GreenX Metals is an ASX-, LSE- and GPW-listed exploration company that has evolved from a Poland-focused coking coal developer (as Prairie Mining) into a European critical-minerals explorer with an exceptionally large litigation receivable. Its core equity thesis has two legs. First, an arbitration award of about £252 million (A$519 million at the FY2026 AR conversion) issued in October 2024 after tribunals found Poland breached the Australia–Poland BIT and the Energy Charter Treaty by blocking the Jan Karski coal mine; interest continues to compound (about £22 million accrued to June 2026). Second, a brownfields Kupferschiefer copper-silver project at Tannenberg in Hesse, Germany (90% owned, ~1,900 km², Exploration Target 1.3–3.9 Mt contained copper), complemented by gold-tungsten-antimony exploration at Eleonore North in East Greenland. With A$13.4 million of cash at 30 June 2026, no debt and no revenue, GreenX is effectively a funded legal-enforcement and exploration vehicle whose valuation will be set by court outcomes in London and Singapore.
Company's own description (FY2026 Annual Report, paraphrased): GreenX states that it aims to create long-term shareholder value through exploration and development of critical mineral resources across its projects, while strongly defending the set-aside motions Poland filed against its arbitration awards and subsequently enforcing those awards. Its stated principal activities during FY2026 were exploration and evaluation of its projects and defence of the award against Poland. The company has not commenced production and has not defined any JORC Ore Reserves.
Independent characterisation: GreenX is best understood as a hybrid of three distinct economic exposures:
-
A sovereign litigation receivable (dominant value driver). The company holds a final arbitral award under the Australia–Poland BIT (seated in London) of approximately £252m including pre-award interest, and a parallel ECT award (seated in Singapore) of approximately £183m; amounts paid under one are offset against the other. Post-award interest compounds annually at SONIA plus 1% (approx. 6% p.a. at November 2024 rates, per company RNS 11 Nov 2024). Poland's set-aside application against the ECT award was dismissed in full by the Singapore International Commercial Court (SICC) in January 2026; Poland's appeal was heard by the Singapore Court of Appeal in September 2026 with judgment pending; the English BIT set-aside hearing is scheduled for October 2026 (FY2026 AR). Proceeds are subject to deductions to the litigation funder (Litigation Capital Management, LCM) under a 2020 Litigation Funding Agreement and to a 6% Management Incentive Program. The company has stated its intention to return the majority of cash received to shareholders.
-
Copper-silver exploration in Germany (Tannenberg). A brownfields Kupferschiefer project in the historic Richelsdorf mining district, 90% held via Group 11 Exploration GmbH.
-
Critical minerals/gold exploration in Greenland (Eleonore North). 100% held licences (four licences, ~2,100 km²) prospective for reduced intrusion-related gold systems (RIRGS), tungsten and antimony.
Business model / revenue model: No product, service, subscription or licensing revenue. "Income" consists of interest on cash (FY2026: A$0.308m), cost recoveries (FY2026: A$1.592m of arbitration costs recouped from Poland) and, historically, arbitration funding income (FY2025: A$0.252m). The model is: (a) raise equity to fund exploration and legal defence; (b) monetise the award (by payment, settlement or enforcement); (c) potentially advance projects to resource definition and transaction.
Value chain position: Upstream, early-stage exploration (pre-resource). No processing, marketing or offtake.
Customer types / end-markets: None currently. Prospective end-markets for future products: copper and silver (electrification, grids, EVs), tungsten (defence, tooling, industrial), antimony (defence, flame retardants, solar glass), gold (monetary/jewellery). The company frames copper, tungsten and antimony as EU/US critical or strategic raw materials (FY2026 AR).
