Norwest Minerals Limited Overview
| Metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
| Disclosed headcount (persons) | — | — | — |
Headcount is not disclosed. The company describes the CEO as a full-time employee and relies heavily on consultants: Orelogy (mining), KCAA and ALS (metallurgy), MBS Environmental (approvals), Hyland Geological and Mining Consultants (resource estimation) and Southern Geoscience (geophysics). A director, Mr Hok Kiang Sia, is engaged as a geological consultant (A$90,000 in H1 FY2026).
Norwest Minerals is a Perth-based, ASX-listed junior that is trying to become a small gold producer at its 100%-owned Bulgera Gold Project. Bulgera sits on a granted mining lease (M52/1085) at the north-eastern end of the Plutonic Well greenstone belt in Western Australia's Mid West/Eastern Gascoyne. Since 2025 the company has reframed Bulgera from a toll-treatment or deeper-lode exploration story into a low-capital heap leach development. The current resource for that purpose is a 191,000-ounce constrained Mineral Resource Estimate (8.7Mt at 0.68 g/t Au, 76% Indicated), and bottle-roll recoveries were 86%. Orelogy is leading a Scoping Study, which has been delayed pending column leach data. The company also holds optionality assets: the Marymia East gold satellite, the Dales Gossan silver-base metal discovery in the West Arunta, Bali copper-gold, and the small Marriott nickel resource. The investment case is constrained by a very low cash balance, heavy dilution and dependence on a related-party major shareholder for funding.
What the company does
Norwest Minerals is a mineral exploration and early-stage development company. Its stated principal activity is "engaging in the business of seeking to exploit and mine natural resources" (Interim Financial Report H1 FY2026, Directors' Report). It has no mining production, no sales revenue and no customers. In accordance with ASX Listing Rule 5.3.2, the company reported no substantive mining production or development activity during the half-year to 31 December 2025.
Its value lies in its portfolio of Western Australian mineral tenements and the JORC-compliant Mineral Resources defined on them. The board aims to turn Bulgera into cash flow through a heap leach operation and to use that cash to fund exploration of the remaining portfolio.
Company's own description (latest filings)
The Morningstar company profile summarises the company as a Western Australian explorer focused on rare earth elements, copper, gold and base metals. Its key projects are Bulgera (gold resources), Marymia East (gold and base metals) and Arunta West (silver, base metals and titanium mineralisation), and it also owns the Bali copper and Marriott nickel projects, where it is advancing exploration and seeking development partners. The H1 FY2026 Directors' Report calls Bulgera "the Company's flagship asset" and says activity is focused on "de-risking the pathway to a low-cost heap leach operation."
Independent characterisation
Norwest has evolved from a diversified, grassroots explorer spun out of Australian Mines in 2018 into a single-asset gold developer with exploration options attached. The commercial logic rests on three facts:
-
Gold price. The Australian-dollar gold price rose from about A$2,175/oz when Bulgera was acquired in 2019 to above A$5,000/oz in 2025–26. Low-grade oxide and transitional material that was waste in the 1990s–2000s is now potentially economic (October 2025 Investor Presentation).
-
Brownfield location. Bulgera supplied oxide ore to the Plutonic plant from about 2002 to 2004 via a haul road that still exists. It also sits near gas-fired power, bore fields, an airstrip and camps. A 2024 Orelogy study found the conceptual heap leach fits within ground already disturbed by historical mining.
-
Permitting progress. Mining Lease M52/1085 (2,435 ha) was granted on 16 April 2025 after the Marputu Aboriginal Corporation approved the State Deed (announced 11 March 2025).
Business and revenue model
| Revenue model component | Current status | Planned / potential |
|---|---|---|
| Product sales (gold doré) | — | Planned heap leach gold production from Bulgera oxide/transition ore (subject to Scoping Study, financing and approvals) |
| Services | — | — |
| Subscription / licensing | — | — |
| Royalty / asset monetisation | None received. A third party, Vox Royalty, holds a royalty over Bulgera. | Possible farm-out or JV of Bali and Marriott ("seeking development partners") |
| Other income | Interest income (A$50,047 other income in H1 FY2026) | — |
Value chain position
Norwest operates at the upstream end of the gold value chain, across exploration, resource definition and pre-feasibility study work. If Bulgera proceeds, it would move into mining and on-site processing (crush, heap leach, carbon recovery, doré). Gold doré would be sold to a refiner such as the Perth Mint. That is an industry-standard route, not a company disclosure.
Customer types and end markets
There are no current customers. The potential end market is the global gold market, with the price set on LBMA/COMEX and realised in A$. Exploration commodities in the portfolio include silver, copper, lead and zinc (Dales Gossan), titanium (Malibu), rare earths and niobium targets (West Arunta), and nickel (Marriott).
