Savannah Goldfields is a micro-capitalisation gold producer and explorer in the Etheridge/Gulf Savannah goldfields of Far North Queensland. Its strategic core is the 100%-owned Georgetown Gold Processing Plant (GGPP), a carbon-in-pulp/leach plant with a gravity circuit. Management describes it as the only gold plant within roughly 400 km by road, with a replacement value of about A$45m. Around this "hub" the company holds about 1,539 km² of tenements. These include:
-
the Agate Creek project, with a 460kt @ 2.5 g/t Au Ore Reserve (36,800 oz) and a 422,000 oz Mineral Resource;
-
satellite high-grade deposits at Red Dam, Electric Light, Big Reef, Jubilee Plunger and Union.
Production restarted in November 2025 after a 22-month weather-driven shutdown, but output has been small (about 2,200 oz sold in FY2026, unaudited) and costly. The investment case rests on three things: restarting Agate Creek reserve mining, extending plant life with sulphide ore, and a hub-and-spoke toll/consolidation strategy. It is currently overshadowed by a heavy, short-dated convertible-note stack, a royalty dispute and an ASX suspension.
Company's own description
In its H1 FY2026 interim report (16 March 2026), SVG describes itself as a gold explorer and producer and a resource development and mining company, with projects primarily targeting gold in Queensland. It states that its FY2026 priorities were:
-
planning and permitting to restart expanded mining at Agate Creek;
-
processing previously mined Agate Creek ore;
-
mining and processing ore from satellite resource areas through the Georgetown CIL plant.
S&P/Morningstar profiles add that the company holds investments in other mining companies and reports a single segment and a single geographical area.
Independent characterisation
| Revenue stream | Share of H1 FY2026 revenue (%) | Comment |
|---|---|---|
| Gold sales (product) | 98.9 | 353.7 oz sold for A$2,309,026 |
| Silver sales (by-product) | 1.1 | 246.2 oz for A$24,534 |
| Toll processing (service) | 0 | Under evaluation; no revenue disclosed |
| Royalties (licensing-like) | 0 | Ashford royalty contingent on mining that has not yet occurred |
| Period | Status | Source |
|---|---|---|
| September 2022 – January 2024 | Producing (Agate Creek ore through GGPP) | Annual reports |
| January 2024 – October 2025 | Care and maintenance after cyclone and road damage | H1 FY2025 and H1 FY2026 interim reports |
| November 2025 – present | Producing, but from low-grade stockpiles, rock dumps and small satellite pits rather than the Ore Reserve | Quarterly reports |
SVG is a single-asset-cluster, owner-operated, vertically integrated junior gold miner. It controls the full chain from tenement to doré:
-
open-pit mining, generally contracted (drill-and-blast and earthmoving contractors);
-
road haulage over roughly 30–100 km to the GGPP;
-
crushing, grinding, gravity recovery and cyanide leaching on carbon;
-
elution and smelting to doré, which is refined at the Perth Mint (H1 FY2026 operations commentary).
Business model. SVG earns revenue entirely from the sale of refined gold, with a small silver by-product. Revenue is a function of ounces recovered multiplied by the prevailing A$ spot price, with no disclosed hedging.
There is a secondary, so-far-unrealised revenue opportunity in toll treatment of third-party ore. Management reports ongoing discussions with small-scale miners in the Georgetown district who want to toll-treat material to doré (Mar 2026 quarterly). A residual coal royalty of A$0.75/t on any production from the Ashford coking coal project, now owned by Clara Resources Australia, is a contingent non-core income stream.
Revenue model mix (latest available).
Source: H1 FY2026 Interim Report, Note 3.
Value-chain position. SVG sits upstream as a primary producer. Owning a processing plant is its key differentiator relative to Etheridge-region explorers, who have no milling option nearby. Its customers are, in effect, the refiner and bullion market: doré is refined by the Perth Mint and sold at spot. SVG's end-market is the global gold market, a fungible, price-taking commodity market.
Customer types and end-markets.
-
Bullion refiner/purchaser (Perth Mint).
-
Prospectively, third-party ore owners (toll customers) and royalty counterparties.
There is no customer concentration risk in the conventional sense, but there is total commodity-price exposure.
Operating reality, FY2024–FY2026. The business has oscillated between production and care and maintenance:
Strategy
Stated strategy (paraphrased themes from company materials)
-
"Hub and spoke" regional consolidation. Use the only operating gold plant within ~400 km as a regional processing hub, fed by owned satellite deposits, third-party toll ore and acquired stranded deposits. The company notes the region has historically produced more than 10 Moz from over 1,000 mines, prospects and occurrences (Mar 2026 quarterly).
-
Restart Agate Creek reserve mining to provide more than 2 years of higher-grade (2.5 g/t) feed to GGPP across 2026–2028.
-
Extend oxide plant life through exploration at Big Reef, Electric Light and Red Dam, and process Big Ben rock dumps in the interim.
-
Unlock sulphide ore via metallurgical testwork and a sulphide processing stream at or adjacent to GGPP.
-
Expand Agate Creek via a stand-alone ~1 Mtpa plant targeting the 422koz bulk resource.
