NRW Holdings Limited Overview
NRW Holdings is one of Australia's most diversified ASX-listed industrial contracting groups, operating four pillars — Civil, Mining, Minerals Energy & Technologies (MET), and, since October 2025, Electrical, Mechanical (HVAC), Infrastructure, Technology & Maintenance (EMIT). Born in the Pilbara iron-ore earthworks market, it has used a disciplined, low-multiple acquisition strategy (Golding, RCR Mining Technologies, BGC Contracting, DIAB, Primero, OFI, HSE Mining assets and Fredon) to evolve from a cyclical earthmover into a full-lifecycle services provider spanning engineering, OEM products, construction, contract mining, maintenance and building services. FY26 delivered record revenue of A$4.29 billion and Underlying EBITA of A$288.6 million, with a A$7.5 billion order book and A$29.1 billion near-term pipeline. Its strategic differentiation is breadth: exposure to iron ore, gold, coal and critical minerals is now balanced by public infrastructure, defence, health and data-centre work, with FY27 guidance pointing to further double-digit earnings growth.
Company's own description (FY26 Annual Financial Statements, Directors' Report)
NRW describes itself as a leading ASX-listed diversified group delivering engineering, construction, manufacturing, technology, operations and maintenance services. Activities are conducted primarily in Australia, with engineering offices in Canada and the USA and smaller projects in New Zealand. The workforce of approximately 13,300 (30 June 2026) supports clients in the industrial, resources, infrastructure, data centre and commercial building sectors. The four pillars are:
Civil: large-scale civil infrastructure and earthworks across resources and public infrastructure: roads, rail, bulk earthworks, concrete installation, mine development, tailings storage facilities, ports, renewable energy and water infrastructure, and residential/commercial subdivisions (Urban).
Mining: mine management, contract mining, load and haul, drill and blast, maintenance services, and fabrication of water and service vehicles.
MET: mine-to-market solutions, specialist maintenance (shutdowns and onsite), non-process infrastructure (NPI), materials-handling OEM products, and turnkey design–construct–operate of minerals processing and energy projects.
EMIT: electrical, data and communications, HVAC, electrical infrastructure, audio-visual technology and building management systems.
Business model and revenue model
| Revenue type | Where it sits | Characterisation |
|---|---|---|
| Multi-year mining services (schedule of rates, equipment hire) | Mining (NRW Mining, Golding, Action Drill & Blast) | Quasi-annuity; 3–7-year contracts; capital-intensive |
| Project-based construction (D&C, construct-only, EPC) | Civil, MET (Primero), EMIT (Fredon) | Lumpy; order-book driven; mix of fixed price and reimbursable |
| Maintenance and shutdown services | MET (DIAB, RCR services), EMIT (Fredon maintenance), Mining | Recurring, lower capital intensity |
| OEM products and parts | MET (RCR Mining Technologies – feeders, materials handling), Mining/OEM (AES Equipment Solutions – rebuilds, service vehicles) | Product sales plus aftermarket parts and service |
| Operations (build-own-operate) | MET (Primero) | Small, but recurring |
| Licensing | None material disclosed; Primero's ALi lithium technology is a potential future licensing/commercialisation avenue | Optionality only |
NRW is overwhelmingly a services/contracting business. Revenue is recognised over time under construction, mining services, maintenance and engineering contracts. The company states that a significant proportion of revenue comes from relationship-based alliance contracts and reimbursable or schedule-of-rates contracts, which allocate risk more evenly than lump-sum work; NRW describes itself as "selective" about fixed-price contracts depending on client, definition, scope and size (FY26 Material Business Risks).
An approximate characterisation of the revenue model, based on segment disclosures (the company does not publish a formal product/service/subscription split):
Subscription and licensing revenue are not material and not disclosed.
Value-chain position
NRW sits in the delivery tier of the resources and infrastructure value chain — between asset owners (miners, state road authorities, the Commonwealth, data-centre developers, builders) and equipment OEMs and labour markets. Unusually for an Australian contractor, it straddles several stages of the asset life cycle: front-end engineering (Primero, OFI), OEM manufacture (RCR, AES), construction (Civil, Primero, Fredon), operations (Mining, Primero BOO) and maintenance (DIAB, Fredon, RCR, Mining). Management describes this in the FY26 presentation as having created "the most diversified Australian listed industrial service provider".
