Meridian Mining Plc Overview
Meridian Mining plc is a London- and Toronto-listed, pre-revenue mine developer whose value rests almost entirely on the Cabaçal gold-copper-silver volcanogenic massive sulphide (VMS) project in Mato Grosso, Brazil — a historic past-producing mine the company acquired in 2020 and has since taken from exploration through a Pre-Feasibility Study (March 2025) to a Definitive Feasibility Study (September 2026). The DFS outlines a 13.9-year open-pit operation with an initial capex of USD 322 million, base-case after-tax NPV5 of USD 2.09 billion and 108% IRR, front-loaded by a high-grade starter zone that yields ~183,500 gold-equivalent ounces a year over the first five years. Meridian complements this "hub" with the Santa Helena satellite deposit and a 50 km VMS belt for "spoke" growth. With ~USD 96 million of cash at mid-2026, no debt, and fresh FTSE 250 and GDXJ index membership, it is positioned as a near-term developer approaching a project-finance and final-investment-decision inflection.
Company's own description. In its H1 2026 interim management report, Meridian describes itself as a mineral resource development and exploration group with projects in Brazil, whose core asset base derives from a November 2020 purchase agreement covering rights within the Cabaçal Au-Cu-Ag VMS belt — including the historical Cabaçal mine and the separate Santa Helena Cu-Au-Ag-Zn-Pb mine — supplemented by additional licences across the belt and in the parallel Jauru and Araputanga greenstone belts. Non-core projects in Rondônia (notably Espigão) are retained. The stated vision is to create sustainable value by developing and exploring high-quality resource assets, as a responsible environmental steward building collaborative community and government partnerships. The company's "About Meridian" boilerplate (Sep 2026) lists four focus areas: (1) development and exploration of Cabaçal; (2) expanding the Santa Helena resource inventory; (3) regional-scale exploration of the Cabaçal VMS Belt to support the "Cabaçal Hub" strategy; and (4) exploration in the Jauru and Araputanga greenstone belts.
Independent characterisation. Meridian is a single-asset, pre-production developer transitioning toward construction. It currently generates no revenue (FY2021–H1 2026 revenue: nil) and funds itself through equity; it reports one operating segment. Its intended business model, once Cabaçal is built, is that of a concentrate producer: ore will be processed on site into a clean, high-grade copper concentrate carrying payable gold and silver (plus some gravity-recovered gold), sold to smelters and traders under offtake contracts. Marketing work by Ocean Partners UK concluded that the concentrate would be attractive to smelters in Japan, South Korea and Europe, with Chinese smelters a lower-gold-payability alternative (DFS release, 22 Sep 2026).
Revenue model mix (projected, not current). 100% product sales (metal-in-concentrate). No service, subscription or licensing revenue. By value at DFS base-case prices, gold dominates: LOM production of 983,537 oz Au, 180,634 t Cu and 1,779,720 oz Ag. At DFS base-case prices (USD 3,570/oz Au, USD 5.03/lb Cu, USD 50.17/oz Ag), gold represents roughly 60–65% of gross metal value and copper roughly 35–40% (analyst derivation from DFS production and price deck; payability and TC/RC deductions ignored).
Value-chain position. Upstream: exploration → resource definition → mine development (current stage) → mining and concentration (from ~2028 per company timeline, subject to licensing and finance). Meridian does not intend to smelt or refine; concentrate will be sold downstream. Drilling, blasting, loading and haulage are planned to be fully outsourced.
Customer types and end-markets. Prospective customers are custom copper smelters and concentrate traders. End-markets are the global gold market (investment, central bank, jewellery demand) and the copper market (electrification, power grids, construction, EVs).
Strategy
Stated strategy themes (company documents, 2026).
-
Build Cabaçal — complete the DFS (done 22 Sep 2026), secure the Installation Licence, finalise project finance, take a Final Investment Decision, and restart Au-Cu-Ag production at Cabaçal by end-2028 subject to licences (17 Feb 2026 release).
-
Hub-and-spoke growth — Cabaçal as processing hub; Santa Helena as first satellite; then regional VMS targets along a 50 km belt.
-
Exploration-led resource growth — near-mine underground potential at Cabaçal (down-dip/down-plunge); Álamo, Aguapei; Jauru and Araputanga greenstone belts.