2026 objectives (Gold Coast presentation, 11 Jun 2026)
| # | Objective | Status at Oct 2026 |
|---|---|---|
| 1 | Continue production from Big Ben and Big Reef until Agate Creek starts | Achieved through at least July 2026 (349 oz sold in July) |
| 2 | Obtain updated Agate Creek EA (expected July 2026) | Achieved 7 Jul 2026 |
| 3 | Mine the Agate Creek Ore Reserve and process at Georgetown (expected Q3 2026); extend TSF capacity | Drill-and-blast contractor due August 2026 (Industry Queensland). Actual restart not confirmed in sources reviewed. |
| 4 | Oxide exploration at Big Reef and Red Dam | 2,000–6,000 m programme announced 20 Aug 2026, starting at Electric Light, up to 12 weeks |
| 5 | Sulphide processing (resource updates, met testwork) | Electric Light and Red Dam resources updated. Met results: ~71% recovery in existing circuit. Flotation tests planned. |
| 6 | Assess Agate Creek exploration potential | Ongoing; geophysical surveys over EPM 15146 on 15–20 Jul 2026 |
| 7 | Define development pathway for expanded Agate Creek | Enthalpy scoping; potential partner discussions |
Initiatives in the last 24 months
| Date | Instrument | Amount |
|---|---|---|
| Feb 2025 | Entitlement offer | A$4.2m |
| Apr–May 2025 | Placements | ~A$7.5m |
| Aug–Oct 2025 | Placement (1.0bn shares at A$0.015) | A$15.0m |
| H1 FY2026 | Convertible notes | ~A$1.4m |
| May 2026 | Placement plus tiered royalty sale | A$3.5m |
Leadership: New CEO (Apr 2025) and Head of Operations (2025).
Recapitalisation: About A$37m of equity, notes and royalty funding since February 2025 (derived total):
Debt reduction: Norfolk loan cut from A$6.0m to A$2.3m in H1 FY2026, with full repayment targeted by 31 Aug 2026. Bizzell Nominees standby facility reduced from A$7.5m to A$2.0m (expiry 31 Mar 2027).
Convertible-note restructuring: Maturity extended from 30 Sep 2025 to 31 Dec 2026; conversion price cut to A$0.04 (7 shares per A$0.28 note).
Permitting: Big Reef processing approval and Agate Creek stockpile haulage (Sep 2025); Agate Creek site-specific EA (Jul 2026), which closes out an Environmental Enforcement Order; GGPP TSF lift EA amendment in preparation.
Resource growth: Maiden Agate Creek Ore Reserve (Aug 2025); Jubilee Plunger (Oct 2025), Electric Light (May 2026) and Red Dam (Jul 2026) resource upgrades.
Operational optimisation: Carbon replacement, kiln repairs, Knelson concentrator activation, single- versus two-mill trials (Mar–Apr 2026 quarterly), and a grade-control review (Jun 2026 quarter).
ESG / sustainability commitments: None quantified. The EA work is framed around safe, stable, non-polluting mining near Rungalla National Park.
Medium-term targets and guidance
Formal production or cost guidance: not publicly disclosed.
Initial Agate Creek phase: management cited 375,000 t of ore for ~31,900 oz (2 Jun 2026 release), processed through 2026, 2027 and into 2028.
DGR Global's view: DGR stated in its May 2026 release that the near-term production plan could generate about A$70m of net cash flow for Savannah. That figure is the investor's estimate and is not company guidance.
Products & Services
SVG's "products" are physical gold and silver plus a set of mineral assets that generate, or could generate, them. Each is catalogued below.
Saleable products
| Product | Description | Specification | Customer | Pricing model |
|---|---|---|---|---|
| Gold doré / refined gold | Doré poured at GGPP roughly weekly since Nov 2025, refined at the Perth Mint | Realised prices: A$6,528/oz (H1 FY2026); A$6,907–7,054/oz (Mar Q 2026, two figures quoted in the same report); A$6,241/oz (Jun Q 2026) | Refiner/bullion market | Spot price; no hedging disclosed |
| Silver (by-product) | Recovered with gold in doré | Realised A$100/oz (H1 FY2026), A$127.30/oz (Mar Q 2026), A$102/oz (Jun Q 2026) | Refiner | Spot |
Sources: H1 FY2026 Interim Report; Mar 2026 quarterly; Jun 2026 quarterly summary (InvestSMART).
Processing infrastructure (the "Hub")
Georgetown Gold Processing Plant (GGPP), Georgetown, Far North Queensland
Flowsheet: crushing, then two ball mills, then a gravity circuit (Knelson concentrator), then carbon-in-pulp/leach, elution and gold room. In April 2026 the company trialled single-mill operation and found throughput matched two-mill operation, with a slightly coarser grind.
Capacity: about 200,000 tpa (June 2026 presentation). An earlier half-year report cited "more than 250,000" tpa current capacity. The discrepancy is noted; the 200 ktpa figure is the more recent.
Replacement value: about A$45m (company estimate).
Carrying value: about A$12.3m for mining assets (plant and infrastructure), depreciated straight-line over 15 years (Interim Report Note 7).
Tailings: a 3 m upstream lift of the tailings storage facility (TSF) would add about 2 years of capacity. Engineering studies were completed in the March 2026 quarter, with the EA amendment application in preparation.
Sulphide expansion: management says it is well advanced in designing a plant modification or adjacent stream to process sulphide ore.
Toll service offering: not yet commercialised; discussions are ongoing with multiple small-scale miners.
