Moho Resources Limited is a Perth-based, ASX-listed junior gold explorer that, through 2024–2026, has completely remade itself. Having listed in 2018 with a diversified portfolio of early-stage nickel, gold, rare-earth and polymetallic projects across Western Australia and Queensland, the company endured three years of falling share prices, large impairments and repeated sub-cent capital raisings. A board refresh in late 2023 under Chairman Peter Christie led to the sale of every legacy project — East Sampson Dam, Empress Springs and Silver Swan North — in exchange for upfront cash, deferred milestone payments and royalties. Proceeds were redeployed into a low-cost, largely pegged land position at Bush Chook in the Pilbara's Mosquito Creek Basin, adjacent to AIM Mining's Nullagine/Blue Spec operations and the 1.8 Mtpa Golden Eagle processing plant. Moho is now a single-asset, discovery-stage gold (and gold-antimony) story with a market value of roughly A$4 million, nil debt, and a funding runway measured in quarters.
What the company does. Moho is a mineral exploration company. Its principal activity, as stated in its FY2025 Directors' Report, is ongoing exploration activities. It acquires prospective exploration tenure (prospecting licences, exploration licences), conducts geological mapping, soil and rock-chip geochemistry, remote sensing (drone, HyMap hyperspectral) and drilling (reverse circulation, aircore), with the aim of making a discovery that can be defined into a JORC-compliant Mineral Resource and then either developed or sold.
Company's own description (paraphrased from the FY2025 Annual Report and 2026 releases). Moho describes itself as an Australian natural resources company that advances early-stage gold and other metals projects in Western Australia from exploration towards development, holding 100% interests in its portfolio, with the Bush Chook Gold Project in the Pilbara Craton as its priority focus.
Business model. Moho's model is a classic "discovery and value-realisation" junior explorer model:
-
Low-cost tenure acquisition — Bush Chook was assembled largely by pegging (staking) open ground in August 2025 (109 tenement applications over 225 km²), then expanded through small share-based tenement acquisitions (Goldtimers, Moonlight Metals, Codrus Minerals, Rocky Ridge vendor). The FY2025 Annual Report repeatedly characterises the Bush Chook acquisition as "non-dilutive" — in the sense that the initial pegging did not require a large share issue.
-
Systematic exploration funded by equity and asset sales — the company has no operating cash flow; all activity is funded by share placements (A$2.0m in October–December 2025; A$0.75m in FY2025; A$1.70m in FY2024) and by proceeds from selling legacy projects (A$1.55m cash received in FY2025; A$0.5m on Silver Swan North in 2026).
-
Monetisation of non-core assets through retained upside — each divestment has retained contingent consideration: up to A$3m of production-linked payments on East Sampson Dam; a A$0.5m mining-lease milestone plus a 1% gross revenue royalty on Silver Swan North; a deferred A$0.3m payment (and originally a 1% NSR) on Empress Springs.
Revenue model mix. Product: 0%. Service: 0%. Subscription: 0%. Licensing: 0%. Reported "revenue" consists entirely of interest income on cash deposits (A$32,943 in FY2025; A$10,000 of other income in FY2023). Future potential non-dilutive income streams are contingent milestone payments and royalties from divested projects.
Value chain position. Upstream, at the earliest (greenfield/brownfield exploration) stage of the mining value chain — before resource definition, feasibility, development, production, processing and sale. Moho has no Mineral Resource or Ore Reserve on its current portfolio (the only JORC resource it ever held, East Sampson Dam's interim 21,600 oz, was sold in late 2024).
Customer types / end-markets. Moho has no customers. Its ultimate "buyers" are (a) equity investors who fund discovery risk, (b) potential acquirers or joint-venture partners (mid-tier producers, private operators such as Mineral Mining Services Pty Ltd), and (c) prospectively, the gold market (bullion via refiners) if a deposit were ever developed. Its strategic thesis also leans on antimony (a critical mineral) via the Rocky Ridge gold-antimony target.
Independent characterisation. Moho is best described as a single-project, shell-like micro-cap explorer that has successfully recycled a failed legacy portfolio into a fresh Pilbara gold land position. Its strengths are a clean balance sheet (no debt, low fixed overhead of roughly A$0.4–0.6m per annum excluding exploration), a large, cheaply acquired landholding in a proven gold district next to established infrastructure, and early drill success (70% of Phase One holes mineralised). Its weaknesses are extreme share-count dilution (shares outstanding nearly quadrupled from 259.6m in July 2023 to over 1.03bn by early 2026), a sub-half-cent share price, no executive management team, and modest grades in first drilling results (generally ~1 g/t Au over moderate widths). The equity is effectively an option on a discovery at Bush Chook.
Strategy
Stated corporate strategy (themes from the FY2025 Annual Report Chairman's Letter and 2026 releases, paraphrased)
-
Strategic transition / portfolio reset — a comprehensive review weighing the cost of advancing legacy projects against redeploying capital into opportunities better aligned with market conditions and shareholder value.
-
Divestment of legacy and non-core projects — crystallise value, release capital and management bandwidth, and keep upside via deferred payments and royalties.
