Magnetite Mines Limited Overview

Magnetite Mines is a pre-revenue South Australian iron ore developer. Its flagship asset is the 100%-owned Razorback Iron Ore Project in the Braemar Iron Province, about 240 km north-east of Adelaide. The company reports a global JORC Mineral Resource of about 6.6 billion tonnes across Razorback (3.84 Bt), Ironback Hill (1.19 Bt) and Muster Dam (1.55 Bt). Razorback also carries a Probable Ore Reserve of about 2.0 Bt. The company positions Razorback as one of the few undeveloped projects globally able to produce 67.5–68.5% Fe "direct-reduction-grade" magnetite concentrate at scale. That product is the feedstock for gas- or hydrogen-based DRI and electric arc furnace steelmaking.

Razorback holds federal Major Project Status (since 11 Feb 2026), and a 5 Mtpa Mining Lease Proposal is under South Australian assessment. However, the company has a micro-capitalisation, a going-concern qualification and no binding strategic partner. In May 2026 it pivoted to a "strategic reset": cost cutting, staged development, and secondary exploration for rare earths, copper-silver and gold.


Company's own description

The company describes itself as an ASX-listed iron ore company. It is focused on developing magnetite iron ore resources in the Braemar Iron Formation of South Australia. It holds a 100%-owned Mineral Resource of 6.6 billion tonnes and is developing Razorback, about 240 km from Adelaide. It argues Razorback is one of the few undeveloped magnetite projects globally capable of producing premium DR-grade concentrate at scale, a key feedstock for green iron and lower-emissions steel (standard "About Magnetite Mines" boilerplate, July 2026). Since 2025 the boilerplate also cites a substantial South Australian tenement portfolio prospective for rare earth elements, copper, silver and gold. The FY2025 Directors' Report defines the principal activity as "mineral exploration in Australia".

Business model

Stage: pre-development / exploration and evaluation. There is no production and no operating revenue.

Revenue model (current): - Nil operating revenue.

  • "Income" consists of bank interest, R&D tax incentive refunds, fuel tax credits and occasional asset-sale gains. FY2025 interest and other income was A$226,151, against A$371,856 in FY2024.

Intended future revenue model: sale of premium magnetite concentrate under long-term offtake agreements, initially 5 Mtpa of concentrate. Customers would be integrated steelmakers and DRI/HBI producers moving to EAF routes.

Intended corporate structure: an unincorporated joint venture with "motivated investors and offtake partners", with Magnetite Mines as operator. The FY2025 Annual Report sets out this preferred model, which is common for large Australian resource projects. It shares capital burden and aligns offtake with equity.

Funding model to date: equity issues (rights issues, placements), unsecured convertible notes (C/M Capital, January 2025) and director fee-for-equity swaps. Royalty funding (via ProspEx) and Chinese strategic investment are under evaluation (Q4 FY2026).

Value-chain position

StageMGT involvement
Exploration / resource definitionCore activity (Razorback, Iron Peak, Ironback Hill, Muster Dam, REE / Cu-Ag / Au prospects)
Mining and beneficiation (crush, grind, magnetic separation, flotation)Planned (Razorback 5 Mtpa concentrate)
Logistics (haul road → Hillgrange intermodal → rail → port)Planned with partners (Aurizon rail; Flinders Ports at Port Pirie; CSL transhipment)
Pelletising / DRI / HBINot intended to be owned by MGT. Envisaged by Green Iron SA to be built by third-party steelmakers at Port Pirie by the early 2030s.
EAF steelmakingEnd customer

Upstream: mine and concentrator.

Customer types and end-markets (prospective)

Customer types: - Japanese, Korean, Chinese and other Asian integrated steelmakers converting to EAF/DRI. JFE Shoji was the lead counterparty until 31 Dec 2025.

  • Trading houses.

  • Prospective Australian green-iron producers in South Australia's "Iron Triangle" (Whyalla, Port Augusta, Port Pirie).

End-markets: seaborne high-grade iron ore (65%+ Fe) and DR-grade pellet feed (67.5%+ Fe). For the exploration portfolio: rare earth oxides (Nd/Pr magnet metals), copper, silver and gold.

Independent characterisation

Magnetite Mines is best characterised as a single-asset, large-tonnage, low-grade-head / high-grade-product magnetite development company. It is in a severe funding squeeze. The geological endowment is genuinely large. The project has meaningful regulatory momentum, including the MLP, EPBC accreditation, Major Project Status and an approved Australian Industry Participation Plan.

However, the project's DFS remains unfunded. The flagship strategic partner (JFE Shoji Australia) allowed its non-binding HoA to lapse on 31 December 2025. Equity value has collapsed from about A$248M market capitalisation at June 2021 to about A$4M.

