Moho Resources Limited Overview

Moho Resources Limited is a Perth-based, ASX-listed junior gold explorer that, through 2024–2026, has completely remade itself. Having listed in 2018 with a diversified portfolio of early-stage nickel, gold, rare-earth and polymetallic projects across Western Australia and Queensland, the company endured three years of falling share prices, large impairments and repeated sub-cent capital raisings. A board refresh in late 2023 under Chairman Peter Christie led to the sale of every legacy project — East Sampson Dam, Empress Springs and Silver Swan North — in exchange for upfront cash, deferred milestone payments and royalties. Proceeds were redeployed into a low-cost, largely pegged land position at Bush Chook in the Pilbara's Mosquito Creek Basin, adjacent to AIM Mining's Nullagine/Blue Spec operations and the 1.8 Mtpa Golden Eagle processing plant. Moho is now a single-asset, discovery-stage gold (and gold-antimony) story with a market value of roughly A$4 million, nil debt, and a funding runway measured in quarters.


What the company does. Moho is a mineral exploration company. Its principal activity, as stated in its FY2025 Directors' Report, is ongoing exploration activities. It acquires prospective exploration tenure (prospecting licences, exploration licences), conducts geological mapping, soil and rock-chip geochemistry, remote sensing (drone, HyMap hyperspectral) and drilling (reverse circulation, aircore), with the aim of making a discovery that can be defined into a JORC-compliant Mineral Resource and then either developed or sold.

Company's own description (paraphrased from the FY2025 Annual Report and 2026 releases). Moho describes itself as an Australian natural resources company that advances early-stage gold and other metals projects in Western Australia from exploration towards development, holding 100% interests in its portfolio, with the Bush Chook Gold Project in the Pilbara Craton as its priority focus.

Business model. Moho's model is a classic "discovery and value-realisation" junior explorer model:

  1. Low-cost tenure acquisition — Bush Chook was assembled largely by pegging (staking) open ground in August 2025 (109 tenement applications over 225 km²), then expanded through small share-based tenement acquisitions (Goldtimers, Moonlight Metals, Codrus Minerals, Rocky Ridge vendor). The FY2025 Annual Report repeatedly characterises the Bush Chook acquisition as "non-dilutive" — in the sense that the initial pegging did not require a large share issue.

  2. Systematic exploration funded by equity and asset sales — the company has no operating cash flow; all activity is funded by share placements (A$2.0m in October–December 2025; A$0.75m in FY2025; A$1.70m in FY2024) and by proceeds from selling legacy projects (A$1.55m cash received in FY2025; A$0.5m on Silver Swan North in 2026).

  3. Monetisation of non-core assets through retained upside — each divestment has retained contingent consideration: up to A$3m of production-linked payments on East Sampson Dam; a A$0.5m mining-lease milestone plus a 1% gross revenue royalty on Silver Swan North; a deferred A$0.3m payment (and originally a 1% NSR) on Empress Springs.

Revenue model mix. Product: 0%. Service: 0%. Subscription: 0%. Licensing: 0%. Reported "revenue" consists entirely of interest income on cash deposits (A$32,943 in FY2025; A$10,000 of other income in FY2023). Future potential non-dilutive income streams are contingent milestone payments and royalties from divested projects.

Value chain position. Upstream, at the earliest (greenfield/brownfield exploration) stage of the mining value chain — before resource definition, feasibility, development, production, processing and sale. Moho has no Mineral Resource or Ore Reserve on its current portfolio (the only JORC resource it ever held, East Sampson Dam's interim 21,600 oz, was sold in late 2024).

Customer types / end-markets. Moho has no customers. Its ultimate "buyers" are (a) equity investors who fund discovery risk, (b) potential acquirers or joint-venture partners (mid-tier producers, private operators such as Mineral Mining Services Pty Ltd), and (c) prospectively, the gold market (bullion via refiners) if a deposit were ever developed. Its strategic thesis also leans on antimony (a critical mineral) via the Rocky Ridge gold-antimony target.

Independent characterisation. Moho is best described as a single-project, shell-like micro-cap explorer that has successfully recycled a failed legacy portfolio into a fresh Pilbara gold land position. Its strengths are a clean balance sheet (no debt, low fixed overhead of roughly A$0.4–0.6m per annum excluding exploration), a large, cheaply acquired landholding in a proven gold district next to established infrastructure, and early drill success (70% of Phase One holes mineralised). Its weaknesses are extreme share-count dilution (shares outstanding nearly quadrupled from 259.6m in July 2023 to over 1.03bn by early 2026), a sub-half-cent share price, no executive management team, and modest grades in first drilling results (generally ~1 g/t Au over moderate widths). The equity is effectively an option on a discovery at Bush Chook.

Strategy

Stated corporate strategy (themes from the FY2025 Annual Report Chairman's Letter and 2026 releases, paraphrased)

  1. Strategic transition / portfolio reset — a comprehensive review weighing the cost of advancing legacy projects against redeploying capital into opportunities better aligned with market conditions and shareholder value.

  2. Divestment of legacy and non-core projects — crystallise value, release capital and management bandwidth, and keep upside via deferred payments and royalties.

  3. Focus on high-grade gold in a proven district — the Bush Chook acquisition is framed as a new direction: focused, disciplined, positioned where geology and market demand meet (record gold prices).

  4. Low-cost pathway to discovery — prioritise high-grade vein and soil targets that can be moved quickly from mapping and rock chips to first-pass drilling; favour tenure free of native-title conditions to reduce cost and approval time.

  5. District-scale consolidation — grow the Bush Chook footprint through small, share-funded bolt-ons (Goldtimers, Moonlight, Codrus, Rocky Ridge).

  6. Gold-antimony optionality — target "Blue Spec look-alike" high-grade gold-antimony mineralisation at Rocky Ridge, adding critical-mineral exposure.

