Mineral Resources Overview
Mineral Resources is a Perth-based, founder-led mining services and diversified commodities company that has spent two decades turning its in-house construction, crushing and haulage capability into ownership of tier-one resource assets. Its integrated "pit-to-ship" model lets it design, build and operate mines and infrastructure faster and cheaper than conventional owner-operators, then capture both contracting margins and commodity upside. Today the business rests on three legs: Mining Services, the contractually-backed earnings base that produced a record 341Mt in FY26; Iron Ore, anchored by the 35Mtpa Onslow Iron project and the Pilbara Hub; and Lithium, where MinRes is the only company operating three hard-rock spodumene mines with their own concentrators (Wodgina, Mt Marion and Bald Hill). After a severe FY25 downturn and a governance crisis in late 2024, FY26 delivered the strongest result in its listed history, a reinstated dividend and A$1.1 billion of debt reduction, though leverage, capex and founder succession remain the defining investment debates.
Company's own description
The company's standard ASX boilerplate (used in announcements through September 2026) describes MinRes as a leading mining services and diversified resources company with operations in iron ore and lithium; a growth company built on an integrated business model that provides pit-to-ship solutions, operational expertise and capital infrastructure to engineer, construct and operate world-class commodity projects.
What the company does
MinRes operates across three reportable segments:
Mining Services: the founding business and the operating engine of the group. It provides crushing and screening, contract mining, haulage (including road trains and the Onslow private haul road), port and transhipping logistics, processing, engineering and construction, and specialist equipment fabrication. It services both MinRes-owned/joint-venture assets (Onslow Iron, Pilbara Hub, Wodgina, Mt Marion, Bald Hill) and third-party clients. Revenue is volume-based (A$/tonne) under long-term contracts, which gives it an annuity-like character relative to the commodity segments.
Iron Ore: production and seaborne sale of iron ore fines from the Onslow Iron project (MinRes-operated JV) in the West Pilbara and the Pilbara Hub (Wonmunna, Iron Valley and the new Lamb Creek pit). Attributable FY26 shipments were a record 29.5Mt.
Lithium: production and sale of spodumene concentrate (reported on an SC6 basis) from Wodgina (JV with Albemarle), Mt Marion (JV with Jiangxi Ganfeng Lithium) and the 100%-owned Bald Hill (restarted May 2026). Record FY26 sales of 559k dmt SC6.
The company also holds energy exploration interests (gas in Western Australia's basins, after selling its Perth Basin Lockyer/North Erregulla gas assets to Hancock Prospecting) and a portfolio of technology and adjacent businesses (e.g., the LieNA lithium processing technology JV with Livium; CSI Mining Services equipment design; MinRes Air FIFO aviation).
Revenue model
| Revenue type | Segment | Mechanism | Characterisation |
|---|---|---|---|
| Contract services (volume-based) | Mining Services | A$ per tonne crushed, mined, hauled or shipped under multi-year contracts; includes intercompany services to MinRes-operated assets | Service / quasi-infrastructure; relatively stable margins (31% EBITDA margin in FY26) |
| Infrastructure tolls | Mining Services / Iron Ore | Onslow haul road toll revenue (road trust part-owned by Morgan Stanley Infrastructure Partners) | Infrastructure-like, volume-linked |
| Commodity sales | Iron Ore | Seaborne iron ore fines priced off benchmark indices (62% Fe) with grade and freight adjustments | Commodity product, price-taker |
| Commodity sales | Lithium | Spodumene concentrate sold under offtake / index-linked pricing to JV partners and third parties | Commodity product, highly cyclical |
| Asset recycling | Group | Sell-downs of JV interests and infrastructure (e.g., POSCO lithium JV, Onslow haul road, Perth Basin gas) | Episodic capital gains / contingent payments |
No subscription or licensing revenue of material size is disclosed.
Value-chain position
MinRes sits upstream: mine development, extraction, beneficiation and bulk logistics to port. It does not refine lithium chemicals after exiting the Kemerton hydroxide joint venture with Albemarle (2023 restructuring) and does not produce steel. Its distinctive value-chain position is vertical integration of the services layer — it owns crushing plants, haulage fleets, a private haul road, transhippers and fabrication capability — which allows it to act as both contractor and asset owner.
