Peel Mining Limited Overview
Peel Mining was a Perth-headquartered, New South Wales–focused base and precious metals explorer and developer. Over roughly 15 years it built one of the most strategic tenement positions in the southern Cobar Basin, which it described as about 2,600 km² of Cobar Basin tenure in FY2025, plus about 1,700 km² in the Curnamona region. The company's identity rested on discovery. It made three significant discoveries: Mallee Bull (copper), Wirlong (copper) and Wagga Tank–Southern Nights (zinc-lead-silver), and these earned it the 2019 AMEC Prospector Award. By April 2025, its South Cobar Project held a global Mineral Resource of 22.9 Mt containing 235 kt copper, 331 kt zinc, 166 kt lead, 25.4 Moz silver and 271 koz gold. Peel never reached production. Its stand-alone "hub-and-spoke" development thesis was ultimately overtaken by a regional consolidation logic: trucking ore to Aeris's under-utilised 1.8 Mtpa Tritton mill. That logic culminated in the 2026 sale of the copper assets to Aeris and the spin-out of the polymetallic assets into Spectre Metals.
Company's own description (FY2025 Annual Report, paraphrased). Peel described its principal activity as exploration for economic deposits of minerals, with an emphasis on copper alongside other base and precious metals. It described itself as an advanced base and precious metals exploration company with projects in two of Australia's premier polymetallic regions: the South Cobar Project, about 100 km south of Cobar in NSW, and the Curnamona Project near Broken Hill (NSW) and in eastern South Australia. Its marketing tagline was "Australian Copper. Powering a Cleaner Future."
Business model. Peel was a pre-revenue mineral explorer. Its value-creation model was:
-
Acquire large, under-explored tenure in proven mineral provinces.
-
Discover and define JORC (2012) Mineral Resources through drilling.
-
Advance resources through pre-feasibility studies, permitting and exploration declines toward development.
-
Monetise through development (stand-alone processing), joint ventures and farm-outs (e.g., CBH Resources, JOGMEC, Red Hill Minerals), or outright sale (the 2026 Aeris transaction).
Revenue model. Peel had no product, service, subscription or licensing revenue. FY2025 "revenue and other income" was A$673,328. That figure comprised A$505,798 of "revenues and other income" (FY2025 AR; receipts from customers in the cash-flow statement were A$394,654, and the underlying source is not itemised) and A$167,530 of interest income. Funding came overwhelmingly from equity issues, supplemented by NSW Government co-funding grants (Critical Minerals & High-Tech Metals Activation Fund), farm-in expenditure by partners, and a short-term A$850,000 loan taken in FY2026 (8.7% interest, repayable by 30 November 2025).
Value-chain position. Upstream: exploration and early-stage development. Peel had no mining, processing, smelting or marketing operations.
Customer types and end-markets. None existed directly. Its prospective products were copper concentrate (Mallee Bull/Wirlong), zinc-lead-silver concentrates (Southern Nights/Wagga Tank) and gold-silver doré or concentrates (May Day, Wagga Tank oxide). Ultimate end-markets would have been global smelters and refiners serving electrification, construction, galvanising, batteries and precious-metal demand.
Independent characterisation. Peel was a classic "discovery-to-sale" junior. It was technically successful, with three discoveries in seven years and a resource that grew from 19.75 Mt (January 2023) to 22.9 Mt (April 2025). It was capital-constrained, however. Cash fell to A$1.4M by 30 June 2025, and A$2.0M of exploration write-offs in FY2024 signalled tenure rationalisation. The stand-alone 1.1 Mtpa processing plan contemplated in the pre-feasibility work required capital that the market valuation (around A$43M at A$0.074 per share in June 2025) could not support. The 2025 leadership overhaul pivoted strategy explicitly toward "regional consolidation". That pivot produced the Aeris transaction within five months of the new CEO's arrival.
Strategy
Pre-2025 strategy: "Hub and spoke". Peel's longstanding plan was to centralise processing at Mallee Bull. A 1.1 Mtpa stand-alone copper flotation plant would be fed from Mallee Bull, Wirlong, May Day and Wagga Tank–Southern Nights, with a future lead-zinc circuit. Pre-feasibility work progressed through FY2025, supported by a A$500k NSW Critical Minerals Activation Fund co-funding grant and by the NSW Government's A$250M royalty-deferral initiative for critical minerals (FY2025 AR).
