Manuka Resources Limited Overview
Manuka Resources is a Sydney-based, ASX- and NZX-listed micro-cap that is transitioning from a care-and-maintenance explorer back into a precious-metals producer in the Cobar Basin of central-west New South Wales. Its core operating asset is the 100%-owned Wonawinta processing plant (~1Mtpa carbon-in-leach facility), historically Australia's largest primary silver producer, which restarted gold processing of Mt Boppy ore in August 2026, with silver ore introduction targeted after a new de-slime circuit is commissioned in December 2026 and first silver revenue targeted for January 2027. The company is unhedged, debt-funded by a US$30M Nebari senior secured facility and repeatedly equity-funded. A secondary, option-value asset is Trans-Tasman Resources, owner of the 3.2Bt Taranaki vanadiferous titanomagnetite (VTM) iron-sands project offshore New Zealand, whose fast-track consent application was withdrawn in February 2026 after an adverse draft decision. The equity is a high-beta, leveraged play on silver and gold prices and execution of the restart.
Company's own description
In its FY2025 Annual Report, Manuka describes itself as an Australian mining and exploration company located in the Cobar Basin, central-west New South Wales, that is the 100% owner of two fully permitted mining projects — one gold (Mt Boppy) and one silver (Wonawinta) — together with a world-class pre-development vanadium-rich iron sands project in the South Taranaki Bight of New Zealand (Taranaki VTM Project, held via Trans-Tasman Resources Limited). The notes to the financial statements define the principal activities as "mine development, mining and processing of silver, gold and exploration activities," and the H1 FY2026 report adds "completing the approval process and bringing its Taranaki VTM project into production." Its NZX-filed profile characterises it as "a diversified critical and precious metals" company.
Independent characterisation
Functionally, Manuka is a single-plant, restart-stage precious-metals producer with an adjunct, stranded-permitting critical-minerals development asset. The economic engine is the Wonawinta CIL plant, a hub that can treat (a) oxide silver ore from Wonawinta stockpiles and five planned open pits, (b) trucked gold ore from Mt Boppy (open pit, stockpiles, screened waste dumps and tailings, ~45–50 km east of Cobar and ~120 km by road from Wonawinta per company commentary), and (c) potentially satellite gold ore from Pipeline Ridge (~28 km south of Mt Boppy). The business model is the classic "hub-and-spoke" toll-style integration of owned ore sources into a centralised mill, with a single London Bullion Market Association (LBMA)-accredited refinery as off-taker.
The company has a history of intermittent production: Mt Boppy open-pit gold (April 2020–November 2021), a Wonawinta silver trial on oxide stockpiles (March–October 2022, formally completed February 2023), and Mt Boppy screened dump material (May–December 2023). It then entered care and maintenance (Q1 CY2024) through to March 2026, generating zero sales revenue in FY2025 and H1 FY2026. Revenue therefore depends entirely on successful ramp-up in FY2027.
Revenue model
| Revenue type | Share of revenue | Notes | Source |
|---|---|---|---|
| Product sales — gold (doré / mineralised ore) | 95.1% of FY2024 sales (A$14.45M of A$15.20M) | Sold to one LBMA-accredited refinery; revenue recognised at lock-in contract | FY2025 AR Note 3.6 & Note 5 |
| Product sales — silver | 4.9% of FY2024 sales (A$0.74M) | Gold credits historically ~15% of payables from silver shipments in the 2022 trial | FY2025 AR Note 5; Review of Operations |
| Services / subscription / licensing | 0% | — | — |
| Other income (R&D incentive, grants, insurance, other) | A$1.45M (FY2024); A$0.95M (FY2025); A$0.35M (H1 FY2026) | FY2024 included A$1.07M R&D incentive and A$0.15M government grant | FY2025 AR Note 5(b); H1 FY2026 Note 5 |
Value-chain position, customers, end-markets
Manuka sits at the upstream end of the precious-metals value chain (mining, haulage, crushing, leaching, doré production). It does not refine; product is delivered to a single refinery customer, creating customer-concentration (but low credit) risk. End-markets are global gold and silver bullion markets (investment, jewellery, industrial/photovoltaic silver demand). The Taranaki VTM project, if developed, would serve seaborne iron-ore (steelmaking) and vanadium markets (high-strength steel alloys and vanadium redox flow batteries), with titanium as a potential by-product.
Strategy
Stated strategy (themes from the FY2025 Annual Report and 2026 releases)
The FY2025 Chairman's Report was titled "Waiting on Fast-Track, while working towards the restart of silver production." The stated pillars are: (1) restart production from the Cobar Basin hub — silver from Wonawinta augmented by incremental gold from Mt Boppy and potentially Pipeline Ridge, centralising ore processing at Wonawinta; (2) remain fully unhedged to capture gold and silver price upside; (3) grow resources near existing infrastructure (Mt Boppy deeps/south, Pipeline Ridge, Wonawinta inferred-to-indicated conversion); (4) advance the Taranaki VTM project to final approvals and a Bankable Feasibility Study (now on hold following withdrawal of the Fast-track application). Management describes Wonawinta as "the only production ready silver mine in Australia."