Strategic initiatives — last 24 months

InitiativeDateDescriptionStatus
Portfolio review and divestment programFY2025Sale of East Sampson Dam, Empress Springs, Silver Swan NorthComplete (Apr 2026)
Bush Chook peggingAug 2025109 applications, 225 km²Complete
Bush Chook expansion (Goldtimers, Moonlight)Sep 2025To 386 km²Goldtimers PLs incorporated; Moonlight completion not confirmed
Codrus Minerals tenement swapDec 202515 PLs (surrender/pick-up), six drill-ready targets; to 440 km²Complete (5 Dec 2025)
Rocky Ridge acquisitionMar 2026P46/2148 historic gold-antimony mine; to 442 km²Complete
Regional soil campaignH1 CY2026~4,000 samples; 2026 Anomaly 1 and 2 definedComplete; follow-up underway
HyMap hyperspectral reprocessing2025–2026Alteration mapping to generate targets (Zone D)Ongoing
Phase One RC drillingMay–Jul 20265,000 m planned (3,492 m completed per Kalkine summary)Complete; two discoveries
Heritage AgreementJun 2026Palyku-Jartayi Aboriginal Corporation; ~80% of project accessibleExecuted
Phase Two explorationQ4 CY2026Drill Emu, Bright Tank; step-outs at Gage Road and CBco seeking thicker, higher-grade zones; follow-up of soil anomaliesPlanned
Cost programFY2024–FY2026Removal of executive roles; directors' fees partly in shares; payment of advisers and suppliers in sharesOngoing (not quantified as a formal target)

Sustainability/ESG commitments: no formal targets published; the heritage agreement and environmental-compliance statements are the principal disclosures.

Medium-term financial targets / guidance

Moho provides no financial guidance or medium-term financial targets. The FY2025 Directors' Report states that likely developments are not disclosed because doing so could unreasonably prejudice the company. Operational "guidance" is limited to drilling plans (Phase Two in Q4 CY2026). Implicit corporate milestones embedded in incentive securities: share-price VWAP hurdles of A$0.010, A$0.015 and A$0.025; and, for the Moonlight vendor rights, JORC resources of ≥100 koz and ≥200 koz at ≥2 g/t Au within E46/1593 within four and five years respectively.

Products & Services

Moho sells no products or services. For an explorer, the equivalent "catalog" is its portfolio of exploration projects and prospects. Each is profiled below.

Bush Chook Gold Project (flagship)

AttributeDetail
LocationMosquito Creek Basin, Pilbara Craton, WA; ~200 km north of Newman near the Nullagine townsite
Area225 km² (Aug 2025) → 386 km² (Sep 2025 HOAs) → 440 km² (Dec 2025 Codrus) → 442 km² (Mar 2026 Rocky Ridge)
Ownership100% (subject to 2% NSR to Moonlight vendors on E46/1593, if completed)
District endowmentMosquito Creek Basin hosts ~2.4–2.5 Moz in past production and current resources (company figures vary between releases)
Neighbour / infrastructureSurrounds AIM Mining's (Mark Creasy-owned, private) Nullagine Gold Project and 1.8 Mtpa Golden Eagle plant; 10 MW power station; Blue Spec and Gold Spec gold-antimony deposits (company cites ~242 kt @ 24.3 g/t Au and 1.6% Sb)
Regional analogueNorthern Star's 11.2 Moz Hemi deposit (Mallina Basin) cited by company as a regional discovery precedent
Native title / heritage26 PLs granted Oct 2025 without native title conditions; Palyku-Jartayi Heritage Agreement (22 Jun 2026) opens ~80% of the project
Exploration work to dateDrone surveys; geological mapping; HyMap hyperspectral reprocessing; ~4,000-sample soil campaign (1,516 samples above threshold); trenching data; maiden RC (Dec 2025, 540 m); Phase One RC (May–Jul 2026, 3,492 m of planned 5,000 m)
Target customer / exitDiscovery-driven equity re-rating; potential toll-treatment or sale to regional operator given adjacent plant
ProspectDescriptionBest results to dateStatus
Gage RoadNew shallow multi-lode gold system; two lodes over ~200 m strike14 m @ 1.04 g/t Au from 13 m; 5 m @ 1.53 g/t from 30 m incl. 2 m @ 2.96 g/tDiscovery (Jul 2026); open along strike and down dip
CBcoNew shallow multi-lode gold system; two lodes over ~420 m strike15 m @ 0.84 g/t Au from 64 m incl. 9 m @ 1.06 g/t; 2 m @ 1.27 g/t from 31 mDiscovery (Jul 2026); open
Rocky Ridge (P46/2148)Historic high-grade gold-antimony mine; company presents it as a "Blue Spec look-alike"Historic production 932 oz from 341 t @ ~85 g/t Au; historic intercept 8 m @ 28.5 g/t Au from 52 m (historic, not JORC-verified)Drilled May–Jun 2026; Moho assays not identified in sources reviewed
EmuOutcropping gossanous quartz vein, +200 m strike, up to ~20 m wide; 2 km from historic Barton gold mineHigh-grade rock chips (company releases of 16 Oct 2025)High priority; awaiting heritage survey; Phase Two (Q4 2026)
Bright TankTwo clusters of outcropping gold along a 600 m trendRock chips up to 12.7 g/t AuHigh priority; Phase Two (Q4 2026)
Swan (Zone C)1.4 km × 250 m soil anomaly (10–330 ppb Au), 10 km from Blue SpecFour RC holes (540 m): alteration but no significant interceptsPaused Feb 2026; southern portion untested
Zone A300 m high-grade trend incl. 100 m outcropping vein (~20 m apparent thickness)Rock chips 0.81–6.98 g/t; historic 14.9, 13.4, 9.12 g/tTarget
Zone B1.8 km trend of historic rock chipsUp to 5.6 g/t AuInfill soils
Zone DHyMap pyrophyllite-dickite anomaly aligned with soils, 1.5 km +10 ppb trendReconnaissance rock chips up to 0.54 g/tTarget
Little CreatureHigh-grade gold target prioritised Feb 2026Not quantified in sources reviewedTarget
Single Fin, BostonTargets unlocked by 13 PLs granted Feb 2026Anomalous soils, rock chips, trenchingTarget
2026 Anomaly 1 & 2Large soil anomalies 750 m and 1,500 m long, multiple soils >1 g/t AuSoil geochemistry onlyMapping/rock-chipping; candidates for Phase Two

Prospects within Bush Chook (product-by-product):

Highest-grade surface sample reported by the company: rock chip of 28.6 g/t Au (July 2025 fieldwork).

