PORR AG Overview
PORR AG is Austria's second-largest construction group and the oldest company still listed on the Vienna Stock Exchange. It is a full-service contractor with a strong infrastructure bias, spanning:
-
tunnelling and rail;
-
roads and bridges;
-
specialist foundation engineering;
-
building construction (residential, healthcare, industrial and cleanroom);
-
environmental engineering;
-
design and BIM services.
In FY2025 it delivered record production output of EUR 6.8bn and revenue of EUR 6.3bn. About 98% of output comes from seven European home markets: Austria, Germany, Switzerland, Poland, the Czech Republic, Slovakia and Romania.
Since 2010, CEO Karl-Heinz Strauss has led the shift from volume-led growth to selective bidding, cost discipline and an in-house value chain. EBIT margin rose from negative in 2020 to 3.1% in 2025, and management targets 3.5–4.0% by 2030.
The order backlog passed EUR 10bn for the first time in Q1 2026. That positions PORR as a leveraged play on CEE infrastructure spending, German infrastructure stimulus and Austrian rail investment. Its margins remain thinner than larger European peers.
Company's own description
In its corporate materials PORR calls itself the "Home of Construction" and a "one-stop shop for construction". It says it covers the whole construction value chain, from planning and design through construction to operation and redevelopment. Its strategy since the early 2020s has been framed as "Intelligent Growth", with a "Green and Lean" operating ethos (AR 2023 contents: "PORR follows a clear strategy: Intelligent Growth…").
PORR AG itself is an operationally active strategic holding company with central staff units. Operating subsidiaries carry out the construction work in each market.
Independent characterisation
PORR is a project-based general and specialist contractor. Almost all revenue is construction contract revenue recognised over time (IFRS 15), so in the requested taxonomy it is overwhelmingly a "service" business. The business model has five features:
-
Contract-based revenue. Most revenue comes from fixed-price, unit-price and target-price construction contracts with public and private clients. Revenue tracks construction progress, which is highly seasonal: Q1 is consistently the weakest quarter and H2 the strongest.
-
Two volume measures. "Production output" is PORR's preferred volume KPI. It includes PORR's proportional share of consortia, equity-accounted entities and minor companies. "Revenue" covers fully consolidated entities only. In FY2025 revenue was about 92% of output (derived: 6,295.9 / 6,818).
-
Vertical integration. PORR repeatedly stresses "building as much as possible itself". It cut purchased services by EUR 25.6m year-on-year in H1 2025 and by EUR 62.0m in 9M 2025. It owns equipment pools, asphalt and concrete capacity, specialist foundation crews, tunnelling capability and design units.
-
Asset-light, working-capital driven. PORR has no material manufacturing base. Cash generation depends on billing milestones, client prepayments and the seasonal working-capital cycle. H1 2026 operating cash flow was −EUR 258m, against full-year FY2025 free cash flow of +EUR 232.9m.
-
Niche concessions and real-estate-adjacent stakes. Examples are the Hospitals Group participation (eight clinics), minority stakes in five Austrian thermal spas acquired with VSG at end-2025, and a hybrid capital investment in related-party UBM Development (June 2026).
Value-chain position: design and engineering, then construction (core), then limited operation and maintenance.
Customer types:
-
public infrastructure owners, such as rail operators (ÖBB, PKP PLK, DB, CFR), motorway agencies (ASFINAG, GDDKiA) and municipalities;
-
healthcare operators;
-
industrial and semiconductor clients (for example X-FAB);
-
residential developers and housing associations;
-
energy utilities (pumped storage, hydro);
-
private developers.
End-markets and FY2025 mix:
-
Civil engineering and infrastructure was about 55% of output in FY2024 (PR, 24 February 2025).
-
Building construction was 34.9% of output in FY2025 (report.porr-group.com annual review).
-
The remainder is specialist and environmental work.
Strategy
Stated strategic themes (AR 2023–2025, H1 2026 report, CEO statements)
Intelligent Growth / selective order acquisition: Bid for margin, not volume. The CEO repeatedly cites "selective order acquisition" as the reason earnings outgrow output.
Focus on seven home markets: About 98% of output; exit or downsizing of risky project markets such as Qatar.
Infrastructure as the backbone: "PORR is and will remain a construction company with a major focus on infrastructure" (CEO, VAMED deal PR, 2024).
In-house value chain ("build as much as possible ourselves"): Reduces purchased services and subcontracting margin leakage.
Green and Lean: Efficiency plus decarbonisation. Emissions intensity fell 14.3% in 2025.
Future fields (H1 2026 CEO statement): healthcare construction, data centres, affordable housing, and turnkey industrial construction.
