Orion Minerals Limited Overview

Orion Minerals is an Australian-domiciled, dual-listed (ASX/JSE) base metals developer. It is trying to become South Africa's next significant copper producer by restarting two historic, fully permitted brownfield mining districts in the Northern Cape. Its flagship asset is the Prieska Copper Zinc Mine (PCZM), a top-30 global volcanogenic massive sulphide (VMS) deposit. Prieska historically produced about 430kt of copper and 1Mt of zinc. Its March 2025 Definitive Feasibility Study (DFS) supports a 13.2-year, 2.4Mtpa operation at a first-quartile all-in sustaining cost (AISC) of US$0.94/lb copper, net of zinc credits. The second hub is the Okiep Copper Project (Flat Mines), which is currently being optimised. Development funding rests on a binding US$250m Glencore prepayment and offtake facility, alongside the Industrial Development Corporation (IDC) as an equity partner and Triple Flag as an existing stream and credit holder. Orion's investment case is a call on copper scarcity combined with execution in a complex jurisdiction. Its main risks are financing close, construction delivery and dilution.


Company's own description (FY2026 Annual Report, paraphrased). Orion describes itself as moving from explorer and developer to copper and base metals producer in the Northern Cape. Its stated purpose is to unlock resources through people to improve the world. It advances two fully permitted projects by revitalising legacy mines that retain significant exploration potential. Two Australian exploration projects provide longer-term optionality.

Independent characterisation. Orion is a single-jurisdiction, pre-revenue mine developer with a staged plan:

  1. Prieska Uppers (Phase 1). A small, high-grade underground operation in the near-surface crown pillar. It is accessed from an existing decline and processes about 240ktpa (20kt/month) through a Build-Own-Operate-Transfer (BOOT) concentrator supplied by ENPROTEC. The Uppers Probable Ore Reserve is 629kt at 2.3% Cu. The phase is planned to run for about 4.3 years and produce a bulk copper-zinc concentrate. First concentrate is targeted about 13 months after Glencore Tranche A funding closes.

  2. Prieska Deeps (Phase 2). Dewatering of historic workings, refurbishment of the Hutchings Shaft and construction of a 2.4Mtpa plant. At steady state this produces separate copper and zinc concentrates of about 22ktpa Cu and 65ktpa Zn.

  3. Okiep Flat Mines. A copper-only underground project (10Mt resource at 1.3% Cu). It is being optimised to reduce capital, with construction targeted from 2028.

  4. Exploration. About 3,400km² of rights, covering roughly 70% of the exposed Areachap Belt and 75% of the exposed Okiep District, supported by the 2026 BHP Xplor accelerator.

Revenue model. Orion's future revenue will come entirely from sales of physical products: base metal concentrates sold under offtake contracts. It has no service, subscription or licensing income. Glencore's prepayment is repaid through concentrate deliveries, so a large share of early cash flow is effectively pre-committed. The September 2025 term sheet referenced 100% offtake of zinc and copper concentrates for 5 to 10 years (Reuters, 17 Sep 2025). Reported "revenue" to date consists of interest and other income: A$0.32m in FY2026.

Value chain position. Upstream mining and concentration only. Orion does not smelt or refine. Concentrates go to Glencore, a trader and smelter owner, under linked offtake agreements.

Customer types and end-markets. In the near term there is one customer, Glencore. The ultimate end-markets are copper for power grids, renewable energy, electric vehicles, data centres, construction and industry, and zinc for galvanising steel used in infrastructure.

Ownership structure at asset level (FY2026 Annual Report).

The CFO review states that after the partial conversion of its ZAR344.5m loan, the IDC holds 23.8% of PCZM HoldCo, which equates to about 16.7% effective in Prieska, plus a ZAR272.4m shareholder loan claim. The BEE partner at Prieska is Prieska Resources (owned by Safika Resources, Black Star Minerals and Kolobe Nala Investment Company). At Okiep it is Landmark Capital Investments, led by Lulamile Xate.

Strategy

Stated strategy (FY2026 Annual Report, three pillars, paraphrased):

  1. Foundation. Establish Orion as a producer at Prieska. Build a low-cost operating base (AISC US$0.94/lb, lowest global cost quartile) and execute the Uppers before scaling into the Deeps.

  2. Growth. Develop Okiep Flat Mines as the second hub, reducing reliance on a single asset. Production is targeted from about 2028 (resource 10Mt; 132kt contained Cu).

  3. Future opportunity. Grow the Northern Cape pipeline through the 3,400km² land position and BHP Xplor learnings.

The enablers listed across all three pillars are: build relationships (Glencore, BHP Xplor, IDC, Triple Flag); prepare the business for operations (systems, culture, governance, safety); and embed ESG into delivery.

MD/CEO performance priorities (FY2026 Annual Report): Zero Harm, enterprise risk management, organisational readiness, funding and capital discipline, stakeholder trust, people and culture, and strategy and delivery.

