Silver Mines Ltd., Sydney Overview
| Field | Detail |
|---|---|
| Legal name | Silver Mines Limited |
| Entity profiled | The listed entity matching the user-supplied identifiers (ASX: SVL; website silvermines.com.au). No change of name or listing was identified. |
| Former names | None identified (Market Index lists "no former company names") |
| ABN / ACN | ABN 45 107 452 942 / ACN 107 452 942 (company corporate directory) |
| Incorporation date | 6 January 2004 (IBISWorld company profile) |
| Incorporation jurisdiction | Australia (New South Wales registered office); public company limited by shares |
| ASX listing date | 19 January 2007 (Market Index) |
| Headquarters / registered office | Level 28, 88 Phillip Street, Sydney NSW 2000, Australia (company corporate directory) |
| Postal address | GPO Box 225, Sydney NSW 2001 |
| Primary exchange and ticker | Australian Securities Exchange: SVL (SVL.AX) |
| Secondary quotation | US OTC Markets: SLVMF (sometimes rendered SLVM.F) |
| ISIN | AU000000SVL8 (user-supplied; consistent with standard ASX ISIN construction) |
| CUSIP | Not publicly disclosed / not applicable (ASX primary listing) |
| Fiscal year end | 30 June |
| Employees | Not publicly disclosed. The company runs a small corporate team plus a site and community team at Bowdens and relies heavily on consultants. No 3-year trend is disclosed. |
| Auditor | Ernst & Young, Sydney, per the current company corporate directory. Market Index still lists Crowe Sydney, which most likely reflects the prior auditor. Discrepancy noted; the company's own directory is preferred. |
| Share registry | Automic, Level 5, 126 Phillip Street, Sydney NSW 2000 |
| Company Secretary / CFO | Trent Franklin |
| Market capitalisation | About A$388 million at 23 September 2026, before the second tranche of the September 2026 placement (Discovery Alert company hub). Simply Wall St reported A$484 million on 4 March 2026 at about A$0.23 per share. The share price traded at A$0.13–0.16 through July–September 2026. |
| Website | www.silvermines.com.au (the user-supplied http address resolves to the same domain) |
| Industry classification | Silver, lead and zinc ore mining / precious metals development |
Silver Mines Limited is a Sydney-based, ASX-listed silver developer. It wholly owns the Bowdens Silver Project near Mudgee in central New South Wales, which it describes as Australia's largest undeveloped silver deposit. A July 2026 Definitive Feasibility Study (DFS) set out a two-stage, 26-year open-pit operation. The DFS is underpinned by an Ore Reserve of 47.9 Mt at 60.8 g/t silver for 93.5 Moz of contained silver, an initial capital estimate of A$455 million, and a pre-tax NPV5 of A$1.04 billion at US$45/oz silver. The company's investment case rests on three things: high leverage to the silver price, Bowdens' position in a stable OECD jurisdiction, and a 2,115 km² district land package along the Rylstone Volcanics. Early-stage silver and gold exploration in California adds optionality. The binding near-term variable is permitting. The project's 2023 consent was voided by the NSW Court of Appeal in August 2024, and a fresh Independent Planning Commission determination is due by 9 December 2026.
What the company does
Silver Mines acquires, explores and develops silver-dominant polymetallic mineral projects. It has never operated a mine and generates no product revenue. Its reported "revenue" consists almost entirely of interest income on cash deposits and minor other income. FY2026 revenue was A$0.511 million (RTTNews, FY2026 results) and FY2025 revenue was A$0.213 million (Simply Wall St / company FY2025 results).
Its stated purpose, as reflected in company materials, is to consolidate silver deposits in New South Wales and build Australia's pre-eminent silver company (InvestSMART company description). Since June 2025 it has also pursued a US exploration strategy through two projects in San Bernardino County, California (2025 Annual Report).