Initiatives in the last 24 months
| Initiative | Date | Detail / target |
|---|---|---|
| PORR Healthcare and VSG acquisition | Closed 31 Dec 2025 | One-stop hospital design and build; about 150 staff; adds spa operating stakes |
| PORR Living modular housing | 2,025 | Modular affordable-housing solution |
| Cleanroom / semiconductor construction | 2,026 | X-FAB Fab4Micro, Erfurt |
| German infrastructure push | 2025–2026 | DE order intake +81% (Q1 2025) and +36% (Q1 2026); EUR 1.5bn tender pipeline from Oct 2026 |
| Cost and purchased-services reduction | 2,025 | EUR 62.0m saving on purchased services (9M 2025); materials costs reduced again in H1 2026 |
| Qatar wind-down | 2024–2025 | Operations "largely reduced" |
| Portfolio pruning | 2,026 | Expected sale of PWW Group (EUR 7.4m related depreciation in H1 2026); sale of business premises (EUR 6.4m gain) |
| Capital structure | Sep–Oct 2026 | EUR 150m hybrid convertible for "organic and/or inorganic growth"; EUR 15m buyback |
| UBM hybrid investment | Jun 2026 | Investment in UBM Development hybrid capital (amount n/d; related party) |
| Decarbonisation | Ongoing | Emissions intensity −14.3% in 2025; large share of electricity from renewable sources (AR 2025, Polish PR) |
Financial targets and guidance
| Target | Value | Source |
|---|---|---|
| FY2026 output and revenue growth | +2% to +4% | H1 2026 PR |
| FY2026 EBIT margin | 3.2% – 3.3% (FY2025: 3.1%) | H1 2026 PR |
| 2030 EBIT margin | 3.5% – 4.0% (peer average 3.7% per PORR) | FY2025 results; Börsen-Zeitung |
| Dividend policy | Payout of 30–50% of profit | Recurring in ARs |
| Legacy target (PORR 2025 programme) | EBT margin of about 3% by 2025 | Achieved about 2.9% on revenue and 2.65% on output (derived): broadly met on revenue, slightly missed on output |
Products & Services
PORR does not sell catalogue products. Its "portfolio" is a set of construction capabilities, specialist subsidiaries and proprietary systems. Pricing is contract-specific (tender, negotiated, partnering or target-price) and is not publicly disclosed per offering.
Infrastructure / civil engineering (all operating segments, concentrated in Infrastructure International, PL, CEE and AT/CH)
| Offering | Description and capabilities | Target customer | Flagship references (from PRs) |
|---|---|---|---|
| Tunnelling | Conventional (NATM) and mechanised tunnelling for rail, road and hydropower; tunnel refurbishment | Rail and motorway authorities, utilities | Pack tunnel chain refurbishment, A2 Süd-Autobahn (Austria, 2025 award); Poland's longest high-speed rail tunnel in Łódź (2025 award); ElbX tunnel (Germany); pumped-storage plants; tunnel breakthrough milestone (Oct 2026) |
| Railway construction | Line modernisation, new lines, stations, track systems | PKP PLK, SŽ (CZ), CFR (RO), ÖBB, DB | Several Polish and Czech line modernisations (2025); Romanian railway line (2025) |
| Slab Track Austria (proprietary) | Ballastless track system developed with ÖBB and patented by PORR; used on high-speed and tunnel sections | Rail operators | Long-standing PORR system (launch year n/d) |
| Road and bridge construction | Motorways, expressways, bridges, asphalt (TEERAG-ASDAG in Austria; German road units) | Motorway agencies, municipalities | A2 Süd-Autobahn |
| Specialist foundation engineering | Piling, diaphragm walls, anchors, ground improvement (Stump Spezialtiefbau in DE/CH and group units) | Contractors, developers, infrastructure owners | Embedded in major projects |
| Hydraulic and energy construction | Pumped storage, hydropower, flood protection | Utilities | Pumped-storage plants in build phase (2025) |
| Environmental engineering | Remediation, landfill, recycling of construction waste, demolition | Public and industrial clients | — |
Building construction (AT/CH, DE, PL, CEE)
| Offering | Description | Target customer | Flagship references |
|---|---|---|---|
| Turnkey industrial and cleanroom construction | Semiconductor fabs, cleanrooms, logistics, data centres | Industrial and tech clients | X-FAB Fab4Micro chip fab, Erfurt (largest single building order in H1 2026) |
| Data centres | Named by the CEO as a growth field (H1 2026 report) | Hyperscalers, colocation providers | n/d (pipeline) |
| PORR Healthcare | One-stop design, build and (via stakes) operation of hospitals; strengthened by VSG (closed end-2025) | Hospital operators, public health agencies | New psychiatric building at Klinik Favoriten, Vienna (2026 award) |
| Residential and affordable housing ("PORR Living") | Conventional and modular residential, including a proprietary modular system | Developers, housing associations | Kladno Living (CZ, 2025); Lil-y am See (AT, 2026) |
| Office, commercial, public buildings | General contracting and design & build | Public and private | — |
Design, engineering and digital
| Offering | Description |
|---|---|
| pde (PORR Design & Engineering) | In-house design and engineering, BIM, value engineering for design & build and partnering models |
| BIM / digital construction | Group-wide BIM deployment, digital site processes (no separate revenue disclosure) |
| Equipment services | Central equipment pool and logistics (Holding) |
Operations and concessions
| Offering | Description |
|---|---|
| Hospitals Group participation | Stake in a group operating eight clinics and healthcare facilities in Austria |
| Thermal spa stakes | Minority stakes in five Austrian thermal spas and operation of Vamed Vitality World, taken over with VSG; some subject to further approvals. Named examples: St. Martins Therme & Lodge (Frauenkirchen), Tauern Spa (Zell am See–Kaprun); press also cites stakes in Vienna and Geinberg |
Financial Narrative
Sources: AR 2023 (FY2020–2023 multi-year table); FY2024 PR (27 March 2025); FY2025 PR (26 March 2026). Profit is "profit for the period" including non-controlling interests and hybrid holders. PORR uses a cost-of-materials P&L format and does not report gross profit.