Medium-term targets and guidance (FY2026 Annual Report timeline): first Uppers concentrate about 13 months after Tranche A closes, targeted for Q3 2027; Uppers running at 0.24Mtpa; Deeps at 2.4Mtpa after dewatering and shaft refurbishment (about two years after the Uppers per Financial Mail); Okiep construction from 2028; a 36-month Prieska resource programme (22,000m of resource definition drilling and 72,000m to test extension targets T1 and T2). No financial targets for revenue, EBITDA or margins have been given beyond the DFS economics.

Products & Services

Orion has no commercial products yet. Its planned product slate is listed below. All quantities come from the 28 March 2025 DFS as summarised in the FY2026 Annual Report.

Flagship offering. Prieska concentrate. The DFS-implied steady state is about 22ktpa of copper and 65ktpa of zinc in concentrate from 2.4Mtpa of ore.

Product Portfolio

ProductSource assetDescription and specificationPlanned life-of-mine outputTarget customerPlanned first salePricing model

Bulk Cu-Zn concentrate

Prieska Uppers

Concentrate from supergene sulphide ore; 20,000tpm BOOT concentrator (ENPROTEC)

70,553 dmt

Glencore (linked offtake)

—

Market-linked terms under Glencore offtake; detailed terms not disclosed

Copper concentrate

Prieska Deeps

Separate Cu concentrate from a 2.4Mtpa plant

995,598 dmt (≈213,055t contained Cu across Prieska)

Glencore

About two years after Uppers

Offtake; terms not disclosed

Zinc concentrate

Prieska Deeps

Separate Zn concentrate; zinc treated as a by-product credit in AISC

1,229,197 dmt (≈610,630t contained Zn)

Glencore

With Deeps ramp-up

Offtake; terms not disclosed

Copper concentrate (minor silver)

Okiep Flat Mines

Copper-only underground project

261,133 dmt (78,340t contained Cu)

Not contracted

Construction from 2028

—

Precious metal stream deliveries

Prieska

Triple Flag holds a stream and credit position (US$87m agreements, 2022)

—

Triple Flag

Linked to production

Stream contract terms not detailed in sources reviewed

“—” = not publicly disclosed.

Financial Narrative

All figures are A$ millions unless stated, for fiscal years ending 30 June. Source: S&P Global Market Intelligence via StockAnalysis.com (updated 17 Sep 2026, reconciled to the FY2025 and FY2026 Annual Report announcements where available).

Income statement

The company itself reported a basic loss per share of 0.18c for FY2025 and 0.09c for FY2024 (FY2025 results announcement). The 0.17c computed above differs because of rounding and the share-weighting method. The FY2025 loss of A$15.36m and FY2026 loss of A$12.69m match the company's announcements (FY2025 results; Quartr FY2026 summary).

Margins and growth. Gross, operating, EBITDA and net margins are not meaningful because there is no operating revenue (S&P computes operating margins of between -3,000% and -27,000%). Revenue CAGR is not meaningful for the same reason.

Commentary. The losses are what you would expect from a developer that expenses part of its project spend. FY2025 rose to A$15.36m because A$6.34m of exploration and evaluation spending at Prieska and Okiep did not meet the capitalisation policy, plus A$1.72m in contractor and adviser costs, partly offset by A$4.92m in finance income (Business Day, 1 Oct 2025). The finance income line, about A$4.9m a year, is largely non-cash. It comes from preference shares issued to Orion's subsidiary Agama by Prieska Resources, which is how Orion vendor-financed its BEE partner's stake. Interest expense jumped from FY2024 as the IDC convertible loan and Triple Flag early funding accrued. It fell in FY2026 (A$5.20m vs A$6.35m), consistent with the IDC loan's partial conversion to equity in May 2026. FX swings, such as the A$9.37m loss in FY2023, reflect intercompany balances in ZAR. The FY2026 improvement to a A$12.69m loss came from lower expensed project costs while Prieska was held in "shovel-ready" status awaiting funding. Note that the FY2024 loss was flattered by a A$1.75m FX gain.

Balance sheet

Latest disclosed positions (FY2026 and H1 FY2026). At 31 December 2025 (Interim Report, S&P data): cash A$5.74m, total assets A$160.76m, total debt A$40.09m (of which A$30.33m was classified current), net debt A$34.35m, shareholders' equity A$100.82m and working capital of -A$27.58m. At 30 June 2026 cash was A$14.46m (FY2026 Annual Report). After the IDC's partial loan-to-equity conversion of about ZAR344.5m in May 2026, borrowings and the current-liability classification should have fallen materially, but the post-conversion figures are not publicly disclosed in the sources reviewed.

Commentary. The balance sheet shows the classic developer pattern: capitalised mine assets grow (PP&E from A$47m to A$91m between FY2021 and FY2025) while liquidity stays thin. Cash fell to A$0.21m at 30 June 2025, a near-going-concern position, before being rebuilt through about A$30m of FY2026 equity. Debt moved from negligible to A$38m between FY2023 and FY2025 as IDC and Triple Flag funding was drawn. The "unearned revenue" line (A$11.6m in FY2025) most likely represents the Triple Flag stream deposit, which is settled in metal rather than cash. The persistent negative minority interest reflects losses attributed to the BEE and community partners, whose stakes Orion largely vendor-financed. Goodwill is nil.