Strategic initiatives — last 24 months
| Initiative | Date | Detail | Status |
|---|---|---|---|
| Cobar Basin Production Plan (v1) | 30 May 2025 | 10.7Mt containing 19.2Moz Ag; capex A$18.9M; AISC A$35/oz; EBITDA A$22M p.a.; IRR 109%; NPV8 A$101M at A$50/oz Ag | Superseded |
| Wonawinta reserve update | 3 Jun 2025 | 6.15Mt @ 56.4 g/t Ag (~11Moz) | Superseded |
| Mt Boppy maiden OP reserve | 29 Jul 2025 | 290kt @ 4.2 g/t (~39koz); adds NPV8 A$43.2M at A$5,000/oz Au | Feeding plant |
| NZX dual listing | 29 Sept 2025 | Access to NZ shareholder base | Complete |
| Updated Cobar Basin PFS (v2) | 30 Jan 2026 | 10.4Mt silver ore + 0.5Mt gold ore; capex A$26.6M (A$11.4M de-slime); average EBITDA A$127M p.a.; C1 A$34.4/oz Ag net of gold credits; NPV8 A$805M; IRR 1,092% at US$95/oz Ag, US$4,800/oz Au, AUD/USD 0.70; mine plan 8% Measured, 54% Indicated, 39% Inferred | Current base case (prior to timetable/cost revisions) |
| Exit from care and maintenance | 9 Mar 2026 | Operational mode declared | Complete |
| Wonawinta reserve upgrade | 13 Jul 2026 | 7.9Mt @ 50.4 g/t (12.8Moz), +28% | Complete |
| Mining contractor | H2 2026 | Mining expected to be contracted to Macmahon Contractors | Pending |
| Gold restart | 20 Aug 2026 | Mt Boppy ore through Wonawinta | Ramp-up |
| De-slime circuit | Q4 2026 | Construction completion Q4 2026; commissioning Dec 2026 | In progress |
| Pipeline Ridge MRE | 2,026 | Maiden resource after high-grade RC results | Pending |
| Taranaki VTM approvals | 2025–2026 | Fast-track application lodged Apr 2025, withdrawn Feb 2026; "considering a number of options" | Stalled |
ESG/sustainability commitments
Sustainability Statement committing to alignment with the UN Sustainable Development Goals; ESG assessment required on all capex requests; stakeholder materiality assessment under review (FY2025 AR). No quantified emissions targets.
Cost programs and guidance
No formal cost-reduction program with targets is disclosed. Production guidance consists of timetables: first gold sales by end-September 2026; first silver revenues from January 2027 (pushed from the earlier Q1 2026 → Q2 2026 → late September 2026 targets). The September 2026 raise cited increases in freight, installation and construction costs plus an approximately three-month timetable extension. No medium-term financial targets (margins, returns) have been issued beyond PFS economics.
Products & Services
Manuka's "products" are mineral assets and the metal they produce. Each asset is catalogued below.
Operations segment
A. Wonawinta Silver Project and Processing Plant (100%)
Location: ~80 km due south of Cobar, NSW, on the "Manuka" pastoral lease (homestead, satellite internet, airstrip, rural power connection).
Description: Granted mining lease ML1659, existing open pits (Manuka and Boundary pits, with planned cutbacks), approved tailings dams, accommodation, and a ~1Mtpa CIL processing plant (capacity raised from 850ktpa in 2022).
Key specifications: Ore Reserve (as at 1 June 2026) 7.9Mt @ 50.4 g/t Ag for 12.8Moz, based solely on Measured and Indicated resources — a 28% increase over the June 2025 reserve of 6.2Mt @ 56.4 g/t for 11.24Moz. Silver mineral resource (group) 49.6Mt @ 39.5 g/t for 63Moz at 30 June 2025 (Wonawinta MRE unchanged since 1 April 2021).
Flowsheet change: New de-slime circuit (trommel plus smaller ball mill ahead of milling) to remove clays that previously limited mill throughput and CIL recoveries; capex A$11.4M within the A$26.6M restart budget (January 2026 PFS); a further A$8.5M of the September 2026 placement is allocated to completing the de-slime circuit to commissioning.
Status: Gold processing restarted 20–21 August 2026; de-slime/crushing construction targeted for completion in Q4 2026, commissioning December 2026, first silver revenue targeted January 2027. Mining expected to be contracted to Macmahon Contractors later in 2026.
Target customer: Single LBMA-accredited refinery.
Pricing model: Spot, fully unhedged.
Sources: ASX releases 13 July 2026, 21 August 2026, 7 September 2026; H1 FY2026 Interim Report; FY2025 AR.
B. Mt Boppy Gold Project (100%, via Mt Boppy Resources Pty Ltd)
Location: ~45–46 km east of Cobar, eastern Cobar Basin (Canbelego–Mineral Hill Rift Zone).