Margins (derived)
Growth. Revenue CAGR FY2021–FY2025 is about 5.0% (derived). EBIT CAGR is about 19.9% and EPS CAGR about 26.3% (derived).
Commentary — earnings. The five-year record shows strong operating leverage from a low base:
2020 trough: EBIT was −EUR 37.2m in 2020, reflecting COVID disruption, cartel-related provisioning and legacy project losses.
2021 recovery: EBIT recovered to EUR 95.2m as the efficiency programme took hold and loss-making markets and projects were exited.
2022–2023 inflation: PORR passed costs through better than expected. EBITDA margin was broadly flat (5.5–5.7%) while revenue rose 17% over two years, a sign that contract escalation clauses and selective bidding protected margins.
2024–2025 inflection: Revenue grew only 2.3% and 1.7%, but EBIT rose 12.9% and 24.2%. Management attributes 2025 to cost savings, lower purchased services (in-sourcing), better capacity utilisation on major rail projects, and higher equity-method income from joint-venture projects.
The rising gap between EBITDA (+11%) and EBIT (+24%) in 2025 shows depreciation growing more slowly than EBITDA, which suggests capex discipline. The net financial result has deteriorated modestly (−EUR 16.3m in 2025 versus −EUR 9.6m in 2023), reflecting higher rates on hybrid refinancing and bond coupons.
Balance sheet
Not captured in sources reviewed (n/d): - total debt split short/long term;
-
goodwill and intangibles;
-
working capital;
-
FY2021–FY2023 cash;
-
FY2022 net debt.
PORR redefined net debt/net cash retrospectively from 31 December 2021 "to make it more transparent" (FY2021 PR).
Commentary — balance sheet. The equity ratio has held at 19–21% throughout. That is adequate for a contractor with large customer prepayments, but below the 25–30% typical of the strongest European peers. The balance sheet has been actively managed:
-
rights issue in 2021;
-
early refinancing of hybrid and participation capital in 2023;
-
repayment of the 2020 hybrid in February 2025;
-
a 2025 buyback with resale of treasury shares;
-
the EUR 150m perpetual hybrid convertible in September 2026, which is likely to be at least partly equity-classified under IFRS.
Year-end net cash (EUR 93.1m at FY2025) flatters the average position. Intra-year net debt peaks were EUR 301.3m at 30 June 2025, EUR 307.0m at 30 September 2025 and EUR 461m at 30 June 2026. This seasonality is critical to credit analysis.
Cash flow
Not captured in sources reviewed (n/d): operating cash flow, capex, and FY2022–FY2023 FCF. FY2025 included a buyback that was largely offset by the resale of treasury shares; net amount n/d.
Commentary — cash flow. FCF reached EUR 262.8m in 2021, fell to EUR 138.2m in 2024 and recovered to EUR 232.9m in 2025 (+68.6%). Cash rose EUR 165m to EUR 748m.
The H1 2026 operating cash outflow of EUR 258m is a normal seasonal pattern, but larger than in prior years. It reflects the harsh winter and the ramp-up of large infrastructure jobs, and it raised net debt to EUR 461m. Full-year 2026 cash conversion is therefore a key monitorable.
Return and efficiency ratios (derived; averages of opening and closing balances)
Not computable from sources reviewed (n/d): ROIC, current ratio, debt/equity and cash conversion cycle. These require the full balance sheet and the interest expense line. The coverage proxy uses the total net financial result, not gross interest expense.