Several factors create an extreme valuation disconnect between the project's stated scale and its market capitalisation:

  • capital intensity of close to A$2 billion (DISR estimate);

  • a 10–12 GL/yr water requirement;

  • a slowdown in global green-steel investment.

The May 2026 strategic reset concedes this. It reorients toward staged, lower-capex pathways such as dry magnetic separation and early-revenue options, and adds critical-minerals optionality to sustain market interest.

Strategy

Stated strategy (themes)

FY2025 Annual Report:

  1. Develop Razorback as a cornerstone supplier of premium magnetite for low-carbon steelmaking.

  2. Develop via a JV with investors and offtakers, with MGT as operator.

  3. Secure DFS funding via a binding transaction.

  4. Complete MLP assessment and land access.

  5. De-risk water supply.

  6. Run low-cost, disciplined exploration for gold and critical minerals.

May 2026 strategic reset. The reset responds to funding constraints, inflation and a slower-than-expected green-steel transition. Its pillars are:

  1. A staged, capital-efficient Razorback pathway, including early-revenue options and dry magnetic separation to cut capital intensity.

  2. Accelerated strategic funding, partnership and offtake engagement.

  3. Further cost-base reduction through workforce optimisation and austerity.

  4. Preservation of approvals and optionality.

  5. Greater emphasis on REE, copper and gold value.

  6. Pursuit of non-debt funding and government support for infrastructure.

  7. Advocacy for magnetite to be recognised as a Critical Mineral in Australia.

Initiatives (last 24 months)

InitiativeDateDescriptionStatus (Oct 2026)
JFE Shoji Australia HoAJul 2024 – Dec 2025DFS funding for up to 10% Stage 1 offtake over 15 yearsLapsed 31 Dec 2025
Green Iron SA consortiumOct 2024 →With Aurizon, Flinders Ports, GHD; CSL added Nov 2025. Port Pirie export and green-iron hub.Active; Port Pirie export concept released Mar 2026
Saline-water flotationJul 2024 →Proprietary process; provisional patent Apr 2025Optimisation testwork
Board / cost restructureSep 2024Board cut from five NEDs to two; over A$600k annual savingsCompleted
C/M Capital convertible notesJan 2025Up to A$7M; A$3.54M drawnA$2.714M outstanding; maturities extended 12 months (Aug 2026)
MLP lodgementMar 20255 Mtpa, plus four Miscellaneous Purposes LicencesValidity assessment done Nov 2025; public consultation completed; regulatory assessment ongoing
Multi-commodity explorationAug 2025 →REE (Ironback Hill), Cu-Ag (Mutooroo Ridge), Au (Manna Hill)Active, low-cost
ZEN Energy MoURenewed Dec 2025Energy / green-iron collaboration with MGT as raw-material supply partner (details limited)Active (non-binding)
Major Project StatusFeb 2026Federal facilitation via the Major Projects Facilitation Agency, three yearsActive to Feb 2029
Australian Industry Participation PlanApproved 9 Mar 2026Required under the Australian Jobs ActApproved
GC Partners Asia mandateMay–Aug 2026China-focused strategic investor engagementConcluded after initial three months
ProspEx royalty evaluation2,026Digital fractional royalty platform for wholesale investorsUnder evaluation
Staged / low-capex study update2,026Development options, beneficiation tech, water solutionsMarket update promised on completion

Guidance / targets

There are no financial guidance or medium-term financial targets; the company is pre-revenue.

Non-financial targets historically stated:

  • DFS completion: originally "end of 2022", later contingent on partner funding.

  • Production timing: "2024" in 2021–2022 materials, now indefinite.

  • Green Iron SA aspiration: DRI/HBI from Port Pirie by the early 2030s.

Products & Services

Magnetite Mines sells no products today. Its "portfolio" consists of mineral projects and a planned concentrate product. Each is catalogued below.

Planned product: DR-grade / premium magnetite concentrate (Razorback)

AttributeDetail
DescriptionPremium-grade magnetite concentrate, targeted at 67.5%–68.5% Fe
Specification targetsDR-grade (low silica/alumina) suitable for DR pelletising and DRI-EAF steelmaking. The Iron Peak composite achieved DR-grade in fresh and saline water. Razorback composites achieved DR-grade in fresh water and high but more variable grades in saline water (FY2025 AR).
Planned scale5 Mtpa concentrate under the MLP (Stage 1). A 2023 expansion option ran from 5 to 10 Mtpa after five years.
Mine lifeAbout 38–39 years (DISR: 38-year operation; Mining Weekly: 39-year scenario)
Target customersEAF/DRI steelmakers in Japan, Korea, China, Europe and Australia; Port Pirie green-iron hub participants
Pricing modelNot disclosed. It would likely be priced off a 62% / 65% Fe index with a high-grade / DR premium.
StatusPre-DFS. The PFS-level work dates from 2021, with optimisation in 2023.