Strategy
Stated strategy (FY2026 AR, paraphrased): Create long-term shareholder value through discovery, exploration, development and acquisition of viable mineral deposits, while defending the set-aside motions and enforcing the award against Poland in the short to medium term. Four stated medium-to-long-term priorities:
-
Strongly defend the set-aside motions and prepare to enforce the ECT award;
-
Continue Tannenberg exploration, including an initial drill program to verify historical estimates and underpin a JORC Mineral Resource;
-
Continue Eleonore North exploration following receipt of 2026 field results;
-
Identify and assess other resource-sector opportunities.
Capital return intent: The company has repeatedly stated that, upon satisfaction of the award, it intends to return the majority of the cash to shareholders (GreenX RNS, January 2025).
Strategic initiatives in the last 24 months:
ESG/cost programs, medium-term financial targets or guidance: None published.
Products & Services
GreenX sells no products or services. Its "portfolio" consists of mineral projects and a legal asset. Each is catalogued below.
Tannenberg Copper Project (Germany) — flagship exploration asset
| Tannenberg Exploration Target zone | Tonnage range | Contained Cu range | Contained Ag range |
|---|---|---|---|
| Zone 1 | 8–16 Mt | 0.1–0.2 Mt | 3.9–10.8 Moz |
| Zone 2 | 40–78 Mt | 0.4–1.1 Mt | 19.3–52.7 Moz |
| Zone 3 | 96–186 Mt | 0.9–2.6 Mt | 46.3–125.6 Moz |
| Total | 144–279 Mt | 1.3–3.9 Mt | 69.4–188.4 Moz |
Description: Large, relatively shallow, potentially high-grade brownfields copper-silver project in the Richelsdorf district, central Germany, on the Basal Zechstein (Kupferschiefer) trend. K+S potash mines operate ~4 km from the licence area.
Tenure: Tannenberg 1 and Tannenberg 2 exploration licences, ~1,900 km² (expanded ~7-fold since the 2024 agreement).
Historical production: The Richelsdorf mines produced about 416,500 t copper and 33.7 Moz silver prior to closure in the 1950s; three mines (Reichenberg, Wolfsberg, Schnepfenbusch) were within the licence area.
Historical estimates (non-JORC): 1940 Mansfeld AG estimate of 728,000 t contained copper at 2.6% Cu (shale only, 18 of 95 drill holes); 1984 St Joe estimate of ~169,000 t Cu and 6.5 Moz Ag at ~2.1% Cu and ~25 g/t Ag in part of Zone 3, with mineralisation up to 3.45 m thick.
JORC Exploration Target (28 May 2026): 144–279 Mt at 0.9–1.4% Cu and 15–21 g/t Ag for 1.3–3.9 Mt Cu and 69–188 Moz Ag (conceptual; competent person MSA Mining Consulting UK).
Metallurgy: June 2026 mineralogy study (SGS Lakefield, reviewed by MSA-UK) found chalcocite-dominant mineralisation consistent with Polish Kupferschiefer ores and amenable to conventional flotation, with a bi-modal (coarse and very fine) sulphide grain size requiring fine grinding.
Next steps: Underground access assessment, data digitisation, seismic evaluation/survey (H2 2026), initial drilling program.
Target customer: Copper concentrate smelters (prospective). Pricing model: Not applicable.
Source: FY2026 AR. Grade ranges 0.9–1.4% Cu, 15–21 g/t Ag (total).
Eleonore North (Greenland) — gold, tungsten, antimony
Description: Ymer Island area, East Greenland; four licences totalling ~2,100 km² within a 160 km structural corridor that also hosts the Malmbjerg molybdenum porphyry (~60 km SE).
Prospects: Noa Pluton (RIRGS bulk-tonnage gold/antimony target); North Margeries (Sb-W); South Margeries (W).
Historical estimates (non-JORC): North Margeries 83 kt at 4.6% Sb and 32 kt at 1% W; South Margeries 58 kt at 3.2% W.
2026 work: Bulk samples (50–100 kg) for metallurgical sighter testwork; RIRGS specialist mapping at Noa; hyperspectral-derived targets (2000 HyMap survey reprocessed by TheiaX); reconnaissance at new licences. Results pending.