Description: Existing open pit, ROM pad, stockpiles, main waste dump, low-grade rock dump, tailings (TSF3, ~800kt). Three mining leases, four gold leases and one exploration licence covering >210 km².
Key specifications: Maiden open-pit Probable Ore Reserve (29 July 2025) 290kt @ 4.2 g/t Au for ~39,100oz. Total group gold Probable Reserves at 30 June 2025: 0.55Mt @ 2.56 g/t for 46koz. Group gold resources 2.6Mt @ 1.3 g/t for 110koz. Screened dump material historically graded 1.7–1.8 g/t in the minus-22mm fraction.
Status: Over 50,000t of Mt Boppy material grading ~1.1 g/t Au stockpiled at Wonawinta as initial feed (August 2026); first gold sales targeted by end-September 2026. Initial deep diamond drilling (three holes) in early 2026 did not intersect significant high-grade zones.
Sources: FY2025 AR; ASX releases 28 April/11 May 2026, 21 August 2026.
Exploration – Australia segment
C. Pipeline Ridge Gold Project (EL5842, 100%)
Location: ~28 km south of Mt Boppy.
Description: Volcanogenic massive sulphide (VMS)-style system with shallow free-milling oxide gold; target open-pit to ~60m depth. Historic drilling of 195 holes for 13,237m.
Key data: H1 FY2026 preliminary open-pit target of 200–1,145kt @ 1.4–2.1 g/t Au for 17–53koz (conceptual exploration target, not a resource). September 2026 RC results included 32m @ 7.98 g/t Au and 8m @ 12.96 g/t Au. Maiden MRE targeted for 2026; further drilling October 2026. No third-party royalties on EL5842.
Sources: H1 FY2026; SmallCaps; ASX/NZX release 10 September 2026.
D. Regional Cobar Basin tenements (~1,150 km²)
- Wonawinta ML1659 extensions on EL7345 (Ag-Pb-Zn); EL6302 (historic ~2 g/t McKinnons gold mine); EL8498 (Guzzi prospect); EL6482 (De Nardi, Gundaroo Cu-Pb-Zn); Mt Boppy South extensions (Au-Cu). Potential future flotation circuit for sulphide/base-metal ore under evaluation.
Source: FY2025 AR.
Exploration – NZ segment
E. Taranaki VTM Iron Sands Project (100%, via TTR)
Location: South Taranaki Bight, 22–36 km offshore North Island, within NZ's Exclusive Economic Zone.
Resource: 3.2Bt @ 10.17% Fe2O3, 0.05% V2O5 (1.6Mt contained V2O5), 1.03% TiO2; Indicated 2.1Bt (65.7%), Inferred 1.1Bt. MMP55581 contains 1.88Bt; MEP54068 (inside the 12 nautical mile limit) contains a further 1.29Bt.
PFS (26 March 2025): 5Mtpa export concentrate (56–57% Fe, 0.5% V2O5, 8.5% TiO2); ~10,000tpa vanadium; initial capex US$602M (NZ$1B) including US$84.4M contingency; opex US$27.20/t concentrate; average EBITDA US$312M; post-tax NPV10 US$1.26B; IRR 39%; 20-year initial life. NZIER impact assessment: NZ$854M annual exports (NZ$658M iron ore; NZ$196M V2O5).
Status: Fast-track application withdrawn 19 February 2026 after an adverse draft decision; the company says it is assessing options for final environmental approvals. No marine and discharge consents held.
Sources: FY2025 AR; H1 FY2026 Interim Report.
Financial Narrative
All figures A$ millions unless stated, FY ending 30 June. Primary source: FY2025 Annual Report (audited FY2024–FY2025 statements and five-year summary); FY2021–FY2023 income items supplemented by the five-year table in the FY2025 Remuneration Report and TipRanks aggregator data (flagged).
Income statement
Notes: FY2021–FY2023 gross profit, operating income and EBITDA are TipRanks aggregator figures (not company-reported). FY2024 and FY2025 EBITDA are derived (loss before finance expenses plus depreciation of A$0.69M and A$0.66M respectively); TipRanks shows -A$9.42M (FY2024) and -A$6.38M (FY2025) — a discrepancy reflecting differing treatment of share-based payments and FX. FY2021 net loss is the restated figure (originally -A$2.90M).
Margins and growth
Revenue CAGR FY2021–FY2024 (last revenue-generating year): -29.7% (derived). FY2021–FY2025 CAGR is not meaningful (zero terminal revenue).
Balance sheet
FY2023 cash (A$0.27M) is the FY2024 opening cash; FY2023 equity (A$19.94M) is the 1 July 2023 opening balance in the FY2025 statement of changes in equity. No goodwill is carried (TTR acquisition recorded within exploration and evaluation assets).