Mineral projects

ProjectCommodityKey dataStageSource
Razorback deposit (Razorback Ridge, EL 6353 etc.)MagnetiteMRE 3,230 Mt @ 14.56% eDTR; 17.43% Fe (8% eDTR cut-off)Resource and reserve; MLP lodgedFY2025 AR
Iron Peak depositMagnetiteMRE 607 Mt @ 17.70% eDTR; 17.24% Fe. Maiden Probable Reserve 362 Mt (Jun 2023, 16.8% recovery). Prioritised for early production.Resource and reserveFY2025 AR; Mining Monthly
Razorback Project (combined)MagnetiteMRE 3,837 Mt (1,973 Mt Indicated, 1,864 Mt Inferred) @ 15.05% eDTR; Probable Ore Reserve about 2.0 BtMLP under assessment; Major Project StatusFY2025 AR
Ironback HillMagnetite1,187 Mt Inferred @ 23.2% Fe (no cut-off)ResourceFY2025 AR
Ironback Hill REEClay-hosted REERe-assays 356–1,153 ppm TREO (Aug 2025). 2026 air-core drilling (37 holes) peaked at 1m @ 4,937 ppm TREO (969 ppm Nd2O3). 9m @ 1,569 ppm TREO in PLAC0015.Early explorationQ4 FY2026 report
Braemar Creek (EL7100)REE (drainage extension)Granted Jan 2026; secures downstream drainage systemsEarly explorationQ4 FY2026 report
Muster Dam (EL 6746)Magnetite1,550 Mt Inferred @ 18.7% Fe (10% mass recovery cut-off)ResourceFY2025 AR
Mutooroo Ridge (EL 6877)Copper-silverRe-assay of 1970s core: 11m @ 1.4% Cu; 8m @ 38.5 g/t Ag. Located in the Broken Hill Domain, Curnamona Province.Early explorationAustralian Mining; ASX 17 Mar 2026
Manna Hill (EL7106)GoldDesktop review identified historical workings and quartz-sulphide veins. 171 historical RC samples (Boomerang prospect) submitted for re-assay.Desktop / earlyQ4 FY2026 report
Other ELs (Pualco EL6126, Red Dragon EL6127, Dragon's Tail EL5902, Sister's Dam EL6037, Braemar EL6788, Lipson EL6745, Manunda North EL6878)Magnetite / multi-commodityPart of the about 2,500 km² tenement packageExplorationQ4 FY2026 report

Global Mineral Resource total: about 6,574 Mt Indicated and Inferred (FY2025 AR).

Technology / IP "products"

ItemDescriptionYearStatus
Saline-water flotation processProprietary reagent regime and flowsheet adaptation enabling seawater use in magnetite flotation. It could reduce or avoid freshwater or desalination needs.Provisional patent lodged April 2025Optimisation testwork ongoing. Fresh water remains the base case.
Dry magnetic separation pathwayLower-capex beneficiation concept cited in the May 2026 reset2,026Under evaluation; no study published
"foresight" sustainability platformCompany ESG / stakeholder frameworkLaunched Jun 2023Active

Financial Narrative

Basis:

  • FY2021–FY2023 figures are from third-party aggregators (Kalkine, MarketScreener, InvestSMART), which draw on annual reports.

  • FY2024–FY2025 figures are from the FY2025 Annual Report and the Dec-2025 Interim FS.

  • FY2026 figures are Appendix 5B cash flows only.

Income statement

Notes:

  • Margins (gross, operating, EBITDA, net) are not meaningful with zero revenue. Aggregators show net margins of about -2,270% to -2,573% only because they treat other income as revenue.

  • A revenue CAGR is not meaningful.

  • Sources conflict on EPS. MarketScreener's adjusted EPS (shown) differs from InvestSMART's (-4.9c FY23, -4.0c FY24, -2.4c FY25) because of different share-count bases.

  • Half-year EPS was -1.14c (H1 FY2026) against -2.03c (H1 FY2025).

Half-year to 31 Dec 2025 (Interim FS, A$):

Commentary: Losses peaked in FY2023 at -A$5.33M, when optimisation studies and an expanded team were being funded. They have declined since, through FY2024 (-A$4.85M), FY2025 (-A$4.19M) and the H1 FY2026 run-rate (-A$1.88M for six months). The drivers are the September 2024 board downsizing (over A$600k a year saved), a CFO departure that was not backfilled, director fees part-paid in shares, and the May 2026 reset. Most project spend is capitalised to exploration and evaluation (E&E), so the P&L understates cash burn.

Balance sheet

Sources: Kalkine/MarketScreener aggregator for FY2021–FY2023 and for net debt. FY2024–FY2025 figures are from company statements, including the Interim FS comparatives.

