MGX Resources Limited. Overview

MGX Resources is a cash-rich Australian resources company in transition from iron ore to gold. For roughly two decades, as Mount Gibson Iron, it mined and exported direct-shipping hematite iron ore. It operated first in Western Australia's Mid-West (Tallering Peak, Extension Hill, Iron Hill, Shine) and later at Koolan Island in the Kimberley, a former BHP mine with some of Australia's highest-grade hematite. A major Main Pit rockfall in October 2025 ended mining at Koolan Island about a year earlier than planned. Final low-grade stockpile shipments were completed in July 2026, and the operation is being sold to Cerberus-backed logistics group Crestlink. MGX's forward identity rests on its 50% interest in the Central Tanami Project Joint Venture in the Northern Territory, acquired from Northern Star for A$50 million. The JV holds about 2.8 Moz of JORC Mineral Resources (1.4 Moz attributable). MGX funds this from more than A$400 million of cash and investments, with no bank debt. The market prices the company close to its cash backing.


Company's own description

In its 2025 Annual Report (released 10 Oct 2025, while still named Mount Gibson Iron), the company described itself as an established Australian producer and exporter of iron ore. It named the Koolan Island high-grade iron ore mine in the Kimberley as its primary operating asset, and the Central Tanami acquisition as the first step in building a new Australian gold business. It also stated that it holds investments in listed and unlisted companies where future strategic or financing opportunities may arise.

Market profiles (Seeking Alpha, Finnomena, 2026) describe the business as mining, processing, shipping, exporting and selling hematite iron ore, with sales into China. They also list treasury management, mineral resource acquisition and investment activities.

Independent characterisation (October 2026)

At the research date, MGX is functionally a pre-production gold developer with a large treasury, not an iron ore producer. Its business has three parts:

  1. Gold development (core, forward). MGX holds a 50% participating interest in the unincorporated Central Tanami Project Joint Venture (CTPJV) with Tanami Gold NL (ASX: TAM), plus adjacent wholly-owned exploration tenements acquired from Northern Star. Work in 2026 focuses on:

    • the Groundrush underground exploration decline (contractor Macmahon Underground, portal works from September 2026);

    • resource definition drilling at Jims;

    • processing plant engineering reviews;

    • permitting and camp/utility upgrades. Management has stated an ambition to become an Australian gold producer within about three years and to reach a development decision within 12–18 months of December 2025.

  2. Iron ore wind-down (legacy, exiting). Koolan Island shipped its final low-grade stockpile cargoes in July 2026 and is on care and maintenance pending sale to Crestlink. Completion is targeted for late 2026, with a long-stop date of 31 March 2027.

  3. Treasury and strategic investments. These include cash and term deposits, a 9.7% stake in Fenix Resources (valued at A$37.8 million at 31 Dec 2025) and a portfolio of junior resource company holdings (A$20.6 million at 30 Jun 2025).

Revenue model

ElementFY26 status
Product sales (iron ore fines and lump, FOB, provisionally priced against Platts-type indices in USD)100% of operating revenue in FY24–FY26. Ends after July 2026 shipments.
Interest income on cash reservesMaterial contributor to "other income". Not separately quantified here for FY26.
Gold salesNil (pre-development)
Services / subscription / licensingNil
Future royalty-style income1.5% gross revenue share on Koolan Island activities under the Crestlink sale, capped (see §11)

Value chain position and customers

Historically MGX was an upstream miner-exporter. It owned mine, crusher, island port and shiploader at Koolan Island, and sold FOB to steel mills and traders, predominantly in China. Freight from Koolan to Chinese ports averaged about US$12–13/wmt in FY26 (FY26 results release). Named customers are not disclosed. End-market for iron ore: blast-furnace steelmaking, with premium-grade fines valued for low impurities. End-market for future gold output: global bullion market via refiners. No customer concentration risk applies once production starts.

Strategy

Stated strategy themes (FY25 Annual Report; FY26 results; 2026 presentations)

Transition from iron ore to precious and base metals: The name change was justified on the basis of becoming a diversified producer, "most notably precious and base metals" (Mining.com.au summary of the Oct 2025 notice of meeting).