Business model and revenue model
| Dimension | Current state (FY2026) | Prospective state (post-development) |
|---|---|---|
| Revenue type | Interest income only | Sale of silver-lead and zinc concentrates to smelters/traders |
| Product vs service mix | 0% product / 0% service | ~100% product. The DFS expects about 91% of revenue from silver (Mining.com.au, 21 Jul 2026) |
| Subscription / licensing | — | None. Note that the company has been buying back third-party royalties rather than creating them |
| Value chain position | Upstream: exploration and project development | Upstream: mining, crushing and flotation to concentrate. Smelting and refining would be done by third parties |
| Customer types | — | Base and precious metal smelters, concentrate traders, potentially offtake financiers |
| End markets | Not applicable | Silver: industrial (photovoltaics, electronics), jewellery and silverware, investment (bars, coins, ETPs). Zinc and lead: galvanising, batteries |
Company's own description
In its corporate materials the company presents Bowdens as one of the world's largest undeveloped silver projects and a high-quality critical minerals project of state and regional significance in NSW (Kalkine, 2 July 2026; company investor presentations 2024). The 2025 Annual Report describes the California acquisitions as brownfields projects. It says they give exposure to tier-one jurisdictions with significant exploration upside and minimal near-term capital needs, and that near-term work will focus on mapping, geophysics and drill-target definition.
Independent characterisation
Silver Mines is best understood as a single-asset, permit-gated, silver-price option. Its equity value is mainly a probability-weighted claim on the future cash flows of Bowdens. Those cash flows depend on four conditions:
-
Reinstatement of State Significant Development consent SSD-5765 by the NSW Independent Planning Commission (IPC).
-
Any subsequent legal challenges failing.
-
Arranging roughly A$455 million of initial capital, most likely through a mix of debt, equity and possibly streaming, offtake or strategic investment.
-
A supportive silver price. The DFS base case uses US$45/oz.
The company has spent heavily to de-risk the project's economics. It completed the DFS, bought freehold land and extinguished both private royalties for A$26 million. Its share price, however, has repeatedly shown that the market prices Bowdens at a deep discount to its stated NPV. Using approximate figures, a market capitalisation of about A$388 million against a post-tax NPV5 of A$736 million implies about 0.5x P/NAV. At the DFS-quoted spot pricing the discount is wider. That discount reflects permitting and community-opposition risk.
Strategy
Stated strategy themes
Based on the 2025 Annual Report, H1 FY2026 report and 2026 announcements, the strategy rests on five pillars (paraphrased):
-
Secure Bowdens development consent. Development of Bowdens is the company's top priority (Kalkine, 2 Jul 2026).
-
Advance Bowdens engineering and economics. The DFS was completed in July 2026 and engineering studies continue.
-
Commercial consolidation. This means removing royalties and buying strategic land to maximise direct exposure to Bowdens' economics.
-
District-scale growth in NSW. The aim is to grow resources across the 80 km Rylstone Volcanics trend (Bara Creek, Tuena, Barabolar).
-
International exploration optionality. This covers low-cost, brownfields US exploration in California.
Strategic initiatives (last 24 months)
| Date | Initiative | Detail / target | Status |
|---|---|---|---|
| Dec 2024 | Bowdens Optimisation Study | Reserve +10%; supported funding discussions | Superseded by DFS |
| Jun 2025 | California entry | Calico North (100%) and Kramer Hills (to 80%) | Exploration; drilling planned |
| 2025–2026 | Biodiversity reassessment | Refreshed ecological surveys; updated BDAR submitted 2 Jul 2026 | Completed |
| Apr/May 2026 | Strategic land acquisition | Land next to Bowdens for water security, biodiversity offsets and infrastructure | Completed |
| May 2026 | Option underwriting | Underwriting agreement to make sure outstanding options are exercised, securing capital | Executed 26 May 2026 |
| Jul 2026 | Bowdens DFS | 26-year LOM; A$455M initial capex | Completed |
| Sep 2026 | Royalty extinguishment | A$26M for the Royalco 2% NSR and Asia Metals 1% GRR | Completed 29 Sep 2026 |
| Sep 2026 | A$70M placement | Funds consent, royalty cash, freehold purchases and US exploration | Tranche 1 settled; Tranche 2 pending AGM on 26 Nov 2026 |
| Aug–Sep 2026 | Community support research | Company-commissioned survey: 84% positive or neutral (ABC); about two-thirds supportive (Mining.com.au) | Ongoing engagement |
| Ongoing | Critical minerals alignment | Positions Bowdens within the NSW Critical Minerals and High-Tech Metals Strategy | Ongoing |
ESG commitments
No quantified emissions targets were identified in public documents. Commitments are project-level: conditions of consent, biodiversity offsets, water management and community benefit.