FY2025 pivots (FY2025 AR):
-
Assess including the shallow Wagga Tank open-pit resource to reduce initial capital.
-
Evaluate using existing Cobar Basin processing facilities, which could simplify permitting and reduce capital expenditure. This is the seed of the Aeris deal.
-
Consider bulk mining methods (sublevel caving) to reduce unit costs.
September 2025 new-management strategy (Creamer Media; TipRanks). Three focus areas: targeted exploration and pre-development; regional consolidation and development opportunities; and disciplined growth in Tier-1 jurisdictions. Management emphasised that the asset base was unencumbered by third parties.
Capital initiatives:
-
September–October 2025 two-tranche placement plus SPP (co-manager Sternship Advisors).
-
Completed raise totalling A$21.25M; cash of A$17.6M at December 2025.
Transformational initiative: the Aeris scheme and Spectre demerger (12 February 2026).
-
Sale of the South Cobar Copper Project via a 100% share acquisition.
-
Spectre Metals to be listed with the Southern Nights Complex, May Day, Nombinnie and regional ground, about A$5M of cash transferred from Peel, and an underwritten capital raise (joint advisers and underwriters Euroz Hartleys and Sternship Advisors; legal adviser Hamilton Locke).
ESG and sustainability commitments: The planned hybrid power system targeted about 41% renewable energy. Peel also signed Native Title agreements and engaged Aboriginal parties on cultural heritage (AHIP application at Mallee Bull). No quantified emissions targets were set.
Medium-term targets and guidance: Peel provided no financial guidance. Successor guidance: Aeris targets permitting of Mallee Bull by FY2029 and a maiden Ore Reserve; Tritton FY2026 guidance was 24–29 kt Cu.
Products & Services
Peel had no commercial products. Its "portfolio" consisted of mineral projects, catalogued here deposit by deposit.
South Cobar Copper Project (sold to Aeris, 1 July 2026)
Mallee Bull (Cu-Ag-Au-Zn-Pb).
Description: Peel described it as one of Australia's highest-grade undeveloped copper deposits. It sits about 100 km south of Cobar and about 40 km south of Wirlong.
Geology: Massive-sulphide and hydrothermal breccia-sulphide lenses in brecciated volcaniclastic and turbidite sediments on the nose of an anticline. Three main lenses: Silver Ray, Union and Mallee Bull Breccia.
Copper resource (January 2023, A$80/t NSR cut-off): 6.34 Mt @ 1.92% Cu, 26 g/t Ag, 0.35 g/t Au for 122 kt Cu, 5.36 Moz Ag and 71 koz Au. Of the Mallee Bull copper tonnage, 5.59 Mt is Indicated.
Zinc-lead lens: 0.67 Mt @ 4.21% Zn, 3.56% Pb, 52 g/t Ag.
Ownership history: Discovered by Peel around 2011; 50% farmed out to CBH (2012–2014); 100% reacquired for A$17M (January 2021).
Development status: Conditional approval for an exploration decline under a Review of Environmental Factors. Pre-feasibility work assumed a 1.1 Mtpa stand-alone flotation plant at Mallee Bull with a future lead-zinc circuit, a 10 Mt tailings storage facility, a hybrid solar/battery/diesel power supply (about 41% renewable), and a 140-person camp. Aeris indicated it planned to complete permitting by FY2029 and to complete a maiden Ore Reserve (Aeris court-approval announcement, June 2026).
Wirlong (Cu-Ag).
Description: About 75 km south of Cobar. Cobar-style copper system along more than 2 km of sheared volcanics and sediments. Primary copper begins about 60 m below surface and extends to at least 600 m.
Key feature: A coherent high-grade lens (MBX) within broader stockwork halos (Main and Oblique zones).
Resource (January 2023): 4.30 Mt @ 1.75% Cu, 6 g/t Ag for 75 kt Cu.
Permitting: Exploration decline (box cut, decline to about 400 m below ground level, and surface infrastructure) approved by the NSW Resource Regulator on 29 October 2024.