  • Use iron ore cash reserves to build a long-life Australian gold business. The CEO said in the FY26 results that MGX would deploy its hard-earned iron ore cash to create a new high-quality gold production business.

Accelerate Central Tanami to a development decision: The target is within 12–18 months of December 2025 (CEO, FIRB release), implying around mid-2027. The broader aim is to become a gold producer within about three years (2026 investor presentation).

Responsible exit from Koolan Island: Complete rehabilitation, transfer the asset to Crestlink and preserve the relationship with the Dambimangari Traditional Owners.

Capital discipline: Maintain a debt-free balance sheet. The buy-back facility remains available to 30 Nov 2026 but is unused since October 2025; the Chairman (Nov 2025) signalled cash preservation for new opportunities.

Initiatives in the last 24 months

InitiativeDateDetail / target
Central Tanami acquisitionJul 2025 – Feb 2026A$50m for 50% CTPJV plus adjacent tenements; bank guarantees of about A$5.8m replaced
CTPJV 2026 work programApr 2026 onwardSite infrastructure, Groundrush exploration decline, permitting, resource drilling, plant engineering reviews
Groundrush exploration declineContractor selected Apr 2026; works from Sep 2026Macmahon Underground; purpose is underground drilling platforms and bulk access
Jims resource definition drillingResumed Jun quarter 2026Grow resource beyond 220 koz; potential open-pit feed near plant
Metallurgical testwork2,026Confirm more than 90% CIL recoveries
Koolan low-grade sales programNov 2025 – Jul 2026About 1.8 Mwmt sold; fully funded rehabilitation
Koolan divestment to CrestlinkSigned 11 Jun 2026Completion late 2026 (long-stop 31 Mar 2027)
Corporate rebrand to MGX ResourcesEffective 4 Dec 2025—
Share buy-backSep 2024 – Nov 2026Up to 10%; 3.2% bought back to Sep 2025 at A$0.313 average
Cost reduction after rockfallOct 2025About 450 roles removed; about 75 retained

Guidance

FY26 iron ore guidance: originally 3.0–3.2 Mwmt at A$80–85/wmt FOB (Aug 2025). Withdrawn on 24 Oct 2025. Replaced by a target of about 1.0 Mwmt of low-grade sales in 2H FY26 (Feb 2026). Actual FY26 sales were 2.68 Mwmt.

FY27: no iron ore production. No formal gold production or capex guidance has been published. A pre-feasibility or feasibility study and development decision are the key milestones; dates are not formally guided beyond "12–18 months".

Products & Services

Iron ore (legacy, Koolan Island)

ProductDescription / specificationTarget customerStatus
Koolan Island high-grade finesHematite DSO fines; FY24 average grade 65.3% Fe, FY25 64.5% Fe, H1 FY26 high-grade fines 63.7% Fe. Moisture about 3%.Chinese steel mills and tradersCeased (final high-grade shipments FY26)
Koolan Island lumpHigh-grade lump; small volumes (e.g., 81 kwmt in one FY24 quarter)Blast furnace direct chargeCeased
Koolan Island low-grade finesStockpiled material; 49.6% Fe average in H1 FY26; about 42–45% Fe targeted for 2H FY26; 1.81 Mwmt sold in FY26Traders / blending millsProgram complete, July 2026
Pricing modelFOB, USD-denominated, index-linked with provisional pricing adjustments. For example, a A$29m adverse provisional pricing adjustment hit the June 2024 quarter.——

Gold (Central Tanami Project JV, MGX 50%)

Asset / depositKey dataStatus (Oct 2026)
CTPJV total Mineral Resource (JORC 2012)31 Mt @ 2.8 g/t Au for 2.8 Moz (100%); MGX attributable 1.4 Moz (MRE 11 Nov 2025)More than 50 known deposits; about 2 Moz historical production
Groundrush11 Mt @ 3.3 g/t for 1.2 Moz (45% Indicated / 55% Inferred). Produced more than 600 koz at about 4 g/t in 2001–2005. Free-milling.Underground exploration decline by Macmahon Underground, portal from Sep 2026
Jims2.6 Mt @ 2.7 g/t for 220 koz; open down plunge and along strikeResource definition drilling resumed in June 2026 quarter; potential open pit near plant
Hurricane-Repulse1.5 Mt @ 3.8 g/t for 180 koz (2022 estimate); adjacent to mill sitePart of resource base
Central Tanami processing plantAbout 1.2 Mtpa CIL plant, idle since 2005Engineering reviews of refurbishment or upgrade options
MetallurgyTestwork targeting more than 90% CIL recoveries at Groundrush and JimsIn progress
Adjacent tenementsWholly-owned exploration tenements acquired from Northern StarExploration