-
Focus on high-grade gold in a proven district — the Bush Chook acquisition is framed as a new direction: focused, disciplined, positioned where geology and market demand meet (record gold prices).
-
Low-cost pathway to discovery — prioritise high-grade vein and soil targets that can be moved quickly from mapping and rock chips to first-pass drilling; favour tenure free of native-title conditions to reduce cost and approval time.
-
District-scale consolidation — grow the Bush Chook footprint through small, share-funded bolt-ons (Goldtimers, Moonlight, Codrus, Rocky Ridge).
-
Gold-antimony optionality — target "Blue Spec look-alike" high-grade gold-antimony mineralisation at Rocky Ridge, adding critical-mineral exposure.
Strategic initiatives — last 24 months
| Initiative | Date | Description | Status |
|---|---|---|---|
| Portfolio review and divestment program | FY2025 | Sale of East Sampson Dam, Empress Springs, Silver Swan North | Complete (Apr 2026) |
| Bush Chook pegging | Aug 2025 | 109 applications, 225 km² | Complete |
| Bush Chook expansion (Goldtimers, Moonlight) | Sep 2025 | To 386 km² | Goldtimers PLs incorporated; Moonlight completion not confirmed |
| Codrus Minerals tenement swap | Dec 2025 | 15 PLs (surrender/pick-up), six drill-ready targets; to 440 km² | Complete (5 Dec 2025) |
| Rocky Ridge acquisition | Mar 2026 | P46/2148 historic gold-antimony mine; to 442 km² | Complete |
| Regional soil campaign | H1 CY2026 | ~4,000 samples; 2026 Anomaly 1 and 2 defined | Complete; follow-up underway |
| HyMap hyperspectral reprocessing | 2025–2026 | Alteration mapping to generate targets (Zone D) | Ongoing |
| Phase One RC drilling | May–Jul 2026 | 5,000 m planned (3,492 m completed per Kalkine summary) | Complete; two discoveries |
| Heritage Agreement | Jun 2026 | Palyku-Jartayi Aboriginal Corporation; ~80% of project accessible | Executed |
| Phase Two exploration | Q4 CY2026 | Drill Emu, Bright Tank; step-outs at Gage Road and CBco seeking thicker, higher-grade zones; follow-up of soil anomalies | Planned |
| Cost program | FY2024–FY2026 | Removal of executive roles; directors' fees partly in shares; payment of advisers and suppliers in shares | Ongoing (not quantified as a formal target) |
Sustainability/ESG commitments: no formal targets published; the heritage agreement and environmental-compliance statements are the principal disclosures.
Medium-term financial targets / guidance
Moho provides no financial guidance or medium-term financial targets. The FY2025 Directors' Report states that likely developments are not disclosed because doing so could unreasonably prejudice the company. Operational "guidance" is limited to drilling plans (Phase Two in Q4 CY2026). Implicit corporate milestones embedded in incentive securities: share-price VWAP hurdles of A$0.010, A$0.015 and A$0.025; and, for the Moonlight vendor rights, JORC resources of ≥100 koz and ≥200 koz at ≥2 g/t Au within E46/1593 within four and five years respectively.
Products & Services
Moho sells no products or services. For an explorer, the equivalent "catalog" is its portfolio of exploration projects and prospects. Each is profiled below.
Bush Chook Gold Project (flagship)
| Attribute | Detail |
|---|---|
| Location | Mosquito Creek Basin, Pilbara Craton, WA; ~200 km north of Newman near the Nullagine townsite |
| Area | 225 km² (Aug 2025) → 386 km² (Sep 2025 HOAs) → 440 km² (Dec 2025 Codrus) → 442 km² (Mar 2026 Rocky Ridge) |
| Ownership | 100% (subject to 2% NSR to Moonlight vendors on E46/1593, if completed) |
| District endowment | Mosquito Creek Basin hosts ~2.4–2.5 Moz in past production and current resources (company figures vary between releases) |
| Neighbour / infrastructure | Surrounds AIM Mining's (Mark Creasy-owned, private) Nullagine Gold Project and 1.8 Mtpa Golden Eagle plant; 10 MW power station; Blue Spec and Gold Spec gold-antimony deposits (company cites ~242 kt @ 24.3 g/t Au and 1.6% Sb) |
| Regional analogue | Northern Star's 11.2 Moz Hemi deposit (Mallina Basin) cited by company as a regional discovery precedent |
| Native title / heritage | 26 PLs granted Oct 2025 without native title conditions; Palyku-Jartayi Heritage Agreement (22 Jun 2026) opens ~80% of the project |
| Exploration work to date | Drone surveys; geological mapping; HyMap hyperspectral reprocessing; ~4,000-sample soil campaign (1,516 samples above threshold); trenching data; maiden RC (Dec 2025, 540 m); Phase One RC (May–Jul 2026, 3,492 m of planned 5,000 m) |
| Target customer / exit | Discovery-driven equity re-rating; potential toll-treatment or sale to regional operator given adjacent plant |
