Pivotal Metals Limited Overview
Pivotal Metals is a Brisbane-headquartered, ASX-listed critical-minerals developer. It has completed a full strategic pivot from Iberian tin-tungsten and Western Australian/Yukon exploration to a Québec-only copper-nickel-precious-metals portfolio. Its flagship is the 100%-owned Horden Lake Cu-Ni-Au-Ag-PGM-Co deposit in the James Bay region. Horden Lake carries a JORC (2012) resource of 52.4 Mt at 1.05% CuEq (549 kt contained CuEq), 87% of it inside a single pit shell. A September 2026 maiden Scoping Study showed a post-tax NPV₇ of A$920m and a 49% IRR at US$5.50/lb copper. The second leg is a ~200 km² district-scale exploration package in the Belleterre-Angliers Greenstone Belt that hosts the past-producing Lorraine Cu-Ni-Au mine. With ~A$3.5m cash, a ~A$22m market capitalisation and a stated development funding requirement above A$400m, Pivotal's investment case rests on converting a low-cost, Tier-1-jurisdiction copper resource into a financeable development or strategic transaction.
Company's own description (FY2026 Annual Report, paraphrased)
The FY2026 Annual Report describes the group's principal activity as the exploration for and development of copper, precious metals (gold, silver), nickel and platinum group metals. The company's stated focus is investing in and developing high-value Canadian projects containing critical metals needed for the energy and technology transition. It names Québec as an established and supportive jurisdiction with the infrastructure needed to find, develop and operate modern mines. At Horden Lake and Belleterre, management aims to delineate and expand resources and to de-risk the assets through metallurgical, engineering and economic studies (FY2026 AR, Directors' Report).
Independent characterisation
Pivotal is a single-asset-weighted, pre-development junior with an exploration "option" portfolio attached.
Business model: Pivotal does not sell products or services. It creates value by (i) increasing resource size and confidence through drilling, (ii) de-risking metallurgy, engineering and permitting, and (iii) monetising the asset. Monetisation could come through a development financing, a project-level transaction (JV or sell-down), metals streaming, or a corporate sale. The appointment in September 2026 of a Strategic Adviser to assess funding alternatives signals that management treats a third-party transaction as a central pathway (Scoping Study announcement, 29 Sep 2026).
Revenue model: There is no operating revenue. "Revenue" in aggregator databases is entirely other income: interest on cash and term deposits (A$83.3k in FY2026) and other income, including government grant income (A$62.6k in FY2026) (FY2026 AR, Note 3). The product/service/subscription/licensing mix is therefore n/a.
Value-chain position: The company sits at the upstream exploration and project-development stage. If Horden Lake is developed as studied, Pivotal would become a concentrate producer selling copper concentrate (24% Cu design grade, ~83% of net smelter return) and nickel concentrate (10% Ni, ~17% of NSR) to smelters. Candidate smelters include Glencore's Horne (Rouyn-Noranda), Sudbury (Glencore/Vale) or overseas buyers (Scoping Study, 29 Sep 2026).
Prospective customer types: These would be custom copper and nickel smelters and concentrate traders. No binding offtake exists (Scoping Study, 29 Sep 2026).
End-markets (indirect): Copper (electrification, grid, AI/data-centre power, EVs), nickel and cobalt (batteries, alloys), PGMs and gold/silver (by-product credits). Copper, nickel, cobalt and PGMs make up 78% of Horden Lake's modelled NSR. All four are designated critical minerals under Québec's 2025–2031 strategy and Canada's federal Critical Minerals Strategy (Scoping Study).
Strategy
Stated strategy (FY2026 AR themes, paraphrased)
-
Focus on Canada and critical metals. Invest only in high-value Canadian projects containing metals essential to the energy and technology transition.
-
Use Québec's jurisdictional advantages. These include 22 operating mines, Canada's only copper smelter and refinery, low-cost renewable hydropower, a skilled workforce and generous flow-through and government co-funding.
-
Grow and de-risk. Expand resources, then de-risk through metallurgy, engineering and economic studies to "create and realise" shareholder value.
-
Positioning. Present Horden Lake as a mid-scale, simple, open-pit, high-margin copper project attractive to mid-tier producers. Management points to scarce comparable pre-development projects and recent sector M&A.
