Company ProfilePremium

OzAurum Resources Limited

Company Profile Analysis

Ticker: OZM.AX

ESOMAR 23 Corporate BadgeISO Certifications Badge
OzAurum Resources Limited - Company showcase

Year Founded & Workforce

1990

OzAurum Resources Limited logo

OzAurum Resources Limited Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

OzAurum Resources Limited Overview

OzAurum Resources is a Kalgoorlie-based junior gold company moving from explorer to small-scale producer. Its flagship is the 100%-owned Mulgabbie North Gold Project, about 130–135 km north-east of Kalgoorlie on the Relief Shear and about 2 km from Northern Star's Carosue Dam operation. The project holds a JORC (2012) Mineral Resource of 11.6 Mt at 0.70 g/t Au for about 260,000 oz, of which 64% is Measured and Indicated.

The company's strategy is a capital-light, owner-operated, staged heap-leach development:

Stage 1: is a metallurgical-trial open pit at James feeding a two-cell heap, using a second-hand agglomeration plant acquired in January 2026. It holds environmental and mining approvals.

Stages 2 and 3: are planned as a larger operation of up to 32 cells / about 2 Mt heap capacity, centred on a shallow, high-grade paleochannel.

Secondary assets are the Patricia Gold Project (WA) and early-stage niobium/REE ground in Brazil's Alto Paranaíba province. ASX-listed Forrestania Resources holds 19.9%, and founder-CEO Andrew Pumphrey holds about 14.9%.


Company's own description

In its FY2026 Annual Report, the company describes its principal activity as mineral exploration for gold, lithium and rare earth elements, with no significant change in the nature of those activities during the year [S1]. Its stated business model is to create value by discovering economic quantities of mineralisation and resources. It does this by:

  • identifying projects that fit its strategy;

  • designing project-specific exploration programs to quantify mineral potential; and

  • continually assessing results against other projects, funding options and opportunities [S1].

The FY2026 Directors' Report states that the primary focus is development of Mulgabbie North, while exploration continues elsewhere and other potential projects are reviewed [S1].

Independent characterisation

DimensionCharacterisation
Current revenueNil operating revenue. Only interest income (A$35,302 in FY2026) and a one-off non-cash gain on settling a liability (A$114,800) [S1]
Intended revenue modelSale of gold doré from an owner-operated open-pit and heap-leach operation (commodity product sales, price-taker)
Product / service / subscription / licensing mix100% prospective commodity product; no service, subscription or licensing revenue
Value chain positionUpstream: exploration → resource definition → mining → heap-leach processing to doré. Refining and marketing would be outsourced (not yet contracted)
Customer typesProspective: bullion refiners (e.g., Perth Mint-type refiners); no offtake disclosed
End-marketsGlobal gold market (investment, central bank, jewellery demand) via refined bullion; secondary optionality in niobium/REE (steel alloying, magnets) through Brazil exploration
Operating modelOwner-operator. Civil works are done in-house. Plant refurbishment is outsourced to Polaris Engineering Services. Drilling is contracted (VM Drilling, partly paid in shares). Metallurgical testing is done at ALS Balcatta plus an in-house percolation laboratory at Coolgardie [S1], [S17]

OzAurum is best described as a micro-cap, pre-revenue, single-asset gold developer. During FY2026 it changed character from a pure explorer to an early-stage builder. The evidence:

New expense line: The FY2026 income statement shows a "development costs" line (A$221,063) for the first time [S1].

Fixed assets ballooned: Property, plant and equipment rose from A$0.41M to A$2.23M, driven by the acquisition and refurbishment of a heap-leach agglomeration plant [S1].

Approvals in hand: The company holds Stage 1 environmental approval under Western Australia's Small Mining Operation Policy and Mining Operator Notification approval to begin open-pit mining [S1].

Remaining permits: At the date of the annual report, a Dangerous Goods Licence application had been lodged. A Department of Health Poisons Permit (needed for cyanide) is still to be sought [S1].

Business model / revenue model.

Economic logic of the strategy.

Why heap leach: The resource is low-grade overall (0.70 g/t), which would struggle to justify a standalone carbon-in-leach (CIL) mill at this scale. The Stage 1 pit and the paleochannel, however, contain shallow higher-grade zones (e.g., James grade-control intervals of 2–6 g/t; paleochannel intervals commonly 3–8 g/t over 2–8 m) [S1]. Heap leaching avoids the A$100M+ capital typical of a new mill.

Low-cost plant: The company bought a second-hand plant with a long operating history (Marvel Loch, Nifty, Bullabulling) to cut capital intensity further [S1].

Gold price tailwind: The company says record A$ gold prices (about A$7,200/oz cited in January 2026) materially improve the investment case [S7].

Strategy

Stated strategic themes (paraphrased from [S1], [S7])

  1. Staged, capital-light heap-leach development of Mulgabbie North. Stage 1 is a metallurgical trial to learn the heap-leach behaviour of oxide ore and build operating capability, followed by Stages 2 and 3 at larger scale.

  2. Owner-operator model with existing infrastructure. This includes in-house civil works, a purchased second-hand plant, and the company's own percolation lab.

  3. Grow the resource while de-risking the project. Exploration and feasibility work are combined so that the project has both technical de-risking and a larger resource base by the time the study is complete [S17].