31 Dec 2025 snapshot (Interim FS):

  • Cash A$2.818M

  • E&E asset A$39.683M

  • Total assets A$43.298M

  • Convertible notes A$2.376M

  • Total liabilities A$3.496M

  • Equity A$39.802M

  • Contributed equity A$102.58M

  • Accumulated losses A$78.52M

  • Working capital deficit A$0.337M

30 Jun 2026: cash A$2.014M (Appendix 5B). Convertible notes with a face value of A$2.714M were outstanding.

Commentary:

  • The balance sheet is dominated by capitalised E&E: about 92–94% of total assets.

  • Liquidity has deteriorated structurally. Current assets fell from A$20.1M (FY2022) to A$1.4–1.7M (FY2024–FY2025).

  • The company moved from net cash to net debt in FY2025 when it drew the C/M Capital notes.

  • There is impairment risk to the A$39.7M E&E carrying value if the project is deferred or tenure lapses. The FY2026 strategic reset makes this a key item to watch in the FY2026 audit.

Cash flow

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Segment Revenue

SegmentContentsRevenue FY2023 (AUD Mn)Revenue FY2024 (AUD Mn)Revenue FY2025 (AUD Mn)Pre-tax result FY2025 (AUD Mn)Share of total

Mineral exploration – Australia

All projects (Razorback, Iron Peak, Ironback Hill, Muster Dam, REE / Cu-Ag / Au prospects)

000-4.19100%

Results by Segment

MetricFY2021FY2022FY2023FY2024FY2025

Exploration segment operating revenue (AUD Mn)

00000

Interest and other income (AUD Mn)

0.020.1950.2130.3720.226

Group Entities

EntityOwnershipCountryRole

Magnetite Mines Limited

Parent (ASX-listed)

Australia

Holding / corporate

Razorback Iron Pty Ltd

100%

Australia

Razorback tenure / project entity

Razorback Operations Pty Ltd

100%

Australia

Intended operating entity

Red Dragon Mining Pty Ltd

100%

Australia

Tenement holder (Red Dragon EL 6127 area)

Ironback Pty Ltd

100%

Australia

Ironback Hill tenure

Income Statement and Per-Share Data

MetricFY2021FY2022FY2023FY2024FY2025

Operating revenue (AUD Mn)

00000

Interest and other income (AUD Mn)

0.020.1950.2130.3720.226

Gross profit (AUD Mn)

00000

EBITDA (AUD Mn)

-1.669-3.547-5.4-4.846-4.055

EBIT / operating income (AUD Mn)

-1.686-3.599-5.466-4.908-4.104

Pre-tax income (AUD Mn)

-1.733-3.662-5.331-4.848-4.188

Net income (AUD Mn)

-1.733-3.662-5.331-4.848-4.188

EPS basic, adjusted (A$ cents)

-3.17-5.7-7.03-5.4-3.7

Dividends per share (A$ cents)

00000

Financial Analysis

Line itemH1 FY2026H1 FY2025

Net finance income

50,67428,128

Other income (R&D benefit of 85,223)

108,278170,830

Employee benefits (incl. share-based 655,208)

-1,325,946-1,581,801

Other expenses

-407,167-659,384

Fair value loss on convertible notes

-198,6620

Net loss

-1,881,536-2,194,163

Balance Sheet

MetricFY2021FY2022FY2023FY2024FY2025

Total assets (AUD Mn)

29.70245.79238.97138.22641.302

Total current assets (AUD Mn)

16.76120.0865.4091.371.673

Cash and equivalents (AUD Mn)

———1.2131.486

Capitalised E&E asset (AUD Mn)

———36.31239.017

Total liabilities (AUD Mn)

2.816.4433.6611.3824.312

Convertible notes, current (AUD Mn)

00002.857

Lease liabilities (AUD Mn)

————0.339

Net debt (AUD Mn)

-14.613-17.135-2.71-1.141.71

Total equity (AUD Mn)

26.89239.34935.3136.84436.989

Goodwill and intangibles (AUD Mn)

00000

Net working capital (AUD Mn)

————-2.49

Cash Flow

MetricFY2021FY2022FY2023FY2024FY2025FY2026

Operating cash flow (AUD Mn)

——-3.87-3.67-2.809-2.229

Investing cash flow (AUD Mn)

——-10-4-2.906-1.31

Capitalised E&E spend (AUD Mn)

————2.7091.334

Financing cash flow (AUD Mn)

———35.9884.067

Free cash flow, OCF + investing (AUD Mn)

——-13.87-7.67-5.715-3.539

Dividends paid (AUD Mn)

000000

Buybacks (AUD Mn)

000000

Returns & Leverage Ratios (%) and Financial Ratios (x)

MetricFY2021FY2022FY2023FY2024FY2025

ROE (%)

——-15.1-13.2-11.3

ROA (%)

-5.8-8-13.7-12.7-10.1

Current ratio (x)

———1.020.4

Debt / equity (%)

————8.6

Price / book (x)