Cash flow

Commentary. Capex peaked in FY2024–FY2025 at A$16–17m a year, covering trial mining in the Uppers, dewatering and power infrastructure. It was then deliberately cut to A$5.4m in FY2026 while Prieska waited for Glencore funding. Cumulative free cash outflow over five years was about A$100.6m (computed). It was funded by about A$64.6m of equity and about A$28.4m of net debt (computed). Weighted shares rose about 83% over FY2022–FY2026 (4.35bn to 7.98bn), an average dilution of about 16–23% a year (S&P share change data). Stock-based compensation has more than quadrupled since FY2022, consistent with management rebuilding under the new CEO. Management has flagged that further capital raising is expected in FY2027 (Quartr FY2026 summary of the annual report).

Ratios

For FY2026, interest coverage was -2.5x (computed: EBIT -12.80 / interest 5.20). S&P's TTM metrics as of August 2026, based on the December 2025 balance sheet, were: ROE -15.6%, ROA -5.3%, ROIC -6.0%, current ratio 0.19x and debt/equity 0.40x. ROIC, net debt/EBITDA and the cash conversion cycle are not meaningful (EBITDA is negative and there is no inventory or receivables cycle). The trend that matters is liquidity. The current ratio collapsed to 0.15x at FY2025 and recovered with the FY2026 raises, but the company still relies on continuous equity access until Glencore funds flow.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Pillar / Economic Segment Details

Pillar / economic segmentContentsStage (Oct 2026)Key metrics

Pillar 1 – Foundation: Prieska Copper Zinc Mine

Uppers (+105 Level crown pillar) and Deeps (Deep Sulphide); PCZM and Vardocube tenements

Pre-execution; funding is the outstanding enabler

31Mt at 1.2% Cu and 3.6% Zn resource; 15.6Mt Probable Reserve; NPV8 A$568m; AISC US$0.94/lb

Pillar 2 – Growth: Okiep Copper Project

Flat Mine North, East, South and Nababeep; New Okiep Mining Company

Optimisation; construction targeted from 2028

10Mt at 1.3% Cu resource; 6.1Mt Probable Reserve; NPV8 A$75m (pre-optimisation)

Pillar 3 – Future opportunity: Exploration

Areachap Belt (Kantienpan, Witkop, Boksputs, Orange River pegmatites, Jacomynspan Ni-Cu-Co-PGE); Okiep District; Australia (Fraser Range 35% JV with IGO; Walhalla 100%)

Exploration / concept

3,400km² of rights; Jacomynspan 6.8Mt at 0.57% Ni

Revenue by Segment

SegmentFY2024FY2025FY2026

Prieska sales revenue (AUD Mn)

000

Okiep sales revenue (AUD Mn)

000

Exploration/Australia sales revenue (AUD Mn)

000

Group other/interest revenue (AUD Mn)

0.380.390.32

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Income Statement and Share Count (M)

MetricFY2022FY2023FY2024FY2025FY2026

Revenue – other/interest income (AUD Mn)

0.060.080.380.390.32

Gross profit (AUD Mn)

0.060.080.380.390.32

Total operating expenses (AUD Mn)

15.6610.6312.0714.3113.12

Operating income / EBIT (AUD Mn)

-15.60-10.55-11.69-13.93-12.80

EBITDA (AUD Mn)

-15.55-10.45-11.32-13.22-12.04

Interest expense (AUD Mn)

-0.29-0.43-2.53-6.35-5.20

Interest and investment income (AUD Mn)

3.123.324.374.924.90

FX gain/loss (AUD Mn)

-2.77-9.371.750.290.42

Pre-tax income = total net loss (AUD Mn)

-15.53-17.13-7.94-15.36-12.69

Minority interest share of loss (AUD Mn)

1.241.802.563.493.17

Net loss attributable to owners (AUD Mn)

-14.29-15.33-5.39-11.87-9.52

Weighted basic shares (M)

4,3484,9205,8116,8207,975

EPS basic and diluted (A cents, computed)

-0.33-0.31-0.09-0.17-0.12

Dividends per share (A cents)

00000

Balance Sheet

MetricFY2021FY2022FY2023FY2024FY2025

Cash and equivalents (AUD Mn)

20.554.297.568.270.21

Total current assets (AUD Mn)

21.355.468.9518.240.91

Property, plant and equipment (AUD Mn)

47.2852.0650.8274.1091.25

Long-term investments, incl. preference shares (AUD Mn)

22.6524.6024.9728.7233.70

Intangible assets (AUD Mn)

0006.356.61

Total assets (AUD Mn)

97.9689.6492.37136.60143.22

Short-term debt incl. current portion (AUD Mn)