Strategy
Stated strategy (themes from the H1 FY2026 report, October 2025 presentation and 2026 announcements)
-
"Bulgera Gold Project – key to Norwest cashflow." The aim is to convert the Bulgera resource into a low-cost heap leach operation that generates near-term cash flow. Management describes this as translating drilling outcomes into financial terms through resource modelling and heap leach scoping work.
-
Resource growth and conversion. Drilling down-dip and along strike (Phase 1 and 2, 2025) and converting Inferred to Indicated. The July 2026 MRE is 76% Indicated.
-
Satellite feed. Developing Marymia East (Shiraz, Chardonay) as higher-grade feed within about 10 km.
-
Brownfield, low-impact development. The heap leach footprint sits within historically disturbed ground. Management says operating revenue would fund rehabilitation of a site "neglected for over 21 years."
-
Critical-minerals optionality. Using the free GSWA Aileron dataset to trace the 40 km Sandman Fault for repeats of the Dales Gossan breccia, with the aim of identifying a district-scale silver-base metal camp.
-
Partnering of non-core assets. Bali and Marriott, for which the company is "seeking development partners."
Strategic initiatives (last 24 months, October 2024 to October 2026)
| Initiative | Date | Detail | Status |
|---|---|---|---|
| Bulgera Mining Lease | April 2025 | M52/1085 granted (2,435 ha) | Complete |
| Bulgera resource re-modelling | July 2025 | 288.4 koz (+33%) | Superseded |
| Phase 1 and 2 RC drilling | July – December 2025 | About 20 holes; down-dip extensions | Complete |
| PQ metallurgical drilling | Q4 2025 | 14 holes, 290m | Complete |
| ATM facility | January 2026 | A$3m standby equity, three years (Dolphin Corporate Investments) | Undrawn at 30 June 2026 |
| 2026 MRE (low cut-off) | March 2026 | 501 koz at 0.24 g/t cut-off | Superseded by pit-constrained MRE |
| Orelogy Scoping Study | May 2026 onwards | Heap leach mine plan and economics | In progress; timetable extended 24 August 2026 |
| KCAA engagement | 26 May 2026 | Heap leach pad design and operating cost estimates | In progress |
| MBS Environmental approvals strategy | 2,026 | Environmental Approvals Strategy completed | Complete |
| Column leach and IBRT testwork | June – October 2026 | 70-day columns on −25mm oxide; fresh rock IBRT | In progress |
| Borefield and infrastructure planning | July 2026 onwards | Funded from the entitlement offer | In progress |
| Dales Gossan re-prioritisation | December 2025 | Silver price above US$60/oz cited | Targeting phase |
| GSWA Aileron survey | December 2025 | Survey complete; data processing | Data release guided for Q1 2026 |
ESG / sustainability commitments
The company acknowledges the Gingirana people as traditional owners of the Bulgera land and has held land-use discussions. It also works with the Marputu Aboriginal Corporation (State Deed) and the Tjamu Tjamu people (Arunta West). It commits to rehabilitation of the historical Bulgera site using heap leach revenue. No quantified emissions or ESG targets are disclosed.
Cost programmes
Directors deferred fees, which were then converted to equity (A$300,000, August 2025). No formal cost-reduction targets are disclosed.
Medium-term financial targets / guidance
No financial guidance is given. Production targets and financial forecasts may be disclosed only in compliance with ASX Listing Rules 5.16/5.17. The company has stated it will announce study results only once compliant. Earlier presentation-level cash-flow indications (for example, A$118m undiscounted on the 2022 model) were subject to a clarifying announcement on 5 November 2025 and are not formal guidance.
Products & Services
Norwest sells no products or services. Its "portfolio" is its mineral project inventory, catalogued project by project below.
Bulgera Gold Project (flagship)
Description: Historical open-pit gold mining centre. Four open pits produced about 23,400 oz when gold was around US$500/oz. Between the late 1990s and 2004, about 440,000t of higher-grade oxide was trucked about 50 km to the Plutonic plant for blending (Stockhead; Kristie Batten, Stockhead). Legacy stockpiles of about 2.2Mt contain material that pre-2004 miners classed as waste at below 1 g/t.
Tenure: Mining Lease M52/1085, 2,435 ha, granted 16 April 2025.
Geology: Shear-hosted gold along a mafic-ultramafic "mine sequence" on the Bulgera granite contact. The trends include Price-Mercuri, Rainbow North and the main Bulgera lode. The Bulgera lode was drilled to more than 550m down dip in 2021 and was said in 2024 to hold 1.38Mt at 2 g/t for 89,000 oz.
Infrastructure: Haul road to the Plutonic plant (owned by Catalyst Metals); gas-fired power, transmission lines, bore fields, airstrip and camps in the district.