  4. Use the high A$ gold price. The company cited about A$7,200/oz in January 2026 [S7].

  5. Keep optionality in Patricia and Brazil Nb/REE at low cost.

  6. Review other projects to increase shareholder value [S1].

Initiative register (last 24 months)

InitiativeDateDescriptionStatus / target
LHBM feasibility funding agreementSep 2024LHBM to fully fund the feasibility study and potentially fund and operate a heap-leach operationTerminated by Deed of Release, Sep 2025 [S1]
In-house feasibility relaunchSep–Oct 2025Percolation tests at the Coolgardie labCompleted [S1]
James Stage 1 grade-control drillingOct–Dec 20255 + 91 RC holes; MNODH019Completed [S1]
Agglomeration plant acquisitionJan 2026Bullabulling plant purchasedCompleted [S1]
Plant refurbishment (Polaris)Feb–Jun 2026Engineered modifications and upgrade to current Australian safety standardsMain modules dry-commissioned; silo system about 95% complete at 30 Jun 2026 [S1]
Stage 1 permittingThrough Mar 2026SMOP environmental approval; Mining Operator NotificationApproved. Dangerous Goods Licence lodged; Poisons Permit pending [S1]
Stage 2 grade-control drillingMar–Apr 2026435 holes for 15,646 m on the paleochannelCompleted [S1]
Stage 2/3 design and permittingFY202632-cell / about 2 Mt heap, pit optimisations, geotechnical, waste rock, heritage surveys with Senior Wongatha EldersMining Development and Closure Proposal to be lodged [S1]
Site civil worksFrom Jun 2026Heap-leach pad and plant foundations, done in-houseFoundations poured before 30 Jun 2026 [S1]
Column leach testwork (ALS)FY2026–FY2027Columns 1–3Columns 1 and 2 final; Column 3 preliminary [S1]
Patricia / Heysen's Find RC drillingPlannedProgramme of Work grantedNot yet drilled [S1]
Brazil Nb/REE magnetometer interpretationFY2027Target 1 anomalyAwaiting interpretation [S1]
Sustainability / ESG commitments—No formal ESG targets disclosed—
Cost programs—None disclosed—

Medium-term targets and guidance

Financial guidance: none. No production targets, capex estimates, AISC guidance or first-gold date have been published in the retrieved disclosures.

Directional statements: "near-term" production from Stage 1 [S1], [S10].

Plant scale: about 350 ktpa on day shift only [S1].

Products & Services

As a pre-revenue resource company, OzAurum's "products" are mineral projects. Each is catalogued below.

Mulgabbie North Gold Project (WA), 100%, flagship

AttributeDetail
LocationAbout 130–135 km north-east of Kalgoorlie, Eastern Goldfields, WA; reached via the Tropicana heavy-haulage road then about 15 km along OzAurum's L28/48 access road [S6], [S9]
AreaAbout 158 km² (2025 description) [S15]. The two projects combined covered about 70.6 km² at IPO [S4]; the difference implies later tenement additions (not itemised in retrieved sources)
Geological settingArchaean mesothermal gold on the Relief Shear, a mineralisation corridor up to 50 m wide, within the Norseman–Wiluna greenstone belt, Yilgarn Craton [S1], [S18]
NeighboursAbout 2 km from Northern Star's Carosue Dam operation (about 3.5 Moz resource; about 4.2 Mtpa mill) [S15]
Mineral Resource (JORC 2012, 18 Jul 2023)Indicated 5.62 Mt @ 0.71 g/t for 128,000 oz; Inferred 4.543 Mt @ 0.64 g/t for 93,000 oz (corrected from 0.85 g/t on 1 Apr 2026); Total M+I+I 11.638 Mt @ 0.70 g/t for 260,000 oz at a 0.3 g/t cut-off. Measured tonnes are not shown in retrieved snippets; by subtraction, Measured is about 39,000 oz [S6]
Ore ReserveNone declared [S1]
ProspectsJames, Ben, Alicia, Demag Zone, Paleochannel, and the Cross Fault target (aircore discovery, 2025) [S6], [S15]
Processing routeCrush (target -8 mm), agglomerate with cement/lime, cyanide heap leach
ColumnOre typeHead gradeRecoveryLeach kineticsCyanide use
Column 1James oxide2.51 g/t>90%60% in 7 days; 80% in 14 days0.45 kg/t
Column 2Lower saprolite/transition1.35 g/t82% at -12 mm (about 88% indicated at -8 mm)—0.21 kg/t
Column 3Paleochannel (preliminary, still running at year end)—>75% after 39 days——

Stage 1 (James open pit, metallurgical trial).

  • Two-cell heap leach fed by campaign mining, crushing, screening and agglomeration [S1].

  • Approvals: environmental approval under the Small Mining Operation Policy and Mining Operator Notification approval have been received. Dangerous Goods Licence application lodged; Poisons Permit to follow [S1].

  • Grade-control highlights include 7 m @ 6.16 g/t (incl. 2 m @ 20.54 g/t) and 14 m @ 2.09 g/t. Diamond hole MNODH019 returned 16 m @ 3.41 g/t from 19 m [S1].

Stages 2 and 3 (expanded operation).

  • About 2 Mt heap-leach facility of 32 cells on M28/240, with a 120-tonne mining fleet [S1], [S10].

  • Paleochannel grade control: 435 holes for 15,646 m.

  • Highlights include 7 m @ 8.12 g/t (incl. 1 m @ 49.7 g/t), 6 m @ 6.31 g/t and 5 m @ 5.26 g/t.

  • MNODH022 returned 6 m @ 11.64 g/t, including 1 m @ 61.10 g/t [S1].

  • The paleochannel trend is open over more than 4 km [S10].

Metallurgy.

Percolation testing: 34 of 55 tests averaged about 59,900 L/hr/m² [S1].

Agglomeration plant.

  • Ex-Marvel Loch / Nifty / Bullabulling plant; agglomerator drum originally designed by Kappes Cassiday.

  • 100 tph (about 1,000 tpd), giving about 350 ktpa on day shift only.

  • Polaris dry-commissioned the feed bin, feed conveyor, drum and discharge conveyor. The lime/cement silo system was about 95% complete at 30 June 2026 [S1].

Key gaps.

  • No published NPV, IRR, capital cost, operating cost/AISC, production target or mine life.

  • No Ore Reserve.

  • Feasibility outputs to date are technical (design, metallurgy, permitting), not financial [S1], [S7].