1.891.96002.44

Long-term debt (AUD Mn)

001.9824.2632.61

Total debt incl. leases (AUD Mn)

3.994.083.5027.9338.27

Net debt; negative = net cash (AUD Mn)

-16.56-0.21-4.0619.6638.06

Long-term unearned revenue, stream deposit (AUD Mn)

0009.9211.61

Total liabilities (AUD Mn)

6.968.747.7443.6656.72

Total common equity (AUD Mn)

94.6885.8192.87102.1898.83

Minority interest (AUD Mn)

-3.68-4.92-8.25-9.24-12.33

Total shareholders' equity (AUD Mn)

91.0080.9084.6392.9486.50

Working capital (AUD Mn)

18.330.796.6013.87-5.24

Cash Flow

MetricFY2022FY2023FY2024FY2025FY2026

Operating cash flow (AUD Mn)

-13.02-9.96-12.07-7.88-10.68

Capital expenditure (AUD Mn)

-4.68-3.95-16.90-16.04-5.41

Free cash flow (AUD Mn)

-17.70-13.92-28.96-23.92-16.08

Equity issued (AUD Mn)

2.6317.172.8611.3230.58

Net debt issued (AUD Mn)

01.6420.465.570.75

Financing cash flow (AUD Mn)

1.8518.3530.5215.8330.34

Dividends paid (AUD Mn)

00000

Share buybacks (AUD Mn)

00000

Net change in cash (AUD Mn)

-16.273.280.71-8.0614.25

Stock-based compensation (AUD Mn)

0.420.540.701.181.90

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2022FY2023FY2024FY2025

ROE % (attributable loss / common equity, computed)

-16.7-16.5-5.3-12.0

ROA % (total loss / total assets, computed)

-17.3-18.5-5.8-10.7

Current ratio (x, computed)

1.173.814.170.15

Debt to equity (x, computed)

0.050.040.300.44

Interest coverage EBIT/interest (x, computed)

-53.8-24.5-4.6-2.2

Asset turnover (x)

0.000.000.000.00

Results by Region

RegionFY2024FY2025FY2026

South Africa sales revenue (AUD Mn)

000

Australia sales revenue (AUD Mn)

000

Group other/interest income (AUD Mn)

0.380.390.32

Share Price History

DatePrice (AUD)ContextSource

9 Feb 2026

0.038

Glencore binding agreement

InvestSMART

18 Mar 2026

0.029

Okiep settlement

InvestSMART

22 May 2026

0.029 → 0.023

Placement at 0.022

InvestSMART

31 Jul 2026

0.023

SARB approval

InvestSMART

21 Aug 2026

0.022

52-week change +120%

StockAnalysis

22 Sep 2026

0.026

Post-results

StockAnalysis

30 Sep 2026

0.0225

Tembo block traded at 0.019

MiningMX

12 Oct 2026

0.025

Latest

StockAnalysis

Performance window

Value

Source

—

52-week change to 21 Aug 2026 (%)

120

S&P via StockAnalysis

—

YTD 2026 to mid-Aug, JSE (%)

26

Financial Mail

—

Analyst Conclusions

Management guidance (FY2026 Annual Report, Sep 2026): Tranche A closing, followed by about 13 months to first Uppers concentrate, targeted for Q3 2027. Uppers at 0.24Mtpa for about 4.3 years. Deeps ramp-up to 2.4Mtpa (about 22ktpa Cu and 65ktpa Zn) over the following years. Okiep construction from 2028 after an updated development case. Further capital raising expected in FY2027.

Consensus growth expectations: not available, since there is no sell-side coverage.

Bull case:

  1. Funding close re-rates the stock. Tranche A closing, which management has repeatedly called "imminent", removes the gating item. The market cap of about A$224m is roughly 0.74x the attributable Prieska NPV8 (computed), before Okiep and exploration.

  2. Low-cost, high-margin production into a copper deficit. An AISC of US$0.94/lb, with ICSG forecasting a refined deficit in 2026, gives a wide margin cushion. The Uppers' high grade (2.3% Cu) supports early cash flow.

  3. Optionality and register clean-up. Flat Mine East grades of 9.4% Cu and above could materially improve Okiep. Tembo's exit to a strategic local holder (Borman) and a South African institution removes a long-standing overhang.

Bear case:

  1. Funding fatigue. Five successive Tranche A target dates have been missed. Tranche B (US$210m) depends on Glencore's own non-recourse fundraising. Peak capital is A$578m against a A$224m market cap, which implies further dilution.

  2. Execution and country risk. Restarting a mine dormant for three decades, in a town with scarce skills and under Eskom, logistics and regulatory constraints, carries a high risk of cost and schedule overruns.

  3. Value leakage. Orion owns only about 53% and 51% of its projects. Glencore's offtake and prepayment terms, the Triple Flag stream and the IDC loan claim all rank ahead of Orion's equity in the cash waterfall. Continuing losses of A$10–15m a year compound dilution.