Development concept: Low-cost heap leach of oxide and transitional material. An earlier desktop cash-flow study (Orelogy, 2022 model) assumed A$4,000/oz, 70% recovery, 3Mt at 0.8 g/t and a three-year life, and produced about A$118m of undiscounted cash flow (October 2025 Investor Presentation). That figure preceded ALS testwork and ASX Listing Rule 5.16/5.17 compliance, and the company later lodged a clarification (5 November 2025). It should not be relied upon.
Current workstreams: Scoping Study (Orelogy); heap leach pad design and operating costs (KCAA); bottle-roll, column and IBRT testwork (ALS); environmental approvals strategy (MBS Environmental, completed); land-use discussions with the Gingirana people.
Royalty: Vox Royalty Corp. (TSX/NASDAQ: VOXR) lists a Bulgera Gold Royalty (development stage). Royalty terms are not disclosed in the sources reviewed.
Bulgera Mineral Resource evolution
| Date | Cut-off (g/t Au) | Tonnes (Mt) | Grade (g/t Au) | Contained Au (oz) | Note | Source |
|---|---|---|---|---|---|---|
| 2,019 | — | 2.0 | 1.03 | 65,500 | Maiden, from historical data | Stockhead |
| 8 April 2020 | — | 2.92 | 1.0 | 93,880 | Indicated 2.06Mt for 66,230 oz | ASX 8 April 2020 |
| 16 March 2022 | — | 5.1 | 1.2 | 200,130 | Increase of 113% | ASX 16 March 2022 |
| 2,024 | 0.3 (lowered from 0.6) | 6.3 | 1.07 | 217,600 | Cut-off reduction | Stockhead |
| 10 July 2025 | 0.6 | 8.39 | 1.07 | 288,400 | Indicated 3.43Mt at 0.95 for 105,020 oz; Inferred 4.96Mt at 1.15 for 183,400 oz | Interim Report H1 FY2026 |
| 26 March 2026 | 0.24 | 23.8 | 0.65 | 501,000 | Low cut-off, heap-leach oriented | ASX 26 March 2026 (InvestSMART summary) |
| 1 July 2026 | RPEEE pit shell at A$5,000/oz | 8.7 | 0.68 | 191,000 | 76% Indicated; current headline | ASX 1 July 2026 |
Metallurgy
| Test | Result | Source |
|---|---|---|
| Bottle roll (oxide/transition) | 86% gold recovery | ASX 8 May 2026; ASX 1 July 2026 |
| Column leach (−25mm, highly and moderately weathered oxide), 70 days | In progress as of 24 August 2026 | ASX 24 August 2026 |
| Fresh rock IBRT | In progress as of 24 August 2026 | ASX 24 August 2026 |
Marymia East Gold Project
Description: 230 km² package less than 10 km south-east of Bulgera, prospective for gold and base metals. Bulgera and Marymia East together cover 26,800 ha.
Shiraz prospect: Flat-lying 400m × 150m saprolite gold zone last drilled in 1996. A 1996 diamond hole intersected 6m at 4.2 g/t about 200–215m vertically below the saprolite; follow-up probably stalled because gold was about A$370/oz. A five-hole RC programme was completed in November 2025, including a diamond tail on a failed RC hole. Results announced 25 February 2026 included 3m at 7.93 g/t Au from 48m (MRC02).
Chardonay (also spelled Chardoney) prospect: Historical shallow mineralisation; drill testing planned for 2026.
Structure: The Jenkins Fault crosses the northern project area; the company links it to the DeGrussa copper-gold system.
Geophysics: High-resolution airborne EM survey over the full tenure completed in September 2025, with interpretation by Southern Geoscience.
Strategic role: A potential higher-grade satellite feed for Bulgera heap leach. A maiden MRE was guided for "by April 2026," but no release was verified in the sources reviewed.
Arunta West (West Arunta) Critical Minerals Project
Description: About 1,400 km² (December 2025 figure; earlier figures were 1,600–1,700 km²) in WA's West Arunta province, near WA1 Resources' Luni niobium discovery.
Dales Gossan (silver-copper-lead-zinc): Vertical fault breccia on the regional Sandman Fault, which is described as extending about 40 km across Norwest tenure. The company interprets it as a possible VMS-style system that remains open at depth, with grades rising in deeper intercepts. Discovery assays from December 2024 include 16m at 24 g/t Ag from 71m (including 6m at 43 g/t) and 12m at 28 g/t Ag from 96m (including 5m at 42 g/t).
Malibu (titanium): A 43-hole RC and aircore programme intersected thick zones of anomalous titanium (2025; Stockhead).
Other targets: Laguna IOCG soil anomaly (about 3–4 km from Dales); Tamba copper-gold anomaly; REE clay targets; North Dovers IOCG (historical BHP target); niobium potential near Luni.
Data: GSWA "Aileron" airborne magnetic and radiometric survey completed 15 December 2025, at no cost to Norwest. Processed data was expected in Q1 2026.
Funding support: Successful Exploration Incentive Scheme (EIS) co-funding applications (FY2023 and FY2025 references).
