Company ProfilePremium

Renascor Resources Limited

Company Profile Analysis

Ticker: RNU.AX

ESOMAR 23 Corporate BadgeISO Certifications Badge
Renascor Resources Limited - Company showcase

Year Founded & Workforce

2009

Renascor Resources Limited logo

Renascor Resources Limited Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

Renascor Resources Limited Overview

Renascor Resources is a pre-revenue, Adelaide-based developer of a vertically integrated "mine-to-anode-material" graphite business that sits entirely within South Australia.

Resource base: Its core asset is the 100%-owned Siviour graphite deposit on the Eyre Peninsula. The company describes Siviour as the world's second-largest reported Proven graphite Reserve and the largest graphite Reserve outside Africa: 61.8Mt @ 7.0% TGC, or 4.3Mt contained graphite.

Downstream plan: Siviour is designed to feed a downstream Purified Spherical Graphite (PSG) facility at Bolivar, north of Adelaide.

Differentiator: Renascor uses a hydrofluoric-acid-free purification flowsheet. In October 2026 its Adelaide demonstration plant produced 99.97% C battery-grade PSG at demonstration scale.

Balance sheet: About A$94M in cash and no debt, plus a conditionally approved A$185M Australian Government loan.

Commercial gap: The company has not secured binding offtake or a final investment decision (FID). It trades at roughly 0.75x book value.

Market headwind: Chinese spherical graphite is priced around US$1,600/t, far below the US$4,150–5,035/t PSG price deck in its 2023 feasibility study.

The equity is a call option on Western supply-chain policy converting into commercial PSG contracts. Renascor is adding a Marree copper–uranium exploration option at low cost.


Company's own description (paraphrased from the FY2026 Annual Report)

The FY2026 Directors' Report presents Renascor as an ASX-listed, South Australian company with two strands:

  • developing its integrated BAM Project in South Australia; and

  • advancing a portfolio of exploration opportunities, led by the Marree copper and uranium project.

The BAM Project has three components:

  1. The Siviour Graphite Deposit.

  2. A conventional open-pit mine with a crush-grind-float concentrator. The company expects low operating costs because the deposit is near-surface and flat-lying.

  3. A downstream BAM production facility. Here graphite concentrate is converted into PSG with an "eco-friendly" HF-free process, then exported to lithium-ion battery anode manufacturers.

The Chairman's letter states the company's view of its advantage. It combines low-cost feedstock from Siviour with a purification process designed for competitive cost and better environmental performance. Management sees this as a route to becoming one of the most competitive PSG suppliers outside China. The letter also positions Australian PSG as an entry point into existing anode supply chains run by established (largely Japanese and Korean) anode makers.

Independent characterisation

Renascor is best understood as a development-stage project company with no operating revenue. Its income statement is driven almost entirely by interest earned on cash raised in 2022 (~A$136M gross across two placements).

Business model (prospective): Upstream extraction of natural flake graphite feeds downstream value-add: micronisation, spheronisation and HF-free purification into PSG of at least 99.95% C.

Customer split: The 2023 BAM Study modelled sales of three products:

  • PSG to anode manufacturers (most of the value);

  • a fines by-product into the fine-flake market; and

  • interim sales of graphite concentrate before each PSG stage is commissioned.

Value-chain position. Renascor targets the mid-stream "PSG" link, between flake mining and coated active anode material (AAM) manufacturing. It does not currently plan to coat or carbonise anode material itself; that step stays with its customers. This is a deliberate choice:

  • it avoids the capital intensity and customer-qualification burden of full AAM production (the route taken by Syrah at Vidalia and Talga in Sweden);

  • but it leaves Renascor exposed to PSG pricing, which China dominates.

Revenue model mix (current). 100% interest income. Product sales, services, subscription and licensing revenue are nil. The company licenses its purification process from Dorfner ANZAPLAN (agreement of 10 August 2023); it is a licensee, not a licensor.

Customer types and end-markets (prospective):

Customers: lithium-ion battery anode manufacturers in Northeast Asia, Europe and North America. All non-binding MOU counterparties are anode makers or trading houses: POSCO, Mitsubishi Chemical, Hanwa, Jiangxi Zhengtuo (Zeto) and Shanxi Minguang.

End-markets: electric vehicles and stationary energy storage.

By-product: conventional flake-graphite markets (refractories, etc.).

Second business line (option value). Exploration across South Australia:

  • Marree/Flat Hill — sediment-hosted copper;

  • Mulgaria and Wooltana — uranium;

  • Olary/Bulloo Creek — cobalt–copper, gold;

  • Tumby Bay — rare earth elements.