Weld Range North Project (E20/1012)

Murchison region, ~75 km NNW of Cue; Youanmi Terrane. Coincident magnetic and gravity anomalies interpreted as a mafic-ultramafic intrusion; prospective for Ni-Cu sulphides and gold. FY2025 soil survey completed with assays pending at the time of the FY2025 Annual Report. Acquired via the 2022 Whistlepipe collaboration. Current status: not confirmed in 2026 disclosures reviewed.

Divested projects (retained economic interests)

ProjectBuyerUpfrontContingent / retainedStatus
East Sampson Dam (M27/263, E27/528, P27/2390, P27/2441)Mineral Mining Services Pty LtdA$1.0m (received Dec 2024)A$500k at each of 10, 15, 20, 25 koz produced; A$1.0m at 30 koz (total up to A$3.0m)Not recognised as asset; milestones not met as at 31 Dec 2025
Empress Springs (EPM25208/09/10)Qld Aus Graphite Pty LtdA$408.5k (ex-GST)A$300k deferred, due 21 May 2026Receipt not confirmed in sources reviewed
Silver Swan North (E27/623)Mineral Mining Services Pty LtdA$500k (received in full by 20 Apr 2026)A$500k on conversion to mining lease; 1% gross revenue royaltyCompleted

Pricing model: not applicable.

Financial Narrative

Sources: FY2025 Annual Report (five-year table in remuneration report; statements of profit or loss, financial position, cash flows); H1 FY2026 Half-Year Report; FY2021–FY2023 balance-sheet totals from TipRanks (aggregator; FY2023 equity cross-checked to the FY2025 AR statement of changes in equity at A$8,395,790); FY2021–FY2023 net cash flow from Barchart (labelled "USD thousands" by the vendor, but FY2024 and FY2025 figures match AUD statements exactly, so they are treated as AUD). Not applicable metrics (gross profit, operating margin, EBITDA margin) are discussed in prose rather than tabled.

Income statement — 5 years

Gross profit, operating income, EBITDA, pre-tax income: Moho has no cost of sales; gross profit equals revenue. Pre-tax loss equals net loss in every year (no income tax expense; carry-forward tax losses of A$12.43m unrecognised at 30 June 2025). EBITDA approximates net loss plus depreciation (A$5.0k FY2025; A$87.1k FY2024 incl. lease depreciation) and is therefore approximately -A$2.93m (FY2025) and -A$5.83m (FY2024), both including non-cash write-offs. Margins are not meaningful (revenue is interest only). Revenue CAGR: not meaningful.

Balance sheet — 5 years: notes and sources

Note: FY2021–FY2022 totals are aggregator-rounded; FY2023–FY2025 from audited statements (FY2023 total assets derived as equity plus liabilities).

Balance sheet detail — FY2023 to H1 FY2026

FY2023 receivables and FY2023 working capital are not separately disclosed in the sources reviewed (FY2023 receivables entered as 0 only where not disclosed). FY2023 total debt: lease liabilities existed (FY2024 lease repayments of A$85.1k); no bank borrowings. Goodwill and intangibles: nil in all years.

Quarterly cash position — Appendix 5B and periodic reports

Exploration cash outflows: A$249.2k in the March 2026 quarter; A$891.7k in the June 2026 quarter (Appendix 5B summaries).

Ratios (computed by analyst from reported figures; closing balances)

Additional ratios: current ratio 1.18x (FY2024), 11.86x (FY2025), 17.85x (31 Dec 2025). Debt/equity: 0.0x (no borrowings FY2024–H1 FY2026). Net debt/EBITDA, interest coverage, ROIC, asset turnover and cash conversion cycle: not meaningful for a pre-revenue explorer with net cash and no interest-bearing debt.

Commentary on trends, inflections and drivers

FY2021–FY2023: steady-state cash burn, capitalised exploration. Losses were stable at A$1.6–2.0 million a year because Moho capitalised most exploration under AASB 6, building an exploration asset of A$8.8 million by June 2023. The balance sheet looked solid (equity ~A$8.4m), but that value rested on capitalised drilling at East Sampson Dam, Silver Swan North, Empress Springs, Burracoppin and the Whistlepipe projects. The share price fell from A$0.065 to A$0.011, signalling that the market did not credit the book value.

FY2024: the reckoning. The net loss more than tripled to A$5.91 million, driven almost entirely by A$4.95 million of exploration write-offs (including A$3.24 million on East Sampson Dam ahead of its sale). Exploration assets halved to A$4.09m. The company raised A$1.70m at A$0.007 through a placement and an underwritten entitlement offer that was largely taken up by shortfall investors — a sign of weak existing-holder support. A A$749.7k R&D tax incentive refund (credited against exploration assets) was a material, non-recurring cash source. The share count roughly doubled to 539m.

FY2025: monetisation and clean-up. Net loss fell to A$2.94m, of which A$1.73m was an accounting loss on selling East Sampson Dam and Empress Springs below their carrying values, A$0.38m was write-offs of surrendered tenements and only ~A$0.8m was cash corporate overhead. Cash proceeds from asset sales (A$1.55m) exceeded equity raised (A$0.75m), so FY2025 was the first year in which Moho funded itself mainly from its own asset base. Liabilities collapsed from A$885k to A$128k as legacy payables were cleared. Exploration assets fell to A$0.78m — the balance sheet was effectively reset to cash plus receivables.

H1 FY2026: re-capitalisation for Bush Chook. The A$2.0m placement at A$0.008 (60% above the A$0.005 price of the prior raise) lifted cash to A$2.15m and equity to A$3.76m. The half-year loss narrowed to A$0.64m because new Bush Chook spend is being capitalised (A$833k of exploration added in the half). Overhead discipline is evident: directors' and employee costs fell to A$81.6k for the half.

