Saunders International Limited Overview
Saunders International is an Australian small-cap integrated infrastructure services contractor. It designs, fabricates, builds, automates and maintains critical fluid, water and industrial assets. Its core is a 75-year legacy in steel bulk-liquid storage tanks and fuel terminals. Through acquisitions from 2021 to 2025 it became a multidisciplinary platform covering structural, mechanical and piping (SMP), industrial automation and electrical, water and civil infrastructure, and industrial asset services. It now reports against four key markets: Defence & Government, Water, Energy, and Resources & Industrials. FY2026 revenue was a record A$305.6 million, up 42.5%, and work in hand reached a record A$571.9 million. Margins, however, are thin: Adjusted EBITDA was 3.2% and statutory NPAT was a small loss. The investment case rests on whether a larger, more recurring base of Defence fuel resilience work, water panel programmes and energy maintenance contracts can rebuild margins toward the levels achieved before FY2025.
Company's own description
In recent ASX releases Saunders describes itself as an Australian integrated infrastructure services business that engineers, builds and sustains critical infrastructure. Its integrated delivery model combines five capability lines:
-
Fluid Storage & Transfer Infrastructure
-
Structural, Mechanical & Piping
-
Industrial Automation & Electrical
-
Water & Civil Infrastructure
-
Industrial Asset Services
These capabilities are applied across four markets: Defence & Government, Water, Energy, and Resources & Industrials (RMAF Butterworth contract release, 16 July 2026). Earlier releases from FY2025 to H1 FY2026 used the wording "multidisciplinary Engineering, Construction and Industrial Asset Services company" covering the full asset lifecycle.
What the company does
Saunders works across the whole asset lifecycle:
-
Design and engineering. Tank and terminal design, structural and piping design, and automation and controls engineering.
-
Fabrication. Steel fabrication of tanks, pipe spools, pressure vessels and structures. Fabrication depth increased with the Piping Solutions acquisition.
-
Construction and installation. EPC and construct-only packages for fuel farms, tank terminals, hydrant systems, reservoirs, pump stations, sewer and water networks, processing-plant structural, mechanical and piping work, and bridges and marine structures (legacy Civilbuild capability).
-
Commissioning and automation. Control systems, SCADA and OT integration through Saunders Automation, formed from PlantWeave (2021) and Automation IT (2023).
-
Sustaining services. Shutdowns, permanent maintenance, coatings and linings, concrete repair, and asset renewal at hazardous facilities. In FY2026 Saunders delivered capital expansion, renewal and maintenance programmes across 15 major hazardous facilities nationally.
Business and revenue model
| Revenue type | Description | Estimated character |
|---|---|---|
| Project and construction contracts | Lump-sum, schedule-of-rates and cost-reimbursable contracts. Recognised over time by percentage of completion. | Majority of revenue. Lumpy and exposed to delays. |
| Panel and framework agreements | Multi-year delivery panels such as Aqua Metro's Victorian water panels and two 10-year Sydney Water Delivery Contractor panels secured in FY2026. | Growing share. Annuity-like but volumes are not guaranteed. |
| Master Services Agreements (MSAs) and Early Contractor Involvement (ECI) | Maintenance MSAs at refineries, terminals and hazardous facilities. ECI engagements that convert into construction awards. | Recurring and lower risk. |
| Automation and technology services | Engineering consulting, projects and support for control systems. | Small. Higher margin per hour. |
The split between product, service, subscription and licensing is not applicable in conventional terms. Saunders is almost entirely a contracting and services business, with no subscription or licensing revenue disclosed. The share of revenue from recurring MSAs and panels versus one-off projects is not publicly disclosed as a percentage. Management states qualitatively that Aqua Metro brings "secure, recurring revenue" through long-term programme and framework agreements (Aqua Metro acquisition presentation, 15 July 2025).
Value chain position
Saunders sits in the middle of the infrastructure value chain. It works as:
-
a head contractor for owners, notably its first direct Department of Defence head contract (July 2026);
-
a tier-1 or tier-2 specialist subcontractor to major contractors (for example, Ward Civil on the Wilton programme and Confluence Water for Sydney Water); and
-
a maintenance partner to asset owners (fuel majors, utilities and miners).
