NEL ASA Overview
| Item | Detail |
|---|---|
| Legal name | Nel ASA |
| Former names | DiaGenic ASA. Renamed Nel ASA in October 2014 after the reverse takeover of Nel Hydrogen (Source: market data profiles; company history) |
| Heritage / founding | History traces to Norsk Hydro's electrolysis activities from 1927 (Source: company boilerplate, all 2025–2026 press releases) |
| Incorporation jurisdiction | Norway (Allmennaksjeselskap, ASA) |
| Headquarters | Oslo, Norway. Street address not re-verified in this review; confirm against Annual Report 2025 |
| Primary listing | Oslo Børs, ticker NEL (Reuters NEL.OL) |
| Secondary trading | US OTC (NLLSF); German venues (e.g., Tradegate, D7G) |
| ISIN | NO0010081235 |
| CUSIP | Not applicable (non-US issuer; no SEC registration) |
| Fiscal year end | 31 December |
| Shares outstanding | ~1,838 million (end-2025 and 30 June 2026) (Source: S&P via StockAnalysis) |
| Employees | 313 (latest standardised figure, S&P via StockAnalysis, 2026). workforce cut by ~20% of Q3 2024 headcount from January 2025 (Source: Nel press release, 13 Jan 2025) |
| Auditor | confirm in Annual Report 2025 auditor's report |
| Share price | NOK 2.045 (close 6 October 2026) |
| Market capitalisation | ~NOK 3.76 billion (1,838m shares × NOK 2.045), ~USD 0.35bn at prevailing FX (approximation) |
| Enterprise value | ~NOK 2.65 billion (market cap minus net cash of ~NOK 1.11bn at 30 June 2026) |
| Website | www.nelhydrogen.com |
| Q3 2026 report | Scheduled mid/late October 2026. Sources conflict: 15 October (StockAnalysis) vs 21 October (German financial press). Confirm on Newsweb |
The entity profiled is Nel ASA, a public limited company listed on Oslo Børs. The type in the request ("Public company") is correct.
Nel ASA is one of the longest-established pure-play water-electrolysis companies globally. Its industrial lineage runs to Norsk Hydro's 1927 hydrogen plants. Since spinning off its fuelling business as Cavendish Hydrogen in 2024, Nel has been a focused electrolyser equipment supplier with two technology platforms. Atmospheric and pressurised alkaline systems are made at Herøya, Norway. PEM stacks and containerised systems are made at Wallingford, Connecticut, USA. The company sells equipment and services, not hydrogen. It increasingly relies on EPC partners (Samsung E&A, Saipem, Reliance under licence) to deliver complete plants. Nel's strategic bet is the PA-Series pressurised alkaline platform, launched commercially in May 2026. Nel claims it cuts system CAPEX by 40–60% versus current market solutions. The bet is backed by an EU Innovation Fund grant of up to EUR 135 million. Nel is cash-rich relative to its size (NOK 1.33bn at June 2026) but loss-making. Its revenue base is shrinking, and its CEO is departing.
Company's own description
In its standard disclosure language (2025–2026 releases), Nel calls itself a leading pure-play hydrogen technology company with a global presence. It says it specialises in PEM and alkaline electrolyser technology for renewable hydrogen production. It positions its products as enablers for decarbonising transportation, refining, steel and ammonia. In the Q2 2026 report, management described the strategy as delivering reliable, energy-efficient electrolyser equipment to customer projects globally. Partnerships with leading EPC companies are meant to let Nel focus resources on core technology and product performance.
Independent characterisation
Nel is a capital-goods OEM in an early-stage, policy-dependent market. It sits upstream in the green-hydrogen value chain. It designs and manufactures electrolyser stacks, the core electrochemical cells. It also supplies balance-of-stack and, for smaller products, complete containerised plants. Downstream are EPC contractors, which integrate electrolysers into hydrogen plants, and project developers and owners: industrial gas companies, refiners, ammonia/fertiliser producers, steelmakers, utilities and mobility operators.
The business has four distinct economic profiles:
-
Large-scale alkaline projects (Nel Alkaline Electrolyser). These are lumpy, contract-based and recognised over time on a percentage-of-completion basis. They are highly exposed to customer final investment decisions (FIDs), cancellations and insolvencies. This segment drove the revenue peak (NOK 1,009m in FY2024) and the subsequent collapse (NOK 562m in FY2025).
-
Containerised and mid-scale PEM systems (Nel PEM Electrolyser). These are standardised MC-Series and M-Series products. Orders are smaller (USD 7m–50m+), with faster turnover. Customers are mobility, industrial and steel buyers in the US and Europe.
-
Small "Industrial Products" PEM units. These are kW-scale generators for laboratories, power-plant generator cooling and industrial gas. In Q2 2026 they were the main driver of PEM revenue (Source: Q2 2026 report).
-
Defence and niche PEM stacks. Examples are electrolyser stacks for submarine life-support systems, sold via Collins Aerospace for US, UK and French naval programmes. This business is high-reliability, repeat and less policy-dependent. About USD 20m was booked in Q3 2026 (Source: Nel releases, 29–30 Sep 2026).
