PARKD Limited Overview
PARKD Limited is a Perth-based construction-technology micro-cap that owns patented prefabricated structural systems. These were originally designed for demountable, multi-level car parks. The technology has since been extended to suspended floors for dealerships, self-storage, industrial buildings and, most recently, data centres. Its core intellectual property comprises the Continuously Voided Beam (CVB™), the Metal Deck Support Bracket (MDSB®), the Metal Deck Support System (MDSS®) and the PARKD Instant Edge Protection System (PIEPS®). Together with Fielders' SlimDek210 steel decking (Fielders is a BlueScope division), these form a propping-free "kit of parts" slab.
PARKD earns money in three ways: feasibility and design fees, turnkey design-and-construct contracts, and, since FY2026, prefabrication of modules under an exclusive national arrangement with Fielders. Revenue has been lumpy and concentrated. A single related-party project, the Audi Centre Myaree, generated 68% of FY2025 revenue and 89% of FY2026 revenue. The company has never reported a full-year profit, and its auditor has flagged a material uncertainty over going concern. Its equity is effectively an option on converting East Coast data-centre interest into contracted volume.
Company's own description (paraphrased from FY2026 Annual Report and Q4 FY2026 quarterly)
The FY2026 Annual Report gives PARKD's principal activities as designing modular car parks and continuing to develop and innovate its modular car-parking system. The system is described as suited to single- or multi-rise arrangements of up to six levels including ground. The Q4 FY2026 quarterly report's "About" section is broader. It describes PARKD as an Australian industrial company delivering patented modular structural systems for data-centre, car-park and commercial construction, supported by a national network of design and manufacturing partners. The gap between the statutory description (car parks) and the marketing description (industrial and data-centre structures) is itself informative. The commercial pivot has run ahead of the formal segment definition.
What the company actually does
PARKD operates three activities.
-
Technical, feasibility and design services. Paid engineering engagements that assess and design structural solutions using PARKD's systems. This is the front end of the sales funnel: being specified early in design gives PARKD a path to a construction or supply contract. Revenue is recognised at a point in time. It was A$473k in FY2026 and A$206k in FY2025 (FY2026 AR, Note 5).
-
Design-and-construct (D&C) contracting. Turnkey delivery of structures through PARKD Construction Pty Ltd, recognised over time on a cost-to-complete basis. This has been the dominant revenue line: A$4.92m in FY2026 and A$11.62m in FY2025. Reference projects include:
-
City Subaru pilot car park (Perth, 2018)
-
John Hughes Rushton Street mezzanine (Victoria Park, 2022)
-
John Hughes Forward Street multi-level car storage (practical completion February 2025)
-
Audi Centre Myaree three-storey dealership (substantial completion January 2026)
-
-
Prefabrication of modules. New in FY2026 (A$68k). PARKD assembles SlimDek210 decking with MDSB brackets and PIEPS edge protection into crane-ready module packs. Since 18 September 2025, PARKD holds exclusive national prefabrication rights under the revised Fielders licence. Its Penrith/Jamisontown (NSW) facility has stated capacity of about 65,000m² of modules a year.
A fourth, latent stream is licence royalties from Fielders. These arise under the 5-year MDSS/MDSB licence executed in FY2025, through which Fielders sells MDSB-fitted SlimDek through its own channels. Royalty amounts are not separately disclosed and appear immaterial to date, as no royalty line is reported in Note 5.
Revenue model mix (FY2026 AR, Note 5)
| Revenue type | FY2026 A$ | % of contract revenue | Model |
|---|---|---|---|
| Design and construction | 4,923,834 | 90.1% | Project / contracting (over time) |
| Feasibility and design technical services | 472,991 | 8.7% | Professional services (point in time) |
| Prefabrication of modules | 68,424 | 1.3% | Product / manufacturing (point in time) |
| Licensing / royalties | — | — | IP licensing |
| R&D tax offset (other income, not revenue) | 251,018 | — | Government incentive |
There is no subscription or recurring revenue. The model is project-based with high customer concentration.
Value-chain position
PARKD sits between material manufacturers and the builder or owner. Upstream it relies on:
-
Fielders/BlueScope for steel decking and MDSB manufacture
-
Precasters such as Delta Corporation and Western Precast
-
Concrete contractors such as Azzurri
-
Crane and rigging providers such as Performance Cranes and Rigging
Downstream it serves owners and developers directly through D&C, or main contractors through module supply and design advice. Its intended long-term position is "IP owner plus prefabricator", which is asset-light. This replaces the balance-sheet-heavy role of "turnkey contractor" that drove FY2024–FY2026 revenue.
Customer types and end-markets
| End-market | Evidence | Status |
|---|---|---|
| Automotive dealerships (car storage, service, sales) | City Subaru; John Hughes (VW) Forward St and Rushton St; Audi Centre Myaree | Core historical market; all major revenue to date |
| Healthcare car parks | FY2022 AR references technical reports across Health; FY2023 feasibility for Bethesda Health Care | Advisory only |
| Ports / transport / aviation | FY2023 feasibility for NSW Port Authority; FY2023 commercial negotiations with Perth Airport; Q3 FY2026 cites an aviation pipeline | Advisory / pipeline |
| Local government | FY2023 feasibility for City of Fremantle | Advisory |
| Retail | FY2023 negotiations with Woolworths (Fabcot Pty Ltd); FY2026 quotations for retail developments | Pipeline |
| Multi-storey self-storage | FY2025 AR cites strong traction; FY2026 quotations | Pipeline |
| Data centres | PARKD-DC+ scale demonstration, Jamisontown NSW, Q4 FY2026; Azzurri investment rationale | Priority pipeline; no disclosed contract |
| Industrial / commercial | McNab Group QLD pilot (FY2026) | Pilot delivered |
Independent characterisation
PARKD is best understood as an early-commercialisation engineering IP company that has funded itself through a few large construction contracts, most of them sourced through its Chairman's automotive network. The FY2025 revenue peak of A$11.8m came overwhelmingly from the Audi Centre Myaree project for Quattro Automotive Pty Ltd, a Chairman-related entity. That revenue did not reflect a scalable product business. Gross margins on D&C work were thin, and the FY2025 near-break-even result relied on that one job.