Customers and end-markets
| Customer type | Examples | End-market |
|---|---|---|
| Major iron ore producers (services) | Pilbara majors and mid-tiers (specific client names and contract values not fully disclosed in sources reviewed) | Seaborne iron ore / steel |
| JV partners (services + offtake) | Albemarle (Wodgina), Jiangxi Ganfeng (Mt Marion), POSCO Holdings (Onslow; prospective lithium JV), AMCI and Baowu/Baosteel (Onslow) | Steel; lithium-ion batteries |
| Steel mills / traders | Predominantly Chinese steelmakers for iron ore (Morningstar notes Australian iron ore is mainly purchased by Chinese steel producers) | Steel |
| Lithium converters | Chinese and Korean converters; POSCO expected to receive ~270,000 t/yr spodumene under the JV offtake (Argus, 12 Nov 2025) | EV batteries, energy storage |
Independent characterisation
MinRes is best understood as a capital-recycling, execution-led infrastructure and mining contractor that uses its own balance sheet to build assets, crystallises value through partial sell-downs to strategic partners, and retains operatorship (and therefore services earnings) for the life of the asset. Onslow Iron is the clearest example: MinRes built a 35Mtpa iron ore system including a 150km private haul road and transhipping fleet, sold minority stakes in the mine (to POSCO, AMCI, Baowu) and the road (to Morgan Stanley Infrastructure Partners), and retains operator economics. The model generated Goldman Sachs-cited average ROIC above 20% since IPO, but it also concentrates execution, commodity and leverage risk in a single, founder-driven organisation — a combination that produced both the FY25 crisis and the FY26 record.
Strategy
Stated strategic themes (FY26 materials)
-
Mining Services as the foundation that "underpins our growth strategy, enabling innovative, high-return projects and Tier 1 partnerships" (FY26 presentation theme).
-
Mining Services "drives growth and enables transition to higher-quality assets".
-
Balance sheet strengthening, governance and leadership as the three Board priorities set in 2025.
-
Disciplined brownfield investment rather than greenfield megaprojects in FY27 (growth capex focused on Mt Marion and Onslow).
-
Capital recycling via strategic partnerships (POSCO, Morgan Stanley Infrastructure Partners, Hancock).
-
Long-term leverage target of 2.0x net debt/EBITDA (achieved at 1.7x).
Strategic initiatives — last 24 months
| Initiative | Date | Description | Status / target |
|---|---|---|---|
| Onslow Iron beyond nameplate | FY27 | Sixth transhipper; haul road upgrades; ~38Mt run-rate | FY27 attributable 20.0–21.7M wmt |
| POSCO lithium partnership | Nov 2025 | 30% of lithium holding JV for US$765M | Pending completion (originally 1H CY2026) |
| Bald Hill restart | May 2026 | Restart on lithium recovery; plant expansion study | Ramp to nameplate in Q2 FY27 |
| Mt Marion flotation + underground | FY27 | Lift recovery, capacity and mine life; Macmahon underground contractor | Construction |
| Wodgina three-train operation | Q1–Q2 FY27 | All three trains running; clean ore from Stage 3 | Sales +14–23% |
| Lamb Creek | Mar 2026 | New Pilbara Hub pit (7.5Mtpa) | Producing |
| LieNA JV with Livium | Aug 2025 | Lithium fines processing technology | Commercialisation |
| Governance reform program | 2025–26 | Five new directors; governance & compliance function; external reviews | Embedded per Chair |
| Leadership succession | 2025–ongoing | Three-stage program | No date |
| Debt refinancing | Oct 2025, Apr 2026 | US$700M 2031 notes; US$1.3B notes | Longer tenor, lower coupons |
| Dividend reinstatement | Aug 2026 | 83c fully franked (20% underlying NPAT payout) | Policy formalisation to watch |
| Inclusive leadership / wellbeing programs | 2,026 | Inclusive Leaders Program; mental health support | ESG |
Medium-term targets and FY27 guidance
| Item | FY26 actual | FY27 guidance |
|---|---|---|
| Mining Services volume (Mt) | 341 | 370–390 |
| Onslow Iron attributable (M wmt) | 19.7 | 20.0–21.7 |
| Pilbara Hub (M wmt) | 9.9 | 10.0–11.0 |
| Total attributable iron ore (M wmt) | 29.5–29.6 | 30.0–32.7 |
| Lithium sales (k dmt SC6) | 559 | 660–750 |
| Bald Hill sales (k dmt SC6) | — | 100–120 |
| Bald Hill FOB (A$/dmt SC6) | — | 1,150–1,250 |
| Revenue (A$B) | 6.5 | 7.5–8.5 (per third-party summary of presentation; re-verify) |
| Underlying EBITDA (A$B) | 2.55 | 2.8–3.2 (per third-party summary; re-verify) |
| Underlying NPAT (A$B) | 0.82 | 0.9–1.1 (per third-party summary; re-verify) |
| Leverage target | 1.7x | ≤2.0x long-term |
Note: the FY27 financial guidance figures come from an announcement-summary service (InvestorPA) and may be consensus or illustrative figures rather than formal company guidance; MinRes historically guides volumes, costs and capex rather than revenue/EBITDA. Treat as unconfirmed.