Interpretation. ROE has nearly doubled from 8.3% to 14.7% with a stable equity ratio. The improvement is driven by margin rather than leverage, which is the higher-quality route to returns improvement. Asset turnover of about 1.4–1.5x is typical of contracting. Every 10 basis points of EBIT margin equals about EUR 6.3m of EBIT, or roughly 4–5% of the FY2025 profit pool.
Interim trend (latest)
Notes: - H1 2025 profit is derived as EUR 36.4m / 1.239.
-
H1 2026 revenue of about EUR 2.93bn is reported by secondary sources (CIJ World via ad-hoc-news).
-
H1 2026 EBIT included a EUR 6.4m gain on the sale of business premises and EUR 7.4m of depreciation linked to the expected sale of the PWW Group (earnings-call coverage).
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Overview
| Segment | Geographic / functional scope | Main activities and subsidiaries |
|---|---|---|
AT / CH | Austria and Switzerland | Building construction, civil engineering, road construction (TEERAG-ASDAG), rail, specialist foundation engineering, environmental engineering, healthcare construction (PORR Healthcare, including VSG from 2026), Switzerland (PORR SUISSE) |
DE | Germany | Building construction (residential, office, industrial and cleanroom), civil engineering, specialist foundation engineering (Stump Spezialtiefbau), road and transport infrastructure |
PL | Poland | Rail modernisation, roads and bridges, building construction (PORR S.A.) |
CEE | Czech Republic, Slovakia, Romania and other CEE | Rail and road infrastructure, building construction, residential (PORR a.s., PORR Construct Romania) |
Infrastructure International | Major international projects managed centrally | Tunnelling (rail, road, pumped storage), large rail projects; project markets such as Norway, UK, Qatar (largely reduced) |
Holding | Group functions | Central services, equipment management, design and engineering (pde) and group-wide units |
Segment revenue (EUR Mn)
| Segment revenue (EUR Mn) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
AT/CH revenue (EUR Mn) | 2,740 | 2,970 | 3,010 | 3,070 | 2,610 |
DE revenue (EUR Mn) | 784 | 885 | 993 | 978 | 1,580 |
PL revenue (EUR Mn) | 749 | 820 | 1,020 | 942 | 962 |
CEE revenue (EUR Mn) | 472 | 616 | 670 | 806 | 701 |
Infrastructure International revenue (EUR Mn) | 416 | 436 | 346 | 403 | 500 |
Group revenue reported (EUR Mn) | 5,169.8 | 5,786.0 | 6,048.5 | 6,190.5 | 6,295.9 |
Segment share of revenue (%)
| Segment share of revenue (%) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
AT/CH share (%) | 53.0 | 51.3 | 49.8 | 49.6 | 41.5 |
DE share (%) | 15.2 | 15.3 | 16.4 | 15.8 | 25.1 |
PL share (%) | 14.5 | 14.2 | 16.9 | 15.2 | 15.3 |
CEE share (%) | 9.1 | 10.6 | 11.1 | 13.0 | 11.1 |
Infrastructure International share (%) | 8.0 | 7.5 | 5.7 | 6.5 | 7.9 |
Segment revenue growth (%)
| Segment revenue growth (%) | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
AT/CH growth (%) | 8.4 | 1.3 | 2.0 | -15.0 |
DE growth (%) | 12.9 | 12.2 | -1.5 | 61.6 |
PL growth (%) | 9.5 | 24.4 | -7.6 | 2.1 |
CEE growth (%) | 30.5 | 8.8 | 20.3 | -13.0 |
Infrastructure International growth (%) | 4.8 | -20.6 | 16.5 | 24.1 |
Revenue by Segment
| Segment EBT (EUR Mn) | FY2021 | FY2022 | FY2023 |
|---|---|---|---|
AT/CH EBT (EUR Mn) | 80.09 | 84.70 | 92.02 |
DE EBT (EUR Mn) | -4.26 | 3.64 | 8.17 |
PL EBT (EUR Mn) | 13.34 | 21.41 | 18.55 |
CEE EBT (EUR Mn) | 5.73 | 11.74 | 19.73 |
Infrastructure International EBT (EUR Mn) | -12.90 | 0.01 | 18.08 |
Holding/other EBT (EUR Mn) | 3.36 | -11.47 | -25.84 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansSegment EBT margin (%)