Initiatives announced in the last 24 months
| Initiative | Date | Detail / targets | Source |
|---|---|---|---|
| Horden Lake metallurgy (Phase 1) | Mar 2025 | Copper recoveries of 87–94%; clean 22–28% Cu concentrates | Nasdaq/INN 2025 |
| Québec MESP-CSM grant | Apr 2025 | C$105k (~A$120k) non-recourse grant co-funding metallurgy | FY2026 AR |
| Horden Lake MRE 2025 | Apr 2025 | 37 Mt at 1.1% CuEq | ASX 29 Apr 2025 |
| AI-assisted targeting at Midrim | Jul 2025 | Field and AI program for high-grade copper | FY2026 AR reference list |
| Ore sorting (TOMRA XRT) | Feb 2026 | 2.1x feed upgrade with 68% mass rejection and 69% Cu recovery; or 1.5x upgrade with 86% Cu recovery | FY2026 AR |
| Phase 2 flotation | Mar–Sep 2026 | Locked-cycle Cu recovery 90.5% into 26% Cu concentrate; recovery algorithms for all 7 payables | FY2026 AR |
| Belleterre first drilling | Feb–Sep 2026 | ~3,000 m program including Alotta, Midrim East, Shanty Lake, Lorraine Mine East | FY2026 AR |
| Horden Lake MRE 2026 | Jul 2026 | 52.4 Mt at 1.05% CuEq | ASX 7 Jul 2026 |
| Bambino option | Aug 2026 | Consolidates 5 km Cu-Ni-PGM trend | FY2026 AR |
| Scoping Study | Sep 2026 | NPV₇ A$920m; capex A$411m; AISC US$1.00/lb | ASX 29 Sep 2026 |
| Strategic Adviser | Sep 2026 | Assess funding alternatives for >A$400m development | ASX 29 Sep 2026 |
| Winter 2026–27 drilling | Planned | Resource infill and expansion at Horden Lake, targeting conductors up to 15,000 siemens | FY2026 AR |
ESG and sustainability commitments: ESG Baseline Report (2022). The company states priorities of low-disturbance exploration, local and First Nations procurement, and Cree stakeholder engagement for Horden Lake (FY2026 AR; Scoping Study).
Cost programmes: No formal cost-reduction targets are disclosed. Corporate and other expenditure was A$0.372m in the June-2026 quarter (June 2026 Quarterly).
Medium-term guidance and targets
The company gives no financial guidance. Its stated development pathway (Scoping Study, Section 11) is:
-
Two summer seasons of environmental baseline work, alongside a concurrent Feasibility Study (a PFS is the immediate next step).
-
COMEX environmental and social impact review lasting 12–24 months.
-
Regional permits over a further 3–9 months.
-
Construction within ~18 months of a final investment decision, aided by early detailed design and long-lead procurement.
Implied earliest production timing is not stated by the company. An analyst inference is that development is unlikely before ~2030 given the sequencing above.
Products & Services
For an explorer, the "product portfolio" is its project inventory and the prospective products those projects could yield. Each asset is catalogued individually below.
Horden Lake (flagship, development)
| Category | Tonnes (Mt) | CuEq % | Cu % | Ni % | 3E g/t | Ag g/t | Co ppm | CuEq kt | Cu kt | Ni kt | 3E koz | Ag koz | Co t |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Open pit (US$25/t NSR cut-off) | 45.5 | 1.07 | 0.56 | 0.17 | 0.34 | 10.5 | 134 | 485 | 257 | 79 | 494 | 15,336 | 6,121 |
| Underground (US$65/t NSR cut-off) | 6.9 | 0.93 | 0.51 | 0.18 | 0.25 | 8.5 | 130 | 64 | 35 | 12 | 55 | 1,872 | 898 |
| Total | 52.4 | 1.05 | 0.56 | 0.17 | 0.33 | 10.2 | 134 | 549 | 292 | 91 | 549 | 17,208 | 7,019 |
| Measured & Indicated | 24.3 | 1.17 | 0.67 | 0.18 | 0.34 | 9.2 | 143 | 283 | 163 | 45 | 262 | 7,175 | 3,478 |
| Inferred | 28.1 | 0.95 | 0.46 | 0.16 | 0.32 | 11.1 | 126 | 266 | 129 | 46 | 288 | 10,033 | 3,540 |
| Parameter | Value |
|---|---|
| Mining method | Conventional truck-and-shovel open pit, owner-operated (lease-to-own) |
| Mill feed / waste | 34 Mt / 269 Mt; strip ratio 7.9:1 |
| Throughput | 3.5 Mtpa crush-grind-float plant |
| Mine life | ~9.7 years scheduled (described as initial 10–11 years) |
| LOM grade processed | 0.90% CuEq (1.02% Y1–8 average) |
| Payable production | 247 kt CuEq LOM; 29.1 kt CuEq/yr Y1–8; 160 kt Cu LOM (19.1 kt/yr Y1–8) |
| By-products (LOM payable) | Ni 20 kt; Au 83 koz; Ag 5,875 koz; Pd 29 koz; Pt 3.1 koz; Co 1.0 kt |
| Recoveries (total) | Cu 92%, Ni 49%, Au 64%, Ag 75%, Pd 60%, Pt 28%, Co 44% |
| Concentrates | Cu concentrate 24% Cu design (locked-cycle test 25.7–26% Cu); Ni concentrate ~10% Ni |
| NSR split by metal | Cu 65%, Ag 11%, Ni 10%, Au 10%, Co 1.5%, PGM 1.4% |
| Pre-production capex | A$428m gross; A$411m net of CTM-ITC credit |
| LOM capex | A$800m gross; A$740m net |
| Opex | A$49.3/t ROM (mining A$26.6, processing A$13.6, G&A A$6.7, transport A$2.4) |
| C1 (co-product) | US$2.18/lb CuEq |
| AISC | US$2.58/lb CuEq co-product; US$1.00/lb Cu net of by-products (US$0.71 at spot) |
| Post-tax NPV₇ / IRR | A$920m / 49% base (Cu US$5.50/lb); A$1,343m / 63% at spot (Cu US$6.78/lb) |
| Pre-tax NPV₇ / IRR | A$1,333m / 56% base; A$1,961m / 75% spot |
| Payback | 1.3 years post-tax from first ore (1.0 at spot) |
| Capital intensity | US$14,127/t Cu (US$9,261/t CuEq) vs a cited global average of US$22,359/t Cu |
| Power | ~15 MW; 42 km 138 kV spur line; grid power at C$0.05/kWh |
| Inferred share | Capped at 30% of LOM NSR; ~14% during payback; 23% over first 4 years |
Description: A copper-dominant magmatic sulphide deposit (pyrrhotite-chalcopyrite) remobilised along a gabbro footwall contact with metasediments. It lies ~130 km north of Matagami in the Eeyou Istchee Baie-James territory and ~10 km west of km 200 on the James Bay Highway (Route 109) (Scoping Study, 29 Sep 2026).