Customers and end-markets
| End-market | Representative clients / projects (FY25–FY26 disclosures) |
|---|---|
| Iron ore (Pilbara, Mid West) | Rio Tinto (Brockman Syncline 1, West Angelas, WASP Deposit H), Karara Mining, Fortescue (historical) |
| Gold | Northern Star (KCGM Fimiston Growth Project), Evolution Mining (Mungari/Castle Hill), Mt Magnet expansion (Primero, Sept 2026) |
| Metallurgical and thermal coal | Stanmore (South Walker Creek), TEC Coal (Stanwell Meandu), Anglo American (Moranbah rail diversion), BHP (Saraji – Civil), Curragh |
| Steel / iron ore SA | OneSteel Manufacturing (South Middleback Ranges) |
| Lithium / critical minerals | Core Lithium (Finniss), PMET Resources (ALi endorsement) |
| Public infrastructure | Main Roads WA (Tonkin Highway, Toodyay Road), Pilbara Ports (Dampier Cargo Wharf), Queensland government (Mackay Ring Road, EDQ Gladstone), Water Corporation WA (Coastal Water Supply) |
| Defence | Commonwealth of Australia infrastructure project in Northern Australia (~A$110m Fredon electrical package) |
| Urban development | Stockland (Yarrabilba, Shoreline estates, SE Queensland) |
| Health and social infrastructure | Westmead Hospital Paediatric Services Building, Geraldton Hospital, SA hospital JV (Fredon) |
| Data centres | Four data-centre contracts (~A$150m, Dec 2025); Stack Data Centre MEL03 (~A$115m, Sept 2026) |
| Commercial towers / transport | Victoria Cross Tower – Over Station (Sydney), Festival Towers (Adelaide), bus-depot charging infrastructure (SA/VIC) |
Independent characterisation
NRW should now be analysed as a diversified Australian industrial services platform with a resources core, rather than a pure mining contractor. FY26 segment revenue (before eliminations) was roughly 35% Mining, 29% MET, 20% Civil and 16% EMIT (nine months only). On a full-year basis, EMIT would approach a fifth of revenue. The quality of earnings has improved: the capital-light segments (Civil, MET, EMIT) together contributed A$179.0m of segment EBITA versus Mining's A$139.9m in FY26, and Mining's EBITDA margin rose to 19.3%. The key analytical tensions are execution breadth (four pillars, ~14,000 people, more than 200 projects), the cyclicality of resource capex, labour scarcity (especially electricians), and whether low-multiple acquisitions can keep compounding without value-destructive overreach.
Strategy
Stated strategy themes (FY26 results and accounts)
-
Diversification as the core of the model — "Our strategy has successfully created the most diversified Australian listed industrial service provider", spanning engineering, manufacturing, construction, operations, maintenance and OEM supply (FY26 presentation).
-
Grow by expanding the service offering into new addressable markets — the explicit rationale for Fredon, which "delivers a 4th pillar" and "aligns with NRW's strategy to grow through expanding the service offering, deliver new capabilities and enter new addressable markets" (Fredon announcement, Sep 2025).
-
Disciplined, low-multiple M&A — Fredon at 5.2x EV/EBIT; refinancing in July 2026 explicitly intended to give "room to move quickly and confidently on growth opportunities, including acquisitions".
-
Repeat business and long client relationships — order book "includes repeat business"; Karara extension and SWC MSA as evidence.
-
Disciplined capital allocation in Mining — management will assess iron ore, gold, copper, coal and battery-metal opportunities "while maintaining a highly disciplined approach to capital allocations".
-
Positioning for structural growth markets — data centres, defence/AUKUS, health and aged care, airports, energy transition, Brisbane 2032 Olympics, water.
Strategic initiatives (last 24 months)
| Initiative | Date | Detail / targets |
|---|---|---|
| Fredon acquisition and EMIT pillar | Sep–Oct 2025 | EV up to A$200m; FY26 expected revenue ~A$840m (full year basis) and EBIT ~A$40m; actual 9-month revenue A$684.3m |
| EMIT margin uplift | FY27 | Management "targeting 6%" run-rate EBITA margin by end of FY27 (vs 5.3% in FY26) |
| Data-centre strategy | FY26–FY27 | Cross-group capability to build "both urban and remote facilities" |
| North American expansion (MET) | Ongoing | Primero, DIAB, RCR and OFI pursuing growth domestically and in North America |
| Commercialisation of Primero ALi | Ongoing; PMET endorsement June 2026 | Focus on "establishing a pathway to building a commercial scale plant" |
| RCR Sealed Pan Feeder internationalisation | Ongoing | Interest across aggregates, oil sands, gold, iron ore, copper, potash |
| Battery-electric haul truck feasibility study | FY26 | Approved by Sustainability Committee for one mining project |
| Emissions intensity target | Aug 2025 | 60% Scope 1+2 intensity reduction in managed facilities by FY30 vs FY20 (replaces 25%) |
| Group-wide Scope 3 methodology | FY26 | Framework developed |
| Critical Risk Management and HSE assurance | FY26 | Group assurance program; worker verifications; system verification rollout H1 FY27 |
| Psychosocial Risk Management Standard | FY26 | Group-wide rollout |
| AI governance framework | FY26 | AI Policy and Standard adopted |
| Balance-sheet refinancing | 31 Jul 2026 | A$700m committed (A$500m 3-yr RCF, A$150m 4-yr RCF, A$50m 1-yr WC) + A$100m accordion; bank guarantees to A$125m |
Guidance and medium-term targets
| Item | FY27 guidance (20 Aug 2026) |
|---|---|
| Revenue | A$4.6–4.8 billion (~85% secured) |
| Underlying EBITA | A$320–330 million |
| Implied EBITA margin | ~6.9% at midpoints |
| Cash conversion | "Consistent with long-term averages" |
| Capex | ~A$165 million (as reported from results call) |
No formal multi-year financial targets (e.g., ROIC hurdle, margin targets) were disclosed beyond leverage being "well below targeted leverage levels" (target not quantified).
Products & Services
NRW does not publish product-level revenue, pricing or launch dates for most offerings. Pricing models below reflect contract-type disclosures; where specific data is absent it is marked "not publicly disclosed".