Customer types and end-markets
| Market | Customers named in disclosures | Typical scope |
|---|---|---|
| Defence & Government | Australian Department of Defence, including the Defence Fuel Resilience Program; Indo-Pacific bases in Malaysia and Japan; airports (Western Sydney International) | Fuel installations, hydrant lines, tankage, fire systems |
| Water | Greater Western Water, Sydney Water, Victorian urban and rural water authorities, councils | Reservoirs, tanks, sewer and water networks, pump stations, treatment plant works, pipe relining |
| Energy | Fuel and terminal operators (historically bp and Ampol among others; FY2023 results release) | Terminal construction, tank renewal, shutdowns, maintenance |
| Resources & Industrials | Gold processors and miners. Four gold-processing expansion projects in FY2026. | SMP packages, tankage, structural steel |
Independent characterisation
Saunders is a sub-A$350 million revenue specialist contractor that has deliberately changed its revenue mix. Before 2021 it was a cyclical tank-and-terminal builder serving Australia's downstream oil industry, which was contracting at the time. Since then it has diversified into water, a structural growth market that now accounts for a very large part of revenue after Aqua Metro, and Defence fuel resilience, a policy-driven market with long tender cycles. Its strengths are a narrow but deep niche in high-compliance hazardous-fluid environments and a credible safety record (LTI-free FY2025 and TRIFR of 3.9 in FY2026). Its weaknesses are typical of small contractors: margins are thin, the business is exposed to weather and access delays, and its fixed cost base, scaled for growth, magnifies earnings swings when revenue slips.
Strategy
Stated strategy themes (FY2026 Annual Report and presentation, paraphrased)
-
Built for sustainable scale. Position Saunders as a trusted Australian partner for complex critical infrastructure. Combine specialist expertise, integrated delivery and a strong record in live, high-compliance environments.
-
Four key markets. Defence & Government, Water, Energy, Resources & Industrials, organised as market-facing delivery structures (H1 FY2026).
-
Earnings resilience. Shift the mix toward longer-term, more recurring work through panels, MSAs and ECIs, reducing reliance on lump-sum projects.
-
Larger, more integrated scopes. Move from subcontractor to head contractor. The first direct Defence head contract in July 2026 was the proof point.
-
Four differentiating advantages in high-compliance infrastructure. These are named in the FY2026 presentation but not enumerated in the sources reviewed.
Strategic initiatives (last 24 months)
| Initiative | Date | Detail | Status |
|---|---|---|---|
| Aqua Metro acquisition (water platform) | Jul 2025 | Up to A$30m; Victorian water specialist | Integrated in FY2026 |
| National water platform expansion | FY2026 | Two 10-year Sydney Water Delivery Contractor panels | Secured |
| Defence fuel resilience positioning | FY2025–FY2027 | Four Defence fuel contracts; first head contract (Butterworth); A$10.7bn federal fuel security package | Active; site mobilisation Q2 FY2027 |
| Indo-Pacific expansion | FY2026 | Contracts in Japan and Malaysia | Active |
| Market-facing reorganisation | H1 FY2026 | Delivery restructured around the four markets | Implemented |
| Leadership succession | Oct 2025 | De Angelis becomes CEO | Complete |
| Funding capacity | Aug 2026 | Facility increased to A$50m to support larger projects | Complete |
| Safety programme | FY2025–FY2026 | TRIFR cut 34% to 4.91 (FY2025), then 20% to 3.9 (FY2026). OFSC accreditation for the maximum six years. | Ongoing |
| Veteran Employment Commitment | FY2026 | Joined the federal Veteran Employment Commitment | Ongoing |
Guidance and medium-term targets
| Item | Detail |
|---|---|
| FY2026 original guidance | Revenue A$315–345m; Adjusted EBITDA margin 3.5–4.5% |
| FY2026 revised guidance (12 May 2026) | Revenue A$300–315m; Adjusted EBITDA margin 3.0–3.5% |
| FY2026 actual | Revenue A$305.6m; Adjusted EBITDA A$9.8m (3.2%). Within revised guidance. |
| FY2027 outlook (27 Aug 2026) | Year-on-year revenue growth, underpinned by record work in hand. Improved H2 FY2026 NPATA margin expected to be sustained through FY2027. No numeric range verified. |
| Medium-term numeric targets | — |
Products & Services
Fluid Storage & Transfer Infrastructure (legacy core)
| Offering | Description and capabilities | Target customer | Flagship / reference |
