MC Mining Ltd Overview
MC Mining is a small-cap South African coal company that has spent most of its history as a developer. It is now crossing into commercial production at its flagship Makhado steelmaking hard coking coal (HCC) mine in Limpopo Province. The foundation phase of Makhado is designed to produce about 800,000 tonnes a year of a mid-volatile HCC product (HCC 64 Mid Vol) plus a 5,500 kcal thermal coal by-product. It has a planned 28-year life of mine. Management describes it as set to become South Africa's largest HCC producer, initially selling into the domestic steel industry. The legacy cash-generating asset, the Uitkomst Colliery in KwaZulu-Natal, was placed on care and maintenance in March 2026, and a binding offer for it is being considered. Since April 2026 the company has been majority-owned (51%) by Hong Kong-listed Kinetic Development Group, a Chinese coal producer that funds its development. The investment case therefore turns on Makhado's ramp-up, KDG's continued financial support and coking coal prices.
What the company does
MC Mining explores for, develops and mines coal in South Africa. Its business has four asset pillars:
-
Makhado Project (67% attributable once the black economic empowerment transaction completes). Steelmaking HCC with a thermal coal by-product, in the Soutpansberg Coalfield, Limpopo. Plant commissioning took place May–August 2026, with ramp-up targeted in the September 2026 quarter.
-
Uitkomst Colliery (84%). An underground metallurgical and thermal coal mine in the Utrecht Coalfield, KwaZulu-Natal. Historically the only revenue source; mining and processing were suspended effective 1 March 2026.
-
Vele Aluwani Colliery (100%). Semi-soft coking coal (SSCC) and thermal coal in the Tuli Coalfield, Limpopo. Suspended, pending a re-engineered business plan and a viable logistics solution.
-
Greater Soutpansberg Projects (GSP) (mostly 74%, some farms 100%). Includes the Chapudi, Generaal and Mopane project areas. These are mining-right tenements next to Makhado. Management describes the GSP as the long-term greenfield growth platform with over 7.0 billion tonnes of coal in place (FY2025 H1 interim report). That figure is a gross in-situ characterisation and not a JORC/SAMREC reserve.
The company also holds small legacy Australian royalty interests: Kanowna West & Kalbara, Abbotshall, and Kookynie gold tenements, with 0.5% net smelter royalties, plus a 5.99% interest in one tenement (M27/181). These are immaterial.
Company's own description
In its 2026 quarterly reports, MC Mining describes itself as an ASX/JSE-listed coal exploration, development and mining company operating in South Africa. It lists its key projects as Uitkomst (metallurgical and thermal coal), Makhado (hard coking coal), Vele (semi-soft coking and thermal coal) and the GSP (coking and thermal coal). Its May 2026 announcement completing the KDG subscription says it intends to become a meaningful new entrant in the global seaborne metallurgical coal market. It also notes a capacity expansion programme under design and testing that targets 800,000 t/y of HCC and 700,000 t/y of thermal coal in total.
Business model and revenue model
| Dimension | Characterisation |
|---|---|
| Revenue model | 100% product sales (physical coal). No service, subscription or licensing revenue. Legacy Australian royalties are immaterial and not separately disclosed. |
| Value chain position | Upstream: mining, beneficiation (washing in a coal handling and preparation plant, CHPP), and road logistics to customers or port. Mining is outsourced to contractors (JCI Mining at Makhado). Plant construction is contracted (Enprotec). |
| Customer types | Uitkomst (historical): domestic metallurgical and industrial buyers (premium duff, sized peas) and lower-grade middlings buyers. A marketing arrangement with a trader, Paladar, ran on a trial basis until its expiry in July 2024 and was not extended. Makhado: domestic steelmakers initially, with seaborne export optionality. Weighbridges were commissioned and trial runs to port were being prepared in August 2026. |
| End markets | Steelmaking (coking coal); industrial and energy (thermal coal, including the API4-referenced 5,500 kcal product) |
| Pricing | Linked to international benchmarks (premium HCC; API4 Richards Bay thermal). The company reports average benchmark prices each quarter. Specific contract terms are not publicly disclosed. |
Independent characterisation
MC Mining is effectively a single-asset development company in transition to production. Its parent is a strategic Chinese coal investor. Historically it was a serial underachiever. As Coal of Africa, it accumulated about US$988M of retained losses by December 2025 (S&P balance sheet data) across failed or stalled projects (Mooiplaats, Vele) and costly legacy contracts. The KDG recapitalisation solved Makhado's financing gap, which had lasted for years. In return, minority shareholders now hold a stock controlled by one funder. Liquidity is fragile: the company had US$2.9M of cash and US$54.4M of current liabilities at 30 June 2026, and its auditors flagged material uncertainty on going concern. Operating revenue is now near zero until Makhado ships coal.