Ownership: JOGMEC farm-in, later exited; 100% Peel; now Aeris. Aeris said it intends further resource drilling at Wirlong.
Combined South Cobar copper resource: 10.64 Mt @ 1.85% Cu for 197 kt Cu, 6.2 Moz Ag and 74 koz Au, with 74% in the Indicated category (FY2025 AR; Aeris deal announcement).
Southern Nights Complex / Wagga Tank (demerged to Spectre Metals)
Wagga Tank–Southern Nights (Zn-Pb-Ag-Cu-Au, VMS-type).
Location: About 130 km south of Cobar and about 45 km south-west of Mallee Bull, within EL6695.
Resource (April 2025): 9.99 Mt @ 2.78% Zn, 1.19% Pb, 52 g/t Ag, 0.35% Cu, 0.41 g/t Au for 277 kt Zn, 119 kt Pb, 16.8 Moz Ag, 35 kt Cu and 131 koz Au.
Open-pit component (April 2025, maiden): 3.56 Mt @ 1.82% CuEq (0.59% Cu, 0.63 g/t Au, 33 g/t Ag), comprising oxide, transition and fresh zones.
Notable FY2025 drill intercepts (FY2025 AR): 119 m @ 3.17% Cu, 1.49 g/t Au from 57 m (WTRC279); 20 m @ 4.02 g/t Au, 800 g/t Ag from 120 m (WTRC273); 2 m @ 6,621 g/t Ag, 6.45% Cu (WTRC255).
2026 activity: Drilling at the Link Zone, Link Zone South and Southern Nights targets returned wide, silver-rich polymetallic intercepts (16 April 2026 announcement; March 2026 Quarterly).
Land security: 1,060 ha Vivigani Station lot purchased (A$400k; settled 4 July 2025).
Chuchi (Au-Cu, Zn-Pb-Ag). A target about 1.5 km south of Wagga Tank on a rhyolite flow-dome margin, with a soil anomaly of about 450 m × 450 m. Historic intercepts include 6 m @ 7.9 g/t Au, 1.6% Cu (WTRCDD161).
May Day (Au-Ag-Zn-Pb) — demerged to Spectre Metals
Location: ML1361, about 9 km west of Mallee Bull. A historic shallow open pit was mined for gold in the 1990s.
Resource (January 2023): 1.61 Mt @ 0.98 g/t Au, 25 g/t Ag, 0.92% Zn, 0.61% Pb for 51 koz Au and 1.3 Moz Ag.
Nombinnie (Au) — demerged to Spectre Metals
On EL8751, about 23 km south-east of Wagga Tank. Historic oxide gold intercepts include 40 m @ 1.46 g/t Au (NP17). Drilling took place in the December 2025 quarter.
Regional Cobar Basin pipeline (demerged to Spectre Metals)
Beanbah (magnetic anomaly at about 700 m depth with coincident As-Mo-Cu), C9, Langbein, Kings Tank, Coan Copper Mine, Mt Allen South, Camtimony, Burthong North, Salt Creek and Mount Victor. These were covered by 25 exploration licences listed in the FY2025 tenement schedule. Peel also held minority interests in EL8414 Mt Walton (11%) and EL8778 Perseus (25%).
Curnamona Project (Broken Hill, NSW and Anabama, SA) — under farm-in
-
About 1,700 km², prospective for Cu, Zn, Pb, Ag, Au, Co and U.
-
Red Hill Minerals can earn 75% by spending A$6.5M over up to five years, with a minimum of A$1.5M in the first 24 months. Peel's interest dilutes to a 1.5% NSR royalty if it falls to 10% or below.
-
FY2025 work by Red Hill included a 1,875 line-km airborne MT survey, IP anomalism over more than 6 km of the Anabama–Redan Shear Zone, a Native Title agreement with the Wilyakali Native Title Aboriginal Corporation, and planned drilling of up to 6,000 m RC and 2,000 m diamond.
-
Post-transaction allocation: the deal materials refer to Peel's remaining non-copper assets moving to Spectre. Whether Curnamona went to Spectre or stayed with Peel/Aeris was not explicitly confirmed in the sources reviewed.