The FY2026 strategy has three parts:
-
Fielders exclusivity, which makes PARKD the sole national prefabricator of SlimDek210+MDSB modules
-
An East Coast prefabrication hub
-
A data-centre product variant (PARKD-DC+)
This is a credible attempt to move from contractor to IP-plus-manufacturing platform. However, as of the FY2026 accounts there were zero unsatisfied performance obligations (backlog A$Nil, versus A$3.13m a year earlier). The pivot therefore had not yet produced contracted revenue.
Strategy
Stated strategy (paraphrased themes, FY2025 and FY2026 Annual Reports)
The FY2025 Outlook set three priorities for FY2026:
-
Roll out the product through strategic partnerships.
-
Enter new segments, notably self-storage and data infrastructure.
-
Keep developing modular IP and safety systems.
The FY2026 Outlook sets three priorities for FY2027:
-
Convert the design, advisory and tender pipeline into contracted projects.
-
Increase utilisation of the prefabrication capability.
-
Extend the technology across targeted infrastructure and commercial markets.
Management describes the target operating model as an asset-light national rollout based on partners (HY FY2026 report).
Strategic initiatives in the last 24 months
| Initiative | Timing | Detail | Status |
|---|---|---|---|
| Fielders licensing (5-year MDSS/MDSB licence) | Q3 FY2025 | Fielders sells MDSB-fitted SlimDek nationally; joint marketing; launch at the Concrete Institute of Australia trade exhibition, Perth | Executed; royalty income not disclosed |
| Exclusive national prefabrication rights | 18 Sep 2025 | PARKD becomes sole national prefabricator and deliverer of SlimDek210+MDSB modules | Executed |
| East Coast expansion: Penrith/Jamisontown facility | Sep–Dec 2025 | ~65,000m² a year capacity; two-year lease | Commissioned; utilisation low (FY2026 prefab revenue A$68k) |
| McNab Group pilot (QLD) | FY2026 | Modules fabricated in NSW and installed in QLD; first external PIEPS deployment | Completed |
| Data-centre product (PARKD-DC+) | Q4 FY2026 | Scale demonstration with Azzurri, Western Precast, Fielders and Performance Cranes and Rigging | Demonstration only; no contract disclosed |
| Strategic equity partner (Azzurri) | Apr 2026 | 4.9% stake; supply-chain alignment in NSW | Completed |
| Delta Corporation national supply agreement | FY2025 | Precast supply to support national scalability | Executed |
| PIEPS safety system | FY2025–FY2026 | Edge protection integrated into modules | Production-ready; deployed |
| MDSB patent filings | FY2025 | Australia and international applications | Pending |
| Cost programmes | — | Going-concern notes cite the ability to cut discretionary administrative costs. No formal programme or target is disclosed | — |
| ESG / sustainability commitments | — | Marketing references to low embodied carbon and lean construction (FY2024 results release). No targets | — |
Medium-term financial targets and guidance
None. The directors state each year that likely developments and expected results are omitted because disclosure would likely cause unreasonable prejudice (FY2026 AR, Section 10). No revenue, margin or volume targets have been published.
Products & Services
All products sit in the single segment. They are catalogued individually below.
PARKD Car Park System (original platform)
Description: A lightweight precast concrete modular car-park structure made of three precast elements. It is designed for disassembly, relocation and reuse, and levels can be added or removed as parking demand changes (Crunchbase; standard company "About" text).
Capabilities: Single- or multi-rise, up to six levels including ground (FY2026 AR). At IPO the company claimed construction up to 75% faster and 35% cheaper than conventional car parks, and roughly half the structural weight (Stockhead, 2017; Commercial Real Estate, 2017).
Target customers: Dealerships, hospitals, landowners with interim-use sites, developers.
Launch: Pilot at City Subaru, 2018.
Pricing: Not publicly disclosed. The City Subaru 49-bay pilot sold for A$690,000 (about A$14k per bay).
Status: Commercial focus has shifted to permanent structural applications.
Continuously Voided Beam (CVB™)
Description: A patented voided precast beam that cuts self-weight and enables long spans. It was the founding IP.
Patent status: Registered in 13 countries (FY2024 results release, 30 Aug 2024).
Deployment: 537 lineal metres used at John Hughes Forward Street (FY2025 AR).
Pricing: Not disclosed.
Metal Deck Support Bracket (MDSB®)
Description: A proprietary bracket connecting steel decking (SlimDek210) to supporting beams. It removes or reduces the need for temporary propping and formwork.
Patent status: Applications filed in Australia and internationally (FY2025 AR). Described as "patent pending" in director bios through FY2026.
Deployment: 4,137 MDSB units at Forward Street (FY2025 AR).
Commercial channel: Licensed to Fielders, which sells MDSB-fitted SlimDek through its channels (FY2025 AR; ASX 18 Sep 2025). PARKD holds exclusive prefabrication rights.