Strategy
Stated strategy themes (from FY2025–FY2026 disclosures, paraphrased)
-
Transition from explorer and developer to operating producer. Management and the board describe the KDG recapitalisation and Makhado commissioning as repositioning the group as an operating coal producer.
-
Makhado as the cornerstone. The aim is to make Makhado South Africa's largest HCC producer: about 800 kt/y of HCC 64 Mid Vol over a 28-year life of mine, with expansion to 800 kt/y HCC plus 700 kt/y thermal coal under design.
-
A Vhembe/Limpopo growth platform. Later development of the GSP tenements and a restructured Vele, using KDG's capital, mining technology and procurement capability.
-
Domestic-first marketing. Initial HCC sales to domestic steel producers, exploiting a logistics cost advantage over imported coking coal, with export capability being built (port trials).
-
Portfolio rationalisation. Uitkomst suspended and offered for partnership or sale; redundant equipment sold (R9.9M); non-core assets reviewed.
-
Safety and community licence. Zero lost-time injuries in Q4 FY2026; a Women in Mining structure at Makhado; host-community hiring targets.
Strategic initiatives in the last 24 months
| Initiative | Date | Description / target | Status |
|---|---|---|---|
| KDG strategic investment | Aug 2024 – Apr 2026 | US$90M for 51%; funds Makhado construction | Complete |
| Makhado construction and commissioning | FY2025–FY2027 | Boxcut, CHPP, power, water, logistics; ramp-up to nameplate before end of the September 2026 quarter | C3 on 22 May 2026; C4 and performance testing in August 2026; ramp-up confirmation pending |
| Uitkomst turnaround plan | Jul 2025 – Feb 2026 | Specialist partner; cost reduction, fleet refurbishment, plant modifications | Failed to restore output; mine suspended 1 Mar 2026 |
| Uitkomst strategic options | Mar 2026 onward | Partnerships, joint operation or sale; binding offer received | Under evaluation; no decision as of 31 Jul 2026 |
| Vele re-engineered business plan | Ongoing | Geological and mine-plan re-evaluation; logistics solution | In progress |
| GSP prioritisation | FY2026 | Prioritising deposits; environmental and water licence applications in H1 calendar 2026 | In progress |
| Convertible note programme | Jun 2026 | US$9.936M bridge to commercial production | Partly drawn (US$5.79M by 30 Jun 2026; plus US$2.246M in July) |
| KDG US$16M capital support | Aug 2026 | US$8M bridge loan plus US$16M subscription | Subject to shareholder approval; second tranche conditional on Makhado production |
| R250M working capital facility | Application flagged at FY2025 results; expected to conclude in Q1 calendar 2026 | Bank or institutional working capital facility | Outcome not publicly disclosed |
| Makhado expansion study | 2,026 | 800 kt/y HCC plus 700 kt/y thermal coal target | Design and testing |
Medium-term guidance and targets
| Item | Guidance | Source |
|---|---|---|
| Makhado plant performance testing | Early August 2026 | Q4 FY2026 activities report |
| Makhado ramp-up to full capacity | Before end of the September 2026 quarter | Q4 FY2026 activities report |
| Makhado planned production levels | By end of calendar 2026 | Business Day, 13 Aug 2026; Feb 2026 market update |
| Foundation-phase HCC output | About 800 kt/y (company); 770 kt/y first phase (Business Day) | Q4 FY2026 report; Business Day |
| Revenue, EBITDA or cost guidance | — | — |
The Makhado schedule has slipped repeatedly. Over 2025–2026 the stated target moved from first coal in calendar 2025, to commissioning in December 2025, then March 2026, April 2026, May 2026, and finally performance testing in August 2026. Reasons given were heavy rainfall and flooding, and delays to the Eskom power connection.
