OzAurum Resources Limited Overview
OzAurum Resources is a Kalgoorlie-based junior gold company moving from explorer to small-scale producer. Its flagship is the 100%-owned Mulgabbie North Gold Project, about 130–135 km north-east of Kalgoorlie on the Relief Shear and about 2 km from Northern Star's Carosue Dam operation. The project holds a JORC (2012) Mineral Resource of 11.6 Mt at 0.70 g/t Au for about 260,000 oz, of which 64% is Measured and Indicated.
The company's strategy is a capital-light, owner-operated, staged heap-leach development:
Stage 1: is a metallurgical-trial open pit at James feeding a two-cell heap, using a second-hand agglomeration plant acquired in January 2026. It holds environmental and mining approvals.
Stages 2 and 3: are planned as a larger operation of up to 32 cells / about 2 Mt heap capacity, centred on a shallow, high-grade paleochannel.
Secondary assets are the Patricia Gold Project (WA) and early-stage niobium/REE ground in Brazil's Alto Paranaíba province. ASX-listed Forrestania Resources holds 19.9%, and founder-CEO Andrew Pumphrey holds about 14.9%.
Company's own description
In its FY2026 Annual Report, the company describes its principal activity as mineral exploration for gold, lithium and rare earth elements, with no significant change in the nature of those activities during the year [S1]. Its stated business model is to create value by discovering economic quantities of mineralisation and resources. It does this by:
-
identifying projects that fit its strategy;
-
designing project-specific exploration programs to quantify mineral potential; and
-
continually assessing results against other projects, funding options and opportunities [S1].
The FY2026 Directors' Report states that the primary focus is development of Mulgabbie North, while exploration continues elsewhere and other potential projects are reviewed [S1].
Independent characterisation
| Dimension | Characterisation |
|---|---|
| Current revenue | Nil operating revenue. Only interest income (A$35,302 in FY2026) and a one-off non-cash gain on settling a liability (A$114,800) [S1] |
| Intended revenue model | Sale of gold doré from an owner-operated open-pit and heap-leach operation (commodity product sales, price-taker) |
| Product / service / subscription / licensing mix | 100% prospective commodity product; no service, subscription or licensing revenue |
| Value chain position | Upstream: exploration → resource definition → mining → heap-leach processing to doré. Refining and marketing would be outsourced (not yet contracted) |
| Customer types | Prospective: bullion refiners (e.g., Perth Mint-type refiners); no offtake disclosed |
| End-markets | Global gold market (investment, central bank, jewellery demand) via refined bullion; secondary optionality in niobium/REE (steel alloying, magnets) through Brazil exploration |
| Operating model | Owner-operator. Civil works are done in-house. Plant refurbishment is outsourced to Polaris Engineering Services. Drilling is contracted (VM Drilling, partly paid in shares). Metallurgical testing is done at ALS Balcatta plus an in-house percolation laboratory at Coolgardie [S1], [S17] |
OzAurum is best described as a micro-cap, pre-revenue, single-asset gold developer. During FY2026 it changed character from a pure explorer to an early-stage builder. The evidence:
New expense line: The FY2026 income statement shows a "development costs" line (A$221,063) for the first time [S1].
Fixed assets ballooned: Property, plant and equipment rose from A$0.41M to A$2.23M, driven by the acquisition and refurbishment of a heap-leach agglomeration plant [S1].
Approvals in hand: The company holds Stage 1 environmental approval under Western Australia's Small Mining Operation Policy and Mining Operator Notification approval to begin open-pit mining [S1].
Remaining permits: At the date of the annual report, a Dangerous Goods Licence application had been lodged. A Department of Health Poisons Permit (needed for cyanide) is still to be sought [S1].
Business model / revenue model.
Economic logic of the strategy.
Why heap leach: The resource is low-grade overall (0.70 g/t), which would struggle to justify a standalone carbon-in-leach (CIL) mill at this scale. The Stage 1 pit and the paleochannel, however, contain shallow higher-grade zones (e.g., James grade-control intervals of 2–6 g/t; paleochannel intervals commonly 3–8 g/t over 2–8 m) [S1]. Heap leaching avoids the A$100M+ capital typical of a new mill.
Low-cost plant: The company bought a second-hand plant with a long operating history (Marvel Loch, Nifty, Bullabulling) to cut capital intensity further [S1].
Gold price tailwind: The company says record A$ gold prices (about A$7,200/oz cited in January 2026) materially improve the investment case [S7].
Strategy
Stated strategic themes (paraphrased from [S1], [S7])
-
Staged, capital-light heap-leach development of Mulgabbie North. Stage 1 is a metallurgical trial to learn the heap-leach behaviour of oxide ore and build operating capability, followed by Stages 2 and 3 at larger scale.
-
Owner-operator model with existing infrastructure. This includes in-house civil works, a purchased second-hand plant, and the company's own percolation lab.
-
Grow the resource while de-risking the project. Exploration and feasibility work are combined so that the project has both technical de-risking and a larger resource base by the time the study is complete [S17].
