, and the A$0.02 note conversion floor will cap near-term price support. The key test over the next 12 months is whether Scott Lowe can secure non-dilutive or strategic capital, through a royalty, a Chinese strategic investor or a project-level sell-down, before tenure obligations and E&E impairment erode the asset base.
Verdict: a speculative, binary situation. The stock is suitable only for high-risk capital. Valuation upside is real if a counterparty commits, but the probability-weighted outcome favours continued dilution until a binding transaction is announced.
Sources referenced: - Magnetite Mines FY2025 Annual Report (26 Sep 2025)
-
Interim Financial Statements, half-year to 31 Dec 2025 (13 Mar 2026)
-
Quarterly activities reports and Appendix 5B: 30 Oct 2025, 29 Apr 2026, 30 Jul 2026
-
ASX announcements of 8 Jul 2024, 22 Oct 2024, 19 Dec 2025, 16 Feb 2026, 17 Mar 2026, 26 May 2026, 1 Jul 2026, 12 Aug 2026
-
Australian Government DISR Major Projects release and AIP Plan summary (Mar 2026)
-
Mining Weekly / Engineering News (2022–2026)
-
Stockhead (2020–2022); Australian Mining (2026); InDaily (2024, 2026); The DCN (Nov 2025); FNN (2026)
-
MarketScreener, Kalkine, InvestSMART, Simply Wall St, Market Index, Investing.com (market data)
-
Grange Resources Half Year Report to 30 Jun 2026 (competitor reference)
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Background | Education | Committees |
|---|---|---|---|---|---|
Scott Lowe | Executive Chair, CEO & MD | CEO/MD 26 May 2026; Chair 1 Jul 2026 | 35+ years in mining. Senior roles at BHP, South32, ArcelorMittal (incl. CEO, ArcelorMittal Liberia), Peabody. CEO/MD of Intrepid Mines, Blackthorn Resources, AIC Mines, Firefinch. CEO of Mineral Commodities Ltd from 2023 (per MarketScreener). | MBA (University of Wollongong) | — |
Paul White | Non-Executive Director (Chair 23 Sep 2024 – 30 Jun 2026) | Director since 12 Jan 2022 | About 8 years at Anglo American and Xstrata; CEO, Brisbane Broncos (about a decade, to Feb 2021); 17 years in Queensland Police; Independent Chair, Coal Network Capacity Company | MBA; MAICD | Chair of Nomination & Remuneration (per FY2025 AR); Audit & Risk member |
Simon Wandke | Non-Executive Director | 6 Jun 2022 | 40+ years in mining; former EVP and CEO, ArcelorMittal Mining; former NED of Kalium Lakes (Oct 2022 – Aug 2023) | BA (Psychology); GAICD; Diploma in Corporate Finance | Chair of Audit & Risk; Nomination & Remuneration member |
“—” = not publicly disclosed.