Acquisition terms: Acquired from Greenfields Exploration (option July 2023, revised and completed July 2024); A$1m deferred consideration shares issued January 2026; A$250k shares payable on grant of MEL 2026-124.
Arctic Rift Copper (Greenland) — being exited
Description: 5,774 km² special exploration licence in eastern North Greenland targeting native copper and sediment-hosted copper; earn-in to 80% by spending A$10m by October 2026.
Status: JV being wound up and licence relinquished (expected H2 2026); asset fully impaired (A$4.415m) in FY2026.
Arbitration award against Poland — the dominant "asset"
| Component | Amount | Notes |
|---|---|---|
| BIT award (London seat), incl. pre-award interest | ~£252m (A$519m / PLN 1.2bn at FY2026 AR rates) | Interest at SONIA +1% compounded annually from 31 Dec 2019 to award date |
| ECT award (Singapore seat) | ~£183m (A$378m / PLN 900m at FY2026 AR rates) | Payments under one award offset the other |
| Post-award interest accrued Oct 2024–Jun 2026 | ~£22m (A$43m) | Continues to compound annually |
| Current annual interest accrual | ~£12m (A$26m) per annum | FY2026 AR (FY2025 AR stated ~£14m p.a.) |
| Implied gross claim value at 30 Jun 2026 | ~£274m | Derived: £252m + £22m |
| Original claim | £806m (A$1.5bn) | BIT Statement of Claim, June 2021 |
| Deductions from proceeds | LCM funder return (terms not fully quantified in sources reviewed); 6% Management Incentive Program | MIP per FY2026 AR |
Financial Narrative
Data provenance: FY2025 and FY2026 from the FY2026 Annual Report (audited). Where aggregators conflicted, the conflict is noted.
Income statement
Sources: FY2026 AR; Kalkine/Stockopedia (FY2022–FY2024).
Gross profit, operating income, EBITDA, margins, revenue CAGR: Not applicable (no revenue). EBITDA can be approximated as operating loss before impairment; for FY2026 this is roughly -A$8.2m excluding interest income and the ARC impairment (derived, not company-reported).
EPS:
Commentary: The loss doubled in FY2026, but the increase is driven by three items that are either non-cash or one-off: the A$4.4m ARC impairment, a ten-fold increase in share-based payments (A$1.4m) following new option grants, and a tripling of expensed exploration as Tannenberg moved into technical work. Arbitration costs remained ~A$3.3m — the company notes the set-aside defence is unfunded by LCM — but were partly offset by A$1.6m recovered from Poland. Underlying cash burn is better measured by operating cash flow below.
Balance sheet
Sources: FY2026 AR (FY2025–FY2026); Stockopedia/Kalkine (FY2022–FY2024). Equity for FY2022–FY2024 derived as total assets minus total liabilities.
Data conflict: One Kalkine dataset shows FY2023 cash of A$4.175m alongside an end-of-period cash flow figure of A$8.675m; Stockopedia shows A$8.68m. The A$8.675m figure is used as it reconciles to the cash flow statement.
Debt: No bank debt. "Other financial liabilities" of A$0.631m at 30 June 2026 (current A$0.264m, non-current A$0.367m) relate to non-borrowing obligations (likely leases/deferred consideration; nature not fully detailed in the excerpt reviewed). Goodwill and intangibles: nil.
Equity movement FY2026: Contributed equity rose from A$95.19m to A$113.96m (share issues A$18.79m less A$0.71m costs plus A$0.69m SBP transfer), reflecting the A$13.6m placement, Tannenberg/Eleonore consideration shares and 3.44m option exercises. Accumulated losses reached A$103.95m.
Cash flow
Sources: Kalkine (FY2022–FY2025); FY2026 derived by converting the AR's PLN cash-flow disclosures back to A$ at the stated average rate of 2.4813 AUD:PLN (operating PLN -15.498m; investing PLN -1.746m ≈ A$-0.704m; financing PLN 33.599m). FY2026 net change derived from reported cash balances.
