MRG Metals Ltd Overview
Core identifiers
| Field | Detail |
|---|---|
| Legal name | MRG Metals Limited (ABN 83 148 938 532) |
| Former names | None recorded (Market Index) |
| Incorporation date | 24 January 2011 (FY25 Annual Report, Directors' Report: Shane Turner a director "since incorporation 24/01/2011") |
| Incorporation jurisdiction | Australia (public company incorporated and domiciled in Australia, FY25 AR Note 2) |
| Registered office / HQ | 12 Anderson Street West, Ballarat VIC 3350, Australia (shared with corporate accountant RSM Australia) |
| Postal address | PO Box 237, Ballarat VIC 3353 |
| Exchange and tickers | ASX: MRQ (ordinary shares); MRQOD (listed options, A$0.004 exercise, expiring 19 Aug 2027). MRQO options (A$0.008, expiry 31 Dec 2025) have now lapsed. |
| Yahoo/aggregator ticker | MRQ.AX |
| ISIN / CUSIP | ASX-only listing) |
| Listing date | Pearler (aggregator) gives an IPO date of 8 June 2011. |
| Fiscal year end | 30 June |
| Employees | Not publicly disclosed as a headcount. Key management personnel are the three non-executive directors. In-country work uses contracted consultants, e.g. Mr JN (Kobus) Badenhorst, In-Country Manager for South Africa and Mozambique and Competent Person. Employee benefits expense equals the KMP remuneration total (A$367,968 in FY25). |
| Auditor | William Buck Audit (Vic) Pty Ltd, Melbourne. Lead auditor for FY25 was J. C. Luckins; H1 FY26 review partner was W. H. D. Lee. |
| Share registry | Automic Pty Ltd, Sydney |
| Solicitors | Moray & Agnew, Melbourne |
| Corporate accountant / ASIC agent | RSM Australia Pty Ltd, Ballarat |
| Market capitalisation (current) | About A$8.6M (Stockopedia, latest available). Earlier 2026 aggregator readings were A$10–12M (InvestSMART, Simply Wall St). The share price was A$0.002–0.004 during Jul–Oct 2026. |
| Shares on issue | 2,872,518,626 at 31 Dec 2025 (H1 FY26 report). Since then: +86.7M (Jan 2026: 75M Garies consideration, 7.2M lead-manager shares, 4.5M acquisition-related shares); director and Sheerartar placement shares issued after the 19 Mar 2026 meeting; +362,750,000 placement shares (18 Aug 2026); plus any SPP shares (up to 375M). Derived total before SPP is about 3.35 billion shares (author's arithmetic, not a company-stated figure). |
| Website | www.mrgmetals.com.au |
| Analyst coverage | None (Simply Wall St: 0 analysts; Market Index: not covered by a major broker) |
MRG Metals is a Ballarat-based micro-cap explorer and developer. It is moving from a single-commodity heavy mineral sands (HMS) story to a diversified southern-African critical-minerals portfolio with a rare-earth focus. Its legacy anchor is a 30% free-carried interest in the Corridor Sands HMS (titanium feedstock) joint venture in Mozambique. Sinowin Lithium operates and funds that JV, which holds a combined JORC resource of about 2.39 billion tonnes and is targeting first production in March 2027. Around this carried interest MRG is building two rare-earth growth options. The first is the high-grade, monazite-hosted Garies Project in South Africa's Northern Cape, acquired in January 2026, where a mining-right conversion application was lodged in June 2026. The second is the early-stage Adriano–Fotinho alluvial rare-earth corridor in Mozambique. MRG has no revenue, about A$1M or less of cash, a going-concern emphasis from its auditor, and heavy reliance on small, dilutive equity raisings.
What the company does
MRG Metals is a mineral exploration and project-development company with no operating revenue. The FY25 Annual Report describes its principal activities as exploration and development of heavy mineral sands, rare earths and uranium in Mozambique, exploration of a carbonatite complex in Zimbabwe, and lithium exploration in Western Australia. The H1 FY26 report narrows this to HMS and rare-earth exploration and development in Mozambique, before the Garies acquisition closed in January 2026.
The H1 FY26 Chairman's Letter describes the company as moving from a single heavy mineral sands play to a diversified critical-minerals company specialising in rare earths. It names three concurrent value drivers:
-
Garies Rare Earth Project (South Africa): high-grade, monazite-hosted; simple metallurgy; a low-capex, fast-track development concept.
-
Corridor titanium-dioxide / HMS Joint Venture (Mozambique): fully funded by the partner, with a production pathway to 2027 that does not need MRG capital.
-
Adriano–Fotinho Rare Earth Project (Mozambique): auger drilling and laboratory results indicating emerging district-scale potential.