Patricia Gold Project (WA), 100%

AttributeDetail
LocationAbout 150 km north-east of Kalgoorlie, within the Celia Tectonic Zone [S1], [S16]
HistoryHistoric underground mine (1930–1937); existing Patricia open pit [S5], [S1]
Key targetHeysen's Find on E31/1186: rock chips up to 16.23 g/t, 10.33 g/t and 6.20 g/t Au along more than 250 m of strike, associated with a newly identified shear (330° strike, near-vertical) [S1]
StatusSection 18 application over all of E31/1186 refused, but drilling approval granted over the rock-chip area and 1 km of strike to the north. Programme of Work granted for RC drilling, not yet drilled. Mapping planned along the 7.5 km Patricia shear [S1]
Resource—

Brazil: Salitre and Catalão Niobium + REE Projects

AttributeDetail
LocationAlto Paranaíba Magmatic Province (APMP), Minas Gerais/Goiás region. The company notes the APMP hosts 97% of global niobium production, all from carbonatites [S1]
SalitreAdjacent to the Salitre and Serra Negra carbonatite complexes (niobium and phosphate resources) [S1]
Work to dateTwo soil-sampling programs (FY2025); "Target 1" niobium soil anomaly; ground magnetometer survey on a 50 m × 25 m grid (FY2026), not diurnally corrected, so lower precision; data awaiting geophysical interpretation [S1], [S2]
Resource—
FY2026 spendA$47,977 exploration (Brazil) [S1]

Brazil lithium (legacy, effectively exited)

ProjectDetailStatus
Linópolis JaimeHard-rock LCT pegmatite project about 65 km ENE of Governador Valadares, Minas Gerais. Historically artisanally mined; the company reported grades up to 7.36% Li₂O; more than 20 LCT-bearing pegmatites [S3], [S14]Acquisition costs written off; acquisitions terminated (FY2025) [S1]
Boca RicaAbout 3,871 ha; spodumene zone about 6 m wide; diamond drilling commenced FY2024 [S14]Treated as part of the terminated Brazil acquisitions (A$186,045 write-off). Specific project status after termination not separately disclosed
Tenement applicationsAbout 19,700 ha lodged around Linópolis in 2023 [S14]Current status not publicly disclosed

Pricing model. Not applicable. Gold would be sold at spot. No hedging, offtake or streaming arrangements have been disclosed.

Financial Narrative

Basis. FY2025–FY2026 figures come from audited statements [S1]. FY2022–FY2024 figures come from aggregator datasets [S12] (Stockopedia, Kalkine), which draw on company annual reports. The FY2024 closing cash and FY2024 equity figures are confirmed by the opening balances in [S1]. All figures are A$ millions unless stated.

Income statement (chartable)

FY2021 (5 Aug 2020 to 30 Jun 2021, a partial first period) net loss was A$4.467M [S12].

Detailed FY2025–FY2026 income statement (A$, audited) [S1]

Margins and earnings metrics.

Balance sheet (chartable)

Equity for FY2022 and FY2023 is calculated as total assets minus total liabilities from [S12]. FY2024 equity of A$2,837,973 is confirmed in [S1].

FY2026 balance sheet detail (A$) [S1].

Debt and capital.

Cash flow (chartable)

Other cash-flow items.

  • Aggregator free cash flow figures that include tenement acquisitions differ slightly. For example, Kalkine shows FY2024 FCF of -A$2.207M [S12]. The definition used above is stated in the row label.

  • FY2021 (partial period): operating cash flow -A$3.875M; financing +A$12.08M (IPO) [S12].

  • Dividends paid: nil. Buybacks: nil.

  • FY2026 operating outflows: exploration A$1.525M, suppliers and employees A$0.995M, development A$0.169M [S1].

Ratios (chartable, analyst calculations from the tables above)

Ratios that are not meaningful or not applicable:

  • ROIC: not meaningful (negative NOPAT, no invested debt).

  • Debt/equity on borrowings: 0.0x every year (only lease liabilities from FY2025: 0.04x FY2025; 0.02x FY2026).

  • Net debt/EBITDA: not meaningful (net cash, negative EBITDA).

  • Interest coverage: not meaningful.

  • Asset turnover: 0 (no revenue).

  • Cash conversion cycle: not applicable.

Commentary on trends, inflections and drivers

1. The IPO cash pile has been consumed; the company now lives raise to raise.

  • Cash fell from A$7.57M at June 2021 to about A$1.1M by June 2023 and June 2024, as the post-IPO drilling campaign (more than 65,000 m by 2022) was funded from IPO proceeds [S5], [S12].

  • Since FY2024, roughly A$8.9M of financing inflows have kept cash at A$1–2M:

    • FY2024: about A$2.2M, mainly the September 2023 placement.

    • FY2025: A$2.7M (December 2024 and March 2025 placements).

    • FY2026: A$4.0M (Forrestania placement).

  • This pattern is typical of a junior explorer but leaves very little buffer.

2. FY2026 is an inflection from exploration to construction.

  • Investing outflows rose from A$0.04M to A$1.24M, and PP&E additions were A$1.82M, reflecting the plant purchase and refurbishment [S1].

  • Trade payables rose more than tenfold to A$0.91M. Part of the build was effectively funded by suppliers. This explains why the current ratio collapsed from 6.2x to 1.9x despite higher cash.

3. The burn rate has stepped up.

  • Combined operating and investing outflow was about A$3.9M in FY2026, against year-end cash of A$2.03M. That is roughly six months of runway at the FY2026 burn rate before any new capital.

  • The auditor flagged a material uncertainty over going concern [S1].

  • Management states that sufficient funds exist for working capital at the report date and that it expects further debt or equity funding after period end [S1].

  • In October 2025 the company itself indicated only just over two quarters of funding [S9].

4. Losses are mostly exploration and development, not overhead.

  • In FY2026, exploration plus development (A$2.30M) made up about 70% of total expenses. Corporate costs (directors, compliance, admin, employees, occupancy) were about A$0.89M.

  • Director fees rose to A$200k from A$145k because a full year of a separate chair was paid.

5. Equity dilution is heavy.

  • Shares on issue rose 82.8%, from 158.75M (1 July 2024) to 290.20M (30 June 2026) [S1]. The weighted average share count rose 35% year on year.

6. Non-cash item. The A$114,800 gain came from settling a A$451,000 drilling invoice to VM Drilling with shares issued at a deemed A$0.11, which were valued at the A$0.082 market close. In effect the driller accepted a non-cash discount [S1].