-
Use the high A$ gold price. The company cited about A$7,200/oz in January 2026 [S7].
-
Keep optionality in Patricia and Brazil Nb/REE at low cost.
-
Review other projects to increase shareholder value [S1].
Initiative register (last 24 months)
| Initiative | Date | Description | Status / target |
|---|---|---|---|
| LHBM feasibility funding agreement | Sep 2024 | LHBM to fully fund the feasibility study and potentially fund and operate a heap-leach operation | Terminated by Deed of Release, Sep 2025 [S1] |
| In-house feasibility relaunch | Sep–Oct 2025 | Percolation tests at the Coolgardie lab | Completed [S1] |
| James Stage 1 grade-control drilling | Oct–Dec 2025 | 5 + 91 RC holes; MNODH019 | Completed [S1] |
| Agglomeration plant acquisition | Jan 2026 | Bullabulling plant purchased | Completed [S1] |
| Plant refurbishment (Polaris) | Feb–Jun 2026 | Engineered modifications and upgrade to current Australian safety standards | Main modules dry-commissioned; silo system about 95% complete at 30 Jun 2026 [S1] |
| Stage 1 permitting | Through Mar 2026 | SMOP environmental approval; Mining Operator Notification | Approved. Dangerous Goods Licence lodged; Poisons Permit pending [S1] |
| Stage 2 grade-control drilling | Mar–Apr 2026 | 435 holes for 15,646 m on the paleochannel | Completed [S1] |
| Stage 2/3 design and permitting | FY2026 | 32-cell / about 2 Mt heap, pit optimisations, geotechnical, waste rock, heritage surveys with Senior Wongatha Elders | Mining Development and Closure Proposal to be lodged [S1] |
| Site civil works | From Jun 2026 | Heap-leach pad and plant foundations, done in-house | Foundations poured before 30 Jun 2026 [S1] |
| Column leach testwork (ALS) | FY2026–FY2027 | Columns 1–3 | Columns 1 and 2 final; Column 3 preliminary [S1] |
| Patricia / Heysen's Find RC drilling | Planned | Programme of Work granted | Not yet drilled [S1] |
| Brazil Nb/REE magnetometer interpretation | FY2027 | Target 1 anomaly | Awaiting interpretation [S1] |
| Sustainability / ESG commitments | — | No formal ESG targets disclosed | — |
| Cost programs | — | None disclosed | — |
Medium-term targets and guidance
Financial guidance: none. No production targets, capex estimates, AISC guidance or first-gold date have been published in the retrieved disclosures.
Directional statements: "near-term" production from Stage 1 [S1], [S10].
Plant scale: about 350 ktpa on day shift only [S1].
Products & Services
As a pre-revenue resource company, OzAurum's "products" are mineral projects. Each is catalogued below.
Mulgabbie North Gold Project (WA), 100%, flagship
| Attribute | Detail |
|---|---|
| Location | About 130–135 km north-east of Kalgoorlie, Eastern Goldfields, WA; reached via the Tropicana heavy-haulage road then about 15 km along OzAurum's L28/48 access road [S6], [S9] |
| Area | About 158 km² (2025 description) [S15]. The two projects combined covered about 70.6 km² at IPO [S4]; the difference implies later tenement additions (not itemised in retrieved sources) |
| Geological setting | Archaean mesothermal gold on the Relief Shear, a mineralisation corridor up to 50 m wide, within the Norseman–Wiluna greenstone belt, Yilgarn Craton [S1], [S18] |
| Neighbours | About 2 km from Northern Star's Carosue Dam operation (about 3.5 Moz resource; about 4.2 Mtpa mill) [S15] |
| Mineral Resource (JORC 2012, 18 Jul 2023) | Indicated 5.62 Mt @ 0.71 g/t for 128,000 oz; Inferred 4.543 Mt @ 0.64 g/t for 93,000 oz (corrected from 0.85 g/t on 1 Apr 2026); Total M+I+I 11.638 Mt @ 0.70 g/t for 260,000 oz at a 0.3 g/t cut-off. Measured tonnes are not shown in retrieved snippets; by subtraction, Measured is about 39,000 oz [S6] |
| Ore Reserve | None declared [S1] |
| Prospects | James, Ben, Alicia, Demag Zone, Paleochannel, and the Cross Fault target (aircore discovery, 2025) [S6], [S15] |
| Processing route | Crush (target -8 mm), agglomerate with cement/lime, cyanide heap leach |
| Column | Ore type | Head grade | Recovery | Leach kinetics | Cyanide use |
|---|---|---|---|---|---|
| Column 1 | James oxide | 2.51 g/t | >90% | 60% in 7 days; 80% in 14 days | 0.45 kg/t |
| Column 2 | Lower saprolite/transition | 1.35 g/t | 82% at -12 mm (about 88% indicated at -8 mm) | — | 0.21 kg/t |
| Column 3 | Paleochannel (preliminary, still running at year end) | — | >75% after 39 days | — | — |
Stage 1 (James open pit, metallurgical trial).