- Mineral Resource (JORC 2012, effective 15 Jun 2026, released 7 Jul 2026; Caracle Creek International / Atticus Geoscience):
Source: Scoping Study (29 Sep 2026), Table 2; FY2026 AR, Table 1/3. CuEq formula: Cu% + Ni%×0.97 + Au ppm×0.78 + Pd ppm×0.27 + Pt ppm×0.23 + Ag ppm×0.0013 + Co ppm×0.0002.
Key capabilities (Scoping Study, AACE Class 5, −30%/+50%): - Target customer. Custom smelters and concentrate traders. No binding offtake (Scoping Study).
Latest version year: MRE dated 2026; Scoping Study dated 2026.
Pricing model: Commodity-linked. Assumed smelter terms include Cu payability of 96.65% and treatment charge of US$40/t of concentrate (Scoping Study, Table 10).
Belleterre Projects (exploration; ~160 km², rising to ~200 km² after the reporting period)
Belleterre sits in the Abitibi region with access to hydropower and milling capacity within ~100 km. Management has identified ~20 priority exploration areas (FY2026 AR).
-
Midrim / Alotta / Lac Croche (Midrim-Alotta). High-tenor magmatic Cu-Ni-PGM. Historic intercepts include 21.1 m at 2.5% Cu, 1.7% Ni, 2.8 g/t 3PGE (Midrim) and 24.2 m at 2.3% Cu, 1.2% Ni, 1.9 g/t 3PGE (Alotta) (ASX 26 Feb 2026). Pivotal's first drilling here (2026) returned 21.8 m at 1.27% Ni, 1.03% Cu, 1.29 g/t 3PGE from 73 m in hole 26-PIV-02. That interval included 4.7 m at 2.63% Ni, 1.67% Cu, 2.35 g/t 3PGE. Four holes totalled 671 m (FY2026 AR).
-
Midrim East. A discrete fixed-loop EM conductor with no outcrop. Hole 26-PIV-01 hit a sulphide concentration coincident with the conductor but no material mineralisation (FY2026 AR).
-
Lac Long / Lac Kirwan. Conductors identified in the north of the property; not yet drilled (FY2026 AR).
-
Lorraine Mine (86.5 km² Lorraine project). Past-producing gabbro-hosted massive sulphide mine. Produced ~600 kt at 1.4% Cu, 0.6% Ni, 0.6 g/t Au in 1964–68 and was mined to ~200 m depth. Historic underground channel sampling returned 28 m at 45 g/t Au and 3.2% Cu in a related Au-Cu vein system (FY2026 AR; SmallCaps).
-
Lorraine Mine East. Eight (some sources cite 11) undrilled induced-polarisation anomalies from the December 2025 IP survey, extending up to 1.8 km east of the mine. Drill programme expanded by 1,500 m on 2 Jul 2026. About 1,000 m of core was awaiting assays as of late September 2026 (ASX 2 Jul 2026; Discovery Alert, Sep 2026).
-
Shanty Lake. A 400 m × 150 m bedrock conductor from 150 m depth. A 674 m hole intersected sulphides but returned no significant assays. Downhole EM indicates the conductor is shallower and more conductive than first modelled (Mining.com.au, Sep 2026).
-
Kelly Lake East. A new Cu-Au corridor (~1 km × 1.5 km) 6.6 km south-east of Lorraine, with grab samples up to 2% Cu and 1.9 g/t Au. It continues onto neighbouring ground held by Vior Inc. (Mining.com.au, Nov 2025; FY2026 AR).