| Prospect | Description | Best results to date | Status |
|---|---|---|---|
| Gage Road | New shallow multi-lode gold system; two lodes over ~200 m strike | 14 m @ 1.04 g/t Au from 13 m; 5 m @ 1.53 g/t from 30 m incl. 2 m @ 2.96 g/t | Discovery (Jul 2026); open along strike and down dip |
| CBco | New shallow multi-lode gold system; two lodes over ~420 m strike | 15 m @ 0.84 g/t Au from 64 m incl. 9 m @ 1.06 g/t; 2 m @ 1.27 g/t from 31 m | Discovery (Jul 2026); open |
| Rocky Ridge (P46/2148) | Historic high-grade gold-antimony mine; company presents it as a "Blue Spec look-alike" | Historic production 932 oz from 341 t @ ~85 g/t Au; historic intercept 8 m @ 28.5 g/t Au from 52 m (historic, not JORC-verified) | Drilled May–Jun 2026; Moho assays not identified in sources reviewed |
| Emu | Outcropping gossanous quartz vein, +200 m strike, up to ~20 m wide; 2 km from historic Barton gold mine | High-grade rock chips (company releases of 16 Oct 2025) | High priority; awaiting heritage survey; Phase Two (Q4 2026) |
| Bright Tank | Two clusters of outcropping gold along a 600 m trend | Rock chips up to 12.7 g/t Au | High priority; Phase Two (Q4 2026) |
| Swan (Zone C) | 1.4 km × 250 m soil anomaly (10–330 ppb Au), 10 km from Blue Spec | Four RC holes (540 m): alteration but no significant intercepts | Paused Feb 2026; southern portion untested |
| Zone A | 300 m high-grade trend incl. 100 m outcropping vein (~20 m apparent thickness) | Rock chips 0.81–6.98 g/t; historic 14.9, 13.4, 9.12 g/t | Target |
| Zone B | 1.8 km trend of historic rock chips | Up to 5.6 g/t Au | Infill soils |
| Zone D | HyMap pyrophyllite-dickite anomaly aligned with soils, 1.5 km +10 ppb trend | Reconnaissance rock chips up to 0.54 g/t | Target |
| Little Creature | High-grade gold target prioritised Feb 2026 | Not quantified in sources reviewed | Target |
| Single Fin, Boston | Targets unlocked by 13 PLs granted Feb 2026 | Anomalous soils, rock chips, trenching | Target |
| 2026 Anomaly 1 & 2 | Large soil anomalies 750 m and 1,500 m long, multiple soils >1 g/t Au | Soil geochemistry only | Mapping/rock-chipping; candidates for Phase Two |
Prospects within Bush Chook (product-by-product):
Highest-grade surface sample reported by the company: rock chip of 28.6 g/t Au (July 2025 fieldwork).
Weld Range North Project (E20/1012)
Murchison region, ~75 km NNW of Cue; Youanmi Terrane. Coincident magnetic and gravity anomalies interpreted as a mafic-ultramafic intrusion; prospective for Ni-Cu sulphides and gold. FY2025 soil survey completed with assays pending at the time of the FY2025 Annual Report. Acquired via the 2022 Whistlepipe collaboration. Current status: not confirmed in 2026 disclosures reviewed.
Divested projects (retained economic interests)
| Project | Buyer | Upfront | Contingent / retained | Status |
|---|---|---|---|---|
| East Sampson Dam (M27/263, E27/528, P27/2390, P27/2441) | Mineral Mining Services Pty Ltd | A$1.0m (received Dec 2024) | A$500k at each of 10, 15, 20, 25 koz produced; A$1.0m at 30 koz (total up to A$3.0m) | Not recognised as asset; milestones not met as at 31 Dec 2025 |
| Empress Springs (EPM25208/09/10) | Qld Aus Graphite Pty Ltd | A$408.5k (ex-GST) | A$300k deferred, due 21 May 2026 | Receipt not confirmed in sources reviewed |
| Silver Swan North (E27/623) | Mineral Mining Services Pty Ltd | A$500k (received in full by 20 Apr 2026) | A$500k on conversion to mining lease; 1% gross revenue royalty | Completed |
Pricing model: not applicable.
Financial Narrative
Sources: FY2025 Annual Report (five-year table in remuneration report; statements of profit or loss, financial position, cash flows); H1 FY2026 Half-Year Report; FY2021–FY2023 balance-sheet totals from TipRanks (aggregator; FY2023 equity cross-checked to the FY2025 AR statement of changes in equity at A$8,395,790); FY2021–FY2023 net cash flow from Barchart (labelled "USD thousands" by the vendor, but FY2024 and FY2025 figures match AUD statements exactly, so they are treated as AUD). Not applicable metrics (gross profit, operating margin, EBITDA margin) are discussed in prose rather than tabled.
Income statement — 5 years
Gross profit, operating income, EBITDA, pre-tax income: Moho has no cost of sales; gross profit equals revenue. Pre-tax loss equals net loss in every year (no income tax expense; carry-forward tax losses of A$12.43m unrecognised at 30 June 2025). EBITDA approximates net loss plus depreciation (A$5.0k FY2025; A$87.1k FY2024 incl. lease depreciation) and is therefore approximately -A$2.93m (FY2025) and -A$5.83m (FY2024), both including non-cash write-offs. Margins are not meaningful (revenue is interest only). Revenue CAGR: not meaningful.