Revenue model mix
| Revenue type | Description | Approximate weight (analyst judgement) |
|---|---|---|
| Product / project equipment sales | Alkaline and PEM electrolyser systems, stacks, containerised units | Large majority (not precisely disclosed) |
| Aftermarket services | Spare parts, service contracts, NASOC remote monitoring, stack refurbishment | Minority share; not separately quantified in reviewed sources |
| Licensing | Alkaline technology licence to Reliance Industries (India); EPC design collaboration with Samsung E&A | Small; terms not disclosed |
| Subscription | None material | 0 |
| Other operating income | Public grants (e.g., EU Innovation Fund milestones), other income | NOK 137m in FY2025 (1,100 total minus 963 contract revenue) |
Customer types and end-markets
| End-market | Use case | Nel exposure |
|---|---|---|
| Ammonia / fertiliser | Green ammonia feedstock | Alkaline (e.g., historic Fertiberia Puertollano 20 MW PEM; Skovgaard Energy alkaline) |
| Refining and chemicals | Replacing grey hydrogen | Alkaline and PEM |
| Steel | Direct reduced iron, mill processes | PEM containerised units for a "major US steel producer" (USD 7m order, April 2026) |
| Mobility | Hydrogen for refuelling stations (trucks, buses) | PEM MC-Series (H2 Energy Switzerland; Mesure Process/Synqo Energies France) |
| Maritime / coastal industry | Norwegian coastal hydrogen hubs | PEM (HyFuel and Kaupanes, >USD 50m); GreenH Kristiansund and Slagentangen |
| Defence | Submarine oxygen generation / life support | PEM stacks via Collins Aerospace |
| Power generation | Generator cooling hydrogen | kW-scale PEM |
| e-fuels / SAF | e-methanol, eSAF | Targeted end-market for PA-Series |
| Energy storage / resilience | Long-duration storage, decentralised supply | Cited by management at the PA-Series launch (May 2026) |
Strategy
Stated strategy themes (AR2025, Q4 2025 and Q2 2026 reporting; paraphrased)
-
Technology leadership in core stacks. Concentrate R&D on improving current PEM and alkaline performance and maturing next-generation platforms, chiefly pressurised alkaline.
-
EPC partnership go-to-market. Deliver equipment to projects through leading EPC firms (Samsung E&A, Saipem; Reliance under licence) rather than acting as a full EPC contractor. This lowers execution risk and working capital.
-
Standardisation and productisation. Move from bespoke projects to factory-built, modular, skid or container products (PA-Series, MC-Series).
-
Capacity discipline and cash preservation. Match production and organisation to demand (Herøya halt and ~20% headcount cut, January 2025). Preserve cash "to be ready to return to growth when the market returns" (Q2 2026 report, paraphrased).
-
Continuity through the CEO transition. The board chair stated there will be no change to strategic direction, business model or priorities (Q2 2026 report).
Strategic initiatives register (last 24 months)
| Date | Initiative | Type | Detail / target |
|---|---|---|---|
| Jan 2025 | Capacity adjustment | Cost programme | Herøya production halted temporarily; workforce down ~20% vs Q3 2024; savings not quantified in reviewed sources |
| Mar 2025 | Samsung E&A EPC collaboration plus equity stake | Partnership / capital | NOK 353m equity; Samsung designs plants on Nel alkaline and PEM stacks; joint work on a larger alkaline balance-of-stack system |
| May 2025 | CompassH2 launch (Samsung E&A) | Partner product | Standardised plant using Nel alkaline technology |
| Nov 2025 | Norwegian coastal hydrogen projects | Commercial | HyFuel/Kaupanes PEM (>USD 50m); GreenH technology provider |
| Dec 2025 | PA-Series FID | Platform investment | Up to 1 GW/yr at Herøya; ~NOK 300m capex before grants; EU Innovation Fund up to EUR 135m (up to 60% of eligible costs; total 4 GW/yr roadmap) |
| Dec 2025 / Feb 2026 | Review and impairment of atmospheric alkaline assets | Portfolio | NOK 799m impairments, incl. Herøya atmospheric lines and PEM goodwill/intangibles |
| May 2026 | PA-Series commercial launch | Product | Indicative <USD 1,450/kW turnkey (25 MW); 40–60% CAPEX reduction claim |
| Jun 2026 | Iwatani settlement | Risk removal | USD 7.5m; removes US litigation tail |
| Sep 2026 | Hydrasun framework (Aberdeen) | Manufacturing footprint | European MC-Series integration; asset-light |
| Sep 2026 | Defence: Collins Aerospace orders | Commercial / diversification | ~USD 20m submarine stack orders; deliveries 2027–2028 |
| Ongoing | Saipem and Reliance collaborations | Partnerships | Named as strategic collaborators in Q2 2026 report |
Medium-term financial targets / guidance
Nel currently provides no quantitative medium-term financial targets or revenue/EBITDA guidance. Market commentary on the Q2 2026 release noted the absence of a concrete outlook. The only quantified forward-looking items are the PA-Series capex (~NOK 300m over 2026–2027, before grants), delivery at scale expected in 2027, and the EU grant structure.
ESG commitments
The company publishes sustainability reporting with a double-materiality assessment and EU Taxonomy disclosures (website).
Products & Services
Specifications marked "datasheet" are from Nel product literature as historically published.