Earlier MRE comparison: at the July 2025 acquisition announcement, the CTPJV JORC resource stood at 13.8 Mt @ 3.6 g/t for 1.6 Moz, plus historical (non-JORC) estimates of 11.2 Mt @ 2.7 g/t for about 1.0 Moz. The November 2025 update re-reported a larger, lower-grade inventory of 2.8 Moz @ 2.8 g/t.

Other

Tallering Peak exploration tenements (WA Mid-West): early-stage base metals exploration since mid-2022.

Strategic equity portfolio: Fenix Resources (9.7%) plus junior holdings.

No services, software or branded consumer products exist. Pricing for gold will be spot-linked; no hedging policy has been disclosed for gold.

Financial Narrative

Currency is A$ million unless stated; FY ends 30 June. Primary sources are the FY24, FY25 and FY26 results releases and the FY24/FY25 Appendix 4E. FY22–FY23 income lines come from TipRanks (aggregator, labelled by calendar year on that site but matching June fiscal years).

Income statement

Notes:

  • FY23 volume is derived: FY24's 4.1 Mwmt was described as "up 36%".

  • FY23 sales revenue of A$450.6m is from Kalkine's FY24 wrap; TipRanks shows A$452.7m.

  • "Total revenue" for FY22–FY24 is from Stockopedia. The FY22 figure (142.7) is below TipRanks' 186.1, a source conflict likely reflecting different revenue definitions.

  • FY26 EPS is computed from NPAT divided by about 1.18bn shares and is approximate.

  • No dividends were declared for FY24, FY25 or FY26 (Appendix 4E, H1 FY26).

Margins (computed from table above)

Revenue CAGR on sales revenue: FY2022→FY2026 about +2.3% p.a. (186.1 → 204.0), but extremely volatile. FY2024→FY2026 about −44.7% p.a.

Balance sheet

Sources and notes:

  • FY24 and FY25 cash, NTA and NTA per share: FY25 Appendix 4E and results.

  • Interim points: A$437.1m (31 Dec 2024, excluding Fenix); A$473m (30 Sep 2025); A$456.2m or A$496.2m at 31 Dec 2025 (two summaries conflict, likely excluding versus including Fenix).

  • "No bank debt" is confirmed for FY26 and for December 2024.

  • Goodwill is zero because NTA equals net assets at FY24–FY25.

  • Short/long-term debt split: not applicable (no bank debt). Lease liabilities were not disclosed in the reviewed material.

  • The Koolan Island rehabilitation provision is a material liability. About A$30m of remaining obligations is to transfer to Crestlink, and A$42.0m of rehabilitation was spent in FY26.

Cash flow

Buy-back to September 2025: 38.8m shares at an average A$0.313, about A$12.1m in total (computed), mostly in FY25. No further purchases were made after 1 Oct 2025 (ASX, Dec 2025).

Capex and free cash flow on a statutory basis are not separately verified. Free cash flow per share was negative in most years from FY18 to FY24 per roic.ai, reflecting heavy capitalised waste stripping at Koolan.

Ratios (computed where possible)

ROA, ROIC, current ratio, interest coverage, asset turnover and cash conversion cycle are not computable from verified data. Interest coverage is not meaningful because there is no debt. Aggregator TTM metrics (Stockopedia, 2026): return on capital −7.28%, ROE −6.96%, operating margin −9.49%, P/B 0.94, P/S 1.21.

Commentary

FY22: trough and loss. A net loss of A$174.1m (aggregator) reflects Koolan's ramp-up costs, lower prices and impairments. The August 2022 Koolan plant fire fell at the start of FY23.

FY23: recovery to profit. NPAT was A$5.2m and pre-impairment PBT A$105.9m as Koolan's Main Pit delivered high-grade ore. The year also included the gain on the Fenix divestment, booked in the FY24 comparative: "other income A$45.5m including A$35.9m net gain".