-
Two-cell heap leach fed by campaign mining, crushing, screening and agglomeration [S1].
-
Approvals: environmental approval under the Small Mining Operation Policy and Mining Operator Notification approval have been received. Dangerous Goods Licence application lodged; Poisons Permit to follow [S1].
-
Grade-control highlights include 7 m @ 6.16 g/t (incl. 2 m @ 20.54 g/t) and 14 m @ 2.09 g/t. Diamond hole MNODH019 returned 16 m @ 3.41 g/t from 19 m [S1].
Stages 2 and 3 (expanded operation).
-
About 2 Mt heap-leach facility of 32 cells on M28/240, with a 120-tonne mining fleet [S1], [S10].
-
Paleochannel grade control: 435 holes for 15,646 m.
-
Highlights include 7 m @ 8.12 g/t (incl. 1 m @ 49.7 g/t), 6 m @ 6.31 g/t and 5 m @ 5.26 g/t.
-
MNODH022 returned 6 m @ 11.64 g/t, including 1 m @ 61.10 g/t [S1].
-
The paleochannel trend is open over more than 4 km [S10].
Metallurgy.
Percolation testing: 34 of 55 tests averaged about 59,900 L/hr/m² [S1].
Agglomeration plant.
-
Ex-Marvel Loch / Nifty / Bullabulling plant; agglomerator drum originally designed by Kappes Cassiday.
-
100 tph (about 1,000 tpd), giving about 350 ktpa on day shift only.
-
Polaris dry-commissioned the feed bin, feed conveyor, drum and discharge conveyor. The lime/cement silo system was about 95% complete at 30 June 2026 [S1].
Key gaps.
-
No published NPV, IRR, capital cost, operating cost/AISC, production target or mine life.
-
No Ore Reserve.
-
Feasibility outputs to date are technical (design, metallurgy, permitting), not financial [S1], [S7].
Patricia Gold Project (WA), 100%
| Attribute | Detail |
|---|---|
| Location | About 150 km north-east of Kalgoorlie, within the Celia Tectonic Zone [S1], [S16] |
| History | Historic underground mine (1930–1937); existing Patricia open pit [S5], [S1] |
| Key target | Heysen's Find on E31/1186: rock chips up to 16.23 g/t, 10.33 g/t and 6.20 g/t Au along more than 250 m of strike, associated with a newly identified shear (330° strike, near-vertical) [S1] |
| Status | Section 18 application over all of E31/1186 refused, but drilling approval granted over the rock-chip area and 1 km of strike to the north. Programme of Work granted for RC drilling, not yet drilled. Mapping planned along the 7.5 km Patricia shear [S1] |
| Resource | — |
Brazil: Salitre and Catalão Niobium + REE Projects
| Attribute | Detail |
|---|---|
| Location | Alto Paranaíba Magmatic Province (APMP), Minas Gerais/Goiás region. The company notes the APMP hosts 97% of global niobium production, all from carbonatites [S1] |
| Salitre | Adjacent to the Salitre and Serra Negra carbonatite complexes (niobium and phosphate resources) [S1] |
| Work to date | Two soil-sampling programs (FY2025); "Target 1" niobium soil anomaly; ground magnetometer survey on a 50 m × 25 m grid (FY2026), not diurnally corrected, so lower precision; data awaiting geophysical interpretation [S1], [S2] |
| Resource | — |
| FY2026 spend | A$47,977 exploration (Brazil) [S1] |
Brazil lithium (legacy, effectively exited)
| Project | Detail | Status |
|---|---|---|
| Linópolis Jaime | Hard-rock LCT pegmatite project about 65 km ENE of Governador Valadares, Minas Gerais. Historically artisanally mined; the company reported grades up to 7.36% Li₂O; more than 20 LCT-bearing pegmatites [S3], [S14] | Acquisition costs written off; acquisitions terminated (FY2025) [S1] |
| Boca Rica | About 3,871 ha; spodumene zone about 6 m wide; diamond drilling commenced FY2024 [S14] | Treated as part of the terminated Brazil acquisitions (A$186,045 write-off). Specific project status after termination not separately disclosed |
| Tenement applications | About 19,700 ha lodged around Linópolis in 2023 [S14] | Current status not publicly disclosed |
Pricing model. Not applicable. Gold would be sold at spot. No hedging, offtake or streaming arrangements have been disclosed.
Financial Narrative
Basis. FY2025–FY2026 figures come from audited statements [S1]. FY2022–FY2024 figures come from aggregator datasets [S12] (Stockopedia, Kalkine), which draw on company annual reports. The FY2024 closing cash and FY2024 equity figures are confirmed by the opening balances in [S1]. All figures are A$ millions unless stated.
Income statement (chartable)
FY2021 (5 Aug 2020 to 30 Jun 2021, a partial first period) net loss was A$4.467M [S12].