Civil
| Offering | Description / capability | Target customer | Pricing model | Flagship examples |
|---|---|---|---|---|
| Bulk earthworks and mine development | Large-scale earthmoving, pre-strip, haul roads, pads | Iron-ore, gold, coal miners | Schedule of rates / D&C | Rio Tinto Brockman Syncline 1 (~A$167m); WASP Deposit H (~A$175m); West Angelas A-West |
| Roads and bridges | Highways, grade separations, interchanges | State road agencies | Construct-only, D&C, alliance | Tonkin Highway Grade Separations (~A$200m, later ~A$300m with optional works); Toodyay Road (A$46m); Mackay Ring Road Bald Hill |
| Rail formations | Heavy-haul rail earthworks and diversions | Miners, rail operators | Lump sum / SoR | Moranbah North Rail Relocation for Anglo American (A$41–45m) |
| Ports and marine | Wharves, link bridges, breakwaters | Port authorities | JV construct | Dampier Cargo Wharf Stage 2 Link Bridge (A$49m, 50:50 JV with Brady Marine & Civil) |
| Water infrastructure | Bulk earthworks for water supply | Water utilities | Construct | Coastal Water Supply Bulk Earthworks (WA) |
| Tailings storage facilities | TSF construction and raises | Miners | SoR / lump sum | Not individually disclosed |
| Renewable energy civil works | Wind/solar farm civil packages | Developers, miners | Construct | Historical solar-farm works (e.g., Gudai-Darri context) |
| Airstrips and defence civil | Airfields, defence infrastructure | Commonwealth, miners | Construct | Not individually disclosed |
| Urban (subdivisions) | Residential and commercial subdivision civil works | Developers | SoR / lump sum | Stockland Yarrabilba and Shoreline (~A$130m); EDQ Gladstone |
| Concrete installation | Structural and mass concrete | Miners, infrastructure | Lump sum | Not individually disclosed |
Mining
| Offering | Description | Target customer | Pricing model | Flagship contracts |
|---|---|---|---|---|
| Whole-of-mine management | Planning, operations, fleet, workforce | Mid-tier and major miners | SoR, multi-year MSA | Karara (extended to Feb 2032, ~A$960m extension); Stanwell Meandu (~A$750m, 5.5 years) |
| Load and haul / contract mining | Open-pit mining with owned fleet | Coal, iron ore, gold, lithium | SoR | South Walker Creek (Stanmore, ~A$1.6bn MSA); Castle Hill/Mungari (Evolution); Curragh South; Core Lithium Finniss Grant Deposit (A$50m) |
| Equipment hire and services | Fleet hire with operators/maintenance | Miners | Hire rates | OneSteel South Middleback Ranges EHSA (~A$150m, 3 years from July 2026) |
| Drill and blast (Action Drill & Blast) | Production drilling, blasting, explosives supply and management | Miners, quarries | SoR | Long association with Stanmore |
| Mine rehabilitation | Progressive and closure rehabilitation | Miners | SoR | Not individually disclosed |
| Ore handling / preparation plants | Operation of crushing and prep plants | Miners | SoR | Not individually disclosed |
| Mobile equipment maintenance | Fleet maintenance services | Miners | SoR | Embedded in MSAs |
| AES Equipment Solutions | Refurbishment and rebuild of earthmoving equipment; water and service vehicle manufacture and sales | Miners, contractors | Product sale / service fee | Pricing not disclosed |
Minerals, Energy & Technologies (MET)
| Business / offering | Description | Target customer | Pricing model | Flagship |
|---|---|---|---|---|
| Primero – minerals processing EPC | Design, construct, commission processing plants | Gold, lithium, base-metal producers | EPC (lump sum and reimbursable) | KCGM Fimiston Growth Project (Northern Star); Mt Magnet expansion (Sept 2026) |
| Primero – energy and NPI | Power, energy and non-process infrastructure | Miners, energy companies | EPC / D&C | Not individually disclosed |
| Primero – operations and maintenance / BOO | Plant operation and maintenance | Miners | O&M contracts | — |
| Primero ALi technology | Atmospheric Lithium Carbonate Refining Process; proprietary lithium refining flowsheet | Lithium developers | Prospective licensing/EPC | Selected by PMET Resources (June 2026) as preferred value-added pathway after review of seven flowsheets |
| RCR Mining Technologies – OEM | Apron feeders, belt feeders, hybrid feeders, Sealed Pan Feeder; materials-handling design | Iron ore, gold, copper, potash, oil sands, aggregates | Product sale + aftermarket | Sealed Pan Feeder (growing domestic and international uptake) |
| RCR – parts, service and maintenance | Product support, spares, service | Installed base | Aftermarket | Market-share growth noted FY26 |
| RCR Heat Treatment | Industrial heat treatment | Industrial, resources | Service fee | — |
| RCR Advanced Technologies | Wind-energy component manufacturing initiative | Renewables | — | WA government A$2m support |
| DIAB Engineering | Shutdowns, onsite maintenance, fabrication, industrial construction | Metals and mining (WA, NSW, QLD) | SoR / maintenance contracts | Not individually disclosed |
| OFI (Overflow Industrial) | Industrial electrical engineering, automation, switchboard design and manufacture, instrumentation, E&I design/construct | Mining, defence, fuels/explosives, utilities, infrastructure | Lump sum / SoR | — |
EMIT (Fredon)
| Offering | Description | Target sectors | Flagship |
|---|---|---|---|
| Electrical services | Design, installation, maintenance; off-site prefabrication | Commercial, government, health, defence, education | Commonwealth Northern Australia project (~A$110m electrical, to mid-2028) |
| Mechanical (HVAC) | Design, installation and maintenance of HVAC systems; off-site fabrication | Data centres, health, commercial | Stack MEL03 mechanical D&C first stage (~A$115m, Sept 2026–Mar 2028); SA hospital JV mechanical (~A$24m) |
| Infrastructure electrical and ventilation | Tunnels, rail, industrial, water systems | Transport, utilities | Victoria Cross Tower – Over Station (completed FY26) |
| Technology | AV, telecommunications, data systems | Commercial, education | Not individually disclosed |
| Maintenance and building services integration | Asset management, BMS, maintenance | Building owners, government | Recurring; not disclosed |
| Energy-transition electrical | EV/bus charging infrastructure | Transport operators | Bus charging (SA, ~A$5m); Oakleigh bus depot (VIC) |
| Data-centre packages | Electrical and mechanical scopes for urban and remote facilities | Hyperscale/colocation developers | Four contracts (~A$150m, Dec 2025); Stack MEL03 |
Financial Narrative
Income statement
FY22 EBITDA derived from FY23's A$288.8m being +10.2%. FY23 underlying NPAT derived from FY24's A$123.8m being +18.6%. FY22 EPS derived from FY23's 23.2c being +11.0%. FY22–FY24 underlying NPAT was labelled "NPATN" (normalised). Gross profit and operating income in the US GAAP sense are not reported by NRW; EBITA is the company's primary operating metric. Performance rights outstanding at 30 June 2026: 8,753,182 (dilution ~1.9%).