Business model and revenue model
| Dimension | Characterisation |
|---|---|
| Revenue model today | None. The only income is interest (A$5,842 in FY25; A$8,152 in FY24) and management fees from the JV (A$193,424 in FY25, booked within discontinued operations). |
| Intended model, HMS | Equity-accounted 30% carried interest in the JV company Terriland. Sinowin funds 100% of capex and opex up to 440,000 tpa of heavy mineral concentrate (HMC). MRG's interest is carried at 30% in Stage 1 and falls to a 20% floor in later stages while staying carried. Sinowin handles all offtake. MRG's value would come through JV distributions and/or the binding US$50M drag-along clause (FY25 AR, Chairman's Letter). |
| Intended model, Garies | Owner-operator development (70% project interest through Sheerartar/Tundratype). Plan: pilot plant, then modular expansion producing a mixed REE concentrate through a chemical-free physical flowsheet. The company is seeking strategic partners for the pilot plant. |
| Intended model, Adriano–Fotinho / Olinga / Shawa | Classic exploration optionality: discovery, resource, then sale, farm-out or development. |
| Product vs. service mix | 100% prospective commodity product (HMC, mixed REE concentrate). No service, subscription or licensing income. |
| Value-chain position | Upstream. Mineral resource ownership and early-stage concentrate production. MRG does not plan separation, refining or downstream processing. Garies defers chemical processing to a later REO conversion stage. |
| Customer types (prospective) | HMC: Chinese titanium-feedstock and zircon processors through Sinowin's network. REE concentrate: separation and refining companies (customers not named). |
| End-markets | Titanium dioxide pigment (paints, plastics, paper), titanium metal and welding, zircon (ceramics, refractories), and rare-earth permanent magnets (EVs, wind turbines, defence). Gallium (semiconductors) and phosphate/vermiculite (Shawa) are optional upside. |
Independent characterisation
MRG is a "carried-interest plus exploration" junior. Its main de-risked asset, the Corridor Sands mining licences, has effectively been handed to a better-capitalised partner in exchange for a free carry. That removes MRG's development funding burden. It also removes MRG's operational control, offtake control and timing control over its most material asset. This shows up in the accounts: the HMS licences (A$6.54M at 31 Dec 2025) are classified as "held for sale" and their results as discontinued operations, pending formal licence transfer to the JV company.
The company is deploying its limited equity capital into rare earths. The most important bet there is Garies. The acquisition is attractive on paper: scrip consideration, high grades, close to the Steenkampskraal mine, and it brought in experienced industry figures. But it has no JORC resource confirmed in the documents reviewed. The core analytical question for MRG is whether a sub-A$10M market capitalisation, funded by placements at A$0.002–0.005 per share, can carry three projects to value-recognition points without crippling dilution.
Strategy
Stated strategy themes (paraphrased from FY25 AR and H1 FY26)
A "dual strategy": near-term cash flow from the carried HMS JV, combined with exposure to structurally growing critical-minerals markets through rare earths and uranium.
- Evolving into a diversified critical-minerals company specialising in rare earths, with three assets advanced in parallel.
Not deploying MRG's own capital into HMS development,: with the JV partner funding everything up to 440,000 tpa.
Building a district-scale rare-earth corridor: at Adriano–Fotinho.
- A capital-efficient, low-capex, chemical-free development pathway at Garies, led by permitting, with strategic partners sought for the pilot plant.
Recycling future JV cash flows: into the rare-earth portfolio.
Strategic initiatives (last 24 months)
| Initiative | Date | Description | Status |
|---|---|---|---|
| Sinowin HMS JV | Signed 12 Jun 2024; CPs satisfied 10 Sep 2024 | 70/30 JV in Terriland. Sinowin funds 100% to 440 ktpa and controls offtake. US$6M initial commitment in two US$3M tranches. US$50M drag-along. | Licence transfer pending at last report. Sinowin had spent more than US$2M by May 2026. |
| Corridor Central and South mining licences | Jan and Jun 2025 | Regulatory base for development | Granted |
| ESIA approvals | Corridor Central ESIA approved 27 Jan 2026; HMS ESIA lodged 24 Apr 2026 (likely Corridor South) | Environmental permits | Partly complete |
| EDM power supply | 2,025 | About US$0.82M for the Year 1 substation and line; about US$2M for Years 2–3 | Committed |
| Garies acquisition | Announced 23 Dec 2025; closed 19 Jan 2026 | Entry to South African rare earths | Mining Right application lodged 12 Jun 2026 |
| Adriano–Fotinho programmes | Oct 2025 – Jul 2026 | Auger drilling, mineralogy, pegmatite mapping | Ongoing |
| Olinga exploration | Commenced Apr 2026 | Uranium and REE | Early stage |
| Shawa (Zimbabwe) due diligence | FY24–FY25 | Phosphate and REE carbonatite | Decision on a JV pending |
| Norrliden divestment | FY25 onward | Sale of the Swedish legacy asset | Being pursued |
| Strategic partner search, Garies | Jun–Aug 2026 | Funding for pilot plant and exploration | Interest reported; no agreement announced |
Cost programmes and ESG commitments
No formal cost-reduction programme with targets has been disclosed. Directors can defer fees if required, which the going-concern note cites as mitigation. The ESG-related messaging is the chemical-free Garies flowsheet and the ESIA processes in Mozambique. No emissions targets have been disclosed.
Medium-term targets and guidance
| Target | Source | Status |
|---|---|---|
| HMS first production: 130–160 ktpa HMC from March 2027 (JV partner target) | ASX 29 Jan 2026 | Not yet reached; licence transfer pending at last verified report |
| HMS ramp-up to 800 ktpa within five years | ASX 29 Jan 2026 | Aspirational |
| Garies small maiden JORC resource, Q1 CY26 | H1 FY26 | — |
| Garies Environmental Assessment and Mining Right application, Q3 CY26 | H1 FY26 | Mining Right Conversion Application lodged 12 Jun 2026, ahead of schedule |
| Corporate financial targets | — | None disclosed |
Products & Services
MRG has no commercial products. Its "portfolio" is its asset base. Each project is catalogued below with specifications, target market, status year and the flagship datum.