FY24: peak operating year. Sales reached 4.1 Mwmt at 65.3% Fe, revenue A$667.7m and pre-impairment PBT A$211.6m. However, a A$159.1m impairment and A$46.0m of tax (including deferred tax asset derecognition) cut NPAT to A$6.4m. H1 FY24 alone earned A$138.7m NPAT.

FY25: cost and price squeeze. The strip ratio rose to 3.7:1 in H1 FY25 (from 0.7:1), and realised fines fell to US$83/dmt. Unit cash costs were A$94–100/wmt. Pre-impairment PBT fell to A$20.2m, and with A$90.4m of impairments and A$32.2m of deferred tax asset derecognition, NPAT was −A$82.2m. A A$27.3m fire insurance receipt supported cash.

FY26: forced transition. The rockfall in October 2025 ended mining. MGX pivoted to low-grade stockpile sales, which beat expectations. Pre-impairment PBT rose to A$29.1m, helped by H1 high-grade sales, interest income and cost cuts. NPAT was −A$30.2m after the Koolan write-off. Cash and investments fell A$72.5m to A$412.1m, mainly from the A$50m Central Tanami payment, rehabilitation spend and CTPJV funding. MGX's 50% share of CTPJV expenditure was A$4.7m in the June 2026 quarter alone.

The inflection point: from FY27 MGX has no operating revenue and will be a net cash consumer, funding gold development from its treasury.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Income Statement and Per-Share Data

MetricFY2022FY2023FY2024FY2025FY2026

Iron ore sales volume (Mwmt)

—3.04.12.612.68

Sales revenue FOB (AUD Mn)

186.1450.6667.7330.5204.0

Total revenue incl. other income (AUD Mn)

142.7452.6684.5350.4220.8

Gross profit (AUD Mn)

-30.5114.2193.120.1—

EBITDA, aggregator (AUD Mn)

-171.9158.590.84.5—

Profit before tax & impairments (AUD Mn)

—105.9211.620.229.1

Impairments, pre-tax (AUD Mn)

——159.190.458.9

Profit before tax (AUD Mn)

-248.230.552.5-70.2—

Net profit after tax (AUD Mn)

-174.15.26.4-82.2-30.2

Basic EPS (A cents)

-150.40.5-6.9-2.6

Dividend per share (A cents)

——000

Margin Analysis (%)

MetricFY2022FY2023FY2024FY2025FY2026

Gross margin on sales revenue (%)

-16.425.328.96.1—

Pre-impairment PBT margin (%)

—23.531.76.114.3

Net margin (%)

-93.61.21.0-24.9-14.8

Key Financials and Per-Share Data

MetricFY2024FY2025FY2026

Cash & investments (AUD Mn)

463.0484.6412.1

Total bank debt (AUD Mn)

000

Net assets / NTA (AUD Mn)

546.2453.2—

NTA per share (A cents)

45.038.4—

Goodwill & intangibles (AUD Mn)

00—

Key Financials

MetricFY2024FY2025FY2026

Koolan operating cashflow (AUD Mn)

284.326.51.0

Group cashflow (AUD Mn)

290.529.1—

Koolan cash operating costs (AUD Mn)

——132.4

Rehabilitation spend (AUD Mn)

——42.0

Dividends paid (AUD Mn)

000

Central Tanami acquisition (AUD Mn)

——50.0

Returns & Leverage Ratios (%)

MetricFY2024FY2025FY2026

ROE on year-end net assets (%)

1.2-18.1—

Debt / equity (x)

000

Net debt / EBITDA (x)

Net debt / EBITDA (x)net cash

Cash & investments / market cap (x)

about 1.0

Revenue by Region

RegionFY2024FY2025FY2026

Total iron ore sales revenue (AUD Mn)

667.7330.5204.0

Share Price & Returns

Reference pointPrice (AUD)Source

Before rockfall announcement (around 20 Oct 2025)

0.470

InvestSMART announcement log

At H1 FY26 results release (19 Feb 2026)