9.232.020.830.710.27

Geographic Revenue

MetricFY2023FY2024FY2025

Australia operating revenue (AUD Mn)

000

Americas operating revenue (AUD Mn)

000

EMEA operating revenue (AUD Mn)

000

APAC ex-Australia operating revenue (AUD Mn)

000

Market Valuation and Financial Ratios (x)

MetricFY2020FY2021FY2022FY2023FY2024FY2025

Market cap at 30 June (AUD Mn)

6.734248.279.6329.226.0910.04

Enterprise value (AUD Mn)

7.98233.662.4926.4924.9911.75

Price / book (x)

0.839.232.020.830.710.27

EV / EBITDA (x)

-7.22-140-17.6-4.91-5.16-2.9

Tranche Details

TrancheFace (AUD)Original maturityPost-extension maturity (Aug 2026)
1186,000

24 Jan 2027

~24 Jan 2028

21,404,000

7 Mar 2027

~7 Mar 2028

3810,000

19 May 2027

~19 May 2028

4314,280

30 Jun 2027

~30 Jun 2028

Total

2,714,280

——

Analyst Conclusions

Management guidance:

  • No financial guidance.

  • Near-term operational priorities, per the Q4 FY2026 report and the May 2026 reset:

    1. Complete and publish the staged / low-capex Razorback study update.

    2. Secure non-debt funding: a strategic investor, possibly Chinese, and/or a royalty.

    3. Progress MLP approval with Major Projects Facilitation Agency support.

    4. Complete Ironback Hill assays and REE metallurgical scoping.

    5. Validate Manna Hill gold and Mutooroo Ridge Cu-Ag.

    6. Hold the cost base at reduced levels.

  • No consensus estimates exist.

Bull case:

  1. Asymmetric scale. A 2.0 Bt reserve within a 6.6 Bt resource, with Major Project Status, an MLP under assessment and an approved AIP Plan, trades at about A$4M. That is a fraction of sunk exploration spend (A$39.7M carrying value). A single binding partner or royalty deal could re-rate the equity materially.

  2. Policy tailwinds. Federal and SA green-iron funds, Port Pirie hub planning, advocacy for critical-mineral status and an integrated logistics consortium (Aurizon, Flinders Ports, GHD, CSL) all lower the external execution burden.

  3. Optionality. High-grade REE clay assays (up to 4,937 ppm TREO), historic Cu-Ag at Mutooroo Ridge and gold at Manna Hill provide catalysts independent of the iron ore cycle.

Bear case:

  1. Funding cliff. With A$2.0M of cash, a A$0.9M per quarter burn and a failed rights issue (about 29% take-up), a further highly dilutive raise appears near-unavoidable. The note conversion floor (A$0.02) sits close to the share price.

  2. Partner credibility gap. JFE's two-year engagement ended without a binding deal, and GC Partners Asia's mandate concluded after three months. This suggests counterparties are unwilling to fund a A$2B-class magnetite project at current green-steel momentum.

  3. Structural economics. Low mass recovery (about 15%), 10–12 GL/yr of water, desalination permitting and magnetite's history of capex blowouts, together with new high-grade supply such as Simandou, may keep Razorback uneconomic for years. That risks E&E impairment and tenure attrition.

Analyst verdict. Magnetite Mines owns one of the largest undeveloped magnetite endowments in the Western world. It has assembled an impressive regulatory and stakeholder scaffold around Razorback: an MLP through validity, state-accredited EPBC assessment, Major Project Status, an approved AIP Plan, a Ngadjuri partnering agreement and a blue-chip logistics consortium. These are non-trivial achievements for a company that has never had a market capitalisation above about A$250M.

Yet the investment case is now dominated by financing rather than geology. The 2024–2025 strategy depended on JFE Shoji converting a non-binding HoA into DFS funding. When that HoA lapsed on 31 December 2025, the company lost its central de-risking event. The following quarter's A$0.04 rights issue raised only about 29% of target, revealing exhausted retail support.

The May 2026 reset is a rational response but carries costs. It brought new leadership with extensive restructuring and capital-markets experience, aggressive austerity, a pivot to staged and low-capex development, and amplification of critical-minerals exploration. It also concentrates power in an executive chair, leaves no CFO, and implicitly concedes that the PFS-era 5 Mtpa / about A$2B concept is not financeable in current markets.

At about A$4M of market capitalisation against A$39.7M of capitalised E&E and roughly 2.1 quarters of cash, the equity behaves like a long-dated, deeply out-of-the-money option on a partner transaction. Investors should expect further dilution, and the A$0.02 note conversion floor will cap near-term price support. The key test over the next 12 months is whether Scott Lowe can secure non-dilutive or strategic capital, through a royalty, a Chinese strategic investor or a project-level sell-down, before tenure obligations and E&E impairment erode the asset base.