Mineral assets (the "Spokes")
| Asset | Location / tenure | Status | Resource / Reserve (JORC 2012) | Historic production / notes | Source |
|---|---|---|---|---|---|
| Agate Creek Gold Project | ML100030 plus surrounding EPMs; ~100 km south of GGPP by road; ~480 km SW of Cairns; adjacent to Rungalla National Park | Mining suspended Jan 2024. Updated EA granted 7 Jul 2026. Restart targeted Q3 CY2026 but not confirmed in sources reviewed. | Ore Reserve: 460kt @ 2.5 g/t = 36,800 oz (Proved 87kt @ 3.3 g/t; Probable 373kt @ 2.3 g/t). Mineral Resource: 15.49Mt @ 0.85 g/t = 422koz (Measured 20koz, Indicated 269koz, Inferred 132koz) at a 0.3 g/t cut-off. | Recoveries at GGPP ~95%. Reserve gold price A$3,750/oz. | Interim Report; Gold Coast presentation |
| — Sherwood West Pits 1–3 | Agate Creek | Reserve | Pit 1: 124kt @ 2.2 g/t (8,700 oz). Pit 2: 67kt @ 2.0 (4,300 oz). Pit 3: 84kt @ 2.1 (5,800 oz). | — | Interim Report |
| — Sherwood Pit 6 | Agate Creek | Reserve | 185kt @ 3.0 g/t (18,000 oz) | Highest-grade reserve pit | Interim Report |
| Red Dam | ML30203 / EPM9158; ~80 km north of GGPP | Resource upgraded 2 Jul 2026 | 396kt @ 4.6 g/t = ~58,600 oz (Indicated 68kt @ 7.9 g/t; Inferred 328kt @ 3.9 g/t; ~11 g/t Ag). Exploration Target 430–1,060kt @ 3.3–5.4 g/t. | 22,600t @ 13.6 g/t mined in 2010. High-arsenic sulphide. Met recovery 70.7% via existing gravity/CIL. | ASX 2 Jul 2026; Gold Coast presentation; Kalkine (Aug 2026) |
| Electric Light | ML3548 / EPM8545; ~30 km from GGPP | Resource updated 29 May 2026 | 364kt @ 3.9 g/t = ~46,000 oz, with Indicated reported for the first time. Exploration Target 100–200kt @ 2.0–5.0 g/t. | ~23,000t @ 8.7 g/t mined in 2010/2011. Met recovery 71.6% via existing gravity/CIL. | Gold Coast presentation; ASX 20 Aug 2026; Kalkine |
| Big Reef | ML3278/3279/3280, EPM15547; ~45–50 km by road from GGPP, near Forsayth | Small open pit mined Nov 2025 and Apr–May 2026 | Inferred 107kt @ 3.0 g/t = 10,000 oz. Exploration Target 190–420kt @ 2.0–3.5 g/t. | 22,700t @ ~2.5 g/t mined in 2013. Big Reef Extended RC returned 7m @ 5.34 g/t from 12m. | Gold Coast presentation; Interim Report |
| Jubilee Plunger | ML3374 | Resource updated Oct 2025 | 296kt @ 2.1 g/t Au and 16.6 g/t Ag = 20,000 oz (Indicated 98kt @ 2.4 g/t; Inferred 198kt @ 2.0 g/t) | Contained gold up 220% vs 2022 estimate | Interim Report |
| Union | ML3366 | Inferred resource | 167kt @ 3.2 g/t = 17,000 oz | — | Interim Report |
| Phily's | Georgetown EPMs | Exploration Target only | 50–150kt @ 1.2–2.5 g/t (2–12koz) | No historical production | Gold Coast presentation |
| Big Ben rock piles | Georgetown district | Plant feed source 2026 | Not a JORC resource | Low-grade feed (~1.4–1.5 g/t processed) | Mar 2026 quarterly |
| Big Wonder, Caledonia prospects | Near GGPP | Drill targets | — | Shallow drilling priority | Mar 2026 quarterly |
| Ashford Coking Coal royalty | Ashford, northern NSW (owned by Clara Resources) | Royalty only | A$0.75/t on coal produced. Ashford resource 14.5Mt (Measured 2.5Mt, Indicated 7.2Mt, Inferred 4.8Mt). | No carrying value attributed | Gold Coast presentation; Interim Report |
| Financial assets (FVTPL) | Listed equity holdings (including Clara shares received on Renison sale) | Held | A$0.12m carrying value (31 Dec 2025) | — | Interim Report |
Aggregate inventory.
-
Georgetown Mineral Resource after the 2026 Red Dam and Electric Light updates: about 1.33Mt @ 3.6 g/t for ~152,000 oz (Kalkine summary of the 20 Aug 2026 release).
-
Company-wide Mineral Resource: cited as ~552–553koz in the June 2026 presentation, before the Red Dam upgrade.
-
Georgetown Exploration Targets in aggregate: 770kt–1.83Mt @ 2.6–4.7 g/t (65–277koz). These are conceptual only.
Development pipeline "products"
Agate Creek stand-alone plant: Concept study for a new ~1 Mtpa gold plant at Agate Creek to unlock the low-grade, bulk 422koz resource and eliminate ~100 km of trucking. Enthalpy Pty Ltd was engaged in the March 2026 quarter to scope a Feasibility Study, and discussions are under way with a potential partner. No capex, timeline or partner has been disclosed.