Pricing model: Not applicable (no commercial sales).
Financial Narrative
Basis: Consolidated, AASB/IFRS, A$, years ended 30 June. Primary source is the FY2025 Annual Report (FY2025 and FY2024 audited statements plus the five-year statutory KPI table). FY2021–FY2023 cash-flow lines come from Stockopedia, which compiles them from annual reports. FY2021–FY2023 pre-tax and revenue lines come from TipRanks. Aggregator figures are flagged.
Income statement
Notes:
-
Net profit, EPS and dividends for all five years come from the FY2025 AR statutory KPI table.
-
FY2024–FY2025 revenue, interest, write-off, pre-tax and tax figures come from the FY2025 AR.
-
FY2021–FY2023 revenue and pre-tax figures come from TipRanks. FY2021–FY2023 tax is derived as net minus pre-tax.
-
FY2021–FY2023 interest income and write-offs were not separately verified and are shown as 0 for chartability.
-
The FY2021 A$7.44M "revenue" and resulting profit appear to reflect a one-off gain.
Margins: Gross, operating, EBITDA and net margins are not meaningful because there is no operating revenue. Revenue CAGR is not meaningful for the same reason.
EBITDA (aggregator): TipRanks shows A$6.50M (FY2021), -A$3.83M (FY2022), -A$1.27M (FY2023), -A$4.34M (FY2024) and -A$2.21M (FY2025).
Commentary. Peel's P&L was structurally loss-making, as is normal for an explorer that capitalises exploration under AASB 6. Losses were driven by corporate overhead (about A$2.5–2.9M a year in cash costs) and periodic tenement write-offs. FY2024's larger pre-tax loss (A$4.05M) reflects a A$2.04M write-off of relinquished tenure. The FY2025 rise in employee costs (+40% year on year) coincided with pre-development study work and leadership transition costs. Deferred tax benefits (A$1.35M in FY2024, A$0.27M in FY2025) cushioned reported losses; the deferred tax liability was fully unwound by 30 June 2025.
Balance sheet
Note: FY2023–FY2025 year-end cash is from the FY2025 AR (FY2023 opening balance of A$12,058,120).
Source: FY2025 AR (E&E reconciliation; statement of changes in equity).
Source: FY2025 AR.
Goodwill and intangibles: Nil. The asset base is about 94% capitalised exploration (A$103.2M of A$109.2M at FY2025).
Debt: No borrowings at 30 June 2025. A A$0.85M short-term loan at 8.7%, repayable by 30 November 2025, was drawn after year end.
FY2026 interim (H1 to 31 December 2025): Cash of A$17.6M after the A$21.25M placement and SPP (December 2025 Quarterly).
Cash flow
Source: Stockopedia for FY2021–FY2023. FY2024–FY2025 match the FY2025 AR: exploration payments of A$4.36M and A$2.96M plus PP&E of A$0.11M and A$0.10M.
Commentary. The cash-flow profile shows a clear "boom-then-austerity" cycle. FY2021 investing outflow of A$25.4M included the roughly A$17M Mallee Bull buy-back, funded by about A$35.5M of equity. FY2022 was peak exploration (A$20.7M), funded by the A$29M April 2022 raise. From FY2023 to FY2025 Peel raised no equity at all. Exploration spend fell by about 85% from peak, to A$3.0M in FY2025, and cash ran down to A$1.4M. That set up a forced recapitalisation in September–December 2025 at depressed prices.
Ratios
These are analyst calculations from FY2025 AR data, using average equity and average assets. FY2024 averages use FY2023 equity of A$111.48M; FY2023 total assets (for the ROA average) were taken as approximately equal to FY2024.