Margins and growth
Revenue CAGR: FY22–FY26 ≈ 15.6% (4-year); FY24–FY26 ≈ 21.4% (2-year). FY26 organic growth excluding Fredon's A$684.3m contribution was ≈ 10.4%.
Commentary. The five-year record shows consistent top-line growth (every year positive) with an EBITA margin band of roughly 6.2–6.7%. FY23 margin compression reflected labour/supply-chain inflation and wet weather; FY25 compression reflected record Queensland rainfall at Golding's coal operations and South Australian legislative changes affecting OneSteel. FY26 was an inflection: organic growth near 10%, the Fredon step-up, MET's Fimiston peak and normal weather combined to lift EBITA 38.8%. EBITDA margin fell in FY26 only because the capital-light EMIT segment carries little depreciation, diluting the group EBITDA ratio while lifting EBITA. Statutory earnings have been volatile because of client-insolvency impairments (Gascoyne in FY23, Strandline and OneSteel in FY25).
Non-underlying items
FY25 impairments included OneSteel A$110.5m and Strandline A$6.0m. FY26 impairment related to the final settlement of a matter from periods before FY25. Acquisition costs in FY26 include retention payments to Fredon employees vesting over two years.
Balance sheet
Notes: FY22 net debt from FY22 results coverage (reduced from A$171.3m in FY21). FY26 drawn facilities at 30 June 2026: bank A$301.7m, equipment finance A$198.5m. Net debt pre-AASB 16: A$180.5m.
Commentary. The FY26 balance sheet absorbed a 100% debt-funded acquisition while keeping leverage at 0.37x (pre-AASB 16), well below internal targets. Negative working capital of A$100.3m reflects Fredon's upfront client payments — a source of float but also a risk if growth slows and advance payments unwind. Goodwill and intangibles doubled to A$433.6m; net tangible assets fell to A$256.3m, making NRW's balance sheet more acquisition-intangible-heavy than at any point in the review period.
Cash flow
Notes: FY23 capex is the forecast figure given with FY22 results (A$206.3m), not an actual. FY22 dividends refer to the declared FY22 total payout (A$56.1m). No buyback programme was disclosed in the review period (n/a if any small on-market purchases for employee plans occurred). FY27 capex guidance: ~A$165m.
Commentary. FY26 free cash flow of A$181.3m (+75.2%) covered dividends 2.2x. The tax line normalised sharply (A$92.9m) as carry-forward tax losses and COVID-era accelerated depreciation benefits were exhausted — a structural headwind to future cash conversion relative to the FY21–FY25 period. Capital intensity is declining: capex was flat while revenue grew 31%, consistent with the AGM-stated trend of capex/revenue falling from 22% (FY19) to 18% (FY23) and now ~3.4% of revenue on a net basis.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Overview
| Segment | Operating businesses | Products / services |
|---|---|---|
Civil | NRW Contracting (Civil WA), Golding Civil and Urban (QLD), BGC Contracting (integrated) | Roads, bridges, rail formation, bulk earthworks, mine development, TSFs, ports, renewables civil works, airstrips, water, concrete, commercial and residential subdivisions |
Mining | NRW Mining, Golding Mining, Action Drill & Blast, AES Equipment Solutions (OEM rebuild and service vehicles) | Whole-of-mine management, mine development, load and haul, ore handling/preparation plants, rehabilitation, full-scope drill and blast, explosives supply, mobile equipment maintenance, service vehicle manufacture |
MET | Primero Group, RCR Mining Technologies (incl. Heat Treatment and RCR Advanced Technologies), DIAB Engineering, OFI (Overflow Industrial) | EPC of processing plants and energy projects, NPI, materials-handling OEM (apron, belt, hybrid, Sealed Pan Feeders), structural/mechanical/piping, E&I design/construct, shutdowns, offsite repairs, heat treatment, switchboard manufacture, BOO |
EMIT | Fredon Industries (acquired 7 Oct 2025) | Electrical design/installation/maintenance, HVAC, tunnel/rail/industrial/water electrical and ventilation systems, AV, telecommunications and data infrastructure, building management systems |
Revenue by Segment
| Segment | FY24 | FY25 | FY26 |
|---|---|---|---|
Civil revenue (AUD Mn) | 655.5 | 823.7 | 862.5 |
Mining revenue (AUD Mn) | — | 1,541.2 | 1,539.5 |
MET revenue (AUD Mn) | 791.8 | 932.0 | 1,259.2 |
EMIT revenue (AUD Mn) | — | — | 684.3 |