Spend here is modest: A$0.89M of exploration and evaluation payments in FY2026.

Strategy

Stated strategy (paraphrased themes, FY2026 AR and FY2026 announcements)

  1. Integrated mine-to-PSG in Australia. Pair Siviour's low-cost feedstock with downstream HF-free PSG to offer anode makers a secure, competitive ex-China supply.

  2. Technology differentiation. Validate HF-free purification at scale. The company sees cost and environmental advantages over HF-based Western flowsheets: lower reagent cost, reagent recycling, and less hazardous handling.

  3. Commercialisation sequence. Validate the process, then produce qualification material, then secure binding offtake and strategic partners, then finance, then FID.

  4. Partnering model. Supply established anode manufacturers rather than build AAM capacity, while keeping mining and purification in Australia.

  5. Government alignment. Engage Australian and US agencies on critical-minerals security. Use the A$185M Critical Minerals Facility loan and seek further government-backed funding.

  6. Second growth leg. Build the Marree copper–uranium exploration opportunity at modest cost.

Initiatives in the last 24 months (Oct 2024 – Oct 2026)

InitiativeDateDetailStatus
ECI on upstream plantJun 2024 – Mar 2025GR Engineering and Primero competitive ECI; executable EPC frameworkCompleted; capex +2.8% (to ~A$220.5M, derived from A$214.5M)
PSG demonstration facilityJul 2024 – Oct 2026A$5M Commonwealth grant (International Partnerships in Critical Minerals)Built on budget; 99.97% C PSG produced
Purification cost study9 Jul 2026US$459/t purification opex; benchmarked against Western HF-based methods (GraphiteHub report)Completed
Bolivar development approvalJun 2025Provisional development authorisation for the commercial PSG facilityGranted
Upstream readinessFY2026Groundwater drilling, pump tests, hydrogeological and geotechnical work; power and site-enabling planning; Cleve accommodation optionOngoing
Bulk concentrate programFY2026730t ore processed at a third-party plant; 96.8% C at 96.5% recoveryCompleted
Exploration diversificationJul 2025 – Oct 2026Vintage farm-in (Mulgaria/Wooltana); Flat Hill copper review; VTEM survey; Marree native title agreementDrill targeting stage
Demo campaignsQ4 CY2026 – Mar 2027Batch trials on Siviour graphite, then multi-tonne continuous runs with reagent and water recycling; feedstock secured through the March 2027 quarterIn progress

ESG commitments

  • Zero lost-time injuries through construction and commissioning (FY2026).

  • An Environmental and Social Management System aligned to global mining standards is being developed.

  • Life Cycle Assessment completed (Nov 2023).

  • Climate risk assessments completed for operations and transport routes.

  • Solar PV behind-the-meter supply planned at Siviour, under a build-own-operate-maintain power purchase agreement (BAM Study).

Guidance and medium-term targets

Milestone (2023 BAM Study)Target dateStatus
Upstream MPP FIDQ4 2023Not achieved
First graphite concentrateQ1 2025Not achieved
PSG FIDQ3 2024Not achieved
First PSGQ2 2026Not achieved

No financial guidance is issued. The last published schedule, in the 2023 BAM Study, was:

All four have lapsed, and no replacement timetable has been published.

Products & Services

Renascor has no commercial products on sale. The catalogue below lists its planned products as specified in the 2023 BAM Study and later updates.

Purification cost build-up (US$/t PSG, 2026 dollars; source: Q4 FY26 Quarterly, Table 1)

This estimate covers purification only. It excludes spheronisation, logistics and financing, and assumes AUD/USD 0.70.

Integrated BAM Study cost stack (2023 DFS-level, US$/t)

Source: BAM Study, 8 Aug 2023. The study states that Renascor's market data put average opex at existing commercial PSG operations (all in China) at about US$2,000/t.

Product Portfolio

ProductDescription and specificationTarget customerStatus / "launch"Pricing modelSource

Primary PSG (D50 ≈ 16 µm)

Spheronised natural flake graphite purified to ≥99.95% C via HF-free flowsheet: sulfuric acid leach → low-temperature caustic bake → dilute acid leach → water treatment with caustic recovery. Lab results up to 99.99% C; demo-plant result 99.97% C (Oct 2026).

Large-scale Li-ion anode manufacturers (high-volume EV anodes)

Demonstration scale only; commercial launch targeted after FID (date not disclosed)

Negotiated, no exchange reference price. BAM Study used a Fastmarkets deck rising from US$4,150/t (2024) to US$5,035/t (2033), averaging US$4,716/t.