Interim balance sheet at 31 December 2025 (H1 FY2026): total assets A$61.05M; cash A$2.44M; current borrowings A$19.28M (almost entirely the A$19.26M related-party debt trust loan); non-current borrowings A$4.65M; total borrowings A$23.93M; total liabilities A$38.06M; equity A$22.99M; net current liabilities A$21.67M. Equity recovered because share capital rose A$32.5M net (to A$105.44M) through placements, debt-for-equity conversions and option exercises. Post-balance date (27 February 2026) the debt trust loan was repaid from the US$26M Nebari Tranche 1. (Source: H1 FY2026 Interim Report.)
Cash flow
H1 FY2026: operating cash flow -A$7.71M; PP&E -A$0.10M; exploration/development -A$0.72M; free cash flow -A$8.53M (derived); share issue proceeds A$21.38M; repayments of borrowings A$40.37M against proceeds of A$30.54M. (Source: H1 FY2026 Interim Report.)
Ratios (derived from year-end figures)
ROIC derived as loss before finance expenses divided by (total borrowings + equity). Net debt/EBITDA and interest coverage are not meaningful (negative EBITDA and EBIT). Cash conversion cycle is not meaningful given intermittent production and no disclosed receivables/payables days; trade payables of A$7.22M at FY2025 against zero revenue indicate stretched creditors (management cites "long-dated creditors" in its going-concern note).
Commentary on trends, inflections and drivers
FY2021–FY2022 (production phase): Revenue of A$43.75M (FY2021) and A$53.27M (FY2022) came principally from Mt Boppy open-pit gold processed at Wonawinta (April 2020–November 2021), with FY2022 also capturing the start of the Wonawinta silver trial. FY2022 was the company's only profitable year (NPAT A$5.28M, EPS 1.92c), aided by high-grade open-pit feed.
FY2023 (inflection to losses): Revenue collapsed 81% to A$9.90M as the Mt Boppy pit was exhausted and the silver trial — which the company says was brought to "an earlier close than originally planned due to factors beyond our control" — ended. The net loss of A$26.34M (EPS -6.15c) was the largest in the company's history, reflecting negative gross margin on trial-scale silver processing and the costs of absorbing TTR.
FY2024 (low-grade dump retreatment): Sales of A$15.20M (95% gold) from screened Mt Boppy dump material processed May–December 2023 could not cover A$21.94M cost of sales (hauling/crushing A$5.32M, processing/refining A$10.05M, site admin A$4.72M), producing an operating contribution of -A$6.74M; finance costs of A$7.32M drove a net loss of A$18.23M. Operations were halted in Q1 CY2024.
FY2025 (care and maintenance): Zero sales revenue. Corporate costs (A$7.32M, including A$3.26M professional fees) and escalating finance costs (A$10.26M, up 40%) produced a A$16.88M loss. Equity fell to A$2.30M; net current liabilities reached A$47.88M; auditor RSM flagged a material uncertainty over going concern.
H1 FY2026 (recapitalisation): Loss widened to A$12.88M (H1 FY2025: A$8.37M), with professional expenses up to A$4.30M and finance expenses of A$5.51M including A$2.15M of share-based payments to lenders. The recapitalisation (A$34.0M gross equity contributions in the half) rebuilt equity to A$22.99M, but the auditor issued a qualified review conclusion because it could not obtain sufficient evidence over the A$51.37M carrying value of exploration, development and PP&E assets. The key inflection — return to revenue — is expected in FY2027 (first gold sales targeted end-September 2026; silver from January 2027).
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Entity | Ownership | Role | Source |
|---|---|---|---|
Manuka Resources Limited (parent) | Listed | Holds Wonawinta silver project (ML1659, pastoral lease "Manuka"), processing plant, Wonawinta exploration licences; group treasury and debt | FY2025 AR |
Mt Boppy Resources Pty Ltd | 100% | Holds Mt Boppy gold project (3 mining leases, 4 gold leases, 1 exploration licence — >210 km²) and EL5842 (Canbelego/Pipeline Ridge) | FY2025 AR |
Trans-Tasman Resources Limited (NZ) | 100% | Holds Taranaki VTM project: mining permit MMP55581 and exploration permit MEP54068 (conversion to MMP61486 under application) | H1 FY2026 Interim Report |
Segment Overview