Mozambique — Corridor Sands HMS JV (30% carried; held for sale)
| Asset | Licence | Status | Key specifications | Source |
|---|---|---|---|---|
| Corridor Central (Koko Massava deposit) | 11142C Mining Licence | Granted Jan 2025; ESIA approved 27 Jan 2026 | Two figures are reported. FY25 AR: 1.53 billion tonnes at 5.1% THM, including a high-grade 103 Mt at 6.6% THM. H1 FY26: 1,534 Mt at 5.5% THM. Discrepancy noted: grade 5.1% vs 5.5% THM. | FY25 AR; H1 FY26 |
| Corridor South (Nhacutse and Poiombo deposits) | 11137C Mining Licence | Approved Jun 2025; site exclusions and compensation discussions ongoing with INAMI | 860 Mt at 4.9% THM, including 257 Mt at 6.0% THM high grade | FY25 AR |
| Corridor North | 10779L Exploration Licence | 130-hole auger programme from 2025; JV-funded drilling announced 1 May 2026 | Exploration stage | FY25 AR; ASX 1 May 2026 |
| Linhuane | 7423L Exploration Licence | Granted May 2025; planned Phase 2 feed | Historical Rio Tinto drilling found multiple 10m intersections of 5–25% THM; company cites 10.5m at 15.6% THM and 10m at 17.9% HM | FY25 AR; SmallCaps |
| Marão (Magonde target) | 6842L Exploration Licence | 100-hole, 1,350m auger programme done Mar 2025; JV-funded drilling announced 6 May 2026; planned Phase 3 feed | Up to 4.57% THM; VHM content 48.16% (rutile, zircon, ilmenite); e.g. 4.0% THM to 13.5m | FY25 AR; ASX 6 May 2026 |
| Plan version | Phase 1 | Phase 2 | Phase 3 | Long-term |
|---|---|---|---|---|
| FY25 AR (Sep 2025) | 110,000 tpa HMC within 12–18 months | 220,000 tpa (adds Linhuane) | 440,000 tpa (adds Marão); MRG interest moves to a 20% carried floor | 800,000 tpa five-year goal; port need of up to 360,000 t in Year 1 |
| Sinowin plan (Jan 2026) | 130,000–160,000 tpa HMC from March 2027 | — | — | 800,000 tpa within five years |
Combined JORC resource: about 2.39 billion tonnes (H1 FY26).
Development plan:
Infrastructure: Sealed road access; grid power from Electricidade de Moçambique (EDM), with about US$0.82M committed for the Year 1 substation and line; the Port of Chongoene about 20 km from Corridor Central. Rail and wharf development is being led by a separate consortium.
Product: Heavy mineral concentrate (ilmenite, rutile, zircon). The FY25 AR cited concentrate market prices above US$300/t (company statement).
South Africa — Garies Rare Earth Project (70% via Sheerartar; acquired Jan 2026)
| Attribute | Detail |
|---|---|
| Location | Northern Cape Province. About 70 km from the Steenkampskraal monazite mine (reported at 14.5% TREO), about 344 km from Saldanha Bay deep-water port, and south of the Namibian border. |
| Area | About 275 km²: an existing 85 km² prospecting permit plus a 190 km² applied extension |
| Mineralisation style | Monazite hosted in magnetite veins and plug-like bodies; coarse-grained and near-surface, which supports low-strip open-pit mining. Associated magnetite has over 60% Fe (possible iron co-product). |
| Grades (pre-acquisition bulk sampling) | Up to 4.85% TREO, equivalent to about 8% monazite (monazite contains about 60% TREO) |
| REE distribution (indicative) | Nd+Pr about 24.1% of TREO; Dy+Tb about 1.4%; heavy REO about 9%; scandium above global averages; gallium present |
| Targets | 23 airborne-magnetic targets; only three partially drill-tested. DrillTarg is the first, with 19 holes intersecting mineralised magnetite veins (17 Mar 2026). Ryshoek is also referenced. |
| Gallium | Identified alongside REE mineralisation (2 Jul 2026); assays of 880 ppm and 573 ppm are referenced in the Aug 2026 summary |
| Metallurgy and process concept | Simple, modular, chemical-free flowsheet: crushing, desliming, magnetic and gravity separation to a high-grade mixed REE concentrate. Chemical processing deferred. |
| Independent technical work | Axiom Exploration Group (Canada) technical report, Jan 2024. Updated Competent Person's Report by Mr Colin Rothnie. Metallurgical testwork by Light Deep Earth (LDE) Laboratory, South Africa. |
| Permitting | Consultants engaged 15 Jan 2026 (Environmental Assessment, Mine Works Programme, Mining Right). Mining Right Conversion Application lodged 12 Jun 2026 with the DMPR for an initial 10-year period. |
| Resource | "Small maiden JORC Resource" guided for Q1 CY26 (H1 FY26). Earlier messaging cited a resource target of up to 300,000 t contained TREO; this is a target, not a resource. |
| Development phases | (1) resource definition and permitting; (2) pilot-scale production; (3) modular, scalable expansion |
| Use of Aug 2026 raise | Completing the Mining Licence application (about A$0.14M); expansion diamond drilling at DrillTarg (about A$0.50M); radiometric and magnetic surveys; stream-sediment work over the 22 remaining Axiom targets |
Mozambique — Adriano–Fotinho Rare Earth Corridor (100%)
| Asset | Licence | Key results | Source |
|---|---|---|---|
| Adriano | 11002L (granted Nov 2023) | Stream sediments (Oct 2024): 42 of 42 samples anomalous; 74% above 1,000 ppm TREO; peak 32,393 ppm (3.24%) TREO; magnet REE about 22%. Auger (Oct–Dec 2025): 37 holes and 126 samples, 100% with visible HMC; 83 samples above 4% THM and 26 above 6% THM; peak 9.56% THM over 1m; 7.16% THM over 2m (AAG25011). Pegmatites mapped along a 3 km trend. Mineralogy (13 May 2026) confirms high monazite, rutile and zircon. | FY25 AR; H1 FY26; ASX 13 May 2026 |
| Fotinho | 11000L (granted Oct 2024) | Exploration began in H1 FY26. First assays (11 Jun 2026) from 32 auger holes. A further 57 holes (1 Jul 2026): 26 holes above 3% THM over the full drilled depth; peak 7.69% THM. | ASX 11 Jun & 1 Jul 2026 |
| Combined area | — | About 396.42 km² | ASX 1 Jul 2026 |
Mozambique — Olinga Uranium/REE (100%)
Licence 11005L was granted in FY25. Its uranium prospectivity rests on elevated uranium/thorium ratios in geophysical data. Exploration began in April 2026 (ASX 17 Apr 2026).