ROIC, net debt/EBITDA, interest coverage, asset turnover and the cash conversion cycle are not meaningful: there is no revenue or EBITDA, and the company had no debt at year end.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Entity | Country | Ownership | Role (analyst inference) |
|---|---|---|---|
Peel Mining Limited | Australia | Parent | Listed holding company; holds most South Cobar tenure |
Peel (CSP) Pty Ltd | Australia | 100% | Cobar Superbasin Project vehicle (likely Wirlong/regional ELs) |
Peel Far West Pty Ltd | Australia | 100% | Curnamona / Broken Hill / Anabama tenure |
Peel Southern Metals Pty Ltd | Australia | 100% | Southern assets |
Spectre Metals Limited | Australia | Formed 23 Feb 2026; demerged 30 Jun 2026 | NewCo holding non-copper assets |
Results by Segment
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Segment net profit (loss) after tax (AUD Mn) | 3.69 | -3.42 | -1.48 | -2.70 | -2.10 |
Segment pre-tax profit (loss) (AUD Mn) | 6.38 | -3.97 | -1.42 | -4.05 | -2.37 |
Project / Deposit Details
| Project / deposit | Tonnes (kt) | Cu % | Zn % | Pb % | Ag g/t | Au g/t | Status after July 2026 |
|---|---|---|---|---|---|---|---|
Mallee Bull Cu (Jan 2023) | 6,340 | 1.92 | 0.12 | 0.19 | 26 | 0.35 | Aeris (via Peel) |
Mallee Bull Zn-Pb | 670 | 0.38 | 4.21 | 3.56 | 52 | 0.67 | Aeris (part of Mallee Bull) |
Wirlong Cu (Jan 2023) | 4,300 | 1.75 | 0.08 | 0.02 | 6 | 0.03 | Aeris (via Peel) |
Wagga Tank–Southern Nights (Apr 2025) | 9,990 | 0.35 | 2.78 | 1.19 | 52 | 0.41 | Spectre Metals |
May Day (Jan 2023) | 1,610 | — | 0.92 | 0.61 | 25 | 0.98 | Spectre Metals |
South Cobar global (Apr 2025) | 22,910 | 1.03 | 1.45 | 0.72 | 35 | 0.37 | Split |
Income Statement and Per-Share Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue and other income incl. interest (AUD Mn) | 7.44 | 0.00 | 0.01 | 0.43 | 0.67 |
Interest income (AUD Mn) | 0.00 | 0.00 | 0.00 | 0.43 | 0.17 |
Exploration write-off (AUD Mn) | 0.00 | 0.00 | 0.00 | 2.04 | 0.04 |
Pre-tax profit (loss) (AUD Mn) | 6.38 | -3.97 | -1.42 | -4.05 | -2.37 |
Income tax benefit (expense) (AUD Mn) | -2.69 | 0.55 | -0.06 | 1.35 | 0.27 |
Net profit (loss) after tax (AUD Mn) | 3.69 | -3.42 | -1.48 | -2.70 | -2.10 |
Basic EPS (AUD) | 0.010 | -0.007 | -0.003 | -0.005 | -0.004 |
Diluted EPS (AUD) | 0.010 | -0.007 | -0.003 | -0.005 | -0.004 |
Dividends per share (AUD) | 0 | 0 | 0 | 0 | 0 |
Expense line
| Expense line | FY2024 (AUD) | FY2025 (AUD) |
|---|---|---|
Employee and director benefits | 986,941 | 1,377,307 |
Administration | 940,072 | 1,139,358 |
Share-based remuneration | 381,284 | 362,517 |
Depreciation | 134,614 | 118,561 |
Exploration write-off | 2,037,071 | 41,422 |
Cash Flow
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Cash and equivalents, year end (AUD Mn) | 16.80 | 22.56 | 12.06 | 6.27 | 1.40 |
Net change in cash (AUD Mn) | 8.60 | 5.76 | -10.50 | -5.78 | -4.88 |
Balance Sheet
| Metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Capitalised exploration and evaluation asset (AUD Mn) | 97.75 | 99.94 | 103.15 |
Total equity (AUD Mn) | 111.48 | 109.16 | 107.42 |
Balance Sheet and Share Count (M)
| Metric | FY2024 | FY2025 |
|---|---|---|
Total assets (AUD Mn) | 110.78 | 109.18 |
Total current assets (AUD Mn) | 6.98 | 2.15 |
Property (land at cost) (AUD Mn) | 2.86 | 2.94 |
Plant and equipment (AUD Mn) | 0.53 | 0.42 |
Total liabilities (AUD Mn) | 1.62 | 1.76 |
Total debt (AUD Mn) | 0 | 0 |