Investing / capex and free cash flow: FY2025 investing outflow ≈ A$2.544m (PLN 6.422m ÷ 2.5244); FY2026 ≈ A$0.704m. Derived FCF (OCF + investing): FY2025 ≈ -A$6.10m; FY2026 ≈ -A$6.95m. Aggregator FCF for earlier years: FY2022 -A$4.44m, FY2023 -A$4.85m, FY2024 -A$5.12m (Kalkine). Data conflict: Kalkine's LSE-labelled page shows FY2022 operating cash flow of -A$2.802m vs -A$2.371m on its ASX page; the ASX page is used.
Commentary: Cash burn has risen steadily from ~A$2.4m p.a. operating outflow (FY2022) to ~A$6.2m (FY2026), as unfunded legal defence costs and German/Greenlandic exploration overlap. The company has funded this entirely with equity (A$37m cumulative financing inflows over five years). At the FY2026 burn rate and planned drilling at Tannenberg, the A$13.4m cash balance implies roughly 18–24 months of runway before further capital is needed, absent award proceeds (derived estimate).
Ratios
All ratios derived by the analyst from the tables above using average equity/assets (FY2021 equity A$5.68m and total assets A$8.11m from Stockopedia used as the FY2022 opening base). ROIC, net debt/EBITDA, interest coverage, asset turnover and cash conversion cycle are not meaningful for a debt-free, pre-revenue explorer.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Asset grouping
| Asset grouping | Contents | Ownership | Status (Oct 2026) | Accounting treatment |
|---|---|---|---|---|
Arbitration claim vs Poland | BIT award (London seat) and ECT award (Singapore seat) re Jan Karski | 100% (via Australian parent and UK subsidiaries; subject to LCM funder entitlement and 6% MIP) | Award final subject to set-aside proceedings; SICC dismissed ECT challenge Jan 2026; Court of Appeal judgment pending; English BIT hearing Oct 2026 | Not recognised as an asset; costs expensed (FY2026 arbitration expense A$3.289m) |
Tannenberg Copper Project (Germany) | Tannenberg 1 & 2 exploration licences, ~1,900 km², Hesse; held by Group 11 Exploration GmbH | 90% | Exploration Target defined; drilling planned | Exploration and evaluation asset (capitalised acquisition cost); exploration spend expensed |
Eleonore North (Greenland) | Four licences (~2,100 km²) including MEL 2023-39 (Noa Pluton) and MEL 2018-19 (Margeries); new MEL 2026-124 and one further licence | 100% | 2026 field season completed; assays pending | E&E asset; exploration expensed |
Arctic Rift Copper (Greenland) | 5,774 km² special exploration licence | JV interest (earn-in to 80%) | Being relinquished; JV being wound up (H2 2026) | Fully impaired FY2026 (A$4.415m) |
Legacy Poland | Jan Karski (Lublin Coal Basin), Dębieńsko, Kaczyce | Relinquished | Subject of arbitration only | Nil; residual environmental obligations noted as a risk |
Results by Segment
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Revenue from customers – all segments (AUD Mn) | 0 | 0 | 0 |
Interest income – corporate (AUD Mn) | 0.451 | 0.245 | 0.308 |
Key Financials
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue from customers (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Interest income (AUD Mn) | 0.262 | 0.313 | 0.451 | 0.245 | 0.308 |
Net loss after tax (AUD Mn) | -3.657 | -3.525 | -4.554 | -6.022 | -12.340 |
Net loss attributable to owners (AUD Mn) | -3.657 | -3.525 | -4.552 | -6.015 | -12.205 |