Nel Alkaline Electrolyser segment
| Product / platform | Description | Key specifications / capabilities | Target customer | Launch / status | Pricing |
|---|---|---|---|---|---|
| PA-Series (Next Generation Pressurised Alkaline) | Modular, skid-based pressurised alkaline system. Factory-assembled and tested; designed for outdoor installation | 15 bar operating pressure (less downstream compression). Hydrogen delivered at 30 bar, 99.99% purity (cost basis). Nel claims estimated turnkey full-scope cost below USD 1,450/kW for a 25 MW plant and 40–60% system CAPEX reduction versus market. Patent-pending proprietary production methods (Source: Nel release, 6 May 2026) | Large industrial projects (ammonia, methanol, refining, eSAF, steel), energy-security and defence-adjacent uses | Development from 2018; full-scale prototype at Herøya 2025; FID Dec 2025; commercial launch 6 May 2026; delivery at scale expected 2027 | Project-based; indicative USD <1,450/kW turnkey (25 MW reference) |
| A-Series atmospheric alkaline | Legacy flagship. Large atmospheric alkaline electrolysers with Hydro-heritage technology; Herøya-made electrodes and stacks | Multi-MW plants; installed base dating back decades (datasheet: A150 to A3880 family; specifications not re-verified) | Large industrial users; ammonia; refineries | Long-standing; Herøya production halted Jan 2025; two 500 MW atmospheric lines idle and partly impaired (Q4 2025) | Project-based; not disclosed |
| Samsung E&A CompassH2 (partner product) | Samsung E&A's standardised hydrogen plant design using Nel alkaline technology | Integrated, bankable plant offering by EPC (Source: Nel release, 15 May 2025) | Project developers seeking single-point EPC | Launched May 2025 | Via Samsung E&A |
| Reliance licensed alkaline (India) | Licence for Reliance to manufacture Nel-design alkaline electrolysers in India | Licence for the Indian market (terms not disclosed) | Reliance's own projects / Indian market | Licence 2023 | Licence fees; not disclosed |
Nel PEM Electrolyser segment
| Product / platform | Description | Key specifications / capabilities | Target customer | Launch / status | Pricing |
|---|---|---|---|---|---|
| MC-Series (containerised PEM) | Fully containerised, modular PEM plant; Nel's standardised PEM "platform" | MC400 described as a fully containerised 2 MW unit in a prior H2 Energy order release. Family historically includes MC250/MC400/MC500 (datasheet; not re-verified). Integration in the US and, from 2026, by Hydrasun (Aberdeen) | Mobility hubs, industrial users, steel mills, coastal hubs | Commercial; multiple repeat orders 2025–2026 (H2 Energy x3; Mesure Process x2; US steel producer) | ~USD 7m per multi-unit order (e.g., April 2026 orders); not list-priced |
| M-Series (multi-MW PEM) | Larger PEM systems built on Nel's large-area stack | Multi-MW (datasheet; not re-verified) | Industrial, refinery, Power-to-X | Commercial | Project-based |
| Large-scale PEM projects (20–100 MW category) | Multi-container / multi-module PEM installations | e.g., HyFuel and Kaupanes order >USD 50m (reported in trade press as ~40 MW) | Norwegian coastal hydrogen hubs, maritime fuel | Ordered Nov 2025 | Project-based |
| C-Series / H-Series / S-Series (kW-scale, "Industrial Products") | Small on-site PEM hydrogen generators | kW-scale outputs for laboratory, process gas, generator cooling (datasheet) | Utilities (generator cooling), labs, semiconductor/industrial gas users | Mature; main Q2 2026 PEM revenue driver | Unit sales; not disclosed |
| Naval / submarine PEM stacks | PEM electrolyser stacks for oxygen-generation life-support systems on submarines, supplied via Collins Aerospace | High reliability and long life; manufactured at Wallingford (Source: Nel releases, 29–30 Sep 2026) | Navies (US, UK, France) via Collins Aerospace | Ongoing; ~USD 20m orders Q3 2026; deliveries 2027–2028 | Contract-based |
Services
| Service | Description | Customer |
|---|---|---|
| NASOC (remote monitoring) | Nel's remote monitoring and operations support centre for installed electrolysers | Installed-base owners |
| Spare parts and support | Parts, field service, technical support | Installed base globally |
| FEED studies | Paid front-end engineering design for prospective projects (referenced in the Jan 2025 release) | Project developers |
| Stack refurbishment / lifetime services | Not separately disclosed in reviewed materials | Installed base |
Financial Narrative
Source for all tables in this section unless noted: S&P Global Market Intelligence and Fiscal.ai standardised data via StockAnalysis.com (updated 15 July 2026), cross-checked against Nel releases. FY2021–FY2022 may include the fuelling business, later discontinued. FY2023 onward reflects continuing operations (alkaline plus PEM). Units: NOK million unless stated.
Income statement
Notes:
-
FY2022 impairment includes NOK 296.4m goodwill impairment plus NOK 30.9m other write-downs.
-
FY2021 pre-tax loss includes a NOK -1,113m loss on investments, mainly related to the Everfuel stake.
-
FY2023 net income includes NOK -289.1m from discontinued operations (fuelling).
-
FY2024 includes NOK +13.3m from discontinued operations.
-
In 2024 Cavendish Hydrogen shares were distributed in kind. No cash dividend was paid to Nel shareholders, although the cash-flow statement shows NOK 625.4m classified as dividends.
Margins and growth
Revenue CAGR FY2021–FY2025: about 6.3% per year on the S&P basis (753.1 to 963.11). The CAGR overstates continuity because FY2021–FY2022 likely include fuelling. On the continuing-operations basis, revenue fell from NOK 1,350m (FY2023) to NOK 963m (FY2025), a two-year CAGR of about -15.5%.
Trend commentary.