-
Laforce. Maiden Pivotal programme on new Cu-Ni targets began 14 May 2026 (ASX 14 May 2026).
-
Bambino (option, Aug 2026). Consolidates a 5 km "string of pearls" trend including the Delphi-Patry and Zullo occurrences. Historic drilling returned 17.5 m at 0.86% Cu, 0.52% Ni, 0.53 g/t PGE. Zullo has not been drilled since 1987. Geophysics was scheduled for September 2026, with drilling possible in the December 2026 quarter (FY2026 AR).
Divested or withdrawn legacy portfolio (for completeness)
| Asset | Country | Commodity | Status | Source |
|---|---|---|---|---|
| Santa Comba | Spain | W-Sn | Acquired Aug 2019; PFS Dec 2020; concessions cancelled 2023; impaired FY2023 | H1 FY2020; FY2023 AR; StockLight |
| San Finx | Spain | Sn-W | Acquired Jan 2022; sold 2023 (effective 30 Jun 2023) | FY2022 AR; Investing News |
| Borralha / Vila Verde | Portugal | W | HoA Nov 2021; withdrawn May 2022 | Mining Weekly, 24 May 2022 |
| McCleery | Yukon, Canada | Co-Cu | IPO asset; impaired FY2023 | FY2023 AR |
| Sandstone | WA, Australia | Au | IPO asset; exit date not publicly disclosed | SmallCaps, 2018 |
Financial Narrative
All figures are in A$ and drawn from the FY2026 Annual Report (5-year summary, FY2025–FY2026 statements). FY2022–FY2024 balance sheet and cash-flow lines come from Stockopedia/Kalkine aggregations of the respective annual reports. Line items marked n/m are not meaningful for a pre-revenue explorer.
Income statement (chartable)
Sources: FY2026 AR "Additional information" 5-year summary (other income, EBITDA, EBIT, net loss); MarketScreener (SG&A, SBC, D&A, impairment FY2022–FY2024); FY2026 AR P&L (FY2025–FY2026 SBC, D&A, impairment). The FY2023 A$16.26m is MarketScreener's "exploration/drilling costs" line and corresponds to the Santa Comba/McCleery impairment named in the FY2023 AR.
Commentary. The P&L has three distinct phases. FY2022 (–A$2.1m) was a holding-cost year for the Spanish development portfolio. FY2023 (–A$19.1m) was the inflection: the cancellation of the Santa Comba concessions and the McCleery write-down crystallised ~A$16–17m of impairments. That loss effectively ended the Iberian thesis. FY2024–FY2026 show steady cost discipline. The net loss narrowed each year (–A$1.87m → –A$1.55m → –A$1.31m). SG&A fell ~56% from its FY2023 peak, while share-based payments rose as the board moved CEO and director pay toward equity. Interest income nearly tripled in FY2026 to A$83.3k on higher average cash after the October–December 2025 placement.
The FY2026 statements contain an internal discrepancy. The Statement of Profit or Loss shows a total comprehensive loss of A$2,280,958, while the going-concern note cites A$2,311,552. The difference (~A$30.6k) is not explained in the sources reviewed. The FY2026 comprehensive loss was inflated by a A$0.97m foreign-currency translation loss on the Canadian dollar-denominated asset base.
Balance sheet (chartable)
Sources: FY2026 AR (FY2025–FY2026); Stockopedia, Kalkine and TipRanks aggregations of the FY2022–FY2024 annual reports. Working capital is analyst-computed as current assets less current liabilities; FY2025–FY2026 values match the AR going-concern note.
Debt. The FY2024–FY2026 balance sheets show no borrowings, and all liabilities are trade payables and provisions. Total debt (short and long term) is therefore nil and net cash equals cash for those years (A$1.27m, A$1.52m, A$3.48m). However, the lapse on 5 May 2026 of 7,518,796 "debt funder" options exercisable at A$0.045 indicates that a debt-related facility existed around 2023 (FY2026 AR). Interest paid was A$25.0k in FY2025 and A$17.6k in FY2026 (FY2026 AR cash flow).
Commentary. The asset base is almost entirely capitalised exploration and evaluation expenditure: A$14.5m of A$18.3m total assets at 30 Jun 2026. FY2026 cash and term deposits (A$1.66m in term deposits) were the highest since FY2023. Equity grew A$3.0m in FY2026 because new equity of A$5.6m gross (A$5.0m net of costs) exceeded the comprehensive loss. The "adjustments" line in FY2026 reversed A$1.91m of share-based payment reserve for expired options and rights into contributed equity and accumulated losses. This is a reclassification, not a cash item.
Cash flow (chartable)
Sources: Stockopedia/Kalkine (FY2022–FY2024); FY2026 AR cash-flow statement (FY2025–FY2026).