Pricing / royalty rate: Not publicly disclosed.
Metal Deck Support System (MDSS®)
Description: The system-level connection methodology combining MDSB with supporting structure. It was validated under construction loading at Forward Street and Audi Myaree (FY2025 AR).
Licensing: Covered by the 5-year Fielders licence (FY2025).
SlimDek210 + MDSB module packs (prefabricated flooring modules)
Description: Prefabricated floor modules of Fielders SlimDek210 steel decking (a Fielders product) fitted with PARKD MDSB brackets and, optionally, PIEPS edge protection. They are assembled offsite and delivered as crane-ready packs that are unpacked and deployed on site using PARKD's patented assembly method (Q4 FY2026 quarterly).
Specifications (company-stated): - Clear spans up to 22 metres
-
Structural loads up to 25kPa
-
Unpropped construction
-
Maximised offsite prefabrication (ASX 25 Sep 2025; ASX 13 Apr 2026)
Productivity evidence: Forward Street installed 3,226m² of modules, achieved over 1,000m² in two days, and recorded about 3.9 man-hours per m² (FY2025 AR).
Capacity: Penrith/Jamisontown NSW facility, about 65,000m² a year (FY2026 AR). A WA prefabrication line was established in FY2024.
Launch: WA line FY2024; national exclusive from 18 Sep 2025; first East Coast pilot (McNab, QLD) FY2026.
Pricing: Not publicly disclosed. FY2026 prefabrication revenue was A$68,424.
PARKD Instant Edge Protection System (PIEPS®)
Description: Edge protection integrated into modules during prefabrication, so that fall protection arrives pre-installed. This reduces work at height (FY2025 AR; FY2026 AR).
Launch: Released alongside the MDSB × SlimDek launch with Fielders in Perth (FY2025). First external deployment on the McNab pilot (FY2026 AR).
Pricing: Not disclosed.
PARKD-DC+ Data Centre Structural System
Description: A data-centre floor-structure variant combining SlimDek210 module packs, reinforced module preparation and PIEPS, aimed at heavy loads and long spans.
Status: A scale example was built at Jamisontown NSW in Q4 FY2026 with Azzurri Concrete, Western Precast, Fielders BlueScope and Performance Cranes and Rigging. It was shown to contractors, consultants and operators from NSW, VIC and SA (Q4 FY2026 quarterly).
Contracts: None disclosed as of FY2026 results.
Pricing: Not disclosed.
Technical, feasibility and design services
Description: Concept feasibility, structural design, construction documentation, technical due diligence and tender support.
Examples: - Coxon Group Kewdale Stage 1 (FY2022)
-
Audi Myaree Stage 1 (FY2023, A$580k)
-
John Hughes Forward St Stage 1 (A$280k)
-
Feasibility for NSW Port Authority, Bethesda Health Care, City of Fremantle and Sultan Group (Tasmania) (FY2023)
Pricing: Fixed price or hourly rate (FY2026 AR revenue policy).
Turnkey design-and-construct
Description: Concept-to-handover delivery through PARKD Construction Pty Ltd.
Flagship deliveries: - City Subaru (2018)
-
John Hughes Rushton St (2022)
-
John Hughes Forward St (A$4.3m, PC February 2025)
-
Audi Centre Myaree (est. A$9.5m Stage 2, substantial completion January 2026)
Financial Narrative
All figures are A$ thousands unless stated and are drawn from audited statements.
-
FY2022–FY2023: FY2023 Annual Financial Statements.
-
FY2024–FY2025: FY2025 Annual Financial Statements (FY2024 restated).
-
FY2026: FY2026 Annual Financial Statements.
EBIT and EBITDA are analyst-derived from reported line items:
-
EBIT = loss before tax + finance costs − interest income
-
EBITDA = EBIT + depreciation and amortisation
Income statement
Notes:
-
FY2024 depreciation (A$8,316) is taken from the cash-flow reconciliation. It is embedded in administrative expenses on the FY2024 P&L face.
-
FY2024 revenue was originally reported as A$3,333,290 and restated to A$3,716,775 in FY2025 AR Note 3. Some aggregators (e.g., Stoxray) still show the unrestated figure.
-
FY2025 administrative expenses appear as A$741,779 in the FY2025 AR and as A$725,147 in the FY2026 AR comparative, where D&A of A$16,632 was split out. The FY2025 AR figure is used here, with D&A shown separately.
Margins and growth
Revenue CAGR:
-
FY2022→FY2026 (4 years): about +27.0% a year (A$2.10m to A$5.47m)
-
FY2021→FY2026 (5 years): about +114% a year, from a near-zero FY2021 base of A$121.3k
-
FY2025→FY2026: −53.8%
Balance sheet
Notes:
-
Debt consists of vehicle chattel mortgages at 7.99%, about A$41k at FY2026, plus the Penrith facility lease liability (A$248k at FY2026).
-
Excluding leases, FY2026 net cash was A$326k.
-
FY2026 payables include A$278k owed to the Australian Taxation Office, up from A$58k, and A$62k of insurance premium funding (FY2026 AR Note 14).
-
Development costs have never been capitalised, so the balance sheet carries no intangible asset for the patent portfolio.
Cash flow
Notes:
-
The FY2025 R&D rebate (A$251k) was assessed in FY2026 but received in early July 2026, i.e. in FY2027 (FY2026 Appendix 4E).