Group revenue (AUD Mn) | 2,913.0 | 3,267.7 | 4,293.3 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansResults by Segment
| Segment metric | FY24 | FY25 | FY26 |
|---|---|---|---|
Civil underlying EBITA (AUD Mn) | 29.8 | 44.2 | 46.9 |
Mining underlying EBITDA (AUD Mn) | — | 275.0 | 297.5 |
Mining underlying EBITA (AUD Mn) | — | 121.0 | 139.9 |
MET underlying EBITA (AUD Mn) | — | 68.3 | 96.0 |
EMIT underlying EBITA (AUD Mn) | — | — | 36.1 |
Corporate and eliminations, derived (AUD Mn) | — | -25.6 | -30.3 |
Group underlying EBITA (AUD Mn) | 195.1 | 207.9 | 288.6 |
Segment Margins & Growth (%)
| Segment metric | FY24 | FY25 | FY26 |
|---|---|---|---|
Civil EBITA margin (%) | 4.5 | 5.4 | 5.4 |
Mining EBITDA margin (%) | — | 17.8 | 19.3 |
Mining EBITA margin (%) | — | 7.9 | 9.1 |
MET EBITA margin (%) | — | 7.3 | 7.6 |
EMIT EBITA margin (%) | — | — | 5.3 |
Group EBITA margin (%) | 6.7 | 6.4 | 6.7 |
Segment growth (YoY %)
| Segment growth (YoY %) | FY25 | FY26 |
|---|---|---|
Civil revenue growth (%) | 25.7 | 4.7 |
Mining revenue growth (%) | — | -0.1 |
MET revenue growth (%) | 17.7 | 35.1 |
Civil EBITA growth (%) | — | 6.2 |
Mining EBITA growth (%) | — | 15.6 |
MET EBITA growth (%) | — | 40.5 |
Revenue by Segment (%)
| Segment | FY25 | FY26 |
|---|---|---|
Civil share (%) | 25.2 | 20.1 |
Mining share (%) | 47.2 | 35.9 |
MET share (%) | 28.5 | 29.3 |
EMIT share (%) | 0 | 15.9 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansSegment Overview — Civil
| Segment | Work in hand | Active tenders | Pipeline (within 12 months) |
|---|---|---|---|
Civil | 0.9 | 1.6 | 8.4 |
Mining | 4.4 | 4.2 | 9.8 |
MET | 0.8 | 2.2 | 6.8 |
EMIT | 1.4 | 3.1 | 4.1 |
Group | 7.5 | 11.1 | 29.1 |
Income Statement and Per-Share Data
| Metric | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Revenue (AUD Mn) | 2,400 | 2,670 | 2,913.0 | 3,267.7 | 4,293.3 |
Underlying EBITDA (AUD Mn) | 262.1 | 288.8 | 334.8 | 391.0 | 486.2 |
Underlying EBITA (AUD Mn) | 157.0 | 166.3 | 195.1 | 207.9 | 288.6 |
Amortisation of acquisition intangibles (AUD Mn) | — | — | 5.9 | 7.5 | 17.5 |
Non-underlying items (AUD Mn) | — | — | — | -142.1 | -26.0 |
Statutory EBIT (AUD Mn) | — | — | — | 58.3 | 245.1 |
Net interest (AUD Mn) | — | — | — | 26.2 | 27.7 |
Profit before tax (AUD Mn) | — | — | — | 32.1 | 217.4 |
Statutory NPAT (AUD Mn) | 97.4 | 85.6 | 105.1 | 27.7 | 153.4 |
Underlying NPAT (AUD Mn) | — | 104.4 | 123.8 | 127.2 | 182.7 |
Underlying / normalised EPS (A$ cents) | 20.9 | 23.2 | 27.3 | 27.9 | 39.8 |
Dividends per share (A$ cents) | 12.5 | 16.5 | 15.5 | 16.5 | 23.0 |
Margin Analysis (%)
| Metric | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Revenue growth (%) | 4.6 | 11.4 | 9.2 | 12.2 | 31.4 |
EBITDA margin (%) | 10.9 | 10.8 | 11.5 | 12.0 | 11.3 |
EBITA margin (%) | 6.5 | 6.2 | 6.7 | 6.4 | 6.7 |
Statutory net margin (%) | 4.1 | 3.2 | 3.6 | 0.8 | 3.6 |
Underlying net margin (%) | — | 3.9 | 4.2 | 3.9 | 4.3 |
Underlying EBITA growth (%) | — | 5.9 | 17.4 | 6.6 | 38.8 |
Income Statement
| Item | FY25 | FY26 |
|---|---|---|
Business acquisition related costs (AUD Mn) | -6.1 | -12.6 |
Impairment of trade receivables and contract assets (AUD Mn) | -131.5 | -11.3 |
Legal fees – OneSteel recovery (AUD Mn) | 0 | -3.0 |
Strandline bond release payment (AUD Mn) | -7.3 | 0 |
Net gain on investments (AUD Mn) | 2.7 | 0.9 |
Total non-underlying EBIT impact (AUD Mn) | -142.1 | -26.0 |
NPAT impact after 30% tax (AUD Mn) | -99.5 | -18.2 |
Liquidity & Coverage Ratios and Margin Analysis (%)
| Metric | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Cash and equivalents (AUD Mn) | 219.3 | 227.6 | 246.6 | 265.7 | 319.7 |
Financial debt (AUD Mn) | — | — | — | 364.2 | 499.6 |
Lease debt (AUD Mn) | — | — | — | 46.9 | 85.9 |
Net debt incl. leases (AUD Mn) | 66.6 | — | — | 145.4 | 265.8 |
Property plant and equipment (AUD Mn) | — | — | — | 604.6 | 585.7 |
Right-of-use assets (AUD Mn) | — | — | — | 40.7 | 79.0 |
Intangibles and goodwill (AUD Mn) | — | — | — | 211.3 | 433.6 |
Working capital (AUD Mn) | — | — | — | -44.3 | -100.3 |
Net tangible assets (AUD Mn) | — | — | — | 398.8 | 256.3 |
Net assets / equity (AUD Mn) | — | — | — | 610.0 | 689.9 |
Gearing incl. leases (%) | — | — | — | 23.8 | 38.5 |
Gearing excl. leases (%) | — | — | — | 16.1 | 26.1 |
Leverage net debt/EBITDA incl. leases (x) | — | — | — | 0.37 | 0.55 |
Leverage excl. leases (x) | — | — | — | 0.25 | 0.37 |
Cash Flow and Margin Analysis (%)