Classification break. Until FY2024, exploration payments were included in operating cash flow. From FY2025 they appear under investing (A$2.121m FY2025; A$2.108m FY2026). As a result, reported OCF "improved" sharply in FY2025 without a true change in burn. On a like-for-like basis (OCF plus exploration and capex), total cash burn was A$4.68m, A$6.00m, A$5.69m, A$2.56m and A$3.46m for FY2022–FY2026 (analyst-computed).
Ratios (chartable)
All analyst-computed from the balance-sheet and P&L tables above (FY2021 equity A$19.75m and total assets A$20.23m used for FY2022 averages, per TipRanks/Kalkine).
Not meaningful for a pre-revenue explorer: ROIC, net debt/EBITDA (EBITDA negative; net cash position), interest coverage (EBIT negative), asset turnover (no operating revenue) and cash conversion cycle (no inventory or receivables cycle). Debt/equity is 0.0x for FY2024–FY2026 because no borrowings are reported.
Trend synthesis. Balance-sheet quality is high in a narrow sense: no debt, current ratio above 11x, and equity at 98% of assets. Funding capacity, however, is thin relative to the plan. Annualising the June-2026 quarter's spend (A$0.593m exploration plus A$0.372m corporate) gives ~A$3.9m a year against A$3.48m cash. Dilutionlens computes 2.9 quarters of cover on A$3.0m "available cash", a difference that likely reflects restricted flow-through funds or committed spend. The company will therefore probably need equity within roughly 6–12 months unless it secures a strategic or project-level transaction (June 2026 Quarterly; Dilutionlens, Aug 2026).
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Income Statement
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Other income incl. interest (AUD K) | 1.7 | 138.0 | 54.3 | 83.1 | 145.8 |
Gross profit (AUD K; equals other income, no COGS) | 1.7 | 138.0 | 54.3 | 83.1 | 145.8 |
SG&A (AUD K) | 1,570 | 1,910 | 1,050 | 856 | 836 |
Share-based payments (AUD K) | 141 | 123 | 64.6 | 170.1 | 189.0 |
Depreciation & amortisation (AUD K) | 94.8 | 119 | 114 | 1.3 | 7.6 |
Exploration impairment / write-off (AUD K) | 0 | 16,260 | 36.4 | 283.7 | 143.2 |
EBITDA (AUD K) | -1,992.2 | -18,895.2 | -1,775.8 | -1,576.6 | -1,371.0 |
EBIT / operating result (AUD K) | -2,087.0 | -19,014.4 | -1,889.7 | -1,577.9 | -1,378.6 |
Pre-tax loss (AUD K) | -2,092.2 | -19,052.2 | -1,869.9 | -1,550.6 | -1,312.9 |
Net loss after tax (AUD K) | -2,092.2 | -19,052.2 | -1,869.9 | -1,550.6 | -1,312.9 |
Dividends per share (AUD) | 0 | 0 | 0 | 0 | 0 |
Per-Share Data and Share Count (m)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 | Source |
|---|---|---|---|---|---|---|
Basic & diluted EPS (A$ cents) | — | — | — | -0.18 | -0.11 | FY2026 AR Note 6 |
Weighted avg shares (m) | — | — | — | 852.8 | 1,149.4 | FY2026 AR Note 6 |
Gross / operating / EBITDA / net margin | n/m | n/m | n/m | n/m | n/m | No operating revenue |
"Revenue" CAGR FY2022–FY2026 | — | — | — | — | ~205% (analyst-computed; n/m, as it reflects interest on cash) | Derived |
Balance Sheet
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Cash & equivalents (AUD Mn) | 0.692 | 5.541 | 1.272 | 1.516 | 3.482 |
Total current assets (AUD Mn) | 1.479 | 5.746 | 1.889 | 1.800 | 3.745 |
Total non-current assets (AUD Mn) | 20.629 | 8.146 | 11.461 | 13.342 | 14.524 |
Total assets (AUD Mn) | 22.108 | 13.892 | 13.351 | 15.142 | 18.269 |
Current liabilities (AUD Mn) | 0.691 | 1.230 | 0.311 | 0.221 | 0.336 |
Total liabilities (AUD Mn) | 2.760 | 1.230 | 0.311 | 0.221 | 0.336 |
Total equity (AUD Mn) | 19.350 | 12.660 | 13.040 | 14.921 | 17.933 |
Working capital (AUD Mn) | 0.788 | 4.516 | 1.578 | 1.579 | 3.409 |
Accumulated losses (AUD Mn) | -7.818 | -26.870 | -28.740 | -30.169 | -31.065 |
Goodwill & intangibles (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow as reported (AUD Mn) | -4.620 | -5.890 | -5.680 | -0.441 | -1.332 |
Net investing cash flow (AUD Mn) | -0.052 | -0.195 | 0.090 | -2.121 | -1.936 |
Capex on plant & equipment (AUD Mn) | -0.058 | -0.114 | -0.007 | 0 | -0.015 |
Free cash flow: OCF + net investing (AUD Mn, analyst-computed) | -4.672 | -6.085 | -5.590 | -2.562 | -3.268 |