-
FY2024 shares were issued in lieu of cash for directors' fees and the MD's bonus (A$68k), which is a non-cash item.
Ratios
The following ratios are not meaningful (n.m.) in every year:
ROIC: invested capital (equity + debt − cash) is negative or near zero.
Net debt / EBITDA: EBITDA is negative and the company holds net cash.
Interest coverage: EBIT is negative and finance costs are trivial.
The ROE figures are mathematically extreme because equity fell to A$11k–A$36k. Read them as a signal of balance-sheet fragility, not as return measures. DSO, DPO and CCC are analyst-derived. The FY2026 DSO is inflated by an A$251k R&D receivable held in "other receivables", and DPO uses total trade and other payables, including accruals and ATO balances.
Commentary — trends, inflections and drivers
Revenue is project-driven, not product-driven. The five-year revenue line (A$2.1m → A$1.1m → A$3.7m → A$11.8m → A$5.5m) tracks the construction phase of three automotive projects:
-
John Hughes Rushton Street (FY2022)
-
John Hughes Forward Street (FY2024–FY2025)
-
Audi Centre Myaree (FY2024–FY2026)
The FY2025 inflection (+218%) was not a scaling event; it was the peak of Audi Myaree's construction. The FY2026 decline (−54%) is its completion. Note 10 of the FY2026 statements shows unsatisfied performance obligations of A$Nil at 30 June 2026, against A$3.13m at 30 June 2025 and A$11.29m at 30 June 2024. Absent new awards, FY2027 revenue starts from zero contracted backlog.
Gross margin has compressed as revenue scaled. Margins fell from 25.5% (FY2023, services-heavy) to 18.5% (FY2024), 12.8% (FY2025) and 4.0% (FY2026). Turnkey construction carries pass-through costs for subcontracted trades and procurement. The FY2024 restatement made this explicit by grossing up offsite procurement. In FY2026, A$95.6k of Penrith facility running costs went into cost of sales before the facility generated meaningful prefabrication revenue (A$68k). Margin recovery depends on mix shifting toward services, licensing and module supply, where PARKD's IP carries more of the value.
Overheads are sticky at about A$1.5m a year. Administrative plus employee expenses (net of the allocation to project cost of sales) were about A$1.30m in FY2022, A$1.01m in FY2023, A$1.19m in FY2024, A$1.64m in FY2025 and A$1.47m in FY2026. D&A rose to A$184k in FY2026, almost entirely from depreciation of the Penrith right-of-use asset (A$167k).
PARKD's break-even depends on gross profit of roughly A$1.5–1.7m a year. At FY2025's 12.8% gross margin that requires about A$12–13m of revenue. At a services-and-prefab margin of 25%, it requires about A$6–7m. This break-even arithmetic is an analyst inference from reported cost lines, not company guidance.
R&D tax offsets are a structural funding prop. Offsets of A$139k–A$251k a year have equalled 11–47% of annual net losses. This is material relative to the cash balance.
The balance sheet is thin. Equity of A$35.8m... correction: equity of A$35,810 at 30 June 2026, against accumulated losses of A$8.71m and issued capital of A$8.48m. Net current liabilities were A$160k, and the auditor's material-uncertainty paragraph on going concern recurs. FY2026 burn of A$1.14m operating plus A$0.18m lease repayments was funded by A$1.12m net equity (four tranches at A$0.03).
Cash runway is short. At 30 June 2026, cash was A$368k. The Q4 FY2026 Appendix 4C reported 2.13 quarters of funding at the June-quarter burn rate of A$173k. The A$251k R&D rebate received in July 2026 extends this somewhat. At the full-year FY2026 burn rate of about A$285k a quarter, runway would be under two quarters.
Working capital has historically been self-funding. The negative cash conversion cycle reflects progress billing and supplier credit on construction jobs. That benefit reversed in FY2026 as payables unwound by A$581k with the end of Audi Myaree. The reversal is a major driver of the operating cash outflow.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Entity | Role | Ownership | Jurisdiction |
|---|---|---|---|
PARKD Limited | Listed parent; IP owner; services and prefabrication | — | Australia |
PARKD Construction Pty Ltd | Contracting entity for D&C projects | 100% | Australia |
Revenue stream (AUD K)
| Revenue stream (AUD K) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Design and construction (AUD K) | 1,853.9 | 882.3 | 3,116.2 | 11,624.0 | 4,923.8 |