| Segment | What it contains | Products / activities |
|---|---|---|
Exploration – Australia | Exploration of existing gold and silver leases and exploration leases at Wonawinta and Mt Boppy | Exploration targets: Mt Boppy deeps/south extension, Pipeline Ridge, McKinnons, Guzzi, De Nardi/Gundaroo |
Exploration – NZ | Mining and exploration permits at the Taranaki VTM Project | VTM iron sands (iron ore concentrate with V2O5, TiO2) |
Operations | Appraisal, development and processing of gold and silver deposits | Wonawinta plant, Mt Boppy and Wonawinta ore sources; carries group finance costs and corporate overheads |
Revenue by Segment
| Segment | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Operations – external revenue (AUD Mn) | — | 15.20 | 0.00 |
Exploration – Australia – external revenue (AUD Mn) | — | 0.00 | 0.00 |
Exploration – NZ – external revenue (AUD Mn) | — | 0.00 | 0.00 |
Total group sales revenue (AUD Mn) | 9.90 | 15.20 | 0.00 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansResults by Segment
| Segment | FY2024 | FY2025 |
|---|---|---|
Operations – profit/(loss) before tax (AUD Mn) | -17.92 | -16.67 |
Exploration – Australia – profit/(loss) before tax (AUD Mn) | -0.17 | -0.05 |
Exploration – NZ – profit/(loss) before tax (AUD Mn) | -0.15 | -0.15 |
Group loss before tax (AUD Mn) | -18.23 | -16.88 |
Revenue by Segment and Segment Margins & Growth (%)
| Metric | FY2024 | FY2025 | Comment |
|---|---|---|---|
Operations segment operating contribution (AUD Mn) | -6.74 | 0.00 | FY2024: revenue A$15.20M less cost of sales A$21.94M |
Operations gross margin (%) | -44.4 | — | Derived: -6.74 / 15.20 |
Operations share of group revenue (%) | 100 | n/m | All revenue from Operations |
YoY revenue growth (%) | +53.5 | -100 | Derived (FY2024 vs FY2023 A$9.90M) |
Segment Revenue
| Segment | FY2024 assets | FY2025 assets | 31 Dec 2025 assets | FY2025 liabilities | 31 Dec 2025 liabilities |
|---|---|---|---|---|---|
Exploration – NZ | 26.22 | 26.61 | 24.73 | 0.00 | 0.00 |
Exploration – Australia | 10.33 | 11.33 | 12.43 | 0.27 | 0.10 |
Operations | 24.59 | 21.46 | 22.89 | 56.84 | 37.96 |
Total | 61.14 | 59.40 | 61.05* | 57.10 | 38.06 |
Income Statement and Per-Share Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue – sales (AUD Mn) | 43.75 | 53.27 | 9.90 | 15.20 | 0.00 |
Revenue and other income (AUD Mn) | 44.54 | 53.27 | 9.90 | 16.64 | 0.95 |
Gross profit (AUD Mn) | 0.44 | 12.03 | -15.46 | -6.74 | 0.00 |
Operating income / loss before finance costs (AUD Mn) | -4.64 | 8.70 | -17.85 | -10.91 | -6.62 |
EBITDA (AUD Mn) | -4.58 | 11.35 | -20.75 | -10.22 | -5.96 |
Finance expenses (AUD Mn) | — | — | — | 7.32 | 10.26 |
Pre-tax income (AUD Mn) | -3.07 | 5.28 | -26.34 | -18.23 | -16.88 |
Net income (AUD Mn) | -3.07 | 5.28 | -26.34 | -18.23 | -16.88 |
EPS basic (A$ cents) | -1.19 | 1.92 | -6.15 | -2.69 | -2.11 |
EPS diluted (A$ cents) | -1.19 | 1.92 | -6.15 | -2.69 | -2.11 |
Dividends per share (A$ cents) | 0 | 0 | 0 | 0 | 0 |
Margin Analysis (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Gross margin (%) | 1.0 | 22.6 | -156.2 | -44.4 | — |
Operating margin (%) | -10.6 | 16.3 | -180.3 | -71.8 | — |
EBITDA margin (%) | -10.5 | 21.3 | -209.6 | -67.2 | — |
Net margin (%) | -7.0 | 9.9 | -266.1 | -120.0 | — |
Revenue growth YoY (%) | 372.5 | 21.8 | -81.4 | 53.5 | -100.0 |
Balance Sheet
| Metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Total assets (AUD Mn) | — | 61.14 | 59.40 |
Cash and equivalents (AUD Mn) | 0.27 | 2.13 | 0.97 |
Borrowings – current (AUD Mn) | — | 28.20 | 40.28 |
Borrowings – non-current (AUD Mn) | — | 0.19 | 0.10 |
Total borrowings (AUD Mn) | — | 28.39 | 40.38 |
Net debt (AUD Mn) | — | 26.26 | 39.41 |
Total equity (AUD Mn) | 19.94 | 17.01 | 2.30 |
Goodwill and intangibles (AUD Mn) | 0 | 0 | 0 |
Exploration and evaluation assets (AUD Mn) | — | 36.55 | 37.93 |
Property, plant and equipment (AUD Mn) | — | 14.89 | 13.75 |
Current assets (AUD Mn) | — | 2.52 | 1.27 |
Current liabilities (AUD Mn) | — | 35.89 | 49.15 |
Working capital (AUD Mn) | — | -33.37 | -47.88 |
Rehabilitation and other non-current provisions (AUD Mn) | — | 8.05 | 7.62 |
Cash Flow