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Group Entities

EntityIncorporatedPlaceOwnershipFunction

OzAurum Resources Limited

5 Aug 2020

NSW, Australia

Parent (ASX-listed)

Head company

OzAurum Mines Pty Ltd (ACN 645 117 111)

14 Oct 2020

WA, Australia

100%

Holder of Mulgabbie North and WA tenements

OzAurum Brazil Pty Ltd

28 Jul 2023

WA, Australia

100%

Brazil holding company

OzAurum Brasil Ltda

26 Sep 2023

São Paulo, Brazil

100%

Brazil operating entity (tax resident in Brazil and Australia)

Results by Segment

MetricFY2025FY2026

Australia loss before tax (AUD K)

-1,863.8-3,081.5

Brazil loss before tax (AUD K)

-415.5-96.0

Group loss before tax (AUD K)

-2,279.3-3,177.5

Segment Assets & Liabilities and Revenue by Segment

MetricFY2025FY2026

Australia total assets (AUD K)

3,962.16,075.7

Brazil total assets (AUD K)

239.2219.7

Intersegment eliminations (AUD K)

-481.4-501.4

Group total assets (AUD K)

3,720.05,794.1

Key Financials

MetricFY2022FY2023FY2024FY2025FY2026

Operating revenue (AUD Mn)

00000

Net loss after tax (AUD Mn)

-4.894-2.924-2.535-2.279-3.178

Balance Sheet (AUD)

Line item (AUD)FY2025FY2026

Interest income

21,43635,302

Gain on disposal of PP&E

1,4120

Gain on settlement of liability

0114,800

Total income

22,848150,102

Exploration costs

-1,169,592-2,077,305

Development costs

0-221,063

Project evaluation costs

-247,5760

Director fees

-144,839-200,000

Compliance and professional fees

-143,336-234,187

Depreciation

-142,846-128,685

Administration expenses

-181,411-190,798

Employee benefits expense

-235,708-249,506

Occupancy costs

-9,789-11,973

Share-based payments

-10,5210

Interest and finance charges

-18,923-13,918

Foreign exchange gain/(loss)

2,391-175

Loss before and after tax

-2,279,302-3,177,508

Financial Analysis

MetricStatus

Revenue

Nil all years; revenue CAGR not applicable

Gross profit, gross margin

Not applicable (pre-revenue)

Operating income, operating margin

Not applicable (pre-revenue)

EBITDA, EBITDA margin

Not applicable as a margin. Analyst calculation of EBITDA proxy (loss before tax + depreciation + interest − interest income): FY2026 about -A$3.07M; FY2025 about -A$2.14M

Net margin

Not applicable (pre-revenue)

EPS, basic and diluted

-1.26 cents (FY2026); -1.22 cents (FY2025). Options are anti-dilutive [S1]

Dividends per share

Nil; no dividend ever paid or declared [S1]

Balance Sheet

MetricFY2022FY2023FY2024FY2025FY2026

Total assets (AUD Mn)

6.092.733.233.7205.794

Cash and equivalents (AUD Mn)

4.2961.1151.0881.9032.034

Total current assets (AUD Mn)

4.441.191.222.0302.327

Total current liabilities (AUD Mn)

0.6120.2060.2450.3291.203

Total liabilities (AUD Mn)

0.6530.2150.3950.4431.278

Total equity (AUD Mn)

5.4372.5152.8383.2774.516

Working capital (AUD Mn)

3.8280.9840.9751.7011.123

Financial Analysis — PP&E

ItemAmount

PP&E

2,234,923 (plant and equipment 2,102,623, after A$1,818,805 of additions)

Right-of-use asset (Kalgoorlie office)

85,932

Capitalised exploration (acquisition costs)

1,146,383 (unchanged since FY2025)

Trade payables

912,659 (FY2025: 84,150)

Lease liability

97,672 (current 45,563; non-current 52,109)

Provisions

146,344

Financial Analysis — Borrowings

ItemStatus

Borrowings

None. No overdraft, loan or borrowing facilities [S1]

Total debt

Lease liabilities only: A$0.098M (FY2026), A$0.137M (FY2025)

Net cash

A$1.94M (FY2026), A$1.77M (FY2025) (analyst calculation: cash − lease liabilities)

Contributed equity

A$23.30M

Accumulated losses

A$19.89M

Reserves

A$1.11M

Cash Flow

MetricFY2022FY2023FY2024FY2025FY2026

Operating cash flow (AUD Mn)

-4.734-3.096-1.607-1.818-2.667

Capex on PP&E (AUD Mn)

-0.240-0.013-0.250-0.010-1.244

Free cash flow, OCF less PP&E capex (AUD Mn)

-4.974-3.109-1.857-1.828-3.911

Financing cash flow (AUD Mn)

1.837-0.0722.1792.6734.041

Net change in cash (AUD Mn)

-3.272-3.181-0.0270.8160.130

Returns & Leverage Ratios (%) and Financial Ratios (x)

MetricFY2022FY2023FY2024FY2025FY2026

ROE on average equity (%)

-70.2-73.5-94.7-74.6-81.6

ROA on average total assets (%)

-64.1-66.3-85.1-65.6-66.8

Current ratio (x)

7.255.784.986.171.93

Liabilities to equity (x)

0.120.090.140.140.28

Results by Region

MetricFY2025FY2026

Australia interest income (AUD K)

21.235.3

Brazil interest income (AUD K)

0.20.0

Revenue by Region

MetricFY2025FY2026

Australia exploration costs (AUD K)

1,047.42,029.3

Brazil exploration costs (AUD K)

122.248.0

Share Price

MetricFY2021FY2022FY2023

Closing share price at 30 June (AUD)

0.1150.1550.042

Period

Performance

Source / basis

—

Since IPO (A$0.25, Feb 2021)

About -66% at about A$0.085

Analyst calculation

—

About 5-year (30 Jun 2021 close A$0.115)

About -26%

Analyst calculation

—

About 3-year (30 Jun 2023 close A$0.042)

About +100%

Analyst calculation

—

Calendar 2026 YTD (to late July)