Income Statement
| Line item | FY2025 | FY2026 |
|---|---|---|
Interest income (AUD Mn) | 0.245 | 0.308 |
Other income incl. cost recoveries (AUD Mn) | 0.279 | 1.592 |
Exploration and evaluation expenses (AUD Mn) | -0.723 | -2.243 |
Employment expenses (AUD Mn) | -0.968 | -0.913 |
Administration and corporate (AUD Mn) | -0.820 | -0.903 |
Occupancy (AUD Mn) | -0.404 | -0.521 |
Business development (AUD Mn) | -0.416 | -0.583 |
Share-based payments (AUD Mn) | -0.137 | -1.373 |
Arbitration related expenses (AUD Mn) | -3.078 | -3.289 |
E&E asset impairment (AUD Mn) | 0 | -4.415 |
Net loss (AUD Mn) | -6.022 | -12.340 |
Per-Share Data
| Metric | FY2025 | FY2026 |
|---|---|---|
Basic and diluted loss per share (A$ cents) | -2.14 | -4.10 |
Balance Sheet
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Cash and equivalents (AUD Mn) | 6.107 | 8.675 | 7.171 | 6.826 | 13.417 |
Total current assets (AUD Mn) | 8.26 | 8.88 | 7.36 | 7.386 | 13.963 |
Exploration and evaluation / non-current assets (AUD Mn) | 7.43 | 8.87 | 9.66 | 10.900 | 7.894 |
Total assets (AUD Mn) | 15.7 | 17.9 | 17.2 | 18.286 | 21.857 |
Total current liabilities (AUD Mn) | 3.05 | 1.71 | 1.78 | 3.659 | 3.130 |
Total liabilities (AUD Mn) | 3.87 | 2.22 | 2.06 | 3.963 | 3.780 |
Total equity (AUD Mn) | 11.83 | 15.68 | 15.14 | 14.323 | 18.077 |
Working capital (AUD Mn) | 5.21 | 7.17 | 5.58 | 3.727 | 10.833 |
Total borrowings (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Net cash (AUD Mn) | 6.107 | 8.675 | 7.171 | 6.826 | 13.417 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | -2.371 | -2.599 | -3.490 | -3.557 | -6.246 |
Financing cash flow (AUD Mn) | 5.745 | 9.147 | 3.618 | 4.434 | 13.541 |
Net change in cash (AUD Mn) | 1.332 | 2.568 | -1.504 | -0.344 | 6.591 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROE (%) | -41.8 | -25.6 | -29.5 | -40.9 | -76.2 |
ROA (%) | -30.7 | -21.0 | -25.9 | -33.9 | -61.5 |
Current ratio (x) | 2.71 | 5.19 | 4.13 | 2.02 | 4.46 |
Debt to equity (x) | 0 | 0 | 0 | 0 | 0 |
Geographic Revenue
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Revenue – Europe (AUD Mn) | 0 | 0 | 0 |
Revenue – Greenland (AUD Mn) | 0 | 0 | 0 |
Revenue – Australia (AUD Mn) | 0 | 0 | 0 |
Share Price & Returns
| Period | Return (%) |
|---|---|
1 month | -3.92 |
3 months | 0.00 |
Year to date | 15.29 |
1 year | 26.45 |
3 years | 10.11 |
5 years | 206.25 |
Capital Markets
| Item | Status |
|---|---|
Analyst consensus | Not covered by a major broker (MarketIndex) |
Dividend history | None paid; no dividend policy |
Capital return intent | Majority of award proceeds to be returned (company statements) |
Credit ratings | None (no debt) |
Recent equity raises | A$13.6m at A$0.85 (Feb 2026); FY2025 financing inflow A$4.4m |
Share Price
| Metric | FY2022 | FY2024 | FY2026 |
|---|---|---|---|
Share price reference point (AUD) | 0.32 | 0.89 | 0.98 |
Analyst Conclusions
Management guidance: No financial guidance. Operational guidance: Singapore Court of Appeal decision pending; English BIT set-aside hearing October 2026; preparation for enforcement; Tannenberg seismic survey (H2 2026, subject to assessment) and initial drilling "in the coming months"; Eleonore North 2026 assay results; ARC wind-up in H2 2026.