Heritage: Agreements with the Tjamu Tjamu people; Mining Entry Permit issued (FY2023 Annual Report).
Bali Copper Project
Description: About 75 km west of Paraburdoo, WA. High-grade copper-gold quartz veins were identified in 2022.
Recent work: A five-day mapping and rock-chip programme concluded that Bali has potential for a gold and/or gold-copper deposit in a large untested area with well-developed hydrothermal alteration. Proposed next steps are soil sampling, IP and resistivity surveys, and mapping (Interim Report H1 FY2026).
Marriott Nickel Project
Description: Single mining lease M37/96, about 70 km south-east of Leinster and 80 km from Leonora.
Resource (JORC 2012, 0.7% Ni cut-off): Indicated 463kt at 1.2% Ni for 5,600t; Inferred 121kt at 1.1% Ni for 1,300t; total 584kt at 1.18% Ni for 6,900t Ni.
Status: No work in H1 FY2026; "Norwest continues to review its Marriott Project exploitation options."
Relinquished or legacy assets
Warriedar: Vended by Australian Mines in 2018; current status not disclosed in sources reviewed.
North Dovers / Arunta West JV with Jervois: Norwest moved from 51% to 80% to 100% (the 2020–21 presentations say "85% to 100%").
Financial Narrative
Sources: FY2025 figures come from the Interim Financial Report H1 FY2026 comparatives and statement of changes in equity (primary). FY2021–FY2024 income statement data come from the TipRanks aggregator, labelled there by calendar year but matching the June fiscal years. For example, TipRanks' "Dec 25" column shows depreciation/impairment of A$480.93k, which matches the FY2025 E&E impairment of A$480,925, so these columns are treated as FY2021–FY2025. The FY2025 net loss of A$1,834,979 is derived from accumulated losses (A$10,809,547 at 30 June 2025 less A$8,974,568 at 30 June 2024) and matches TipRanks' A$1.83m.
Income statement
EPS is derived as net loss divided by weighted shares (analyst calculation); TipRanks rounds these to A$0.00–0.02. The FY2021 "revenue" of A$86.76k is shown by TipRanks but is probably other income such as a grant or option fee; the FY2020 report references option payments to Norwest totalling A$200,000 plus GST. It is not product revenue.
Margins and growth
Margins are not meaningful because there is no revenue. The revenue CAGR from FY2021 to FY2025 is not meaningful (zero revenue since FY2022).
Half-year comparison (A$)
Source: Interim Financial Report H1 FY2026, Note 2 and income statement. The reported basic and diluted loss per share of "(0.062)" dollars for H1 FY2026 appears to be a typographical error in the filing. On about 1.0bn shares the loss per share is about 0.06 cents, not 6.2 cents.
Balance sheet
Latest balance sheet (31 December 2025, reviewed): cash A$1,641,837; receivables A$172,331; E&E A$25,166,490; total assets A$26,980,658; payables A$509,215; borrowings nil (converted to equity); net assets A$26,471,443; working capital surplus A$1,304,953; 1,030,106,951 shares on issue.
Latest cash position (30 June 2026, Appendix 5B): cash about A$394,000 after a quarterly net cash outflow of about A$370,000. Subsequently, A$1,892,326 gross was raised in the August 2026 entitlement offer.
Cash flow: notes and sources
Source: Interim Financial Report H1 FY2026 (cash flow statement; equity Note 5). Full-year FY2025 operating and investing cash flows are not separately verified.
Commentary
Loss profile. Norwest's annual cash and accounting loss has been stable at A$1.0–1.8m. That is typical of a lean ASX junior that capitalises almost all field spending into the E&E asset under AASB 6. The FY2025 jump to A$1.83m was driven almost entirely by a non-cash impairment of A$480,925 on tenement costs. Excluding it, the underlying loss of about A$1.35m was similar to FY2023–FY2024. Corporate overhead is modest, at about A$0.5m of cash operating outflow per half. Share-based payments, at A$290k in H1 FY2025 and A$172k in H1 FY2026, are a meaningful share of reported expenses.
Balance sheet. The accounting balance sheet looks solid, with A$26.5m of net assets at 31 December 2025, but this is misleading as a measure of liquidity. About 93% of total assets are capitalised exploration costs, and these are recoverable only through successful development or sale. Book equity of about A$26m compares with a market capitalisation of A$9–12m. The market is therefore pricing the E&E asset at a large discount, a common pattern for illiquid juniors.
Liquidity inflection. Liquidity is the defining issue. Cash peaked at A$4.23m on 30 June 2025 after the FY2025 recapitalisation (A$7.35m gross, 580m new shares). It then fell to A$1.64m by 31 December 2025 and to about A$0.39m by 30 June 2026 as Phase 1/2 drilling, metallurgical drilling and Marymia East work were funded. The H1 FY2026 accounts carry a material uncertainty related to going concern. The July 2026 entitlement offer was explicitly described as "necessary to support Norwest's solvency testing as part of the FY2026 audit process." The A$3m ATM facility with Dolphin Corporate Investments was unused at 30 June 2026.