-
Capital-markets repositioning — become a leading London-listed copper-gold stock; index inclusion to attract passive and institutional capital (achieved: FTSE Small Cap June 2026, GDXJ September 2026, FTSE 250 October 2026).
-
Mid-tier ambition — CEO describes transforming from junior explorer to a "near-term mid-tier" company (H1 2026 commentary; Proactive interview, 9 Sep 2026).
Initiatives in the last 24 months.
ESG commitments (stated). Dry-stack filtered tailings; separate containment of potentially acid-generating pyrite tails; maximising process water recycling; local hiring and training. No quantified emissions targets are disclosed.
Medium-term guidance. Management targets: DFS-defined production profile (183.5 koz AuEq/yr for years 1–5); production restart by end-2028. No financial guidance (revenue/EBITDA) is issued; the DFS model is the de facto medium-term framework.
Products & Services
Meridian has no commercial products today. Its "portfolio" is a set of mineral projects and their planned future outputs. Each is catalogued below.
Cabaçal Gold-Copper-Silver Project (flagship)
| Attribute | Detail (DFS, effective 15 Sep 2026, unless stated) |
|---|---|
| Location | Mato Grosso, Brazil; ~320 km WNW of Cuiabá; 35 km all-weather gravel road from São José dos Quatro Marcos |
| Deposit type | Volcanogenic massive sulphide (VMS), historic past-producing mine |
| Mining method | Conventional open pit, 24/7; contractor drill/blast/load/haul; 55 t trucks, ~75 t excavators |
| Mine life | ~10 years mining + stockpile reclaim; 13.9-year processing life |
| Throughput | 1.93 Mtpa (Y1) → 2.50 Mtpa (Y2–3) → 4.50 Mtpa (Y4 onward, after ball-mill expansion) |
| Reserves (P&P, effective 31 Dec 2025) | 56.04 Mt @ 0.61 g/t Au, 0.35% Cu, 1.33 g/t Ag (1,106.5 koz Au; 429.9 Mlb Cu; 2,388 koz Ag) |
| Resources (M&I, inclusive) | 70.10 Mt @ 0.56 g/t Au, 0.33% Cu, 1.31 g/t Ag (1,259 koz Au; 233.5 kt Cu; 2,960 koz Ag) |
| Strip ratio | 1.42 (waste:ore); total material moved 135.4 Mt |
| Year-1 head grade | 2.80 g/t Au, 0.71% Cu, 2.69 g/t Ag |
| Recoveries (LOM avg.) | Au 89.3%, Cu 92.8%, Ag 74.3% |
| Process flowsheet | Crushing; single-stage SAG (ball mill added Y4); 150 µm grind; gravity gold circuit (~30% of mill feed); Cu flotation with regrind to 30 µm via IsaMill and Jameson cell re-cleaning; pyrite flotation of rougher tails; filtered dry-stack tailings |
| Product | Clean high-grade copper concentrate with Au-Ag credits (smelter test produced high-grade blister copper) plus gravity gold |
| Production | Y1–5 avg. 183,526 oz AuEq/yr; LOM avg. 112.9 koz AuEq/yr; LOM recovered 1,569.6 koz AuEq |
| Costs | LOM AISC USD 1,056/oz AuEq (Y1–5 AISC USD 715/oz); operating cost USD 22.41/t milled |
| Capital | Initial USD 322m (incl. 10% contingency, net of USD 21m tax credits); expansion USD 56m; sustaining USD 74m; closure USD 59m |
| Economics (base case) | NPV5 USD 2,092m; IRR 107.6%; payback 0.9 yr; LOM revenue USD 5.36bn; LOM after-tax FCF USD 2.87bn |
| Economics (spot, 10 Sep 2026) | NPV5 USD 2,902m; IRR 134.7%; payback 0.7 yr |
| Fiscal regime | 25% corporate tax + 9% social tax; SUDAM 75% tax reduction for 10 years; royalties 1.5% Au, 2.0% Cu, 2.0% Ag |
| Permitting | Preliminary Licence (Oct 2025); Installation Licence application lodged May 2026; 138 kV power-line Installation Licence granted (Sep 2026) |
| Target customers | Smelters in Japan, South Korea, Europe; Chinese smelters secondary |
| Pricing model | Market-linked concentrate sales; DFS uses Ocean Partners' long-term TC/RCs (more conservative than current forward curve) |
Santa Helena (Au-Cu-Ag-Zn-Pb)
| Attribute | Detail |
|---|---|
| Status | Maiden open-pittable M&I resource declared 20 Jan 2026 |
| Resource | 5.3 Mt @ 0.6 g/t Au, 0.4% Cu, 15.5 g/t Ag, 1.9% Zn, 0.4% Pb |