Cost programmes
No formal cost-reduction programme has been disclosed. Corporate cost discipline is shown by operating cash outflows staying near A$2.3–2.6M per year in FY2023–FY2025.
Medium-term targets and guidance
| Item | Guidance |
|---|---|
| IPC determination | On or before 9 Dec 2026 (statutory 85-day window) |
| Development timeline | The company has previously said it will give detailed development and permitting timelines once development consent is granted (Vox Royalty summary of SVL statements) |
| California exploration | Geophysics and drill planning in H2 calendar 2026 |
| Production guidance | DFS average of about 3.2 Moz Ag per year over 26 years; AISC US$23.04/oz |
| Financial guidance | None (pre-revenue) |
Products & Services
For a mining developer the "product portfolio" is its project portfolio. Each asset is profiled below.
Bowdens Silver Project (NSW, Australia) — flagship, 100% owned
| Attribute | Detail | Source |
|---|---|---|
| Location | About 26 km east of Mudgee in central NSW (company). Local press describes the site as about 2 km north of the village of Lue and about 35 km east of Mudgee (distance discrepancy reflects different reference points) | Mining.com.au; Daily Liberal, 21 Sep 2026 |
| Project area | 2,115 km² (521,000 acres) covering about 80 km of strike of the Rylstone Volcanics | Discovery Alert, 16 Sep 2026 |
| Commodity | Silver (primary), zinc, lead | DFS, 21 Jul 2026 |
| Ore Reserve (2026) | 47.9 Mt at 60.8 g/t Ag, 0.36% Zn, 0.26% Pb, containing 93.5 Moz Ag, 172 kt Zn, 127 kt Pb | SVL DFS announcement, 21 Jul 2026 |
| Reserve change | +46% in ore tonnes and about +30% in silver ounces versus the 2024 Ore Reserve | SVL DFS announcement |
| Mineral Resource (2026) | 173 Mt at 33 g/t Ag, 0.39% Zn, 0.28% Pb (Motley Fool quarterly summary). Mining.com.au and Kalkine report the same tonnage as "33 g/t AgEq for 286 Moz AgEq". Discrepancy: 173 Mt at 33 g/t equals about 183 Moz Ag, so the 286 Moz figure is consistent only with silver-equivalent accounting that includes zinc and lead. The analyst reads this as 33 g/t Ag with about 286 Moz AgEq | Motley Fool, 31 Jul 2026; Mining.com.au, 21 Jul 2026 |
| Prior resource (2024 materials) | 189 Moz Ag (396 Moz AgEq) | SVL investor presentation, Nov 2024 |
| Mine plan | Two stages over 26 years. Stage 1 runs 16 years and produces 65.4 Moz Ag. Stage 2 adds 10 years, is at pre-feasibility level and needs further approvals | Quartr Q4 FY2026 summary |