Dilution. Weighted average shares rose from 112m (FY2021) to 463m (FY2025). Shares on issue reached about 1.35bn after the August 2026 entitlement offer. Capital has been raised at progressively lower prices: A$0.20 at IPO, A$0.01 in 2025, A$0.0117 for the director conversion, and A$0.007 in July 2026.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Project "Segment" Details
| Project "segment" | Location | Ownership | Commodity | Stage | Key asset metrics |
|---|---|---|---|---|---|
Bulgera Gold Project | About 200 km north of Meekatharra; north-east end of the Plutonic Well greenstone belt, WA | 100% | Gold | Pre-development (Scoping Study); granted ML M52/1085 | MRE 8.7Mt at 0.68 g/t for 191 koz (July 2026 constrained) |
Marymia East | Less than 10 km south-east of Bulgera, WA; 230 km² | 100% per the H1 FY2026 interim report; 89% per the October 2025 presentation (discrepancy noted) | Gold, base metals | Exploration (drilling at Shiraz) | — |
Arunta West (West Arunta) | About 600 km west of Alice Springs, WA (plus an NT application); about 1,400 km² currently cited | 100% (consolidated from the Jervois JV) | Silver, copper, lead, zinc, titanium, REE, niobium | Early exploration | Dales Gossan discovery; Malibu titanium |
Bali Copper Project | About 75 km west of Paraburdoo, WA | 100% | Copper, gold | Early exploration (mapping and rock chips) | No resource |
Marriott Nickel Project | About 70 km south-east of Leinster, WA; single mining lease M37/96 | 100% | Nickel | Care and maintenance / review of options | JORC 2012 MRE 584kt at 1.18% Ni for 6,900t Ni |
Segment Assets & Liabilities and Revenue by Segment
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Segment revenue all projects (AUD K) | 0 | 0 | 0 | 0 | 0 |
E&E asset carried forward (AUD K) | — | — | — | 21,422 | 22,904 |
E&E expenditure capitalised in year (AUD K) | — | — | — | — | 1963 |
E&E impairment (AUD K) | — | — | — | — | 481 |
Income Statement and Share Count (millions)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue (AUD K) | 87 | 0 | 0 | 0 | 0 |
Gross profit (AUD K) | 56 | -8 | -3 | 0 | 0 |
Operating expenses (AUD K) | 646 | 1,460 | 1,280 | 1,040 | 1,360 |
Operating income (AUD K) | -676 | -1,470 | -1,280 | -1,040 | -1,360 |
EBITDA (AUD K) | -1,660 | -1,470 | -1,290 | -1,040 | -1,360 |
Pre-tax income (AUD K) | -1,690 | -1,470 | -1,290 | -1,040 | -1,835 |
Net income (AUD K) | -1,690 | -1,470 | -1,290 | -1,040 | -1,835 |
Weighted average shares basic (millions) | 112.10 | 171.56 | 221.73 | 315.36 | 463.38 |
EPS basic (A$ cents) | -1.51 | -0.86 | -0.58 | -0.33 | -0.40 |
EPS diluted (A$ cents) | -1.51 | -0.86 | -0.58 | -0.33 | -0.40 |
Dividends per share (A$ cents) | 0 | 0 | 0 | 0 | 0 |
Financial Analysis
| Item | H1 FY2025 (6 months to 31 December 2024) | H1 FY2026 (6 months to 31 December 2025) |
|---|---|---|
Other income | 1,159 | 50,047 |
General and administration | 124,017 | 79,221 |
Employee benefits | 213,007 | 207,333 |
Other fees and services | 188,774 | 202,064 |
Share-based payments | 290,250 | 172,200 |
Travel and accommodation | 12,016 | 15,557 |
Total expenses | 828,064 | 676,375 |
Net loss | (826,905) | (626,328) |
Balance Sheet and Share Count (millions)
| Metric | FY2024 | FY2025 |
|---|---|---|
Cash and equivalents (AUD K) | 245 | 4,230 |
Other receivables (AUD K) | — | 9 |
E&E assets (AUD K) | 21,422 | 22,904 |
Total assets (AUD K) | — | 27,144 |
Trade and other payables (AUD K) | — | 518 |
Borrowings, related-party, current (AUD K) | — | 422 |
Long-term debt (AUD K) | — | 0 |
Total liabilities (AUD K) | — | 940 |
Net debt, negative = net cash (AUD K) | — | -3,808 |
Total equity (AUD K) | 20,755 | 26,203 |
Goodwill and intangibles (AUD K) | 0 | 0 |
Working capital (AUD K) | — | 3,299 |
Contributed equity (AUD K) | 27,899 | 34,832 |
Accumulated losses (AUD K) | -8,975 | -10,810 |
Shares on issue at year end (millions) | 388.12 | 968.36 |
Cash Flow
| Metric | H1 FY2025 | H1 FY2026 |
|---|---|---|
Operating cash flow (AUD K) | -438 | -472 |
Exploration and evaluation (capex) (AUD K) | -1,161 | -2,116 |