Zimbabwe — Shawa Carbonatite Complex (due diligence)
The interest is under due diligence; MRG has not yet decided whether to enter a JV. Results so far: phosphate up to 17.24% P₂O₅; REE above 2,500 ppm TREO; vermiculite noted; a 50 kg bulk sample in testwork targeting about 30% P₂O₅ concentrate; 550 soil and rock samples (FY25 AR).
Western Australia — Lithium (applications)
Tenements: Lake Johnston E63/2394 and E63/2446, and Forrestania E77/3164, all applications. They have been on care and maintenance pending native heritage clearance (H1 FY26). A$60,000 of acquisition costs were capitalised in FY25.
Sweden — Norrliden (legacy)
Concessions: Norrliden K nr 1 and Malanaset nr 100/101. The company intends to sell Norrliden (FY25 AR "Likely developments").
Financial Narrative
Income statement
Sources: FY2021–FY2025 net loss from the FY25 AR five-year table. Operating expenses, EBITDA and pre-tax for FY2021–FY2023 are from Barchart (aggregator). FY24 pre-tax continuing (-860.3) and FY25 (-726.2) are from the FY25 AR income statement. Barchart's FY24 pre-tax figure of -847 combines continuing and discontinued results, a minor discrepancy.
Gross profit, operating income, margins and revenue CAGR: not applicable (nil revenue).
Per-share data
Losses per share in those years were fractions of a cent.
Balance sheet
Source: FY25 AR five-year table.
Total equity at 1 July 2023 (FY2023 close) was A$6,747.6k (FY25 AR statement of changes in equity).
H1 FY26 (31 Dec 2025): cash A$1,050.1k; total assets A$8,205.1k; held for sale A$6,541.4k; E&E A$547.8k; liabilities A$182.4k; equity A$8,022.8k. Cash at 28 Feb 2026 was A$737.6k. No debt at any reporting date. Short-term and long-term debt are both nil.
Tax losses: carried-forward tax losses of A$20.99M at 30 June 2025, with no deferred tax asset recognised.
Cash flow
Source: Barchart, cross-checked against FY25 AR cash balances. The FY2022 derived change is -593.2 versus Barchart's -596.
H1 FY26: operating cash flow -A$344.8k; E&E -A$271.7k; financing +A$1,472.8k (A$1,548.0k gross proceeds less A$75.2k costs).
Q4 FY26 (June 2026 quarter, Appendix 5B summary): net operating cash outflow about A$188k; E&E expenditure A$317,564.
Ratios
ROE uses average equity.
Not meaningful or not applicable: ROIC (negative earnings, no invested-capital returns), net debt/EBITDA (net cash, negative EBITDA), interest coverage (no interest expense), asset turnover (nil revenue), cash conversion cycle (no inventory or receivables cycle).
Capital raised and dilution
H1 FY26: 146.0M shares issued (shares on issue 2,872.5M at 31 Dec 2025) plus 817.96M MRQOD options. Shares on issue rose from 1,985.9M at 1 July 2023 to 2,872.5M at 31 December 2025, a 44.6% increase in 30 months, before the larger 2026 issues.
Commentary on trends, inflections and drivers
Cost base. MRG runs a very lean corporate structure. The annual continuing cash burn of A$0.6–0.9M is driven mostly by directors' fees (A$300,000 cash per year plus superannuation, split between director and consulting fees), administration and consultants. Two notable movements occurred in FY25. Administration costs halved (A$452k to A$223k). Consultants' fees rose sharply (A$25k to A$126k), which suggests outsourcing of technical and corporate work as the portfolio expanded.
The FY25 net-loss inflection (-A$939k against -A$847k) was entirely a non-cash A$406k impairment of a Mozambique VAT receivable in discontinued operations. Underlying continuing losses improved by 16%.
Balance-sheet transformation. In FY25 the A$6.4M HMS carrying value moved from non-current E&E to "held for sale". This reflects the pending transfer of licences into Terriland in exchange for a 30% carried interest. The auditor treated it as a key audit matter, because judgement is needed on held-for-sale classification, discontinued-operation status and expected significant influence over the future associate. When the transfer completes, MRG will need to recognise its 30% interest (likely under the equity method). Any difference between fair value and carrying value would pass through profit or loss. The quantum is not disclosed.
Liquidity. Year-end cash fell for four straight years (A$1.61M in FY21 to A$0.19M in FY25) before the H1 FY26 options offer and placement rebuilt it to A$1.05M. On current burn (about A$0.5M per quarter including exploration in Q4 FY26), the August 2026 placement (A$0.73M gross) and any SPP proceeds give a runway of a few quarters at most. The auditor has flagged a material uncertainty on going concern in both FY25 and H1 FY26.