Feasibility and design services (AUD K) | 248.3 | 267.0 | 600.6 | 206.3 | 473.0 |
Prefabrication of modules (AUD K) | 0 | 0 | 0 | 0 | 68.4 |
Total contract revenue (AUD K) | 2,102.2 | 1,149.3 | 3,716.8 | 11,830.3 | 5,465.2 |
Revenue by Segment (%) and Segment Margins & Growth (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
D&C share of revenue (%) | 88.2 | 76.8 | 83.8 | 98.3 | 90.1 |
Services share of revenue (%) | 11.8 | 23.2 | 16.2 | 1.7 | 8.7 |
Prefabrication share of revenue (%) | 0 | 0 | 0 | 0 | 1.3 |
Total revenue YoY growth (%) | 1,633.1 | -45.3 | 223.4 | 218.3 | -53.8 |
Segment gross margin (%) | 6.2 | 25.5 | 18.5 | 12.8 | 4.0 |
Segment pre-tax result (AUD K) | -1,281.3 | -530.1 | -294.1 | -76.1 | -1,258.1 |
Revenue by Segment and Revenue by Segment (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue from Quattro Automotive / Audi Myaree (AUD K) | 0 | 580.3 | 1,974.4 | 8,007.0 | 4,866.3 |
Share of total revenue (%) | 0 | 50.5 | 53.1 | 67.7 | 89.0 |
Income Statement and Per-Share Data
| Metric (AUD K) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue (AUD K) | 2,102.2 | 1,149.3 | 3,716.8 | 11,830.3 | 5,465.2 |
Cost of sales incl. NSW facility cost (AUD K) | 1,970.8 | 856.4 | 3,027.3 | 10,320.2 | 5,244.9 |
Gross profit (AUD K) | 131.4 | 292.9 | 689.5 | 1,510.1 | 220.4 |
Other income – R&D tax offset (AUD K) | 183.6 | 239.6 | 220.6 | 138.8 | 251.0 |
Administrative expenses (AUD K) | 502.7 | 493.5 | 619.0 | 741.8 | 739.1 |
Employee benefits expense (AUD K) | 799.2 | 512.7 | 575.0 | 893.6 | 732.1 |
Share-based payment expense (AUD K) | 294.1 | 57.3 | 4.4 | 79.9 | 24.1 |
Depreciation and amortisation (AUD K) | 0 | 0 | 8.3 | 16.6 | 184.0 |
Operating income / EBIT (AUD K) | -1,281.1 | -531.0 | -288.4 | -66.4 | -1,207.8 |
EBITDA (AUD K) | -1,281.1 | -531.0 | -280.1 | -49.7 | -1,023.8 |
Finance costs (AUD K) | 0.5 | 2.7 | 7.3 | 10.4 | 51.0 |
Pre-tax income (AUD K) | -1,281.3 | -530.1 | -294.1 | -76.1 | -1,258.1 |
Income tax (AUD K) | 0 | 0 | 0 | 0 | 0 |
Net income (AUD K) | -1,281.3 | -530.1 | -294.1 | -76.1 | -1,258.1 |
EPS basic (A$ cents) | -1.28 | -0.52 | -0.29 | -0.07 | -0.96 |
EPS diluted (A$ cents) | -1.28 | -0.52 | -0.29 | -0.07 | -0.96 |
Dividends per share (A$ cents) | 0 | 0 | 0 | 0 | 0 |
Weighted avg shares (millions) | 100.2 | 101.0 | 103.0 | 104.0 | 131.5 |
Margin Analysis (%)
| Metric (%) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Gross margin (%) | 6.2 | 25.5 | 18.5 | 12.8 | 4.0 |
Operating (EBIT) margin (%) | -60.9 | -46.2 | -7.8 | -0.6 | -22.1 |
EBITDA margin (%) | -60.9 | -46.2 | -7.5 | -0.4 | -18.7 |
Net margin (%) | -61.0 | -46.1 | -7.9 | -0.6 | -23.0 |
Revenue YoY growth (%) | 1,633.1 | -45.3 | 223.4 | 218.3 | -53.8 |
Balance Sheet
| Metric (AUD K) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total assets (AUD K) | 1,534.2 | 691.0 | 953.3 | 1,805.9 | 1,334.5 |
Cash and equivalents (AUD K) | 888.7 | 402.3 | 590.6 | 675.0 | 367.7 |
Trade and other receivables (AUD K) | 7.3 | 140.8 | 33.3 | 164.1 | 334.2 |
Contract assets (AUD K) | 484.1 | 32.9 | 180.2 | 836.5 | 191.9 |
Total current assets (AUD K) | 1,534.2 | 691.0 | 895.1 | 1,764.3 | 1,067.6 |
Right-of-use assets (AUD K) | 0 | 0 | 0 | 0 | 234.3 |
Short-term debt incl. current leases (AUD K) | 0 | 0 | 8.2 | 8.2 | 218.9 |
Long-term debt incl. non-current leases (AUD K) | 0 | 0 | 49.7 | 41.4 | 70.9 |
Total debt incl. leases (AUD K) | 0 | 0 | 57.9 | 49.6 | 289.8 |
Net debt (negative = net cash) (AUD K) | -888.7 | -402.3 | -532.7 | -625.3 | -77.9 |
Trade and other payables (AUD K) | 682.7 | 367.7 | 802.0 | 1,630.6 | 909.1 |
Total current liabilities (AUD K) | 861.7 | 454.0 | 892.7 | 1,749.9 | 1,227.8 |
Total liabilities (AUD K) | 861.7 | 454.0 | 942.5 | 1,791.3 | 1,298.7 |
Total equity (AUD K) | 672.5 | 237.0 | 10.8 | 14.6 | 35.8 |
Goodwill and intangibles (AUD K) | 0 | 0 | 0 | 0 | 0 |
Working capital (AUD K) | 672.5 | 237.0 | 2.3 | 14.4 | -160.3 |
Accumulated losses (AUD K) | -6,911.3 | -7,441.5 | -7,729.1 | -7,455.8 | -8,713.9 |
Issued capital (AUD K) | 7,126.6 | 7,163.9 | 7,227.4 | 7,227.4 | 8,482.7 |
Cash Flow
| Metric (AUD K) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (AUD K) | -735.7 | -521.9 | 170.9 | 92.7 | -1,140.6 |
Capex – plant and equipment (AUD K) | 0 | 0 | -19.5 | -8.3 | -15.9 |
Free cash flow (OCF less capex) (AUD K) | -735.7 | -521.9 | 151.4 | 84.4 | -1,156.5 |