Products & Services
Mining Services
| Offering | Description | Key specs / capability | Target customer | Notes |
|---|---|---|---|---|
| Crushing & screening (BOO) | Build-own-operate crushing plants paid per tonne | Modular plants; MinRes's founding service | Iron ore and lithium miners | Company's historical core; Ken's Bore crushing plant featured in 2026 AR |
| Contract mining | Load-and-haul, drill-and-blast | Fleet-based; record 341Mt FY26 production volume | Own and third-party mines | FY27 guidance 370–390Mt |
| Haulage & logistics | Road train haulage; Onslow private haul road | ~150km private haul road (Onslow) with autonomous/jumbo road trains | Onslow JV; external | Road part-owned by Morgan Stanley Infrastructure Partners |
| Port & transhipping | Transhipper fleet loading cape-size vessels offshore | Six transhippers operational from June 2026 at Onslow | Onslow Iron | Enables beyond-nameplate shipments |
| Processing & beneficiation | Operation of concentrators (spodumene) and iron ore processing | Three-train concentrator at Wodgina; flotation plant under construction at Mt Marion | JV assets | — |
| Engineering & construction | Project design and build | Onslow delivered three years from FID to nameplate | Own projects and partners | — |
| CSI Mining Services | In-house equipment design and fabrication | New dump truck tray deployed at Mt Marion (Aug 2026) | Internal fleet | Wholly-owned subsidiary |
| MinRes Air | Company-operated FIFO aviation | Inaugural flight July 2024 | Internal workforce | Cost and reliability control |
| Resource Development Group assets | Acquired construction/services capability (Q1 FY26) | — | Mining Services | Bolt-on |
Iron Ore
| Asset / product | Ownership | FY26 performance | FY27 guidance | Notes |
|---|---|---|---|---|
| Onslow Iron (Ken's Bore deposit, West Pilbara) | MinRes operator; JV partners POSCO, AMCI, Baowu (Baosteel) collectively ~43% | 19.7M wmt attributable shipments; FOB cost A$52/wmt (below A$54–59 guidance); 35Mtpa nameplate since Aug 2025, ~38Mt run-rate cited | 20.0–21.7M wmt attributable | Operating beyond nameplate in FY27; carry loan A$335M outstanding at 30 Jun 2026 |
| Pilbara Hub (Wonmunna, Iron Valley) | MinRes operated | 9.9M wmt; FOB A$79/wmt (top of A$75–80 guidance) | 10.0–11.0M wmt | Higher-cost operation |
| Lamb Creek pit (Pilbara Hub) | MinRes | First ore shipped March 2026 | 7.5Mt/yr pit (Argus) | Extends Pilbara Hub life |
| Total attributable iron ore | — | 29.5–29.6M wmt (record) | 30.0–32.7M wmt | — |
Lithium
| Asset | Ownership (current → post-POSCO) | FY26 sales (k dmt SC6) | FY26 FOB cost (A$/dmt SC6) | FY27 outlook | Notes |
|---|---|---|---|---|---|
| Wodgina (Pilbara) | 50% (Albemarle 50%) → 35% MinRes / 15% POSCO | 317 (record; guidance 270–290) | 738 | Sales +14–23% as clean ore feeds all three trains from Q2 FY27; Stage 4 pre-strip from Q1 FY27 | One of the world's largest hard-rock deposits |
| Mt Marion (Goldfields) | 50% (Ganfeng 50%) → 35% MinRes / 15% POSCO | 242 (record; guidance 210–230) | 847 | Flotation plant + underground mine; Macmahon appointed underground contractor | FY27 capex A$340M (Market Index) vs A$490M expansion (Argus) — see discrepancy note |