Using the H1 loss of A$396.9k and an elevated H2 activity level, the full-year loss is likely to be of the same order as prior years. This is an observation, not an estimate.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Results by Segment
| Metric | FY2024 | FY2025 |
|---|---|---|
Mozambique segment result (AUD K) | -225.9 | -121.2 |
Australia segment result (AUD K) | -634.5 | -605.1 |
Total continuing operations result (AUD K) | -860.3 | -726.2 |
Results by Segment (H1FY2025–H1FY2026)
| Metric | H1FY2025 | H1FY2026 |
|---|---|---|
Mozambique segment result (AUD K) | 0 | 0 |
Australia segment result (AUD K) | -310.0 | -385.4 |
Segment Assets & Liabilities
| Metric | FY2024 | FY2025 |
|---|---|---|
Mozambique segment assets (AUD K) | 6,756.2 | 6,697.8 |
Australia segment assets (AUD K) | 451.5 | 389.3 |
Mozambique segment liabilities (AUD K) | 26.3 | 20.1 |
Australia segment liabilities (AUD K) | 197.2 | 148.7 |
Revenue by Segment
| Metric | FY2024 | FY2025 |
|---|---|---|
Management fees from JV (AUD K) | 13.3 | 193.4 |
Impairment of Mozambique VAT receivable (AUD K) | 0 | -406.2 |
Result from discontinued operations (AUD K) | 13.3 | -212.8 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansGroup Entities
| Entity | Jurisdiction | Ownership | Role |
|---|---|---|---|
MRG Metals Ltd | Australia | Parent | Listed company |
MRG Metals (Australia) Pty Ltd | Australia | 100% | Dormant (no assets or liabilities) |
MRG Metals (Exploration) Pty Ltd | Australia | 100% | Dormant |
Lake Hope Lithium Pty Ltd | Australia | 100% | Holds WA lithium tenement applications |
Sofala Resources Pty Ltd | Australia | 100% | Holding company for the Mozambique subsidiaries |
Sofala Mining & Exploration Lda and I–X Lda (11 entities) | Mozambique | 99% | One licence-holding company per tenement, as Mozambican law requires |
Sheerartar Minerals Pty Ltd | (not stated in docs reviewed) | 100% (from 19 Jan 2026) | Holds 70% of Tundratype, the Garies project vehicle |
Tundratype (Garies holder) | South Africa | 70% via Sheerartar | The remaining 30% is held by qualifying South African (empowerment) holders |
Terriland (JV company) | Mozambique | 30% MRG / 70% Sinowin at inception | HMS JV company; licence transfer pending at last report |
Income Statement
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue (AUD K) | 0 | 0 | 0 | 0 | 0 |
Operating expenses, continuing (AUD K) | 668 | 712 | 865 | 876 | 722 |
EBITDA, continuing (AUD K) | -668 | -693 | -865 | -876 | -722 |
Pre-tax income, continuing (AUD K) | -666 | -702 | -847 | -860 | -726 |
Net income attributable (AUD K) | -665.7 | -702.3 | -846.9 | -847.1 | -939.0 |
Key Financials (AUD)
| Line item (AUD) | FY2024 | FY2025 |
|---|---|---|
Interest income | 8,152 | 5,842 |
Employee benefits expense | -233,000 | -267,968 |
Consultants | -24,733 | -126,311 |
Administration | -452,343 | -222,546 |
Exploration expensed | -165,615 | -105,610 |
FX gain/(loss) | 7,211 | -9,622 |
Loss from continuing ops | -860,328 | -726,215 |
Discontinued ops | 13,274 | -212,796 |
Net loss | -847,054 | -939,011 |
Per-Share Data and Share Count (millions)
| Metric | FY2024 | FY2025 |
|---|---|---|
Basic EPS, total (A$ cents) | -0.04 | -0.04 |
Basic EPS, continuing (A$ cents) | -0.04 | -0.03 |
Diluted EPS, total (A$ cents) | -0.04 | -0.04 |
Dividends per share (AUD) | 0 | 0 |
Weighted avg shares (millions) | 2,341.2 | 2,717.2 |
Key Financials and Share Price
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Cash and equivalents (AUD K) | 1,610.7 | 1,017.5 | 575.0 | 359.5 | 193.8 |
Closing share price (AUD) | 0.008 | 0.0065 | 0.002 | 0.004 | 0.003 |
Balance Sheet
| Metric | FY2024 | FY2025 |
|---|---|---|
Total assets (AUD K) | 7,207.7 | 7,087.0 |
Current assets incl. held-for-sale (AUD K) | 762.6 | 6,679.4 |
Exploration and evaluation, non-current (AUD K) | 6,416.3 | 400.3 |
Assets held for sale (AUD K) | 0 | 6,418.8 |
Total liabilities (AUD K) | 223.5 | 168.8 |
Total debt (AUD K) | 0 | 0 |
Net debt (AUD K) | -359.5 | -193.8 |
Total equity (AUD K) | 6,984.1 | 6,918.2 |
Goodwill and intangibles (AUD K) | 0 | 0 |
Working capital incl. held-for-sale (AUD K) | 539.0 | 6,510.6 |
Working capital excl. held-for-sale (AUD K) | 539.0 | 91.8 |
Accumulated losses (AUD K) | -23,050.8 | -23,989.8 |
Share capital (AUD K) | 29,722.3 | 30,561.9 |
Cash Flow
| Metric | FY2024 | FY2025 |
|---|---|---|
Operating cash flow (AUD K) | -730.9 | -614.4 |
Exploration and evaluation payments, capex (AUD K) | -589.6 | -341.1 |
Free cash flow (AUD K) | -1,322.2 | -955.5 |
Equity proceeds, gross (AUD K) | 1,040.0 | 801.0 |
Dividends paid (AUD K) | 0 | 0 |
Buybacks (AUD K) | 0 | 0 |
Net change in cash (AUD K) | -215.5 | -165.7 |
Cash Flow (FY2021–FY2022)
| Metric | FY2021 | FY2022 |
|---|---|---|