Consensus: None available.
Bull case:
-
Legal endgame is near and trending favourably. Poland lost every objection before the SICC, has already paid a court costs order, and has no further Singapore appeal after the Court of Appeal. A dismissal plus an English rejection would leave a final, enforceable award of ~£274m and rising, against an EV of roughly half that in A$ terms.
-
Settlement optionality. Management has publicly invited settlement since November 2024; the political context in Poland has changed since the 2018 refusal, and continued litigation costs Poland ~£12m a year in interest.
-
Free exploration upside. If the award is substantially collected and largely distributed, residual equity retains a 90% stake in a brownfields European copper project with a JORC Exploration Target of up to 3.9 Mt Cu, plus high-grade W/Sb/Au targets in Greenland.
Bear case:
-
Binary legal risk. An English set-aside of the BIT award would leave only the smaller ECT award (~£183m), and an adverse Court of Appeal ruling would jeopardise even that.
-
Collection risk against a sovereign. EU member states have resisted intra-EU treaty awards; enforcement could take years, during which cash burn (~A$6–7m p.a.) forces further dilution.
-
Leakage and exploration risk. LCM's return, the 6% MIP and taxes reduce shareholder proceeds; Tannenberg remains conceptual (historical, non-JORC data) and ARC's write-off shows exploration capital can be lost.
Catalysts and monitorables (next 12 months):
-
Singapore Court of Appeal judgment;
-
English High Court decision on the BIT set-aside;
-
Commencement of enforcement actions, or settlement talks;
-
Tannenberg seismic and first drill results;
-
Eleonore North assays and metallurgical sighter results;
-
Cash runway and any further placement;
-
Expiry/exercise of 4.0m A$0.55 options (30 Nov 2026).
Analyst verdict:
GreenX Metals is no longer the coal developer that the "Prairie Mining / PDZ" identifiers describe; it is a debt-free, three-exchange-listed vehicle whose value rests overwhelmingly on a sovereign arbitration award, with a credible but early-stage European copper project as a long-dated option. The financial statements tell a simple story: no revenue, rising but manageable cash burn (around A$6–7 million a year), A$13.4 million of cash and no debt at 30 June 2026. Conventional profitability and valuation metrics are irrelevant.
The legal record is the investment case. Two tribunals found Poland liable over Jan Karski; the Singapore court dismissed Poland's ECT challenge comprehensively in January 2026, rejecting the intra-EU objection that has historically been the strongest state defence; and Poland has paid the resulting costs order. The final Singapore appeal (heard September 2026) and the English BIT hearing (October 2026) are therefore the defining near-term events. Set-aside thresholds in both jurisdictions are high, and the January ruling makes a reversal in Singapore unlikely, though not impossible. The English proceedings are a separate risk and bear directly on whether the larger BIT figure survives.
Even a clean sweep in court does not equal cash. Enforcement against an EU sovereign can be slow, and funder returns and the 6% management pool reduce what reaches shareholders. Against that, interest of about £12 million a year compounds in GreenX's favour, which strengthens the incentive for a negotiated settlement.