Lease principal repayments (AUD K) | 0 | 0 | 0 | 0 | -183.3 |
Equity raised net of costs (AUD K) | 0 | -1.4 | 0 | 0 | 1,115.3 |
Dividends paid (AUD K) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (AUD K) | 0 | 0 | 0 | 0 | 0 |
R&D rebate received in cash (AUD K) | 183.6 | 239.6 | 220.6 | 138.8 | 0 |
Net change in cash (AUD K) | -809.4 | -486.4 | 188.3 | 84.4 | -307.3 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROE on closing equity (%) | -190.5 | -223.7 | -2,717.5 | -522.3 | -3,513.3 |
ROA on closing assets (%) | -83.5 | -76.7 | -30.9 | -4.2 | -94.3 |
Current ratio (x) | 1.78 | 1.52 | 1.00 | 1.01 | 0.87 |
Debt to equity incl. leases (x) | 0 | 0 | 5.35 | 3.40 | 8.09 |
Asset turnover, revenue / closing assets (x) | 1.37 | 1.66 | 3.90 | 6.55 | 4.10 |
DSO incl. contract assets (days) | 85.3 | 55.2 | 21.0 | 30.9 | 35.1 |
DPO, payables / cost of sales (days) | 126.4 | 156.7 | 96.7 | 57.7 | 63.3 |
Cash conversion cycle, no inventory (days) | -41.1 | -101.5 | -75.7 | -26.8 | -28.2 |
Revenue by Region and Region Margins & Growth (%)
| Region (AUD K) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Australia (AUD K) | 2,102.2 | 1,149.3 | 3,716.8 | 11,830.3 | 5,465.2 |
Rest of world (AUD K) | 0 | 0 | 0 | 0 | 0 |
Australia YoY growth (%) | 1,633.1 | -45.3 | 223.4 | 218.3 | -53.8 |
Stream Details
| Stream | FY2026 geography (qualitative) |
|---|---|
D&C (A$4.92m) | Western Australia (Audi Centre Myaree, Perth) |
Prefabrication (A$0.07m) | NSW-fabricated modules supplied to a Queensland project (McNab pilot) |
Services (A$0.47m) | National. FY2026 AR attributes partial offset of the revenue decline to East Coast technical and advisory work |
Share Price and Market Valuation
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|---|
Share price at 30 June (AUD) | 0.036 | 0.020 | 0.020 | 0.026 | 0.029 | 0.028 |
Market cap at 30 June, computed (AUD Mn) | 3.61 | 2.00 | 2.04 | 2.70 | 3.02 | 4.18 |
Shares on issue at 30 June (millions) | 100.2 | 100.2 | 101.8 | 104.0 | 104.0 | 149.4 |
Change by Horizon
| Horizon | Change |
|---|---|
1-year (30 Jun 2025 → 30 Jun 2026) | −3.4% (A$0.029 → A$0.028) |
3-year (30 Jun 2023 → 30 Jun 2026) | +40.0% (A$0.020 → A$0.028) |
5-year (30 Jun 2021 → 30 Jun 2026) | −22.2% (A$0.036 → A$0.028) |
Since IPO (A$0.20) | about −86% at A$0.028 (Stoxray cites −88% at an earlier date) |
Valuation Multiples
| Multiple | PARKD | Comment |
|---|---|---|
EV/Sales (FY2026) | 0.83x | EV ~A$4.55m ÷ revenue A$5.47m |
EV/Sales (FY2025) | 0.38x | On FY2025 revenue A$11.83m |
P/B | ~129x | Market cap A$4.63m ÷ equity A$0.036m; not meaningful given near-zero book value |
Peer reference: Duratec P/E | ~22x | Market cap ~A$530m (Investmets, Aug 2026) ÷ FY2026 NPAT A$23.8m; analyst-computed |
Peer EV multiples (FWD, SRG) | Not computed | — |
Debt maturity profile at 30 Jun 2026
| Debt maturity profile at 30 Jun 2026 | Within 1 year (AUD K) | 1–5 years (AUD K) | Total undiscounted (AUD K) |
|---|---|---|---|
Vehicle chattel mortgages (7.99%, VW Financial Services) | 11.7 | 38.0 | 49.7 |
Penrith facility lease | 227.3 | 38.1 | 265.5 |
Total | 239.1 | 76.1 | 315.2 |
Analyst Conclusions
Management guidance
No quantitative guidance. The qualitative FY2027 outlook (FY2026 AR) prioritises:
-
converting the design, advisory and tender pipeline into contracts
-
lifting utilisation of the prefabrication capability
-
broadening application of the technology to infrastructure and commercial markets
The Q4 FY2026 quarterly names critical infrastructure, transport and data centres as focus sectors.
Consensus expectations
None (no broker coverage).
Bull case (three arguments)
-
Platform conversion via Fielders. As sole national prefabricator for a BlueScope-branded system with up to 65,000m² a year of NSW capacity, PARKD needs only modest data-centre or self-storage volume to transform its revenue. Under that scenario, mix would move away from 4–13%-margin turnkey work toward higher-margin module supply and licensing. FY2023, when services were 23% of revenue, delivered a 25.5% gross margin.
-
Validated technology and engaged partners. Two completed WA projects demonstrate measured productivity of about 3.9 man-hours per m² with over 1,000m² installed in two days. The Azzurri equity stake and the McNab pilot show East Coast contractors investing time and capital. A first data-centre award could re-rate a stock valued at about 0.8x trailing EV/Sales.