|---|---|---|---|
| Steel bulk-liquid storage tanks | Design and construction of above-ground steel tanks for fuels, chemicals and water. Fixed and floating roofs. | Fuel majors, terminal operators, utilities | 10 ML potable water tanks with a 100-year design life for Sydney Water (2024) |
| Fuel and chemical terminals (EPC) | Turnkey terminal design and construction: tankage, pipework, loading and fire systems | Energy and Defence | Western Sydney International Airport Fuel Farm & Hydrant Line |
| Aviation fuel farms and hydrant systems | Airport fuel storage plus hydrant reticulation | Airports and airline fuel consortia | WSIA (contract announced Oct 2022; wet commissioning Feb 2025) |
| Defence fuel installations | Fuel storage and transfer upgrades on Defence estate, including off-site fabrication, installation and commissioning with civil, structural, mechanical, piping, electrical, controls and fire safety systems | Department of Defence | RMAF Butterworth (about A$23m, FY2027–FY2028) |
| Water reservoirs and tanks | Potable and recycled water reservoirs | Water utilities | Wilton WISP: 8 ML potable and 1.7 ML recycled reservoirs (A$10.4m, Dec 2025) |
| Coal bins, hoppers and associated steelwork | Bulk-handling steel structures | Resources | Vendor profile |
Pricing for these offerings is contract-specific (lump sum or schedule of rates). No list pricing is disclosed.
Structural, Mechanical & Piping (SMP)
| Offering | Description | Target customer | Reference |
|---|---|---|---|
| Pipe spool fabrication and pipelines | Fabrication, installation and maintenance of steel pipelines and piping systems, pressure vessels and refuelling systems. Capability strengthened by Piping Solutions. | Defence, aviation, energy, infrastructure | Saunders Piping Solutions |
| Structural steel | Fabrication and erection of plant structures | Mining and processing | Gold processing expansions (four projects in FY2026) |
| Mechanical installation | Equipment installation for processing plants and terminals | Resources and energy | — |
Industrial Automation & Electrical (Saunders Automation)
| Offering | Description | Target customer | Reference |
|---|---|---|---|
| Control systems engineering | PLC, SCADA and OT design and integration | Energy, water, Defence, mining | Automation IT (QLD) and PlantWeave |
| Electrical and instrumentation | E&I installation packaged with SMP and tank scopes | All markets | Integrated in Defence fuel scopes |
| Support services | Ongoing OT support and consulting | Existing automation clients | Automation IT legacy client base |
Water & Civil Infrastructure (Saunders Aqua Metro)
| Offering | Description | Target customer | Reference |
|---|---|---|---|
| Water and sewer networks | Construction and renewal of reticulation and trunk networks | Victorian water authorities; Sydney Water | Victorian panels; Sydney Water panels |
| Pump stations and treatment plants | Construction and upgrades | Urban and rural water authorities | Aqua Metro portfolio |
| Drop structure construction and rehabilitation | Specialist sewer structures | Utilities | Aqua Metro (Signalbase profile) |
| Pipe relining and manhole rehabilitation | Trenchless rehabilitation | Utilities and councils | Aqua Metro |
| Earthworks and retarding basins | Construction and upgrade of flood-retarding basins | Councils and authorities | Aqua Metro |
| Hydraulics, mechanical and civil design | Design and engineering services | Water authorities | Aqua Metro |
Industrial Asset Services
| Offering | Description | Target customer |
|---|---|---|
| Refinery and industrial shutdowns | Planned turnaround labour and supervision | Refiners, terminals, processors |
| Permanent maintenance | Embedded maintenance crews under MSAs | Hazardous facilities (15 major facilities in FY2026) |
| High-performance coatings and linings | Abrasive blasting, protective coatings, tank linings | Energy and water |
| Concrete repair and structural strengthening | Crack injection, precision grouting, joint refurbishment, façade and heritage refurbishment, waterproofing | Infrastructure owners |
| Industrial flooring | Industrial and commercial floor coverings | Industrial clients |
Legacy civil and marine (historic Saunders Civilbuild)
Road and rail bridges, marine structures, jetties and wharves, precast concrete and heavy-industry foundations are listed in vendor profiles and in the FY2020 release. Whether these lines are still an active focus after the 2025 market realignment is not publicly disclosed.