BAM Study (8 Aug 2023); 7 Oct 2026 release

Fine PSG products (D50 ≤ 10 µm; "PSG10")

Finer spherical fractions from multi-stream milling; lifts milling yield from ~50% to ~65%

High-performance or specialty anode applications

Demonstration / pilot

Negotiated

BAM Study

Fines by-product (un-purified)

Fine graphite from the spheronisation stage, sold into the flake market

Industrial graphite buyers

Test samples supplied to customers

Forecast US$432–790/t (avg US$650/t over 10 years)

BAM Study

Graphite concentrate

~95% TC flotation concentrate. ECI target is 95.3% C at 96.7% recovery; bulk program achieved 96.8% C at 96.5% recovery. Larger flake (>150 µm) share raised from 17% to 27% after ECI.

Internal feedstock; interim third-party sales before each PSG stage

Bulk samples produced at a third-party commercial plant

Market-linked; BAM Study referenced US$640/t for −195 mesh (Aug 2023)

BAM Study; ECI release (28 Mar 2025); FY2026 AR

HF-free purification process (technology)

Licensed from Dorfner ANZAPLAN; integrated water treatment and reagent recycling; purification opex ~US$459/t (2026 US$) at an assumed 50ktpa reference design

Internal use. Not offered for licence by Renascor.

Validated at demonstration scale (Oct 2026)

—

Licensing announcement (10 Aug 2023); cost study (9 Jul 2026)

Cost componentUS$/t

Reagents

121

Energy

115

Labour

79

Maintenance

74

Other (water treatment, laboratory, G&A)

70

Total purification opex

459

MetricFirst 10 yearsLife of mine

Graphite concentrate opex

405472

Gross PSG opex

1,7821,846

PSG opex net of by-product credit

1,4741,452

Financial Detail

Income Statement and Per-Share Data

MetricFY2022FY2023FY2024FY2025FY2026

Operating (non-interest) revenue (AUD Mn)

0.000.000.000.080.00

Interest revenue (AUD Mn)

———4.995.05

Total revenue incl. interest (AUD Mn)

———5.065.05

Total expenses (AUD Mn)

———3.234.18

Employee benefits expense (AUD Mn)

———1.671.48

Administration and consulting (AUD Mn)

———0.970.81

Impairment of exploration (AUD Mn)

———0.001.14

Operating result excl. interest income (AUD Mn)

———-3.16-4.18

EBITDA incl. interest income (AUD Mn)

———1.970.99

Pre-tax income (AUD Mn)

-1.500.421.711.830.86

Net income (AUD Mn)

-1.500.421.711.830.86

Basic EPS (A$ cents)

-0.100.020.070.070.03

Diluted EPS (A$ cents)

———0.070.03

Dividends per share (A$ cents)

00000

Balance Sheet and Share Count (millions)

MetricFY2022FY2023FY2024FY2025FY2026

Total assets (AUD Mn)

97.47168.97171.09175.91175.37

Cash, equivalents and term deposits (AUD Mn)

74.04129.27110.02105.3994.35

— of which cash at bank (AUD Mn)

74.0489.2780.0215.3914.35

— of which term deposits / financial assets (AUD Mn)

0.0040.0030.0090.0080.00

Development asset + PP&E + E&E (AUD Mn)

22.9337.4357.7268.6679.04

— Development asset (AUD Mn)

———54.5165.28

— Property, plant and equipment (AUD Mn)

———12.3112.22

— Exploration and evaluation (AUD Mn)

———1.851.53

Goodwill and intangibles (AUD Mn)

00000

Total debt — borrowings (AUD Mn)

00000

Lease liabilities — short term (AUD Mn)

0.000.000.120.460.42

Lease liabilities — long term (AUD Mn)

0.000.000.060.330.43

Net debt (negative = net cash) (AUD Mn)

-74.04-129.27-109.84-104.60-93.50

Total liabilities (AUD Mn)

1.192.772.334.512.98

Shareholders' equity (AUD Mn)

96.28166.20168.76171.39172.39

Issued capital (AUD Mn)

114.60183.83184.07184.26184.53

Accumulated losses (AUD Mn)

-18.47-18.04-16.33-14.50-13.62

Working capital (AUD Mn)

73.30128.73110.93102.9993.71

Shares outstanding (millions)

2,1542,5392,5412,5432,546

Cash Flow

MetricFY2022FY2023FY2024FY2025FY2026

Operating cash flow (AUD Mn)

-0.970.332.712.891.68

Interest received (AUD Mn)

———5.174.15

Capex: development + PP&E + E&E (AUD Mn)

4.6014.1821.859.4414.94

— Payments for development assets (AUD Mn)