Balance sheet — 5 years: notes and sources
Note: FY2021–FY2022 totals are aggregator-rounded; FY2023–FY2025 from audited statements (FY2023 total assets derived as equity plus liabilities).
Balance sheet detail — FY2023 to H1 FY2026
FY2023 receivables and FY2023 working capital are not separately disclosed in the sources reviewed (FY2023 receivables entered as 0 only where not disclosed). FY2023 total debt: lease liabilities existed (FY2024 lease repayments of A$85.1k); no bank borrowings. Goodwill and intangibles: nil in all years.
Quarterly cash position — Appendix 5B and periodic reports
Exploration cash outflows: A$249.2k in the March 2026 quarter; A$891.7k in the June 2026 quarter (Appendix 5B summaries).
Ratios (computed by analyst from reported figures; closing balances)
Additional ratios: current ratio 1.18x (FY2024), 11.86x (FY2025), 17.85x (31 Dec 2025). Debt/equity: 0.0x (no borrowings FY2024–H1 FY2026). Net debt/EBITDA, interest coverage, ROIC, asset turnover and cash conversion cycle: not meaningful for a pre-revenue explorer with net cash and no interest-bearing debt.
Commentary on trends, inflections and drivers
FY2021–FY2023: steady-state cash burn, capitalised exploration. Losses were stable at A$1.6–2.0 million a year because Moho capitalised most exploration under AASB 6, building an exploration asset of A$8.8 million by June 2023. The balance sheet looked solid (equity ~A$8.4m), but that value rested on capitalised drilling at East Sampson Dam, Silver Swan North, Empress Springs, Burracoppin and the Whistlepipe projects. The share price fell from A$0.065 to A$0.011, signalling that the market did not credit the book value.
FY2024: the reckoning. The net loss more than tripled to A$5.91 million, driven almost entirely by A$4.95 million of exploration write-offs (including A$3.24 million on East Sampson Dam ahead of its sale). Exploration assets halved to A$4.09m. The company raised A$1.70m at A$0.007 through a placement and an underwritten entitlement offer that was largely taken up by shortfall investors — a sign of weak existing-holder support. A A$749.7k R&D tax incentive refund (credited against exploration assets) was a material, non-recurring cash source. The share count roughly doubled to 539m.
FY2025: monetisation and clean-up. Net loss fell to A$2.94m, of which A$1.73m was an accounting loss on selling East Sampson Dam and Empress Springs below their carrying values, A$0.38m was write-offs of surrendered tenements and only ~A$0.8m was cash corporate overhead. Cash proceeds from asset sales (A$1.55m) exceeded equity raised (A$0.75m), so FY2025 was the first year in which Moho funded itself mainly from its own asset base. Liabilities collapsed from A$885k to A$128k as legacy payables were cleared. Exploration assets fell to A$0.78m — the balance sheet was effectively reset to cash plus receivables.
H1 FY2026: re-capitalisation for Bush Chook. The A$2.0m placement at A$0.008 (60% above the A$0.005 price of the prior raise) lifted cash to A$2.15m and equity to A$3.76m. The half-year loss narrowed to A$0.64m because new Bush Chook spend is being capitalised (A$833k of exploration added in the half). Overhead discipline is evident: directors' and employee costs fell to A$81.6k for the half.
H2 FY2026: drilling consumes the war chest. Cash fell from A$2.15m (Dec 2025) to A$1.72m (Mar 2026) and A$1.27m (Jun 2026), despite receipt of the A$500k Silver Swan North consideration, because the 5,000 m RC program accelerated spending (A$892k exploration outflows in the June quarter). At the June-quarter run-rate, available cash (plus the A$300k Empress Springs deferred payment, if received) covers roughly one to two quarters of active drilling. A further equity raise before or during Phase Two drilling is, in our assessment, highly probable; the company itself states confidence in raising capital as required.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Entity | Ownership | Status | Role |
|---|---|---|---|
Moho Resources Limited | Listed parent (ASX: MOH) | Active | Holds all tenements directly |