Revenue inflection: Growth peaked in FY2023 (+47.5%) as alkaline project deliveries ramped, then flattened in FY2024. FY2025 revenue collapsed by 30.7%. Management attributed the fall to alkaline-specific problems: contract cancellations (e.g., Statkraft 40 MW, April 2025), a customer bankruptcy, and a lack of new large alkaline orders (Q4 2025 earnings call). TTM revenue to June 2026 fell further to NOK 935m.
Gross margin: Gross margin expanded strongly from 26% (FY2021) to 62.8% (FY2024). Revenue mix and project margin improvements helped. So did accounting effects: cost of revenue excludes significant production overheads and idle-capacity costs, which sit in operating expenses. The high gross margin therefore does not translate into operating profitability.
Operating loss: EBIT losses narrowed from NOK -951m (FY2022) to NOK -389m (FY2024), then widened to NOK -587m in FY2025 as revenue fell against a semi-fixed cost base. TTM EBIT is NOK -602m.
Impairments: FY2025 net loss (NOK -1,265m) was dominated by NOK 799m of impairments. These covered alkaline production assets at Herøya (the atmospheric lines made largely redundant by the PA-Series pivot) and PEM goodwill and technology intangibles. Goodwill fell from NOK 411.8m to NOK 61.4m.
Q2 2026: Q2 2026 EBITDA of NOK -155m included NOK 70m tied to the Iwatani settlement. Adjusted EBITDA (≈NOK -85m) was broadly in line with Q2 2025 (NOK -86m).
Balance sheet
At 30 June 2026: cash NOK 1,328m, total debt NOK 218.5m (all lease liabilities), net cash NOK 1,110m, equity NOK 3,602m, total assets NOK 4,639m, inventory NOK 889.5m (Source: S&P via StockAnalysis; Q2 2026 report).
Commentary.
No financial debt: All "debt" is IFRS 16 lease liabilities; long-term bank debt was nil from FY2024.
Cash burn: Cash fell from NOK 3.39bn (end-2023) to NOK 1.33bn (June 2026), a drop of about NOK 2.06bn in 2.5 years. Part of this was cash transferred with the Cavendish spin-off in 2024 (~NOK 625m), so the underlying burn was lower.
Inventory build: Inventory rose to NOK 919m at end-2025 despite collapsing revenue. Contributing factors include alkaline equipment repossessed from a defaulting customer (January 2025 release) and components for cancelled or delayed projects. This is a key monitorable for future write-downs.
Asset write-down: Total assets fell 21% in FY2025, mainly from impairments.
Cash flow
The FY2024 NOK -625.4m "dividends" line reflects cash leaving the group in connection with the Cavendish Hydrogen spin-off, not a cash dividend to Nel shareholders; this is an analyst interpretation. TTM to June 2026: OCF NOK -305m, capex NOK -130m, FCF NOK -435m.
Commentary.
Equity funding: Nel funded its 2021–2023 expansion with about NOK 4.4bn of new equity. The only raise since then was the Samsung E&A placement (NOK 353m, 2025).
Lower burn, but not by enough: FY2025 FCF burn (NOK -398m) was the lowest in five years thanks to lower capex and working-capital release (receivables down NOK 206m). TTM burn has worsened to NOK -435m.
Capex outlook: PA-Series capex of about NOK 300m before grants is due over 2026–2027. EU Innovation Fund milestone payments (first payment above EUR 10m) partly offset it.
Ratios
Sources: ROE, ROA, ROIC, liquidity, leverage and turnover ratios are from S&P via StockAnalysis. Interest coverage, DIO, DSO, DPO and CCC are analyst calculations from year-end balances (DIO = 365 / inventory turnover; DSO = receivables / revenue × 365; DPO = payables / cost of revenue × 365). Net debt/EBITDA is not meaningful because EBITDA is negative and the company is net cash.