Verdict: a speculative, binary situation. The stock is suitable only for high-risk capital. Valuation upside is real if a counterparty commits, but the probability-weighted outcome favours continued dilution until a binding transaction is announced.


Sources referenced: - Magnetite Mines FY2025 Annual Report (26 Sep 2025)

  • Interim Financial Statements, half-year to 31 Dec 2025 (13 Mar 2026)

  • Quarterly activities reports and Appendix 5B: 30 Oct 2025, 29 Apr 2026, 30 Jul 2026

  • ASX announcements of 8 Jul 2024, 22 Oct 2024, 19 Dec 2025, 16 Feb 2026, 17 Mar 2026, 26 May 2026, 1 Jul 2026, 12 Aug 2026

  • Australian Government DISR Major Projects release and AIP Plan summary (Mar 2026)

  • Mining Weekly / Engineering News (2022–2026)

  • Stockhead (2020–2022); Australian Mining (2026); InDaily (2024, 2026); The DCN (Nov 2025); FNN (2026)

  • MarketScreener, Kalkine, InvestSMART, Simply Wall St, Market Index, Investing.com (market data)

  • Grange Resources Half Year Report to 30 Jun 2026 (competitor reference)

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleAppointedBackgroundEducationCommittees

Scott Lowe

Executive Chair, CEO & MD

CEO/MD 26 May 2026; Chair 1 Jul 2026

35+ years in mining. Senior roles at BHP, South32, ArcelorMittal (incl. CEO, ArcelorMittal Liberia), Peabody. CEO/MD of Intrepid Mines, Blackthorn Resources, AIC Mines, Firefinch. CEO of Mineral Commodities Ltd from 2023 (per MarketScreener).

MBA (University of Wollongong)

—

Paul White

Non-Executive Director (Chair 23 Sep 2024 – 30 Jun 2026)

Director since 12 Jan 2022

About 8 years at Anglo American and Xstrata; CEO, Brisbane Broncos (about a decade, to Feb 2021); 17 years in Queensland Police; Independent Chair, Coal Network Capacity Company

MBA; MAICD

Chair of Nomination & Remuneration (per FY2025 AR); Audit & Risk member

Simon Wandke

Non-Executive Director

6 Jun 2022

40+ years in mining; former EVP and CEO, ArcelorMittal Mining; former NED of Kalium Lakes (Oct 2022 – Aug 2023)

BA (Psychology); GAICD; Diploma in Corporate Finance

Chair of Audit & Risk; Nomination & Remuneration member

“—” = not publicly disclosed.

Executive Leadership Team

NameRoleStatus / dates

Inthu Siva

Company Secretary and Financial Controller

With the company since 2010; CoSec since 14 Apr 2023; AGIA, CPA

Trevor Thomas

Director – Studies; Competent Person (exploration results)

Long-serving geologist; formerly GM Geology

Gemma Brosnan

Director – External Affairs

Media and investor contact

Mark McManus

Commercial consultant

Engaged during FY2025

Tim Dobson

Former CEO (from 23 Aug 2022) and MD (from 23 Sep 2024)

Stepped down 26 May 2026

Simon Smith

Former CFO and Joint CoSec

4 Sep 2023 – 7 Mar 2025; not replaced

Jim McKerlie

Former Chair (Sep 2023 – Sep 2024)

Left Board 27 Nov 2024

Peter Schubert

Former Executive Chair / Interim CEO

Left Board 27 Nov 2024

Dr Carmen Letton

Former NED

Left Board 27 Nov 2024

Directors' Remuneration

PersonFixed fee / salaryNotes

Paul White (as Chair)

A$160,000 per year

Elected to forgo A$90,000 for shares from 1 Feb 2025

Simon Wandke

A$110,000 per year

Elected to forgo A$40,000 for shares from 1 Feb 2025

Scott Lowe

Executive service agreement disclosed 26 May 2026

—

Major Shareholders

HolderShares (approx.)% (approx., at time of data)

Jojo Enterprises Pty Ltd

6,153,8473.31

Yucaja Pty Ltd

2,765,7151.49

Peter Schubert (former director)

2,731,0401.47

Liu Kun

2,359,3221.27

Michael Damian

2,273,9281.22

Paul White (director)

2,263,9431.22

Timothy Dobson (former MD)

2,197,9021.18

1215 Capital Pty Ltd

2,143,3421.15

Jing Wang

2,121,6951.14

Mark Eames (former technical director)

1,757,5110.94

Competitive Landscape

Key Competitors

#CompetitorTicker / statusAssetRelative position vs MGT
1

Grange Resources

ASX: GRR (producer)

Savage River magnetite (Tasmania); Southdown project (WA)

Australia's most experienced magnetite producer. H1 2026 underlying NPAT A$10.5M; unit cash cost A$146.95/t. Producing pellets now; MGT is pre-DFS.