PBM Mining Pty Ltd | 100% | Dormant, no assets or liabilities | Historic vehicle |
Moonlight Metals Pty Ltd | To be 100% on completion | Acquisition agreed 4 Sep 2025 (completion status not confirmed in sources reviewed) | Applicant for exploration licence E46/1593 (also written as E45/1593 in filings) |
Revenue by Segment and Segment Assets & Liabilities
| Metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Segment revenue (interest/other income, AUD K) | 10.0 | 0 | 32.9 |
Segment result = net loss after tax (AUD K) | -1,634.8 | -5,914.5 | -2,936.4 |
Exploration assets at year end (AUD K) | 8,800.9 | 4,091.5 | 782.4 |
Contribution to total revenue (%) | 100 | 100 | 100 |
Project Portfolio
| Project | Location | Commodity | Status (Oct 2026) |
|---|---|---|---|
Bush Chook Gold Project | Mosquito Creek Basin, Pilbara, WA | Gold, gold-antimony | 100%, flagship, ~442 km² |
Weld Range North (E20/1012) | ~75 km NNW of Cue, Murchison, WA | Ni-Cu sulphide, gold | Held at FY2025; not mentioned in H1 FY2026 review of operations — current status not confirmed |
Silver Swan North (E27/623) | ~40 km NE of Kalgoorlie, WA | Gold | Sold to MMS, completed 20 Apr 2026 (retained 1% GRR + A$500k milestone) |
East Sampson Dam | Near Kalgoorlie, WA | Gold | Sold to MMS, Nov 2024 (retained up to A$3m production milestones) |
Empress Springs | Western/North Queensland | Polymetallic / graphite potential | Sold to Qld Aus Graphite, May 2025 (A$300k deferred due May 2026) |
Burracoppin, Peak Charles REE, Manjimup, other Whistlepipe projects | WA | Gold, REE, Ni-Cu-PGE | Relinquished/surrendered (written off during FY2024–FY2025) |
Income Statement and Per-Share Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue incl. interest income (AUD K) | 0 | 0 | 10.0 | 0 | 32.9 |
Net loss after tax (AUD K) | -1,989.2 | -1,720.1 | -1,634.8 | -5,914.5 | -2,936.4 |
Basic EPS (AUD cents) | -2.31 | -1.42 | -0.82 | -1.34 | -0.45 |
Diluted EPS (AUD cents) | -2.31 | -1.42 | -0.82 | -1.34 | -0.45 |
Dividends per share (AUD cents) | 0 | 0 | 0 | 0 | 0 |
Share price at 30 June (AUD) | 0.065 | 0.024 | 0.011 | 0.004 | 0.004 |
Income Statement
| Line item | FY2024 | FY2025 | H1FY2026 |
|---|---|---|---|
Interest income (AUD K) | 0 | 32.9 | 18.7 |
Corporate advisory and consulting (AUD K) | -36.7 | -7.6 | -0.1 |
Compliance and regulatory (AUD K) | -228.4 | -292.5 | -154.5 |
Directors and employee benefits (AUD K) | -383.0 | -255.2 | -81.6 |
Depreciation and amortisation (AUD K) | -87.1 | -5.0 | -4.3 |
Exploration and evaluation expensed / written off (AUD K) | -4,958.9 | -378.6 | -221.2 |
Finance costs (AUD K) | -11.3 | 0 | 0 |
Marketing (AUD K) | -52.9 | -2.5 | -39.4 |
Share-based payments (AUD K) | -4.8 | -98.1 | -61.0 |
Loss on sale of exploration assets (AUD K) | 0 | -1,729.7 | -20.8 |
Other expenses (AUD K) | -148.0 | -200.2 | -76.0 |
Net loss (AUD K) | -5,914.5 | -2,936.4 | -640.3 |
Balance Sheet
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Total assets (AUD K) | 7,620 | 9,020 | 9,324.1 | 5,144.5 | 2,301.7 |
Total liabilities (AUD K) | 756.2 | 1,120 | 928.3 | 884.6 | 128.4 |
Total equity (AUD K) | 6,860 | 7,910 | 8,395.8 | 4,259.8 | 2,182.3 |
Net change in cash (AUD K) | 146 | -29 | -492 | 621.4 | 217.8 |
Balance Sheet and Share Count (millions)
| Metric | FY2023 | FY2024 | FY2025 | H1FY2026 |
|---|---|---|---|---|
Cash and equivalents (AUD K) | 379.7 | 1,001.1 | 1,218.9 | 2,147.5 |
Trade and other receivables (AUD K) | 0 | 41.7 | 304.2 | 829.2 |
Exploration and evaluation assets (AUD K) | 8,800.9 | 4,091.5 | 782.4 | 873.5 |
Total debt / borrowings (AUD K) | 0 | 0 | 0 | 0 |
Net debt (AUD K) | -379.7 | -1,001.1 | -1,218.9 | -2,147.5 |
Total liabilities (AUD K) | 928.3 | 884.6 | 128.4 | 166.7 |
Total equity (AUD K) | 8,395.8 | 4,259.8 | 2,182.3 | 3,756.8 |
Issued capital (AUD K) | 14,721.1 | 16,155.0 | 16,915.8 | 18,669.6 |
Accumulated losses (AUD K) | -9,081.5 | -14,996.0 | -15,268.0 | -15,908.3 |
Working capital (AUD K) | — | 158.2 | 1,394.7 | 2,809.9 |
Shares on issue (millions) | 259.6 | 539.2 | 745.4 | 1,029.6 |
“—” = not publicly disclosed.