| Segment EBT margin (%) | FY2021 | FY2022 | FY2023 |
|---|---|---|---|
AT/CH EBT margin (%) | 2.9 | 2.9 | 3.1 |
DE EBT margin (%) | -0.5 | 0.4 | 0.8 |
PL EBT margin (%) | 1.8 | 2.6 | 1.8 |
CEE EBT margin (%) | 1.2 | 1.9 | 2.9 |
Infrastructure International EBT margin (%) | -3.1 | 0.0 | 5.2 |
Segment Revenue
| Segment | Q1/2026 | Q1/2025 | Δ % |
|---|---|---|---|
AT / CH | 515 | 548 | -6.0 |
DE | 314 | 321 | -2.3 |
PL | 214 | 175 | 22.8 |
CEE | 97 | 89 | 8.6 |
Infrastructure International | 135 | 112 | 20.5 |
Group | 1,300 | 1,270 | 2.3 |
Key Financials and Financial Ratios (x)
| Operating KPI | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Production output (EUR Mn) | 5,727 | 6,226 | 6,577 | 6,747 | 6,818 |
Order intake (EUR Mn) | 6,414 | 6,659 | 6,835 | 6,846 | 7,813 |
Order backlog year-end (EUR Mn) | 7,764 | 8,204 | 8,452 | 8,543 | 9,539 |
Backlog / output (x, derived) | 1.36 | 1.32 | 1.29 | 1.27 | 1.40 |
Book-to-bill intake/output (x, derived) | 1.12 | 1.07 | 1.04 | 1.01 | 1.15 |
Average staff (number) | 20,177 | 20,232 | 20,665 | 21,228 | 20,829 |
Output per employee (EUR K, derived) | 284 | 308 | 318 | 318 | 327 |
Income statement (EUR Mn)
| Income statement (EUR Mn) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue (EUR Mn) | 5,169.8 | 5,786.0 | 6,048.5 | 6,190.5 | 6,295.9 |
EBITDA (EUR Mn) | 287.5 | 318.9 | 344.3 | 368.8 | 409.4 |
EBIT (EUR Mn) | 95.2 | 120.1 | 140.3 | 158.4 | 196.7 |
Net financial result (EUR Mn, derived EBT-EBIT) | -9.8 | -10.1 | -9.6 | -13.3 | -16.3 |
EBT (EUR Mn) | 85.4 | 110.0 | 130.7 | 145.1 | 180.4 |
Profit for the period (EUR Mn) | 61.4 | 82.6 | 95.0 | 108.9 | 136.7 |
EPS basic (EUR) | 1.18 | 1.65 | 2.21 | 2.32 | 3.00 |
Dividend per share (EUR) | 0.50 | 0.60 | 0.75 | 0.90 | 1.05 |
Payout ratio on EPS (%, derived) | 42.4 | 36.4 | 33.9 | 38.8 | 35.0 |
Margin (%)
| Margin (%) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
EBITDA margin on revenue (%) | 5.56 | 5.51 | 5.69 | 5.96 | 6.50 |
EBIT margin on revenue (%) | 1.84 | 2.08 | 2.32 | 2.56 | 3.12 |
EBT margin on revenue (%) | 1.65 | 1.90 | 2.16 | 2.34 | 2.87 |
EBT margin on output (%) | 1.49 | 1.77 | 1.99 | 2.15 | 2.65 |
Net margin on revenue (%) | 1.19 | 1.43 | 1.57 | 1.76 | 2.17 |
Revenue / output conversion (%) | 90.3 | 92.9 | 92.0 | 91.8 | 92.3 |
Balance Sheet and Margin Analysis (%)
| Balance sheet (EUR Mn) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Total assets (EUR Mn) | 4,065 | 4,147 | 4,136 | 4,240 | 4,578 |
Equity incl. non-controlling interests (EUR Mn) | 824 | 799 | 860 | 894 | 964 |
Equity ratio (%) | 20.3 | 19.3 | 20.8 | 21.1 | 21.1 |
Cash and cash equivalents (EUR Mn) | — | — | — | 583 | 748 |
Net debt, negative = net cash (EUR Mn) | -65 | — | -40 | 2 | -93 |
Liquidity reserve incl. committed lines (EUR Mn) | — | — | — | — | 1,197.8 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansCash flow (EUR Mn)
| Cash flow (EUR Mn) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Free cash flow (EUR Mn) | 262.8 | — | — | 138.2 | 232.9 |
Dividends paid, approx. (EUR Mn, derived DPS prior year x 39.28m shares) | 0 | 19.6 | 23.6 | 29.5 | 35.4 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
ROE profit/avg equity (%) | 8.3 | 10.2 | 11.5 | 12.4 | 14.7 |
ROA profit/avg assets (%) | 1.6 | 2.0 | 2.3 | 2.6 | 3.1 |
Asset turnover revenue/avg assets (x) | 1.37 | 1.41 | 1.46 | 1.48 | 1.43 |
EBIT / net financial cost proxy coverage (x) | 9.7 | 11.9 | 14.6 | 11.9 | 12.1 |
Net debt / EBITDA (x, negative = net cash) | -0.23 | — | -0.12 | 0.01 | -0.23 |
Income Statement and Per-Share Data
| Interim KPI | H1 2025 | H1 2026 |
|---|---|---|
Production output (EUR Mn) | 3,171 | 3,167 |