Net debt (AUD Mn) | -6.27 | -1.40 |
Working capital (AUD Mn) | 5.62 | 0.39 |
Contributed equity (AUD Mn) | 113.30 | 113.30 |
Accumulated losses (AUD Mn) | -10.72 | -12.82 |
Shares on issue (M) | 581.08 | 581.08 |
Cash Flow — Operating cash flow
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | -1.42 | -2.09 | -1.44 | -1.56 | -1.91 |
Capex incl. exploration and PP&E (AUD Mn) | 10.40 | 20.70 | 10.20 | 4.48 | 3.06 |
Free cash flow (OCF minus capex) (AUD Mn) | -11.82 | -22.79 | -11.64 | -6.04 | -4.97 |
Investing cash flow (AUD Mn) | -25.40 | -20.70 | -9.06 | -4.23 | -2.97 |
Financing cash flow (AUD Mn) | 35.50 | 28.50 | 0 | 0 | 0 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2024 | FY2025 |
|---|---|---|
ROE (%) | -2.45 | -1.94 |
ROA (%) | -2.44 | -1.91 |
Current ratio (x) | 5.14 | 1.22 |
Debt to equity (x) | 0 | 0 |
Revenue by Region
| Region | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Australia: revenue and other income (AUD Mn) | 0.01 | 0.43 | 0.67 |
Rest of world: revenue and other income (AUD Mn) | 0 | 0 | 0 |
Margin Analysis (%) and Share Price
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Share price change for the year (%) | 52 | -36 | -19 | -4 | -41 |
Year-end share price (AUD) | 0.251 | 0.161 | 0.130 | 0.125 | 0.074 |
Share Count (M)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Weighted average shares (M) | 352.65 | 467.11 | 580.77 | 580.97 | 581.08 |
Analyst Conclusions
Management guidance. None is applicable for Peel as a standalone entity. Relevant successor guidance:
Aeris: Tritton FY2026 guidance of 24–29 kt Cu. Mallee Bull maiden Ore Reserve and feasibility in progress; permitting targeted by FY2029. Integration study on Tritton–Mallee Bull scheduling.
Spectre Metals: To be led by former Peel management. Focused on the Southern Nights Complex and the broader Cobar Basin portfolio, with about A$5M transferred cash plus an underwritten raise.
Consensus growth expectations: Not available.
Bull case (for former Peel holders via AIS and Spectre)
-
Mallee Bull's 1.92% Cu Indicated-heavy resource could backfill Tritton's 1.8 Mtpa mill, de-risking Aeris's mine-life problem and re-rating AIS, in which former Peel holders own about 20.5%.
-
Southern Nights' wide silver-rich intercepts (April 2026) plus the shallow Wagga Tank open pit give Spectre a high-grade polymetallic growth story funded from day one.
-
The Wirlong decline approval and Aeris's committed drilling create a near-term resource-growth catalyst within an already-permitted exploration framework.
Bear case
-
Mallee Bull permitting is not expected until FY2029, so cash-flow contribution is years away and value is exposed to copper-price and cost volatility in the meantime.
-
Former Peel holders now carry Aeris's full operating risk across Tritton and Cracow. Aeris shares fell about 8% on announcement, reflecting dilution concerns (Livewire).
-
Like Peel in FY2023–FY2025, it faces a familiar junior funding treadmill.
Key catalysts and monitorables (next 12 months)
-
Aeris integration study outcomes and maiden Mallee Bull Ore Reserve.
-
Mallee Bull and Wirlong permitting milestones.
-
Aeris Wirlong drilling results.
-
Spectre Metals' ASX admission, its capital raise and Southern Nights drilling.
-
Red Hill's Curnamona drilling results, and confirmation of which entity holds Curnamona.
-
Copper, zinc and silver price direction.
-
Any Aeris reporting on Peel-related ATO provisions.