0.445

InvestSMART

11 Jun 2026 (Crestlink release)

0.335

InvestSMART

19 Jun 2026

0.355

InvestSMART

20 Jul 2026 (June quarterly)

0.330

InvestSMART

21 Aug 2026 (FY26 results)

0.350

InvestSMART

14 Sep 2026

0.345

InvestSMART

Metric

FY2024

FY2025

Valuation Multiples

MultipleMGX

P/E

n/m (loss-making)

EV/EBITDA

n/m (EV near zero or negative; GuruFocus showed EV of about −US$35.6m at one point)

EV/Sales

n/m

P/B

0.92–0.94

P/S

1.21

Market cap / cash & investments

about 1.0x (A$407m vs A$412.1m)

Analyst Conclusions

Management guidance

  • No iron ore production after July 2026; complete the Crestlink sale by late 2026 (long-stop 31 Mar 2027).

  • Central Tanami: development decision targeted within 12–18 months of Dec 2025, with an aspiration to gold production within about three years.

  • 2026–27 work: Groundrush exploration decline, Jims drilling, metallurgical testwork, plant engineering reviews and permitting.

  • No formal capex, production or cost guidance for gold yet.

Consensus expectations

No verified consensus forecasts. Stockopedia listed an FY26E revenue of A$326.5m, a pre-rockfall estimate now superseded by the actual A$220.8m. FY27 revenue is expected to be negligible (interest income only).

Bull case

  1. Cash floor. The share price roughly equals cash and investments of about A$0.35 per share, so investors effectively get the 1.4 Moz attributable gold resource, the Fenix stake and the Koolan revenue share for close to nothing.

  2. High-grade underground resource plus existing plant. Groundrush (1.2 Moz @ 3.3 g/t) on granted leases, with a plant and camp already in place, could support a lower-capex restart than a greenfield build in a strong gold market.

  3. Liabilities ring-fenced. Koolan rehabilitation is largely funded by FY26 low-grade sales, and about A$30m of obligations transfer to Crestlink, removing the main legacy drag.

Bear case

  1. Cash burn without revenue. Treasury fell A$72.5m in FY26. Development capex for an NT underground mine plus plant refurbishment could absorb a large share of the A$412m before first gold.

  2. Execution record. Successive Koolan setbacks (2014 seawall, 2022 fire, 2025 rockfall) and A$308m of impairments in three years raise doubts about technical and capital-allocation discipline.

  3. Governance and JV complexity. A 50% JV with a related-party partner of limited means, and a concentrated register, may keep a structural discount on the shares.

Catalysts and monitorables (next 12 months)

CatalystExpected timing
September 2026 quarterly (first gold-only quarter; cash burn)About 15 Oct 2026
2026 AGM (board, remuneration, buy-back intent)About Nov 2026
Crestlink completionLate 2026 (long-stop 31 Mar 2027)
Buy-back expiry or renewal30 Nov 2026
Groundrush decline progress and underground drilling resultsLate 2026 – 2027
Jims resource update2,027
Scoping, pre-feasibility or feasibility study and development decisionAbout mid-2027 (12–18 months from Dec 2025)
Any move to consolidate the CTPJV or further M&AUnscheduled

Analyst verdict

MGX Resources is no longer an iron ore company. It is a well-capitalised gold developer that happens to carry an iron ore history. The October 2025 rockfall forced the transition about a year early. Management's response was a low-grade stockpile campaign that funded rehabilitation, a timely sale of Koolan Island that offloads about A$30m of closure liabilities, and early completion of the Central Tanami acquisition. That response has been competent and capital-preserving.

The investment case now rests almost entirely on two variables: what MGX does with its A$412m treasury, and whether the Central Tanami JV can be converted from a 2.8 Moz resource into a funded, permitted, operating mine.

The equity trades close to cash backing. That gives meaningful downside protection today, and it means the market is ascribing little value to the gold project, the Fenix stake or the Koolan revenue share. Re-rating needs evidence:

  • Indicated-to-Measured conversion at Groundrush from the new decline;

  • metallurgical confirmation of more than 90% recoveries;

  • a credible study showing restart capex and all-in sustaining costs that work in a normalised gold price.

The risks are equally clear. Without revenue, every quarter of JV spending, head-office cost and study work erodes the cash floor that underpins the valuation. The company's record includes repeated geotechnical and operational setbacks and large impairments. The JV partner shares a common major shareholder, which could help coordination but also raises related-party governance questions for minority investors.