| DFS-specific mine design | The DFS references a 29.9 Mt Stage 1 ore mine design, within the 48.2 Mt 2026 life-of-mine design | SVL DFS announcement |
| Average output | About 3.2 Moz Ag per year | Motley Fool, 31 Jul 2026 |
| LOM payable silver | 73.2 Moz (+46% versus the 2024 study) | Quartr |
| Initial capex | A$455 million | DFS |
| LOM capex | A$545 million (+58% versus the 2024 study); sustaining capital A$90.8 million | Quartr |
| AISC | US$23.04/oz, equal to A$32.91/oz at A$/US$0.70 (+39% versus the 2024 study) | Quartr; Mining.com.au |
| Base-case pricing | US$45/oz silver (A$64/oz) at A$/US$0.70 | Mining.com.au |
| LOM revenue | A$5,175 million | Quartr |
| LOM operating margin | A$2.39 billion (A$4.04 billion at spot) | DFS |
| Pre-tax operating surplus | A$1.94 billion undiscounted (A$3.59 billion at spot) | DFS |
| Pre-tax NPV5 / IRR | A$1,043 million / 31.5% (A$2.01 billion / 49% at spot) | DFS |
| Post-tax NPV5 | A$736 million (+191% versus 2024) | DFS; Motley Fool |
| Payback | 3 years from start of production | DFS |
| Employment | 300+ direct FTE in construction and 200+ over the mine life (company). Local press quotes about 320 construction and 228 ongoing jobs | Discovery Alert; Oberon Review |
| Royalty status | Both private royalties extinguished on 29 Sep 2026. NSW State royalties still apply | Mining.com.au, 29 Sep 2026 |
| Permitting status | SSD-5765 under IPC redetermination; public hearing 14–16 Oct 2026; determination due by 9 Dec 2026 | Discovery Alert; ABC |
Evolution of Bowdens study metrics (multi-year)
| Metric | FS2018 | OS2024 | DFS2026 |
|---|---|---|---|
| Ore Reserve (Mt) | 29.9 | 32.8 | 47.9 |
| Reserve silver grade (g/t) | 69.0 | 68.0 | 60.8 |
| Contained silver in reserve (Moz) | 66.32 | 71.7 | 93.5 |
| Mine life (years) | — | 16.5 | 26 |
| Pre-tax NPV5 base case (A$ M) | — | 359 | 1,043 |
| Post-tax NPV5 base case (A$ M) | — | 253 | 736 |
| Pre-tax IRR base case (%) | 20.8 | 21.0 | 31.5 |
Sources: company Bowdens project page (FS2018); SVL DFS comparison table (OS2024 and DFS2026); Simply Wall St (OS2024 reserve and life). FS2018 reported post-tax NPV of A$70.6M and pre-tax NPV of A$143.9M on its own assumptions, and the FS2018 mine life is not restated here. The DFS comparison table also shows an intermediate column with pre-tax NPV5 of A$877M and post-tax NPV5 of A$626M, which appears to be a DFS Stage 1 or alternate-price case. Pricing assumptions differ across studies, so NPVs are not like-for-like.