2

Fortescue

ASX: FMG

Iron Bridge magnetite (WA), 67% Fe

Mega-cap with an operating magnetite project; sets the benchmark for magnetite capex risk

3

CITIC Pacific Mining

Private / Chinese SOE

Sino Iron magnetite (WA)

Largest Australian magnetite operation; history of large cost overruns, which shapes investor caution toward magnetite

4

Champion Iron

TSX / ASX: CIA

Bloom Lake (Québec), 66%+ Fe; DR-grade upgrade

Producing high-grade, DR-quality concentrate; competes directly for DR-grade offtake

5

Hawsons Iron

ASX: HIO

Hawsons magnetite (Broken Hill region, NSW)

Similar Braemar-style soft magnetite and DR-grade pitch; also capital-constrained

6

Iron Road

ASX: IRD

Central Eyre Iron Project (SA)

Large SA magnetite development; competes for SA government and green-iron attention

7

SIMEC Mining / GFG Alliance (Whyalla, under administration)

Private

Iron Duke / Middleback Ranges; Whyalla steelworks

Incumbent SA iron producer; A$2.4B government rescue package draws policy focus

8

Vale / Samarco (pellet feed)

NYSE: VALE

Brazilian high-grade pellet feed

Dominant seaborne DR-grade supplier

9

LKAB

State-owned (Sweden)

Kiruna / Malmberget magnetite; HYBRIT

Leading DR-pellet producer; European green-steel benchmark

10

Rio Tinto (IOC, Simandou)

ASX / LSE: RIO

Iron Ore Company of Canada pellets; Simandou high-grade (Guinea)

Simandou adds large high-grade supply, which could compress premiums

11

Mount Gibson Iron

ASX: MGX

Koolan Island hematite (65% Fe)

High-grade hematite producer; capital-markets peer

12

Magnetite peers in SA (e.g., other Braemar ELs)

Various juniors

Braemar Province

Compete for infrastructure (rail, water, power, port)

Peer Comparison FY2025

MetricMagnetite MinesGrange Resources

Operating revenue

0—

Revenue growth

n/m

—

Net result

-4.19 (FY2025)

+10.5 underlying NPAT (H1 CY2026)

R&D intensity

n/m

—

Stage

Pre-DFS

Producer

“—” = not publicly disclosed.

Recent Developments

--

Company Snapshot

2004

Founded

Adelaide, Australia

Headquarters

SWOT Analysis

Strengths

  • Global JORC Mineral Resource of about 6,574 Mt, including the Razorback project at 3,837 Mt (FY2025 AR). The company says this is over a third of South Australia's defined magnetite resources.
  • Probable Ore Reserve of about 2.0 Bt, including Iron Peak's 362 Mt at a higher 16.8% recovery (June 2023).
  • DR-grade concentrate (67.5–68.5% Fe) demonstrated in testwork, including Iron Peak in saline water (FY2025 AR).
  • Federal Major Project Status effective 11 Feb 2026 for three years. It is the only iron ore project on the list (DISR; Mining Weekly).
  • MLP for 5 Mtpa lodged (March 2025) and through validity assessment (November 2025), with EPBC assessment accredited to the state.
  • Infrastructure consortium with Aurizon, Flinders Ports, GHD and CSL, plus a Port Pirie export concept (March 2026).

Weaknesses

  • Going-concern material uncertainty in the FY2024 and FY2025 accounts and the H1 FY2026 review.
  • Cash of A$2.014M at 30 Jun 2026, giving only 2.13 quarters of funding (Appendix 5B).
  • No binding strategic partner since the JFE HoA lapsed (31 Dec 2025).
  • Low head grade: Razorback averages about 14.6% eDTR mass recovery, so about 7 t of ore are needed per tonne of concentrate.
  • Heavy dilution: shares rose from 121M (Jul 2025) to 195M (Dec 2025), with more after the March 2026 rights issue. The March 2026 raising achieved only about 29% of target.
  • Thin governance after the cuts: a three-person board with a combined executive chair and CEO; no CFO since March 2025.

Opportunities

  • A staged, lower-capex development (dry magnetic separation, early revenue), signalled in May 2026.
  • Chinese strategic investment, or a royalty financing via ProspEx.
  • Port Pirie green-iron hub and state / federal green-iron funds (A$1B fund, A$500M outside Whyalla).
  • Ironback Hill REE: assays up to 4,937 ppm TREO with elevated Nd2O3 (June 2026).
  • Mutooroo Ridge Cu-Ag (11m @ 1.4% Cu; 8m @ 38.5 g/t Ag) and Manna Hill gold, in a supportive precious-metals price environment.
  • Lobbying for magnetite to be recognised as an Australian "Critical Mineral", which could unlock concessional finance (e.g., via the Critical Minerals Facility).