Products & Services
Makhado Project products
| Product | Description / specification | Target customer | Status | Pricing |
|---|---|---|---|---|
| HCC 64 Mid Vol | Primary product: mid-volatile hard coking coal for blast-furnace coke making. Design rate about 800,000 t/y at foundation-phase steady state. Business Day (Sep 2026) cites 770,000 t/y for the first phase; the difference is noted. | Domestic South African steelmakers initially (logistics advantage over imports); seaborne export optionality | Commissioning; first production in the September 2026 quarter (not yet confirmed by a published report at cut-off) | Benchmark-linked; contract terms not publicly disclosed. Premium HCC benchmark averaged US$238/t in Q4 FY2026. |
| 5,500 kcal thermal coal (API4-type) | Secondary product from washing | Domestic and export thermal markets | Commissioning | API4-linked; thermal coal averaged US$113/t in Q4 FY2026 |
| Expansion case | Target of 800,000 t/y HCC plus 700,000 t/y thermal coal "under design and testing" | — | Concept / design | — |
| Parameter | Value |
|---|---|
| Life of mine | 28 years |
| Total saleable coal over life of mine | About 41 Mt (Engineering News project profile) |
| Steady-state ROM throughput | About 4.0 Mtpa (FilingReader summary of July 2026 announcement) |
| Initial pit | East Pit, 5.5 km strike × 400 m width |
| Mining contractor | JCI Mining (Pty) Ltd: 249 people, 8 backhoe excavators, 33 articulated dump trucks |
| CHPP contractor | Environmental and Process Technologies (Enprotec); peak workforce 450 across 16 subcontractors, 140 from host communities |
| Power | Paradise Overhead Line: 14 km, 22 kV, 7.5 MVA from the national grid via the Paradise substation. Commissioned in Q4 FY2026. |
| Water | Eastern wellfields commissioned; western wellfields due in the September 2026 quarter |
| Logistics | Two 80-tonne certified weighbridges; logistics contractors shortlisted; trial run to port in August 2026 |
| Peak funding (historical estimate) | US$96M (R1.8bn) (Engineering News project profile) |
| Coal mined for commissioning | 101,000 t by end-June 2026 |
Key Makhado specifications (Q4 FY2026 activities report and Engineering News project updates):
Uitkomst Colliery products (suspended)
| Product | Description | Customers | Status |
|---|---|---|---|
| Premium duff | High-grade fine coal with metallurgical and thermal applications | Domestic industrial and metallurgical users | Suspended 1 Mar 2026 |
| Sized peas | Sized high-grade product | Domestic industrial users | Suspended |
| Middlings | Lower-grade by-product. Sales were 12,995t in H1 FY2026 per Business Report; the company's own release shows none. | Domestic | Suspended |
| Slurry processing | A short-term arrangement for processing slurry was concluded during the suspension | Third party | Short-term |
Plant yield improved from 60% to 73% (Q3 FY2025) and reached 79.7% (Q2 FY2026) after plant modifications.
Vele Aluwani Colliery products
Semi-soft coking coal and thermal coal. The mine is suspended. The company is studying a commercially viable logistics route. No sales.
GSP
No products. The GSP comprises mining-right tenements across the Chapudi, Generaal and Mopane areas, which management has prioritised for future development after Makhado. The company says these areas also have steelmaking HCC potential.
Services
None.
Financial Narrative
Basis. Standardised figures come from S&P Global Market Intelligence via StockAnalysis.com (USD M, fiscal years ending 30 June), cross-checked against company results announcements. Company-reported headline figures:
-
FY2026: revenue US$7.4M; loss after tax US$17.8M; administrative expenses US$9.8M; finance costs US$0.9M; operating cash outflow US$8.9M; unrestricted cash US$2.9M.
-
FY2025: revenue US$17.5M; loss after tax US$36.0M; impairments US$24.3M; administrative expenses US$6.9M; finance costs US$1.6M; unrestricted cash US$7.4M; net asset value US$83.2M.
-
FY2024: revenue US$36.7M; loss after tax US$14.6M; net asset value US$75.4M.
Income statement
EPS for FY2025 (-7.06 US cents) and FY2026 (-2.37 US cents) are company-reported via RTT News and FilingReader; earlier years are S&P rounded values.
Margins (%)
Revenue CAGR FY2022–FY2026: -25.0% per year (USD 23.51M to USD 7.45M; calculated).
Commentary. Revenue peaked in FY2023 (US$44.8M), helped by strong coal prices after 2022. It then fell for three consecutive years as Uitkomst output dropped. ROM production fell 22% in FY2025 because of narrower seams, geological intrusions and poor fleet availability, and sales declined further in FY2026 until the March 2026 suspension. The gross margin turned negative in FY2025 as unit costs rose 44% to US$92/t while the realised price fell to US$72/t.