Net change in cash (AUD K) | 889 | -596 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2024 | FY2025 |
|---|---|---|
ROE (%) | -12.3 | -13.5 |
ROA (%) | not computed | -13.1 |
Current ratio, incl. held-for-sale (x) | 3.41 | 39.56 |
Current ratio, excl. held-for-sale (x) | 3.41 | 1.54 |
Debt / equity (x) | 0 | 0 |
Operating Metrics (millions) and Key Financials
| Metric | FY2024 | FY2025 |
|---|---|---|
Shares issued during year (millions) | 539.2 | 201.4 |
Gross capital raised (AUD K) | 1,165.0 | 898.8 |
Shares on issue at year-end (millions) | 2,525.1 | 2,726.5 |
Options on issue at year-end (millions) | 879.5 | 1,075.9 |
Geographic Revenue
| Region | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Australia revenue (AUD K) | 0 | 0 | 0 |
Mozambique revenue (AUD K) | 0 | 0 | 0 |
South Africa revenue (AUD K) | 0 | 0 | 0 |
Revenue by Region
| Metric | FY2024 | FY2025 |
|---|---|---|
Mozambique E&E additions (AUD K) | 541.9 | 334.0 |
Australia E&E additions incl. acquisitions (AUD K) | 79.6 | 68.9 |
Share Price
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Closing share price at 30 June (AUD) | 0.008 | 0.0065 | 0.002 | 0.004 | 0.003 |
Period | Performance | Source | — | — | — |
Recent range (Jul–Oct 2026) | A$0.002–0.004 | InvestSMART | — | — | — |
1-year | +12.5% (Simply Wall St, date unclear); flat (another Simply Wall St reading, Mar 2026); -3.83% vs ASX 200 (Market Index, 1-yr relative) | Aggregators; readings conflict | — | — | — |
3-year | -10% | Simply Wall St (date unclear) | — | — | — |
5-year | -55% (Simply Wall St); -80% (Pearler, to 30 Sep 2026) | Aggregators; readings conflict | — | — | — |
Since IPO | about -97% | Simply Wall St | — | — | — |
Relative to 200-day MA | -27.8% | Stockopedia | — | — | — |
Valuation Snapshot
| Metric | Value |
|---|---|
Market cap | about A$8.6M (Stockopedia, latest); A$10–12M in earlier 2026 readings |
Enterprise value | about market cap minus cash. No debt. |
P/E | Not meaningful (loss-making) |
EV/EBITDA | Not meaningful (negative EBITDA) |
EV/Sales | Not meaningful (nil revenue) |
P/B | about 1.1x (A$8.6M market cap / A$8.0M book equity at 31 Dec 2025, before 2026 issues). Derived. |
Implied value vs JV reference | The US$50M drag-along on the JV equity position compares with a total market cap below A$12M |
Capital Markets
| Item | Status |
|---|---|
Analyst consensus | None (0 analysts) |
Dividends | None ever paid; no policy |
Buybacks | None authorised |
Credit ratings (Moody's / S&P / Fitch) | Not rated |
Debt maturity profile | No borrowings. Liabilities are trade payables only, all due within six months. |
Capital Instruments
| Instrument | Number | Terms |
|---|---|---|
Ordinary shares (31 Dec 2025) | 2,872,518,626 | Plus about 449M issued Jan–Aug 2026 (derived) and any SPP shares |
MRQOD listed options | — | A$0.004 exercise; expire 19 Aug 2027 |
MRQO options | 1,075.9M at 30 Jun 2025 | A$0.008; lapsed 31 Dec 2025 (expiry moved A$312,683 from reserves to issued capital) |
Director performance rights | 67.5M | JV production milestones (see §9.2) |
Garies deferred consideration | 175M shares | Issued on Mining Licence grant |
Garies performance shares | Not quantified | Value milestones such as a A$100M market cap; total consideration capped at A$10M |
Analyst Conclusions
Management guidance
HMS JV: first HMC production targeted for March 2027 at 130–160 ktpa, ramping to 800 ktpa within five years (partner target). Sinowin is responsible for funding and offtake.
Garies: progress the Mining Right Conversion Application to grant. Expansion diamond drilling at DrillTarg; stream-sediment and geophysical work over the remaining targets. Seek strategic partners to fund a pilot plant.
Adriano–Fotinho: grid-based auger drilling to define the footprint; mineralogy; pegmatite source testing.
Corporate: no financial guidance. Further equity raisings are implied by the going-concern disclosures.
Consensus growth expectations: none (no coverage).
Bull case
-
The carried interest is mispriced. A 30% free-carried stake in granted HMS mining licences over about 2.39 Bt, with a partner spending real money (more than US$2M, plus funded drilling) and a US$50M drag-along reference, is worth far more than a sub-A$12M total market cap. First production in 2027 would force a re-rating.
-
Garies could be a genuine high-grade REE asset. Grades up to 4.85% TREO, a magnet-rich assemblage, a simple physical flowsheet and proximity to Steenkampskraal give it rare characteristics among ASX micro-caps. Mining Right grant would be a recognisable value point, and South Africa is attracting government capital into rare earths.
-
Insider and industry alignment. The directors keep buying through placements. Egan (ex-BHP Titanium) and Deysel (Critica CEO, ex-MRC, ex-Kenmare) add credibility that MRG's board alone lacked.