Calico North Project (California, USA) — 100% owned
| Attribute | Detail |
|---|---|
| Location | San Bernardino County, California, next to the historic Calico silver district |
| Commodity | Silver, barite |
| Acquired from | California Silver |
| Consideration | US$600,000 cash plus 39 million SVL shares (FNN, 13 Jun 2025) |
| Description | Extensive silver-barite mineralisation near historical mines, with limited modern exploration over the last century |
| Status | Mapping and sampling confirmed high-grade silver and barite. Drill planning and geophysics scheduled for H2 calendar 2026 (Quartr Q4 FY2026 summary). Earlier guidance targeted drilling in H1 2026 (H1 FY2026 outlook), so timing has slipped |
Kramer Hills Project (California, USA) — earning up to 80%
| Attribute | Detail |
|---|---|
| Location | San Bernardino County, California, at the historical Shaherald property; about 48 km² |
| Commodity | Oxide gold, with silver |
| Vendor / partner | Lustrum Gold |
| Farm-in terms | Initial US$600,000 plus 23.5 million SVL shares (12-month voluntary escrow). The first 50% is earned by funding US$3.5 million of exploration and property costs, plus a US$1.25 million cash payment and US$1.5 million in shares at 10-day VWAP. The company can then progress to up to 80% (FNN, 13 Jun 2025) |
| Historical results | Historical drilling includes 21.3 m at 7.9 g/t Au (Proactive Investors, Jun 2025) |
| Exploration target | Initial oxide exploration target of 160,000–445,000 oz contained gold. This is conceptual; there is insufficient data to define a Mineral Resource (Proactive Investors) |
| Status | Drill planning under way |
NSW regional exploration
| Project | Commodity focus | Status | Source |
|---|---|---|---|
| Bara Creek Prospect | Silver / base metals (Rylstone Volcanics) | Exploration targeted for resource growth | H1 FY2026 interim report |
| Tuena Project | Gold / silver | Exploration | H1 FY2026 interim report; Market Index |
| Barabolar Project | Copper / gold / silver | Exploration | Market Index; Motley Fool ticker profile |
| District targets | Bowdens analogues, high-grade epithermal Ag-Pb-Zn, VMS, copper-gold | Target generation | Discovery Alert, 16 Sep 2026 |
Pricing model: not applicable. There are no products for sale. Future concentrate sales would be priced against LBMA silver and LME zinc and lead, less treatment and refining charges and payability deductions.
Financial Narrative
All figures are in A$ millions unless stated; fiscal years end 30 June. Primary sources are company annual and interim reports, cross-checked against TipRanks, Simply Wall St, Investing.com and RTTNews. The FY2026 Annual Report was lodged in late September 2026; only headline figures (revenue, net loss, EPS) and the 30 June 2026 quarterly cash balance could be verified for FY2026.
Income statement
Sources: FY2022–FY2024 TipRanks (SLVMF financials); FY2025 net income and revenue from company results via Simply Wall St; FY2025 operating income approximated from Koalagains (operating margin -1,736.68% on A$0.213M revenue, about -A$3.70M; operating expenses A$4.07M); FY2026 RTTNews. FY2025 EPS of -A$0.0023 and FY2026 EPS of -A$0.0015 are from RTTNews. Diluted EPS equals basic EPS because the company is loss-making.
FY2021 reference: revenue A$0.199M; net income +A$5.36M (one-off gain); EBITDA +A$5.77M (TipRanks). The FY2022 EBITDA of -A$12.94M and net loss of -A$13.30M include a significant non-cash item.
Margins: gross, operating, EBITDA and net margins are not meaningful. Revenue is interest income, so margins of roughly -1,700% (FY2025, Simply Wall St net margin -1,769.43%) carry no analytical value.
Revenue CAGR FY2022–FY2026: about 31.7% per year (A$0.170M to A$0.511M). This reflects higher cash balances and interest rates, not operating growth.
Commentary. Net losses have stayed in a narrow A$2–4 million band since FY2023. This is consistent with a lean corporate structure that capitalises most project expenditure under AASB 6. The FY2026 loss narrowed to A$3.21M from A$3.77M, helped by higher interest income on a larger cash balance. The trend inflection to watch is not the P&L but the jump in capitalised spending: A$13.44M in H1 FY2026 alone. That spending was driven by the DFS, biodiversity surveys, land purchases and the start of California exploration.
Balance sheet
Sources: FY2022–FY2024 TipRanks; FY2025 Simply Wall St balance sheet (equity A$157.1M, total assets A$159.6M, liabilities A$2.5M, cash A$19.3M, debt nil). FY2026 cash is the 30 June 2026 quarter-end figure of A$35.75M from the June 2026 quarterly activities report (Quartr; Motley Fool). Equity for FY2022–FY2024 is derived as total assets minus total liabilities. Cash definitions differ between the TipRanks pages: the "cash & short-term investments" series includes term deposits, while "end cash position" does not. The FY2022–FY2023 "debt" of about A$3.5M probably reflects lease or other financial liabilities and was nil by FY2024.