| Bald Hill (Goldfields) | 100% | Restarted May 2026; first concentrate June 2026 | n/a FY26 | 100–120k dmt SC6 at A$1,150–1,250/dmt | Nameplate ~165k dmtpa SC5.1 (~140k SC6); 58.1Mt @ 0.94% Li2O resource; restart cost ~A$20M |
| Total lithium | — | 559 (record) | — | 660–750k dmt SC6 | — |
Energy and technology
| Offering | Description | Status |
|---|---|---|
| Gas exploration | Exploration permits in Western Australian basins (after sale of Perth Basin assets to Hancock) | Exploration; uncertain near-term impact (company guidance commentary) |
| LieNA technology JV | 50:50 JV with Livium (formed Aug 2025) to commercialise LieNA lithium processing technology (recovering lithium from fine spodumene) | Commercialisation stage |
| Kali Metals | Former lithium exploration spin-out / investment | Subject of concluded ASIC investigation |
Pricing models for individual services are not publicly disclosed beyond the general per-tonne contract structure.
Financial Narrative
Income statement — chartable
Sources: FY26 Appendix 4E and results announcement; Market Matters (27 Aug 2026); FY22–FY24 from prior annual reports (re-verify).
MinRes reports primarily on underlying EBITDA and NPAT, and its income statement does not present a conventional gross profit line.
Derived per-share and margin metrics — chartable
FNArena's data feed shows an FY26 net profit margin of −20.21%, which matches the FY25 statutory loss margin; it appears to be lagged. Discrepancy noted.
Revenue CAGR: FY22→FY26 (4 years) ≈ 17.4% p.a.; FY21 (A$3,734M, prior AR) → FY26 (5 years) ≈ 11.7% p.a. (calculated).
Balance sheet — chartable
FNArena's data shows total debt of A$5,762M (short-term A$317M, long-term A$5,445M), most likely as at 31 Dec 2025 or a prior period; not reconciled to 30 June 2026. FY25 liquidity is derived from the company's statement that liquidity "more than doubled" to A$2.4B.
Cash flow — chartable
1H FY26 free cash flow was A$293M, implying 2H FY26 FCF of ~A$556M. FY26 capex of A$1,111M was below the A$1,140M guidance midpoint. Buybacks: none disclosed. The FY26 final dividend (A$163M) was paid 30 September 2026, i.e., in FY27; a DRP operated for this dividend.
Commentary on trends, inflections and drivers
FY22–FY23: lithium super-cycle. Revenue rose ~40% to A$4.8B in FY23 and underlying EBITDA reached ~A$2.4B, a then-record, as spodumene prices peaked. Statutory NPAT lagged (A$244M) due to impairments and the capital-intensive build of Onslow.
FY24: peak capex, falling lithium. Revenue reached ~A$5.3B, but lithium prices collapsed and capex peaked at A$3.4B (Fitch) for Onslow construction. Net debt rose sharply. Only a 20c interim dividend was paid.
FY25: the trough. Revenue fell to ~A$4.5B, underlying EBITDA collapsed to ~A$0.9B and the statutory loss was A$904M, driven by lithium impairments, care-and-maintenance costs (Bald Hill), Onslow ramp-up costs and weak lithium pricing. Net debt/EBITDA reached ~5.9x and the shares hit a five-year low in early 2025. The governance crisis compounded the financial stress, prompting a Fitch downgrade.