———9.3014.05

— Payments for exploration and evaluation (AUD Mn)

———0.140.89

Free cash flow (OCF − capex) (AUD Mn)

-5.57-13.85-19.14-6.55-13.25

Government grant co-funding received (AUD Mn)

———2.251.68

R&D tax incentive received (AUD Mn)

———0.001.27

Equity issued, gross (AUD Mn)

65.9172.610.000.000.00

Dividends paid (AUD Mn)

00000

Share buybacks (AUD Mn)

00000

Net change in cash and deposits (AUD Mn)

56.7655.24-19.25-4.63-11.04

Returns & Leverage Ratios (%) and Financial Ratios (x)

MetricFY2022FY2023FY2024FY2025FY2026

ROE (%)

-2.280.321.021.080.50

ROA (%)

-2.240.321.001.050.49

Current ratio (x)

62.647.650.527.142.8

Debt to equity incl. leases (x)

0.0000.0000.0010.0050.005

Cash as % of total assets (%)

76.076.564.359.953.8

Book value per share (A$ cents)

4.56.56.66.76.8

Revenue by Region and Region Margins & Growth (%)

RegionFY2024FY2025FY2026

Australia — total revenue incl. interest (AUD Mn)

—5.065.05

Americas — revenue (AUD Mn)

000

EMEA — revenue (AUD Mn)

000

APAC excluding Australia — revenue (AUD Mn)

000

Australia — YoY growth (%)

——-0.2

Per-Share Data and Margin Analysis (%)

MetricFY2022FY2023FY2024FY2025FY2026

Share price at FY end (A$ cents)

15.018.58.86.85.3

Annual share price change (%)

12123-52-23-22

Shares outstanding at FY end (millions)

2,1542,5392,5412,5432,546

Market capitalisation at FY end (AUD Mn)

323470224173135

Book value per share (A$ cents)

4.56.56.66.76.8

Price to book (x)

3.362.831.331.010.78

Basis by Period

PeriodBasisChange

Year to date (2026)

MarketScreener

−36.3%

~1 year

From 30 Jun 2025 (6.8 cents)

−25%

~3 years

From 30 Jun 2023 (18.5 cents)

−72%

~5 years

From 30 Jun 2021 (~6.8 cents, implied by FY2022's +121% move)

−25%

52-week range

Investing.com, late Sep 2026

A$0.050–0.105

Valuation Multiples

MultipleRenascorComment

Market cap

~A$130M

A$0.051 × ~2,546M

Enterprise value

~A$36M

Market cap − A$94.35M cash + A$0.85M leases

P/E (FY2026)

~150x

Not meaningful (interest-driven profit)

EV/EBITDA

n/m

EBITDA is interest-driven

EV/Sales

n/m

No sales

P/B

~0.75x

Book value A$172.4M

EV / Stage 1 NPV10 (A$1.49bn, 2023)

~2%

Implies deep market scepticism on price deck and funding

EV / contained Reserve graphite (4.3Mt)

~A$8/t

Derived

Capital Markets

ItemDetail

Analyst consensus

Covered by 1–2 analysts (Simply Wall St). No public consensus target or rating identified.

Dividend history and policy

No dividends paid or declared in FY2025 or FY2026; no dividend history identified. Dividends are not expected before production.

Buybacks

None authorised or executed.

Credit ratings (Moody's / S&P / Fitch)

Not rated.

Debt maturity profile

No borrowings. Leases only (A$0.42M current, A$0.43M non-current).

Conditional A$185M CMF loan

A$150M term + A$35M cost overrun. Undrawn; maturity and pricing not publicly disclosed.

Potential dilution

~32.1M performance rights outstanding (~1.3% of issued capital; derived from the FY2026 AR schedule). No options on issue.

Analyst Conclusions

Management guidance

There is no quantitative financial guidance. Management's FY2027 priorities (FY2026 AR; 7 Oct 2026 release):

  1. Continue batch trials on Siviour graphite during the December 2026 quarter.

  2. Move to multi-tonne continuous runs with reagent and water recycling.

  3. Produce customer qualification samples.

  4. Advance offtake and strategic-partner discussions.

  5. Progress government funding discussions, in Australia and internationally.

  6. Drill-test the Flat Hill copper targets, subject to land access.

Feedstock is secured through the March 2027 quarter. Later campaigns depend on additional material, and delays could affect timing.

Consensus growth expectations

None publicly available (sub-scale coverage).