Tenement acquisition (AUD K) | -220 | 0 |
Free cash flow (AUD K) | -1,819 | -2,588 |
Share issue proceeds net (AUD K) | 2,345 | 0 |
Dividends paid (AUD K) | 0 | 0 |
Buybacks (AUD K) | 0 | 0 |
Financial Analysis (Annual)
| Metric | FY2021 | FY2022 |
|---|---|---|
Dividends paid (AUD K) | 0 | 0 |
Buybacks (AUD K) | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2025 | Comment |
|---|---|---|
ROE (%) | -7.0 | Net loss A$1.835m divided by average equity of about A$23.5m |
Current ratio (x) | 4.5 | A$4.24m current assets / A$0.94m current liabilities |
Debt / equity (x) | 0.016 | Related-party loans only, since converted to equity |
Geographic Revenue
| Region | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Australia revenue (AUD K) | 0 | 0 | 0 |
Rest of world revenue (AUD K) | 0 | 0 | 0 |
Capital Markets Data (AUD)
| Metric | FY2019 | FY2020 | FY2021 | FY2022 | FY2023 |
|---|---|---|---|---|---|
Year-end close (AUD) | 0.195 | 0.150 | 0.089 | 0.029 | 0.048 |
Recent Reference Point Details
| Recent reference point | Price (AUD) | Source |
|---|---|---|
22 October 2025 (presentation) | 0.014 | NWM presentation |
17 February 2026 | 0.025 | InvestSMART (price at release) |
26 March 2026 | 0.016 | InvestSMART |
8 May 2026 | 0.012 | InvestSMART |
6 July 2026 close | 0.009 | Offer Letter |
July – August 2026 | 0.006–0.009 | InvestSMART |
Capital Markets
| Item | Number | Date / source |
|---|---|---|
Shares on issue | 1,030,106,951 | 31 December 2025 (Interim Report) |
ATM collateral shares issued | 51,402,000 | January 2026 |
Shares before the entitlement offer (implied) | about 1,081,508,952 | Derived from 270,377,238 × 4 |
Entitlement offer shares issued | 270,332,225 | 6 August 2026 (106,289,585 applications + 164,042,640 shortfall) |
Shares after the offer (derived) | about 1,351.8 million | Analyst derivation; excludes any 11 August 2026 quotation |
Listed options (NWMO) | 634.8 million | — |
Unlisted options | 292.4 million | October 2025; includes 35m director options (A$0.03, five years) |
Valuation Snapshot
| Metric | Value | Comment |
|---|---|---|
P/B | about 0.4x | About A$10m market cap against A$26.5m book equity (31 December 2025); analyst estimate |
EV/resource oz | about A$40–60/oz | EV of about A$8–10m on 191 koz (constrained); about A$16–20/oz on 501 koz (unconstrained); analyst estimate |
EV (October 2025, company-stated) | A$10.2m | NWM presentation |
Capital Markets — Dividend history
| Item | Detail |
|---|---|
Dividend history | None paid since listing; no recommendation (H1 FY2026) |
Dividend policy | None stated |
Buyback authorisations | None. The company may buy back and cancel the ATM collateral shares for nil consideration on termination, subject to shareholder approval. |
Credit ratings (Moody's/S&P/Fitch) | Not rated |
Debt maturity profile | No debt at 31 December 2025. The A$375k director loans (6% per year, granted September 2023, maturity extended to 30 June 2025) were converted to equity in July 2025. |
Standby funding | A$3m ATM (Dolphin Corporate Investments, three years from January 2026); undrawn at 30 June 2026 |
Analyst Conclusions
Management guidance
There is no quantitative financial guidance. Stated near-term deliverables are:
-
Completion of 70-day column leach and fresh-rock IBRT testwork.
-
Release of the Bulgera Gold Heap Leach Scoping Study "promptly following the receipt and evaluation of the complete metallurgical" data (ASX, 24 August 2026).
-
Progress on borefield, infrastructure layouts, operating cost refinement and environmental permitting, funded from the August 2026 raise.
-
Groundwork for "subsequent definitive studies."
Consensus
No consensus exists because there is no analyst coverage.
Bull case
-
A de-risked, permitted brownfield. A granted ML, heritage agreements, a disturbed footprint and an existing haul road give Bulgera a permitting and capex profile that many WA juniors lack. If the Scoping Study shows positive economics at A$5,000/oz with about 80%+ column recoveries, the stock trading at about 0.4x book and about A$50/oz EV could re-rate sharply.