Operating losses are distorted by non-cash items. FY2022 included about US$16.8M of depreciation, amortisation and impairment. FY2025 included US$24.3M of impairments on Uitkomst and the GSP, part of US$25.8M of non-cash charges. The FY2026 loss halved because there were no impairments, but underlying EBITDA worsened to -US$17.6M. That reflects Uitkomst's cash losses before suspension and higher administrative costs (+42% to US$9.8M) during the transition to Makhado operations.
Balance sheet
Notes:
-
FY2026 cash (US$2.906M) is from the June 2026 Appendix 5B. FY2026 current assets and liabilities are from the FY2026 results as reported by Business Day.
-
At the December 2025 half-year: total assets US$134.79M; equity US$101.93M; total debt US$13.59M; shares 691.57M (S&P).
-
Shares outstanding were 816.06M by August 2026 (S&P).
Commentary. The balance sheet is asset-heavy (PP&E plus long-term investments) but chronically illiquid. Working capital has been negative in every year. It deteriorated sharply to about -US$49.8M at June 2026 as Makhado construction payables built up and short-term funding was used: convertible notes of US$5.79M drawn and the ABSA overdraft. Debt is small relative to book equity, but the company depends on its controlling shareholder for liquidity rather than on banks. The IDC loan, a legacy development finance institution facility, was settled. Equity has been rebuilt through about US$113M of share issuance between FY2023 and FY2026 (S&P cash flow data).
Cash flow
Note: the FY2026 Appendix 5B shows equity proceeds of US$47.029M, borrowings of US$5.985M, repayments of US$2.742M, PP&E payments of US$44.245M and operating cash flow of -US$10.522M. The Appendix 5B classifications differ slightly from the S&P/IFRS figures above (operating cash flow -US$8.9M per the results).
Commentary. The FY2025–FY2026 capital cycle is Makhado construction: about US$62M of capex across the two years, almost entirely funded by KDG equity (US$47M in FY2026 alone per Business Day; US$42.9M of equity raised in FY2025). Free cash flow has been negative in every year. The company has never paid a dividend and has no buyback authority. The June 2026 quarter showed a small positive operating cash flow of US$0.39M, but this reflected working-capital movements (production payments of +US$1.09M) during the Uitkomst suspension, not underlying profitability.
Ratios
Notes:
-
All ratios are calculated from the S&P figures above using average equity and average assets; current ratio, debt/equity and interest coverage use period-end values. FY2026 current ratio uses current assets of US$4.6M and current liabilities of US$54.4M.
-
ROIC (S&P, trailing twelve months to December 2025) was -22.58%.
-
Net debt / EBITDA is not meaningful because EBITDA is negative in every year.
-
Cash conversion cycle is not publicly disclosed and not meaningful at current scale.
Inflections and drivers:
-
FY2023 was the high point of the last cycle: highest revenue and positive gross margin, on post-2022 coal prices.
-
FY2025 marked a structural break. Impairments, collapsing Uitkomst economics and the start of heavy Makhado capex coincided with the KDG cash injection.
-
FY2026 is a trough year with near-zero revenue, peak capex and going-concern uncertainty.