Executive Leadership Team
| Name | Role | Status / dates |
|---|---|---|
Inthu Siva | Company Secretary and Financial Controller | With the company since 2010; CoSec since 14 Apr 2023; AGIA, CPA |
Trevor Thomas | Director – Studies; Competent Person (exploration results) | Long-serving geologist; formerly GM Geology |
Gemma Brosnan | Director – External Affairs | Media and investor contact |
Mark McManus | Commercial consultant | Engaged during FY2025 |
Tim Dobson | Former CEO (from 23 Aug 2022) and MD (from 23 Sep 2024) | Stepped down 26 May 2026 |
Simon Smith | Former CFO and Joint CoSec | 4 Sep 2023 – 7 Mar 2025; not replaced |
Jim McKerlie | Former Chair (Sep 2023 – Sep 2024) | Left Board 27 Nov 2024 |
Peter Schubert | Former Executive Chair / Interim CEO | Left Board 27 Nov 2024 |
Dr Carmen Letton | Former NED | Left Board 27 Nov 2024 |
Directors' Remuneration
| Person | Fixed fee / salary | Notes |
|---|---|---|
Paul White (as Chair) | A$160,000 per year | Elected to forgo A$90,000 for shares from 1 Feb 2025 |
Simon Wandke | A$110,000 per year | Elected to forgo A$40,000 for shares from 1 Feb 2025 |
Scott Lowe | Executive service agreement disclosed 26 May 2026 | — |
Major Shareholders
| Holder | Shares (approx.) | % (approx., at time of data) |
|---|---|---|
Jojo Enterprises Pty Ltd | 6,153,847 | 3.31 |
Yucaja Pty Ltd | 2,765,715 | 1.49 |
Peter Schubert (former director) | 2,731,040 | 1.47 |
Liu Kun | 2,359,322 | 1.27 |
Michael Damian | 2,273,928 | 1.22 |
Paul White (director) | 2,263,943 | 1.22 |
Timothy Dobson (former MD) | 2,197,902 | 1.18 |
1215 Capital Pty Ltd | 2,143,342 | 1.15 |
Jing Wang | 2,121,695 | 1.14 |
Mark Eames (former technical director) | 1,757,511 | 0.94 |
Competitive Landscape
Key Competitors
| # | Competitor | Ticker / status | Asset | Relative position vs MGT |
|---|---|---|---|---|
| 1 | Grange Resources | ASX: GRR (producer) | Savage River magnetite (Tasmania); Southdown project (WA) | Australia's most experienced magnetite producer. H1 2026 underlying NPAT A$10.5M; unit cash cost A$146.95/t. Producing pellets now; MGT is pre-DFS. |
| 2 | Fortescue | ASX: FMG | Iron Bridge magnetite (WA), 67% Fe | Mega-cap with an operating magnetite project; sets the benchmark for magnetite capex risk |
| 3 | CITIC Pacific Mining | Private / Chinese SOE | Sino Iron magnetite (WA) | Largest Australian magnetite operation; history of large cost overruns, which shapes investor caution toward magnetite |
| 4 | Champion Iron | TSX / ASX: CIA | Bloom Lake (Québec), 66%+ Fe; DR-grade upgrade | Producing high-grade, DR-quality concentrate; competes directly for DR-grade offtake |
| 5 | Hawsons Iron | ASX: HIO | Hawsons magnetite (Broken Hill region, NSW) | Similar Braemar-style soft magnetite and DR-grade pitch; also capital-constrained |
| 6 | Iron Road | ASX: IRD | Central Eyre Iron Project (SA) | Large SA magnetite development; competes for SA government and green-iron attention |
| 7 | SIMEC Mining / GFG Alliance (Whyalla, under administration) | Private | Iron Duke / Middleback Ranges; Whyalla steelworks | Incumbent SA iron producer; A$2.4B government rescue package draws policy focus |
| 8 | Vale / Samarco (pellet feed) | NYSE: VALE | Brazilian high-grade pellet feed | Dominant seaborne DR-grade supplier |
| 9 | LKAB | State-owned (Sweden) | Kiruna / Malmberget magnetite; HYBRIT | Leading DR-pellet producer; European green-steel benchmark |
| 10 | Rio Tinto (IOC, Simandou) | ASX / LSE: RIO | Iron Ore Company of Canada pellets; Simandou high-grade (Guinea) | Simandou adds large high-grade supply, which could compress premiums |
| 11 | Mount Gibson Iron | ASX: MGX | Koolan Island hematite (65% Fe) | High-grade hematite producer; capital-markets peer |
| 12 | Magnetite peers in SA (e.g., other Braemar ELs) | Various juniors | Braemar Province | Compete for infrastructure (rail, water, power, port) |
Peer Comparison FY2025
| Metric | Magnetite Mines | Grange Resources |
|---|---|---|
Operating revenue | 0 | — |
Revenue growth | n/m | — |
Net result | -4.19 (FY2025) | +10.5 underlying NPAT (H1 CY2026) |
R&D intensity | n/m | — |
Stage | Pre-DFS | Producer |
“—” = not publicly disclosed.
Recent Developments
--