Analyst verdict. Orion Minerals has a good orebody and a weak balance sheet. Prieska is a credible, top-30 global VMS deposit with brownfield infrastructure, a first-quartile cost position and a DFS-backed post-tax NPV8 of A$568m. Three sophisticated counterparties have each done extensive due diligence: Glencore as financier and offtaker, the IDC as a project equity partner, and BHP through Xplor. That validation is meaningful for a company of this size. The management team assembled since mid-2025, led by former Palabora CEO Tony Lennox, has more operating depth than the company has historically had. The value-engineering and execution-readiness work completed during the funding hiatus should shorten mobilisation once money arrives.

The problem is time and capital. Every Glencore Tranche A target since November 2025 has been missed. At 12 October 2026 the company was still describing the construction decision as imminent rather than taken. Even after Tranche A, the US$40m only covers the Uppers. The value is in the Deeps, which depends on a US$210m tranche conditional on Glencore's own non-recourse funding, against a peak capital need of A$578m. Orion's attributable interest of about 53% sits behind a stack of senior claims, and the company has told investors to expect more equity raising in FY2027. A market capitalisation of about A$224m, roughly 0.74x attributable Prieska NPV before any risk discount, is therefore not obviously cheap. It reflects a plausible but unfunded production path in a demanding jurisdiction.

On balance, Orion is a high-risk, high-beta option on copper and on South African mine delivery. The investment thesis turns almost entirely on one binary event: Tranche A closing and construction starting. A clean close, followed by visible on-time contract awards, would justify a re-rating toward a larger share of NAV. Another slippage, especially one combined with a deeply discounted raise, would confirm the market's scepticism. The single most important monitorable is Tranche A drawdown.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleBackgroundEducationIndependence (analyst assessment)

Denis Waddell

Non-Executive Chairman

~40 years in exploration, mining and finance. Founded Tanami Gold NL in 1994 and served as MD, Chair and NED until 2012; earlier Finance Director of the Metana Minerals group. Long association with Orion since its early years.

Chartered Accountant; FAICD

Long tenure and founder-era links make strict independence doubtful

Anthony (Tony) Lennox

Managing Director and CEO (appointed May 2025)

~40 years as a mining engineer, underground and open-cut, in coal and base metals. Senior roles at Rio Tinto, BHP and Shell Australia; former MD/CEO of Palabora Mining Company. More than a decade of African leadership and about 20 years of board experience.

B.Eng (Mining) (Hons), UNSW

Executive

Godfrey Gomwe

Non-Executive Director

Former CEO of Anglo American Thermal Coal. Former Executive Director, FD and COO of Anglo American South Africa; Chairman and CEO of Anglo American Zimbabwe.

B.Acc (Hons), University of Zimbabwe; MBL, UNISA; CA (Z)

Likely independent

Dr Patience Mpofu

Non-Executive Director

MD of AXEL REE Limited; founder and CEO of Insight Mining Experts. Formerly at South32, Anglo American and Sibanye-Stillwater (ex-Lonmin).

BSc (Hons) Applied Chemistry, NUST; PhD Mineral Processing, UniSA; MBA, Wits; AMP, INSEAD

Likely independent

Mark Palmer

Non-Executive Director

Mining finance specialist: Dominion Mining, NM Rothschild & Sons, led UBS's EMEA mining team, joined Tembo Capital in 2015

BSc Mining Geology, University College Cardiff

Not independent (Tembo nominee). Tembo exited in Oct 2026, so his board position may come under review.

Executive Leadership Team

NameTitleBackgroundEducation

Peet van Coller

Chief Financial Officer

23 years: Jubilee Metals Group, Murray & Roberts, Master Drilling, Samancor Chrome, Anglo American Platinum, ARM-Norilsk Nkomati; articles at Ernst & Young

BCom (Acc), Potchefstroom; BCom (Hons), UNISA; CA (SA)

John Paul Hunt

Executive: Exploration

30+ years: Norilsk Nickel Africa, Newgenco, Council for Geoscience, SRK Exploration

MSc Economic Geology, Wits; GDE (Resource Evaluation), Wits

Marcus Birch

Executive: Sustainability and Business Support

35 years: Anglovaal, AngloGold Ashanti, Clarity Minerals, High Power Exploration

BSc (Hons) Geology, Exeter; BCom, UNISA

Avishkar Nagaser

Executive: Corporate Communications and IR

EVP IR and Corporate Affairs at Gold Fields (2015–2023); analyst at BofA Merrill Lynch and Macquarie First South

BBusSci (Finance and Economics), UKZN

Johan van Dyk

Project Director

40 years, including 26 at Palabora Mining Company (GM Operations, Projects, SHEQ); ISCOR, Sasol, Rio Tinto Northparkes

MBA, University of Cumbria; Government Certificate of Competency

Andre Bergh

General Manager: Prieska

27+ years: De Beers Namibia; operations in Namibia, Ghana, Tanzania and South Africa