| Best intercepts (2026) | CD-854: 21.2 m @ 1.5 g/t Au, 1.2% Cu, 45.7 g/t Ag, 6.0% Zn; CD-853: 14.8 m @ 1.5 g/t Au, 1.6% Cu; CD-849: 11.7 m @ 2.2 g/t Au, 1.8% Cu |
| Discoveries | Second Au-Ag/Zn-Pb VMS layer (CD-869: 7.2 m @ 1.4 g/t Au, 24.3 g/t Ag, 2.3% Zn; first visible gold), followed post-period by multiple stacked horizons |
| Role | Intended "second development opportunity" and first spoke feeding the Cabaçal hub |
| Next steps | Preliminary licence application data; metallurgical work to improve precious-metal recoveries in fresh rock |
Regional exploration portfolio
| Prospect / belt | Commodity focus | Status (2026) |
|---|---|---|
| Cabaçal mine corridor | Au-Cu-Ag VMS; down-dip/down-plunge underground potential | Geochemistry, geophysics; drone-based geophysical sensors purchased |
| Álamo (1.6 km trend) | Structurally hosted Au | Discovery (CD-852: 3.5 m @ 2.4 g/t Au, 0.5% Cu) |
| Aguapei | Au | Exploration planned |
| Jauru & Araputanga greenstone belts | Au, possibly intrusive-related/orogenic | Ten additional mineral titles approved by ANM (Jan 2026) |
| Espigão (Rondônia) | Cu-Au polymetallic | Non-core; Cu-Au testing flagged for 2026 |
| Ariquemes / Mirante da Serra (Rondônia) | Previously Sn/Au/Mn interest | Certain licences relinquished (Jan 2026) |
Non-product capabilities
Meridian has no proprietary technology, brands or services offered to third parties. Its "capabilities" are its geological database (1,290 drillholes, ~140,000 m at Cabaçal), metallurgical dataset, permits and land-access agreements (153 landholder access agreements).
Financial Narrative
Data provenance. FY2021–FY2024 income-statement and balance-sheet figures are taken from aggregator reproductions of the company's audited IFRS statements (TipRanks, Barchart, Kalkine/EOD) and cross-checked where possible against the FY2024 annual report key figures (FinancialFilings) and the H1 2026 interim report comparatives (primary source). FY2025 balance-sheet figures are primary (H1 2026 comparatives). The FY2025 net loss is derived from aggregator operating-expense and other-income data and is flagged as such; the FY2025 annual report should be consulted for the exact figure. All figures USD millions.
Income statement
Gross profit, EBITDA margins, operating/net margins and revenue CAGR are not meaningful (no revenue). Aggregator EBITDA: FY2021 -9.38; FY2022 1.15 (boosted by non-operating gains); FY2023 -11.75; FY2024 -18.00; FY2025 not disclosed.
FY2022's small profit was produced by a reversal of roughly USD 10m in other income against a USD 9.2m operating loss. From FY2023 the trajectory is a clean ramp in operating spend — USD 12.1m → 17.6m → 18.3m — tracking the progression from PEA to PFS to DFS work. This is the expected profile of a developer: losses scale with technical work, not with business deterioration.
Interim comparison (primary source: H1 2026 interim report, reviewed by Deloitte)
H1 2026 drivers: E&E costs rose on DFS engineering, environmental, permitting and Santa Helena licensing work; within E&E, "fees and licences" jumped from USD 0.03m to USD 1.44m and field/road construction from USD 0.18m to USD 0.86m, indicating the start of pre-construction. G&A nearly doubled on executive hiring and higher management fees (management and director fees USD 1.19m vs 0.78m; rent USD 0.21m vs 0.04m reflecting the London office). A USD 3.6m unrealised FX loss arose from translating CAD and GBP cash balances into USD — a structural exposure because the company raises in CAD/GBP and reports in USD.
Balance sheet
Goodwill: nil. Intangibles: USD 0.05m (FY2025), USD 0.04m (H1 2026). Since FY2022 the company has carried no financial debt; liabilities are trade payables, payroll, provisions (USD 0.37m) and taxes. Minor discrepancy: Kalkine/EOD reports FY2025 total assets of 46.04m and equity of 42.85m versus the interim comparatives of 46.12m and 42.93m; the primary source is preferred.