FY26: the inflection. Three drivers converged: (1) Onslow Iron at nameplate from August 2025 (FOB cost A$52/wmt), contributing ~A$1B of EBITDA consistent with Fitch's forecast of ~A$1B/yr incremental EBITDA FY26–FY29; (2) record Mining Services volumes (341Mt, +22%); and (3) a lithium price recovery (spodumene prices reportedly up 92% quarter-on-quarter at one point in 2H) combined with record volumes and lower costs at Wodgina. Underlying EBITDA rose 183% to A$2.55B, statutory NPAT swung to A$1,061M (including non-underlying items), FCF was A$849M and net debt fell A$1.1B. Capex discipline (A$1.1B vs A$3.4B in FY24) was essential to the deleveraging.
Key watch-point. The A$239M gap between statutory NPAT (A$1,061M) and underlying NPAT (A$822M) indicates material non-underlying gains in FY26 — likely including contingent payments (Onslow haul road A$200M; Hancock gas A$41M) and/or impairment reversals. The composition should be checked in the 2026 Annual Report before relying on statutory earnings as recurring.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Overview
| Segment | Contents | Key assets / services |
|---|---|---|
Mining Services | Crushing & screening, contract mining, haulage, ports/transhipping, processing, construction, equipment design (CSI Mining Services), aviation (MinRes Air) | Services to Onslow Iron, Pilbara Hub, Wodgina, Mt Marion, Bald Hill and external clients |
Iron Ore | Ownership share of iron ore operations and marketing | Onslow Iron (MinRes-operated JV, ~57% MinRes), Pilbara Hub (Wonmunna, Iron Valley, Lamb Creek) |
Lithium | Ownership share of spodumene operations and marketing | Wodgina (50%, Albemarle), Mt Marion (50%, Ganfeng), Bald Hill (100%) |
Other / Central | Energy exploration, corporate, investments | Gas exploration permits; LieNA JV; corporate overhead |
Segment revenue (AUD Mn)
| Segment revenue (AUD Mn) | FY24 | FY25 | FY26 |
|---|---|---|---|
Mining Services revenue (AUD Mn; FY25 derived) | — | 3,294 | 3,110 |
Iron Ore revenue (AUD Mn; FY25 derived) | — | 2,331 | 3,590 |
Lithium revenue (AUD Mn) | — | — | 1,310 |
Group revenue (AUD Mn; post eliminations) | 5,280 | 4,500 | 6,500 |
Segment underlying EBITDA (AUD Mn)
| Segment underlying EBITDA (AUD Mn) | 1H FY26 | FY26 |
|---|---|---|
Mining Services underlying EBITDA (AUD Mn) | 488 | 976 |
Iron Ore underlying EBITDA (AUD Mn) | 573 | 1,000 |
of which Onslow Iron EBITDA (AUD Mn) | 519 | — |
Lithium underlying EBITDA (AUD Mn) | 167 | — |
Group underlying EBITDA (AUD Mn) | 1,167 | 2,550 |
Segment Revenue
| Segment | FY26 revenue (AUD Mn) | YoY growth | FY26 EBITDA (AUD Mn) | EBITDA margin | Share of segment EBITDA (approx.) |
|---|---|---|---|---|---|
Mining Services | 3,110 | −5.6% | 976 | 31% | ~38% |
Iron Ore | 3,590 | +54% | ~1,000 | ~28% | ~39% |
Lithium | 1,310 |
| — | — | ~23% (residual inference) |
Income Statement and Per-Share Data
| Metric | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Revenue (AUD Mn) | 3,418 | 4,779 | 5,280 | 4,500 | 6,500 |
Underlying EBITDA (AUD Mn) | — | 2,400 | — | 901 | 2,550 |
Underlying NPAT (AUD Mn) | — | — | — | -112 | 822 |
Statutory NPAT attributable (AUD Mn) | 351 | 244 | 125 | -904 | 1,061 |
Dividends per share (A$ cents) | 100 | 190 | 20 | 0 | 83 |
Margin Analysis (%) and Per-Share Data
| Metric | FY25 | FY26 |
|---|---|---|
Underlying EBITDA margin (%) | 20.0 | 39.2 |
Statutory net margin (%) | -20.1 | 16.3 |
Underlying NPAT margin (%) | -2.5 | 12.6 |
Statutory basic EPS (A$ cents; derived on ~196.5M shares) | -460 | 540 |