-
Gold price leverage. The resource is highly sensitive to price: the unconstrained 501 koz inventory sits at a 0.24 g/t cut-off, against a 191 koz constrained case. Each pit re-optimisation at a higher gold price could add Indicated ounces to the mine plan, particularly if Marymia East supplies higher-grade feed.
-
Free silver option. Dales Gossan (16m at 24 g/t Ag; open at depth) on a 40 km fault, now mapped with free GSWA data, gives exposure to silver above US$60/oz that the market is not valuing.
Bear case
-
Funding gap. Cash was about A$394k at 30 June 2026. The A$1.89m raise covers study work only. Construction capex has not been disclosed but will be many multiples of the market cap, implying further heavy dilution, a punitive debt or offtake package, or a control transaction at a low price.
-
Credibility and slippage. Repeated revisions (the presentation clarification, the revised May 2026 announcement, 501 koz cut to 191 koz) and missed timelines (MRE, Scoping Study, Marymia East MRE) suggest investors will demand a heavy technical discount until independent study outputs appear.
-
Governance and control. The combined Chair/CEO role, related-party loans, director consultancy and Fortress Minerals' growing stake through underwriting create the risk that minority shareholders are diluted on terms set by insiders, and reduce the probability of a competitive takeover premium.
Catalysts and monitorables (next 12 months)
| Catalyst / monitorable | Expected timing | Why it matters |
|---|---|---|
| FY2026 audited Annual Report (going-concern wording, auditor opinion) | September – October 2026 | Confirms solvency status and any emphasis of matter |
| September 2026 quarterly / Appendix 5B | About 29 October 2026 | Cash burn and remaining runway after the A$1.89m raise |
| Column leach and IBRT results | Q4 2026 | Recovery assumption for the Scoping Study |
| Bulgera Heap Leach Scoping Study (LR 5.16/5.17 compliant) | Late 2026 / early 2027 (company: "promptly" after metallurgy) | First compliant economics: capex, opex, NPV, IRR |
| AGM (typically November) | About November 2026 | Board renewal, option approvals, capacity resolutions |
| Use of the A$3m ATM facility | Ongoing | Signals funding pressure and dilution pace |
| Fortress Minerals holding and any takeover thresholds | Ongoing | Control dynamics |
| Marymia East maiden MRE | Not dated (previously April 2026) | Satellite feed grade uplift |
| GSWA Aileron interpretation / Dales Gossan follow-up | 2026–2027 | Silver option value |
| Environmental approvals (Mining Proposal, Works Approval) | 2027+ | Development pathway |
Analyst verdict
Norwest Minerals is a classic ASX micro-cap at a crossroads. It owns a permitted, brownfield gold asset that the gold price has belatedly made interesting, but it lacks the balance sheet to exploit that asset on its own terms. The positive technical facts are real. Bulgera sits on a granted mining lease within a historically mined footprint with a haul road and district power. Its pit-constrained resource of 191,000 ounces is three-quarters Indicated, and early bottle-roll recoveries of 86% are encouraging for heap leaching. Meanwhile, the Dales Gossan silver-base metal discovery and the broader West Arunta tenure offer free option value as silver prices strengthen.
These positives are weighed down by four facts. First, the company was down to about A$0.39 million in cash at 30 June 2026 and needed an underwritten raise at A$0.007 per share explicitly to support FY2026 audit solvency testing. Second, resource and economic communications have been revised several times within twelve months, including a March 2026 501 koz headline that became 191 koz by July. Third, governance is thin: the CEO is also Chairman, the board is closely tied to the major funder, and related parties have both lent to and underwritten the company. Fourth, the critical value catalyst, a Listing Rule-compliant Scoping Study, has slipped again pending column leach data.
The equity therefore behaves as an option on one event: a credible Scoping Study demonstrating robust heap leach economics at prevailing gold prices, followed by a non-punitive funding or strategic solution, potentially involving the dominant regional mill owner. Until that study lands, the most likely path is continued incremental dilution with Fortress Minerals' influence increasing. Verdict: speculative, high-risk.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Title | Tenure | Background (as disclosed) |
|---|---|---|---|
Charles Craig Schaus | Chairman and Chief Executive Officer (Acting Chairman since 7 November 2023) | CEO since 2018 (founding CEO) | BSc (Geology), University of California; MAusIMM, AIG. Arrived in Perth in 1986. Exploration and development roles at Tuckabianna (Australmin/Newmont, 1987), Yilgarn Star (Gascoyne/Orion, 1991), Nimary (Eagle Mining/Great Central, 1994) and Chirano, Ghana (Redback Mining, 1998). Consulting through HGS Pty Ltd (2001). Founding MD of Aurox Resources (2004), which was taken over by Atlas Iron in 2010 at a 170% premium. Founding Chairman of Plymouth Minerals, now Infinity Lithium (2011, five years). Company's Competent Person for exploration and metallurgy. |
Yew Fei Chee | Non-Executive Director | — | Controls YF Chee Holdings Sdn Bhd (lender to Norwest in 2023). Associate of Fortress Minerals Limited (SGX: OAJ), the July 2026 underwriter. |
Kok Hou Leong | Non-Executive Director | — | Controls Merit Grace Global Limited (lender to Norwest in 2023) |
Hok Kiang Sia | Non-Executive Director | — | Also engaged as geological consultant (A$90,000 in H1 FY2026). Associated with Malaco Mining Sdn Bhd (2023 loan holder). |
Ching Hong Loong | Non-Executive Director | — | — |
Oliver Carton | Non-Executive Director and Company Secretary | — | — |
“—” = not publicly disclosed.