-
FY2027 should be the first year with Makhado revenue. Volumes and pricing remain unconfirmed.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment / asset
| Segment / asset | Ownership | Location | Contents | Status (Oct 2026) |
|---|---|---|---|---|
Uitkomst Colliery | 84% | Utrecht Coalfield, KwaZulu-Natal | Underground mine (South Mine) and planned northern extension (Klipspruit/North Mine); coal preparation plant; products: premium duff, sized peas, middlings | Suspended since 1 Mar 2026; binding offer received; strategic options under review |
Makhado Project | 67% (after the 26% BBBEE transaction completes) | Soutpansberg Coalfield, Limpopo | Open pit (East Pit), CHPP, 14 km 22 kV power line, wellfields, weighbridges; products: HCC 64 Mid Vol and 5,500 kcal thermal coal | Commissioning / ramp-up (C4 performance testing in Aug 2026) |
Vele Aluwani Colliery | 100% | Tuli Coalfield, Limpopo | Open-pit SSCC/thermal coal mine and plant | Suspended; business plan being re-engineered |
Greater Soutpansberg Projects | 74% (selected farms 100%) | Soutpansberg Coalfield, Limpopo | Chapudi, Generaal and Mopane mining-right areas | Evaluation; environmental and water licence applications in preparation |
Corporate / Australia | 100% | Australia / South Africa | Head office; legacy Western Australian gold royalties | Ongoing |
Revenue by Segment
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Uitkomst sales revenue (USD Mn) | — | — | 27.7 | 17.5 | — |
Group revenue (USD Mn) | 23.51 | 44.8 | 36.67 | 17.45 | 7.45 |
Makhado revenue (USD Mn) | 0 | 0 | 0 | 0 | 0 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansOperating Metrics (kt) and Revenue by Segment (USD)
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
ROM production (kt) | 498.589 | 390.788 | 139.821 |
Coal sales (kt) | 350.677 | 269.877 | 96.886 |
Net revenue per tonne (USD/t) | 79 | 72 | — |
Production cost per saleable tonne (USD/t) | 64 | 92 | — |
Income Statement and Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue (USD Mn) | 23.51 | 44.8 | 36.67 | 17.45 | 7.45 |
Revenue growth (%) | 13.57 | 90.55 | -18.16 | -52.40 | -57.33 |
Cost of revenue (USD Mn) | 21.0 | 41.21 | 36.54 | 24.08 | 15.58 |
Gross profit (USD Mn) | 2.51 | 3.59 | 0.12 | -6.63 | -8.13 |
SG&A / administrative expenses (USD Mn) | 6.84 | 8.92 | 15.37 | 6.91 | 9.8 |
Operating income / EBIT (USD Mn) | -19.75 | -4.17 | -14.62 | -37.91 | -18.06 |
EBITDA (USD Mn) | -2.92 | -2.77 | -12.53 | -12.69 | -17.55 |
Interest expense (USD Mn) | 1.18 | 0.98 | 0.99 | 1.07 | 0.46 |
Pre-tax income (USD Mn) | -20.72 | -4.01 | -15.07 | -38.25 | -17.79 |
Net income attributable (USD Mn) | -20.73 | -4.32 | -14.32 | -35.68 | -17.26 |
Net income incl. minorities (USD Mn) | -20.84 | -4.40 | -14.65 | -35.98 | -17.79 |
EPS basic (USD) | -0.13 | -0.01 | -0.04 | -0.0706 | -0.0237 |
EPS diluted (USD) | -0.13 | -0.01 | -0.04 | -0.0706 | -0.0237 |
Dividends per share (USD) | 0 | 0 | 0 | 0 | 0 |
Weighted average shares (M) | 164 | 296 | 405 | 506 | 729 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansMargin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Gross margin (%) | 10.68 | 8.01 | 0.34 | -38.00 | -109.15 |
Operating margin (%) | -84.02 | -9.32 | -39.88 | -217.22 | -242.46 |
EBITDA margin (%) | -12.42 | -6.17 | -34.16 | -72.74 | -235.60 |
Net margin (%) | -88.18 | -9.63 | -39.05 | -204.45 | -231.82 |
Balance Sheet and Share Count (M)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total assets (USD Mn) | 125.42 | 124.44 | 115.64 | 114.95 | — |
Cash & equivalents (USD Mn) | 2.99 | 7.5 | 0.23 | 7.39 | 2.91 |
Short-term debt incl. current portion (USD Mn) | 23.19 | 16.30 | 18.80 | 12.41 | — |
Long-term debt (USD Mn) | 0 | 0.05 | 0.04 | 0.03 | — |
Total debt incl. leases (USD Mn) | 26.13 | 18.85 | 21.11 | 14.09 | — |
Net debt (USD Mn) | 23.13 | 11.35 | 20.87 | 6.37 | — |
Shareholders' equity (USD Mn) | 77.14 | 87.35 | 75.41 | 83.21 | — |
Goodwill & intangibles (USD Mn) | 0 | 0.5 | 0.49 | 0.47 | — |
Current assets (USD Mn) | 8.53 | 16.05 | 2.21 | 11.15 | 4.6 |