Detailed FY2025–FY2026 income statement (A$, audited) [S1]
Margins and earnings metrics.
Balance sheet (chartable)
Equity for FY2022 and FY2023 is calculated as total assets minus total liabilities from [S12]. FY2024 equity of A$2,837,973 is confirmed in [S1].
FY2026 balance sheet detail (A$) [S1].
Debt and capital.
Cash flow (chartable)
Other cash-flow items.
-
Aggregator free cash flow figures that include tenement acquisitions differ slightly. For example, Kalkine shows FY2024 FCF of -A$2.207M [S12]. The definition used above is stated in the row label.
-
FY2021 (partial period): operating cash flow -A$3.875M; financing +A$12.08M (IPO) [S12].
-
Dividends paid: nil. Buybacks: nil.
-
FY2026 operating outflows: exploration A$1.525M, suppliers and employees A$0.995M, development A$0.169M [S1].
Ratios (chartable, analyst calculations from the tables above)
Ratios that are not meaningful or not applicable:
-
ROIC: not meaningful (negative NOPAT, no invested debt).
-
Debt/equity on borrowings: 0.0x every year (only lease liabilities from FY2025: 0.04x FY2025; 0.02x FY2026).
-
Net debt/EBITDA: not meaningful (net cash, negative EBITDA).
-
Interest coverage: not meaningful.
-
Asset turnover: 0 (no revenue).
-
Cash conversion cycle: not applicable.
Commentary on trends, inflections and drivers
1. The IPO cash pile has been consumed; the company now lives raise to raise.
-
Cash fell from A$7.57M at June 2021 to about A$1.1M by June 2023 and June 2024, as the post-IPO drilling campaign (more than 65,000 m by 2022) was funded from IPO proceeds [S5], [S12].
-
Since FY2024, roughly A$8.9M of financing inflows have kept cash at A$1–2M:
-
FY2024: about A$2.2M, mainly the September 2023 placement.
-
FY2025: A$2.7M (December 2024 and March 2025 placements).
-
FY2026: A$4.0M (Forrestania placement).
-
-
This pattern is typical of a junior explorer but leaves very little buffer.
2. FY2026 is an inflection from exploration to construction.
-
Investing outflows rose from A$0.04M to A$1.24M, and PP&E additions were A$1.82M, reflecting the plant purchase and refurbishment [S1].
-
Trade payables rose more than tenfold to A$0.91M. Part of the build was effectively funded by suppliers. This explains why the current ratio collapsed from 6.2x to 1.9x despite higher cash.
3. The burn rate has stepped up.
-
Combined operating and investing outflow was about A$3.9M in FY2026, against year-end cash of A$2.03M. That is roughly six months of runway at the FY2026 burn rate before any new capital.
-
The auditor flagged a material uncertainty over going concern [S1].
-
Management states that sufficient funds exist for working capital at the report date and that it expects further debt or equity funding after period end [S1].
-
In October 2025 the company itself indicated only just over two quarters of funding [S9].
4. Losses are mostly exploration and development, not overhead.
-
In FY2026, exploration plus development (A$2.30M) made up about 70% of total expenses. Corporate costs (directors, compliance, admin, employees, occupancy) were about A$0.89M.
-
Director fees rose to A$200k from A$145k because a full year of a separate chair was paid.
5. Equity dilution is heavy.
- Shares on issue rose 82.8%, from 158.75M (1 July 2024) to 290.20M (30 June 2026) [S1]. The weighted average share count rose 35% year on year.
6. Non-cash item. The A$114,800 gain came from settling a A$451,000 drilling invoice to VM Drilling with shares issued at a deemed A$0.11, which were valued at the A$0.082 market close. In effect the driller accepted a non-cash discount [S1].