Cash Flow
| Metric | FY2024 | FY2025 | H1FY2026 |
|---|---|---|---|
Operating cash flow (AUD K) | -803.1 | -1,155.9 | -388.0 |
Exploration expenditure — investing (AUD K) | -855.8 | -820.0 | -655.8 |
Purchase of fixed assets (AUD K) | -8.4 | 0 | -72.5 |
Free cash flow (OCF + exploration + PPE) (AUD K) | -1,667.3 | -1,975.9 | -1,116.3 |
R&D tax incentive receipts (AUD K) | 749.7 | 0 | 0 |
Proceeds from sale of exploration assets (AUD K) | 0 | 1,549.4 | 50.0 |
Proceeds from share issues (AUD K) | 1,696.2 | 746.0 | 2,000.0 |
Capital raising costs (AUD K) | -72.1 | -101.7 | -5.1 |
Lease repayments (AUD K) | -85.1 | 0 | 0 |
Dividends paid (AUD K) | 0 | 0 | 0 |
Share buybacks (AUD K) | 0 | 0 | 0 |
Net change in cash (AUD K) | 621.4 | 217.8 | 928.6 |
Key Financials
| Metric | Jun2025 | Sep2025 | Dec2025 | Mar2026 | Jun2026 |
|---|---|---|---|---|---|
Cash at quarter end (AUD K) | 1,218.9 | 669 | 2,147.5 | 1,720 | 1,270 |
Returns & Leverage Ratios (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
ROE on closing equity (%) | -29.0 | -21.7 | -19.5 | -138.9 | -134.6 |
ROA on closing assets (%) | -26.1 | -19.1 | -17.5 | -115.0 | -127.6 |
Liabilities to equity (%) | 11.0 | 14.2 | 11.1 | 20.8 | 5.9 |
Revenue by Region
| Region | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Australia revenue (AUD K) | 10.0 | 0 | 32.9 |
Rest of world revenue (AUD K) | 0 | 0 | 0 |
Share Price
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|---|
Share price at 30 June (AUD) | 0.065 | 0.024 | 0.011 | 0.004 | 0.004 | 0.0085 |
Share Count (millions)
| Metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Shares on issue at 30 June (millions) | 259.6 | 539.2 | 745.4 |
Weighted average shares (millions) | — | 440.0 | 656.7 |
“—” = not publicly disclosed.
Valuation Snapshot
| Metric | Value | Basis |
|---|---|---|
Market capitalisation | ~A$4.1–4.2m | — |
Enterprise value | ~A$2.9m | Market cap less A$1.27m cash (30 Jun 2026); no debt |
P/B | ~1.1x | vs equity of A$3.76m at 31 Dec 2025 (later equity not available) |
EV per km² of tenure | ~A$6.6k/km² | EV ÷ 442 km² |
Capital Markets
| Item | Detail |
|---|---|
Analyst consensus | None — covered by 0 analysts (Simply Wall St); not covered by a major broker (Market Index) |
Dividend history / policy | No dividends paid, recommended or declared in any year reviewed |
Buybacks | None authorised |
Credit ratings (Moody's / S&P / Fitch) | Not rated |
Debt maturity profile | No debt |
Options outstanding (31 Dec 2025) | 203m: 3m @ A$0.097 (expired 18 Jan 2026); 120m @ A$0.015 (exp. 30 Nov 2027); 80m @ A$0.020 (exp. 30 Nov 2029) |
Performance rights (31 Dec 2025) | 74m (VWAP hurdles A$0.010 / A$0.015 / A$0.025); 5m converted Feb 2026 |
Contingent scrip | Moonlight: 24m shares + 24m milestone rights; Goldtimers: 12m shares (if not yet issued) |
Recent raising prices | A$0.007 (Oct–Nov 2023); A$0.005 (Nov 2024, Mar 2025); A$0.008 (Oct–Dec 2025) |
Liquidity | FY2026 average daily volume ~3.1m shares (~A$20–30k per day); FY2027 YTD ~0.6m shares/day |
Analyst Conclusions
Management guidance
No financial guidance. Operational guidance: Phase Two exploration underway, with RC drilling to recommence in Q4 calendar 2026, testing Emu and Bright Tank for the first time, drilling wide-spaced step-outs at Gage Road and CBco for thicker and higher-grade zones, and following up 2026 Anomaly 1 and 2 (June 2026 quarterly; 22 July 2026 release). Management states it remains confident of raising further capital when required.
Consensus growth expectations
None — no analyst coverage.
Bull case
-
Discovery leverage on a ~A$3m EV. Moho has already found two shallow, open multi-lode systems with a 70% hit rate in its first meaningful program, and its highest-priority outcropping targets (Emu, Bright Tank, Rocky Ridge) have not yet been fully tested. A single high-grade intercept could re-rate a company valued at under A$5m by multiples.
-
Infrastructure-adjacent, high-grade model. Bush Chook surrounds a 1.8 Mtpa plant and a high-grade gold-antimony deposit grading >24 g/t. Small, high-grade deposits near existing plants are the classic path to early cash flow or a takeover by the plant owner.
-
Non-dilutive funding tail and clean balance sheet. No debt, minimal overhead, and up to A$4m-plus of contingent payments and royalties (East Sampson milestones, Silver Swan North milestone and 1% GRR, Empress Springs deferral) provide optionality that is not reflected in the market value.
Bear case
-
Funding treadmill. Cash of A$1.27m at June 2026 against a drilling burn approaching A$0.9m per quarter means another raise is near-certain, likely at or near A$0.004–0.006, extending a pattern that has already quadrupled the share count since mid-2023.
-
Grades may not be economic. Phase One intercepts are ~1 g/t over moderate widths; the first Swan program missed entirely. Without materially higher grades, the "low-cost pathway to discovery" may yield only sub-economic mineralisation.
-
Governance and execution capacity. No CEO or technical executive director, a three-person NED board holding market-price performance rights, and frequent payment of advisers in equity raise questions about alignment and the capacity to run a sustained drill-out.