Accounting note. Meridian expenses exploration and evaluation spending through the P&L and capitalises only acquisition costs (Cabaçal Agreement instalments) into E&E assets. The balance sheet therefore materially understates cumulative project investment: the accumulated deficit was USD 80.7m at 30 June 2026.
Cash flow
FY2024 operating cash flow was USD -12.12m (FinancialFilings, FY2024 annual report key figures). Annual cash flows for other years are not disclosed in sources reviewed.
Ratios
Funding gap. Against initial capex of USD 322m (DFS), plus remaining Cabaçal Agreement payments (USD 4.85m cash plus 2m shares or CAD 0.6m), working capital and contingencies, the H1 2026 cash pile of ~USD 96m (around USD 90m per CEO in September 2026) leaves a construction funding requirement in the region of USD 250–300m. Management has engaged up to 30 lending groups. The auditor and directors continue to flag a material uncertainty regarding going concern because the company depends on external capital to reach production.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Revenue by Segment (%)
| Segment metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Single segment revenue (USD Mn) | 0 | 0 | 0 |
Share of group revenue (%) | 100 | 100 | 100 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansGroup Entities
| Entity | Jurisdiction | Role | Source |
|---|---|---|---|
Meridian Mining plc | UK | Listed parent; head office London | H1 2026 interim |
Rio Cabaçal Mineração Ltda ("RCM") | Brazil | Holds Cabaçal Agreement (assigned 5 Oct 2021) and mineral rights across Cabaçal, Jauru and Araputanga belts | H1 2026 interim; Jan 2026 release |
Meridian Mineração Jaburi S.A. ("Jaburi") | Brazil | Subsidiary; historically associated with Rondônia (Espigão) portfolio | H1 2026 interim, Note 1 |
Asset group
| Asset group | Contents | Stage | H1 2026 activity |
|---|---|---|---|
Cabaçal (Hub) | Historic Au-Cu-Ag VMS mine; open-pit development project | DFS complete (Sep 2026); Preliminary Licence granted; Installation Licence pending | DFS engineering, long-lead procurement, pre-construction |
Santa Helena (first Spoke) | Historic Cu-Au-Ag-Zn-Pb VMS mine; Santa Helena Central resource | Maiden M&I resource; preliminary-licence data gathering | 20 holes / 1,598 m; new stacked VMS layers |
Regional Cabaçal Belt & Jauru/Araputanga |
| Early exploration | 30 holes / 5,943 m; IP and BHEM geophysics |
Rondônia (non-core) | Espigão Cu-Au polymetallic; Ariquemes and Mirante da Serra licences partly relinquished | Dormant / non-core | Espigão Cu-Au testing planned in 2026 |
Income Statement and Per-Share Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue (USD Mn) | 0 | 0 | 0 | 0 | 0 |
Operating expenses (USD Mn) | 9.38 | 9.03 | 12.06 | 17.59 | 18.31 |
Operating income (USD Mn; FY2025 = minus opex, derived) | -9.41 | -9.19 | -12.35 | -17.79 | -18.31 |
Other income or expense, net (USD Mn) | -28.17 | 10.13 | 0.37 | -0.45 | 1.22 |
Pre-tax income (USD Mn; FY2025 derived) | -37.58 | 0.94 | -11.99 | -18.23 | -17.09 |
Net income (USD Mn; FY2025 derived) | -37.58 | 0.80 | -11.99 | -18.23 | -17.09 |
EPS basic and diluted (USD) | -0.30 | 0.00 | -0.05 | -0.06 | -0.05 |
Dividends per share (USD) | 0 | 0 | 0 | 0 | 0 |
Weighted avg shares (M) | 126.06 | 192.08 | 228.90 | 285.68 | 372.00 |
Key Financials and Per-Share Data
| Metric | H1 2025 | H1 2026 |
|---|---|---|
Exploration and evaluation expenses (USD Mn) | 3.81 | 5.67 |
General and administrative (USD Mn) | 1.59 | 3.01 |
Professional fees (USD Mn) | 1.12 | 0.70 |
Share-based payments (USD Mn) | 1.00 | 0.40 |