Revenue (EUR Mn) | 2,959.2 | 2,930 |
EBITDA (EUR Mn) | 153.4 | — |
EBIT (EUR Mn) | 48.7 | 56.3 |
Profit for the period (EUR Mn) | 29.4 | 36.4 |
EPS (EUR) | 0.53 | 0.71 |
Order intake (EUR Mn) | 4,049 | 3,466 |
Order backlog (EUR Mn) | 9,421 | 9,839 |
Total assets (EUR Mn) | 4,271 | 4,725.8 |
Equity ratio (%) | 20.0 | 20.0 |
Net debt (EUR Mn) | 301.3 | 461 |
Geographic Revenue
| Country | Share of output FY2025 (%) | Output FY2025 (EUR Mn, derived) |
|---|---|---|
Austria | 46.2 | 3,150 |
Germany | 25.5 | 1,739 |
Poland | 14.3 | 975 |
Czech Republic + Slovakia | 5.6 | 382 |
Romania | 5.4 | 368 |
Switzerland (residual of home markets, derived) | 1.4 | 95 |
Other / project markets | 1.6 | 109 |
Total | 100.0 | 6,818 |
Revenue by Region (%)
| Geographic indicator | FY2021 | FY2022 | FY2023 | FY2025 |
|---|---|---|---|---|
Foreign share of output (%) | 53.9 | 54.2 | 54.9 | 53.8 |
Home-markets share of output (%) | — | 95.6 | — | 98.4 |
Valuation Snapshot
| Metric | Value |
|---|---|
Share price | EUR 30.88 |
52-week range | EUR 25.30 – 46.55 |
Distance from 52-week high | About -34% |
~2-year performance | About +130% (from "barely above EUR 13" two years ago per Börsen-Zeitung) |
1-year and 5-year performance | n/d (exact reference prices not captured) |
Market cap | ~EUR 1.21bn (39.28m shares, derived) |
P/E on FY2025 EPS (EUR 3.00) | ~10.3x (derived); 9.65x quoted by a third party (13 Oct 2026) |
EV/EBITDA FY2025 (EV = market cap − YE net cash) | ~2.7x (derived; excludes hybrids and leases; indicative) |
EV/Sales FY2025 | ~0.18x (derived) |
P/B (equity incl. NCI EUR 964m) | ~1.26x (derived) |
Dividend yield (EUR 1.05) | ~3.4% (derived) |
EV/EBIT 2026e | ~7x versus ~12x peers (Raiffeisen via Börsen-Zeitung) |
Source Details
| Source | Rating | Target |
|---|---|---|
Consensus (7 analysts, Oct 2026, per ad-hoc-news) | — | EUR 43.26 average |
Raiffeisen Research (6 Oct 2026) | Buy (from Hold) | EUR 36 (from EUR 45) |
Dividend metric
| Dividend metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
DPS (EUR) | 0.50 | 0.60 | 0.75 | 0.90 | 1.05 |
Payout ratio (%) | 42.4 | 36.4 | 33.9 | 38.8 | 35.0 |
Capital Instruments
| Instrument | Detail |
|---|---|
Buyback 2025 | Buyback and subsequent sale of treasury shares (amount n/d) |
Buyback 2026–27 | Up to EUR 15m / 392,782 shares; 14 Oct 2026 – 31 Mar 2027 |
Hybrid 2020 | Repaid February 2025 |
Hybrid convertible 2026 | EUR 150m, perpetual, deeply subordinated; 2.75% to Sep 2031, then 5-year mid-swap + 900bp. Conversion price EUR 42.90; underlying about 8.9% of share capital. Concurrent delta placement at EUR 33.00; 90-day lock-up. Advisors: KWR (issuer), Lilja & Co (financial); bookrunners BofA Securities, RBI with ODDO BHF, and UniCredit |
Bonds outstanding | AT0000A39724; XS2408013709 (terms n/d in sources reviewed) |
Credit ratings | No public Moody's / S&P / Fitch rating identified |
Analyst Conclusions
Guidance and consensus
FY2026 guidance: output and revenue +2–4%; EBIT margin 3.2–3.3%. That implies FY2026 EBIT of roughly EUR 207–224m (derived: revenue of EUR 6.42–6.55bn × margin).
H1 2026 starting point: EBIT EUR 56.3m, so H2 must deliver about EUR 150–168m, against EUR 148m in H2 2025 (derived: 196.7 − 48.7).
2030 target: EBIT margin 3.5–4.0%.
Third-party long-range model: (Simply Wall St narrative): about EUR 7.0bn revenue and EUR 155m earnings by 2029, roughly 3.4% annual revenue growth. Indicative only.
Bull case
-
Margin compounding on a record backlog. EBIT margin expanded about 30–55bp per year from 2022 to 2025. Hitting 3.75% on about EUR 7bn revenue by 2030 implies EBIT of about EUR 260m, roughly a third above FY2025.