| Metric | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Operating cash flow before interest and tax (AUD Mn) | — | — | — | 310.5 | 447.1 |
Operating cash conversion (%) | — | 99 | 94.9 | 82.9 | 93.8 |
Net interest paid (AUD Mn) | — | — | — | 26.2 | 27.0 |
Income tax paid (AUD Mn) | — | — | — | 32.8 | 92.9 |
Operating cash flow before capital (AUD Mn) | — | — | — | 251.5 | 327.3 |
Net capital expenditure (AUD Mn) | — | 206.3 | — | 148.0 | 146.0 |
Free cash flow after all capital (AUD Mn) | — | — | — | 103.5 | 181.3 |
Payments for business combinations (AUD Mn) | — | — | — | 78.3 | 154.4 |
Dividends paid (AUD Mn) | 56.1 | — | — | 73.0 | 82.5 |
Share buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY25 | FY26 |
|---|---|---|
ROE statutory, closing equity (%) | 4.5 | 22.2 |
ROE underlying, closing equity (%) | 20.9 | 26.5 |
ROIC, EBITA after 30% tax / (equity + net debt) (%) | 19.3 | 21.1 |
Debt incl. leases / equity (x) | 0.67 | 0.85 |
Net debt / EBITDA (x) | 0.37 | 0.55 |
Interest coverage, EBITA / net interest (x) | 7.9 | 10.4 |
Dividend payout, DPS / underlying EPS (%) | 59.1 | 57.8 |
Free cash flow / underlying NPAT (%) | 81.4 | 99.2 |
State / Region Details
| State / region | Segments active | FY26 direction | Drivers |
|---|---|---|---|
Western Australia (Pilbara, Mid West, Goldfields) | Civil, Mining, MET, EMIT | Growing | Rio Tinto sustaining/replacement projects; Karara; Castle Hill; Fimiston; Tonkin Highway; defence |
Queensland (Bowen Basin, SE QLD) | Civil, Mining, EMIT | Mixed — Mining up (weather normalised), Civil resources softer, Urban +52.3% | Coal MSAs (SWC, Meandu from FY27, Curragh South); Brisbane 2032 Olympics; migration-driven housing |
South Australia | Mining, EMIT | Mining declining; EMIT growing | Reduced OneSteel scope; Festival Towers; hospital and bus-charging projects |
New South Wales | EMIT, MET (DIAB) | Growing | Westmead Hospital; Victoria Cross; DIAB projects |
Victoria | EMIT | Growing | Data centres (Stack MEL03), health, education |
Northern Territory | Mining, EMIT | New | Core Lithium Finniss; Commonwealth defence infrastructure |
North America | MET (Primero, RCR) | Small; pursuing growth | Sealed Pan Feeder interest (oil sands, potash); Primero engineering offices |
Share Price & Returns
| Period | Performance | Source / basis |
|---|---|---|
FY26 (1 Jul 2025 – 30 Jun 2026) | +148% (A$3.00 → A$7.44) | Morningstar data via InvestSMART |
Calendar 2025 | +36.6% (A$3.77 → A$5.15) | Same |
2026 YTD (to early Oct) | ≈ +40–42% (A$5.00 → ~A$7.0–7.1) | Same |
FY27 YTD | ≈ −8% (A$7.70 → ~A$7.09) | Same |
1-year | ≈ +104% (to 20 Aug 2026, Motley Fool) to +135% (Stockopedia, later date) | Varies by end date |
2026 trading range | A$4.98 – A$7.84 | Morningstar via InvestSMART |
Valuation Snapshot
| Multiple | Value | Basis |
|---|---|---|
Market capitalisation | ~A$3.26bn | Price × derived shares |
Enterprise value | ~A$3.53bn | Market cap + FY26 net debt incl. leases (A$265.8m) |
P/E (FY26 underlying EPS 39.8c) | ~17.8x | Trailing |
P/E (FY26 statutory) | ~21x | Trailing (statutory EPS derived) |
EV/EBITDA (FY26 A$486.2m) | ~7.3x | Trailing |
EV/EBITA (FY27 guidance midpoint A$325m) | ~10.9x | Forward |
EV/Sales (FY26) | ~0.82x | Trailing |
P/B (FY26 net assets A$689.9m) | ~4.7x | Trailing |
Dividend yield (23.0c) | ~3.2% | Trailing, fully franked |
Capital Markets
| Item | Value | Source |
|---|---|---|
Consensus recommendation | Buy | Stockopedia (Oct 2026) |
Consensus target price | A$6.98 | Stockopedia (below current price) |
Next-year consensus EPS | A$0.38 | Stockopedia (basis unclear; likely statutory) |
FY26 revenue consensus pre-result | A$4.19bn (actual A$4.29bn) | Visible Alpha, via Rivkin |
FY26 statutory NPAT consensus | A$161.3m (actual A$153.4m) | Visible Alpha, via Rivkin |
Per-Share Data
| Metric | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Interim DPS (A$ cents) | 5.5 | — | 6.5 | 7.0 | 8.5 |
Final DPS (A$ cents) | 7.0 | — | 9.0 | 9.5 | 14.5 |
Total DPS (A$ cents) | 12.5 | 16.5 | 15.5 | 16.5 | 23.0 |
Debt Facilities
| Facility (post-31 Jul 2026) | Maturity | Limit (AUD Mn) |
|---|---|---|
Working capital facility | 31 Jul 2027 | 50 |
Facility A – revolving credit | 31 Jul 2029 | 500 |
Facility B – revolving credit | 31 Jul 2030 | 150 |
Uncommitted accordion | Subject to lender approval | 100 |
Bank guarantee facilities | — | 125 |
Equipment finance (limit; A$198.5m drawn at 30 Jun 2026) | Various | 637 |
“—” = not publicly disclosed.