Ratio commentary. Liquidity is ample: the current ratio is about 4x and there is no financial debt. Capital efficiency is very poor. The cash conversion cycle has lengthened dramatically, from about 440 days to about 668 days, driven by inventory accumulation. Combined with an S&P Altman Z-score of 1.44 and a Piotroski F-score of 2, the data point to deteriorating operating fundamentals despite a sound headline balance sheet.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Income Statement and Per-Share Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue from contracts (NOK Mn) | 753.1 | 914.85 | 1,350 | 1,390 | 963.11 |
Total revenue and income as reported (NOK Mn) | 798 | 993.58 | 1,427 | 1,495 | 1,100 |
Cost of revenue (NOK Mn) | 557.27 | 595.39 | 730.17 | 517.7 | 408.32 |
Gross profit (NOK Mn) | 195.82 | 319.47 | 619.64 | 872.21 | 554.79 |
SG&A (NOK Mn) | 434.47 | 612.97 | 486.65 | 577.83 | 511.58 |
Operating income / EBIT (NOK Mn) | -580.61 | -951.36 | -446.17 | -389.43 | -586.58 |
EBITDA, S&P standardised (NOK Mn) | -493.66 | -801.23 | -254.18 | -202.68 | -327.72 |
EBITDA, company-reported (NOK Mn) | — | — | — | -173 | -275 |
Asset write-downs / impairments (NOK Mn) | -4.5 | -327.3 | -1.42 | 0 | -799.41 |
Pre-tax income (NOK Mn) | -1,684 | -1,187 | -574.27 | -264.19 | -1,296 |
Net income (NOK Mn) | -1,667 | -1,171 | -855.2 | -244.34 | -1,265 |
EPS basic (NOK) | -1.14 | -0.76 | -0.52 | -0.15 | -0.70 |
EPS diluted (NOK) | -1.14 | -0.76 | -0.52 | -0.15 | -0.70 |
Dividends per share, cash (NOK) | 0 | 0 | 0 | 0 | 0 |
Weighted avg shares (M) | 1,461 | 1,538 | 1,652 | 1,671 | 1,806 |
Margin Analysis (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue growth YoY (%) | 30.22 | 21.48 | 47.54 | 2.97 | -30.71 |
Gross margin (%) | 26.00 | 34.92 | 45.91 | 62.75 | 57.60 |
Operating margin (%) | -77.10 | -103.99 | -33.05 | -28.02 | -60.90 |
EBITDA margin, S&P (%) | -65.55 | -87.58 | -18.83 | -14.58 | -34.03 |
Net margin (%) | -221.33 | -128.02 | -63.36 | -17.58 | -131.36 |
Balance Sheet
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Total assets (NOK Mn) | 6,007 | 6,951 | 7,857 | 6,304 | 4,957 |
Cash and equivalents (NOK Mn) | 2,723 | 3,139 | 3,363 | 1,876 | 1,617 |
Cash plus short-term investments (NOK Mn) | 3,331 | 3,686 | 3,387 | 1,876 | 1,629 |
Short-term debt, current leases (NOK Mn) | 19.92 | 30.44 | 38.07 | 44.48 | 42.96 |
Long-term debt incl. leases (NOK Mn) | 136.70 | 192.61 | 221.60 | 215.52 | 190.19 |
Total debt (NOK Mn) | 156.61 | 223.05 | 259.66 | 260 | 233.15 |
Net debt, negative = net cash (NOK Mn) | -3,174 | -3,463 | -3,128 | -1,616 | -1,396 |
Shareholders' equity (NOK Mn) | 5,039 | 5,450 | 6,198 | 4,977 | 3,933 |
Goodwill (NOK Mn) | 615.18 | 365.58 | 375.31 | 411.75 | 61.36 |
Other intangibles (NOK Mn) | 528.96 | 568.88 | 639.74 | 617.42 | 523.09 |
Goodwill plus intangibles (NOK Mn) | 1,144.14 | 934.46 | 1,015.05 | 1,029.17 | 584.45 |
Inventory (NOK Mn) | 328.47 | 504.6 | 703.99 | 531.75 | 918.79 |
Receivables (NOK Mn) | 398.08 | 591.1 | 903.8 | 756.87 | 328.81 |
Working capital (NOK Mn) | 3,439 | 3,786 | 4,049 | 2,406 | 2,222 |
Order backlog (NOK Mn) | 1,230 | 2,613 | 2,093 | 1,614 | 1,319 |
Cash Flow
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Operating cash flow (NOK Mn) | -449.46 | -690.58 | -669.67 | -241.58 | -252.8 |
Capital expenditure, PP&E (NOK Mn) | -258.28 | -160.49 | -573.59 | -527.34 | -145.16 |
Capitalised development / intangibles (NOK Mn) | -118.87 | -118.25 | -166.24 | -119.24 | -145.25 |
Free cash flow, OCF minus PP&E capex (NOK Mn) | -707.74 | -851.07 | -1,243 | -768.92 | -397.95 |
Equity issued (NOK Mn) | 1,255 | 1,546 | 1,609 | 0 | 353.07 |
Dividends / distributions paid (NOK Mn) | 0 | 0 | 0 | -625.42 | 0 |
Share buybacks (NOK Mn) | 0 | 0 | 0 | 0 | 0 |
Lease principal repaid (NOK Mn) | -19.93 | -16.29 | -27.31 | -20.94 | -29.46 |
Net change in cash (NOK Mn) | 389.92 | 415.78 | 224.88 | -1,488 | -258.12 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
ROE (%) | -32.37 | -22.94 | -10.00 | -4.85 | -29.09 |
ROA (%) | -9.70 | -20.00 | -6.08 | -5.64 | -24.24 |
ROIC (%) | -20.55 | -51.76 | -15.98 | -12.36 | -46.18 |
Current ratio (x) | 5.88 | 4.18 | 4.05 | 3.40 | 3.91 |
Quick ratio (x) | 4.42 | 3.10 | 3.18 | 2.60 | 2.52 |
Debt / equity (x) | 0.03 | 0.04 | 0.04 | 0.04 | 0.05 |
Net debt / equity (x) | -0.51 | -0.53 | -0.50 | -0.32 | -0.35 |
Interest coverage, EBIT / interest expense (x) | -144.1 | -85.2 | -29.9 | -23.6 | -35.2 |
Asset turnover (x) | 0.13 | 0.15 | 0.19 | 0.21 | 0.20 |
Inventory turnover (x) | 1.95 | 1.40 | 1.18 | 0.82 | 0.55 |
Days inventory outstanding (days) | 187 | 261 | 309 | 445 | 664 |
Days sales outstanding (days) | — | — | 233 | 190 | 117 |
Days payables outstanding (days) | — | — | 102 | 78 | 113 |
Cash conversion cycle (days) | — | — | 440 | 557 | 668 |
Region Overview