Directors' Remuneration
| Name | FY | Salary (AUD) | Equity (AUD) | Total (AUD) | Source |
|---|---|---|---|---|---|
Charles Schaus | FY2025 | about 238,300 (77.16% of total) | — | 308,800 | Simply Wall St (derived from FY2025 annual report) |
Charles Schaus | 2018 (appointment) | 250,000 base | — | — | Business News (2018) |
Directors (aggregate) | FY2025–FY2026 | A$300,000 accrued fees deferred and converted to shares in August 2025 | 35m options at A$0.03 (value about A$0.00861 each, about A$301k total) | — | Interim Report H1 FY2026 |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
7 November 2023 | Schaus becomes Acting Chairman | — |
29 July 2025 | Director loans of A$422,456 converted to equity | Shareholder approval |
August 2025 | 35m director options issued | Share-based remuneration |
12 August 2026 | Six Change of Director's Interest notices | Entitlement offer participation by all directors |
Major Shareholders
| Holder | Shares | % | Date / source |
|---|---|---|---|
Fortress Minerals Limited (SGX: OAJ) | 60,235,692 | 5.85 | Substantial holder notice (InvestSMART); before the July 2026 offer |
Fortress Minerals Limited | 30,263,300 | 10.52 | 26 September 2023 notice (Market Index) |
YF Chee Holdings Sdn Bhd (Yew Fei Chee) | 20,138,890 | 7.00 | 26 September 2023 notice (Market Index) |
Yew Fei Chee (on-market/placement purchase) | 29,888,890 added | — | 26 May 2025 (Simply Wall St) |
Top 20 shareholders combined | — | 57.21 | Simply Wall St (November 2025) |
Institutions | 7,000,000 | 0.68 | Simply Wall St |
Public companies | 90,498,992 | 8.79 | Simply Wall St |
Private companies | 130,548,684 | 12.7 | Simply Wall St |
CEO Charles Schaus | — | about 0.1 | Simply Wall St |
Competitive Landscape
Key Competitors
| Company | Ticker | Relevance to Norwest | Comparative data (where sourced) |
|---|---|---|---|
Catalyst Metals | ASX: CYL | Owns the Plutonic plant and most Plutonic Well belt tenure; the haul road runs from its plant to Bulgera; it absorbed Vango's Marymia (+1 Moz) deposit | Producer; data not compiled here |
WA1 Resources | ASX: WA1 | Luni niobium discovery adjacent to Norwest's West Arunta ground | Market cap about A$1.35bn; cash about A$86m (October 2025 NWM presentation) |
Encounter Resources | ASX: ENR | West Arunta niobium (Green, Emily, Crean) | Market cap about A$158m; cash about A$23m (October 2025 NWM presentation) |
Tali Resources | — | West Arunta targets immediately north of NWM | Market cap about A$70m; cash about A$6.0m (October 2025 NWM presentation) |
Jervois Global (formerly Jervois Mining) | ASX: JRV | Former Arunta West JV partner | Not compiled |
Westgold Resources | ASX: WGX | Mid West/Murchison processing hub owner; potential toll-treatment counterparty | Not compiled |
Northern Star Resources | ASX: NST | Former Plutonic Well participant (historical); regional consolidator | Not compiled |
Sandfire Resources | ASX: SFR | DeGrussa copper-gold system on the Jenkins Fault trend referenced at Marymia East | Not compiled |
Meeka Metals | ASX: MEK | Murchison gold developer competing for similar capital | Not compiled |
Vox Royalty | TSX/NASDAQ: VOXR | Royalty holder on Bulgera (stakeholder rather than competitor) | Not compiled |
Peer Comparison FY2025
| Metric | Norwest (NWM) | WA1 Resources | Encounter Resources | Tali Resources |
|---|---|---|---|---|
Market cap October 2025 (AUD Mn) | 14 | 1,350 | 158 | 70 |
Cash October 2025 (AUD Mn) | 4.3 | 86 | 23 | 6.0 |
Revenue (AUD Mn) | 0 | 0 | 0 | 0 |
Recent Developments
--