Net financing cash flow (AUD Mn) | 1.916 | 10.910 | 1.370 | 2.781 | 5.216 |
Net change in cash (AUD Mn) | -2.689 | 4.849 | -4.094 | 0.244 | 1.948 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROE (%; net loss / average equity) | -10.7 | -119.0 | -14.6 | -11.1 | -8.0 |
ROA (%; net loss / average assets) | -9.9 | -105.8 | -13.7 | -10.9 | -7.9 |
Current ratio (x) | 2.14 | 4.67 | 6.07 | 8.15 | 11.14 |
Total liabilities / equity (x) | 0.143 | 0.097 | 0.024 | 0.015 | 0.019 |
Equity / total assets (%) | 87.5 | 91.1 | 97.7 | 98.5 | 98.1 |
Region Overview
| Region | Assets / activity | Trend | Source |
|---|---|---|---|
Canada (Québec) | 100% of capitalised exploration (A$14.5m); all drilling, studies and permitting | Growing (E&E +A$1.17m in FY2026 despite a A$0.97m FX translation loss) | FY2026 AR |
Australia | Corporate head office (Brisbane registered office, Perth business office); treasury | Stable | FY2026 AR |
Spain | Wind-down entity; bond released FY2026 | Exiting | FY2026 AR |
Portugal / WA / Yukon | Exited or impaired | Exited | Mining Weekly 2022; FY2023 AR |
Share Price
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Share price at 30 June (AUD) | 0.030 | 0.021 | 0.019 | 0.009 | 0.011 |
Performance Window Details
| Performance window | Return | Basis | Source |
|---|---|---|---|
1-year (30 Jun 2025 to 30 Jun 2026) | +22.2% | FY-end prices | FY2026 AR (analyst-computed) |
3-year (30 Jun 2023 to 30 Jun 2026) | -47.6% | FY-end prices | FY2026 AR (analyst-computed) |
5-year | -78.0% | As at 18 Feb 2026 | Simply Wall St |
Since IPO (A$0.20, Jul 2018) to implied ~A$0.017 (28 Sep 2026) | ~-91.5% | Market cap A$22.3m ÷ ~1.31bn shares | Discovery Alert (analyst-computed) |
52-week range | A$0.007–A$0.032 | As at Jul 2026 | StockAnalysis.com |
Valuation Snapshot
| Multiple | Value | Basis | Source |
|---|---|---|---|
Market capitalisation | A$22.3m | Company presentation | Discovery Alert |
Enterprise value | A$18.8m | Market cap less cash | Discovery Alert |
P/E | n/m | Loss-making | — |
EV/EBITDA | n/m | Negative EBITDA | — |
EV/Sales | n/m | No operating revenue | — |
P/B | ~1.24x | A$22.3m ÷ FY2026 equity A$17.93m | Analyst-computed |
P/NAV (EV ÷ post-tax NPV₇) | 0.02x | A$18.8m ÷ A$920m | Company presentation |
EV per tonne of contained CuEq | ~A$34/t | A$18.8m ÷ 549 kt | Analyst-computed |
Peer P/NAV range | 0.03x–0.63x | SVY, AW1, CUF, FFM, CNB | Company presentation |
Share Price & Returns
| Date | Type | Size | Price (AUD) | Source |
|---|---|---|---|---|
Jul 2018 | IPO | A$5.0m | 0.20 | Stockhead |
Dec 2022 | Placement | A$4.3m (A$3.3m initial: 77.8m shares) | 0.042 | Engineering News |
May–Jun 2023 | Flow-through placement and prospectus | A$4.0m | — | Investing News |
Nov 2024 | Placement | ~A$3.0m | ~0.01 | Nasdaq/TipRanks; Simply Wall St |
Oct–Dec 2025 | Flow-through and placement | A$5.4m (159.1m FT shares at 0.0182; 227.3m shares at 0.011) | 0.0182 / 0.011 | FY2026 AR |
Analyst Conclusions
Management guidance
The company provides no financial guidance. Its operational guidance is:
-
Winter 2026–27 Horden Lake infill and expansion drilling.
-
Start of PFS-level engineering and two seasons of environmental baseline work.
-
Progressive Belleterre assay releases (Lorraine Mine East ~1,000 m pending).
-
Bambino geophysics, with drilling possible in the December 2026 quarter.
-
A Strategic Adviser-led review of funding options (FY2026 AR; Scoping Study).
Consensus growth expectations: Not publicly disclosed.
Bull case
-
The valuation gap is extreme. EV of A$18.8m against a post-tax NPV₇ of A$920m (0.02x) is well below the management-selected peer range of 0.03–0.63x. Even a re-rating to the bottom of the peer range for comparably advanced studies implies multi-fold upside before any further drilling.
-
The resource keeps growing efficiently. Two consecutive upgrades took contained CuEq from 407 kt (2025) to 549 kt (2026), and every Contact Zone hole has hit mineralisation. With strong conductors untested at depth, mine-life extension and Inferred conversion could lift NPV and financeability.