Bull case

  1. Optionality at a discount to cash-adjusted value. EV of about A$36M buys a permitted, 40-year, 4.3Mt-reserve project carried at A$79M of capitalised cost. It comes with a demonstrated HF-free flowsheet (99.97% C) and a A$185M conditional government loan. Any binding offtake or strategic equity deal could re-rate the stock toward book value (6.8 cents) or above.

  2. Geopolitical catalyst. China's suspension of anode export controls expires in November 2026, and US anti-dumping and FEOC rules are tightening. A non-HF, Australian-sourced, FTA-eligible PSG source answers buyers' compliance needs. The claimed US$459/t purification cost undercuts the Western HF range Renascor cites.

  3. Concentrate-first de-risking. The upstream plant is ECI-matured (~A$220M) and could be largely funded by A$94M cash plus the A$185M loan. That would let Renascor sell concentrate and generate cash before committing ~A$395M to PSG, as designed in the BAM Study.

Bear case

  1. The price deck is broken. The BAM Study NPV of A$1.49bn assumed US$4,150–5,035/t PSG. Chinese spherical graphite trades around US$1,600/t, below Renascor's own gross PSG opex of US$1,782/t. Without a policy-protected premium, downstream economics fail.

  2. Chronic commercial slippage. Six years of non-binding MOUs, and every 2023 timeline missed. The board's own STI assessment concedes neither offtake nor FID was achieved. A 72% share-price decline over three years signals the market's view of execution.

  3. Funding arithmetic implies heavy dilution. About A$609M of Stage 1 capex (2023 dollars, before escalation) is roughly 4.7x market cap. With a retail-dominated register and no anchor holder, equity funding at current prices would be massively dilutive. A partner-led farm-down could transfer much of the upside.

Key catalysts and monitorables (next 12 months)

Catalyst / monitorableExpected timingWhy it matters
Batch trial results on Siviour graphite; release of customer samplesDec 2026 quarterConfirms the Oct 2026 result on Renascor's own feed
China anode export-control suspension expiry / renewal~Nov 2026Key driver of Western buyers' urgency
AGM (23 Nov 2026)Nov 2026Remuneration vote; strategy update
Multi-tonne continuous campaigns with reagent recycling1H 2027Validates the US$459/t cost claim in operation
Feedstock export approvalsThrough Mar 2027Campaign continuity beyond the March 2027 quarter
Binding offtake or strategic equity announcementNot guidedSingle most important re-rating trigger
Status and conditions precedent of the A$185M CMF loan; new government funding (Australia/US)Not guidedFunding pathway
Updated BAM Study / capex escalation / revised scheduleNot guidedRe-baselining economics to current prices and costs
Flat Hill maiden drillingSubject to land access, after the Oct 2026 native title agreementCopper optionality
Quarterly cash (next report ~30 Oct 2026)QuarterlyBurn of ~A$2.5–3.5M a quarter

Analyst verdict

Renascor has done the parts within its control competently. It has assembled:

  • a large, shallow, fully permitted graphite reserve;

  • a native-title-cleared development pathway;

  • a debt-free treasury of A$94M;

  • and, as of 7 October 2026, demonstration-scale proof that its licensed HF-free purification route reaches battery-grade 99.97% C.

The demonstration plant was delivered on budget and without lost-time injuries. That is a meaningful credibility signal for a company that has never built anything at scale.

What the company cannot yet show is a customer willing to sign. The investment case therefore turns on one variable: whether Western policy creates a durable, contractable price premium for non-Chinese PSG.

The evidence is mixed:

  • Chinese spherical graphite near US$1,600/t sits below Renascor's own 2023 estimate of gross PSG production cost.

  • The 2023 feasibility study's NPV rests on a price deck nearly three times today's Chinese spot.

  • Every milestone in that study's schedule has lapsed.

Against this, the stock sits at about 0.75x book and an EV of roughly A$36M. The market ascribes almost no value to the project beyond cash already spent, so downside from here is mostly a function of continued cash burn and the risk of a dilutive raise.

On balance, Renascor is best treated as a speculative, catalyst-driven option rather than a fundamental development story.

Rating: Speculative / Hold-to-Accumulate on specific triggers, for risk-tolerant portfolios.

Turn positive on: a binding offtake or strategic equity deal, ideally with a policy-linked price floor; or a re-baselined BAM study showing viability at realistic prices.

Turn negative on: prolonged silence on offtake through 2027, deterioration in feedstock access, or a large equity raise at current levels.

The Marree copper program is a low-cost free option, not a thesis.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleTenureBackground and education

Richard (Dick) Keevers

Non-Executive Chairman

Director since Jul 2016

Geologist on Telfer (Au-Cu), Phosphate Hill and Baal Gammon. Ex-Executive Director of Santana Minerals (Rise and Shine discovery, NZ). Former executive director of broker Pembroke Josephson Wright. Chaired Eyre Peninsula Minerals at the Siviour discovery. BSc (Geology, UNE), FAusIMM.