About +63% (A$0.051 at start of year to A$0.083)

[S19]

—

1-year

Sources conflict: about +1.3% (investing.com, 4 Aug 2026) versus about +45% (investing.com, 31 Aug 2026). The difference reflects the base date. Not reconciled

[S13]

—

52-week range

A$0.05–0.13

[S13]

—

Share Count (millions)

MetricFY2024FY2025FY2026

Shares on issue at 30 June (millions)

158.75229.10290.20

Share Price & Returns

DateRaisePriceTerms

Feb 2021

A$12.0M IPO

A$0.25

—

Sep 2023

About A$2.4M

A$0.075

1-for-2 options at A$0.11

Dec 2024

A$1.0M

about A$0.026

—

Mar 2025

A$1.746M

A$0.06

—

Jan 2026

A$4.097M

A$0.072

—

Series Details

SeriesExercise priceExpiryNumber

Director and staff options

A$0.23

26 Nov 2027

7,750,000

Capital raising options (Sep 2023)

A$0.11

28 Nov 2026

17,990,910

Broker options (Dec 2024)

A$0.05 (shown as "0.05c" in the annual report; Note 20 confirms A$0.05)

20 Dec 2027

3,475,000

Broker options (Mar 2025)

A$0.09 (shown as "0.09c"; Note 20 confirms A$0.09)

10 Mar 2028

3,000,000

Total

WAEP A$0.131

—32,115,910

Valuation Multiples

MultipleOZMBasis

Market cap

About A$24.7–24.9M

290.2M shares × A$0.085; investing.com A$24.89M

Enterprise value

About A$22.8M

Market cap − cash A$2.03M + lease A$0.10M

P/E

Not meaningful (loss)

—

EV/EBITDA

Not meaningful (negative EBITDA)

—

EV/Sales

Not meaningful (nil revenue)

—

P/B

About 5.5x

A$24.8M / A$4.52M equity

EV / resource ounce

About A$88/oz

A$22.8M / 260 koz

Analyst Conclusions

Management guidance

There is no quantitative guidance. Management's qualitative outlook [S1]:

  • move Mulgabbie North from construction to Stage 1 heap-leach operation;

  • lodge Stage 2 environmental permitting (the Mining Development and Closure Proposal);

  • finish Column 3 testwork;

  • drill Heysen's Find; and

  • interpret Brazil magnetics.

Management expects additional debt or equity funding after period end [S1].

Consensus growth expectations

None available; there is no analyst coverage.

Bull case

  1. Cheap route to production. OZM owns a proven 100 tph agglomeration plant and holds Stage 1 environmental and mining approvals. At an EV of about A$23M (about A$88/resource oz), the market may be under-pricing a near-term, debt-free producer at A$ gold prices around A$7,000/oz [S1], [S7].

  2. Grade upside for the next resource update. Paleochannel intercepts of 4–8 g/t over 3–8 m at about 25 m depth suggest the grade-controlled Stage 2 inventory could be materially richer than the 0.70 g/t global MRE. Metallurgy shows recoveries above 80% with low cyanide use [S1].

  3. Strategic floor from FRS. A producer at the 19.9% ceiling, with an acquisitive record, provides a credible takeover or merger pathway [S8], [S20].

Bear case

  1. Funding cliff. Cash of A$2.03M against a burn of about A$3.9M a year, plus A$0.91M of payables, makes a discounted raise or expensive debt likely. Options at A$0.11 expiring November 2026 are out of the money [S1].

  2. Lab-to-heap risk. Clay-rich saprolite and transition ores can fail at scale even after successful agglomerated column tests. There is no Ore Reserve or financial model to anchor value [S1].

  3. Small, low-grade asset with execution and governance thinness. A single key person, no audit committee, an MRE disclosure error, and a prior partner collapse [S1], [S6].

Catalysts and monitorables (next 12 months)

TimingCatalyst
About 30 Oct 2026September 2026 quarterly: cash balance, commissioning status, funding plans
Q4 20262026 AGM (remuneration vote, any capital resolutions)
By 28 Nov 2026Capital-raising terms and size, FRS participation, and whether the A$0.11 options are exercised
PendingGrant of the Dangerous Goods Licence and Poisons Permit; Stage 1 first ore stacked and first gold pour
PendingColumn 3 final results; updated MRE including grade-control data; any Ore Reserve or financial study outputs
PendingLodgement and approval of the Stage 2 Mining Development and Closure Proposal
OngoingFRS strategic intentions; Heysen's Find drill results; A$ gold price

Concluding analyst verdict

OzAurum Resources is a classic high-risk, high-optionality Goldfields junior. It now sits at the most fragile point of the junior-miner lifecycle: the move from feasibility to first production, funded by a balance sheet that cannot carry it alone. The technical case has improved markedly over the past twelve months:

  • Stage 1 permits are in hand.

  • An agglomeration plant with a long operating pedigree has been bought and largely refurbished for a fraction of new-build cost.

  • Columns across three ore types show recoveries of 75–90% with low cyanide consumption.

  • A dense 435-hole grade-control program has repeatedly found high grades at shallow depth along a paleochannel that remains open beyond 4 km.

Forrestania's 19.9% placement at the 10-day VWAP was both a funding event and a statement that a regional consolidator sees strategic value.

The financial case, however, is still unproven and unfunded. There is no Ore Reserve, no published capital or operating cost, and no production target. The audited accounts carry a going-concern material uncertainty. FY2026 cash outflows of about A$3.9M compare with A$2.0M in the bank and rising payables, so another dilutive raise in the coming months looks likely. Share count has already risen by more than 80% in two years. Governance is lean, with no audit committee and dependence on a founder who is also the sole Competent Person, which raises execution risk.

At an EV of about A$23M, or roughly A$88 per resource ounce, the market is pricing OZM as a funded-risk explorer rather than an emerging producer. Re-rating depends on three verifiable steps:

  1. securing a fully funded path to first gold on acceptable terms;

  2. demonstrating heap performance in the Stage 1 trial; and

  3. converting grade-control data into an upgraded resource and, ideally, a maiden reserve.