Operating loss (USD Mn) | -7.65 | -9.98 |
Finance income (USD Mn) | 0.19 | 0.83 |
Foreign exchange gain or loss (USD Mn) | 0.71 | -3.60 |
Loss for the period (USD Mn) | -6.76 | -12.83 |
Basic EPS (USD) | -0.02 | -0.03 |
Balance Sheet
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Total assets (USD Mn) | 16.19 | 15.25 | 17.45 | 11.23 | 46.12 |
Total current assets (USD Mn) | 9.38 | 6.39 | 7.48 | 8.09 | 41.99 |
Total liabilities (USD Mn) | 19.90 | 3.63 | 2.43 | 2.04 | 3.20 |
Total equity (USD Mn) | -3.72 | 11.62 | 15.02 | 9.19 | 42.93 |
Liquidity & Coverage Ratios
| Metric | 31 Dec 2024 | 31 Dec 2025 | 30 Jun 2026 |
|---|---|---|---|
Cash and equivalents (USD Mn) | 7.71 | 41.71 | 95.98 |
Exploration and evaluation assets (USD Mn) | 2.45 | 3.33 | 6.27 |
Property, plant and equipment (USD Mn) | — | 0.75 | 2.00 |
Total debt (USD Mn) | 0 | 0 | 0 |
Net debt (USD Mn; negative = net cash) | -7.71 | -41.71 | -95.98 |
Working capital (USD Mn) | — | 38.80 | 93.82 |
Net assets (USD Mn) | 9.19 | 42.93 | 102.13 |
Cash Flow
| Metric | H1 2025 | H1 2026 |
|---|---|---|
Operating cash flow (USD Mn) | -6.43 | -9.38 |
Capex: E&E assets plus PP&E (USD Mn) | -0.31 | -2.55 |
Free cash flow (USD Mn) | -6.74 | -11.93 |
Equity raised, gross (USD Mn) | 12.13 | 76.16 |
Share issue costs (USD Mn) | -0.08 | -6.65 |
Dividends paid (USD Mn) | 0 | 0 |
Buybacks (USD Mn) | 0 | 0 |
Financial Analysis
| Ratio | Value (latest) | Comment |
|---|---|---|
Current ratio (30 Jun 2026) | 35.2x | Current assets 96.56m / current liabilities 2.75m |
Debt / equity | 0.0x | No borrowings |
Net debt / EBITDA | n/m | Net cash USD 96m |
Interest coverage | n/m | Finance expense only USD 0.08m in H1 2026 |
Asset turnover / cash conversion cycle | n/m | No revenue |
Cash runway (corporate + exploration only) | ~4 years at H1 2026 burn (~USD 24m/yr) | Excludes construction capex |
Region revenue
| Region revenue | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Brazil revenue (USD Mn) | 0 | 0 | 0 |
Rest of world revenue (USD Mn) | 0 | 0 | 0 |
Share Price & Returns
| Date | Venue | Price | Source |
|---|---|---|---|
19 Feb 2025 | Placement | CAD 0.39 | H1 2026 interim |
12 Feb 2026 | Bought deal | CAD 1.58 | H1 2026 interim |
6 Mar 2026 | TSX | CAD 1.82 (1-year change +272.9%) | Fintel |
27 Apr 2026 | LSE placing | GBP 0.92 (CAD 1.70) | Company release |
20 May 2026 | TSX | CAD 1.96 | HALO |
14 May 2026 | LSE | 117p (LSE all-time high per TradingView) | TradingView |
17 Jul 2026 | LSE | 73p (LSE all-time low per TradingView) | TradingView |
5 Oct 2026 | TSX | CAD 2.31; 52-wk range CAD 1.01–2.50 | WealthAwesome |
Share Count (M)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Weighted average shares (M) | 126.06 | 192.08 | 228.90 | 285.68 | 372.00 |
Valuation Snapshot
| Metric | Value | Basis |
|---|---|---|
Market cap | ~CAD 1.17bn (~USD 0.85bn at CAD/USD 0.73) | Aggregator, Oct 2026 |
Enterprise value | ~USD 0.76bn | Market cap less ~USD 90m cash (CEO, Sep 2026) |
EV / DFS base NPV5 | ~0.36x | Analyst derivation |
P/NAV (spot) | 0.33x vs 0.42x peers | Scotiabank (Sep 2026) |
P/B | ~8x | Market cap vs H1 2026 equity USD 102m (book understates due to expensed exploration) |
Analyst Conclusions
Management guidance (H1 2026 interim and DFS). For the remainder of 2026: complete the DFS (done) and file the NI 43-101 technical report; advance the Cabaçal Installation Licence; progress project-finance discussions; prepare for construction and production; drill Santa Helena and extensions; continue metallurgical work at Santa Helena; and explore the wider VMS belt. Production restart targeted by end-2028 subject to licences.