Financial Detail
Income Statement and Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue (AUD Mn) | 129.96 | 200.89 | 216.08 | 214.52 | 305.63 |
Revenue growth YoY (%) | 28.4 | 54.6 | 7.6 | -0.7 | 42.5 |
Statutory EBITDA — aggregator (AUD Mn) | 11.73 | 17.58 | 19.02 | 7.49 | — |
Statutory EBITDA — company (AUD Mn) | — | — | — | 8.1 | — |
Adjusted EBITDA — company (AUD Mn) | — | — | 21.3 | 9.3 | 9.8 |
Operating income / EBIT (AUD Mn) | 8.71 | 14.53 | 15.70 | 3.11 | — |
Depreciation & amortisation (AUD Mn) | 2.25 | 3.04 | 4.29 | 4.04 | — |
Pre-tax income (AUD Mn) | 9.38 | 14.15 | 14.60 | 3.18 | — |
Statutory NPAT attributable (AUD Mn) | 6.55 | 9.49 | 9.36 | 2.08 | -0.94 |
Adjusted NPAT / NPATA (AUD Mn) | — | — | 11.3 | 3.2 | 3.9 |
Basic EPS statutory (AUD cents) | 6.24 | 8.84 | 8.27 | 1.72 | -0.69 |
Adjusted basic EPS (AUD cents) | — | — | — | 2.68 | 2.85 |
Dividends per share (AUD cents) | — | 4.00 | 4.25 | 2.25 | 1.00 |
Weighted average shares (M) | 104.95 | 107.33 | 113.23 | 120.97 | — |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansMargin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Statutory EBITDA margin (%) | 9.0 | 8.8 | 8.8 | 3.8 | — |
Adjusted EBITDA margin (%) | — | — | 9.9 | 4.3 | 3.2 |
EBIT margin (%) | 6.7 | 7.2 | 7.3 | 1.4 | — |
Pre-tax margin (%) | 7.2 | 7.0 | 6.8 | 1.5 | — |
Statutory net margin (%) | 5.0 | 4.7 | 4.3 | 1.0 | -0.3 |
Adjusted NPATA margin (%) | — | — | 5.2 | 1.5 | 1.3 |
Income Statement and Margin Analysis (%) (Half-Yearly)
| Metric | H1 FY2025 | H1 FY2026 | H2 FY2026 (derived) |
|---|---|---|---|
Revenue (AUD Mn) | 126.31 | 143.56 | 162.07 |
Adjusted EBITDA (AUD Mn) | 9.9 | 0.37 | 9.43 |
Adjusted EBITDA margin (%) | 7.8 | 0.3 | 5.8 |
Adjusted NPAT (AUD Mn) | 5.04 | -2.84 | 6.7 |
Balance Sheet and Per-Share Data
| Metric | FY2023 | FY2025 | FY2026 |
|---|---|---|---|
Net assets / total equity (AUD Mn) | 39.3 | 52.3 | 63.4 |
Cash & equivalents (AUD Mn) | — | 22.1 | 29.8 |
Net tangible assets per share (AUD cents) | — | 28.34 | 12.63 |
Acquisition debt facility limit (AUD Mn) | — | — | 10.0 |
Acquisition facility drawn at deal (AUD Mn) | — | — | 8.0 |
Contract assets (AUD Mn) | — | 13.62 | — |
Contract liabilities (AUD Mn) | — | 6.89 | — |
Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Dividends declared per share (AUD cents) | — | 4.00 | 4.25 | 2.25 | 1.00 |
Buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%)
| Ratio | FY2023 | FY2025 | FY2026 |
|---|---|---|---|
ROE on closing equity (%) | 24.1 | 4.0 | -1.5 |
State / Region Details
| State / region | Exposure | Evidence |
|---|---|---|
New South Wales | Historic home market. WSIA, Sydney Water panels, Wilton reservoirs, Marsfield and Marayong reservoirs. | Contract releases 2022–2026 |
Victoria | Large after Aqua Metro: Victorian water authorities, Greater Western Water, Melbourne sewer project (delayed by a cultural heritage find) | Aqua Metro release; May 2026 downgrade |
Queensland | Automation IT base, energy and resources work | Automation IT release |