Underlying EPS (A$ cents; derived) | -57 | 418 |
Dividend payout of underlying NPAT (%) | 0 | 20 |
Key Financials
| Metric | FY25 | FY26 |
|---|---|---|
Net debt (AUD Mn; incl. leases) | 5,400 | 4,300 |
Liquidity (AUD Mn) | 1,200 | 2,400 |
Cash (AUD Mn) | — | 1,600 |
Undrawn revolving credit facility (AUD Mn) | — | 800 |
Onslow carry loan outstanding (AUD Mn) | — | 335 |
Cash Flow
| Metric | FY24 | FY25 | FY26 |
|---|---|---|---|
Capital expenditure (AUD Mn) | 3,400 | — | 1,111 |
Free cash flow (AUD Mn) | — | — | 849 |
Dividends paid (AUD Mn) | — | 0 | 0 |
Dividend declared, paid in FY27 (AUD Mn) | — | — | 163 |
Financial Ratios (x)
| Ratio | FY25 | FY26 | Source / basis |
|---|---|---|---|
Net debt / underlying EBITDA (x) | 5.9 | 1.7 | Company (FY26: 1.7x); Morningstar cites 1.5x for FY26 and 5.9x for FY25 — methodology discrepancy |
Region Overview
| Region | Revenue drivers | Assessment |
|---|---|---|
Australia | Mining Services revenue from third-party clients (WA-based); domestic sales | All production assets are in Western Australia; Morningstar flags poor geographic diversification and high dependence on WA capital activity |
China | Iron ore sales to steel mills; spodumene to converters (incl. Ganfeng offtake) | Likely the largest destination for commodity revenue; not publicly quantified in sources reviewed |
United States (via Albemarle) | Wodgina spodumene offtake to Albemarle | Partner offtake |
South Korea | Prospective POSCO offtake (~30% of MinRes's Wodgina/Mt Marion share; ~270kt/yr spodumene eventually) and POSCO's Onslow iron ore share | Growing post-completion |
Capital Markets
| Measure | Value | Source / basis |
|---|---|---|
Price (early Oct 2026) | ~A$50.25 | Company website ticker, 1 Oct 2026 |
2026 YTD range | A$48.27 – A$74.94 | InvestSMART |
12-month range (to ~Aug 2026) | A$27.65 – A$74.94 | Motley Fool |
1-year return | ~+60–100% depending on reference date (shares were ~A$30 in Aug 2025; ~+106% to late July 2026) | Motley Fool; calculated |
3-year return | Negative (shares were ~50% below Jan 2023 all-time highs as of late 2025) | Kalkine |
Valuation Multiples
| Multiple | FY26 actual | FY27 guidance midpoint |
|---|---|---|
Market cap (AUD Bn) | ~9.9 | — |
Enterprise value (AUD Bn; mkt cap + A$4.3B net debt) | ~14.2 | — |
EV / underlying EBITDA (x) | ~5.6 | ~4.7 (on A$3.0B) |
EV / Sales (x) | ~2.2 | ~1.8 (on A$8.0B) |
P/E statutory (x) | ~9.3 | — |
P/E underlying (x) | ~12.0 | ~9.9 (on A$1.0B) |
Dividend yield (trailing) | ~1.7% (83c) | — |
Broker / Provider Details
| Broker / provider | Rating | Target / fair value | Date |
|---|---|---|---|
Macquarie | Outperform (implied) | A$85 | Jul 2026 |
Morningstar | No-moat | Fair value A$77 | ~May 2026 |
Bell Potter | Buy | A$70 | Feb 2026 |
Jarden | Positive bias (EPS FY26 forecast 308.8c) | — | Jan–Feb 2026 |
Consensus (Motley Fool summary) | 10 of 16 analysts Buy/Strong Buy | Bull-case ~A$86 | ~Aug 2026 |
Dividend (A$ cents)
| Dividend (A$ cents) | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Interim dividend (A$ cents) | 0 | 120 | 20 | 0 | 0 |
Final dividend (A$ cents) | 100 | 70 | 0 | 0 | 83 |
Total dividend (A$ cents) | 100 | 190 | 20 | 0 | 83 |
Credit Ratings
| Agency | Rating | Outlook | Last action |
|---|---|---|---|
Moody's | Ba3 | Negative (as of Oct 2025 per MNI) | — |
S&P | Not rated | — | — |
Fitch | BB- | Stable | Outlook revised from negative, Nov 2025; upgrade possible if net leverage sustained <3.0x and governance risks ease |