Bear case
-
Chronic dilution and going-concern risk. Raisings fell from A$0.0045 (Jul 2024) to A$0.005 (Dec 2025) to A$0.002 (Aug 2026), against a burn of about A$0.5M per quarter. Without a non-dilutive inflow, per-share value creation is structurally weak.
-
HMS value is out of MRG's hands. Timelines have already slipped. The licence transfer and tax assessment remain unresolved, and MRG controls neither operations nor offtake. Even in production, MRG's economics depend on how the JV distributes cash, which is not disclosed.
-
Garies is unproven at JORC level. No verified resource exists yet. Two clarification announcements in mid-2026 suggest disclosure friction. Monazite projects also carry thorium-related permitting complexity.
Catalysts and monitorables (next 12 months)
| Catalyst | Expected timing | Why it matters |
|---|---|---|
| FY26 Annual Report and going-concern wording | Released c. late Sep 2026 (to be reviewed) | Liquidity and audit status |
| SPP result and post-raise cash | Sep–Oct 2026 | Runway |
| September 2026 quarterly (Appendix 5B) | 29 Oct 2026 (scheduled) | Burn rate and cash |
| AGM, including the remuneration vote and the board's 7.1A/placement approvals | c. Nov 2026 | Governance and capacity |
| Class A performance-rights expiry | 29 Nov 2026 | Signals Stage 1 feasibility status |
| Mozambique tax assessment and licence transfer to Terriland; US$3M tranche deposited | Overdue; any time | Unlocks accounting for the JV interest |
| Garies maiden JORC resource / updated CPR | Guided Q1 CY26; overdue if not yet released | Core value support |
| Garies Mining Right grant (triggers 175M shares) | 2027+ (regulatory) | Development licence |
| Garies strategic partner or pilot-plant funding | Unspecified | Non-dilutive capital |
| HMS construction start and first production | Construction 2026–27; production March 2027 target | Cash-flow inflection |
| Expiry of MRQOD options | 19 Aug 2027 | Potential A$3.9M+ inflow if exercised; currently out of the money near A$0.002 |
Concluding analyst verdict
MRG Metals is a speculative, binary-outcome micro-cap. Its market value appears to reflect funding risk more than asset quality. Its strongest asset is not something it runs. It is a free-carried 30% interest in the Corridor Sands HMS JV, where granted mining licences, an approved ESIA for Corridor Central and partner-funded drilling are tangible progress. Taken at face value, the carry and the US$50M drag-along imply a value well above MRG's roughly A$9–12M market capitalisation. The market's discount reflects uncertainty that is reasonable. The licence transfer to Terriland has slipped from "before end-2025" and still depends on a Mozambican tax assessment. The partner's own production timeline has moved. MRG has no visibility over JV cash distributions.
The Garies acquisition was a smart, low-cost entry: scrip at A$0.004, with most consideration deferred to Mining Licence grant. It brings in credible industry leaders. Reported grades and the magnet-rich assemblage are encouraging, and lodging the Mining Right application in June 2026 shows execution. But until a JORC resource is published and independently tested, Garies remains a concept with good indications rather than a defined asset. The two mid-2026 clarification announcements are a reminder to weigh promotional language carefully.
The binding constraint is capital. Year-end cash fell for four straight years to under A$0.2M in FY25. The auditor has twice flagged going-concern uncertainty. The latest raise was at A$0.002, the lowest price in the series. Unless non-dilutive capital arrives through a Garies partner, JV distributions or a JV transaction, shareholders face continued dilution.
Verdict: a high-risk option on two de-risking events, the HMS licence transfer leading to 2027 production, and the Garies resource and Mining Right. The key monitorables are the transfer completion, a published Garies JORC resource, and the quarterly cash balance.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Tenure | Background | Education |
|---|---|---|---|---|
Andrew Van Der Zwan | Non-Executive Chairman | Director since 14 Feb 2011; Chair since 8 Oct 2013 | 30+ years in engineering and commercial roles; 17 years in senior roles across ExxonMobil's global operations; 11 years as NED of Gulfx Ltd; NED of Argo Exploration (ASX: AXT) since 2013 | BE Chemical Engineering (Hons) |
Shane Turner | Non-Executive Director; Company Secretary; Group CFO | Director and Secretary since incorporation, 24 Jan 2011 | Chartered Accountant with 30+ years; formerly KPMG; ran his own practice; now with RSM Australia; Company Secretary and CFO of Akora Resources (ASX: AKO) since Dec 2023 | CA; Bachelor of Business |
Christopher Gregory | Non-Executive Director | Since 12 Aug 2013 | 38+ years in global minerals; 22 years with Rio Tinto in Asia-Pacific; former VP Operational Geology at Mandalay Resources (TSX: MND); founding partner of Sasak Minerals; director of Trigg Minerals (ASX: TMG) since 28 Jul 2025 | BSc Geology; MAusIMM, MAIG, FSEG, MAICD |
Board of Directors — Ian Egan
| Name | Role | Background |
|---|---|---|
Ian Egan | Executive Chairman, Sheerartar Minerals | Former Group GM of BHP Titanium Minerals and GM Non-Ferrous Metals at BHP; past boards include Kenmare Resources, Golconda Gold, Ok Tedi Mining, Orbital Corporation |