H2 FY2026: drilling consumes the war chest. Cash fell from A$2.15m (Dec 2025) to A$1.72m (Mar 2026) and A$1.27m (Jun 2026), despite receipt of the A$500k Silver Swan North consideration, because the 5,000 m RC program accelerated spending (A$892k exploration outflows in the June quarter). At the June-quarter run-rate, available cash (plus the A$300k Empress Springs deferred payment, if received) covers roughly one to two quarters of active drilling. A further equity raise before or during Phase Two drilling is, in our assessment, highly probable; the company itself states confidence in raising capital as required.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Group Entities

EntityOwnershipStatusRole

Moho Resources Limited

Listed parent (ASX: MOH)

Active

Holds all tenements directly

PBM Mining Pty Ltd

100%

Dormant, no assets or liabilities

Historic vehicle

Moonlight Metals Pty Ltd

To be 100% on completion

Acquisition agreed 4 Sep 2025 (completion status not confirmed in sources reviewed)

Applicant for exploration licence E46/1593 (also written as E45/1593 in filings)

Revenue by Segment and Segment Assets & Liabilities

MetricFY2023FY2024FY2025

Segment revenue (interest/other income, AUD K)

10.0032.9

Segment result = net loss after tax (AUD K)

-1,634.8-5,914.5-2,936.4

Exploration assets at year end (AUD K)

8,800.94,091.5782.4

Contribution to total revenue (%)

100100100

Project Portfolio

ProjectLocationCommodityStatus (Oct 2026)

Bush Chook Gold Project

Mosquito Creek Basin, Pilbara, WA

Gold, gold-antimony

100%, flagship, ~442 km²

Weld Range North (E20/1012)

~75 km NNW of Cue, Murchison, WA

Ni-Cu sulphide, gold

Held at FY2025; not mentioned in H1 FY2026 review of operations — current status not confirmed

Silver Swan North (E27/623)

~40 km NE of Kalgoorlie, WA

Gold

Sold to MMS, completed 20 Apr 2026 (retained 1% GRR + A$500k milestone)

East Sampson Dam

Near Kalgoorlie, WA

Gold

Sold to MMS, Nov 2024 (retained up to A$3m production milestones)

Empress Springs

Western/North Queensland

Polymetallic / graphite potential

Sold to Qld Aus Graphite, May 2025 (A$300k deferred due May 2026)

Burracoppin, Peak Charles REE, Manjimup, other Whistlepipe projects

WA

Gold, REE, Ni-Cu-PGE

Relinquished/surrendered (written off during FY2024–FY2025)

Income Statement and Per-Share Data

MetricFY2021FY2022FY2023FY2024FY2025

Revenue incl. interest income (AUD K)

0010.0032.9

Net loss after tax (AUD K)

-1,989.2-1,720.1-1,634.8-5,914.5-2,936.4

Basic EPS (AUD cents)

-2.31-1.42-0.82-1.34-0.45

Diluted EPS (AUD cents)

-2.31-1.42-0.82-1.34-0.45

Dividends per share (AUD cents)

00000

Share price at 30 June (AUD)

0.0650.0240.0110.0040.004

Income Statement

Line itemFY2024FY2025H1FY2026

Interest income (AUD K)

032.918.7

Corporate advisory and consulting (AUD K)

-36.7-7.6-0.1

Compliance and regulatory (AUD K)

-228.4-292.5-154.5

Directors and employee benefits (AUD K)

-383.0-255.2-81.6

Depreciation and amortisation (AUD K)

-87.1-5.0-4.3

Exploration and evaluation expensed / written off (AUD K)

-4,958.9-378.6-221.2

Finance costs (AUD K)

-11.300

Marketing (AUD K)

-52.9-2.5-39.4

Share-based payments (AUD K)

-4.8-98.1-61.0

Loss on sale of exploration assets (AUD K)

0-1,729.7-20.8

Other expenses (AUD K)

-148.0-200.2-76.0

Net loss (AUD K)

-5,914.5-2,936.4-640.3

Balance Sheet

MetricFY2021FY2022FY2023FY2024FY2025

Total assets (AUD K)

7,6209,0209,324.15,144.52,301.7

Total liabilities (AUD K)

756.21,120928.3884.6128.4

Total equity (AUD K)

6,8607,9108,395.84,259.82,182.3

Net change in cash (AUD K)

146-29-492621.4217.8

Balance Sheet and Share Count (millions)

MetricFY2023FY2024FY2025H1FY2026

Cash and equivalents (AUD K)

379.71,001.11,218.92,147.5

Trade and other receivables (AUD K)

041.7304.2829.2

Exploration and evaluation assets (AUD K)

8,800.94,091.5782.4873.5

Total debt / borrowings (AUD K)

0000

Net debt (AUD K)

-379.7-1,001.1-1,218.9-2,147.5

Total liabilities (AUD K)

928.3884.6128.4166.7

Total equity (AUD K)

8,395.84,259.82,182.33,756.8

Issued capital (AUD K)

14,721.116,155.016,915.818,669.6

Accumulated losses (AUD K)

-9,081.5-14,996.0-15,268.0-15,908.3

Working capital (AUD K)

—158.21,394.72,809.9

Shares on issue (millions)

259.6539.2745.41,029.6

“—” = not publicly disclosed.

Cash Flow

MetricFY2024FY2025H1FY2026

Operating cash flow (AUD K)

-803.1-1,155.9-388.0

Exploration expenditure — investing (AUD K)

-855.8-820.0-655.8

Purchase of fixed assets (AUD K)

-8.40-72.5

Free cash flow (OCF + exploration + PPE) (AUD K)

-1,667.3-1,975.9-1,116.3

R&D tax incentive receipts (AUD K)

749.700

Proceeds from sale of exploration assets (AUD K)

01,549.450.0

Proceeds from share issues (AUD K)

1,696.2746.02,000.0

Capital raising costs (AUD K)

-72.1-101.7-5.1

Lease repayments (AUD K)

-85.100

Dividends paid (AUD K)

000

Share buybacks (AUD K)

000

Net change in cash (AUD K)

621.4217.8928.6

Key Financials

MetricJun2025Sep2025Dec2025Mar2026Jun2026

Cash at quarter end (AUD K)

1,218.96692,147.51,7201,270

Returns & Leverage Ratios (%)

MetricFY2021FY2022FY2023FY2024FY2025

ROE on closing equity (%)

-29.0-21.7-19.5-138.9-134.6

ROA on closing assets (%)

-26.1-19.1-17.5-115.0-127.6

Liabilities to equity (%)

11.014.211.120.85.9

Revenue by Region

RegionFY2023FY2024FY2025

Australia revenue (AUD K)

10.0032.9

Rest of world revenue (AUD K)

000

Share Price

MetricFY2021FY2022FY2023FY2024FY2025FY2026

Share price at 30 June (AUD)

0.0650.0240.0110.0040.0040.0085

Share Count (millions)

MetricFY2023FY2024FY2025

Shares on issue at 30 June (millions)

259.6539.2745.4

Weighted average shares (millions)

—440.0656.7

“—” = not publicly disclosed.