Western Australia | Industrial and resources projects, including WA recruitment for a major industrial project | H1 FY2024 presentation references; LinkedIn |
Northern Territory | Defence pipeline, for example Larrakeyah Defence Precinct | H1 FY2026 presentation |
Malaysia | RMAF Butterworth, Penang: first direct Defence head contract | 16 July 2026 release |
Japan | One Indo-Pacific Defence fuel contract (details not disclosed) | FY2026 results |
Margin Analysis (%) and Share Price
| Metric | CY2025 | FY2025 | FY2026 | YTD 2026 (to Jul) |
|---|---|---|---|---|
Share price change (%) | -20.6 | -8.6 | 41.9 | 29.0 |
Period-end share price (AUD) | 0.81 | 0.74 | 1.05 | 1.045 |
Valuation Snapshot
| Multiple | Value | Basis |
|---|---|---|
Market cap (AUD Mn) | 121 | A$0.86 × 140.6m |
Enterprise value (AUD Mn) | about 99 | Market cap minus A$29.8m cash plus about A$8m acquisition debt |
P/E (Adjusted NPATA FY2026) | about 31x | A$121m / A$3.9m |
EV / Adjusted EBITDA FY2026 | about 10.1x | A$99m / A$9.8m |
EV / H2 FY2026 annualised Adjusted EBITDA | about 5.2x | A$99m / (A$9.43m × 2) |
EV / Sales FY2026 | about 0.32x | A$99m / A$305.6m |
P/B FY2026 | about 1.9x | A$121m / A$63.4m |
Dividend yield (FY2026 DPS) | about 1.2% | 1.0 cent / A$0.86 |
Per-Share Data (FY2023–FY2026)
| Metric | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
Interim DPS (AUD cents) | 2.00 | 2.00 | 2.00 | 0.00 |
Final DPS (AUD cents) | 2.00 | 2.25 | 0.25 | 1.00 |
Total DPS (AUD cents) | 4.00 | 4.25 | 2.25 | 1.00 |
Analyst Conclusions
Management guidance (FY2027)
-
Year-on-year revenue growth, underpinned by record work in hand of A$571.9m.
-
Improved H2 FY2026 NPATA margin expected to be sustained throughout FY2027.
-
Drivers cited: Defence spending heading toward 3% of GDP; US Indo-Pacific investment; water utility and council investment; the A$10.7bn fuel security package; gold-processing capital expenditure.
-
Risks cited: project timing, weather and government funding priorities.
Consensus
Consensus FY2027 revenue and EPS are not publicly disclosed or verified.
Bull case
-
Operating leverage is already visible. H2 FY2026 Adjusted EBITDA of about A$9.4m on about A$162m revenue (about 5.8% margin) is close to the whole of FY2026's EBITDA earned in one half. Sustaining it, as guided, implies FY2027 Adjusted EBITDA of A$18–20m on growing revenue, roughly double FY2026. At an EV of about A$99m, that is about 5x EBITDA.
-
Structural demand and better contract quality. The A$5.1bn pipeline, 10-year Sydney Water panels, Victorian frameworks and Defence fuel resilience give the multi-year visibility the pre-FY2025 business lacked. Improved contract terms are visible in rising contract liabilities in H1 FY2026.
-
Positioning for larger Defence work. The head contractor milestone, the A$50m facility and net cash allow Saunders to bid for larger Defence fuel packages under the A$10.7bn programme.
Bear case
-
Execution record. Two downgrades in 12 months, a statutory loss and a dividend cut to 1 cent show that Saunders' cost base and project mix are vulnerable to exogenous delays that will happen again.