The more relevant consensus metric is the average price target of CAD 3.66.
Bull case.
-
Asset quality is demonstrably high: an NPV/capex of 6.5x and sub-one-year payback at base-case prices mean the project can absorb meaningful cost overruns or price declines and still clear hurdle rates.
-
The funding path is credible: USD ~90–96m cash, zero debt, a clean balance sheet, index-driven liquidity, ~30 lenders engaged and a concentrate attractive to Asian/European smelters support a debt-heavy finance package with limited further dilution.
-
Re-rating mechanics are in place: trading at ~0.33x spot P/NAV against ~0.42x peers, Meridian has visible catalysts (technical report, Installation Licence, finance, FID) that historically close developer discounts.
Bear case.
-
Price-dependence: the NPV doubled from PFS to DFS largely on price assumptions; at PFS-era prices, the low-grade tail would contribute little, and the project's value is concentrated in five years.
-
Execution and cost risk: capex already rose 30% between studies; Brazilian inflation, BRL strength and a first-time owner-builder raise the risk of further overruns and schedule slippage.
-
Permit and footprint constraints: the Installation Licence is the FID trigger and sits with a state regulator; the licensed footprint caps how much of the enlarged resource can be mined without amending the Preliminary Licence.
Key catalysts and monitorables (next 12 months).
-
NI 43-101 DFS technical report filing (due within 45 days of 22 Sep 2026).
-
Q3 2026 results (~mid-November 2026) — cash burn and committed capital.
-
Cabaçal Installation Licence decision by SEMA.
-
Project-finance term sheet(s), lender mandate, any stream/royalty or strategic equity.
-
EPCM award and FID.
-
Santa Helena resource update and preliminary-licence application.
-
Exploration results at Álamo, Aguapei and Cabaçal underground targets.
-
Gold and copper prices; BRL/USD; copper TC/RC benchmarks.
-
Any change in major-holder positions (TR-1 notifications) and FTSE 250 index flows.
Analyst verdict. Meridian Mining has, in eighteen months, executed one of the more complete de-risking sequences seen among London-listed resource developers: a PFS, a Preliminary Licence, two oversubscribed financings totalling more than USD 110 million, a Main Market listing, index inclusion culminating in FTSE 250 membership, and a DFS that shows a USD 2.1 billion after-tax NPV against USD 322 million of initial capital. The headline economics are not merely a product of today's gold price; the structural feature that drives them is geological — a shallow high-grade core that delivers 2.8 g/t gold and 0.7% copper in year one and pays back capital within roughly eleven months. That gives Meridian an unusually wide margin of safety against cost inflation or price softening during the payback window, which is what lenders care about most.
The discount at which the shares trade, roughly one-third of spot NAV by Scotiabank's estimate, is therefore less a verdict on the asset than on the remaining binary steps: the Installation Licence, a USD 250–300 million financing, and the conversion of a capable exploration and studies team into an owner-builder in Mato Grosso. Each step is achievable, and the company has moved quickly on long-lead items, power and access to compress the schedule; but each also carries timing risk that can erode the end-2028 target. Investors should also note that the later mine life is low-grade and price-sensitive, that capex rose 30% between studies, and that the register is concentrated.