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Entity | Incorporated | Place | Ownership | Function |
|---|---|---|---|---|
OzAurum Resources Limited | 5 Aug 2020 | NSW, Australia | Parent (ASX-listed) | Head company |
OzAurum Mines Pty Ltd (ACN 645 117 111) | 14 Oct 2020 | WA, Australia | 100% | Holder of Mulgabbie North and WA tenements |
OzAurum Brazil Pty Ltd | 28 Jul 2023 | WA, Australia | 100% | Brazil holding company |
OzAurum Brasil Ltda | 26 Sep 2023 | São Paulo, Brazil | 100% | Brazil operating entity (tax resident in Brazil and Australia) |
Results by Segment
| Metric | FY2025 | FY2026 |
|---|---|---|
Australia loss before tax (AUD K) | -1,863.8 | -3,081.5 |
Brazil loss before tax (AUD K) | -415.5 | -96.0 |
Group loss before tax (AUD K) | -2,279.3 | -3,177.5 |
Segment Assets & Liabilities and Revenue by Segment
| Metric | FY2025 | FY2026 |
|---|---|---|
Australia total assets (AUD K) | 3,962.1 | 6,075.7 |
Brazil total assets (AUD K) | 239.2 | 219.7 |
Intersegment eliminations (AUD K) | -481.4 | -501.4 |
Group total assets (AUD K) | 3,720.0 | 5,794.1 |
Key Financials
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating revenue (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Net loss after tax (AUD Mn) | -4.894 | -2.924 | -2.535 | -2.279 | -3.178 |
Balance Sheet (AUD)
| Line item (AUD) | FY2025 | FY2026 |
|---|---|---|
Interest income | 21,436 | 35,302 |
Gain on disposal of PP&E | 1,412 | 0 |
Gain on settlement of liability | 0 | 114,800 |
Total income | 22,848 | 150,102 |
Exploration costs | -1,169,592 | -2,077,305 |
Development costs | 0 | -221,063 |
Project evaluation costs | -247,576 | 0 |
Director fees | -144,839 | -200,000 |
Compliance and professional fees | -143,336 | -234,187 |
Depreciation | -142,846 | -128,685 |
Administration expenses | -181,411 | -190,798 |
Employee benefits expense | -235,708 | -249,506 |
Occupancy costs | -9,789 | -11,973 |
Share-based payments | -10,521 | 0 |
Interest and finance charges | -18,923 | -13,918 |
Foreign exchange gain/(loss) | 2,391 | -175 |
Loss before and after tax | -2,279,302 | -3,177,508 |
Financial Analysis
| Metric | Status |
|---|---|
Revenue | Nil all years; revenue CAGR not applicable |
Gross profit, gross margin | Not applicable (pre-revenue) |
Operating income, operating margin | Not applicable (pre-revenue) |
EBITDA, EBITDA margin | Not applicable as a margin. Analyst calculation of EBITDA proxy (loss before tax + depreciation + interest − interest income): FY2026 about -A$3.07M; FY2025 about -A$2.14M |
Net margin | Not applicable (pre-revenue) |
EPS, basic and diluted | -1.26 cents (FY2026); -1.22 cents (FY2025). Options are anti-dilutive [S1] |
Dividends per share | Nil; no dividend ever paid or declared [S1] |
Balance Sheet
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total assets (AUD Mn) | 6.09 | 2.73 | 3.23 | 3.720 | 5.794 |
Cash and equivalents (AUD Mn) | 4.296 | 1.115 | 1.088 | 1.903 | 2.034 |
Total current assets (AUD Mn) | 4.44 | 1.19 | 1.22 | 2.030 | 2.327 |
Total current liabilities (AUD Mn) | 0.612 | 0.206 | 0.245 | 0.329 | 1.203 |
Total liabilities (AUD Mn) | 0.653 | 0.215 | 0.395 | 0.443 | 1.278 |
Total equity (AUD Mn) | 5.437 | 2.515 | 2.838 | 3.277 | 4.516 |
Working capital (AUD Mn) | 3.828 | 0.984 | 0.975 | 1.701 | 1.123 |
Financial Analysis — PP&E
| Item | Amount |
|---|---|
PP&E | 2,234,923 (plant and equipment 2,102,623, after A$1,818,805 of additions) |
Right-of-use asset (Kalgoorlie office) | 85,932 |
Capitalised exploration (acquisition costs) | 1,146,383 (unchanged since FY2025) |
Trade payables | 912,659 (FY2025: 84,150) |
Lease liability | 97,672 (current 45,563; non-current 52,109) |
Provisions | 146,344 |
Financial Analysis — Borrowings
| Item | Status |
|---|---|
Borrowings | None. No overdraft, loan or borrowing facilities [S1] |
Total debt | Lease liabilities only: A$0.098M (FY2026), A$0.137M (FY2025) |
Net cash | A$1.94M (FY2026), A$1.77M (FY2025) (analyst calculation: cash − lease liabilities) |
Contributed equity | A$23.30M |
Accumulated losses | A$19.89M |
Reserves | A$1.11M |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | -4.734 | -3.096 | -1.607 | -1.818 | -2.667 |
Capex on PP&E (AUD Mn) | -0.240 | -0.013 | -0.250 | -0.010 | -1.244 |
Free cash flow, OCF less PP&E capex (AUD Mn) | -4.974 | -3.109 | -1.857 | -1.828 | -3.911 |
Financing cash flow (AUD Mn) | 1.837 | -0.072 | 2.179 | 2.673 | 4.041 |
Net change in cash (AUD Mn) | -3.272 | -3.181 | -0.027 | 0.816 | 0.130 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROE on average equity (%) | -70.2 | -73.5 | -94.7 | -74.6 | -81.6 |