-
Structurally thin margins. Even guided H2 margins (about 5–6% EBITDA) trail peers. Water civil work is competitively tendered, and the acquired Aqua Metro business forecast an EBITDA margin of only about 8% before integration costs.
-
Liquidity and governance discount. A tightly held register (top 21 own about 74%, institutions about 0.6%), limited segment disclosure and a new CEO justify a persistent discount. NTA halved to 12.6 cents after the acquisition.
Key catalysts and monitorables (next 12 months)
| Catalyst | Expected timing |
|---|---|
| FY2026 AGM and any FY2027 trading update | About Nov 2026 |
| Site mobilisation at RMAF Butterworth | Q2 FY2027 (Oct–Dec 2026) |
| Conversion of the deferred A$30m (Melbourne sewer, two Defence projects) | FY2027 |
| H1 FY2027 results: margin sustainability test | About late Feb 2027 |
| Reinstatement of an interim dividend | Feb 2027 |
| Defence Fuel Resilience Program awards and further Indo-Pacific contracts | Rolling |
| First call-offs under the Sydney Water panels | Rolling |
| Aqua Metro earn-out determination and any further bolt-on M&A | FY2027 |
| Changes to the substantial holder register and liquidity events | Rolling |
Analyst verdict
Saunders International is not the business it was three years ago. That change is both the source of its opportunity and the reason for scepticism. From 2021 to 2025 management turned a cyclical tank-and-terminal builder into a multidisciplinary critical-infrastructure contractor spanning Defence fuel, water, energy maintenance and resources. FY2026 shows both sides of the transition. Revenue reached a record A$305.6 million, work in hand a record A$571.9 million and the pipeline a record A$5.1 billion. Yet the group made a statutory loss, cut its dividend to a single cent and missed its original guidance by about A$30 million.
The key analytical point is the split between the two halves. H1 FY2026 EBITDA was close to zero. H2 FY2026 generated about A$9.4 million of Adjusted EBITDA at a margin of roughly 5.8%. Management has explicitly guided to that H2 margin continuing through FY2027 on higher revenue. If that guidance holds, the stock at about A$0.86 trades at roughly 5x forward run-rate EBITDA, with net cash, which is undemanding for a business with this backlog. If it fails, the business looks like a 3%-margin contractor with low barriers to growth and a thin equity base.
Our assessment is cautiously constructive but conditional on evidence. The structural tailwinds are real and well documented: Defence fuel resilience, Indo-Pacific basing, water renewal and gold processing expansions. The first direct Defence head contract and the Sydney Water panels are tangible proof of improved positioning. Against that, Saunders has disappointed twice in twelve months, discloses little segment detail, and runs on margins too thin to absorb the next heritage find, access restriction or wet season without visible damage.
The H1 FY2027 result in February 2027 is the decisive test. Investors should look for EBITDA margins of 5% or more, positive operating cash flow and reinstatement of an interim dividend before treating the H2 FY2026 recovery as a new baseline rather than a rebound from a low base.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Title | Tenure | Background |
|---|---|---|---|
Angelo De Angelis | Managing Director & CEO | CEO from 1 Oct 2025; COO from Jun 2021 | More than 30 years' experience. Former President, Chief Executive, Chief HR Officer and Head of Strategy roles at Transfield Services and Ventia across Australia, the Indo-Pacific and North America (CEO appointment release, Sep 2025) |
Alex Dunne | Chief Financial Officer | CFO since at least FY2024 | — |
Manish Pancholi | Executive Vice President | Listed in FY2026 presentations | — |
Trevor Walker | Executive General Manager | Listed in FY2026 presentations | — |
Mark Benson | Former MD & CEO (Oct 2015 – Sep 2025); Executive Director to Dec 2025; 12-month transition support | About 10 years as CEO | Previously General Manager / CEO at RCR Energy. Holds about 3.95 million shares (2.81%) as of Dec 2025 (MarketScreener). |
“—” = not publicly disclosed.