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | — | — | — | -7.23 | -5.20 |
Capex – PP&E (AUD Mn) | — | — | — | -0.33 | 0.00 |
Capex – exploration and development (AUD Mn) | — | — | — | -1.09 | -0.26 |
Free cash flow (AUD Mn) | — | — | — | -8.65 | -5.46 |
Proceeds from share issues (AUD Mn) | — | — | — | 10.69 | 1.70 |
Net borrowings (AUD Mn) | — | — | — | 1.02 | 2.82 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2024 | FY2025 |
|---|---|---|
ROE (%) | -107.2 | -735.1 |
ROA (%) | -29.8 | -28.4 |
ROIC (%) | -23.9 | -15.5 |
Current ratio (x) | 0.07 | 0.03 |
Debt to equity (x) | 1.67 | 17.59 |
Asset turnover (x) | 0.25 | 0.00 |
Revenue by Region and Region Margins & Growth (%)
| Region | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
Australia – revenue (AUD Mn) | 53.27 | 9.90 | 15.20 | 0.00 |
New Zealand – revenue (AUD Mn) | 0.00 | 0.00 | 0.00 | 0.00 |
Australia – YoY growth (%) | 21.8 | -81.4 | 53.5 | -100.0 |
Revenue by Region
| Commodity | FY2024 | FY2025 |
|---|---|---|
Gold – sales (AUD Mn) | 14.45 | 0.00 |
Silver – sales (AUD Mn) | 0.74 | 0.00 |
Share Price
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|---|
Closing share price (AUD) | 0.305 | 0.17 | 0.053 | 0.041 | 0.043 | 0.078 |
Share Price & Returns
| Horizon | Return |
|---|---|
1-year (FY2025 close → FY2026 close) | +81.4% |
3-year (FY2023 close → FY2026 close) | +47.2% |
5-year (FY2021 close → FY2026 close) | -74.4% |
Calendar 2025 | +251.9% (A$0.027 open → A$0.095 close) |
FY2026 trading range | A$0.034 low – A$0.23 high |
Calendar 2026 YTD (to Aug 2026) | High A$0.23, low A$0.071 |
Valuation Snapshot
| Multiple | Value | Comment |
|---|---|---|
P/E | n/m | Loss-making |
EV/EBITDA | n/m | Negative EBITDA |
EV/Sales | n/m | Zero trailing revenue |
P/B | ~5–7x (indicative) | Market cap A$119–152M vs H1 FY2026 equity A$22.99M (pre subsequent raises) |
Enterprise value | ~A$160–195M before cash (indicative) | Market cap plus US$30M Nebari debt (~A$43M at the ~0.69 AUD/USD implied by Tranche 2) |
EV per reserve ounce (silver) | ~A$12.5–15/oz (indicative) | EV divided by 12.8Moz Wonawinta reserve, ignoring gold |
Capital Instruments
| Instrument | Amount | Terms | Maturity |
|---|---|---|---|
Nebari senior secured term facility | US$30M (US$26M drawn 27 Feb 2026; US$4M drawn 26 Jun 2026) | 4-year term; principal repayments commence after 18 months; security over all assets; 44.66M warrants issued; interest rate not disclosed in sources accessed | ~Feb 2030 (derived); amortisation from ~Aug 2027 |
Working capital facility (restructured H1 FY2026) | US$3.0M term + US$4.0M working capital (per H1 FY2026 note) | — | — |
Vehicle finance | A$16,789 at 31 Dec 2025 | 12% | June 2027 |
“—” = not publicly disclosed.
Share Price & Returns by Date
| Date | Type | Amount | Price | Shares |
|---|---|---|---|---|
5 Aug 2025 | Entitlement offer and related issues | ~A$9.97M | A$0.043 | 231.8M |
Oct–Dec 2025 | Two-tranche placement | A$15M | A$0.075 | 200.0M |
5 Dec 2025 | Debt-to-equity (trade finance) | A$6.43M | A$0.075 | 85.7M |
Pre-16 Mar 2026 | Option exercises | A$4.6M | Various | 73.4M |
May 2026 | Underwritten option exercise | ~A$2.5M | A$0.06 | ~42.0M |
Sept 2026 | Placement + SPP | A$14.5M + up to A$1M | A$0.07 | 207.1M + SPP |
Analyst Conclusions
Management guidance
-
First gold sales targeted by end-September 2026 (outcome to be confirmed in the September quarterly, due ~30 October 2026).
-
De-slime and crushing circuit construction complete Q4 2026; commissioning December 2026.
-
First silver revenues targeted January 2027.
-
Maiden Pipeline Ridge Mineral Resource Estimate in 2026; further drilling October 2026.
-
Contract mining (Macmahon) later in 2026.
-
No financial guidance (revenue, AISC, EBITDA) for FY2027 has been issued. The January 2026 PFS remains the reference: 10-year average EBITDA A$127M p.a. at US$95/oz Ag, C1 A$34.4/oz.
Consensus expectations
None available (no broker coverage).
Bull case
-
Price leverage on a sunk-cost plant: With restart capex of only A$26.6M and silver well above the A$50/oz reserve price, steady-state silver production from 2027 could transform cash generation; the company's own sensitivity indicates ~A$43M of NPV per 10% move in silver.