On balance, MGX is best viewed as a Hold / special situation. It offers asymmetric optionality if the development decision arrives by mid-2027 on competitive economics. The main risk is slow value leakage if capital allocation drifts. Key monitorables are quarterly cash burn, Crestlink completion, buy-back use and the first underground drilling results from Groundrush.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Executive Leadership Team

NameTitleTenure / backgroundCompensation

Peter Kerr

Chief Executive Officer

CEO since Oct 2018. Joined as CFO in 2012 from Bannerman Resources (former CFO).

About A$1.34m total yearly compensation (59% salary, 41% bonus/equity). Holds about 0.69% of shares (Simply Wall St, 2026). Latest fiscal year of the comp figure not confirmed.

David Stokes

Company Secretary & General Counsel

Named on 2025 AGM call

—

CFO / other executives

Not confirmed in sources reviewed.

——

John Phaceas

Manager, Investor & External Relations

Named in ASX releases

—

Board of Directors

NameRoleNotes

Brett Smith

Non-Executive Chairman (since 17 Apr 2025)

Chemical engineer with more than 32 years' international engineering, construction and mining experience. Alternate to Lee Seng Hui from Nov 2024. Former Executive Director and Deputy Chairman of HK-listed APAC Resources. Has served on boards including Tanami Gold NL. Associated with the largest shareholder group, so not independent of that bloc.

Lee Seng Hui

Non-Executive Director; alternate for Brett Smith

Chairman Feb 2014 – Apr 2025. CEO of Allied Group (HK); director of APAC Resources; chairs Tian An China Investments and Tian An Medicare. Law graduate, University of Sydney. Age about 52 per Stockopedia (date of figure uncertain).

Simon Bird

Non-Executive Director

—

Alan Jones

Non-Executive Director

Chartered accountant; former MD and executive deputy chairman of Mulpha Australia (Business News)

Paul Dougas

Non-Executive Director

Consulting engineer; former MD of SKM (Business News)

Fifth NED (referred to as "Evian" in the AGM transcript)

Non-Executive Director

—

Board & Management Changes

DateChange

Nov 2024

Brett Smith appointed alternate director for Lee Seng Hui

17 Apr 2025

Lee Seng Hui steps down as Chairman (served since Feb 2014); Brett Smith appointed Director and Chairman

Nov 2025 AGM

Chairman's address thanks a "recently retired" director (name not captured in the excerpt reviewed)

Competitive Landscape

Key Competitors

CompanyTickerRelevance

BHP

ASX: BHP

Original Koolan owner; Pilbara giant

Rio Tinto

ASX: RIO

Seaborne iron ore leader

Fortescue

ASX: FMG

Pilbara major

Mineral Resources

ASX: MIN

Mid-tier WA iron ore and mining services

Champion Iron

ASX/TSX: CIA

High-grade concentrate peer

Fenix Resources

ASX: FEX

Mid-West DSO producer (MGX holds 9.7%)

Grange Resources

ASX: GRR

High-grade pellet producer

Cockatoo Island operators

Private

Neighbouring Kimberley island operations, now linked to Crestlink

Northern Star Resources

ASX: NST

Seller of the CTPJV stake; nearby Tanami operations

Newmont

NYSE: NEM / ASX: NEM

Operates the Tanami mine (Callie) in the same region

Tanami Gold NL

ASX: TAM

JV partner holding the other 50%

Ramelius Resources

ASX: RMS

Mid-tier producer

Genesis Minerals

ASX: GMD

Mid-tier producer and consolidator

Bellevue Gold

ASX: BGL

High-grade underground producer

Capricorn Metals

ASX: CMM

Developer-turned-producer

Westgold Resources

ASX: WGX

Mid-tier producer

Pantoro Gold

ASX: PNR

Restart and redevelopment peer

Ora Banda Mining

ASX: OBM

Restart peer

Competitor Detail

MetricMGX (FY26)

Revenue (AUD Mn)

220.8

Revenue growth (%)

-37

Net margin (%)

-14.8

R&D intensity (%)

0

Net cash / (debt) (AUD Mn)

about 412 (cash & investments, no bank debt)