David Christensen

Managing Director (founder)

Director since 2009; MD since 2010

Ex-CEO of Heathgate Resources and Quasar Resources (Beverley uranium). Ex-President, Nuclear Fuels Corporation. Former attorney at Latham & Watkins (California and London). BA Cornell, JD UCLA, Fulbright Fellow (Bologna), FAusIMM.

Stephen Bizzell

Non-Executive Director

Since Sep 2010

Executive Director of Arrow Energy 1999–2010 (acquired by Shell/PetroChina for A$3.5bn). Chairman of Maas Group Holdings. Director of Savannah Goldfields and Strike Energy. Chartered Accountant. BCom (UQ).

Geoffrey McConachy

Non-Executive Director

Since Oct 2010

Geologist with 40+ years' experience. Ex-MD Exploration at Heathgate/Quasar. Co-recipient of AMEC Prospector of the Year for Four Mile. Involved in the Fosterville and Potosi discoveries. BSc (Hons), FAusIMM. Company Competent Person for exploration results.

Kathryn Presser AM

Non-Executive Director

Since 20 Jun 2024

CFO/Company Secretary of Beach Energy for 20 years. Director of AEMO, the National Reconstruction Fund Corporation and Police Credit Union. Chairs the Risk and Performance Committee of SA's Department for Energy and Mining. BA, MBA, FAICD, FCPA.

Jon Colquhoun

CFO and Company Secretary

CFO since Jul 2021

Former partner of HLB Mann Judd (Adelaide). Registered Company Auditor. BCom (Adelaide), CA.

Directors' Remuneration

KMPCash salary/feesCash bonusNon-monetarySuperannuationLong-service leavePerformance rights (SBP)Total FY2026Total FY2025

David Christensen (MD)

502,579140,00046,68730,0008,53975,126802,931818,294

Richard Keevers (Chair)

126,837——15,220——142,057140,000

Stephen Bizzell

99,666—————99,66698,000

Geoffrey McConachy

99,666—————99,66698,000

Kathryn Presser

88,970——10,676——99,64697,979

Total KMP

917,718140,00046,68755,8968,53975,126

1,243,966

1,252,273

Directors' Remuneration (Meetings held FY2026)

BodyMeetings held FY2026

Board

7

Audit & Risk Committee

3

ESG Committee

2

Remuneration Committee

2

Nomination Committee

2

Major Projects Committee

4

Directors' Shareholdings

DirectorSharesApprox. % of ~2,546M (derived)

Keevers

49,693,3241.95%

Bizzell

49,122,3831.93%

Christensen

32,886,6671.29%

McConachy

10,381,3850.41%

Presser

250,0000.01%

Total

142,333,759

~5.6%

Major Shareholders

RankHolderShares%
1

Richard Keevers

49,693,3241.95
2

IOOF Investment Services Ltd

49,185,0021.93
3

Stephen Bizzell

47,445,913*

1.86
4

Renascor Pty Ltd

40,000,000**

1.57
5

David Christensen

32,886,6671.29
6

Sarwell Pty Ltd

32,500,0001.28
7

AustralianSuper Pty Ltd

21,939,8550.86
8

Kenneth Miller

—0.76

9–10

Not publicly disclosed in retrieved sources

——

“—” = not publicly disclosed.

Competitive Landscape

Key Competitors

CompetitorSegment / assetPositioning vs Renascor

Chinese PSG/anode incumbents (BTR, Shanshan, Putailai and others)

~85–90% of global spherical graphite; >95% of synthetic anode

Set the global price floor. China spherical graphite (Shandong, SMM) ~US$1,600/t (Aug 2026).

Syrah Resources (ASX: SYR)

Balama mine (Mozambique) plus Vidalia AAM, Louisiana (11.25ktpa)

Only material ex-China producer. US$98M cash (30 Jun 2026). Commercial AAM sales targeted 2H 2026. Operating cash flow targeted from 2H 2027.