ROA on average total assets (%) | -64.1 | -66.3 | -85.1 | -65.6 | -66.8 |
Current ratio (x) | 7.25 | 5.78 | 4.98 | 6.17 | 1.93 |
Liabilities to equity (x) | 0.12 | 0.09 | 0.14 | 0.14 | 0.28 |
Results by Region
| Metric | FY2025 | FY2026 |
|---|---|---|
Australia interest income (AUD K) | 21.2 | 35.3 |
Brazil interest income (AUD K) | 0.2 | 0.0 |
Revenue by Region
| Metric | FY2025 | FY2026 |
|---|---|---|
Australia exploration costs (AUD K) | 1,047.4 | 2,029.3 |
Brazil exploration costs (AUD K) | 122.2 | 48.0 |
Share Price
| Metric | FY2021 | FY2022 | FY2023 |
|---|---|---|---|
Closing share price at 30 June (AUD) | 0.115 | 0.155 | 0.042 |
Period | Performance | Source / basis | — |
Since IPO (A$0.25, Feb 2021) | About -66% at about A$0.085 | Analyst calculation | — |
About 5-year (30 Jun 2021 close A$0.115) | About -26% | Analyst calculation | — |
About 3-year (30 Jun 2023 close A$0.042) | About +100% | Analyst calculation | — |
Calendar 2026 YTD (to late July) | About +63% (A$0.051 at start of year to A$0.083) | [S19] | — |
1-year | Sources conflict: about +1.3% (investing.com, 4 Aug 2026) versus about +45% (investing.com, 31 Aug 2026). The difference reflects the base date. Not reconciled | [S13] | — |
52-week range | A$0.05–0.13 | [S13] | — |
Share Count (millions)
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Shares on issue at 30 June (millions) | 158.75 | 229.10 | 290.20 |
Share Price & Returns
| Date | Raise | Price | Terms |
|---|---|---|---|
Feb 2021 | A$12.0M IPO | A$0.25 | — |
Sep 2023 | About A$2.4M | A$0.075 | 1-for-2 options at A$0.11 |
Dec 2024 | A$1.0M | about A$0.026 | — |
Mar 2025 | A$1.746M | A$0.06 | — |
Jan 2026 | A$4.097M | A$0.072 | — |
Series Details
| Series | Exercise price | Expiry | Number |
|---|---|---|---|
Director and staff options | A$0.23 | 26 Nov 2027 | 7,750,000 |
Capital raising options (Sep 2023) | A$0.11 | 28 Nov 2026 | 17,990,910 |
Broker options (Dec 2024) | A$0.05 (shown as "0.05c" in the annual report; Note 20 confirms A$0.05) | 20 Dec 2027 | 3,475,000 |
Broker options (Mar 2025) | A$0.09 (shown as "0.09c"; Note 20 confirms A$0.09) | 10 Mar 2028 | 3,000,000 |
Total | WAEP A$0.131 | — | 32,115,910 |
Valuation Multiples
| Multiple | OZM | Basis |
|---|---|---|
Market cap | About A$24.7–24.9M | 290.2M shares × A$0.085; investing.com A$24.89M |
Enterprise value | About A$22.8M | Market cap − cash A$2.03M + lease A$0.10M |
P/E | Not meaningful (loss) | — |
EV/EBITDA | Not meaningful (negative EBITDA) | — |
EV/Sales | Not meaningful (nil revenue) | — |
P/B | About 5.5x | A$24.8M / A$4.52M equity |
EV / resource ounce | About A$88/oz | A$22.8M / 260 koz |
Analyst Conclusions
Management guidance
There is no quantitative guidance. Management's qualitative outlook [S1]:
-
move Mulgabbie North from construction to Stage 1 heap-leach operation;
-
lodge Stage 2 environmental permitting (the Mining Development and Closure Proposal);
-
finish Column 3 testwork;
-
drill Heysen's Find; and
-
interpret Brazil magnetics.
Management expects additional debt or equity funding after period end [S1].
Consensus growth expectations
None available; there is no analyst coverage.
Bull case
-
Cheap route to production. OZM owns a proven 100 tph agglomeration plant and holds Stage 1 environmental and mining approvals. At an EV of about A$23M (about A$88/resource oz), the market may be under-pricing a near-term, debt-free producer at A$ gold prices around A$7,000/oz [S1], [S7].
-
Grade upside for the next resource update. Paleochannel intercepts of 4–8 g/t over 3–8 m at about 25 m depth suggest the grade-controlled Stage 2 inventory could be materially richer than the 0.70 g/t global MRE. Metallurgy shows recoveries above 80% with low cyanide use [S1].
-
Strategic floor from FRS. A producer at the 19.9% ceiling, with an acquisitive record, provides a credible takeover or merger pathway [S8], [S20].
Bear case
-
Funding cliff. Cash of A$2.03M against a burn of about A$3.9M a year, plus A$0.91M of payables, makes a discounted raise or expensive debt likely. Options at A$0.11 expiring November 2026 are out of the money [S1].
-
Lab-to-heap risk. Clay-rich saprolite and transition ores can fail at scale even after successful agglomerated column tests. There is no Ore Reserve or financial model to anchor value [S1].
-
Small, low-grade asset with execution and governance thinness. A single key person, no audit committee, an MRE disclosure error, and a prior partner collapse [S1], [S6].