-
Strategic scarcity. A simple 29 kt CuEq-per-year open pit with US$1.00/lb AISC, highway and hydropower access, and Québec's critical-minerals incentives fits the profile mid-tier acquirers have been buying. The Strategic Adviser appointment creates an explicit path to a transaction.
Bear case
-
Funding arithmetic. More than A$400m of capex against A$3.5m cash means equity holders face either heavy dilution or a value-sharing project-level deal. Persistent issuance has already lifted the share count 86.5% in 30 months.
-
Study fragility. A Class 5 estimate (−30%/+50%) with 30% of NSR from Inferred material, a ~10-year life with weak tail grades, and 49% nickel recovery leaves the A$920m NPV highly assumption-dependent. A 15% copper-price fall alone takes pre-tax NPV toward ~A$1.0bn from A$1.33bn.
-
Permitting and social licence. Caribou calving habitat, an "Extreme" preliminary TSF consequence class, and no Cree agreements to date point to a long COMEX pathway. The NPV discounts this time risk only through a 7% real rate.
Catalysts and monitorables (next 12 months)
| Catalyst | Expected timing | Why it matters |
|---|---|---|
| Lorraine Mine East assays (~1,000 m) | Q4 CY2026 | First test of 1.8 km Au-Cu corridor and Cu-Ni IP targets |
| 2026 AGM (24 Nov 2026) | Nov 2026 | Approvals (Bambino shares, incentives); board renewal |
| Bambino geophysics and first drilling | Q4 2026 – Q1 2027 | New Cu-Ni-PGM discovery potential |
| Horden Lake winter drilling (infill and deep conductors) | Q1–Q2 2027 | Inferred conversion; depth extension |
| Strategic Adviser outcomes (partner, stream, JV) | 2,027 | Funding path and re-rating |
| Capital raise | Within ~2–4 quarters | Cash runway (A$3.48m at 30 Jun 2026) |
| PFS commencement and environmental baseline | 2,027 | Development de-risking |
| Cree engagement milestones | 2026–27 | Social licence |
Concluding analyst verdict
Pivotal Metals has finished reinventing itself. The Rafaella Resources that listed in 2018 as a cobalt and gold explorer became an Iberian tungsten developer, then wrote off that strategy in a A$19m FY2023 impairment. Since then, management under Ivan Fairhall has executed with discipline. It bought Horden Lake for C$4m in 2022, roughly doubled the contained resource across two upgrades, de-risked metallurgy to 90%+ copper recovery, and released a Scoping Study showing an A$920m post-tax NPV₇ and US$1.00/lb AISC. It did all this while cutting annual net losses to A$1.3m and keeping the balance sheet debt-free.
The market's response is telling. At an EV of roughly A$19m, investors are valuing Horden Lake at about two cents per dollar of study NPV. That discount is not irrational. It reflects four real hurdles:
-
a more-than-A$400m funding requirement for a company with A$3.5m cash;
-
a Class 5 study leaning on 30% Inferred material;
-
a ~10-year initial mine life;
-
environmental and Indigenous permitting complexity in caribou habitat.
None of these is unusual for a scoping-stage copper project. Together, however, they mean value is likely to accrue to shareholders only through a third-party transaction or strategic partnership, not through self-funded development.
Our assessment is that Pivotal offers asymmetric but binary exposure. On the upside, there are credible paths to a substantial re-rating: Inferred conversion, deep conductor drilling, a by-product stream, or acquisition by a mid-tier producer in a copper market priced near record highs. On the downside, continued micro-cap dilution could erode per-share value even as project value grows. The next 12 months will hinge on three things: winter drilling results, Strategic Adviser outcomes, and the price and structure of the next equity raise. The asset quality is real. Whether existing shareholders capture it depends on how the funding gap is bridged.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Tenure | Background / education | Source |
|---|---|---|---|---|---|
Simon Gray | Independent Non-Executive Chairman; Chair of Remuneration & Nomination Committee; member of Audit & Risk Committee | 1 Aug 2023 | ~3.2 yrs | BA, LLM (Corporate & Commercial Law), GAICD. Chair of ASX Appeals Tribunal; Chief Risk & Legal Officer, Envest Group. Formerly director of Probiotec, Morgans Financial and Shaw and Partners, and Chair of ASIC's Markets Disciplinary Panel | FY2026 AR |
Ivan Fairhall | Managing Director & CEO | 19 Sep 2023 (employment from 1 Sep 2023) | ~3.1 yrs | B.Eng (Hons, Mech), B.Bus, Chartered Engineer (CEng), FAusIMM. Former CEO of TSX-listed Mawson Gold; ~7 years Senior Investment Manager at Greenstone Resources (UK private equity). Former director of ACDC Metals | FY2026 AR; Scoping Study |
Robert Wrixon | Independent Non-Executive Director; member of both committees | 27 Aug 2019 | ~7.1 yrs | BEng (Chem), PhD (Materials Science & Mineral Engineering), GAICD. Director of Starboard Global; former MD of three ASX resources companies; 5 years in Xstrata plc corporate strategy. Current director of Nordic Resources | FY2026 AR |
Daniel Rose | Independent Non-Executive Director; Chair of Audit & Risk Committee | 10 Oct 2022 | ~4.0 yrs | LLB (Hons), BCom. Former CEO & Director, VTB Capital Hong Kong; 18 years at Société Générale in commodities trading and structured finance | FY2026 AR |
Amanda Wilton-Heald | Company Secretary | 3 Jul 2018 | ~8.3 yrs | BCom, CA; 25+ years in accounting, audit and company secretarial roles | FY2026 AR |
Paul Nagerl | VP Exploration (consultant); Competent Person for exploration results | — | — | P.Geo (OGQ); 17 years at Falconbridge in its Cu-Ni-PGM business unit | FY2026 AR; Discovery Alert (Sep 2026 presentation) |
“—” = not publicly disclosed.