Interim reference point (31 Dec 2025): net assets A$197.1M; cash A$40.5M (H1 FY2026 interim report).
Working capital: not disclosed in detail. It is positive and dominated by cash; liabilities were only A$2.5M at FY2025.
Commentary. The balance sheet is ungeared and asset-heavy. Most assets are capitalised exploration, evaluation and development costs plus land at Bowdens. Equity has grown through repeated equity raisings rather than retained earnings. The September 2026 transactions will change the balance sheet materially in FY2027. They comprise a A$70M placement (about A$40M in Tranche 1 and about A$30M in Tranche 2, subject to approval), A$18M cash paid for royalties, and A$8M of shares issued for royalties. Pro-forma cash after Tranche 2 is likely to sit well above the June 2026 level, but the exact figure is not publicly disclosed.
Cash flow
Sources: TipRanks cash flow page (labelled by calendar year but matching June fiscal years, e.g. end cash A$19.30M = 30 June 2025); Investing.com for net change in cash. Data quality flag: the TipRanks FCF series does not reconcile with OCF plus investing cash flow for every year (e.g. FY2025 FCF of -A$4.38M versus OCF plus investing of -A$14.90M). A more economically meaningful cash burn is OCF plus investing cash flow. The analyst estimates this at FY2021 -10.79, FY2022 -15.11, FY2023 -25.76, FY2024 -10.70 and FY2025 -14.90 (A$ M).
FY2026 interim and quarterly cash data: H1 FY2026 E&E spend A$13.44M; June 2026 quarter included A$7.98M of option exercise proceeds; cash fell from A$40.5M (Dec 2025) to A$35.75M (Jun 2026) despite those inflows. This implies H2 FY2026 gross cash use of roughly A$12–13M, consistent with land acquisition and DFS completion.
Capex: total capitalised E&E and development spending is the relevant measure. It is captured in investing cash flow above; PP&E capex is not separately disclosed.
Ratios
Analyst calculations from the tables above. Simply Wall St independently reports FY2025 ROE of -2.40% and debt/equity of 0%.
Overall financial commentary. The financial statements are typical of a well-capitalised developer. Losses are small and stable, there is no debt, and capitalised spending is rising. Funding comes entirely from equity: about A$89M of financing inflows over FY2021–FY2025, followed by a further A$70M placement plus A$8M of scrip in September 2026. Dilution is the main cost. Simply Wall St notes shares outstanding grew about 42% in the year to March 2026. The key financial inflection lies ahead: project finance for the A$455M initial capex, which is roughly 12–13x the June 2026 cash balance.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue incl. interest (AUD Mn) | 0.170 | 0.172 | 0.263 | 0.213 | 0.511 |
Gross profit as computed by TipRanks (AUD Mn) | -1.41 | -1.61 | 0.058 | — | — |
Operating income (AUD Mn) | -2.81 | -3.36 | -2.59 | -3.70 | — |
EBITDA (AUD Mn) | -12.94 | -3.74 | -1.97 | — | — |
Net income (AUD Mn) | -13.30 | -4.11 | -2.22 | -3.77 | -3.21 |
Basic EPS (A cents) | — | — | — | -0.23 | -0.15 |
Dividends per share (A cents) | 0 | 0 | 0 | 0 | 0 |
Balance Sheet
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total assets (AUD Mn) | 117.53 | 130.76 | 138.74 | 159.65 | — |
Cash & equivalents, year-end (AUD Mn) | 16.89 | 8.05 | 10.81 | 19.30 | 35.75 |
Cash + short-term investments (AUD Mn) | 22.72 | 13.64 | 11.07 | 19.30 | — |
Total debt (AUD Mn) | 3.49 | 3.57 | 0.00 | 0.00 | — |