Recent Developments

--

Company Snapshot

373

Employees

1996

Founded

West Perth, Australia

Headquarters

SWOT Analysis

Strengths

  • Large treasury. A$412.1m cash and investments at 30 Jun 2026, with no bank debt (FY26 results).
  • Gold project acquired at a low headline price. A$50m for 50% of a 2.8 Moz (100%) resource implies about A$36/oz attributable. This is computed and pre-dates development capex.
  • High-grade core deposit. Groundrush hosts 1.2 Moz @ 3.3 g/t and historically produced more than 600 koz at about 4 g/t (2001–2005).
  • Existing infrastructure. A roughly 1.2 Mtpa plant, camp and granted mining leases host most resources (acquisition release, Jul 2025).
  • Proven crisis execution. The FY26 low-grade sales program sold 1.81 Mwmt of stockpiles and generated positive site cashflow after the rockfall.
  • Liability transfer achieved. Crestlink is to assume about A$30m of rehabilitation obligations at Koolan (June 2026 quarterly).

Weaknesses

  • No revenue from FY27. The final iron ore shipment was in July 2026.
  • Recurring impairments. Impairments totalled A$308.4m over FY24–FY26 (159.1 + 90.4 + 58.9), showing asset-life and pricing misjudgements.
  • Three consecutive years of weak or negative statutory earnings. NPAT was A$6.4m in FY24, −A$82.2m in FY25 and −A$30.2m in FY26.
  • Only 45% of Groundrush ounces are Indicated. The rest are Inferred (MRE Nov 2025), so it is not yet a reserve.
  • Minority / JV structure. MGX holds 50%, not operator-controlled outright.
  • History of operational setbacks. These include the 2014 seawall failure, the 2022 plant fire and the 2025 rockfall.

Opportunities

  • Resource growth. Jims is open down plunge and along strike; more than 50 known deposits are in the JV.
  • Underground drilling access. The Groundrush decline (from Sep 2026) may upgrade Inferred to Indicated and Measured.
  • Consolidating 100% of the CTPJV with Tanami Gold under common shareholder influence. This is speculative and unconfirmed.
  • Monetising the Fenix stake (A$37.8m at Dec 2025) and junior holdings.
  • Buy-back authority (up to 10%, to 30 Nov 2026) with shares trading near cash backing.
  • Base metals exploration at Tallering Peak, plus further acquisitions using surplus cash.