Sulphide processing stream at GGPP: Under design. Flotation testwork is planned for 2026 to improve recoveries from Red Dam and Electric Light sulphides, given the ~71% recoveries from the existing circuit.
Toll-treatment service: Under negotiation; no contracts disclosed.
Financial Narrative
Basis. FY2021–FY2025 are audited annual data (S&P Global template, via StockAnalysis). H1 FY2026 is the reviewed interim. Audited FY2026 is not available because the annual report had not been lodged as at 16 Oct 2026. Units are A$ millions unless stated.
Income statement
Sources: SVG annual reports FY2021–FY2025 (S&P/StockAnalysis). Income tax is nil throughout, so pre-tax equals net. Note that FY2021 and FY2022 operating losses exceed net losses, which indicates non-operating gains in those years (for example, a A$2.16m gain on asset sale in FY2021 per the cash-flow reconciliation).
Margins
FY2025 margins are not meaningful because revenue was only A$11,618 (S&P reports an operating margin of -54,845% and a net margin of -64,573%).
Revenue CAGR. No meaningful 5-year CAGR exists, because revenue went from nil to A$23.6m in FY2023 and back to near-nil in FY2025. The derived FY2023–FY2025 two-year CAGR is about -97.8%.
Balance sheet
Source: S&P/StockAnalysis, FY2021–FY2025 annual reports. FY2021–FY2022 share counts appear restated to a post-consolidation basis.
Latest balance sheet (31 December 2025, reviewed):
-
Cash A$0.29m; current assets A$4.54m.
-
Exploration and evaluation assets A$24.39m; development assets A$3.35m; plant and equipment A$12.32m.
-
Total assets A$46.78m.
-
Borrowings A$22.76m, comprising:
-
Norfolk Enchants short-term loan: A$2.30m at 20%, secured, repayable by 31 Aug 2026;
-
convertible notes: A$19.82m carrying value (A$22.2m face by June 2026), 12%, due 31 Dec 2026, secured over current assets;
-
accrued note interest: A$0.64m.
-
-
Trade and other payables A$3.85m; rehabilitation and other provisions A$3.48m.
-
Total liabilities A$30.17m; net assets A$16.61m; net current liabilities A$22.15m.
Source: H1 FY2026 Interim Report.
Cash flow
Source: S&P/StockAnalysis cash-flow statements. FY2023 capex reflects the Georgetown acquisition and refurbishment.
H1 FY2026 cash flow (reviewed):
-
Operating cash flow: -A$7.96m. Receipts of A$2.34m were swamped by A$10.17m of payments, which included settlement of legacy creditors.
-
Exploration spend: A$0.93m.
-
Equity raised: A$13.30m net of A$0.90m costs; convertible notes A$1.42m.
-
Borrowings repaid: A$5.10m, mainly Norfolk.
-
Net decrease in cash: A$0.09m.
Subsequently, the March 2026 quarter generated positive operating cash flow of A$1.24m (Mar 2026 quarterly).
Ratios (derived unless stated)
Net debt/EBITDA and interest coverage: not meaningful, because EBITDA and EBIT were negative in every year.
Cash conversion cycle: not publicly disclosed and not meaningful at current scale.
Investing.com cross-check: it reports a TTM return on investment of -135.62%, consistent with the derived FY2025 ROE.
Debt/equity at 31 Dec 2025: 1.37x (A$22.76m / A$16.61m), matching Simply Wall St's 137%.
Commentary on trends, inflections and drivers
FY2021–FY2022: the explorer-to-developer pivot.
Laneway was effectively pre-revenue. Losses were small (-A$0.21m and -A$0.97m) because exploration was capitalised; the exploration and evaluation balance is now A$24.4m. Equity rose from A$13.7m to A$24.7m on capital raisings, including the January 2022 ~A$11m programme. Capex rose to A$8.7m in FY2022 as Agate Creek was pre-stripped and the Georgetown deal was struck.
FY2023: the production year, with value destruction on scale.
Revenue peaked at A$23.6m once the GGPP began processing Agate Creek ore in September 2022. However:
-
gross margin was -25.5%, meaning cost of sales exceeded revenue even before overheads;
-
the net loss widened to A$14.7m;
-
the Georgetown acquisition was funded largely with debt (A$19.3m of debt issued), lifting total debt to A$18.3m;
-
capex of A$22.9m drove free cash flow to -A$20.5m.
Operating cash flow was briefly positive at A$2.45m, but only because accounts payable rose by A$6.7m. That deferral of creditor payments later turned into statutory demands.
FY2024: weather shock and balance-sheet impairment.
Cyclones from December 2023 and road damage forced a halt in January 2024. Revenue halved to A$11.6m, the gross margin collapsed to -110%, and the net loss reached A$20.6m. Equity fell to A$3.1m and debt/equity rose to 8.1x. Payables reached A$10.6m. The company failed to lodge periodic reports on time and was suspended by ASX from 1 May 2024 until 2 January 2025.
FY2025: care and maintenance plus recapitalisation.
Revenue was negligible, and the net loss of A$7.5m was cushioned by a A$3.98m gain on the Renison Coal sale. The company raised about A$12.9m of equity at A$0.015, including the Morgans-underwritten entitlement offer and placements. This roughly quadrupled the share count to 1.14bn and repaired equity to A$7.9m. All A$25.7m of debt became current because the convertible notes matured within 12 months.