Catalysts and monitorables (next 12 months)
| Timing | Catalyst |
|---|---|
| About 30 Oct 2026 | September 2026 quarterly: cash balance, commissioning status, funding plans |
| Q4 2026 | 2026 AGM (remuneration vote, any capital resolutions) |
| By 28 Nov 2026 | Capital-raising terms and size, FRS participation, and whether the A$0.11 options are exercised |
| Pending | Grant of the Dangerous Goods Licence and Poisons Permit; Stage 1 first ore stacked and first gold pour |
| Pending | Column 3 final results; updated MRE including grade-control data; any Ore Reserve or financial study outputs |
| Pending | Lodgement and approval of the Stage 2 Mining Development and Closure Proposal |
| Ongoing | FRS strategic intentions; Heysen's Find drill results; A$ gold price |
Concluding analyst verdict
OzAurum Resources is a classic high-risk, high-optionality Goldfields junior. It now sits at the most fragile point of the junior-miner lifecycle: the move from feasibility to first production, funded by a balance sheet that cannot carry it alone. The technical case has improved markedly over the past twelve months:
-
Stage 1 permits are in hand.
-
An agglomeration plant with a long operating pedigree has been bought and largely refurbished for a fraction of new-build cost.
-
Columns across three ore types show recoveries of 75–90% with low cyanide consumption.
-
A dense 435-hole grade-control program has repeatedly found high grades at shallow depth along a paleochannel that remains open beyond 4 km.
Forrestania's 19.9% placement at the 10-day VWAP was both a funding event and a statement that a regional consolidator sees strategic value.
The financial case, however, is still unproven and unfunded. There is no Ore Reserve, no published capital or operating cost, and no production target. The audited accounts carry a going-concern material uncertainty. FY2026 cash outflows of about A$3.9M compare with A$2.0M in the bank and rising payables, so another dilutive raise in the coming months looks likely. Share count has already risen by more than 80% in two years. Governance is lean, with no audit committee and dependence on a founder who is also the sole Competent Person, which raises execution risk.
At an EV of about A$23M, or roughly A$88 per resource ounce, the market is pricing OZM as a funded-risk explorer rather than an emerging producer. Re-rating depends on three verifiable steps:
-
securing a fully funded path to first gold on acceptable terms;
-
demonstrating heap performance in the Stage 1 trial; and
-
converting grade-control data into an upgraded resource and, ideally, a maiden reserve.
If those land while A$ gold prices stay high, the asymmetry is attractive, and the FRS holding adds corporate optionality. If funding stalls or the heaps underperform, dilution will capture most of the value. Verdict: speculative. Suitable only for risk-tolerant capital; monitor funding terms first.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Background / prior roles | Education / memberships |
|---|---|---|---|---|
Ashok Parekh | Non-Executive Chairman | 21 May 2025 | Over 45 years in mining. Chartered Accountant running a Kalgoorlie practice for about 40 years. Former MD of several Kalgoorlie gold mining/milling companies; ran Coolgardie Custom Milling for 12 years. Centenary Medal (2003); CA ANZ Meritorious Service Award. Also a director of Maritana Minerals Limited (since 14 Jun 2019) | Chartered Accountant |
Andrew Pumphrey | Managing Director and CEO | 5 Aug 2020 | Geologist and mine surveyor with more than 30 years' experience; Kalgoorlie-based since 1989; ran an exploration contracting business. Former Operations Manager/GM of MacPhersons Resources and Maritana Minerals; Exploration Manager at MacPhersons for four years. Competent Person for OZM exploration results | Member, AIG; Member, AusIMM |
Jeffrey Williams | Non-Executive Director (Chairman until 21 May 2025) | 5 Aug 2020 | More than 40 years in mining; 16 years as a mining engineer; 7 years in stockbroking. MD of Mineral Deposits Ltd for 15 years to late 2011, where he secured the Sabodala gold and Grande Côte zircon projects (Senegal) and saw market capitalisation grow from about A$6M (2003) to more than A$1B (2011) | Mining engineer |
Jessica Fertig | Non-Executive Director | 13 Jan 2025 | Founder and Managing Partner of Tau Media (investor and media relations); more than a decade in IR and IPOs; Director of Australian Women in Mining and Resources (AWIMAR) | Master of Business Law (Univ. of Sydney); Grad. Dip. Psychology (Monash); B.Com Law and Economics (Rhodes University) |