Analyst Conclusions
Management guidance (FY27)
Revenue A$4.6–4.8bn (~85% secured); Underlying EBITA A$320–330m; cash conversion in line with long-term averages; capex ~A$165m. At the midpoints this implies ~9.5% revenue growth and ~12.6% EBITA growth, with margin expansion to ~6.9% — consistent with a full-year Fredon contribution, Meandu commencement, Castle Hill expansion and EMIT margin improvement.
Consensus expectations
Consensus EPS of ~A$0.38 for the next year (Stockopedia) and a target price of ~A$6.98 suggest the sell-side sees the shares as approximately fairly valued after the FY26 re-rating.
Bull case
-
Compounding through diversification: The pipeline nearly doubled to A$29.1bn and active tenders doubled to A$11.1bn, while ~85% of FY27 revenue is already secured — a combination that supports sustained double-digit EBITA growth into FY28.
-
Accretive M&A machine with dry powder: Fredon (5.2x EV/EBIT) beat assumptions; A$718m of pro-forma liquidity and 0.37x leverage allow another bolt-on or step-change deal without equity.
-
Mix shift to capital-light earnings: Civil, MET and EMIT generated A$179m of FY26 segment EBITA versus Mining's A$140m, reducing capital intensity and supporting higher FCF conversion and a possible multiple re-rating toward services peers.
Bear case
-
Peak-cycle earnings: MET's record result leaned on the KCGM Fimiston Growth Project; Mining revenue was flat; gold and iron-ore cycles could turn, and resource capex is historically volatile.
-
Execution and credit risk across a much larger footprint: ~14,000 people, >200 projects, a FY26 loss-making Queensland contract, and a history of client-insolvency write-downs (OneSteel A$110.5m) suggest statutory earnings will remain lumpier than underlying metrics imply.
-
Valuation leaves little room for error: after a ~148% FY26 share-price gain, the stock trades above the consensus target on ~17.8x trailing underlying earnings, while tax normalisation (A$92.9m paid in FY26) and a tightening electrician market could pressure cash conversion and EMIT margins.
Catalysts and monitorables (next 12 months)
| Catalyst / monitorable | Expected timing |
|---|---|
| 2026 AGM — remuneration vote outcome and any FY27 guidance update | ~November 2026 |
| Fredon earn-out settlement (A$45–60m based on CY25 results) | FY27 (timing not disclosed) |
| H1 FY27 results — EMIT margin trajectory toward ~6%, Meandu ramp-up | ~February 2027 |
| Further data-centre and defence awards (EMIT active tenders A$3.1bn) | Ongoing |
| Mining tender conversion (A$4.2bn active) and commodity prices (gold, iron ore, met coal) | Ongoing |
| ALi commercial plant pathway / PMET progress | Ongoing |
| Possible acquisition using refinanced facilities | Unconfirmed |
| OneSteel recovery proceedings | Ongoing |
| Queensland wet season (Dec–Mar) impact on Mining and Civil | Q3 FY27 |
| Fimiston completion and MET backlog replacement (MET order book A$0.8bn) | FY27 |
Analyst verdict
NRW Holdings has completed its transition from a Pilbara earthmover into a genuinely diversified Australian industrial services group, and FY26 is the proof point. Record revenue of A$4.29bn, Underlying EBITA of A$288.6m and free cash flow of A$181.3m were delivered while absorbing a 100% debt-funded acquisition and keeping leverage at 0.37x. The Fredon deal, bought at 5.2x EBIT and already ahead of plan, gives NRW credible access to data centres, defence, health and commercial building — markets that are less correlated with commodity cycles and that require far less capital than contract mining. With ~85% of FY27 revenue secured, a A$7.5bn order book and a pipeline that has grown by roughly two-thirds in a year, near-term earnings visibility is the best in the company's history.