Board of Directors
| Name | Role | Appointed | Background |
|---|---|---|---|
Nick (Nicholas) Yates | Independent Non-Executive Chair | — | More than 35 years in engineering services and construction. Former Chief Executive, Infrastructure ANZ at Transfield Services; former CEO and later Chair of ASX-listed BSA Limited (Market Index). |
Robert Patterson | Non-Executive Director | Nov 2020 | — |
Rick Burke | Non-Executive Director | Mar 2022 | — |
Angelo De Angelis | Managing Director | Oct 2025 | See above |
Timothy Burnett | Former Chair (retired c.2023) | Long-serving | Sold about 2.67 million shares from Sep to Dec 2024 (Simply Wall St) |
“—” = not publicly disclosed.
Board & Management Changes
| Date | Change | Context |
|---|---|---|
Mid-2025 | Mark Benson resignation announced, effective 31 Dec 2025 | Announced alongside the FY2025 guidance downgrade |
22 Sep 2025 | Angelo De Angelis appointed MD & CEO, effective 1 Oct 2025 | Internal succession, presented as ensuring continuity |
Dec 2025 | Benson leaves the Board and stays engaged for 12 months | Orderly transition |
Major Shareholders
| Holder | Type | Stake / evidence |
|---|---|---|
Anacacia Capital Pty Ltd | Private equity (VC/PE) | Substantial holder. Participated in the July 2025 placement. PE/VC holdings were about 10.2% (Simply Wall St, 2025). |
Ahrens Group Pty Ltd | Strategic / industrial (SA engineering group) | Bought about 6.33m shares in Dec 2024 and participated in the July 2025 placement. |
Naos Asset Management | Fund manager | Was a large holder. Sold about 8.7m shares between Nov 2024 and Mar 2025. |
Debry Pty Ltd (associated with Desmond Bryant) | Private | 2.0m shares transferred in Feb 2025 |
Mark Benson | Former CEO | About 3.95m shares (2.81%), Dec 2025 |
Nick Yates | Chair | About 594,000 direct shares (Jun 2025) |
Saunders Employee Share Plan Pty Ltd | Employee trust | About 1.12m shares (about 0.9%) |
Aqua Metro vendors | Vendor shares | — |
Competitive Landscape
Key Competitors
| Competitor | Listing | Overlap with Saunders | Relative scale |
|---|---|---|---|
Monadelphous Group | ASX: MND | Energy and resources SMP, maintenance, tanks; water (Monadelphous Water) | Roughly 7–8x Saunders' revenue (A$2bn+ class) |
Ventia Services Group | ASX: VNT | Defence estate services, water, telecom and infrastructure maintenance | 15–20x+ (multi-billion) |
Downer EDI | ASX: DOW | Utilities and water, Defence, facilities | 30x+ |
SRG Global | ASX: SRG | Asset maintenance, engineering and construction, specialist services | 4x+ (A$1bn+ class) |
Service Stream | ASX: SSM | Water and utilities maintenance programmes | 7x+ |
Southern Cross Electrical Engineering (SCEE) | ASX: SXE | Electrical and instrumentation in resources, Defence, infrastructure | 2–3x |
GenusPlus Group | ASX: GNP | Electrical and power infrastructure (overlap in E&I) | 2–3x |
Lycopodium | ASX: LYL | Gold processing EPCM (Resources & Industrials) | 1–1.5x |
Fulton Hogan | Private | Water networks, civil infrastructure | Multi-billion |
CPB Contractors / UGL (CIMIC) | Private (CIMIC delisted) | Defence fuel, water treatment, energy | Multi-billion |
Specialist tank contractors (for example CB&I and regional tank fabricators) | Mixed | Bulk-liquid storage tanks | Varies |
Victorian water civil specialists (various private firms) | Private | Victorian water panels | Comparable to Aqua Metro |
Peer Comparison FY2026
| Metric | Saunders FY2026 | Monadelphous | SRG Global | SCEE |
|---|---|---|---|---|
Revenue scale | A$305.6m | A$2bn+ class | A$1bn+ class | A$0.6–0.9bn class |
Revenue growth | +42.5% (acquisition-led) | — | — | — |
EBITDA margin | 3.2% (adjusted) | Mid–high single digit (historic) | High single digit to about 10% (historic) | Mid–high single digit (historic) |
Recent Developments
Several FY2026 contract awards were not individually dated in the sources reviewed.