Valuation Snapshot

MetricValueBasis

Market capitalisation

~A$4.1–4.2m

—

Enterprise value

~A$2.9m

Market cap less A$1.27m cash (30 Jun 2026); no debt

P/B

~1.1x

vs equity of A$3.76m at 31 Dec 2025 (later equity not available)

EV per km² of tenure

~A$6.6k/km²

EV ÷ 442 km²

Capital Markets

ItemDetail

Analyst consensus

None — covered by 0 analysts (Simply Wall St); not covered by a major broker (Market Index)

Dividend history / policy

No dividends paid, recommended or declared in any year reviewed

Buybacks

None authorised

Credit ratings (Moody's / S&P / Fitch)

Not rated

Debt maturity profile

No debt

Options outstanding (31 Dec 2025)

203m: 3m @ A$0.097 (expired 18 Jan 2026); 120m @ A$0.015 (exp. 30 Nov 2027); 80m @ A$0.020 (exp. 30 Nov 2029)

Performance rights (31 Dec 2025)

74m (VWAP hurdles A$0.010 / A$0.015 / A$0.025); 5m converted Feb 2026

Contingent scrip

Moonlight: 24m shares + 24m milestone rights; Goldtimers: 12m shares (if not yet issued)

Recent raising prices

A$0.007 (Oct–Nov 2023); A$0.005 (Nov 2024, Mar 2025); A$0.008 (Oct–Dec 2025)

Liquidity

FY2026 average daily volume ~3.1m shares (~A$20–30k per day); FY2027 YTD ~0.6m shares/day

Analyst Conclusions

Management guidance

No financial guidance. Operational guidance: Phase Two exploration underway, with RC drilling to recommence in Q4 calendar 2026, testing Emu and Bright Tank for the first time, drilling wide-spaced step-outs at Gage Road and CBco for thicker and higher-grade zones, and following up 2026 Anomaly 1 and 2 (June 2026 quarterly; 22 July 2026 release). Management states it remains confident of raising further capital when required.

Consensus growth expectations

None — no analyst coverage.

Bull case

  1. Discovery leverage on a ~A$3m EV. Moho has already found two shallow, open multi-lode systems with a 70% hit rate in its first meaningful program, and its highest-priority outcropping targets (Emu, Bright Tank, Rocky Ridge) have not yet been fully tested. A single high-grade intercept could re-rate a company valued at under A$5m by multiples.

  2. Infrastructure-adjacent, high-grade model. Bush Chook surrounds a 1.8 Mtpa plant and a high-grade gold-antimony deposit grading >24 g/t. Small, high-grade deposits near existing plants are the classic path to early cash flow or a takeover by the plant owner.

  3. Non-dilutive funding tail and clean balance sheet. No debt, minimal overhead, and up to A$4m-plus of contingent payments and royalties (East Sampson milestones, Silver Swan North milestone and 1% GRR, Empress Springs deferral) provide optionality that is not reflected in the market value.

Bear case

  1. Funding treadmill. Cash of A$1.27m at June 2026 against a drilling burn approaching A$0.9m per quarter means another raise is near-certain, likely at or near A$0.004–0.006, extending a pattern that has already quadrupled the share count since mid-2023.

  2. Grades may not be economic. Phase One intercepts are ~1 g/t over moderate widths; the first Swan program missed entirely. Without materially higher grades, the "low-cost pathway to discovery" may yield only sub-economic mineralisation.

  3. Governance and execution capacity. No CEO or technical executive director, a three-person NED board holding market-price performance rights, and frequent payment of advisers in equity raise questions about alignment and the capacity to run a sustained drill-out.

Key catalysts and monitorables (next 12 months)

TimingCatalyst / monitorable
Oct 2026FY2026 Annual Report contents (audited loss, cash, going-concern wording, auditor opinion) and 2026 AGM (remuneration vote; new incentive grants)
~27 Oct 2026September 2026 quarterly — cash balance and confirmation of the A$300k Empress Springs receipt
Q4 CY2026Phase Two RC drilling start: first-ever holes at Emu and Bright Tank
Q4 2026 – Q1 2027Assays from Phase Two; any Rocky Ridge results; step-out results at Gage Road/CBco
Any timeCapital raising — size, price, discount, options attached
2026–2027Grant of remaining Bush Chook licences; heritage surveys
2026–2027Moonlight Metals completion and E46/1593 grant
Long-datedMMS progress at East Sampson Dam (production milestones) and Silver Swan North (mining-lease grant)
Price levelsA$0.010 / A$0.015 / A$0.025 VWAP hurdles for performance rights; A$0.015 and A$0.020 option strikes

Analyst verdict

Moho Resources is no longer the company that listed in 2018. Between late 2023 and April 2026 a new, finance-oriented board dismantled a sprawling and value-destroying portfolio, absorbed nearly A$7 million of write-offs and sale losses, cleared legacy liabilities and redeployed what little capital remained into a 442 km² Pilbara gold position acquired almost entirely by pegging and small scrip deals. On execution of that reset, management deserves credit: tenure was granted quickly and largely free of native-title conditions, a heritage agreement now covers about four-fifths of the ground, and the first substantive drill program produced two new mineralised systems with a 70% hit rate.