The risks are equally clear. Underlying margins remain contractor-thin at ~6.7%, statutory earnings have been repeatedly dented by client failures and project losses, and the Mining segment's flat revenue in FY26 shows that the resources core is not growing on its own. Governance has room to improve — a long-tenured chair, no internal audit function, an infrequently meeting audit committee and a recent remuneration first strike — at precisely the time the group has become larger and more complex. The tax tailwind has ended, and labour scarcity for electricians is a direct threat to the EMIT thesis.
On balance, NRW's fundamentals justify a structurally higher valuation than its historical mining-contractor discount, but after the FY26 re-rating the shares already discount much of the FY27 guidance, sitting slightly above the consensus target. The investment case from here rests on three tests: EMIT margins reaching ~6%, MET replacing Fimiston with new major projects, and management deploying its new A$700m facility on acquisitions with the same price discipline shown on Fredon. Delivery on all three would support further upside; a stumble on any would expose a stock priced for steady execution.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Background | Other listed boards (3 yrs) |
|---|---|---|---|---|
Michael Arnett | Chairperson, Non-Executive Director | NED 27 Jul 2007; Chair 9 Mar 2016 | Lawyer; former Partner, Director and national head of Natural Resources at Norton Rose (formerly Deacons) | McLaren Minerals (Chair, from Feb 2025); Genmin (Chair, to Jan 2025) |
Julian (Jules) Pemberton | CEO and Managing Director | Director 1 Jul 2006; CEO/MD 7 Jul 2010 | Joined NRW 1996; former COO; 30+ years in resources and infrastructure | None disclosed |
Jeff Dowling | Non-Executive Director (Audit Chair) | 21 Aug 2013 | 35+ years at Ernst & Young, incl. Managing Partner Western Region; B.Com (UWA); FCA, FAICD, FFin | S2 Resources; Fleetwood; Arrow Minerals (Chair); Battery Minerals (to Sep 2023) |
Fiona Murdoch | Non-Executive Director (N&RC Chair) | 24 Feb 2020 | 30+ years with MIM Holdings, Xstrata Queensland, AMCI; former Partner Neuchâtel Partners; MBA, LLB (Hons), GAICD | Ramelius Resources; Metro Mining (to Oct 2024) |
David Joyce | Non-Executive Director (Sustainability Chair) | 19 Mar 2024 | 30+ years; Kinhill, WMC Resources, senior leadership at Rio Tinto to 2021; BE (First Class Hons), Adelaide | — |
Adrienne Parker | Non-Executive Director (Risk Chair) | 13 May 2024 | 25+ years resources/energy/infrastructure law; former Partner and Head of Perth office at a global law firm; LLB (UWA) | Fleetwood; Liontown; Resolute Mining |
Directors' Remuneration
| Committee | Chair | Members | FY26 meetings |
|---|---|---|---|
Nomination & Remuneration | Fiona Murdoch | Michael Arnett, Jeff Dowling | 6 |
Audit | Jeff Dowling | Fiona Murdoch, David Joyce | 2 |
Risk | Adrienne Parker | Jeff Dowling, David Joyce | 3 |
Sustainability | David Joyce | Michael Arnett, Fiona Murdoch, Adrienne Parker | 3 |
Executive Leadership Team
| Name | Title | Notes |
|---|---|---|
Jules Pemberton | CEO and Managing Director | CEO since July 2010; with NRW since 1996 |
Peter Bryant | Chief Financial Officer | — |
Kim Hyman | Company Secretary | Since July 2007; also responsible for legal coordination and insurance |
Chief HSE & Sustainability Officer | Group HSES | — |
Segment heads (Civil, Mining, MET, EMIT/Fredon) | Divisional leadership | — |
Major Shareholders
| Holder | Stake | Date / source |
|---|---|---|
Macquarie Group Limited and controlled entities | 6.26% (28,773,577 shares) | Substantial holder notice, 26 Jun 2026 |
Australian Retirement Trust | 5.004% (22,990,728 shares) | Became substantial 4 Sep 2026 (notice 8 Sep 2026); had ceased on 24 Aug 2026 and re-crossed |
First Sentier Group / MUFG | 5.01% (23,039,787 shares) | — |
Other top-10 holders | — | Top-20 register is in the FY26 Shareholder Information section |
“—” = not publicly disclosed.
Competitive Landscape
Competitors by Segment
| Segment | Named competitors |
|---|---|
Civil | CPB Contractors (CIMIC), Acciona, BGC/Georgiou-type WA civil contractors, Decmil, Ventia (infrastructure services), Downer (infrastructure), MACA Civil (now Thiess-owned), regional civil contractors |
Mining | Thiess (incl. MACA), Perenti (Barminco/African Underground), Macmahon, Mineral Resources' mining services, BUMA Australia, MLG Oz, Byrnecut (private, underground) |
MET | Monadelphous, GR Engineering Services, Lycopodium, Civmec, SRG Global (maintenance/specialist), Worley (engineering), Ausenco (private) |
EMIT | Southern Cross Electrical Engineering, Stowe Australia, Ventia, Downer (building services), Service Stream, GenusPlus, Total Construction-type HVAC firms (private) |
Peer Comparison FY2026
| Metric | NRW Holdings | Monadelphous | SRG Global |
|---|---|---|---|
Revenue (AUD Mn) | 4,293.3 | 2,980 | 1,675.5 |
Revenue growth (%) | 31.4 | 31.5 | 27.0 |
EBITDA margin (%) | 11.3 | — | 10.2 |
EBIT(A) margin (%) | 6.7 | — | 7.9 |
NPAT (AUD Mn) | 153.4 | 127.3 | 85.3 |
Work in hand (AUD Bn) | 7.5 | — | 5.1 |
Recent Developments
--