H1 FY2026: restart.
The A$15m placement funded A$5m of Norfolk debt repayment and the plant restart. Revenue of A$2.33m on 354 oz sold was achieved at a realised price of A$6,528/oz. Mining and processing costs of A$4.70m implied a deeply negative gross result, partly because of commissioning and a A$1.43m inventory build.
Second half FY2026 (unaudited, quarterly):
Taking H1 revenue plus these quarters, unaudited FY2026 revenue is about A$14.6m (derived) on about 2,173 oz sold. Third-party estimates were A$16–17m (Simply Wall St / MarketScreener). Audited FY2026 figures will not be known until the annual report is lodged.
Key inflection. The business is operationally cash-positive at the plant level at roughly A$6,000–7,000/oz gold even on low-grade (~1.4–2.4 g/t) feed. However, it does not generate enough cash to service legacy creditors, A$22.2m of 12% notes due 31 Dec 2026, the minimum royalty payments to DGR, and the Agate Creek restart costs (including a A$1.60m additional cash rehabilitation bond). Hence the current financing transaction.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Entity | Role | Status | Source |
|---|---|---|---|
Savannah Goldfields Limited | ASX-listed parent; holder of Agate Creek tenements | Active | Interim Report |
Masterson Minerals Pty Ltd | Acquired FY2023; holding company for the Georgetown Project | Active (acquired) | Interim Report |
Kempton Minerals Pty Ltd | Subsidiary of Masterson; owner of the Georgetown plant and tenements at acquisition | Active (acquired) | Mining Weekly (Feb 2022) |
Renison Coal Pty Ltd | Ashford coking coal interest | Sold 17 Jul 2024 | Interim Report Note 3 |
Results by Segment and Segment Margins & Growth (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Segment revenue (AUD Mn) | — | — | 23.60 | 11.56 | 0.01 |
Segment operating income (AUD Mn) | -2.06 | -1.39 | -9.85 | -15.86 | -6.37 |
Segment pre-tax income (AUD Mn) | -0.21 | -0.97 | -14.71 | -20.57 | -7.50 |
Segment operating margin (%) | — | — | -41.7 | -137.3 | — |
Revenue YoY growth (%) | — | — | — | -51.0 | -99.9 |
Contribution to total revenue (%) | — | — | 100 | 100 | 100 |
Results by Segment and Operating Metrics (oz)
| Metric | H1 FY2025 | H1 FY2026 |
|---|---|---|
Revenue (AUD Mn) | 0.00 | 2.33 |
Other income (AUD Mn) | 4.30 | 0.01 |
Loss after tax (AUD Mn) | -1.52 | -5.71 |
Gold sold (oz) | 0 | 354 |
Income Statement and Per-Share Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue (AUD Mn) | — | — | 23.60 | 11.56 | 0.01 |
Gross profit (AUD Mn) | — | — | -6.01 | -12.71 | -3.51 |
Operating income / EBIT (AUD Mn) | -2.06 | -1.39 | -9.85 | -15.86 | -6.37 |
D&A (AUD Mn) | 1.08 | 0.15 | 6.46 | 2.11 | 1.17 |
EBITDA, derived = EBIT + D&A (AUD Mn) | -0.98 | -1.24 | -3.39 | -13.75 | -5.20 |
Pre-tax income (AUD Mn) | -0.21 | -0.97 | -14.71 | -20.57 | -7.50 |
Net income (AUD Mn) | -0.21 | -0.97 | -14.71 | -20.57 | -7.50 |
EPS basic and diluted (AUD, S&P rounded) | -0.00 | -0.01 | -0.08 | -0.09 | -0.02 |
Dividends per share (AUD) | 0 | 0 | 0 | 0 | 0 |
Margin Analysis (%)
| Metric | FY2023 | FY2024 |
|---|---|---|
Gross margin (%) | -25.5 | -110.0 |
Operating margin (%) | -41.7 | -137.3 |
EBITDA margin, derived (%) | -14.4 | -118.9 |
Net margin (%) | -62.3 | -178.0 |
Balance Sheet
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Total assets (AUD Mn) | 20.96 | 32.24 | 50.22 | 43.22 | 42.95 |
Cash and equivalents (AUD Mn) | 0.03 | 0.13 | 0.11 | 0.15 | 0.39 |
Short-term debt incl. current portion (AUD Mn) | 1.68 | 2.00 | 7.47 | 10.74 | 25.68 |
Long-term debt (AUD Mn) | 1.89 | 1.84 | 10.85 | 14.56 | 0.00 |
Total debt (AUD Mn) | 3.56 | 3.85 | 18.32 | 25.30 | 25.68 |
Net debt (AUD Mn) | 3.53 | 3.71 | 18.21 | 25.14 | 25.29 |
Shareholders' equity (AUD Mn) | 13.67 | 24.72 | 19.57 | 3.13 | 7.93 |
Goodwill and intangibles (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Working capital (AUD Mn) | -3.37 | -1.67 | -12.06 | -22.08 | -30.43 |
Shares outstanding (M, post-consolidation) | 94.38 | 157.55 | 195.85 | 281.08 | 1,141.58 |
Cash Flow
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | -0.32 | -3.26 | 2.45 | -6.68 | -10.59 |
Capital expenditure (AUD Mn) | -3.91 | -8.66 | -22.91 | -0.86 | -0.21 |
Free cash flow (AUD Mn) | -4.23 | -11.92 | -20.45 | -7.53 | -10.80 |