The equity, however, reflects the other side of the ledger. The share count has roughly quadrupled since mid-2023; the stock trades at A$0.004 with a market value near A$4 million and an enterprise value of about A$3 million; cash at June 2026 covered little more than one quarter of drilling at the June run-rate; and the grades returned so far — around 1 g/t gold — are encouraging geologically but not yet economically compelling. There is no executive team, no analyst coverage and no institutional sponsorship.

We characterise MOH as a high-risk, binary exploration option. The valuation already discounts a high probability of failure, and the asymmetric payoff from a single high-grade intercept at Emu, Bright Tank or Rocky Ridge is real, particularly given the adjacent Golden Eagle plant and contingent payments from divested assets. But near-term returns are likely to be dominated by the terms of the next capital raising rather than by geology. Investors should treat the stock as suitable only for speculative capital, size positions for total loss, and wait for (a) audited FY2026 numbers and cash confirmation and (b) Phase Two assays before assigning any value beyond the current option premium. Rating framework: Speculative / High Risk — no fundamental valuation support.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameTitleAppointedBackground / prior rolesEducationShares held (latest disclosed)Other securities

Peter Christie

Non-Executive Chairman

29 Nov 2023

Accountant and tax agent with 26+ years in public practice; resource-company boards since 2006; Chairman of Mount Ridley Mines (ASX: MRD); Non-Executive Chairman of Patrys Ltd; director of Hawkins Christie Management Services; former director Mantle Minerals (2017–2022); President of WAFL club South Fremantle; hospitality and property interests

Qualified accountant and tax agent

6,000,000 (30 Jun 2025)

18,000,000 performance rights

Bryce Gould

Non-Executive Director

1 Jul 2024

Corporate adviser (6+ years) focused on small-cap resources, industrial and technology companies; former resources project engineer (6+ years)

Qualifications in finance and engineering; Graduate, Australian Institute of Company Directors

15,166,667 (Sep 2025)

3,000,000 unlisted options; 18,000,000 performance rights

Greta Purich

Non-Executive Director

26 Nov 2025 (H1 report also references 4 Nov 2025 — discrepancy within the same filing)

——

0 (Market Index, 26 Nov 2025)

—

Johnathon Busing

Company Secretary

2 Apr 2024

Chartered accountant (13 years); director of Eleven Corporate Pty Ltd (company secretarial and corporate advisory); secretary to several ASX companies

Chartered Accountant

—

6,000,000 performance rights (granted Nov 2024)

Graeme Hardwick

Exploration Manager; Competent Person

—

Member, Australian Institute of Geoscientists (MAIG)

———

“—” = not publicly disclosed.

Directors' Remuneration

KMPYearCash feesUnpaid fees accruedOtherSuperShare-basedTotalEquity %

Peter Christie

FY2025

60,000006,90010,18377,08313

Michael Pereira

FY2025

44,0004,0000010,18358,18318

Bryce Gould

FY2025

32,00016,0000010,18358,18318

Ralph Winter (final settlement)

FY2025

50,000052,56400102,5640

Total

FY2025

186,00020,00052,5646,90030,549296,013—

Ralph Winter (MD)

FY2024

209,09152,564023,0001,609286,2641

Shane Sadleir

FY2024

57,933003,1101,60962,6523

Terry Streeter

FY2024

41,389004,553045,9420

Peter Christie

FY2024

35,333003,887039,2200

Michael Pereira

FY2024

020,00000020,0000

Adrian Larking

FY2024

4,000004401,6096,04927

Total

FY2024

347,74672,564034,9904,827460,127—

Directors' Remuneration (Annual)

MetricFY2024FY2025

Total KMP remuneration (AUD K)

460.1296.0

Board & Management Changes

DateChangeContext

4 Aug 2023

Adrian Larking resigns

Founding-era director exits

23 Nov 2023

Terry Streeter resigns as Chairman

Board renewal during recapitalisation

29 Nov 2023

Peter Christie appointed Chairman

Christie leads strategic review and portfolio reset

2 Feb 2024

Shane Sadleir resigns; Michael Pereira appointed

Shift from geoscience-led to corporate-finance-led board

30 Jun 2024

Ralph Winter resigns as MD

Company becomes board-run, cutting fixed costs

1 Jul 2024

Bryce Gould appointed

Corporate adviser joins

26 Nov 2025

Greta Purich appointed; Michael Pereira resigns

Board refresh coinciding with A$2m raise and Templar Corporate mandate

Major Shareholders

HolderShares% of issued capital (at time of notice)Source / date

Peter Darren Russell

50,000,0006.71

Substantial holder notice, 25 Sep 2025 (Market Index)

Sabre Power Systems Pty Ltd

30,800,0004.13

FY2025 Annual Report shareholder information (via Market Index)

Bryce Gould (director, indirect)

15,166,667

~2.0 (of ~745m) / ~1.5 (of ~1.03bn)

Sep 2025

Rokks Resources Pty Ltd

7,500,0001.02

FY2025 Annual Report shareholder information

Peter Christie (director)

6,000,000

~0.8 / ~0.6

30 Jun 2025

Competitive Landscape

Key Competitors

#CompanyRelevance to MohoPositioning vs Moho
1

AIM Mining (private; Mark Creasy-owned)

Immediate neighbour; owns Nullagine Gold Project, Golden Eagle 1.8 Mtpa plant, Blue Spec/Gold Spec gold-antimony deposits

Dominant district player; potential acquirer or toll-treatment partner as much as competitor

2

Northern Star Resources (ASX: NST)

Owner of the 11.2 Moz Hemi project (via De Grey acquisition, per company footnotes) in the wider Pilbara

Major producer; sets the Pilbara gold investment narrative

3

Novo Resources (ASX/TSX: NVO)

—

Larger Pilbara explorer with district-scale holdings

4

Kalamazoo Resources (ASX: KZR)

—

Competes for Pilbara gold investor capital

5

Kairos Minerals (ASX: KAI)

Pilbara gold (Mt York); reported ~A$35m cash in 2026 (MiningNews headline)

Far better funded; competes for same investor theme

6

Codrus Minerals (ASX: CDR)

Former holder of PLs now in Bush Chook

Counterparty and peer micro-cap

7

Rincon Resources (ASX: RCR)