-
Stimulus tailwinds. German infrastructure spending (EUR 1.5bn of tenders) plus EU-funded Polish and Romanian rail should lift intake and mix toward higher-margin civil work.
-
Discount valuation with capital return. About 10x P/E and about 7x EV/EBIT versus about 12x for peers, a 3.4% yield, a buyback, and a convertible struck at EUR 42.90 (management signalling).
Bear case
-
Volume stall and intake decline. H1 2026 output was flat and intake fell 14%. If H2 cannot catch up, both revenue growth and margin guidance are at risk.
-
Cash and leverage seasonality. OCF of −EUR 258m and net debt of EUR 461m at June 2026. Hybrid layering (a 900bp reset in 2031) and the equity ratio stuck at about 20% limit resilience to a large project loss.
-
Governance and overhang. Syndicate selling (IGO −4%), related-party capital allocation to UBM, convertible hedge selling and potential dilution of about 8.9% weigh on the multiple.
Catalysts and monitorables (next 12 months)
| Date / period | Catalyst | What to watch |
|---|---|---|
| 18/19 Nov 2026 | Q3 2026 results | H2 catch-up in output; working-capital reversal; guidance confirmation |
| Q4 2026 – Q1 2027 | German infrastructure awards | Share of the EUR 1.5bn pipeline won |
| Through 31 Mar 2027 | Buyback execution | Volume bought versus convertible hedging flows |
| Early Mar 2027 | Preliminary FY2026 | EBIT vs EUR 207–224m implied range; year-end net cash |
| 31 Mar 2027 | FY2026 Annual Report | DPS, 2027 guidance, 2030 path, PWW sale close |
| 18 May 2027 | AGM 2027 | Governance; capital authorisations |
| Ongoing | Syndicate holdings | Any further IGO or Strauss disposals |
Analyst verdict
PORR has transformed itself from a volume-driven, loss-making contractor in 2020 into a disciplined, cash-generative infrastructure specialist. FY2025 delivered:
-
record EBIT of EUR 196.7m, a 3.1% margin;
-
EPS of EUR 3.00;
-
free cash flow of EUR 232.9m;
-
year-end net cash of EUR 93.1m.
Return on equity has nearly doubled in four years without added leverage. The order book, above EUR 10bn at its Q1 2026 peak and EUR 9.8bn at mid-year, gives unusually good visibility into 2027. It is weighted toward EU- and state-funded rail, tunnelling and civil works in markets where PORR holds strong positions.
The equity story has, however, moved from "turnaround" to "proof of sustainability", and the market has de-rated the shares by about a third from their 52-week high. Three issues dominate. First, volume momentum softened in H1 2026: output was flat and intake fell 14%. Second, seasonal net debt rose to EUR 461m, putting the onus on H2 cash conversion. Third, capital-markets technicals turned negative: a syndicate disposal and convertible hedging flows.
The EUR 150m hybrid convertible has a 2.75% coupon and a EUR 42.90 conversion price. It is cheap, equity-like funding that signals management confidence and preserves M&A optionality. The penal 2031 reset effectively commits PORR to refinancing or converting it.
At about 10x trailing earnings, about 7x EV/EBIT and a 3.4% yield, the valuation embeds limited credit for the 2030 margin ambition. If PORR delivers the 3.2–3.3% FY2026 margin with positive full-year cash flow, the risk-reward looks favourable. Upside levers are German stimulus awards and CEE rail. The principal risks are execution on fixed-price megaprojects, governance concentration and further shareholder selling.
On balance: constructive, with Q3 and FY2026 cash conversion as the decisive tests.
SOURCE REGISTER (primary first)
PORR AG press releases: FY2021 (28 Apr 2022); FY2022 (30 Mar 2023); FY2023 (21 Mar 2024); preliminary FY2024 (24 Feb 2025); FY2024 (27 Mar 2025); Q1 2025 (22 May 2025); H1 2025 (21 Aug 2025); Q3 2025 (20 Nov 2025); preliminary FY2025 (4 Mar 2026); FY2025 (26 Mar 2026); Q1 2026 (27 May 2026); H1 2026 (27 Aug 2026); Supervisory Board changes (3 May 2024); VAMED/VSG (2024, 23 Dec 2025).
PORR filings: Yearly Financial Report 2023 (multi-year tables); Half-Year Report 2025 (German); AR 2025 annual review (report.porr-group.com).
Ad-hoc and regulatory notices: (pressetext/pta, Deutsche Börse): COO nomination (12 Mar 2025); hybrid convertible launch and terms (22–23 Sep 2026); AGM 2026 convocation (27 Mar 2026); STRABAG EQS ad-hoc on VAMED termination (10 Oct 2025).
Advisor and bank releases: KWR (Chambers); ODDO BHF / RBI (LinkedIn).