On balance, Meridian represents a high-quality, single-asset development story at the most catalyst-dense stage of its life cycle. A disciplined financing that minimises equity dilution would be the clearest trigger for a re-rating toward peer multiples.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Title | Tenure / background | Age | Disclosed compensation | Source |
|---|---|---|---|---|---|
Gilbert Clark | CEO & Executive Director (non-independent) | Executive Chairman Jan 2021–Jun 2023; CEO since 2023; B.Sc. (Geology); board member ~8 years | 56 | USD 328,075 (latest aggregator figure); ~0.92% shareholding | Simply Wall St |
Dr Adrian McArthur | President | Director 2020–Jun 2026; remains full-time President and director of certain Brazilian subsidiaries | — | USD 260,050 (aggregator); ~0.26% | Simply Wall St; H1 2026 interim |
David Halkyard | SVP Project Finance & CFO | Under one year in role (2026) | — | — | Simply Wall St |
James McLucas | SVP Corporate Development | ~3.5 years | — | n/d; ~0.14% | Simply Wall St |
Erich Marques | Chief Geologist; non-independent QP (B.Sc., FAIG) | — | — | — | Company releases |
Unnamed | Chief Development Officer; SVP Strategy & Projects | Roles referenced in related-party note | — | Included in key management pool | H1 2026 interim, Note 11 |
Board of Directors
| Name | Role | Independence | Notes |
|---|---|---|---|
Bruce McLeod | Non-Executive Chair | Independent | Chair since ~2023 (aggregator tenure ~2.8 yrs); ~0.19% holding |
Douglas (Doug) Ford | Senior Independent NED | Independent | Joined 12 Jul 2023; CEO Waverunner Capital; former CFO American Lithium; UBC graduate |
Susanne Sesselmann | NED | Independent (as presented) | Re-elected 2026 |
Neil Gregson | NED | Independent (as presented) | Re-elected 2026 |
Gilbert Clark | CEO & Executive Director | Non-independent | — |
Dr Carlos Vilhena | NED | Independent | Elected 29 Jun 2026; Brazilian mining experience |
Felipe Holzhacker Alves | NED | Independent | Elected 29 Jun 2026; Brazilian mining experience |
Major Shareholders
| Holder | Shares (M) | Stake (%) | Type |
|---|---|---|---|
Helikon Investments Limited | 94.85 | 19.5 | Hedge fund |
Ithaki Limited | 44.46 | 9.16 | Private company |
Jupiter Fund Management plc | 43.83 | 9.03 | Institution |
Henry Maxey | 38.04 | 7.84 | Individual (insider-classified) |
Franklin Resources, Inc. | 22.46 | 4.63 | Institution |
T. Rowe Price Group, Inc. | 21.54 | 4.44 | Institution |
Ixios Asset Management | 14.67 | 3.02 | Institution |
Konwave AG (Gold 2000) | ~11 | 2.27 | Institution |
William Skinner | ~5.4 | ~1.1 | Individual |
Gilbert Clark | — | ~0.92 | Insider |
Competitive Landscape
Key Competitors
| Company | Listing | Relevance | Positioning vs Meridian |
|---|---|---|---|
Ero Copper | TSX/NYSE | Brazilian copper-gold producer (Bahia, Pará, Mato Grosso gold) | Producer; benchmark for Brazilian construction execution |
Aura Minerals | TSX/Nasdaq/B3 | Brazilian/LatAm gold-copper producer | Producer; potential consolidator |
G Mining Ventures | TSX | Built Tocantinzinho gold mine in Pará | Recent Brazilian build benchmark |
Hochschild Mining | LSE | Built Mara Rosa gold mine in Goiás | LSE-listed comparator with Brazilian build experience |
Equinox Gold | TSX/NYSE | Brazilian gold operations | Producer; capital competitor |
Lundin Mining | TSX | Chapada copper-gold mine, Goiás | Major Brazilian Cu-Au producer |
BHP (ex-OZ Minerals Carajás assets) | ASX/LSE | Copper-gold in Pará | Major; potential acquirer class |
Serabi Gold | AIM/TSX | Brazilian gold producer (Pará) | LSE-quoted Brazilian peer |
Cabral Gold | TSXV | Brazilian gold developer (Cuiú Cuiú) | Earlier-stage developer peer |
Hot Chili / Solaris / Los Andes Copper | ASX/TSX | Copper-gold developers in Chile/Ecuador | Capital-markets peers for copper-gold developers |
Peer Comparison FY2025
| Metric | Meridian (Cabaçal DFS) | Comment |
|---|---|---|
Initial capex | USD 322m | Moderate for a ~180 koz AuEq/yr start |
NPV5 / capex | 6.5x (base) | Exceptionally high for developers (driven by Y1–5 grades and price deck) |
Y1–5 AISC | USD 715/oz AuEq | First-quartile range for the starter period |
LOM AISC | USD 1,056/oz AuEq | Mid-cost; low-grade tail lifts LOM costs |
P/NAV (spot) | ~0.33x (Scotiabank) | vs ~0.42x gold-developer peer average (Scotiabank) |