Concluding analyst verdict
Peel Mining's corporate life is a textbook case of how Australian junior explorers create and then crystallise value. Between 2010 and 2017 it converted greenfields tenure in the southern Cobar Basin into three genuine discoveries. Between 2020 and 2025 it re-consolidated 100% ownership and advanced its flagship copper assets to approved-decline, pre-feasibility status. It grew a global Mineral Resource to 22.9 Mt containing 235 kt of copper, 331 kt of zinc and 25.4 Moz of silver.
Technical progress, however, never fixed the strategic flaw in the stand-alone "hub-and-spoke" plan. Individually modest deposits had to support a greenfields 1.1 Mtpa plant. Equity markets were unwilling to fund that at Peel's valuation: the shares lost 41% in FY2025, and cash fell to A$1.4M by June 2025.
New management, installed in September 2025, diagnosed the problem quickly. They recapitalised with A$21.25M and, within five months, negotiated a transaction that monetised the copper assets through the only logical buyer: the owner of an under-utilised mill within trucking distance. The A$214M package represented about a 46% premium and roughly tripled value from the June 2025 trough. It was structured to give shareholders both liquid exposure to a producer (Aeris, about 20.5%) and continued upside in the polymetallic assets through Spectre Metals.
From an institutional standpoint, Peel Mining itself is no longer an investable security. It is now an asset-holding subsidiary inside Aeris. The analytical questions have migrated: whether Aeris can permit and integrate Mallee Bull on schedule (FY2029), and whether Spectre can fund and grow Southern Nights. On the evidence, the transaction was a value-accretive and well-structured exit for Peel shareholders. It was achieved through disciplined recognition that regional consolidation, not stand-alone development, was the highest-value path.
Verdict: Exit completed successfully. Monitor AIS for integration and permitting execution; monitor Spectre as a higher-risk exploration option.
Principal sources consulted
-
Peel Mining Limited, Financial Report for the year ended 30 June 2025 (ASX, 19 September 2025)
-
Peel Mining Limited, FY2022 and FY2023 Annual Reports and H1 FY2024 Half-Year Report (ASX)
-
Peel Mining ASX announcements: 29 Sep 2025 placement; December 2025 Quarterly; 12 Feb 2026 scheme announcement; March 2026 Quarterly (20 Apr 2026); Scheme Booklet (5 May 2026); 15, 19 and 22 Jun 2026; 30 Jun, 1 Jul and 2 Jul 2026 (via ASX, InvestSMART, Market Index, Webull bulletin)
-
Peel Mining website (www.peelmining.com.au): home page and Resources & Reserves page
-
Aeris Resources announcement and presentation, 12 Feb 2026; coverage by Smallcaps, Creamer Media/Mining Weekly, Mining Technology, Livewire/Resources Rising Stars
-
Hamilton Locke transaction release (13 Feb 2026); FilingReader (15 Jun 2026)
-
Creamer Media (22 Sep 2025) on the leadership appointments; TipRanks; Simply Wall St; IBISWorld; Stockopedia (cash-flow history); Market Index (director holdings)
-
Mining Weekly / Engineering News (2020–2021) on the Mallee Bull consolidation; Resources Roadhouse (2012–2017) on the CBH and JOGMEC farm-ins
-
Geoscience Australia (Lawrie & Hinman, 1998) on Cobar-style deposits
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Tenure | Background | Source |
|---|---|---|---|---|
Nick (Nicholas) Woolrych | Managing Director & CEO | Director from 21 Sep 2025 | Mining engineer with more than 20 years' experience. Formerly led New World Resources (Antler copper project, Arizona) through permitting and the Kinterra takeover; previously senior roles at PYBAR Mining Services and Diversified Minerals (Dargues and Henty gold mines). Slated to lead Spectre Metals | Creamer Media; Market Index |