Current liabilities (USD Mn) | 33.94 | 25.42 | 26.61 | 22.88 | 54.4 |
Working capital (USD Mn) | -25.41 | -9.38 | -24.4 | -11.73 | -49.8 |
Property, plant & equipment (USD Mn) | 112.19 | 102.63 | 106.26 | 99.0 | — |
Shares outstanding at period end (M) | 197.65 | 399.67 | 414.01 | 595.81 | — |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (USD Mn) | -2.36 | -3.33 | -3.19 | -11.39 | -8.9 |
Capital expenditure (USD Mn) | -1.15 | -7.93 | -4.34 | -17.92 | -44.18 |
Free cash flow (USD Mn) | -3.51 | -11.26 | -7.52 | -29.31 | -53.07 |
Equity issued (USD Mn) | 3.52 | 22.8 | 0 | 42.88 | 47.03 |
Net debt issued / repaid (USD Mn) | 3.42 | -1.75 | -0.25 | -7.79 | 2.59 |
Dividends paid (USD Mn) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (USD Mn) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROE (%) | -22.4 | -5.2 | -17.4 | -44.2 | — |
ROA (%) | -14.8 | -3.5 | -11.9 | -30.9 | — |
Current ratio (x) | 0.25 | 0.63 | 0.08 | 0.49 | 0.08 |
Debt / equity (x) | 0.34 | 0.22 | 0.28 | 0.17 | — |
Interest coverage, EBIT / interest (x) | -16.7 | -4.3 | -14.8 | -35.4 | -39.3 |
Asset turnover (x) | 0.17 | 0.36 | 0.31 | 0.15 | — |
Revenue by Region and Region Margins & Growth (%)
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
South Africa revenue (USD Mn) | 36.67 | 17.45 | 7.45 |
Rest of world revenue (USD Mn) | 0 | 0 | 0 |
South Africa revenue growth (%) | -18.16 | -52.40 | -57.33 |
Share Price History
| Date | Price (AUD) | Context |
|---|---|---|
16 Mar 2026 | 0.265 | Fell 17.2% in one session after interim results |
13 Mar 2026 | 0.320 | Price at release of half-year results |
30 Apr 2026 | 0.310 | Price at release of Q3 report |
11 Jun 2026 | 0.280 | Price at release of convertible notes announcement |
31 Jul 2026 | 0.275 | After Q4 report |
13 Aug 2026 | 0.270 | Price at release of KDG package |
20 Aug 2026 | 0.285 | Market cap AUD 232.6M |
30 Sep 2026 | 0.26 | FY2026 results (unchanged on the day) |
2 Oct 2026 | 0.255 | Latest data point retrieved |
Valuation Snapshot
| Metric | Value |
|---|---|
52-week change (to 20 Aug 2026) | +171.4% (S&P via StockAnalysis) |
Beta (5-year) | 0.21 |
Average daily volume (20 days, Aug 2026) | About 21,855 shares (thin liquidity) |
Share count growth (year on year, Aug 2026) | +41.86% |
Valuation Snapshot by Multiple
| Multiple | Value |
|---|---|
P/E | n/m (loss-making) |
EV/EBITDA | n/m (negative EBITDA) |
EV/Sales | 10.47x |
P/S | 9.91x |
P/B | 1.52x |
P/TBV | 1.50x |
Altman Z-score | -10.12 |
Piotroski F-score | 3 |
Capital Instruments
| Instrument | Lender | Amount | Terms | Maturity |
|---|---|---|---|---|
Convertible promissory notes | KDG | US$6.136M committed; US$3.89M drawn at 30 June 2026 plus US$2.246M in July 2026 (fully drawn) | Unsecured; RBA medium-business rate +3%; convertible at US$0.2089 | 12 months from first receipt (around mid-2027) |
Convertible promissory notes | Eagle Canyon | US$3.8M committed; US$1.9M drawn | As above | Around mid-2027 |
Bridge loan | KDG | US$8M | Unsecured; to be set off against the first US$8M share tranche | Settled by share issue on shareholder approval (terms otherwise not disclosed) |
Overdraft | ABSA | US$0.8M | South African prime +3%; secured on receivables and a bond over Uitkomst assets | Reviewed annually |
Lease liabilities | Various | US$1.65M (June 2025) | — | 2026–2028 |
Analyst Conclusions
Management guidance
-
Makhado plant performance testing in early August 2026.
-
Ramp-up to full capacity before the end of the September 2026 quarter.
-
Planned production levels by the end of calendar 2026.
-
Foundation-phase rate of about 800 kt/y HCC; expansion case of 800 kt/y HCC plus 700 kt/y thermal coal.
-
No revenue, cost or EBITDA guidance has been published.
Consensus
None available.
Bull case
-
Price leverage at the right moment. Makhado starts selling just as premium HCC has recovered to an average of US$238/t (Q4 FY2026). At 0.8 Mtpa, even modest margins would turn group cash flow positive from a base of US$7.45M of revenue.