| Region | Segment exposure | Evidence (dated) | Direction |
|---|---|---|---|
Norway / Nordics | PEM (coastal hubs), Alkaline (legacy), PA-Series (prospective) | HyFuel/Kaupanes >USD 50m (Nov 2025); GreenH Kristiansund and Slagentangen (Nov 2025); Statkraft 40 MW cancelled (Apr 2025) | Mixed: PEM up, alkaline down |
Continental Europe | PEM containerised; Alkaline projects | H2 Energy (Switzerland) third MC order (Oct 2025); Mesure Process/Synqo (France) USD 7m (Apr 2026); German customer insolvency affecting alkaline (FY2025) | PEM growing; alkaline impaired by insolvencies and cancellations |
UK | PEM integration (supply side); naval | Hydrasun framework (Sep 2026); UK naval programmes via Collins (Sep 2026) | Emerging |
North America | PEM (manufacturing base), naval stacks, industrial products | USD 7m PO for a US steel producer (Apr 2026); Collins Aerospace ~USD 20m (Sep 2026); Iwatani legacy dispute settled | Defence and industrial PEM strengthening; large-scale US green hydrogen projects hit by policy uncertainty (analyst view) |
Middle East / Asia | Alkaline via partners | Samsung E&A (Korea) EPC collaboration; Reliance (India) licence | Optionality rather than current revenue |
Australia | PEM | Historical Viva Energy Australia containerised PEM order (pre-2025) | Low current visibility |
Share Price and Market Valuation
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Year-end share price (NOK) | 15.20 | 13.85 | 6.89 | 2.70 | 2.23 |
Year-end market cap (NOK Mn) | 22,200 | 21,642 | 11,513 | 4,518 | 4,103 |
Year-end enterprise value (NOK Mn) | 19,634 | 18,726 | 8,409 | 2,903 | 2,718 |
P/S at year-end (x) | 27.82 | 21.78 | 8.07 | 3.02 | 3.73 |
P/B at year-end (x) | 4.41 | 3.97 | 1.86 | 0.91 | 1.04 |
EV/Sales at year-end (x) | 24.60 | 18.85 | 5.89 | 1.94 | 2.47 |
Share Price & Returns
| Period | Performance | Basis |
|---|---|---|
1 year | ~+2% | S&P 52-week change (+1.91% at 20 Sep 2026) |
~3 years | ~-70% | vs FY2023 year-end close NOK 6.89 (analyst calculation) |
~5 years | ~-87% | vs FY2021 year-end close NOK 15.20 (analyst calculation) |
2026 high | 25 May 2026 (post-PA launch) | Shares were about 41–46% below the 52-week high in Jul–Aug 2026, per press |
Valuation Multiples
| Multiple | Nel ASA | Comment |
|---|---|---|
EV/Sales (TTM) | ~2.8x | EV ~NOK 2.65bn / TTM revenue NOK 935m |
P/S (TTM) | ~4.0x | — |
P/B | ~1.04x | Book equity NOK 3.60bn (Jun 2026) |
P/Tangible book | ~1.3x | TBV ~NOK 2.97bn |
Capital Markets
| Item | Detail |
|---|---|
Dividend policy | No cash dividends; none expected while loss-making |
Dividend history | No cash dividends FY2021–FY2025. In 2024 Cavendish Hydrogen shares were distributed in kind (spin-off) |
Dilution | Share count up ~6.7% YoY (Samsung placement, 2025); ~5–8% annual dilution FY2021–FY2023 from equity raises |
Moody's / S&P / Fitch ratings | Not rated (no public debt) |
Debt maturity profile | No bonds or bank debt. Lease liabilities NOK 218m (Jun 2026): current portion ~NOK 41m; non-current ~NOK 178m |
Liquidity | Cash NOK 1,328m; current ratio ~4.0x |
Analyst Conclusions
Management guidance
There is no numeric revenue or EBITDA guidance. Qualitative messages from the Q2 2026 report (paraphrased):
-
Encouraging commercial momentum, with two significant purchase orders and the PA-Series launch.
-
Strategy unchanged despite the CEO transition.
-
Cash plus cost-base adjustments allow Nel to fund operations, invest in technology and resume growth when the market recovers.
-
PA-Series delivery at scale is expected in 2027, with capex incurred in 2026–2027.
Consensus expectations
The aggregator consensus implies about 16.5% annual revenue growth over three years from a depressed base (S&P via StockAnalysis), with a "Sell" consensus rating.
Bull case
-
PA-Series becomes the cost leader. If the claimed <USD 1,450/kW turnkey cost and 40–60% CAPEX reduction hold up in the field, Nel could win a disproportionate share of the next wave of European FIDs. A 1 GW line costing ~NOK 300m before up-to-60% grant support would be low-cost capacity relative to Nel's NOK ~3.8bn market value.
-
PEM momentum plus defence give a revenue floor. PEM backlog of NOK 990m (Q2 2026) plus ~USD 20m of Q3 naval orders support PEM revenue through 2027–2028. Defence demand is less policy-dependent and repeats.
-
Balance sheet, Samsung and valuation provide downside support. The stock trades near book value (~1.0x P/B, ~2.8x EV/Sales). Net cash of ~NOK 1.1bn covers about 30% of market cap. A strategic owner (Samsung E&A) sits on the register, and its standstill expires around March 2027.
Bear case
-
Cash runway and dilution. At a TTM FCF of NOK -435m plus PA capex, cash of NOK 1.33bn implies roughly 2–3 years of runway before new equity is needed, absent a revenue recovery. Historical precedent (NOK ~4.4bn raised 2021–2023) suggests dilution risk.