Investing cash flow (AUD Mn) | -2.09 | -8.66 | -23.20 | 0.09 | 3.24 |
Debt issued (AUD Mn) | 1.85 | 5.75 | 19.26 | 4.80 | 2.45 |
Debt repaid (AUD Mn) | 0 | -4.07 | -4.60 | -1.38 | -4.32 |
Equity issued (AUD Mn) | — | 10.96 | 6.81 | 3.21 | 10.48 |
Financing cash flow (AUD Mn) | 1.85 | 12.03 | 20.72 | 6.63 | 7.59 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
ROE on average equity (%) | — | -5.1 | -66.4 | -181.2 | -135.6 |
ROA on average assets (%) | — | -3.6 | -35.7 | -44.0 | -17.4 |
ROIC on average invested capital, EBIT basis (%) | — | -6.1 | -29.8 | -48.0 | -20.7 |
Current ratio (x) | 0.35 | 0.69 | 0.29 | 0.07 | 0.04 |
Debt / equity (x) | 0.26 | 0.16 | 0.94 | 8.08 | 3.24 |
Asset turnover (x) | — | — | 0.57 | 0.25 | 0.00 |
Share Price & Returns
| Quarter | Gold sold | Realised price | Proceeds / revenue | Cost commentary | Source |
|---|---|---|---|---|---|
March 2026 | 985 oz | A$6,907–7,054/oz | A$7.03m of gold and silver proceeds | Provisional project-related cost A$4,389/oz produced; positive operating cash flow of A$1.24m | Mar 2026 quarterly |
June 2026 | 834 oz | A$6,241/oz | ~A$5.2m (derived) | Feed grades below estimates prompted a grade-control review | Jun 2026 quarterly summary; Industry Queensland |
Revenue by Region and Revenue by Region (%)
| Region | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Australia revenue (AUD Mn) | 23.60 | 11.56 | 0.01 |
Australia share of total (%) | 100 | 100 | 100 |
Rest of world revenue (AUD Mn) | 0 | 0 | 0 |
Region growth (%)
| Region growth (%) | FY2024 | FY2025 |
|---|---|---|
Australia revenue YoY growth (%) | -51.0 | -99.9 |
Ore Source by Period
| Period | Ore source | Source |
|---|---|---|
FY2023–FY2024 | 100% Agate Creek ore | Annual reports |
Nov 2025 – Feb 2026 | Agate Creek stockpiles, Charters Towers toll-campaign crushed material, GGPP stockpiles and tailings, and Big Ben rock dumps | H1 FY2026 Interim Report |
Mar 2026 quarter | Big Ben rock piles only | Mar 2026 quarterly |
Apr–May 2026 | Big Reef pit material | Mar 2026 quarterly; Jun 2026 presentation |
Share Price History
| Date | Price (AUD) | Context | Source |
|---|---|---|---|
2023 (date per Reuters brief) | 0.150 | Placement price for A$2.7m raise (post-consolidation) | Reuters via Stockopedia |
Feb 2025 – Oct 2025 | 0.015 | Placement and entitlement price (A$15m raise) | Interim Report |
6 Feb 2026 | 0.017 | — | StockAnalysis |
10 Jun 2026 | 0.009 | Market cap A$19.2m | Gold Coast presentation |
8 Jul 2026 | 0.012 | After EA approval | Kalkine |
30 Jul 2026 | 0.012 | Market cap ~A$26.9m | StockAnalysis |
26 Aug 2026 | 0.009 | 1-year return -40% | StockAnalysis |
11–30 Sep 2026 | 0.006 | Last trades before suspension | StockAnalysis; stockinvest.us |
Valuation Multiples (x)
| Valuation metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
P/S at fiscal year end, S&P (x) | 0.87 | 0.32 | 1,572.15 |
Capital Instruments
| Instrument | Amount | Rate | Maturity | Security |
|---|---|---|---|---|
Convertible notes | A$22.2m face (A$19.8m carrying at 31 Dec 2025) | 12% | 31 Dec 2026 | Current assets |
Norfolk Enchants loan | A$2.30m (31 Dec 2025), less A$0.75m repaid after period end | 20% | 31 Aug 2026 | Fixed and floating charge |
Bizzell Nominees facility | A$2.0m limit, undrawn | 8% | 31 Mar 2027 | — |
DGR royalty obligations | Minimum A$100k per fortnight during Tier 1 | — | — | Proposed priority mortgage (not executed) |
Analyst Conclusions
Management guidance
-
No formal FY2027 production or cost guidance has been disclosed.
-
Stated intentions are:
-
restart Agate Creek mining (Phase 1: 375kt for ~31,900 oz, processed across 2026–2028);
-
sustain weekly gold pours;
-
complete the 2026 drilling programme;
-
advance sulphide and stand-alone plant studies.
-
-
Near term, the overriding objective is to close the undisclosed financing transaction, lodge the FY2026 Annual Report and restore quotation by the end of October 2026.
Consensus
There is no credible broker consensus.
Bull case
-
Grade step-change. Moving from about 1.4–1.9 g/t interim feed to the 2.5 g/t Agate Creek reserve (Pit 6 at 3.0 g/t), with ~95% recoveries, could roughly double ounces per tonne milled. At about A$6,000/oz this could transform plant margins against the March 2026 quarter's provisional A$4,389/oz cost.