Press and data: Börsen-Zeitung; trend.at; industriemagazin.at; ORF; Construction Briefing; vol.at; ad-hoc-news.de (Oct 2026 share data, analyst targets, call coverage); Parqet (IGO sale); MarketScreener (segment revenue — aggregator); Simply Wall St (remuneration, board tenure — aggregator); 4investors (EPS/DPS history); finanzen.at (financial calendar); GlobalData; IV Vienna (Iris Ortner CV).
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Title | In role since | Background | Total remuneration |
|---|---|---|---|---|
Karl-Heinz Strauss | CEO, Chairman of the Executive Board | 13 Sep 2010 | MBA, FRICS. Formerly in Raiffeisen/real-estate banking (detail n/d). Co-owner of the Strauss Group (syndicate partner). Age about 65 per GlobalData | ~EUR 2.18m (FY2024; ~48% fixed salary per Simply Wall St) |
Klemens Eiter | CFO | ~2022 (about 3.5 years at late 2025) | Long-time PORR finance executive (detail n/d) | ~EUR 1.28m (FY2024) |
Josef-Dieter Deix | COO, Member of the Executive Board | Appointed 26 Mar 2025 | More than 25 years at PORR; management of PORR Bau GmbH since 2020; age 53 at appointment | n/d (joined 2025) |
Dušan Čížek | Member of the Executive Board; CEO PORR CZ & SK | ~2025 (less than one year per Simply Wall St, late 2025) | Head of the Czech/Slovak business | — |
(Former) Jürgen Raschendorfer | COO | Resigned 2025 | — | ~EUR 1.13m (FY2024) |
Board of Directors
| Name | Role | Since | Notes |
|---|---|---|---|
Iris Ortner (Ortner-Winischhofer) | Chair; chairs the Nomination, Remuneration and Sustainability Committees | Member since 2010; Chair since 30 Apr 2024 | Managing Director of IGO Industries; ETH Zurich mechanical engineering; INSEAD MBA. Not independent of the major shareholder |
Karl Pistotnik | Deputy Chair | Chair until Apr 2024; Deputy since 30 Apr 2024 | Classified independent (Simply Wall St); age about 81 |
Klaus Ortner | Member | Since 1998 | Former Chair/Deputy; IGO founder generation |
Henrietta Egerth | Member | Elected AGM 2026 (per trend.at) | Managing Director of FFG (Austrian Research Promotion Agency); innovation, research and sustainability |
Axel Melchior | Member | Elected AGM 2026 (per trend.at) | Former ÖVP Secretary General; authorised officer at IGO Industries since early 2026 |
Other shareholder representatives | Members | Various | Several classified independent (tenures of about 11–13 years) |
Employee representatives | Members (works council delegation, one-third of the board) | Various | — |
Major Shareholders
| Holder | Stake | Source / date |
|---|---|---|
Syndicate (IGO Industries Group + Strauss Group) | 43.4% | After IGO's sale of 4.0% of syndicated shares, mid-2026 (Parqet / company statement) |
— of which IGO Industries (Ortner family) | ~39% in 2023 (Iris Ortner CV); current split n/d | IV Vienna CV, Aug 2023 |
— of which Strauss Group | Remainder of syndicate (n/d) | — |
Free float | 56.6% | Mid-2026 |
Treasury shares | Small; buyback of up to 392,782 shares (about 1%) running Oct 2026 – Mar 2027 | PR 8 Oct 2026 |
Competitive Landscape
Competitors by Segment
| Segment | Competitors |
|---|---|
AT / CH | STRABAG SE, Swietelsky, HABAU Group, Implenia (CH), Marti (CH), Leyrer + Graf, Granit |
DE | STRABAG (Ed. Züblin), HOCHTIEF, Max Bögl, Implenia Germany, Leonhard Weiss, Goldbeck (building) |
PL | Budimex (Ferrovial), Mirbud, Mostostal Warszawa, Unibep, Strabag Poland, Torpol, Trakcja |
CEE | Metrostav, Eurovia (Vinci), Skanska CZ/SK, Subterra, Strabag CEE |
Infrastructure International (tunnelling) | Implenia, Webuild, Vinci Construction, Hochtief/CIMIC, Strabag, Marti, Ferrovial |
Peer Comparison FY2025
| Company | Latest revenue (approx.) | Recent growth | EBIT margin (approx.) |
|---|---|---|---|
PORR (FY2025) | EUR 6.3bn | +1.7% revenue | 3.1% |
STRABAG SE (FY2024/25) | ~EUR 18–20bn output | Mid-single digit | ~5% |
Implenia (FY2024/25) | ~CHF 3.5–3.7bn | Flat to low | ~4% |
Budimex (FY2024/25) | ~PLN 8–9bn | Volatile | ~7–8% |