On a derived basis, the market capitalisation implies a meaningful discount to the gross claim, suggesting investors price a substantial but not certain recovery and attribute modest value to Tannenberg and Eleonore North. For investors comfortable with binary legal outcomes, GreenX offers asymmetric exposure over the next six to twelve months; for those who are not, the governance concentration, dilution history and pre-resource exploration profile argue for waiting until the court decisions are known.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Background / qualifications |
|---|---|---|---|
Ian Middlemas | Non-Executive Chairman | 25 Aug 2011 | B.Com, CA; ~10 years as senior executive at Normandy Mining; current director of Sovereign Metals, Berkeley Energia, Apollo Minerals, Constellation Resources, NGX, Odyssey Gold, Equatorial Resources, GBM Resources, Salt Lake Potash (receivers appointed) |
Benjamin Stoikovich | Executive Director & CEO | Director 17 Jun 2013 | B.Eng (Mining, UNSW), M.Eng (Environmental, Wollongong), M.Sc Mineral Economics (Curtin); CEng, CEnv; former BHP Billiton longwall coal engineer; London investment banking (M&A, debt and offtake finance); director of Sovereign Metals |
Garry Hemming | Non-Executive Director; Audit Committee member | 6 Oct 2021 | BAppSc (Applied Geology), MAusIMM, FGS; discovery/feasibility experience (Yilgarn Star, Acoje Ni-PGE) |
Mark Pearce | Non-Executive Director; Audit Committee Chair | 25 Aug 2011 | B.Bus, CA, FCIS, FFin; director of Sovereign Metals, Constellation Resources, NGX, Equatorial Resources, Zinc of Ireland; director and beneficial shareholder of Apollo Group (service provider) |
Simon Kersey | Chief Financial Officer | — | Engaged via Cheyney Resources Limited consultancy |
Dylan Browne | Company Secretary | 25 Oct 2012 | B.Com, CA, AGIA; employee of Apollo Group; led 2015 LSE/GPW listings |
“—” = not publicly disclosed.
Directors' Remuneration
| Name | Salary & fees | Super | Share-based payments | Total FY2026 | Total FY2025 |
|---|---|---|---|---|---|
Ian Middlemas | 36,000 | 4,320 | 0 | 40,320 | 40,140 |
Benjamin Stoikovich | 493,109 | 0 | 218,460 | 711,569 | 512,229 |
Garry Hemming | 60,080 | 0 | 0 | 60,080 | 60,080 |
Mark Pearce | 20,000 | 2,400 | 108,159 | 130,559 | 27,423 |
Simon Kersey | 315,225 | 0 | 102,412 | 417,637 | 326,370 |
Dylan Browne | 0 | 0 | 103,204 | 103,204 | 4,870 |
Total KMP | 924,414 | 6,720 | 532,235 | 1,463,369 | 971,112 |
Major Shareholders
| Holder | Shares | % | Source |
|---|---|---|---|
CD Capital Natural Resources Fund III LP | 50,487,925 | 18.10 (as notified) | FY2026 AR substantial holder notice |
Ian Middlemas | 11,660,000 | ~3.9 (derived) | FY2026 AR |
Mark Pearce | 2,943,113 | ~1.0 (derived) | FY2026 AR |
Benjamin Stoikovich | 2,047,995 | ~0.7 (derived) | FY2026 AR |
Dylan Browne | 629,208 | ~0.2 (derived) | FY2026 AR |
Simon Kersey | 171,441 | ~0.1 (derived) | FY2026 AR |
Competitive Landscape
Key Competitors
| Peer | Segment overlap | Position vs GreenX |
|---|---|---|
KGHM Polska Miedź | Kupferschiefer copper (Poland) | Integrated producer; processing analogue for Tannenberg (~30 Mtpa at ~1.6% Cu) |
Lumina Metals (Nowa Sól) | Kupferschiefer Cu-Ag (Poland) | PEA-stage developer, further advanced than Tannenberg |
KSL Kupferschiefer Lausitz (Spremberg) | Kupferschiefer copper (Germany) | Advanced German Kupferschiefer project |
Amaroq Minerals | Greenland gold | Producer/developer in South Greenland; larger scale |
Greenland Resources | Malmbjerg molybdenum (same corridor as Eleonore North) | Development-stage neighbour |
Critical Metals Corp (Tanbreez) | Greenland critical minerals | Rare-earths developer; competes for Greenland investor capital |
Bluejay Mining / GreenRoc | Greenland exploration | Small-cap Greenland explorers |
Almonty Industries | Tungsten | Producer/developer; benchmark for tungsten valuation |
Larvotto Resources / Perpetua Resources | Antimony | Antimony developers benefiting from supply concerns |
Rockhopper Exploration | Litigation asset (ECT award vs Italy) | Closest "treaty award equity" analogue |