Mechanical engineering; Mines and Works Certificate of Competency

Martin Bouwmeester

Company Secretary

30 years; former CFO and Company Secretary of Perseverance Corporation (Fosterville Gold Mine)

FCPA

Board & Management Changes

DateChangeContextSource

Apr 2025

Errol Smart (long-serving MD/CEO) departs

Abrupt exit to set up his own exploration and development business

MiningMX (17 Apr 2025)

May 2025

Tony Lennox appointed MD and CEO

Hired to move the company to execution; brought in former Palabora colleagues (e.g. van Dyk)

FY2026 Annual Report; MiningMX

FY2025–FY2026

New executive bench built (CFO, IR, Project Director, Prieska GM)

Readiness for operations

FY2026 Annual Report

Major Shareholders

HolderStakeDate / source

Tom (Thomas) Borman

14.32%

After buying just under half of Tembo's 1.08bn shares (MiningMX, 1 Oct 2026)

Undisclosed South African institution

Remainder of Tembo's block (~6–7% implied, computed: 12.1% less Borman's purchase); exact stake not disclosed

MiningMX; Mining Weekly (Oct 2026)

Tembo Capital Mining Fund II / Ndovu Capital X B.V.

Exited (was 12.77% after the May 2026 placement; 16.47% before earlier raises)

FilingReader (Jun 2026); MiningMX (Oct 2026)

Insiders (S&P)

18.87%

StockAnalysis, Aug 2026 (before the Tembo sale)

Institutions (S&P)

14.10%

StockAnalysis, Aug 2026

Free float (S&P)

~5.50bn shares

StockAnalysis, Aug 2026

Competitive Landscape

Key Competitors

CompanyListingAsset / regionStageRelative positioning vs Orion

Copper 360

JSE

Rietberg and Northern Cape copper (Okiep region)

Small producer

Northern Cape neighbour. Has missed production targets since listing in 2023 and relied on a dilutive rights issue; share price -43% YTD to Aug 2026 (FM).

Jubilee Metals Group

AIM/JSE

Zambian copper (Molefe, Roan); selling its South African PGM and chrome operations

Producer / processor

-35% YTD to Aug 2026; expects about R1bn in disposal proceeds (FM)

Vedanta Zinc International

Private (Vedanta)

Black Mountain and Gamsberg zinc, Northern Cape

Producer

Regional zinc incumbent; competes for skills and infrastructure

Palabora Mining Company

Private

Limpopo copper

Producer

The South African copper incumbent; Orion's CEO and Project Director are Palabora alumni

Sandfire Resources

ASX

Motheo, Botswana (Kalahari Copper Belt)

Producer

Successful Southern African copper development benchmark

MMG

HKEX

Khoemacau, Botswana

Producer

Kalahari Copper Belt producer

Ivanhoe Mines

TSX

Kamoa-Kakula, DRC

Major producer

Tier-1 African copper; competes for capital and offtake attention

Cobre Ltd

ASX

Kalahari Copper Belt, Botswana

Developer

Junior African copper developer peer

Khoemacau / Motheo-type developers generally

Various

Botswana and Namibia

Developer

Competition for streaming and prepayment capital

Trafigura / Glencore-funded juniors

Various

Global

Developer

Competition for trader prepayments

Peer Comparison FY2026

MetricOrionCopper 360Jubilee MetalsSandfire

Stage

Pre-production

Producer (early)

Producer

Producer

YTD share performance to mid-Aug 2026 (%)

26-43-35—

Feasibility basis

DFS (JORC) on both assets

Mining viability report and maiden reserve

JORC resource pending at Molefe

Operating

Funding anchor

US$250m Glencore prepayment

Rights issue

Disposal proceeds

Internal cash flow

Revenue, margins, R&D intensity

Not applicable (no revenue; no R&D)

———

Recent Developments

--

Company Snapshot

13

Employees

Victoria, Australia

Headquarters

SWOT Analysis

Strengths

  • World-class orebody: Prieska is a top-30 global VMS deposit: 31Mt at 1.2% Cu and 3.6% Zn, containing 370kt Cu and 1.12Mt Zn (FY2026 AR)
  • First-quartile costs: DFS AISC of US$0.94/lb Cu net of zinc credits (FY2026 AR)
  • Robust economics: Post-tax NPV8 A$568m and IRR 26.2% over a 13.2-year life (FY2025 results)
  • Brownfield head start: Existing decline, shaft, dewatering, power and water; trial mining completed in 2024 (FY2026 AR)
  • Blue-chip validation: Binding US$250m Glencore facility; IDC equity partner; BHP Xplor selection from more than 600 applicants (FY2026 AR)
  • Fully permitted, Charter-compliant: Mining rights for Prieska (2019), Vardocube (2020) and Flat Mines (2022); 20% BEE plus 5% community and 5% employee trusts (FY2026 AR)
  • Safety record: 473 days without a lost-time injury; LTIFR of 0; 3,566 fatality-free production shifts (FY2026 AR)