If those land while A$ gold prices stay high, the asymmetry is attractive, and the FRS holding adds corporate optionality. If funding stalls or the heaps underperform, dilution will capture most of the value. Verdict: speculative. Suitable only for risk-tolerant capital; monitor funding terms first.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleAppointedBackground / prior rolesEducation / memberships

Ashok Parekh

Non-Executive Chairman

21 May 2025

Over 45 years in mining. Chartered Accountant running a Kalgoorlie practice for about 40 years. Former MD of several Kalgoorlie gold mining/milling companies; ran Coolgardie Custom Milling for 12 years. Centenary Medal (2003); CA ANZ Meritorious Service Award. Also a director of Maritana Minerals Limited (since 14 Jun 2019)

Chartered Accountant

Andrew Pumphrey

Managing Director and CEO

5 Aug 2020

Geologist and mine surveyor with more than 30 years' experience; Kalgoorlie-based since 1989; ran an exploration contracting business. Former Operations Manager/GM of MacPhersons Resources and Maritana Minerals; Exploration Manager at MacPhersons for four years. Competent Person for OZM exploration results

Member, AIG; Member, AusIMM

Jeffrey Williams

Non-Executive Director (Chairman until 21 May 2025)

5 Aug 2020

More than 40 years in mining; 16 years as a mining engineer; 7 years in stockbroking. MD of Mineral Deposits Ltd for 15 years to late 2011, where he secured the Sabodala gold and Grande Côte zircon projects (Senegal) and saw market capitalisation grow from about A$6M (2003) to more than A$1B (2011)

Mining engineer

Jessica Fertig

Non-Executive Director

13 Jan 2025

Founder and Managing Partner of Tau Media (investor and media relations); more than a decade in IR and IPOs; Director of Australian Women in Mining and Resources (AWIMAR)

Master of Business Law (Univ. of Sydney); Grad. Dip. Psychology (Monash); B.Com Law and Economics (Rhodes University)

Stephen Hewitt-Dutton

Company Secretary (and finance)

20 Aug 2020

More than 30 years in corporate finance, accounting and company secretarial roles. Formerly Associate Director at Trident Capital (12 years) and Carmichael Corporate; Big 4 background

B.Bus (Curtin)

Directors' Remuneration

NameCash salary/fees (AUD)Superannuation (AUD)Leave accrual (AUD)Share-based (AUD)Bonus (AUD)Total FY2026 (AUD)Total FY2025 (AUD)

Ashok Parekh

71,4298,57100080,0009,032

Andrew Pumphrey

240,00028,80020,75100289,551289,261

Jeffrey Williams

53,5716,42900060,00077,742

Jessica Fertig

60,000000060,00028,065

Andrew Tudor (former)

00000030,000

Total KMP

425,00043,80020,75100489,551434,100

Governance Overview

ItemStatus

Board size

4 directors

Independence

3 non-executive directors. Analyst view: Parekh appears independent. Fertig's firm received A$3,000 for IR services before her appointment (minor). Williams holds 2.0M options and was Chair from IPO to May 2025. Formal independence determinations are in the corporate governance statement (not fully retrieved)

Chair/CEO separation

Yes. Separate non-executive chair since IPO

Committees

No formally constituted audit committee; the Board considers the group too small to need one

Board meetings FY2026

  1. Attendance 100% except Williams (6/7)

Gender diversity

1 of 4 directors female (25%)

Related-party transactions

Payments to Ben Pumphrey (the MD's son, field assistant): A$672 (FY2026), A$2,885 (FY2025). Accrued director fees payable A$39,567

Major Shareholders

HolderShares% of 290.2MBasisSource

Forrestania Resources Limited (ASX: FRS)

56,900,000

19.89% (reported) / 19.6% (analyst calculation on 30 June 2026 shares)

Substantial holder notice 5 Feb 2026

[S8], [S13]

Andrew Pumphrey (MD/CEO, direct and indirect)

43,324,00014.93%

FY2026 KMP shareholding table

[S1]

Jeffrey Williams

1,187,5000.41%

[S1]

[S1]

Ashok Parekh

200,0000.07%

[S1]

[S1]

Jessica Fertig

00.00%

[S1]

[S1]

Total board

44,711,50015.41%

[S1]

[S1]

VM Drilling (WA) Pty Ltd (or nominee)

4,100,000 issued 25 Jun 2026

1.41% at issue; current holding not disclosed

Share-based settlement

[S1]

Competitive Landscape

Key Competitors

#Company (ticker)Relevance to OZMRelative positioning
1

Northern Star Resources (ASX: NST)

Owns Carosue Dam (about 3.5 Moz resource, about 4.2 Mtpa mill), about 2 km from Mulgabbie North [S15]

Dominant regional producer; potential consolidator or toll-treatment counterparty; competes for regional tenure

2

Forrestania Resources (ASX: FRS)

19.9% holder of OZM; transitioning to producer via Lake Johnston CIL (Polaris-built) and a A$300M Edna May bid [S8], [S20]

Both strategic partner and potential acquirer; competes for Eastern Goldfields capital

3

KalGold (ASX: A1G)

Eshuys-backed explorer in the same under-explored area north-east of Kalgoorlie [S21]

Direct peer for capital in the same district

4

Saturn Metals (ASX: STN)

Eastern Goldfields heap-leach development peer (Apollo Hill)

—
5

Genesis Minerals (ASX: GMD)

Eastern Goldfields producer and consolidator

Potential acquirer; much larger

6

Ora Banda Mining (ASX: OBM)

Goldfields producer

Competes for contractors and staff

7

Black Cat Syndicate (ASX: BC8)

Kalgoorlie-region developer and producer

Peer for development capital

8

Horizon Minerals (ASX: HRZ)

Kalgoorlie/Coolgardie developer focused on toll/processing

Peer; processing-capacity competitor

9

Brightstar Resources (ASX: BTR)

Goldfields developer

Peer for small-scale development capital

10

CBMM and CMOC (Catalão) (Brazil niobium)

Incumbent niobium producers in the APMP, including Boa Vista at Catalão [S1]

Relevant only to Brazil optionality; OZM is a grassroots explorer next to dominant incumbents

Peer Comparison FY2026

MetricOZM (FY2026)Northern StarForrestania Resources

Revenue

A$0

——

Net margin

n/a (net loss A$3.18M)

——

R&D / exploration intensity

Exploration A$2.08M (about 65% of total expenses)

——

Market capitalisation

About A$24.9M (Aug 2026)

——

Gold resource

260 koz

Carosue Dam about 3.5 Moz (one asset) [S15]

Johnson Range MRE 103.5 koz (one asset) [S20]

Recent Developments

Absence should not be taken as confirmation that none occurred.