-
Funding risk is underwritten. KDG has put in US$90M of equity plus more than US$22M of further support since June 2026. It has a strong incentive to finish a 28-year-life asset it now controls.
-
Optionality is cheap. The GSP (over 7 billion tonnes in situ, all mining rights granted), a Vele restart, and the 1.5 Mtpa expansion case are not reflected in an EV of about A$246M.
Bear case
-
Going concern is real. US$2.9M cash against US$54.4M of current liabilities at June 2026. Survival depends on shareholder approval of the US$16M package and on Makhado reaching nameplate. The second tranche is conditional on production and KDG's satisfaction.
-
Execution record. First coal has slipped at least five times since 2025. Uitkomst's turnaround failed within eight months. Leadership changed again in July 2026.
-
Minority value leakage. Repeated issuance at US$0.2089 (816M shares versus 414M two years earlier), a controlling-shareholder board, a combined Chair and CEO, negligible institutional ownership and thin trading liquidity.
Key catalysts and monitorables (next 12 months)
| Catalyst | Expected timing | What to watch |
|---|---|---|
| Q1 FY2027 activities report | About 30 Oct 2026 | Makhado ROM tonnes, CHPP yield, first HCC sales and realised price |
| General meeting on the KDG US$16M subscription | Q4 calendar 2026 | Approval; independent expert opinion; dilution |
| Second US$8M tranche | After production starts | Whether KDG declares itself satisfied with performance |
| Uitkomst transaction | Undated | Price and terms of the binding offer; removal of care-and-maintenance costs |
| Appointment of a permanent CEO | Undated | Experience profile; separation of Chair and CEO |
| H1 FY2027 results | About March 2027 | First Makhado revenue and unit costs; going-concern status |
| Conversion or repayment of convertible notes | Around mid-2027 | Conversion at US$0.2089 versus cash repayment |
| Port trial runs and offtake contracts | H2 calendar 2026 | Domestic versus export mix; named offtakers |
| HCC benchmark | Continuous | Sustaining above US$200/t |
| GSP licence applications | 2026–2027 | Environmental and water use licence submissions |
Analyst verdict
MC Mining is no longer an exploration story but is not yet a mining business. It sits at the riskiest point of a junior miner's life. Construction is complete, the plant is commissioning, and almost all historical revenue has disappeared with Uitkomst's suspension. The FY2026 numbers show a company being kept alive by its controlling shareholder: US$7.45M of revenue, a US$17.6M EBITDA loss, US$53M of negative free cash flow and US$2.9M of cash at year-end. The board has disclosed a material uncertainty over going concern.
Against that, the asset is real and appears well matched to the market. Makhado holds all its licences, has a 28-year life, and is built to produce a mid-volatile hard coking coal for a domestic steel industry that imports most of its needs, at a time when HCC benchmarks have rebounded to around US$238/t. KDG's behaviour so far suggests it will keep funding the asset. It completed the full US$90M subscription despite delays and then added convertible notes and a further US$16M package within three months.
For minority investors the question is less whether Makhado works than how much of its value they will keep. Every recent capital injection has been priced at US$0.2089 per share, the board is KDG-controlled, the Chair is acting as CEO, and trading liquidity is minimal. On available data the shares, at about 1.5x book and 10x trailing sales, already price in a successful ramp-up.
The position should be graded as speculative, with event-driven exposure to two near-term binary outcomes: Makhado confirming nameplate production with positive unit margins in the September and December 2026 quarters, and approval of the KDG funding package. Evidence of sustained output near 0.8 Mtpa at an operating margin, together with the appointment of an experienced independent CEO, would materially de-risk the story. Further slippage would point to more dilution at the same fixed price.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Title | Tenure | Background / prior roles | Compensation |
|---|---|---|---|---|
Jianheng (Albert) Deng | Chairman (since May 2026); Interim MD & CEO (since 29 Jul 2026) | Board since 2026 | — | Continues on his existing non-executive chairman arrangements during the interim period; amount not disclosed |
Bill Pavlovski | Company Secretary (Vision Corporate (Pty) Ltd) | Independent NED Oct 2024 to May 2026; company secretary ongoing | Corporate secretarial services | — |
General Manager, South African operations | KDG-linked appointee announced 5 May 2026 | 2,026 | — | — |
“—” = not publicly disclosed.