-
Aligned, cheap capital structure. Directors own 29% and the MD buys on market. The A$0.10 options require a ~3x share-price rise to be in the money. A low absolute EV (~A$4.6m) gives asymmetric upside if the pipeline converts.
Bear case (three arguments)
-
Revenue cliff and zero backlog. Contracted backlog was A$Nil at 30 June 2026. FY2025–FY2026 revenue relied on one related-party project, now finished. Non-Audi revenue was only about A$0.6m in FY2026, below the roughly A$1.5m of annual overheads.
-
Funding and dilution. Cash was A$368k with about two quarters' runway at June-quarter burn. The company had net current liabilities and an ATO payable of A$278k, and the auditor flags material uncertainty. Further equity at or below A$0.03 looks likely, compounding the 43.6% share-count increase in FY2026.
-
Bargaining-power imbalance. Fielders/BlueScope owns manufacturing, channel and a competing in-house deck brand (Lysaght). Tier-1 data-centre builders favour balance-sheet-strong suppliers, so PARKD may capture only a thin slice of value even if its system is adopted.
Key catalysts and monitorables (next 12 months)
-
Q1 FY2027 Appendix 4C (due by 31 October 2026): cash, burn and any new contract revenue.
-
Trading status: confirm whether the "halted/suspended" badge on Market Index reflects an actual ASX status (no supporting announcement was located).
-
Annual Report (forecast 22 October 2026) and AGM (expected November 2026): top-20 holders, governance statement, any board renewal (e.g., an additional independent director) and capital-raising capacity resolutions.
-
First contracted data-centre or self-storage module-supply order under the Fielders exclusivity, along with its size, margin and counterparty.
-
Capital raising: size, price and the participation of Azzurri, McNab or other strategic investors.
-
Fielders royalty and volume disclosure: any separate reporting of licence income.
-
MDSB patent grants in Australia and internationally.
-
Penrith lease renewal (about September 2027) and utilisation trend.
-
Half-year FY2027 (forecast 26 February 2027): whether revenue mix has shifted toward prefabrication and services.
Concluding analyst verdict
PARKD Limited is a genuine piece of engineering IP attached to a fragile corporate shell. The technology is real: registered CVB patents, a pending MDSB patent, PIEPS safety integration and two measured, completed reference projects. So is the partner endorsement, from BlueScope's Fielders division in particular, and now from Azzurri as an equity holder. The FY2026 decision to stop being a balance-sheet-heavy turnkey contractor and become an exclusive prefabricator and licensor is strategically sound. It is the only plausible route to margins above the single digits PARKD has earned on construction work.
The financial record, however, argues for caution. In eight years as a listed company, PARKD has not produced a profitable year. Its revenue peak was built on a single project for an entity associated with its Chairman. That project ended in January 2026, leaving zero contracted backlog at 30 June 2026. Equity sits at about A$36k, cash at about A$368k, and the auditor has repeated its going-concern material uncertainty. A three-person board without functioning committees, plus heavy related-party exposure, would concern institutional investors, although the stock's size places it well below most institutional thresholds anyway.
The investment case therefore reduces to a binary near-term question: can PARKD sign a meaningful East Coast module-supply contract, ideally in data centres or self-storage, before its next capital raise? A disclosed order in the A$2–5m range would validate the pivot and would materially change the risk profile. That threshold is the analyst's illustration, not company guidance. Absent such a contract, further dilution at about A$0.03 is the base case. On balance, PKD is a high-risk, speculative micro-cap whose value lies chiefly in its IP and partnerships rather than its earnings. The near-term monitorables are the Q1 FY2027 cash report, any contract award and the terms of the next equity raise.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Tenure | Prior roles | Education / qualifications |
|---|---|---|---|---|
Bronte Howson OAM | Non-executive Chairman | Director since 10 May 2017 | CEO of Automotive Holdings Group (ASX: AHG) from January 2000; MD 2007–2017. President and life member, East Perth Football Club and WAFL. Dealer Principal, Audi Centre Perth | MAICD; OAM (2016) |
Peter McUtchen | Managing Director (CEO); founder | Director since 20 October 2016 | Practice Manager, ADG Engineers (2013–2016). About 20 years in construction consulting. National Councillor, Concrete Institute of Australia. Curtin University industry advisory roles | B.Eng (Civil) |
Robert (Bob) Freedman | Non-executive Director | Director since 4 May 2018 | Joined SRG (then Structural Systems) in 1970; MD 1985–2009; Chairman 2009–2014. Involved in Centrepoint Tower, Stadium Australia, Rod Laver Arena and Emirates Tower projects | Member, Institution of Engineers Australia; Postgraduate Diploma in Business Administration (WAIT) |