-
Asset backing exceeds market value. A plant with an estimated ~A$45m replacement value, a permitted reserve and ~574koz of total resources (422koz Agate Creek plus ~152koz Georgetown) sit inside an equity value of about A$13.5m. Any financing that removes the 31 December 2026 note overhang could re-rate the equity sharply.
-
Hub monopoly. Being the only mill within 400 km gives SVG pricing power over toll feed and first-mover status as regional consolidator, alongside resource upside from Exploration Targets of 65–277koz and open-at-depth high-grade shoots at Red Dam and Electric Light.
Bear case
-
Capital structure overwhelms the asset. A$22.2m of 12% notes due in about 11 weeks, against negligible cash and a suspended share price, means the pending "material financing" is likely to be highly dilutive, debt-heavy or control-changing. The conversion price of A$0.04 is about seven times the last trade.
-
Execution track record. Every production year (FY2023–FY2024) generated negative gross margins. Creditor demands, winding-up petitions and two late-reporting episodes (2024 and 2026) indicate weak financial control. June 2026 quarter grades disappointed.
-
Counterparty and governance risk. DGR's material-breach allegation threatens the royalty financing and could escalate to litigation. Related-party concentration around the Chairman complicates independent decision-making in any restructuring.
Key catalysts and monitorables (next 12 months)
| Timing | Catalyst / monitorable |
|---|---|
| By 31 Oct 2026 | Announcement of the financing transaction (counterparty, structure, dilution, security ranking); lodgement of the FY2026 audited Annual Report (watch the going-concern wording and any audit qualification); reinstatement to quotation |
| ~27–31 Oct 2026 | September 2026 quarterly: gold sold, realised price and unit costs; confirmation of whether Agate Creek mining actually restarted |
| Q4 CY2026 | Resolution or escalation of the DGR dispute |
| Q4 CY2026 | Norfolk loan full repayment confirmation (31 Aug 2026 deadline) |
| By 31 Dec 2026 | Convertible-note redemption, conversion, refinancing or further extension; expiry of A$0.03 listed options |
| Q4 CY2026 / Q1 CY2027 | Results of 2,000–6,000 m drilling; TSF lift EA approval; first Agate Creek reserve ore through GGPP; wet-season resilience of haulage |
| CY2027 | Agate Creek stand-alone plant feasibility scope and budget; partner announcement; toll-treatment contracts; FY2027 guidance |
Analyst verdict
Savannah Goldfields is a textbook case of strategically valuable infrastructure trapped inside a distressed capital structure.
What is real. The Georgetown plant is the only gold mill in a large, historically prolific but under-processed goldfield. The company has spent five years and considerable capital securing what it needed. In July 2026 it obtained a site-specific Environmental Authority for a 36,800-ounce, 2.5 g/t Ore Reserve that can feed the plant for more than two years at gold prices far above the A$3,750/oz reserve assumption. Since November 2025 it has shown it can run the plant and pour gold weekly, and it even generated positive operating cash flow in the March 2026 quarter while processing sub-2 g/t rock dumps. Resource growth at Red Dam, Electric Light and Jubilee Plunger is genuine, and the exploration pipeline is credible.
What dominates. The equity story, however, is not determined by geology. It is determined by the next eleven weeks:
-
A$22.2m of 12% secured notes mature on 31 December 2026.
-
The company had A$0.29m of cash at the half-year.
-
It has a documented history of creditor demands, winding-up petitions and late reporting.
-
A royalty investor alleges material breach.
-
The shares are suspended pending an undisclosed transaction without which the auditors cannot sign the accounts.
Whatever closes the funding gap will reset ownership, security ranking and possibly control. Existing shareholders' claim on the asset will depend almost entirely on those terms.