Board of Directors
| Name | Role | Independence | Appointed / note |
|---|---|---|---|
Jianheng (Albert) Deng | Chairman; Interim MD & CEO | Executive (interim) | Chairman from May 2026 (KDG nominee) |
Ontiretse Mathews Senosi | Non-executive director | Not independent; substantial shareholder (about 13.8% per Simply Wall St register, date unclear) | Former Chairman and Interim Chairman; stepped down as chair in Q4 FY2026 |
Yi (Christine) He | Non-executive director | Not independent (former CEO; shareholder) | Moved to NED from 29 Jul 2026 |
Muhui (Chris) Huang | Non-executive director | KDG nominee | Appointed 2024 |
Guo Xin | Non-executive director | KDG nominee | Appointed 5 May 2026; mining operations and safety expertise |
Mei Zhang | Non-executive director | KDG nominee (governance, commercial, procurement focus) | Appointed Q4 FY2026 |
Dr Steele West | Independent non-executive director | Independent | Appointed 2024 |
Lanlan (Lily) Wang | Non-executive director | — | — |
Dr Huoxin (Hevin) Wang | Non-executive director | — | — |
Zhen (Brian) He | Non-executive director | — | — |
Board & Management Changes
| Date | Change |
|---|---|
1 Jul 2024 | Godfrey Gomwe exits as MD and CEO; Christine He interim MD and CEO |
| 2024 | Muhui (Chris) Huang (KDG nominee), Bill Pavlovski and Dr Steele West join the board |
1 Oct 2025 | Christine He made permanent MD and CEO |
5 May 2026 | Guo Xin and Mei Zhang appointed NEDs; Bill Pavlovski resigns as NED; Albert Deng appointed Chairman; Mathews Senosi steps down as Interim Chairman but stays as NED |
28 Jul 2026 | Christine He resigns as MD and CEO (stays as NED); Albert Deng becomes interim MD and CEO from 29 Jul 2026 |
Major Shareholders
| Holder | Shares (M) | Stake (%) |
|---|---|---|
Goldway Capital Investment Limited | 125.39 | 18.1 |
Kinetic Crest Limited | 119.89 | 17.3 |
Dendocept Proprietary Limited | 95.56 | 13.8 |
Ontiretse Mathews Senosi | 95.36 | 13.8 |
Longelephant International Trade Limited | 50.16 | 7.25 |
Shining Cuisine Investment Management | 35.0 | 5.06 |
Golden Eagle Trust | 26.50 | 3.83 |
Pacific Goal Investment Limited | 24.93 | 3.6 |
An Chee Sin | 21.41 | 3.1 |
Eagle Canyon International Group Holding (HK) | — | Described by the company as a "significant minority shareholder" (Q4 FY2026) |
“—” = not publicly disclosed.
Competitive Landscape
Competitors by Segment
| Segment | Competitor | Type | Relative positioning vs MC Mining |
|---|---|---|---|
South African coal (thermal and metallurgical) | Exxaro Resources (JSE: EXX) | Listed major | Far larger; mostly thermal coal for Eskom and export |
South African coal | Thungela Resources (JSE/LSE: TGA) | Listed major | Large thermal exporter via Richards Bay |
South African coal | Seriti Resources | Private | Large thermal producer for Eskom |
South African coal | Glencore (South African coal operations) | Subsidiary of a major | Large export thermal coal |
South African coal | Sasol Mining | Captive | Feedstock for Sasol's synthetic fuels; not a merchant competitor |
South African coal | Menar / Canyon Coal | Private | Mid-tier thermal and some metallurgical coal |
Southern African coking coal | Vulcan (Moatize, Mozambique; formerly Vale) | Private | Large-scale coking coal; competes for regional and seaborne buyers |
Southern African coking coal | Jindal Africa (Mozambique); ICVL Benga (Mozambique) | Private / subsidiaries | Regional coking coal supply |
Seaborne HCC | Coronado Global Resources (ASX: CRN) | Listed | Large US and Australian met coal producer |
Seaborne HCC | Stanmore Resources (ASX: SMR) | Listed | Large Queensland met coal producer |
Seaborne HCC | Warrior Met Coal (NYSE: HCC); Peabody (NYSE: BTU) | Listed | US met coal |
Seaborne HCC | Bowen Coking Coal (ASX: BCB) | Listed junior | Comparable "junior developer turned producer" profile |
Competitor Detail
| Metric | MC Mining |
|---|---|
Latest FY revenue (USD Mn) | 7.45 (FY2026) |
Revenue growth (%) | -57.3 |
Gross margin (%) | -109.2 |
Recent Developments
--