Key catalysts and monitorables (next 12 months)
| Timing | Catalyst / monitorable |
|---|---|
| Oct 2026 | FY2026 Annual Report contents (audited loss, cash, going-concern wording, auditor opinion) and 2026 AGM (remuneration vote; new incentive grants) |
| ~27 Oct 2026 | September 2026 quarterly — cash balance and confirmation of the A$300k Empress Springs receipt |
| Q4 CY2026 | Phase Two RC drilling start: first-ever holes at Emu and Bright Tank |
| Q4 2026 – Q1 2027 | Assays from Phase Two; any Rocky Ridge results; step-out results at Gage Road/CBco |
| Any time | Capital raising — size, price, discount, options attached |
| 2026–2027 | Grant of remaining Bush Chook licences; heritage surveys |
| 2026–2027 | Moonlight Metals completion and E46/1593 grant |
| Long-dated | MMS progress at East Sampson Dam (production milestones) and Silver Swan North (mining-lease grant) |
| Price levels | A$0.010 / A$0.015 / A$0.025 VWAP hurdles for performance rights; A$0.015 and A$0.020 option strikes |
Analyst verdict
Moho Resources is no longer the company that listed in 2018. Between late 2023 and April 2026 a new, finance-oriented board dismantled a sprawling and value-destroying portfolio, absorbed nearly A$7 million of write-offs and sale losses, cleared legacy liabilities and redeployed what little capital remained into a 442 km² Pilbara gold position acquired almost entirely by pegging and small scrip deals. On execution of that reset, management deserves credit: tenure was granted quickly and largely free of native-title conditions, a heritage agreement now covers about four-fifths of the ground, and the first substantive drill program produced two new mineralised systems with a 70% hit rate.
The equity, however, reflects the other side of the ledger. The share count has roughly quadrupled since mid-2023; the stock trades at A$0.004 with a market value near A$4 million and an enterprise value of about A$3 million; cash at June 2026 covered little more than one quarter of drilling at the June run-rate; and the grades returned so far — around 1 g/t gold — are encouraging geologically but not yet economically compelling. There is no executive team, no analyst coverage and no institutional sponsorship.
We characterise MOH as a high-risk, binary exploration option. The valuation already discounts a high probability of failure, and the asymmetric payoff from a single high-grade intercept at Emu, Bright Tank or Rocky Ridge is real, particularly given the adjacent Golden Eagle plant and contingent payments from divested assets. But near-term returns are likely to be dominated by the terms of the next capital raising rather than by geology. Investors should treat the stock as suitable only for speculative capital, size positions for total loss, and wait for (a) audited FY2026 numbers and cash confirmation and (b) Phase Two assays before assigning any value beyond the current option premium. Rating framework: Speculative / High Risk — no fundamental valuation support.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Title | Appointed | Background / prior roles | Education | Shares held (latest disclosed) | Other securities |
|---|---|---|---|---|---|---|
Peter Christie | Non-Executive Chairman | 29 Nov 2023 | Accountant and tax agent with 26+ years in public practice; resource-company boards since 2006; Chairman of Mount Ridley Mines (ASX: MRD); Non-Executive Chairman of Patrys Ltd; director of Hawkins Christie Management Services; former director Mantle Minerals (2017–2022); President of WAFL club South Fremantle; hospitality and property interests | Qualified accountant and tax agent | 6,000,000 (30 Jun 2025) | 18,000,000 performance rights |
Bryce Gould | Non-Executive Director | 1 Jul 2024 | Corporate adviser (6+ years) focused on small-cap resources, industrial and technology companies; former resources project engineer (6+ years) | Qualifications in finance and engineering; Graduate, Australian Institute of Company Directors | 15,166,667 (Sep 2025) | 3,000,000 unlisted options; 18,000,000 performance rights |
Greta Purich | Non-Executive Director | 26 Nov 2025 (H1 report also references 4 Nov 2025 — discrepancy within the same filing) | — | — | 0 (Market Index, 26 Nov 2025) | — |
Johnathon Busing | Company Secretary | 2 Apr 2024 | Chartered accountant (13 years); director of Eleven Corporate Pty Ltd (company secretarial and corporate advisory); secretary to several ASX companies | Chartered Accountant | — | 6,000,000 performance rights (granted Nov 2024) |
Graeme Hardwick | Exploration Manager; Competent Person | — | Member, Australian Institute of Geoscientists (MAIG) | — | — | — |
“—” = not publicly disclosed.