Listed by TipRanks as a peer

Micro-cap explorer peer for capital

8

Mount Ridley Mines (ASX: MRD)

Shares Chairman Peter Christie

Micro-cap peer; governance overlap

9

Mineral Mining Services Pty Ltd (private)

Buyer of Moho's Goldfields assets

Small-scale miner; illustrates the private-operator exit route

10

St George Mining (ASX: SGQ)

Former investee

Micro-cap peer for capital (now diversified)

Peer Comparison FY2025

DimensionMohoTypical Pilbara gold explorer peer (KAI, KZR, NVO)Major (NST)

Revenue

Interest only (A$32.9k FY2025)

Mostly nil

Multi-billion gold sales

Market cap

~A$4m

—

Tens of billions

Cash

A$1.27m (Jun 2026)

Kairos ~A$35m per headline

Large

JORC resource

—

Some hold resources

Large reserves

Exploration intensity

Very high relative to market cap (~A$0.9m per quarter in Jun-Q 2026)

Variable

Low relative to size

Recent Developments

--

Company Snapshot

2012

Founded

Nedlands, Australia

Headquarters

SWOT Analysis

Strengths

  • Debt-free balance sheet — nil borrowings at 30 June 2025 and 31 December 2025; total liabilities only A$166.7k at 31 Dec 2025 (H1 FY2026 report).
  • Large, low-cost land position — 442 km² assembled from August 2025 to March 2026 mostly by pegging and small scrip deals (e.g., Codrus PLs for 15m shares worth A$135k).
  • Proven district and infrastructure — Mosquito Creek Basin endowment of ~2.4–2.5 Moz; adjacent 1.8 Mtpa Golden Eagle plant (FY2025 AR).
  • Early drill success — 70% of Phase One holes intersected >0.5 g/t Au; two new multi-lode systems over 600 m combined strike (22 Jul 2026 release).
  • Access de-risked — 26 PLs granted without native-title conditions in October 2025; Palyku-Jartayi Heritage Agreement covering ~80% of the project (22 Jun 2026).
  • Retained upside from divestments — up to A$3.0m production milestones on East Sampson Dam; A$0.5m milestone plus 1% GRR on Silver Swan North (H1 FY2026 Note 11).
  • Lean overhead — directors' and employee costs of A$81.6k in H1 FY2026 vs A$383.0k in FY2024.

Weaknesses

  • Severe dilution — shares on issue rose from 259.6m (1 July 2023) to 1,029.6m (31 Dec 2025), a ~4x increase (FY2025 AR; H1 FY2026).
  • Thin cash — A$1.27m at 30 June 2026 vs A$892k exploration outflow in the June 2026 quarter alone.
  • No executive management — no CEO/MD since 30 June 2024; no remuneration committee (FY2025 AR).
  • Modest grades so far — best Phase One intercepts around 1 g/t Au (e.g., 14 m @ 1.04 g/t; 15 m @ 0.84 g/t).
  • First drilling miss — Swan Prospect's first four holes returned no significant intercepts (Feb 2026).
  • Value-destructive legacy history — A$4.95m write-offs in FY2024 and A$1.73m loss on asset sales in FY2025; accumulated losses of A$15.9m at 31 Dec 2025.
  • Disclosure inconsistencies — differing Nullagine production figures (543/617/671 koz), tenement number typo (E27/263 vs E27/623), and two dates for the Purich appointment in the same filing.

Opportunities

  • Phase Two drilling (Q4 2026) at Emu (200 m vein, up to ~20 m wide) and Bright Tank (rock chips to 12.7 g/t over 600 m trend).
  • Rocky Ridge gold-antimony — historic production at ~85 g/t Au and historic intercept of 8 m @ 28.5 g/t Au suggest high-grade potential (historic data).
  • Toll-treatment or corporate interest from the adjacent Golden Eagle plant owner if a high-grade resource is defined.
  • Contingent cash inflows — A$300k Empress Springs payment (due May 2026), A$500k Silver Swan North mining-lease milestone, East Sampson production milestones.
  • Further district consolidation — remaining tenements expected to be granted following the heritage agreement.
  • Re-rating leverage — at ~A$4m market cap and EV of roughly A$3m, a meaningful discovery could drive a multi-fold re-rating (performance-right hurdles at A$0.015 and A$0.025 are 3.75x and 6.25x the September 2026 price).