Threats

  • Gold price reversal would undermine restart economics.
  • Capex escalation in remote NT construction.
  • Crestlink deal failure or delay beyond the 31 Mar 2027 long-stop, leaving closure liabilities with MGX.
  • Partner funding risk if Tanami Gold cannot fund its 50% share of development costs.
  • Governance or related-party concerns depressing valuation (historical board independence disputes).
  • Treasury erosion. Cash and investments fell A$72.5m in FY26 (484.6 → 412.1) and will continue to decline without revenue.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
1 Apr 2025Buy-back reaches 33.1m shares cumulativeCapital return while trading below cash
17 Apr 2025Brett Smith replaces Lee Seng Hui as ChairmanGovernance transition
Jul 2025June 2025 quarterly reportFY25 sales 2.61 Mwmt
16 Jul 2025Agreement to buy 50% of Central Tanami for A$50mStrategic pivot to gold
Aug 2025Tanami Gold waives ROFRKey condition satisfied
20 Aug 2025FY25 results: NPAT −A$82.2m; FY26 guidance 3.0–3.2 MwmtImpairment-driven loss
10 Sep 2025Buy-back extended to 30 Sep 2026 (up to 10%)38.8m shares bought at A$0.313 average
10 Oct 2025FY25 Annual Report released—
16–17 Oct 2025Major Main Pit rockfall at Koolan; trading haltMining suspended; no injuries
20–21 Oct 2025Voluntary suspension from ASXPending technical assessment
24 Oct 2025Remediation not viable; FY26 guidance withdrawn; about 250 redundancies and 200 contractor roles lostPremature end of Koolan mining
24 Oct 2025Share price drop. InvestSMART logs show about A$0.47 before release, and the price later traded around A$0.33.Market reaction
11 Nov 2025CTPJV MRE updated to 2.8 Moz @ 2.8 g/tLarger resource base
12 Nov 2025AGM: shareholders approve the MGX Resources name. Chairman stresses safety and cash preservation.Rebrand
Late Nov / Dec 2025Buy-back re-noticed for 1 Dec 2025 – 30 Nov 2026No purchases since Oct 2025
3 Dec 2025FIRB approval for Central Tanami dealKey condition satisfied
4 Dec 2025Name change effective—
Early Feb 2026Central Tanami acquisition completes, ahead of 31 Mar deadlineMGX becomes a gold developer
19 Feb 2026H1 FY26: pre-impairment PBT A$39.9m (+113%); NPAT −A$20.8m; A$60.3m impairment; 2H target about 1.0 Mwmt low-gradeStock fell from about A$0.445 to around A$0.33 in the following period (InvestSMART logs)
24 Apr 2026March quarterly: Macmahon preferred decline contractor; Koolan rehab earthworks on track for mid-2026Development momentum
11 Jun 2026Binding conditional sale of Koolan to CrestlinkLiability transfer
20 Jul 2026June quarterly: 0.94 Mwmt shipped; cash A$412.1m; MGX CTPJV spend A$4.7m in quarterFinal iron ore quarter
Late Jul 2026Final Koolan shipments; care and maintenanceEnd of iron ore era
21 Aug 2026FY26 results: NPAT −A$30.2m; revenue A$220.8m total; no dividendNarrowed loss
2–3 Sep 2026Presentation at Mining the Territory conference, DarwinGold developer positioning
Sep 2026Macmahon Underground commences works at GroundrushFirst physical development
Around 9 Oct 2026FY26 Annual Report scheduled or lodged (per InvestSMART calendar)Full remuneration and shareholder data
Around 15 Oct 2026 (upcoming)September 2026 quarterly report scheduledFirst gold-only quarter

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

2 charts
Income Statement: Revenue & Gross Profit: Total revenue incl. other income rose from AUD 142.7 Mn in FY2022 to AUD 220.8 Mn in FY2026.
MGX Resources Limited. — Income Statement: Revenue & Gross Profit
Series (AUD Mn)FY2022FY2023FY2024FY2025FY2026
Total revenue incl. other income142.7452.6684.5350.4220.8
Iron ore sales volume (Mwmt)—34.12.62.7
Sales revenue FOB186.1450.6667.7330.5204
Gross profit-30.5114.2193.120.1—

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. MGX / Mount Gibson ASX releases: FY24 results (21 Aug 2024); H1 FY25 results (19 Feb 2025); buy-back increase (19 Feb 2025); Chairman succession (17 Apr 2025); Central Tanami acquisition (16 Jul 2025); FY25 results (20 Aug 2025); FY25 Annual Report (10 Oct 2025); Koolan operations update (24 Oct 2025); Chairman's AGM address (12 Nov 2025); FIRB approval (3 Dec 2025); CTPJV completion (Feb 2026); March 2026 quarterly (24 Apr 2026); Crestlink agreement (11 Jun 2026); June 2026 quarterly (20 Jul 2026); FY26 results (21 Aug 2026); Mining the Territory presentation (3 Sep 2026). Available via announcements.asx.com.au, mtgibsoniron.com.au, nsrltd.com and bulletin.webull.com.
  2. Mid-West transaction releases (29 Jun 2023; 24 Jul 2023); company website operations and background pages (mtgibsoniron.com.au).
  3. InvestorPA and InvestSMART announcement summaries (FY25 Appendix 4E; H1 FY26; buy-back extensions; FY26 results; share price logs).
  4. Quartr event summaries (H2 FY26; Q4 FY26; investor presentation).
  5. Mining Weekly / Creamer Media (Oct 2025 – Feb 2026); Mining.com.au; Australian Mining Review; HCAMag; DCN; The West Australian / Broome Advertiser; FilingReader.
  6. Aggregators: TipRanks (income statement, ratings); Stockopedia; Simply Wall St; roic.ai; GuruFocus; Seeking Alpha; MarketScreener (Lee Seng Hui profile).
  7. Tanami Gold NL presentations and resource statements; Business News (WA) on historical governance; Market Index (2024); Kalkine (FY24 wrap).