Directors' Remuneration
| KMP | Year | Cash fees | Unpaid fees accrued | Other | Super | Share-based | Total | Equity % |
|---|---|---|---|---|---|---|---|---|
Peter Christie | FY2025 | 60,000 | 0 | 0 | 6,900 | 10,183 | 77,083 | 13 |
Michael Pereira | FY2025 | 44,000 | 4,000 | 0 | 0 | 10,183 | 58,183 | 18 |
Bryce Gould | FY2025 | 32,000 | 16,000 | 0 | 0 | 10,183 | 58,183 | 18 |
Ralph Winter (final settlement) | FY2025 | 50,000 | 0 | 52,564 | 0 | 0 | 102,564 | 0 |
Total | FY2025 | 186,000 | 20,000 | 52,564 | 6,900 | 30,549 | 296,013 | — |
Ralph Winter (MD) | FY2024 | 209,091 | 52,564 | 0 | 23,000 | 1,609 | 286,264 | 1 |
Shane Sadleir | FY2024 | 57,933 | 0 | 0 | 3,110 | 1,609 | 62,652 | 3 |
Terry Streeter | FY2024 | 41,389 | 0 | 0 | 4,553 | 0 | 45,942 | 0 |
Peter Christie | FY2024 | 35,333 | 0 | 0 | 3,887 | 0 | 39,220 | 0 |
Michael Pereira | FY2024 | 0 | 20,000 | 0 | 0 | 0 | 20,000 | 0 |
Adrian Larking | FY2024 | 4,000 | 0 | 0 | 440 | 1,609 | 6,049 | 27 |
Total | FY2024 | 347,746 | 72,564 | 0 | 34,990 | 4,827 | 460,127 | — |
Directors' Remuneration (Annual)
| Metric | FY2024 | FY2025 |
|---|---|---|
Total KMP remuneration (AUD K) | 460.1 | 296.0 |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
4 Aug 2023 | Adrian Larking resigns | Founding-era director exits |
23 Nov 2023 | Terry Streeter resigns as Chairman | Board renewal during recapitalisation |
29 Nov 2023 | Peter Christie appointed Chairman | Christie leads strategic review and portfolio reset |
2 Feb 2024 | Shane Sadleir resigns; Michael Pereira appointed | Shift from geoscience-led to corporate-finance-led board |
30 Jun 2024 | Ralph Winter resigns as MD | Company becomes board-run, cutting fixed costs |
1 Jul 2024 | Bryce Gould appointed | Corporate adviser joins |
26 Nov 2025 | Greta Purich appointed; Michael Pereira resigns | Board refresh coinciding with A$2m raise and Templar Corporate mandate |
Major Shareholders
| Holder | Shares | % of issued capital (at time of notice) | Source / date |
|---|---|---|---|
Peter Darren Russell | 50,000,000 | 6.71 | Substantial holder notice, 25 Sep 2025 (Market Index) |
Sabre Power Systems Pty Ltd | 30,800,000 | 4.13 | FY2025 Annual Report shareholder information (via Market Index) |
Bryce Gould (director, indirect) | 15,166,667 | ~2.0 (of ~745m) / ~1.5 (of ~1.03bn) | Sep 2025 |
Rokks Resources Pty Ltd | 7,500,000 | 1.02 | FY2025 Annual Report shareholder information |
Peter Christie (director) | 6,000,000 | ~0.8 / ~0.6 | 30 Jun 2025 |
Competitive Landscape
Key Competitors
| # | Company | Relevance to Moho | Positioning vs Moho |
|---|---|---|---|
| 1 | AIM Mining (private; Mark Creasy-owned) | Immediate neighbour; owns Nullagine Gold Project, Golden Eagle 1.8 Mtpa plant, Blue Spec/Gold Spec gold-antimony deposits | Dominant district player; potential acquirer or toll-treatment partner as much as competitor |
| 2 | Northern Star Resources (ASX: NST) | Owner of the 11.2 Moz Hemi project (via De Grey acquisition, per company footnotes) in the wider Pilbara | Major producer; sets the Pilbara gold investment narrative |
| 3 | Novo Resources (ASX/TSX: NVO) | — | Larger Pilbara explorer with district-scale holdings |
| 4 | Kalamazoo Resources (ASX: KZR) | — | Competes for Pilbara gold investor capital |
| 5 | Kairos Minerals (ASX: KAI) | Pilbara gold (Mt York); reported ~A$35m cash in 2026 (MiningNews headline) | Far better funded; competes for same investor theme |
| 6 | Codrus Minerals (ASX: CDR) | Former holder of PLs now in Bush Chook | Counterparty and peer micro-cap |
| 7 | Rincon Resources (ASX: RCR) | Listed by TipRanks as a peer | Micro-cap explorer peer for capital |
| 8 | Mount Ridley Mines (ASX: MRD) | Shares Chairman Peter Christie | Micro-cap peer; governance overlap |
| 9 | Mineral Mining Services Pty Ltd (private) | Buyer of Moho's Goldfields assets | Small-scale miner; illustrates the private-operator exit route |
| 10 | St George Mining (ASX: SGQ) | Former investee | Micro-cap peer for capital (now diversified) |
Peer Comparison FY2025
| Dimension | Moho | Typical Pilbara gold explorer peer (KAI, KZR, NVO) | Major (NST) |
|---|---|---|---|
Revenue | Interest only (A$32.9k FY2025) | Mostly nil | Multi-billion gold sales |
Market cap | ~A$4m | — | Tens of billions |
Cash | A$1.27m (Jun 2026) | Kairos ~A$35m per headline | Large |
JORC resource | — | Some hold resources | Large reserves |
Exploration intensity | Very high relative to market cap (~A$0.9m per quarter in Jun-Q 2026) | Variable | Low relative to size |
Recent Developments
--