-
Reserve and resource growth: The 28% Wonawinta reserve increase to 12.8Moz and Pipeline Ridge intercepts (32m @ 7.98 g/t) suggest mine-life and grade upside without new infrastructure.
-
Free option on Taranaki and corporate value: The NZ asset (A$24.7M book) is carried at a fraction of its PFS NPV (US$1.26B); any revived pathway, farm-out or sale could re-rate the group.
Bear case
-
Execution and metallurgy risk: The project has slipped by roughly 9–12 months versus the May 2025 plan, costs have risen, and the de-slime circuit that underpins silver economics is unproven at commercial scale on clay-rich ore that defeated the 2022 trial.
-
Balance-sheet fragility and dilution: Accumulated losses of A$85.6M, going-concern qualifications, a qualified auditor review, ~283M options and 44.7M warrants outstanding, and serial discounted raises point to continued per-share value leakage; Nebari amortisation begins ~August 2027.
-
Taranaki is effectively impaired: Five adverse decisions across 12 years, united iwi opposition and a comprehensive draft panel rejection make consent improbable; the A$24.7M carrying value faces impairment risk.
Key catalysts and monitorables (next 12 months)
| Timing | Catalyst / monitorable |
|---|---|
| ~30 Oct 2026 | September 2026 quarterly: first gold ounces, grade, recovery, cash balance |
| Q4 2026 | Pipeline Ridge maiden MRE |
| 26 Nov 2026 (expected) | AGM — remuneration, option issues, board renewal |
| Dec 2026 | De-slime circuit commissioning |
| Jan 2027 | First silver revenue |
| Jan/Mar 2027 | December quarterly and H1 FY2027 report — first revenue-bearing half; auditor conclusion |
| H1 CY2027 | Steady-state throughput (~1Mtpa) and C1 cost vs A$34.4/oz plan |
| Ongoing | TTR strategic options; any impairment of NZ assets; silver/gold prices; AUD/USD |
| ~Aug 2027 | Commencement of Nebari principal amortisation |
Analyst verdict
Manuka Resources is a classic leveraged restart story whose investment case now rests almost entirely on the Cobar Basin, not on the New Zealand asset that dominated its narrative for three years. The company has done the hard part of recapitalising: it replaced expensive related-party bridge debt with a fully drawn US$30M Nebari facility, raised roughly A$50M of equity in twelve months, rebuilt a site workforce from five to more than eighty, lifted the Wonawinta reserve to 12.8Moz, and restarted gold processing in August 2026. With silver and gold at or near historic highs, the theoretical economics of an existing, permitted 1Mtpa plant are compelling, and the market currently values the group at an indicative EV of roughly A$12–15 per reserve ounce of silver before any gold or exploration credit.
Against this, the evidence on execution is mixed. Every production target since May 2025 has slipped, the latest by about three months with cost overruns; the silver flowsheet's critical de-slime circuit is not yet built; prior silver processing ended early; and the first gold feed grades only ~1.1 g/t. Financial reporting carries a going-concern material uncertainty and a qualified auditor review, governance is thin (three-person, majority-executive board with a combined chair-CEO and a related-party debt arrangement), and the share count has roughly doubled in fifteen months. The Taranaki VTM project, following the February 2026 withdrawal, should be treated as near-zero value for underwriting purposes.
Our view: speculative, high-risk, execution-contingent. The September 2026 quarterly and December 2026 de-slime commissioning are binary checkpoints. Demonstrated plant throughput near nameplate with recoveries in line with the PFS, and C1 costs near A$34–35/oz, would justify a materially higher valuation; any further slippage or another discounted raise before positive cash flow would confirm the bear case of chronic dilution.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Title | Tenure | Background and education |
|---|---|---|---|
Dennis Karp | Executive Chairman (also described as Managing Director in June 2026 releases) | Director since 20 Apr 2016; Executive Chairman since 1 Mar 2020 | Entered Australian financial markets 1983; Head of Trading, HSBC Australia; joined Tennant Limited (physical commodity trader) 1997, managing director 2000–2014; founded ResCap Investments 2014. BCom, University of Cape Town |
Alan J Eggers | Executive Director; Executive Chairman of TTR | Director since 10 Nov 2022; executive since 1 Feb 2023 | Geologist, 40+ years; founding director of Summit Resources (NZX 1987 listing to ASX 200; taken over by Paladin Energy for A$1.2B in 2007). BSc, BSc (Hons), MSc, Victoria University of Wellington; Fellow SEG, Fellow AusIMM, Member AIG |
John Seton | Independent Non-Executive Director; Chair, Remuneration Committee | Since 10 Nov 2022 | Auckland-based commercial and resources lawyer; former director of Summit Resources; former Chairman, Vietnam/New Zealand Business Council; other listed boards (last 3 yrs): Manhattan Corporation (ASX: MHC), Good Spirits Hospitality (NZX: GSH). LLB, Victoria University of Wellington; LLM (Hons), University of Auckland |
Anthony McPaul (former) | Non-Executive Director | 25 Nov 2016 – 3 Dec 2024 (resigned) | — |
Executive Leadership Team
| Name | Title | Tenure | Background |
|---|---|---|---|
Haydn Lynch | Chief Operating Officer (described by Greenpeace as co-founder) | Since 1 Jul 2019 | Not detailed in filings |
Rod Griffith | Executive General Manager – Operations (Wonawinta and Mt Boppy) | Appointed 7 Jan 2026, started late Jan 2026 | 30+ years in mine development; former COO, KBL Mining; 20+ years at Straits Resources (incl. GM Projects); most recently GM Operations, Alkane Resources' Tomingley Gold Mine |
Dieter Engelhardt | Metallurgy lead; Competent Person for metallurgy, infrastructure and tailings | — | Directed Wonawinta metallurgical test work and flowsheet |
Eryn Kestel | Joint Company Secretary | Since 31 May 2024 | CPA; BBus (Accounting), Curtin University; ~30 years as listed-company secretary |
Alex Sutton | Joint Company Secretary | — | — |
“—” = not publicly disclosed.