Talga Group (ASX: TLG)

Vittangi mine plus anode refinery, Sweden

Vertically integrated AAM; binding offtake (Nyobolt); EU positioning

Nouveau Monde Graphite (TSX/NYSE: NOU/NMG)

Matawinie mine plus Bécancour AAM, Québec

Larger market cap (~US$448M, Aug 2026); North American AAM

Novonix (ASX: NVX)

Synthetic graphite anode, Tennessee

Synthetic substitute for natural PSG

EcoGraf (ASX: EGR)

Epanko (Tanzania) plus HF-free purification technology

Direct technology competitor on HF-free PSG

Graphite One (TSXV: GPH)

Graphite Creek (Alaska) plus planned Ohio AAM

US domestic integrated route

NextSource Materials (TSX: NEXT)

Molo (Madagascar) plus planned anode facilities

Producing flake; downstream plans

Black Rock Mining (ASX: BKT)

Mahenge (Tanzania)

Flake concentrate supply

Quantum Graphite (ASX: QGL)

Uley 2, South Australia

In-state flake competitor

Sarytogan Graphite; Evolution Energy Minerals; Triton; International Graphite; Westwater

Various

Development-stage peers (all in Renascor's TSR peer group)

Peer Comparison FY2026

MetricRenascorSyrah ResourcesTalga GroupNouveau Monde Graphite

Stage

Pre-FID developer; demo plant

Producer (Balama) plus AAM ramp-up

Developer / AAM

Developer / AAM

Revenue

Nil (interest A$5.05M, FY26)

———

Market cap

~A$130M (15 Oct 2026, derived)

~A$232M (INN 2026 list)

~A$148M (INN 2026 list)

~US$448M (Aug 2026)

Cash

A$94M (30 Jun 2026)

US$98M (30 Jun 2026)

——

Growth

n/m

n/m

n/m

n/m

Margins

n/m

—

n/m

n/m

R&D intensity

n/m

———

Binding offtake

—

Yes (AAM customers)

Yes (Nyobolt)

—

Recent Developments

No disclosed events in: * guidance revisions, litigation, regulatory enforcement, layoffs or restructurings.

Company Snapshot

2009

Founded

Adelaide, Australia

Headquarters

SWOT Analysis

Strengths

  • World-scale, shallow reserve. 61.8Mt @ 7.0% TGC (4.3Mt contained) in Reserves and 123.6Mt @ 6.9% (8.5Mt) in Resources. Mineralisation starts 5–15m below surface (FY2026 AR; BAM Study).
  • Permitting maturity. ML (Apr 2019), PEPR for 1.65Mtpa ore (Nov 2022), desalination approval (Dec 2021), registered ILUA (Aug 2024) and Bolivar provisional approval (Jun 2025).
  • Demonstration-scale technical proof. 99.97% C PSG through the integrated HF-free circuit (7 Oct 2026). Lab results up to 99.99% C.
  • Competitive purification cost claim. US$459/t, below Renascor's GraphiteHub-sourced range for Western HF-based routes (9 Jul 2026).
  • Fortress balance sheet for its stage. A$94.35M cash, nil borrowings, A$172.4M equity (FY2026 AR).
  • Government support. A$185M conditional Critical Minerals Facility loan, A$5M grant, Major Project Status, reduced royalty.
  • Execution credibility on a small project. The demo plant was delivered on budget with zero lost-time injuries (FY2026 AR).

Weaknesses

  • No binding offtake after six years of MOUs. The earliest dates from Sep 2020. The AR explicitly concedes non-binding status.
  • Every 2023 BAM Study milestone missed. MPP FID (Q4 2023), first concentrate (Q1 2025), PSG FID (Q3 2024), first PSG (Q2 2026).
  • Profit depends on interest income. Interest of A$5.05M masks an operating loss of A$4.18M (FY2026).
  • Licensed rather than owned core IP (Dorfner ANZAPLAN licence, Aug 2023).
  • Retail-heavy register with no strategic anchor. Institutions hold ~3.9% and no ≥5% holder was identified, which complicates large raisings.
  • Board tenure and related-party optics. Average tenure ~15 years. McConachy's related-party services (~A$145k in FY2026) and Vintage JV interest.

Opportunities

  • Chinese export-control escalation. The November 2026 expiry of the suspension of anode export controls could force Western buyers to contract.
  • US/EU policy pull. FEOC rules, anti-dumping duties (93.5% preliminary, Jul 2025) and possible strategic stockpiles that include PSG (Metal Tech News, Aug 2026).
  • Strategic equity from offtakers. The BAM Study and Oct 2026 release cite discussions on equity investment by partners.
  • Marree copper discovery potential. Historical intercepts such as 134m @ 0.57% Cu and 18m @ 1.57% Cu; VTEM targets defined (Sep 2026).
  • Phased start: concentrate first. Sell concentrate before the PSG FID (BAM Study design), reducing initial capital to ~A$220M.
  • Fines and by-product markets, worth a US$308–394/t credit in the BAM Study.