Jacob Deysel | Director, Sheerartar Minerals | 25+ years; current CEO of Critica Limited (ASX: CRI); former CEO/MD of Mineral Commodities (ASX: MRC); Operations Director at Kenmare Resources; GM Mining and Planning at Rio Tinto's Richards Bay Minerals; senior roles at Newmont; VP South America at Uranium Energy Corp; Mining Engineer, MBA |
JN (Kobus) Badenhorst | In-Country Manager (South Africa and Mozambique); Competent Person for Mozambique exploration results | Geologist; SACNASP and GSSA member; contracted consultant |
Colin Rothnie | Independent Competent Person, Garies CPR | — |
Directors' Remuneration
| Director | Cash fees | Superannuation | Share-based (performance rights) | Total FY2025 | Total FY2024 |
|---|---|---|---|---|---|
A. Van Der Zwan | 100,000 | 11,500 | 11,156 | 122,656 | 111,000 |
S. Turner | 100,000 | 11,500 | 11,156 | 122,656 | 111,000 |
C. Gregory | 100,000 | 11,500 | 11,156 | 122,656 | 111,000 |
Total | 300,000 | 34,500 | 33,468 | 367,968 | 333,000 |
Share-Based Incentives
| Class | Rights per director | Vesting milestone | Expiry |
|---|---|---|---|
A | 5,000,000 | Stage 1: 110,000 tpa HMC capacity | 29 Nov 2026 |
B | 7,500,000 | Stage 2: 220,000 tpa | 29 Nov 2028 |
C | 10,000,000 | Stage 3: 440,000 tpa | 29 Nov 2029 |
Directors' Remuneration by Attribute
| Attribute | Status |
|---|---|
Board size | 3, all non-executive |
Independence | All three are described as independent. However, tenures of 12–15 years, consulting arrangements and a related-party accounting service (Turner) would challenge independence under ASX Corporate Governance Council guidance. |
Chair/CEO separation | No CEO role exists; the Chair is non-executive |
Committees | Not separately disclosed in the documents reviewed. With three directors, the full board likely acts as audit, risk and remuneration committee (see the Corporate Governance Statement in the AR). |
Meetings FY25 | 4 board meetings with 100% attendance |
Gender diversity | 0% female board representation |
Remuneration consultants | None engaged in FY25 |
Major Shareholders
| Rank | Holder | Shares | % |
|---|---|---|---|
| 1 | 10 Bolivianos P/L (sole substantial holder) | 199,803,430 | 7.33 |
| 2 | BNP Paribas Nominees P/L | 131,277,918 | 4.81 |
| 3 | Lone Wolf Investments P/L | 56,905,935 | 2.09 |
| 4 | CJ & M Gregory S/F A/C (director-related) | 56,813,536 | 2.08 |
| 5 | JNW SFund P/L | 54,033,447 | 1.98 |
| 6 | Xiaotian Xu | 42,000,000 | 1.54 |
| 7 | Rob Roy P/L (John Wright Family A/C) | 37,951,031 | 1.39 |
| 8 | Nicole Dsouza | 37,724,800 | 1.38 |
| 9 | Hall Capital Finance P/L | 34,000,000 | 1.25 |
| 10 | KV Van Der Zwan Harleston Family A/C (director-related) | 33,441,679 | 1.23 |
| — | Top 20 total | 962,036,107 | 35.28 |
Directors' Shareholdings
| Director | Shares | Options |
|---|---|---|
Christopher Gregory | 80,813,986 | 28,444,201 |
Andrew Van Der Zwan | 64,126,679 | 26,220,004 |
Shane Turner | 33,982,509 | 11,594,753 |
Total | 178,923,174 | 66,258,958 |
Competitive Landscape
Competitors by Segment
| Segment | Competitor | Listing | Asset / relevance | Relative positioning vs MRG |
|---|---|---|---|---|
HMS – Mozambique | Kenmare Resources | LSE/Euronext Dublin | Moma Titanium Minerals Mine, Nampula; a major ilmenite producer | Producing major; far larger in scale |
HMS – Mozambique | Dingsheng Minerals / Chinese-operated Chibuto/Corridor operations | Private | Operation northwest of MRG's Corridor; 2018 media reported about 500 kt/yr ilmenite exported to China | Proves regional economics; potential competitor for logistics |
HMS – Mozambique | Rio Tinto (Mutamba project) | LSE/ASX | Southern Mozambique HMS development | Major with optionality; historically drilled Linhuane |
HMS – global | Iluka Resources | ASX | Zircon/rutile major; building a REE refinery at Eneabba | Benchmark producer and potential REE concentrate buyer |
HMS – global | Tronox | NYSE | Integrated TiO₂ producer | Potential offtaker or competitor |
REE – South Africa | Steenkampskraal (private) | Unlisted | High-grade monazite mine (14.5% TREO), 70 km from Garies | Closest geological analogue and competitor for capital and offtake |
REE – South Africa | Frontier Rare Earths (Zandkopsdrift) | Unlisted (Luxembourg) | Magnet REE and manganese project; Carester technology deal and US$20M IDC investment announced Feb 2026 (per MRG's Jun 2026 announcement) | More advanced; better funded |
REE – South Africa | Rainbow Rare Earths (Phalaborwa) | LSE | REE recovery from phosphogypsum | More advanced; different feedstock |
REE – Mozambique | Altona Rare Earths (Monte Muambe) | LSE | Mozambique carbonatite REE | Direct jurisdictional peer |
REE – Malawi | Lindian Resources (Kangankunde) | ASX | Large monazite carbonatite | ASX REE peer; much larger market cap |
REE – Malawi | Mkango Resources (Songwe Hill) | TSX-V/AIM | Advanced REE project | More advanced |
REE – Angola | Pensana (Longonjo) | LSE | NdPr project | More advanced |
Peer Comparison FY2025
| Metric | MRG Metals | Kenmare | Iluka | Lindian |
|---|---|---|---|---|
EBITDA margin | N/A (loss) | — | — | — |
Stage | Explorer plus carried JV | Producer | Producer | Developer |
Recent Developments
--