Directors' Remuneration
| Person | Salary/fees | Leave accrual | Superannuation | Share-based | Total FY2025 | Total FY2024 |
|---|---|---|---|---|---|---|
Dennis Karp | 350,000 | 4,815 | 30,000 | 0 | 384,815 | 396,967 |
Alan J Eggers | 252,000 | 0 | 0 | 0 | 252,000 | 240,000 |
John Seton | 65,000 | 0 | 0 | 0 | 65,000 | 71,710 |
Anthony McPaul | 27,085 | 0 | 0 | 0 | 27,085 | 72,697 |
Haydn Lynch | 244,708 | 7,602 | 28,141 | 0 | 280,451 | 284,819 |
Total KMP | 938,793 | 12,417 | 58,141 | 0 | 1,009,351 | 1,066,193 |
Major Shareholders
| Rank | Holder | Shares | % |
|---|---|---|---|
| 1 | Rosenberg Group | 139,442,729 | 13.09 |
| 2 | Mr Antanas Guoga | 72,401,509 | 6.80 |
| 3 | Citicorp Nominees Pty Ltd | 58,020,391 | 5.45 |
| 4 | Sharesies Australia Nominee Pty Ltd | 51,392,661 | 4.82 |
| 5 | Minvest Securities (New Zealand) Ltd | 49,375,887 | 4.63 |
| 6 | HSBC Custody Nominees (Australia) Ltd | 36,990,414 | 3.47 |
| 7 | Soothgrove Pty Ltd | 35,982,915 | 3.38 |
| 8 | Tennant Metals South Africa Pty Ltd | 32,427,194 | 3.04 |
| 9 | Buttonwood Nominees Pty Ltd | 30,497,538 | 2.86 |
| 10 | BNP Paribas Nominees Pty Ltd | 25,505,996 | 2.39 |
Competitive Landscape
Competitors by Segment
| Segment | Competitor | Ticker | Relative positioning vs Manuka |
|---|---|---|---|
Silver (Australia) | Silver Mines Limited (Bowdens, NSW) | ASX: SVL | Larger silver resource in NSW; development-stage with permitting challenges; Manuka claims production-readiness advantage |
Silver (Australia) | Investigator Resources (Paris silver, SA) | ASX: IVR | Development-stage; no plant |
Silver (offshore, ASX-listed) | Andean Silver | ASX: ASL | Chilean silver developer competing for silver-themed capital |
Silver (offshore, ASX-listed) | Sun Silver | ASX: SS1 | US silver explorer |
Cobar Basin base/precious metals | Aurelia Metals (Peak mines) | ASX: AMI | Established Cobar producer; far larger scale |
Cobar Basin base metals | Polymetals Resources (Endeavor mine) | ASX: POL | Fellow Cobar restart story |
Cobar Basin copper | Metals Acquisition Ltd (CSA mine) | ASX/NYSE: MAC | Large-scale producer; competes for labour |
Cobar Basin explorers | Peel Mining | ASX: PEX | Explorer/developer in same district |
NSW gold | Alkane Resources (Tomingley) | ASX: ALK | Established producer; source of Manuka's new EGM Operations |
Vanadium (Australia) | Australian Vanadium | ASX: AVL | Onshore vanadium developer; avoids offshore permitting risk |
Vanadium/iron sands (NZ/Aus) | Richmond Vanadium Technology | ASX: RVT | Vanadium developer competing for critical-minerals capital |
Competitor Detail
| Metric | Manuka (FY2025) |
|---|---|
Revenue (AUD Mn) | 0.00 (FY2024: 15.20) |
Revenue growth (%) | -100 |
EBITDA margin (%) | n/m |
Stage | Restart producer |
Recent Developments
--