Company Snapshot

1990

Founded

West Kalgoorlie, Australia

Headquarters

SWOT Analysis

Strengths

  • Advanced permitting. Stage 1 holds environmental approval (SMOP) and Mining Operator Notification approval [S1].
  • Processing plant owned. The 100 tph agglomeration plant (about 350 ktpa on day shift) has been acquired, with main modules dry-commissioned by Polaris [S1].
  • Strong laboratory metallurgy. Column 1 recovered more than 90% at 2.51 g/t head grade; Column 2 recovered 82% (about 88% indicated at -8 mm); cyanide use was low at 0.21–0.45 kg/t [S1].
  • Shallow high grades. Paleochannel grade control returned intercepts such as 7 m @ 8.12 g/t and 6 m @ 6.31 g/t from about 25 m depth [S1].
  • Mostly higher-confidence resource. 64% of the 260 koz MRE is Measured and Indicated [S6].
  • Strategic backing and alignment. FRS holds 19.9% after a A$4.1M placement at the 10-day VWAP [S8]. Board and insiders own about 15.4% [S1].
  • Debt-free. No borrowings; only a A$0.10M lease liability [S1].

Weaknesses

  • Going-concern material uncertainty. FY2026 cash of A$2.03M compares with combined operating and investing outflows of A$3.91M [S1].
  • No Ore Reserve and no published economics (NPV, IRR, capex, AISC) [S1], [S7].
  • Low global grade of 0.70 g/t across a 260 koz resource [S6].
  • Heavy dilution. Shares on issue rose 82.8% between July 2024 and June 2026 [S1].
  • Governance gaps. No audit committee; 18.4% vote against the 2025 remuneration report [S1].
  • Disclosure error. The MRE Inferred grade was misstated (0.85 g/t instead of 0.64 g/t) for about 2.7 years before correction [S6].
  • Concentration on one person. The CEO is also the sole Competent Person for exploration results [S1].

Opportunities

  • Resource growth. The paleochannel is open over more than 4 km and the system is described as about 8 km long. Grade-control data could support an MRE upgrade [S10], [S18].
  • Recovery uplift. Crushing to -8 mm could add about 6 percentage points of recovery on transitional ore [S1].
  • Stage 2/3 scale-up to a 32-cell / about 2 Mt heap with a 120 t fleet [S1].
  • Corporate activity. FRS's acquisitive strategy (Edna May bid, Kula takeover) [S20]; NST is the neighbour.
  • New discoveries. The Cross Fault aircore discovery (2025) and Heysen's Find drilling (PoW granted) [S15], [S1].
  • Brazil niobium/REE optionality in the province hosting about 97% of world niobium production [S1].
  • Gold price. About A$7,200/oz cited in January 2026 [S7].

Threats

  • Funding risk. A dilutive raise is probable within months. September 2026 options at A$0.11 (17.99M, expiring 28 Nov 2026) are out of the money at about A$0.085 [S1].
  • Heap-leach scale-up risk. Clay-rich saprolite could permeate poorly at scale despite laboratory results.
  • Permit dependencies. The Dangerous Goods Licence and Poisons Permit are still pending [S1].
  • Weather and supply delays. Unseasonable rain delayed concrete pours by about 3 weeks; silo conveyors were late [S1].
  • Partner failure precedent. LHBM collapsed in August 2025 [S1].
  • Gold price reversal would erode the economics of a low-grade deposit.
  • Native title and heritage constraints. The Section 18 refusal over all of E31/1186 [S1].