Directors' Remuneration
| Name | Year | Salary / fees | Superannuation | Fair value of security incentives | Total | Fixed % | LTI % |
|---|---|---|---|---|---|---|---|
Ivan Fairhall | FY2026 | 273,589 | 32,143 | 84,733 | 390,465 | 77 | 23 |
Ivan Fairhall | FY2025 | 257,271 | 23,206 | 69,958 | 350,435 | 80 | 20 |
Simon Gray | FY2026 | 66,000 | 0 | 19,325 | 85,325 | 77 | 23 |
Robert Wrixon | FY2026 | 42,000 | 0 | 19,325 | 61,325 | 68 | 32 |
Daniel Rose | FY2026 | 42,000 | 0 | 19,325 | 61,325 | 68 | 32 |
Major Shareholders
| Holder | Shares (m) | % of ~1.31bn | Basis / source |
|---|---|---|---|
Bring On Retirement Ltd | 74.98 | 5.72 | Simply Wall St (Frankfurt listing page, 2026) |
Kenneth Hall | 35.00 | 2.67 | Simply Wall St |
Matthew Latimore | 25.00 | 1.91 | Simply Wall St |
Mark Ellis | 23.51 | 1.79 | Simply Wall St |
Daniel Rose (director) | 22.92 | 1.75 | FY2026 AR (22,161,587 direct + 756,000 indirect) |
Robert Wrixon (director) | 21.98 | 1.68 | FY2026 AR (19,141,090 direct + 2,836,372 indirect) |
Ivan Fairhall (director) | 10.78 | 0.82 | FY2026 AR (indirect, at report date) |
Simon Gray (director) | 8.50 | 0.65 | FY2026 AR (indirect) |
Competitive Landscape
Key Competitors
| Company (ticker) | Project / jurisdiction | Relevance to Pivotal | Valuation datapoint | Source |
|---|---|---|---|---|
FireFly Metals (ASX: FFM) | Green Bay Cu-Au, Newfoundland | ASX-listed Canadian copper study-stage peer | P/NAV 0.55x | Sep 2026 company presentation via Discovery Alert |
Carnaby Resources (ASX: CNB) | Greater Duchess Cu-Au, QLD | ASX copper study-stage peer; cited M&A comparable | P/NAV 0.63x | Same |
CuFe Ltd (ASX: CUF) | Orlando Cu (per peer table) | Copper scoping/PFS peer | P/NAV 0.26x | Same |
American West Metals (ASX: AW1) | Storm Cu, Nunavut | Canadian copper peer | P/NAV 0.16x | Same |
Stavely Minerals (ASX: SVY) | Thursday's Gossan Cu, VIC | Copper scoping peer | P/NAV 0.03x | Same |
Cygnus Metals (ASX: CY5) | Chibougamau Cu-Au, Québec | Québec copper peer; cited by Pivotal as M&A comparable | — | Scoping Study |
Hammer Metals (ASX: HMX) | Mount Isa Cu | Cited M&A comparable | — | Scoping Study |
Havilah Resources (ASX: HAV) | Mutooroo Cu-Co JV, SA | Cited development-stage JV comparable | — | Scoping Study |
New World Copper (as cited) | — | Cited M&A comparable | — | Scoping Study |
Vior Inc. (TSXV: VIOR) | Belleterre gold district, Québec | Adjacent landholder; Kelly Lake East trend continues onto its ground | — | FY2026 AR |
“—” = not publicly disclosed.
Peer Comparison FY2026
| Metric | Pivotal (PVT) | FireFly (FFM) | Carnaby (CNB) | American West (AW1) |
|---|---|---|---|---|
Revenue | n/a (pre-revenue) | — | — | — |
P/NAV (market cap less cash ÷ post-tax NPV) | 0.02x | 0.55x | 0.63x | 0.16x |
Study stage | Scoping (Sep 2026) | Scoping/PFS | Scoping/PFS | Scoping/PFS |