Threats

  • Price suppression. China spherical graphite at ~US$1,600/t (Aug 2026) is below BAM gross PSG opex of US$1,782/t.
  • Capital scale versus market cap. Stage 1 capex of ~A$609M (2023 dollars, before escalation) against a ~A$130M market cap implies heavy dilution or project-level partnering.
  • Competition for the same Western offtake pool from Syrah (Vidalia operating), Talga, NMG, Graphite One and EcoGraf (also HF-free).
  • Synthetic graphite substitution, which dominates Chinese anode supply (>95% of synthetic anode in China).
  • Feedstock logistics via China. Demonstration campaigns beyond March 2027 depend on additional feedstock shipments that needed export approvals (Q4 FY26 Quarterly; 7 Oct 2026 release).
  • Policy reversal. US extension of Chinese graphite sourcing allowances to 2027 dampens near-term urgency.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
24 Apr 2025Electrical long-lead equipment for the demonstration plant installed and commissionedDemo plant de-risking
30 Apr 2025March 2025 quarterly reportRoutine; cash ~A$108M at 31 Dec 2024 (per Mar 2025 release)
9–13 May 2025Investor webinar. MD buys ~372,753 shares on market (~US$0.043, per Simply Wall St).Insider alignment
12–13 Jun 2025Trading halt, then ministerial (provisional) development approval for the Bolivar BAM facilityKey downstream permit
19 Jun 2025Joint company secretary resignsGovernance housekeeping
8 Jul 2025Exploration update; Vintage farm-in (Mulgaria uranium, Wooltana)Diversification into uranium
10 Jul 2025Siviour accommodation site secured (Cleve)Final project tenure requirement
25–31 Jul 2025Bulk sample production completed for the demo plantFeedstock; flotation outperforms DFS
25 Aug 2025Demo facility updateProcurement progress
18 Sep 2025Demo facility construction commencesExecution milestone
30 Sep 2025FY2025 Annual Report: profit A$1.83M; cash A$105MTreasury-driven earnings
22 Oct 2025Demo construction advancingOn schedule
7 Nov 2025Exploration approvals for SA drilling (shares +4%)Exploration momentum
25 Nov 2025AGM; remuneration report passes (83.27%); kiln due 1 DecGovernance
5 Dec 2025Performance rights issued (FY26 LTI 3.89M to MD)Remuneration
23 Dec 2025Kiln and tanks installed; utility commissioning beginsExecution
29–30 Jan 2026Demo update; December 2025 quarterlyProgress
17 Feb 2026RIU Explorers Conference presentationInvestor engagement
6 Mar 2026Half-year report to 31 Dec 2025Cash ~A$97M (S&P)
16 Mar 2026Demo construction completed (on budget)Major de-risking
20 Mar 2026Exploration update: Bulloo Creek cobalt–copper horizon; new Olary EL application; Marree native title agreement advancingPipeline
29–30 Apr 2026Full-plant commissioning; March 2026 quarterlyCommissioning
22 Jun 2026Graphite processing begins through the HF-free flowsheet (Finance News Network reported a 2 Jun date; the company list shows 22 Jun)First integrated operation
25 Jun 2026Flat Hill copper prospects (e.g. 134m @ 0.57% Cu, historical)Copper optionality; shares +~12% on the day per InvestSMART
9 Jul 2026Purification cost study: US$459/tCost competitiveness claim
22–23 Jul 2026Official demo opening; international battery-supply-chain visitors tour the plant and SiviourCustomer engagement
31 Jul 2026June 2026 quarterly: cash ~A$94M; EL 7133 granted; two ELs surrendered; export approvals awaited for feedstockLiquidity; feedstock risk
25 Sep 2026Exploration update: high-priority VTEM drill targets at Flat HillDrill-ready copper targets
30 Sep – 1 Oct 2026FY2026 Annual Report (profit A$0.86M; impairment A$1.14M); Appendix 4G; Native Title Agreement executed for MarreeResults; access to Marree
5–6 Oct 2026AGM set for 23 Nov 2026; director nominations closed 12 OctGovernance
7 Oct 202699.97% C battery-grade PSG produced at demonstration scale (third-party benchmark feed)Key technical validation

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

2 charts
Income Statement: Revenue & Gross Profit: Total revenue incl. interest fell from AUD 5.1 Mn in FY2025 to AUD 5.1 Mn in FY2026.
Renascor Resources Limited — Income Statement: Revenue & Gross Profit
Series (AUD Mn)FY2022FY2023FY2024FY2025FY2026
Total revenue incl. interest———5.15.1
Operating (non-interest) revenue0000.10
Interest revenue———55.1

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.