Net debt, negative = net cash (AUD Mn) | -13.40 | -4.48 | -10.81 | -19.30 | — |
Total liabilities (AUD Mn) | 4.85 | 4.83 | 1.13 | 2.50 | — |
Shareholders' equity (AUD Mn) | 112.68 | 125.93 | 137.61 | 157.15 | — |
Goodwill & intangibles (AUD Mn) | 0 | 0 | 0 | 0 | — |
Cash Flow
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | -1.63 | -1.96 | -2.49 | -2.30 | -2.55 |
Investing cash flow (AUD Mn) | -9.16 | -13.15 | -23.27 | -8.40 | -12.35 |
Financing cash flow (AUD Mn) | 30.08 | 5.44 | 16.92 | 13.45 | 23.39 |
Free cash flow as defined by TipRanks (AUD Mn) | -12.88 | -17.37 | -25.46 | -16.03 | -4.38 |
Net change in cash (AUD Mn) | 19.30 | -14.53 | -8.84 | 2.75 | 8.49 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%)
| Ratio | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
ROE (%) | 4.5 | -11.8 | -3.3 | -1.6 | -2.4 |
ROA (%) | 4.3 | -11.3 | -3.1 | -1.6 | -2.4 |
Debt to equity (%) | 3.2 | 3.1 | 2.8 | 0.0 | 0.0 |
Financial Analysis
| Ratio | Assessment |
|---|---|
ROIC | Not meaningful (negative operating returns; pre-production) |
Current ratio | Not publicly disclosed in detail. It is very high, because current liabilities are small relative to cash: FY2025 total liabilities were A$2.5M against cash of A$19.3M |
Net debt / EBITDA | Not meaningful (net cash, negative EBITDA) |
Interest coverage | Not applicable (no interest-bearing debt) |
Asset turnover | About 0.001x; not meaningful |
Cash conversion cycle | Not applicable (no trading operations) |
Revenue by Region
| Region | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Australia revenue (AUD Mn) | 0.263 | 0.213 | 0.511 |
United States revenue (AUD Mn) | 0 | 0 | 0 |
Share Price History
| Date | Price (AUD) | Context | Source |
|---|---|---|---|
6 Mar 2025 | about 0.11 | Market cap about A$166M; 1,508M shares | Goldstockdata |
4 Mar 2026 | 0.23 | Market cap A$484.4M; 1-year return +191.7% | Simply Wall St |
26 May 2026 | 0.155 | Land acquisition announced | InvestSMART |
19 Jun 2026 | 0.125 | Substantial holder notice | InvestSMART |
2 Jul 2026 | 0.14 | +8% on Bowdens update; +12.5% over 1 year | Kalkine |
21 Jul 2026 | 0.14 | DFS release day (+8%) | Motley Fool / Morningstar |
about 18 Sep 2026 | about 0.161 (implied 5-day VWAP) | Placement priced at a 10% discount | Mining.com.au |
23 Sep 2026 | about 0.157 implied | Market cap about A$388M | Discovery Alert |
Return metric | Value | — | — |
1-year (to Mar 2026) | +191.7% (Simply Wall St) | — | — |
1-year (to Jul 2026) | +12.5% (Kalkine) | — | — |
3-year and 5-year | Not publicly disclosed in retrieved sources | — | — |
Volatility | Average weekly move of 14.8%, above 75% of ASX stocks (Simply Wall St) | — | — |
Valuation Multiples
| Multiple | SVL | Comment |
|---|---|---|
P/E | Not meaningful (loss-making; -99x TTM per StockInvest, Feb 2026) | — |
P/B | About 2.0x (market cap about A$388M / FY2025 equity A$157M). About 1.9x on H1 FY2026 net assets of A$197M before the Sep 2026 issuance | Analyst calculation |
P/NAV (base-case post-tax NPV5 A$736M) | About 0.5x before project-level adjustments (excludes capex funding dilution and corporate costs) | Analyst calculation |
EV per reserve ounce | About A$3.7/oz Ag (EV of about A$350M / 93.5 Moz; EV assumes about A$35M net cash at June 2026) | Analyst calculation |
Capital Markets
| Item | Status |
|---|---|
Dividend history | None ever paid |
Dividend policy | No dividends expected before production and free cash flow |