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
4 Apr 2025Application for quotation of securities (option exercises) [S11]Minor capital inflow
17 Apr 2025Quotation and unquoted securities notices [S11]Option exercises
23 Apr 20251.2M new shares quoted [S11]Option conversions
7 May 2025Quotation of securities [S11]Option exercises
21 May 2025Ashok Parekh appointed Chair [S11], [S1]Adds deep Kalgoorlie milling and deal experience
30 May 2025Quotation of securities [S11]Option exercises
12 Aug 2025Line Hydrogen enters voluntary administration [S1]Feasibility partner fails; funding gap
12 Sep 2025Deed of Release with Line Hydrogen [S1], [S17]OZM regains 100% control of the study at no cost
16 Sep 2025ASX release on metallurgical lab conditions (cited by the Competent Person) [S1]Metallurgical methodology baseline
19 Sep 2025FY2025 Annual Report: net loss A$2.28M [S2]Annual results
9 Oct 2025Percolation test results (55 tests) [S1]Heap-leach permeability validated
Oct 2025Five-hole James RC program (54 m holes, 8 m × 5 m pattern) [S1]Stage 1 continuity test
31 Oct 2025September quarter report: cash A$1.264M; about two quarters of funding; high-grade Cross Fault intercepts [S9]Funding pressure signalled
11 Nov 2025James RC results, e.g., 7 m @ 2.46 g/t; 13 m @ 1.36 g/t [S1]Stage 1 de-risking
Dec 202591-hole James grade-control program and MNODH019 [S1]Mine-planning density
13 Jan 2026First James grade-control results [S1]Stage 1 confidence
19 Jan 2026Heap-leach agglomeration plant secured [S11], [S1]Major capex shortcut
22 Jan 2026Feasibility update: low-capex Stage 1 design; column recovery >80%; A$ gold about A$7,200/oz [S7], [S11]Shares rose about 38% from announcement price over following weeks
27 Jan 2026High-grade results strengthen Stage 1 confidence (e.g., 7 m @ 6.16 g/t) [S11], [S1]Grade validation
29–30 Jan 2026Trading halt; FRS 19.9% strategic placement of A$4.1M; December quarter report [S11], [S8]Balance-sheet repair; strategic shareholder
2–6 Feb 2026Placement shares issued; FRS becomes substantial holder; IPO director options cease [S11]Capital structure change
16 Feb 2026Polaris Engineering appointed [S11]Execution partner
18 Feb 2026Metallurgical diamond drilling commences [S11]Column testwork samples
10 Mar 2026Stage 1 environmental mining approval received [S11], [S1]Key permit milestone
11 Mar 2026Half-year report: H1 net loss A$1.16M [S11]Interim results
13 Mar 2026Stage 2 grade-control drilling commences; Notice of General Meeting [S11]Stage 2 study input
1 Apr 2026Strong heap-leach results; correction to the MRE table (Inferred grade 0.64 g/t, not 0.85 g/t) [S11], [S6]Disclosure-quality flag; totals unchanged
15 Apr 2026GM ratifies the FRS placement and VM Drilling share issue [S1]Governance
27 Apr 2026March quarter report [S11]Plant secured; final Column 1 results
28 Apr 2026First paleochannel batch: 6 m @ 4.46 g/t incl. 1 m @ 17.34 g/t [S11]Stage 2 grade confirmation
11 May 2026Second paleochannel batch (the annual report cites 1 May; conflicting date noted) [S11], [S1]Continuity
26 May 2026Third batch; plant refurbishment update; Kanowna Belle analogy [S11]Construction progress
11 Jun 2026Fourth batch; site civil works commenced [S11], [S10]Shift from study to build
23 Jun 2026Final batch: 7 m @ 8.12 g/t incl. 1 m @ 49.7 g/t [S10]Program complete
25 Jun 20264.1M shares issued to VM Drilling [S1]Non-cash settlement
8 Jul 2026Column 2: 82% recovery, cyanide 0.21 kg/t; Column 3 >75% (preliminary) [S18]Metallurgy across all three ore types
28 Jul 2026June quarter report: civil works underway; four plant modules dry-commissioned [S10]Construction status
21 Sep 2026FY2026 Annual Report: net loss A$3.18M; cash A$2.03M; going-concern uncertainty [S1]Funding remains the key issue
Upcoming (about 30 Oct 2026)September 2026 quarterly report due [S11]Cash position and construction update

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

4 charts
Revenue by Segment: Intersegment eliminations fell from AUD -0.5 Mn in FY2025 to AUD -0.5 Mn in FY2026.
OzAurum Resources Limited — Revenue by Segment
Series (AUD Mn)FY2025FY2026
Intersegment eliminations-0.5-0.5

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. S1OzAurum Resources Ltd, Annual Report for the year ended 30 June 2026 (investorpa.com mirror of ASX release, 21 Sep 2026) — FY2026, FY2025 comparatives
  2. S2OzAurum Resources Ltd, Annual Report for the year ended 30 June 2025 (ASX, 19 Sep 2025) — FY2025
  3. S3OzAurum Resources Ltd, Annual Report for the year ended 30 June 2023 (ASX, 21 Sep 2023) — FY2023
  4. S4OzAurum Resources Ltd, Financial Report for the half-year ended 5 Feb 2021 (ASX, 21 Apr 2021); Annual Report 2021 (ASX, 21 Sep 2021) — FY2021
  5. S5Stockhead IPO Watch articles (2020–2021); Mining Journal / MiningNews "OzAurum drills in home of gold" — 2020–2022
  6. S6OZM ASX releases: Mineral Resource Estimate (18 Jul 2023); Correction to Mineral Resource Table (1 Apr 2026); Resources Roadhouse summary — 2023, 2026
  7. S7OZM ASX release "Feasibility Demonstrates Path to Low-Cost Gold Production" (22 Jan 2026), via investorpa.com / MarketIndex — Jan 2026
  8. S8Forrestania Resources ASX release "19.9% Strategic Investment in OzAurum Resources Ltd" (30 Jan 2026); Grafa summary; investing.com shareholder data — Jan–Feb 2026
  9. S9InvestSMART summaries of OZM September 2025 quarterly report and amendment (31 Oct 2025) and 9 Oct 2025 release — Q1 FY2026
  10. S10OZM Quarterly Activities Report, June 2026 quarter (28 Jul 2026); OZM releases 11 Jun and 23 Jun 2026; Kalkine summary — Q4 FY2026
  11. S11InvestSMART OZM ASX announcements index (pages 1–6) — 2023–2026
  12. S12Stockopedia (balance sheet, cash flow FY2021–FY2025); Kalkine Media (income and cash flow FY2021–FY2025) — FY2021–FY2025
  13. S13Investing.com OZM quote pages (Jul–Aug 2026); TipRanks market cap snapshots — 2025–2026
  14. S14Smallcaps "OzAurum Resources bolts on Brazil lithium" (2023); Moomoo / MT Newswires headlines; OZM Brazil Exploration Update — 2023–2024
  15. S15Stockhead special reports: LHBM agreement (2024), Cross Fault discovery (2025), heap-leach testwork (Oct 2025) — 2024–2025
  16. S16MarketIndex OZM profile (listing date, auditor, registry, year-end prices) — Retrieved 2026
  17. S17Smallcaps "OzAurum Resources Regains Control of Mulgabbie North Feasibility Study" — Sep 2025
  18. S18OZM ASX release "Outstanding Heap Leach Results Continue at Mulgabbie North" (8 Jul 2026); InvestSMART summary — Jul 2026
  19. S19InvestSMART OZM share price history (May–Jul 2026) — 2026
  20. S20Stocklight / InvestSMART / TipRanks summaries of Forrestania Resources announcements (Edna May bid, Johnson Range MRE, Lake Johnston, TG Metals) — 2025–2026
  21. S21MiningNews company page (headlines incl. KalGold / OzAurum paleochannel, Apr 2025; Forrestania backs OzAurum, Jan 2026) — 2025–2026

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.