Weaknesses

  • Thin liquidity: Cash of A$0.21m at 30 June 2025 and A$14.46m at 30 June 2026, against an annual free cash burn of A$16–29m (S&P)
  • Chronic dilution: Weighted shares rose from 4.35bn (FY2022) to 7.98bn (FY2026); a further raise is flagged for FY2027
  • Timeline credibility: Tranche A targets have slipped from Nov 2025 to end-Mar 2026, end-Jun 2026, end-Aug 2026, and remained open into Oct 2026. The company itself acknowledges that historic delays have hurt confidence (FY2026 AR).
  • Diluted economic interest: Orion's effective interest is about 53% in Prieska and 51% in Okiep, with vendor-financed partners
  • Governance gaps: No standalone remuneration or nomination committee disclosed; independence under review (FY2026 AR)
  • Okiep marginality: AISC of US$2.39/lb; IRR 19%; copper-only, so it is highly sensitive to costs (FY2026 AR)

Opportunities

  • High-grade Okiep upside: OFMED153 returned 49.35m at 5.05% Cu, including 21.66m at 9.41% (FY2026 AR)
  • Prieska mine-life extensions: Five extension targets at depth; a 72,000m drilling programme planned (FY2026 AR)
  • District consolidation: About 70% of the exposed Areachap Belt and 75% of the Okiep District (FY2026 AR)
  • Capex reduction: BOOT concentrator, equipment rental and tailings-to-stopes options (FY2026 AR)
  • Copper deficit: ICSG expects a refined deficit in 2026 (FM, Aug 2026)
  • Strategic interest: A Glencore relationship and BHP Xplor exposure could lead to future corporate activity (analyst inference)

Threats

  • Funding conditions: Tranche B depends on Glencore securing non-recourse third-party funding (Mining Weekly, Feb 2026)
  • South African regulatory risk: Exchange control, cadastre problems and approval delays (FY2026 AR; MiningMX Jun 2026)
  • FX mismatch: Revenue in US$, costs mainly in ZAR (FY2026 AR CFO review)
  • Skills scarcity: Decades without mining in the Prieska area (Chairman's message)
  • Community expectations: High local unemployment; targets of 50% host-community employment and 30% local procurement (FY2026 AR)
  • Commodity price cyclicality: Copper and zinc price sensitivity (FY2026 AR material matters)

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
28 Mar 2025Prieska and Okiep DFSs released FY2025 results announcementBasis for financing; NPV8 A$568m and A$75m
17 Apr 2025CEO Errol Smart departs MiningMXLeadership disruption
May 2025Tony Lennox appointed MD and CEO FY2026 Annual ReportShift to an execution-focused leader
4–8 Jul 2025ASX trading halt; ~A$5.8m raise announced (A$3.3m placement plus SPP) MiningMX; FY2026 Annual ReportLiquidity rescue; cash had fallen to A$0.21m at 30 June 2025
Aug 2025A$1.9m Share Purchase Plan completed FY2026 Annual ReportRetail support
17 Sep 2025Non-binding Glencore US$200–250m term sheet; first Uppers production then hoped for in December 2026 MiningMX; ReutersFunding breakthrough
30 Sep–1 Oct 2025FY2025 results: loss A$15.36m. About A$5m placement; shares fell 13% that day Business Day (1 Oct 2025)Dilution and wider loss
Sep–Oct 2025A$8.6m capital raise in total FY2026 Annual ReportBridge funding
21 Nov 2025Glencore due diligence in final stages; binding documents targeted for mid-December 2025 Mining.com.auFirst timetable slippage (Tranche A had been targeted for November 2025)
2 Feb 2026Selected for BHP Xplor 2026 (from more than 600 applicants) FY2026 Annual Report; MiningMXExploration validation
9 Feb 2026Binding US$250m Glencore prepayment; closing expected around end-March 2026; first concentrate end-Q1 2027 Mining Weekly; Business ReportKey milestone. The share price around release was 3.8c.
6 Mar 2026Half-year report: loss A$6.42m; cash A$5.74m ASX Interim ReportLiquidity still tight
12 Mar 2026Australian roadshow aimed at broadening the equity base MiningMXInvestor diversification
18 Mar 2026Final Okiep acquisition consideration settled ASX/JSE releaseOkiep ownership secured
Apr 2026Sustainable Development Policy adopted FY2026 Annual ReportESG framework
30 Apr 2026March 2026 quarterly report SENSReadiness update
20 May 2026Flat Mine East result OFMED157: 7.88m at 9.24% Cu FY2026 Annual ReportUpside to Okiep grade
22 May 2026A$15.4m placement at 2.2c with attaching options at 3.1c; shares fell about 20% from 2.9c ASX release; InvestSMARTDilutive but funds early works
29 May 2026IDC converts its loan to 23.8% of PCZM HoldCo; Tembo diluted to 12.77% as shares on issue rise from 7.70bn to 8.47bn FY2026 Annual Report; FilingReaderDeleveraging at project level
29 Jun 2026Flat Mine East result OFMED158: 3.96m at 4.64% Cu FY2026 Annual ReportConfirms continuity at depth
30 Jun 2026Notice of General Meeting; meeting results 30 Jul 2026 InvestSMART–
10 Jul 2026Company says it is "shovel-ready" but awaiting Glencore funds; target Q2 2027 MiningMX / News24Funding delay acknowledged
31 Jul 2026South African Reserve Bank approval; intercreditor agreement advanced; offtake in final form; Tranche A guided for end-August; June quarter cash A$14.45m ASX/JSE release; Business DayKey condition cleared
Aug 2026Zero Harm programme relaunched FY2026 Annual ReportSafety readiness
17 Aug 2026Financial Mail: share price up 26% year to date versus falls at Copper 360 (-43%) and Jubilee (-35%) MiningMX / FMRelative outperformance
2 Sep 2026Investor presentation FY2026 Annual Report referenceUpdated guidance
17 Sep 2026FY2026 Annual Report: loss A$12.69m; cash A$14.46m; first production targeted Q3 2027; further raise expected in FY2027 Quartr; FY2026 Annual ReportGuidance slips one quarter
17 Sep 2026Business Day reports the Reserve Bank approval opens the way to procurement and contractingMedia confirmation
1 Oct 2026Tembo sells its 12.1% stake at a 16% discount; Borman lifts to 14.32%; shares fall about 4% MiningMXRegister change and overhang cleared
9 Oct 2026Tembo CEO says the Prieska construction decision is very close; Lennox calls it imminent Mining Weekly; IndexBoxImplies Tranche A had not yet closed