-
Alkaline revenue cliff and inventory risk. The alkaline backlog has fallen to NOK 224m, implying alkaline revenue near trough levels until PA orders convert, likely not before 2027. NOK ~0.9bn of inventory with ~664 days DIO carries further write-down risk.
-
Leadership and competition. CEO-less execution of a first-of-kind industrialisation, against bigger competitors (nucera, Siemens Energy) and Chinese price leaders, raises execution and pricing risk. The "Sell" consensus reflects this scepticism.
Catalysts and monitorables (next 12 months)
| Timing | Catalyst / monitorable | What to watch |
|---|---|---|
| Oct 2026 | Q3 2026 results | Collins orders in intake (~USD 20m); EBITDA ex-one-offs; cash burn; inventory trend |
| Q4 2026 – Q1 2027 | CEO appointment | Candidate profile (industrialisation/commercial); any strategy change |
| By early Jan 2027 | Volldal departure effective | Continuity of commercial pipeline |
| 2026–2027 | First PA-Series purchase orders | Size, customer quality, pricing vs claimed cost |
| 2026–2027 | EU Innovation Fund milestone payments | Receipt of the first payment (>EUR 10m) and subsequent tranches |
| Feb 2027 | FY2026 results / AR2026 | Further impairments (idle atmospheric lines, inventory); updated strategy or targets |
| ~Mar 2027 | Expiry of Samsung E&A 2-year lock-up/standstill | Potential stake increase or exit |
| Ongoing | PEM order flow (MC-Series via Hydrasun; Norwegian hubs) | Book-to-bill > 1 sustained |
| Ongoing | Policy: EU Hydrogen Bank auctions, RED III transposition, US incentives | Project FIDs |
Concluding analyst verdict
Nel ASA enters late 2026 as a company whose strategic logic has improved while its financial profile has deteriorated. The FY2025 reset was severe: revenue down 31% to NOK 963m, a NOK 1.27bn net loss and NOK 799m of impairments. It also cleared away much of the overbuilt atmospheric-alkaline legacy. What remains is a leaner dual-technology OEM with no financial debt and about NOK 1.3bn of cash. It has a credible PEM franchise with a backlog near NOK 1bn and a valuable defence niche. Its pressurised alkaline platform, if the claimed economics hold, could reposition Nel as a cost leader in large-scale electrolysis.
The investment case therefore hinges on three binary questions over the next 12–18 months:
-
Does the PA-Series convert from launch publicity into signed, profitable orders from bankable customers, ideally through Samsung E&A or Saipem?
-
Can the board appoint a CEO with industrialisation credibility before Volldal's departure without strategic drift?
-
Can cash burn be held near NOK 400–450m a year so the runway reaches 2027–2028 PA deliveries without a heavily discounted equity raise?
On current evidence the stock is priced for scepticism: roughly book value, about 2.8x EV/Sales, and a consensus "Sell". That pricing is justified by the absence of guidance, a shrinking alkaline backlog, a lengthening cash cycle and leadership uncertainty.
Our assessment is a Neutral / Hold with a speculative positive skew for long-horizon holders. Downside is cushioned by net cash and a strategic shareholder. Upside requires evidence that the PA-Series cost claims hold up in commercial contracts. The key near-term tests are Q3 2026 order intake, the CEO appointment and the first PA-Series order. Investors should treat any new large alkaline order with skilled-EPC backing as the most important single signal of a fundamental turn.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Title | In role since | Prior roles | Education |
|---|---|---|---|---|
Håkon Volldal | President & CEO (resigning; serving 6-month notice; joins Elopak as CEO by early Jan 2027) | 1 Jul 2022 | President & CEO, Q-Free ASA; EVP, TOMRA | MSc Industrial Economics & Technology Management, NTNU |
Kjell Christian Bjørnsen | CFO | 1 Mar 2020 | CFO, Kavli Group; CFO, REC ASA; strategy/BD roles in global industrials | MSc Chemical Engineering, NTNU |
Marius Løken | CTO | Jun 2023 | 23+ years at TOMRA Systems (Head of Europe/APAC, Head of Technology, Head of Product Management) | MSc Mechanical Engineering, NTNU (thesis at Michigan Tech) |
Todd Cartwright | Chief Commercial Officer | 2 Jan 2024 | Commercial VP, Technip Energies; CB&I | BS Mechanical Engineering |
Anne Liberg | Chief People & Culture Officer | 2 Apr 2024 | McKinsey & Co. (1995–2016); Arundo Analytics (Chief of Staff, CHRO) | Computer & Information Sciences, Norwegian School of IT |
Stein Ove Erdal | Chief Legal Officer | May 2019 | Associate General Counsel, Nexans Norway; Arntzen de Besche | Cand. Jur., University of Oslo |
Tushar Ghuwalewala | SVP PEM Operations | Full PEM ops responsibility Oct 2024 (with Nel since 2000) | ABB Lummus Global (NASA projects) | BSc and MSc Mechanical Engineering, Tulane |