Threats

  • Convertible notes (A$2.714M face) mature in 2028 after the extension. Change-of-control or default terms allow early repayment.
  • Impairment of the A$39.7M capitalised E&E asset if development is deferred.
  • Tenure obligations: about A$396k of minimum spend due within one year and A$1.86M over one to five years (Interim FS Note 14).
  • A competing high-grade supply wave (Simandou; Champion Iron and Vale expansions) could compress DR premiums.
  • Water, power and native title approvals. The project needs 10–12 GL/yr of water, desalination permitting and a Ngadjuri mining agreement.
  • Possible delisting or value-destructive recapitalisation if funding fails. The share price is about A$0.015–0.019, near the A$0.02 conversion floor on the notes.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
2 Apr 2025Saline-water flotation provisional patent lodgedIP for possible capex / water reduction
29 Apr 2025Q3 FY2025 activities reportMLP progress; JFE negotiations
19 May 2025Third C/M note tranche (A$0.81M face)Liquidity
30 Jun 2025Razorback MRE restated to 3.84 Bt; global 6.6 Bt; fourth note tranche (A$0.314M)Resource scale; liquidity
30 Jul 2025Q4 FY2025 report; TACTIC conference presentation—
8 Aug 2025Rights issue of up to A$2.65M at A$0.065 announced, with 1:1 optionsFunding
15 Aug 2025EGM; all resolutions passed—
19 Aug 2025Ironback Hill REE identified (356–1,153 ppm TREO); A$0.3M notes convertedDiversification narrative
5 Sep 2025Rights issue closes fully subscribed; A$1.214M follow-on placement; total A$3.86MFunding
26 Sep 2025FY2025 Annual Report; auditor going-concern material uncertaintyFinancial risk
30 Oct 2025Q1 FY2026 report; cash A$3.909M—
13 Nov 2025CSL Australia joins Green Iron SALogistics chain completed
18 Nov 2025Additional rare earths confirmed; drilling plannedExploration
24 Nov 2025MLP validity assessment finalisedApprovals milestone
26 Nov 20252025 AGM; Employee Incentive Plan approvedGovernance
2 Dec 2025A$0.46M notes converted into 9.33M sharesDilution
19 Dec 2025JFE HoA to lapse; partnering broadened; ZEN MoU renewedMajor setback
7 Jan 2026EL7100 Braemar Creek grantedREE tenure
30 Jan 2026Q2 FY2026 report—
13 Feb 2026Registry changes to AutomicAdmin
16 Feb 2026Major Project Status (effective 11 Feb 2026); Ironback Hill drilling approvals; shares up about 12–16% to A$0.058Federal facilitation
3 Mar 2026Rights issue of up to A$3.92M at A$0.04, underwritten to A$0.8MFunding at a deep discount
9–10 Mar 2026AIP Plan approved; investor presentation—
13 Mar 2026H1 FY2026 interim accounts (loss A$1.88M)—
17 Mar 2026High-grade Cu-Ag at Mutooroo Ridge (11m @ 1.4% Cu; 8m @ 38.5 g/t Ag)Exploration
Mar 2026Manna Hill gold tenement (EL7106) grantedExploration
23 Mar 2026Green Iron SA Port Pirie export conceptLogistics
1 Apr 2026Rights issue results (about A$1.15M raised); MGTOG options quotedWeak take-up
8 Apr 2026AMEC Investor Pitch Battle, AdelaideIR
21 Apr 2026Ironback Hill drilling commences; EGM notice—
29 Apr 2026Q3 FY2026 report; cash A$2.12M—
4 May 2026GC Partners Asia appointedChina partnering
26 May 2026Strategic reset; Dobson exits; Lowe becomes CEO and MD; shares fall about 45% from release price over the following weeksMajor strategic pivot
29 May 2026EGM; all resolutions passed (incl. director fee shares)—
22 Jun 2026Ironback Hill air-core assays: up to 4,937 ppm TREOExploration
27 Jun 2026Manna Hill desktop review identifies historical gold targetsExploration
1 Jul 2026Scott Lowe appointed Chair; White stays as NEDGovernance
30 Jul 2026Q4 FY2026 report; cash A$2.014M; 2.13 quarters of funding; GC Partners engagement concluded; ProspEx royalty reviewLiquidity warning
12 Aug 2026Convertible note maturities extended 12 months; 16.67M options (or A$250k cash) as consideration, subject to 2026 AGM approvalNear-term default risk deferred
~25 Sep 2026FY2026 Annual Report (scheduled)–
29 Oct 2026Q1 FY2027 activities report (scheduled)Upcoming

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

1 chart
Results by Segment: Interest and other income rose from AUD 0 Mn in FY2021 to AUD 0.2 Mn in FY2025.
Magnetite Mines Limited — Results by Segment
Series (AUD Mn)FY2021FY2022FY2023FY2024FY2025
Interest and other income00.20.20.40.2

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.