Stephen Hewitt-Dutton | Company Secretary (and finance) | 20 Aug 2020 | More than 30 years in corporate finance, accounting and company secretarial roles. Formerly Associate Director at Trident Capital (12 years) and Carmichael Corporate; Big 4 background | B.Bus (Curtin) |
Directors' Remuneration
| Name | Cash salary/fees (AUD) | Superannuation (AUD) | Leave accrual (AUD) | Share-based (AUD) | Bonus (AUD) | Total FY2026 (AUD) | Total FY2025 (AUD) |
|---|---|---|---|---|---|---|---|
Ashok Parekh | 71,429 | 8,571 | 0 | 0 | 0 | 80,000 | 9,032 |
Andrew Pumphrey | 240,000 | 28,800 | 20,751 | 0 | 0 | 289,551 | 289,261 |
Jeffrey Williams | 53,571 | 6,429 | 0 | 0 | 0 | 60,000 | 77,742 |
Jessica Fertig | 60,000 | 0 | 0 | 0 | 0 | 60,000 | 28,065 |
Andrew Tudor (former) | 0 | 0 | 0 | 0 | 0 | 0 | 30,000 |
Total KMP | 425,000 | 43,800 | 20,751 | 0 | 0 | 489,551 | 434,100 |
Governance Overview
| Item | Status |
|---|---|
Board size | 4 directors |
Independence | 3 non-executive directors. Analyst view: Parekh appears independent. Fertig's firm received A$3,000 for IR services before her appointment (minor). Williams holds 2.0M options and was Chair from IPO to May 2025. Formal independence determinations are in the corporate governance statement (not fully retrieved) |
Chair/CEO separation | Yes. Separate non-executive chair since IPO |
Committees | No formally constituted audit committee; the Board considers the group too small to need one |
Board meetings FY2026 |
|
Gender diversity | 1 of 4 directors female (25%) |
Related-party transactions | Payments to Ben Pumphrey (the MD's son, field assistant): A$672 (FY2026), A$2,885 (FY2025). Accrued director fees payable A$39,567 |
Major Shareholders
| Holder | Shares | % of 290.2M | Basis | Source |
|---|---|---|---|---|
Forrestania Resources Limited (ASX: FRS) | 56,900,000 | 19.89% (reported) / 19.6% (analyst calculation on 30 June 2026 shares) | Substantial holder notice 5 Feb 2026 | [S8], [S13] |
Andrew Pumphrey (MD/CEO, direct and indirect) | 43,324,000 | 14.93% | FY2026 KMP shareholding table | [S1] |
Jeffrey Williams | 1,187,500 | 0.41% | [S1] | [S1] |
Ashok Parekh | 200,000 | 0.07% | [S1] | [S1] |
Jessica Fertig | 0 | 0.00% | [S1] | [S1] |
Total board | 44,711,500 | 15.41% | [S1] | [S1] |
VM Drilling (WA) Pty Ltd (or nominee) | 4,100,000 issued 25 Jun 2026 | 1.41% at issue; current holding not disclosed | Share-based settlement | [S1] |
Competitive Landscape
Key Competitors
| # | Company (ticker) | Relevance to OZM | Relative positioning |
|---|---|---|---|
| 1 | Northern Star Resources (ASX: NST) | Owns Carosue Dam (about 3.5 Moz resource, about 4.2 Mtpa mill), about 2 km from Mulgabbie North [S15] | Dominant regional producer; potential consolidator or toll-treatment counterparty; competes for regional tenure |
| 2 | Forrestania Resources (ASX: FRS) | 19.9% holder of OZM; transitioning to producer via Lake Johnston CIL (Polaris-built) and a A$300M Edna May bid [S8], [S20] | Both strategic partner and potential acquirer; competes for Eastern Goldfields capital |
| 3 | KalGold (ASX: A1G) | Eshuys-backed explorer in the same under-explored area north-east of Kalgoorlie [S21] | Direct peer for capital in the same district |
| 4 | Saturn Metals (ASX: STN) | Eastern Goldfields heap-leach development peer (Apollo Hill) | — |
| 5 | Genesis Minerals (ASX: GMD) | Eastern Goldfields producer and consolidator | Potential acquirer; much larger |
| 6 | Ora Banda Mining (ASX: OBM) | Goldfields producer | Competes for contractors and staff |
| 7 | Black Cat Syndicate (ASX: BC8) | Kalgoorlie-region developer and producer | Peer for development capital |
| 8 | Horizon Minerals (ASX: HRZ) | Kalgoorlie/Coolgardie developer focused on toll/processing | Peer; processing-capacity competitor |
| 9 | Brightstar Resources (ASX: BTR) | Goldfields developer | Peer for small-scale development capital |
| 10 | CBMM and CMOC (Catalão) (Brazil niobium) | Incumbent niobium producers in the APMP, including Boa Vista at Catalão [S1] | Relevant only to Brazil optionality; OZM is a grassroots explorer next to dominant incumbents |
Peer Comparison FY2026
| Metric | OZM (FY2026) | Northern Star | Forrestania Resources |
|---|---|---|---|
Revenue | A$0 | — | — |
Net margin | n/a (net loss A$3.18M) | — | — |
R&D / exploration intensity | Exploration A$2.08M (about 65% of total expenses) | — | — |
Market capitalisation | About A$24.9M (Aug 2026) | — | — |
Gold resource | 260 koz | Carosue Dam about 3.5 Moz (one asset) [S15] | Johnson Range MRE 103.5 koz (one asset) [S20] |
Recent Developments
Absence should not be taken as confirmation that none occurred.