Verdict. The asset quality warrants monitoring, but the equity is uninvestable for institutional mandates until three things are clear: the financing terms, audited FY2026 accounts, and the post-restructure capital table. Over a 12-month view, the operational upside (Agate Creek grade uplift, toll and sulphide optionality) is real. It accrues first to whoever provides the rescue capital. Speculative only; high risk of permanent dilution.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Background | Disclosed compensation | Indicative ownership |
|---|---|---|---|---|---|
Stephen Bizzell | Executive Chairman (non-independent) | 28 Jun 1996 | 30+ years in corporate finance. Led or co-founded Arrow Energy, Bow Energy, Stanmore, Renascor, Strike Energy. Chairman of Maas Group Holdings (from Oct 2020). Principal of Bizzell Capital Partners. ACA, BComm, MAICD; born 1968. | ~A$156k (third-party compilation of latest remuneration report) | ~2.9% (Simply Wall St) |
Richard (Rick) Anthon | Non-executive director | 28 Jun 1996 | Corporate and commercial lawyer, 30+ years in resources | ~A$48k | ~0.8% |
Mark Baker | Non-executive director | 2 Oct 2014 | Former senior editor and national editorial executive at Fairfax Media; government relations | ~A$48k | ~1.0% |
Peter Wright | Non-executive director | 31 Oct 2017 | 25 years in financial markets. Partner at Bizzell Capital Partners. Director of DGR Global (from Jan 2021) and Greenwing Resources. | Not captured | Not captured |
Brad Gordon (former) | NED from 11 Dec 2020, then CEO & MD | Resigned 31 Oct 2023 | Former CEO of LSE-listed Acacia Mining | — | — |
Executive Leadership Team
| Name | Title | Tenure | Prior roles / education | Compensation | Source |
|---|---|---|---|---|---|
Stuart Bradley (Brad) Sampson | Chief Executive Officer | Since 15 Apr 2025 (consultant beforehand) | CEO of Discovery Metals and Kore Potash. Newcrest Chief Transformation Officer. BE (Hons) Mining (UQ), MBA (Deakin), Oxford AMP. Age ~59. | Total fixed remuneration A$450k incl. super. STI up to 40% of TFR. 20m options at A$0.02 (3-year term, two tranches). 12.8m LTI performance rights (approved at Nov 2025 AGM). | Creamer Media; FNN; AGM results 26 Nov 2025 |
Paul (Jonathan Paul Kershaw) Marshall | Company Secretary (and CFO per third-party profiles) | Throughout recent periods | ACA, CA, Grad Dip, LLB; 30+ years as company secretary/CFO for resource companies; born 1962 | ~A$156k (third-party) | Annual reports; Yahoo |
Patrick (Pat) Smith | Exploration Manager (contractor via PSGS Pty Ltd); Competent Person | Current | MAusIMM; 30+ years exploration geology | Contract terms not disclosed | Quarterlies |
Bob Hayes | Head of Operations | Current (options granted 28 Nov 2025) | — | 3m options at A$0.03 (vesting Jun 2026 and Jun 2027) | Interim Report Note 13 |
Scott Hall (former) | COO and Exploration Manager | Earlier period | — | ~A$297.6k (third-party) | Yahoo |
Brett Thompson (former) | CEO (period between Gordon and Sampson, per third-party profile) | — | FSAIMM, Grad Dip, MAusIMM | ~A$455.4k (third-party) | Yahoo |
“—” = not publicly disclosed.
Major Shareholders
| Holder | Stake (%) | Date | Source |
|---|---|---|---|
W&E Maas Holdings (Wes Maas, CEO/MD of Maas Group) | 14.7 | 10 Jun 2026 | Gold Coast presentation |
Board and management (aggregate) | 13.0 | 10 Jun 2026 | Gold Coast presentation |
Collins Street Asset Management | 6.3 | 10 Jun 2026 | Gold Coast presentation |
Shundao Pty Ltd and Jiansheng Wang | 5.20 | 4 Aug 2026 (Form 603) | Kalkine (5 Aug 2026) |
DGR Global Ltd | 4.5 | 10 Jun 2026 | Gold Coast presentation; DGR release |
Other top-10 holders | 13.5 | 10 Jun 2026 | Gold Coast presentation |
Other holders | 48.0 | 10 Jun 2026 | Gold Coast presentation |
Competitive Landscape
Key Competitors
| Competitor (ticker) | Segment overlap | Positioning vs SVG | Source |
|---|---|---|---|
Native Mineral Resources (ASX: NMR) | North Qld restart of a small gold plant (Blackjack, Charters Towers) | Closest analogue: plant restart funded partly by Wes Maas, SVG's largest holder (A$6.8m into NMR's A$15.9m raise). Has a record gold pour in early 2026. | Smallcaps; Miners News |
Sunshine Metals (ASX: SHN) | Charters Towers district hub; converting the 300 ktpa Mt Moss plant to gold, processing from mid-2027 | Emerging regional processor; potential competitor for third-party feed in the broader North Qld market | SHN ASX release 30 Apr 2026 |
Citigold Corporation (ASX: CTO) | Charters Towers underground gold with a 340 ktpa CIL plant (historical capacity) | Legacy regional plant owner. | Mining Technology project profile |
Evolution Mining (ASX: EVN) | Major Australian producer with Queensland exposure (e.g., Ernest Henry) | Industry benchmark for costs and access to capital; not a direct competitor for SVG's feed | — |
Westgold Resources (ASX: WGX) | Hub-and-spoke multi-mill model (Western Australia) | Strategic archetype SVG emulates at micro-scale | — |
Pantoro (ASX: PNR) | Restarted Norseman plant (WA) | Comparable restart narrative at larger scale | — |
Barton Gold (ASX: BGD) | Owns the Central Gawler Mill (SA) as a regional hub | Analogue: plant-led regional consolidation | — |
Brightstar Resources (ASX: BTR) | WA hub-and-spoke consolidation | Analogue for consolidation and capital competition | — |
Kaiser Reef (ASX: KAU) | Small Victorian producer with its own plant (Maldon) | Micro-cap peer with a similar plant-ownership model | — |
Georgetown-district small-scale miners | Local oxide producers | Potential toll customers or acquisition targets rather than competitors | Mar 2026 quarterly |
Peer Comparison FY2026
| Metric | SVG | SHN |
|---|---|---|
Latest annual revenue (AUD Mn) | 0.01 (FY2025 audited); ~14.6 FY2026 unaudited, derived | ~0 (developer) |
Revenue growth | n/m | n/m |
Operating margin | Negative (FY2023 -41.7%; FY2024 -137.3%) | Negative (developer) |
R&D intensity | Not disclosed (exploration capitalised) | — |
Own plant | Yes (~200 ktpa) | Converting (300 ktpa, mid-2027) |