Ronnie (Ronald) Beevor | Non-executive Chair | From Sep 2025 | — | TipRanks; IBISWorld |
Warwick Amos | Chief Financial Officer | From Sep 2025 | Ex-New World Resources executive | Creamer Media |
Tony Schultz | Non-executive Director | Appointed around 29 Sep 2025 | — | ASX announcement, 29 Sep 2025 |
Robert (Rob) Tyson | Executive Director – Technical (founder) | Director since 20 Apr 2006 | Geologist with more than 25 years' experience (Cyprus Exploration, Normandy, Equigold). Former MD. 2019 AMEC Prospector Award. Non-executive director of Saturn Metals | FY2025 AR |
Dr Graham Hardie | Non-executive Director | Since 24 Feb 2010 | FCA; principal of Hardie Finance Corporation. Largest director holder (21.05M shares) | FY2025 AR |
Mark Okeby | Non-executive Chair (Mar 2022 – Sep 2025) | Director from 3 Mar 2022 | LLM. Director of Capricorn Metals and Red Hill Minerals; ex-Regis Resources, Westgold. | FY2025 AR |
Ryan Woodhouse | Company Secretary (CFO until Sep 2025; later Financial Controller) | Company Secretary since 7 Jan 2015 | CA, FGIA | FY2025 AR; Simply Wall St |
Directors' Remuneration
| KMP | Salary/fees | Super | Long-term leave | Share-based | Total | % performance-related |
|---|---|---|---|---|---|---|
M Okeby (Chair) | 50,004 | 5,751 | 0 | 73,671 | 129,426 | 57 |
R Tyson (ED-Technical) | 282,376 | 35,650 | 29,357 | 73,671 | 421,054 | 17 |
G Hardie (NED) | 50,004 | 5,751 | 0 | 24,557 | 80,312 | 31 |
J Simpson (MD/CEO, resigned 12 Aug 2025) | 391,782 | 47,045 | 31,469 | 98,228 | 568,524 | 17 |
R Woodhouse (CoSec/CFO) | 238,268 | 28,964 | 23,852 | 45,098 | 336,182 | 13 |
Total | 1,012,434 | 123,161 | 84,678 | 315,225 | 1,535,498 | — |
Competitive Landscape
Key Competitors
| Company (ticker) | Cobar Basin / relevant assets | Stage | Comparative notes | Verification |
|---|---|---|---|---|
Aeris Resources (ASX: AIS) | Tritton Cu complex (1.8 Mtpa mill); Cracow gold | Producer | FY2026 Tritton guidance 24–29 kt Cu, up to 10 koz Au, 263 koz Ag. Pre-deal market capitalisation ~A$676M; pro-forma ~A$850M. Now Peel's owner | Livewire; Creamer Media |
Metals Acquisition Ltd (ASX/NYSE: MAC) | CSA copper mine, Cobar | Producer | — | — |
Aurelia Metals (ASX: AMI) | Peak mines; Federation; Hera | Producer/developer | — | — |
Polymetals Resources (ASX: POL) | Endeavor Zn-Pb-Ag mine (formerly CBH) | Restart | Peel's former JV partner's former asset | — |
CBH Resources / Toho Zinc | Formerly Endeavor | Former producer | Exited Mallee Bull in 2021 | Australian Mining |
West Cobar Metals (ASX: WC1) | Bulla Park Cu-Sb-Ag | Explorer | Maiden copper-antimony-silver resource (April 2025) | West Cobar FY2025 AR |
Eastern Metals (ASX: EMS) | Cobar project (Kelpie Hill, Windmill Dam) | Explorer | Early-stage gold and base-metal hits | Smallcaps |
Red Hill Minerals (ASX: RHI) | Curnamona farm-in | Explorer | Partner and competitor for capital | FY2025 AR |
Saturn Metals (ASX: STN) | Apollo Hill (WA) | Developer | Board linkage via Tyson | FY2025 AR |
Spectre Metals (NewCo) | Southern Nights, May Day | Explorer | Successor competitor in the southern Cobar Basin | ASX |
Peer Comparison FY2025
| Metric | Peel (FY2025) | Aeris |
|---|---|---|
Revenue | ~A$0.67M (other income) | — |
Contained Cu resource | 235 kt (South Cobar global) | 314 kt Tritton pre-deal (analyst derivation: 511 kt combined minus 197 kt) |
Processing capacity | — | 1.8 Mtpa (Tritton) |
R&D intensity | n/m | n/m |
Recent Developments
Note: The InvestSMART and Market Index calendars still list a 15 October 2026 annual report and a 27 October 2026 quarterly for PEX. These are stale placeholders; a delisted subsidiary is not expected to lodge them with the ASX.