Capital Instruments
| Instrument | Amount | Coupon | Maturity | Notes |
|---|---|---|---|---|
Senior unsecured notes (2027) | — | — | May 2027 | Being refinanced from 2026 issuance proceeds |
Senior unsecured notes (Oct 2025 issue) | US$700M | 7.000% | April 2031 | Settled Oct 2025 |
Senior unsecured notes (Apr 2026 issue) | US$1.3B | — | — | "Best result" in international debt markets per company |
Revolving credit facility | A$800M | — | — | Undrawn at 30 Jun 2026 |
Onslow carry loan | A$335M outstanding | — | — | At 30 Jun 2026 |
Analyst Conclusions
Management guidance (FY27)
Volume growth in every division: Mining Services 370–390Mt (+9–14%); attributable iron ore 30.0–32.7M wmt; lithium 660–750k dmt SC6 including Bald Hill 100–120k. Growth capex focused on Mt Marion (flotation and underground) and Onslow. Wodgina cost-down from Q2 FY27. Financial guidance cited by third parties (revenue A$7.5–8.5B; underlying EBITDA A$2.8–3.2B; underlying NPAT A$0.9–1.1B) is unconfirmed.
Bull case
-
Deleveraging flywheel: FY26 FCF of A$849M plus ~A$1.0B post-tax POSCO proceeds could take net debt toward ~A$3B, supporting rating upgrades (Fitch trigger: <3.0x sustained, already met at 1.7x) and lower funding costs.
-
Volume-led earnings growth independent of price: Mining Services +9–14%, lithium +18–34% and Onslow beyond nameplate give multiple earnings levers rather than one commodity.
-
Valuation: at ~A$50, EV/EBITDA ~5.6x trailing and below most broker targets (A$70–A$86); the removal of the ASIC overhang lowers the governance discount.
Bear case
-
Commodity reversal: FY25 showed a A$904M statutory loss is possible; lithium prices are volatile and Onslow's lower-grade fines face new seaborne supply.
-
Earnings quality and capex: ~A$239M of FY26 statutory profit is non-underlying, while FY27 capex rises; Market Matters argues the test is converting EBITDA into cash and lower debt.
-
Leadership and governance: no MD handover date, CE Lithium departing, and an unresolved class action; POSCO completion already beyond its original timetable.
Catalysts and monitorables (next 12 months)
| Timing | Catalyst |
|---|---|
| 29 Oct 2026 | Q1 FY27 Quarterly Activity Report (Bald Hill ramp, Wodgina ore quality, Onslow run-rate) |
| Nov 2026 | AGM: succession update, remuneration vote |
| Q2 FY27 | Wodgina clean ore through all three trains; Bald Hill at nameplate |
| By Dec 2026 | Appointment of new Chief Executive – Lithium |
| TBD | POSCO lithium JV completion (FIRB, clearances) |
| Feb 2027 (est. 25 Feb) | 1H FY27 results; potential interim dividend |
| May 2027 | Maturity / refinancing of first US bonds |
| Ongoing | Moody's outlook review; spodumene and 62% Fe prices; class action progress |
Analyst verdict
Mineral Resources enters FY27 as a materially de-risked but not yet de-levered business. The FY26 result validated the core thesis that MinRes's integrated services model can build and operate tier-one infrastructure at a structural cost advantage: Onslow Iron reached 35Mtpa three years after FID at a FOB cost of A$52/wmt and delivered roughly A$1 billion of EBITDA in its first full year, while Mining Services posted record volumes at a 31% margin. Lithium, the source of the FY25 collapse, swung back to meaningful profitability on price and record volumes, and the company is now positioned with three operating hard-rock mines into a recovering market. Net debt fell A$1.1 billion to A$4.3 billion, liquidity doubled to A$2.4 billion, and the dividend was reinstated.