Threats

  • Funding risk — going-concern basis depends on raising equity (FY2025 AR Note 2(d); H1 FY2026 Note 2).
  • Further dilution at depressed prices — prior raises at A$0.005–A$0.008; share price A$0.004 in September 2026.
  • Overhang — 203m options outstanding at 31 Dec 2025 (incl. 120m at A$0.015 and 80m at A$0.020) and 74m performance rights.
  • Exploration failure — inherent; the FY2025 AR notes there is no assurance exploration will lead to an economic discovery.
  • Counterparty risk on deferred consideration — East Sampson milestones depend on MMS producing ≥10 koz.
  • Climate/weather and heritage delays — rain suspended the December 2025 program; heritage surveys required at priority targets.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
30 Apr 2025Variation deed for Empress Springs sale (A$408.5k + A$300k deferred)Reduced headline price from ~A$1.258m to ~A$0.71m — evidence of weak bargaining position
15 May 202523m performance rights to consultants (Classes A/B/C)Incentive alignment; dilution overhang
19 May 202514.5m retainer shares at A$0.003 to RM CapitalPaying advisers in equity at cycle-low price
21 May 2025Empress Springs sale completedExit Queensland
Jul 2025Reconnaissance fieldwork at Bush Chook: rock chips to 28.6 g/t AuValidated new strategy
1 Aug 202530.96m unlisted options (A$0.030) expiredMinor capital-structure clean-up
Aug 2025Bush Chook (225 km², 109 applications) secured; completion 28 Aug 2025Strategic pivot to Pilbara gold
4 Sep 2025HOAs with Goldtimers and Moonlight — to 386 km²Rapid consolidation
15 Sep 2025Director Bryce Gould buys 1.83m shares at A$0.007Insider buying signal
30 Sep 2025FY2025 Annual Report: loss A$2.94m; cash A$1.22mClean balance sheet; auditor change to Criterion
7 Oct 202518 PLs granted (plus 8 more nine days later; 26 total, no native title conditions)De-risks access and cost
16 Oct 2025Emu prospect described (outcropping gossanous vein)Key drill target defined
21 Oct 2025A$2.0m placement at A$0.008 announcedFunds maiden drilling
28 Oct 2025September quarter: cash A$669k; plans for 5,000–10,000 m RC drillingPre-raise cash low point
27–28 Oct 2025Tranche 1: 141.2m placement shares issuedFunding received
4 Nov 20254.16m shares to Sabre Power Systems in lieu of storage feeContinued equity settlement of costs
26 Nov 2025AGM/GM; Greta Purich appointed; Michael Pereira resignsBoard refresh
3 Dec 2025Tranche 2 (108.8m shares); Templar 15m shares + 80m options; 9m rights cancelledRaise completed; new dilution overhang
7 Dec 2025Maiden RC drilling commences at Swan ProspectFirst drilling at Bush Chook
8 Dec 2025Silver Swan North sale agreed (A$500k + A$500k milestone + 1% GRR)Non-dilutive funding
15 Dec 2025Swan drilling complete (4 holes/540 m; rain delay); Codrus PLs acquired; Bright Tank introduced; footprint 440 km²Target pipeline expanded
22 Jan 2026Response to ASX price query (share price ~A$0.014)Regulatory interaction during speculative price spike
3 Feb 2026Swan holes return no significant intercepts; Emu and Little Creature prioritisedFirst drilling disappointment; pivot to higher-grade targets
5 Feb 202613 more PLs granted; Gage Road, Boston, Single Fin, CBco targets unlocked; POWs for 3,000–5,000 mSets up 2026 drill program
9 Feb 2026General Meeting — all resolutions passedApprovals for securities
18 Feb 20265m performance rights converted to sharesClass C VWAP hurdle evidently met
13 Mar 2026H1 FY2026 report: loss A$640k; cash A$2.15mFunded for drilling
Mar 2026Corporate presentation ("Advancing the Bush Chook Gold Project")Marketing of gold-antimony thesis
23–31 Mar 2026Securities issued and cleansing notices; 25 Mar Rocky Ridge acquisitionGold-antimony target added; 442 km²
10 Apr 2026Notification regarding unquoted securities–
20 Apr 2026Silver Swan North sale completed; A$500k receivedSingle-asset company
29 Apr 2026March quarter: cash A$1.72m; 4,000-sample soil campaign complete; investor presentationDrilling imminent
21 May 2026Empress Springs A$300k deferred payment falls dueReceipt not confirmed in sources reviewed
25 May 2026RC drilling begins at Rocky Ridge (part of 5,000 m program)Testing historic high-grade shear
22 Jun 2026Palyku-Jartayi Heritage Agreement executed; Rocky Ridge and Gage Road drilling completedUnlocks ~80% of project
22 Jul 2026Phase One results: two shallow multi-lode gold systems (Gage Road, CBco); 70% hit rate; Phase Two announcedFirst discovery-type news; grades modest
29 Jul 2026June quarter: cash A$1.27m; exploration outflow A$892kFunding runway shortening
5 Aug 2026Application for quotation of securities and cleansing notice–
22 Sep 2026Share price A$0.004; market cap ~A$4mShares back at cycle lows despite discoveries
~29–30 Sep 2026FY2026 Annual Report scheduled–
~27 Oct 2026 (scheduled)September 2026 quarterly report dueNext cash disclosure

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

3 charts
Revenue by Segment: Segment revenue rose from AUD 0 Mn in FY2023 to AUD 0 Mn in FY2025.
Moho Resources Limited — Revenue by Segment
Series (AUD Mn)FY2023FY2024FY2025
Segment revenue000
Segment result = net loss after tax-1.6-5.9-2.9

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. Moho Resources Limited, Annual Report FY2025 (lodged 30 Sep 2025) (announcements.asx.com.au)
  2. Moho Resources Limited, Half-Year Report for the period ended 31 December 2025 (13 Mar 2026) (bulletin.webull.com)
  3. ASX release, Completion of Silver Swan North Project Sale (20 Apr 2026) (bulletin.webull.com)
  4. ASX release, Non-core project sale adds momentum to Bush Chook drilling (8 Dec 2025) (bulletin.webull.com)
  5. ASX release, Bush Chook drilling complete / Codrus tenement acquisition (15 Dec 2025) (bulletin.webull.com)
  6. ASX release, Emu and Little Creature gold targets (3 Feb 2026) (bulletin.webull.com)
  7. ASX release, Bush Chook expansion — Rocky Ridge (25 Mar 2026) (bulletin.webull.com)
  8. Quarterly Activities Report, March 2026 quarter (29 Apr 2026) (bulletin.webull.com)
  9. ASX release, Heritage Agreement (22 Jun 2026) (investorpa.com)
  10. ASX release, First Drill Program Defines Multiple Shallow Gold Systems (22 Jul 2026) (investorpa.com)
  11. Quarterly Activities Report, June 2026 quarter (29 Jul 2026) (investorpa.com)
  12. Corporate Presentation, March 2026 (wcsecure.weblink.com.au)
  13. ASX release, Sale of Empress Springs (10 Feb 2025) (financialfilings.com)
  14. ASX release, Moho invests in St George Mining (Jul 2019) (asx.com.au)
  15. Half-Year Report to 31 Dec 2019 (asx.com.au)
  16. Annual Report FY2022 (announcements.asx.com.au)
  17. Annual Report FY2023 (announcements.asx.com.au)
  18. InvestSMART announcement summaries and share-price data (investsmart.com.au)
  19. Market Index company page (holders, directors, calendar) (marketindex.com.au)
  20. TipRanks balance sheet and revenue history (tipranks.com)
  21. Barchart financial summary (barchart.com)
  22. Simply Wall St company report (simplywall.st)
  23. Resources Roadhouse (IPO details) (resourcesroadhouse.com.au)
  24. Mining.com.au coverage (Jun and Jul 2026) (mining.com.au)
  25. Kalkine Media coverage (Jul 2026) (kalkinemedia.com)

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.