Mats Bohman | VP Alkaline Operations | Dec 2025 (joined 2023) | Veoneer, Autoliv (GM, Plant Manager, Purchasing Director) | MSc Mechanical Engineering, Chalmers |
Board of Directors
| Name | Role | Since | Born | Background | Shares held | Committees |
|---|---|---|---|---|---|---|
Arvid Moss | Chair | 2023 | 1,958 | Norsk Hydro corporate management since 2008; EVP Energy 2010–2024; chair Hydro REIN; Chair, Norwegian Export Council; former State Secretary | 100,000 | Not specified |
Hanne Blume | Director | — | 1,968 | EVP & Group CHRO, DLG Group; 12 years CHRO at Ørsted | 0 | Remuneration Committee |
Charlotta Falvin | Director | 2020 | 1,966 | Multiple listed tech boards; ex-CEO The Astonishing Tribe | 46,000 | Audit, Risk & Sustainability |
Gyuyeon Kang | Director (Samsung E&A nominee) | 2025 | 1,965 | EVP Sales & BD, Samsung E&A; ex-Head of Finance & Accounting | 0 direct (related to Samsung E&A's 167,148,210 shares) | Not specified |
Beatriz Malo de Molina | Director | 2017 | 1,972 | Goldman Sachs IBD, EY, Alvarez & Marsal, Orkla, Kistefos, McKinsey | 0 | Audit, Risk & Sustainability |
Jens Bjørn Staff | Director | — | 1,967 | Group CEO, Skagerak Energi; ex-CFO Orkla and Statkraft | 0 | Not specified |
Hans Erik Vatne | Director | — | 1,968 | COO, Vianode; ex-SVP and CTO, Norsk Hydro (led next-generation electrolysis pilot at Karmøy) | 0 | Not specified |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
15 Jun 2026 | CEO Håkon Volldal resigns; joins Elopak as CEO (by early January 2027); serves 6-month notice | Board says strategy unchanged; successor search ongoing; no successor announced as of 7 Oct 2026 |
Dec 2025 | Mats Bohman appointed VP Alkaline Operations | Industrialisation of PA-Series |
| 2025 | Gyuyeon Kang joins board | Samsung E&A strategic stake |
| 2026 | Hans Erik Vatne joins board | Adds electrolysis industrialisation expertise |
Oct 2024 | Tushar Ghuwalewala assumes full responsibility for PEM Operations | PEM restructuring |
Major Shareholders
| Holder | Shares | Stake (%) | Source / note |
|---|---|---|---|
Samsung E&A Co., Ltd. | 167,148,210 | ~9.09 | Nel governance page; 2-year lock-up/standstill from March 2025 |
Arvid Moss (Chair) | 100,000 | ~0.005 | Governance page |
Charlotta Falvin | 46,000 | ~0.003 | Governance page |
Institutional ownership (aggregate) | — | ~21.8 | S&P via StockAnalysis |
Insider ownership (aggregate) | — | ~0.01 | S&P via StockAnalysis |
Competitive Landscape
Key Competitors
| Competitor | HQ | Technology | Segment overlap | Positioning notes |
|---|---|---|---|---|
thyssenkrupp nucera | Germany | Alkaline (AWE), chlor-alkali; developing SOEC and modular high-pressure | Alkaline (large-scale) | Largest Western alkaline supplier by revenue; Stegra (>700 MW) and Moeve (300 MW) projects |
Siemens Energy | Germany | PEM (Silyzer) | PEM large-scale | Gigawatt factory in Berlin; division of large conglomerate |
ITM Power | UK | PEM | PEM | Listed UK pure play; Neptune/Poseidon standardised plants |
Plug Power | USA | PEM (plus fuel cells, liquid H2) | PEM | Large US hydrogen platform; heavy losses |
Electric Hydrogen | USA | Large-format PEM | PEM large-scale | Private; 100 MW-class plant product |
Sunfire | Germany | Pressurised alkaline and SOEC | Alkaline (direct competitor to PA-Series) | Private; pressurised alkaline production |
John Cockerill Hydrogen | Belgium/France | Pressurised alkaline | Alkaline | Acquired McPhy assets (2025, per industry reports); large Chinese-scale capacity ambitions |
LONGi Hydrogen | China | Alkaline | Alkaline | Low-cost Chinese supplier |
PERIC Hydrogen Technologies | China | Alkaline | Alkaline | Leading Chinese alkaline OEM |
Sungrow Hydrogen | China | Alkaline and PEM | Both | Integrated with renewable power electronics |
Stargate Hydrogen | Estonia | Alkaline | Alkaline | Ceramic-based alkaline; emerging |
Cummins (Accelera) | USA | PEM and alkaline | Both | — |
Peer Comparison FY2025
| Metric | Nel ASA (FY2025) | thyssenkrupp nucera (FY2024/25, Sep YE) | thyssenkrupp nucera gH2 segment (FY2024/25) |
|---|---|---|---|
Revenue | NOK 963m (~EUR 82m at approx. 11.7 NOK/EUR) | ~EUR 846m (gH2 459 + CA 387) | EUR 459m |
Revenue growth | -30.7% | Revenue declining in FY2025/26 (guidance EUR 450–550m) | gH2 guidance FY2025/26 EUR 120–170m |
EBIT / EBIT margin | NOK -587m / -60.9% | EBIT EUR +2m (~0.2%) | EBIT EUR -56m (~-12%) |
R&D intensity | ~15% (capitalised development proxy) | Q1 FY2025/26 R&D EUR 9m (+31%) | — |
Net cash | NOK 1.11bn (Jun 2026) | — | — |
“—” = not publicly disclosed.
Recent Developments
Layoffs and hiring: the last announced reduction was in January 2025 (~20% of Q3 2024 headcount).