Three issues prevent an unqualified view. First, the balance sheet is improved rather than repaired: A$4.3 billion of net debt against a cyclical earnings base, sub-investment-grade ratings and rising FY27 growth capex means a commodity downturn would again test the company. Completion of the long-delayed POSCO transaction is the single most important near-term balance sheet event. Second, earnings quality warrants scrutiny: roughly a quarter of FY26 statutory profit was non-underlying, and Mining Services revenue fell despite record volumes. Third, governance and leadership remain in transition: the founder has no set exit date, has begun selling shares, and the lithium chief is departing — even as the board refresh and the closure of the ASIC investigation materially improve the governance picture.
On balance, at approximately 5–6x trailing EV/EBITDA, the market is pricing MinRes closer to its FY25 stress than its FY26 delivery. If POSCO completes, Wodgina's cost-down arrives in Q2 FY27 and lithium prices hold, the equity has meaningful re-rating potential. Investors should treat it as a high-beta, execution-proven, leverage-sensitive vehicle and size positions accordingly.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Title | Tenure / appointment | Background | Notes |
|---|---|---|---|---|
Chris Ellison | Managing Director (founder) | Founder 1992; MD since listing | Founder of MinRes; New Zealand-born | Largest shareholder; sold 1.75M shares May 2026 (first sale since 2017); succession program underway with no fixed date |
Darren Killeen | Chief Operating Officer | Appointed May 2026 | Long-serving MinRes executive; led delivery of major projects including Onslow | Reported frontrunner to succeed Ellison (The Nightly, June 2026) |
Joshua Thurlow | Chief Executive – Lithium | Since Sep 2022 (joined 2019); resigned 1 Oct 2026, departing December 2026 | Mining engineer, MBA (Melbourne Business School); ex-Newcrest, Aeris, BHP | Successor not yet announced |
Kate Barker | Director, Governance and Compliance | Appointed 2025 (new role) | — | Reports directly to Chair |
Nick Rohr | Director, Legal and Commercial | Appointed 2025 | — | — |
Sarah Standish | Company Secretary | Joint CoSec from 6 Oct 2025 | — | Authorises ASX releases |
Board of Directors
| Director | Role | Appointed | Background |
|---|---|---|---|
Malcolm (Mal) Bundey | Independent Non-Executive Chair | Early 2025 | Melbourne-based company director; brought in to lead the governance reset |
Chris Ellison | Managing Director | Founder | — |
Lawrie Tremaine | Independent NED | July 2025 | Former CFO, Origin Energy |
Ross Carroll | Independent NED | July 2025 | Former CEO, Macmahon Holdings |
Susan Ferrier | Independent NED | 10 Oct 2025 | Former people and culture lead, National Australia Bank |
Colin Moorhead | Independent NED | 10 Oct 2025 | Director, Ramelius Resources; mining executive |
Colleen Hayward | NED | Prior to 2025 | — |
Major Shareholders
| Holder | Stake | Date / source |
|---|---|---|
Chris Ellison (and associates) | — | May 2026 disclosure |
AustralianSuper | 6.74% (13.32M shares) | Substantial holder notice, 12 Nov 2025 |
Competitive Landscape
Competitors by Segment
| Segment | Competitor | Relative positioning |
|---|---|---|
Mining Services | NRW Holdings | Contract mining and civil; closest direct competitor in WA |
Mining Services | Perenti | Surface/underground contract mining, global |
Mining Services | Macmahon Holdings | Contract mining; also MinRes subcontractor at Mt Marion |
Mining Services | Monadelphous | Engineering, construction, maintenance |
Mining Services | Worley | Engineering and project delivery (global) |
Iron Ore | BHP | Tier-one, ~290Mt WAIO scale; far lower cost |
Iron Ore | Rio Tinto | Largest Pilbara producer |
Iron Ore | Fortescue | ~190Mt; low-grade fines peer; closest product comparison |
Iron Ore | Champion Iron | High-grade Canadian producer |
Lithium | PLS (Pilbara Minerals) | Largest pure-play ASX spodumene producer (Pilgangoora) |
Lithium | IGO | Greenbushes interest (via TLEA) |
Lithium | Liontown Resources | Kathleen Valley |
Lithium | Elevra (formerly Sayona/Piedmont) | North American hard rock |
Lithium | Albemarle / Ganfeng | Also JV partners |
Competitor Detail
| Metric | MinRes (FY26) |
|---|---|
Revenue | A$6.5B |
Revenue growth | +44% |
Underlying EBITDA margin | ~39% |