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

3 charts
Income Statement: Revenue & Gross Profit: Revenue – other/interest income rose from AUD 0.1 Mn in FY2022 to AUD 0.3 Mn in FY2026.
Orion Minerals Limited — Income Statement: Revenue & Gross Profit
Series (AUD Mn)FY2022FY2023FY2024FY2025FY2026
Revenue – other/interest income0.10.10.40.40.3
Gross profit0.10.10.40.40.3

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. Orion Minerals, Annual Report 2026 "Metals for Tomorrow" (17 Sep 2026) (investorpa.com)
  2. Orion Minerals, Results Announcement – Annual Report FY2025 (1 Oct 2025) (sharedata.co.za)
  3. Orion Minerals, Interim Financial Report H1 FY2026 (6 Mar 2026) (announcements.asx.com.au)
  4. Orion Minerals, Okiep final consideration release (18 Mar 2026) (bulletin.webull.com)
  5. Orion Minerals, March 2026 Quarterly Activities Report (sharedata.co.za)
  6. Orion Minerals, Prieska project page (orionminerals.com.au)
  7. InvestSMART, ORN announcements and summaries (May–Sep 2026) (investsmart.com.au)
  8. InvestSMART, June 2026 quarterly summary (investsmart.com.au)
  9. StockAnalysis.com (S&P Global Market Intelligence data), income statement, balance sheet, cash flow and statistics (stockanalysis.com)
  10. Quartr, Orion FY2026 (H2 2026) summary (quartr.com)
  11. Mining Weekly, Glencore prepayment signed (9 Feb 2026) (miningweekly.com)
  12. Engineering News, Tranche A expected end-August (31 Jul 2026) (engineeringnews.co.za)
  13. Business Day, funding milestone (3 Aug 2026) (businessday.co.za)
  14. Business Day, Reserve Bank approval (17 Sep 2026) (businessday.co.za)
  15. Business Day, FY2025 loss (1 Oct 2025) (businessday.co.za)
  16. MiningMX, Orion tag page and articles (2024–2026) (miningmx.com)
  17. MiningMX, Orion moves ahead of JSE junior copper peers (17 Aug 2026) (miningmx.com)
  18. MiningMX, Orion awaits Glencore's US$250m cheque (10 Jul 2026) (miningmx.com)
  19. MiningMX, Cornerstone investor sells 12% stake (1 Oct 2026) (miningmx.com)
  20. MiningMX, Glencore term sheet (17 Sep 2025) (miningmx.com)
  21. Mining Weekly, Tembo exit (9 Oct 2026) (miningweekly.com)
  22. FilingReader, Tembo dilution notice (1 Jun 2026) (filingreader.com)
  23. Mining.com.au, Glencore due diligence (21 Nov 2025) (mining.com.au)
  24. Kalkine, Glencore term sheet details (kalkine.com.au)
  25. Reuters via Kitco, Glencore term sheet (17 Sep 2025) (kitco.com)
  26. SENS, Agama acquisition / escrow release (28 Sep 2017) (sharedata.co.za)
  27. Mining Weekly, JSE listing (Sep 2017) (miningweekly.com)
  28. Engineering News, Tembo cornerstone and name change (Apr 2017) (engineeringnews.co.za)
  29. Engineering News, first IDC/Triple Flag drawdown (17 Jul 2023) (engineeringnews.co.za)

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.