Lucia McLean | Company Secretary | From 27 March 2026 | 20+ years in finance and company secretarial roles in Australia, the UK and South Africa | B.Com; Higher Diploma in Accountancy (Rhodes University); Chartered Accountant (CA ANZ) |
CFO / COO | Not a separately disclosed KMP role | — | — | — |
Directors' Remuneration
| Name | Cash salary / fees | Cash bonus | Superannuation | Share-based (options) | Total FY2026 | Total FY2025 |
|---|---|---|---|---|---|---|
Bronte Howson | 70,000 (accrued, unpaid at year end) | 0 | 8,400 | 8,022 | 86,422 | 104,678 |
Robert Freedman | 35,000 | 0 | 4,200 | 8,022 | 47,222 | 65,653 |
Peter McUtchen | 225,000 | 0 | 27,000 | 8,021 | 260,021 | 344,403 |
Robert Martin (resigned 24 March 2025) | — | — | — | — | — | 28,874 |
Total KMP | 330,000 | 0 | 39,600 | 24,065 | 393,665 | 543,608 |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
24 Mar 2025 | Robert Martin resigns as NED | His 5m options lapsed. Board reduced to three |
27 Mar 2026 | Kevin Hart retires as Company Secretary; Lucia McLean appointed | Routine succession |
Major Shareholders
| Rank | Holder | Shares | % (30 Sep 2025) |
|---|---|---|---|
| 1 | Cap McUtchen Pty Ltd (The Cap McUtchen A/C) | 11,212,323 | 9.02 |
| 2 | B.M. & C.C. Howson (The Howson Super Fund A/C) | 10,717,795 | 8.62 |
| 3 | Longland Street Pty Ltd (Longland St A/C) | 6,500,000 | 5.23 |
| 4 | DHT Investments (WA) Pty Ltd | 5,498,000 | 4.42 |
| 5 | Croystone Nominees Pty Ltd (The BBK Unit A/C) | 3,915,536 | 3.15 |
| 6 | Ben Buckler Investments Pty Ltd | 3,900,000 | 3.14 |
| 7 | S.A. Spiteri & P. Murti (The Jolly Rodger S/F A/C) | 3,500,000 | 2.82 |
| 8 | Chiron Investment Pty Ltd | 3,333,333 | 2.68 |
| 9 | B.M. & C.C. Howson (Howson Super Fund, second line) | 3,253,226 | 2.62 |
| 10 | The W&M Holding Group Pty Ltd | 3,166,667 | 2.55 |
Major Shareholders by Holder
| Holder | Shares | % of 149.35m | Options |
|---|---|---|---|
Bronte Howson (incl. related parties) | 28,819,892 | 19.3 | 5,000,000 |
Peter McUtchen | 13,256,012 | 8.9 | 5,000,000 |
Robert Freedman | 1,250,001 | 0.8 | 5,000,000 |
Directors combined | 43,325,905 | 29.0 | 15,000,000 |
Azzurri Concrete Group (strategic) | 7,333,334 | 4.9 | — |
Competitive Landscape
Key Competitors
| # | Competitor | Segment overlap | Type | Revenue (latest) | Positioning vs PARKD |
|---|---|---|---|---|---|
| 1 | Stramit (Fletcher Building) – Condeck HP composite decking | Composite steel-deck flooring | Listed parent (NZX/ASX: FBU) | — | Incumbent deck system specified by engineers; lacks PARKD's propping-free bracket and prefabricated module packs |
| 2 | Lysaght (BlueScope) – Bondek decking | Composite steel-deck flooring | Listed parent (ASX: BSL) | — | Sister brand to partner Fielders within BlueScope; potential channel conflict |
| 3 | Ultrafloor | Precast prestressed floor beams | Private | — | Established precast flooring for car parks and commercial floors |
| 4 | Hollowcore precasters (e.g., Waeger Precast, Westkon Precast, Austral Precast) | Precast floor planks, car-park structures | Private | — | Conventional precast car-park and floor solutions; scale and track record |
| 5 | Delta Corporation | Precast | Private (also a PARKD partner) | — | "Co-opetition": supplies PARKD while also selling conventional precast |
| 6 | Fleetwood Limited (ASX: FWD) | Modular / offsite building | Listed | A$475.0m (FY2026) | Volumetric modular buildings; not slab systems, but competes for "offsite construction" budgets |
| 7 | Hickory Group (Hickory Building Systems) | Offsite / unitised building systems | Private | — | Prefabricated structural systems for high-rise and data-centre-adjacent work |
| 8 | SRG Global (ASX: SRG) | Specialist structural, post-tensioning, precast and civil heritage | Listed | A$1,675.5m (FY2026) | Large specialist contractor; NED Freedman is its former MD |
| 9 | Duratec (ASX: DUR) | Structural remediation and building | Listed | A$570.3m (FY2026) | Adjacent: car-park and structural refurbishment rather than new-build |
| 10 | Tier-1/2 builders for data centres and car parks (e.g., Multiplex, Built, Hutchinson Builders) | Main contracting | Private | — | Gatekeepers and specifiers; PARKD needs them as customers, not just as competitors |
“—” = not publicly disclosed.
Peer Comparison FY2026
| Metric | PARKD (PKD) | Fleetwood (FWD) | SRG Global (SRG) | Duratec (DUR) |
|---|---|---|---|---|
Revenue (AUD Mn) | 5.47 | 475.0 | 1,675.5 | 570.3 |
Revenue growth YoY (%) | -53.8 | -6.0 | 26.6 | -0.5 |
EBITDA (AUD Mn) | -1.02 | — | 170.1 (underlying) | 58.5 (normalised) |
EBITDA margin (%) | -18.7 | — | 10.2 | 10.3 |
EBIT margin (%) | -22.1 | 1.3 (statutory); 7.5 (underlying) | 7.9 (EBIT(A)) | — |
Net profit (AUD Mn) | -1.26 | — | — | 23.8 |
R&D intensity | ~4.9% (FY2025 implied; analyst-derived) | — | — | — |
Order book / backlog (AUD Mn) | 0 | Building Solutions 157 (at HY FY2026) | Work in hand 5,100 | 650.8 |
“—” = not publicly disclosed.
Recent Developments
There were no guidance revisions, litigation events, regulatory actions or layoffs disclosed in the period. Headcount changes are not disclosed. The FY2026 wage bill fell 21% year on year (A$1.32m to A$1.04m).