Share buybacks | None (share-count growth is the opposite trend) |
Credit ratings (Moody's / S&P / Fitch) | Not rated |
Debt maturity profile | No debt |
Share Price & Returns
| Date | Instrument | Amount | Price | Notes |
|---|---|---|---|---|
H1 FY2026 | Placement and SPP | Not publicly disclosed in retrieved sources | — | Cash rose to A$40.5M |
Jun 2026 quarter | Option exercises (underwritten) | A$7.98M | — | — |
29 Sep 2026 | Placement Tranche 1 | 277.73M shares (about A$40.3M) | A$0.145 | Unconditional, within existing capacity |
29 Sep 2026 | Royalty consideration shares | 55.17M shares (about A$8.0M) | A$0.145 | — |
2 Dec 2026 (scheduled) | Placement Tranche 2 | 204.36M shares plus 0.69M director shares (about A$29.7M) | A$0.145 | Subject to AGM on 26 Nov 2026 |
Analyst Conclusions
Management guidance
-
IPC determination on SSD-5765 on or before 9 December 2026.
-
Continued Bowdens engineering after the DFS. Detailed development timelines are promised after consent.
-
Geophysics and drill planning at Calico North and Kramer Hills in H2 calendar 2026.
-
No financial guidance (pre-revenue).
Consensus expectations
Not publicly disclosed (single-analyst coverage).
Bull case
-
Consent reinstated in December 2026. DPHI has twice found Bowdens approvable, and the defect that voided the 2023 consent was procedural and has now been addressed through additional assessment. Approval would remove the main discount in a stock trading at about 0.5x base-case NAV.
-
Silver-price torque. At spot pricing the DFS shows a pre-tax NPV5 of A$2.01bn and 49% IRR, about double the base case. Primary silver supply is scarce because most supply is by-product.
-
De-risked economics. A DFS-grade reserve of 93.5 Moz, no private royalties, owned freehold land and a debt-free balance sheet make Bowdens one of the most financeable undeveloped primary silver assets in the OECD. That raises the odds of strategic investment, offtake prepayment or M&A.
Bear case
-
Permitting and litigation. Opposition is organised and motivated: about 100 speakers and a protest at the hearing. Even after approval, a further legal challenge could delay final investment decision by 12–24 months. The 2024 precedent shows opponents can win.
-
Funding dilution. A$455M of initial capex against a market cap below A$400M implies substantial further equity issuance. Shares on issue are already rising from about 2.14bn to about 2.68bn in 2026.
-
Cost and grade trajectory. AISC is up 39%, LOM capex up 58% and reserve grade has fallen. If silver retreats towards the base case or lower, project margins compress quickly, and Stage 2 (10 years of the LOM) still lacks approval.
Catalysts and monitorables (next 12 months)
| Timing | Catalyst |
|---|---|
| Oct–Nov 2026 | IPC post-hearing process; any requests for further information |
| 26 Nov 2026 | AGM: Tranche 2 placement approval and remuneration vote |
| 2 Dec 2026 | Tranche 2 settlement |
| By 9 Dec 2026 | IPC determination (binary event) |
| Dec 2026 – Mar 2027 | Window for any judicial-review challenge |
| H2 CY2026 – H1 CY2027 | Maiden drilling at Calico North and Kramer Hills |
| 2,027 | Project finance process, offtake and strategic partner discussions, early works decisions |
| Ongoing | Silver price, A$/US$ exchange rate, cost inflation |
Analyst verdict
Silver Mines is approaching the most important event in its corporate history: the IPC's redetermination of the Bowdens consent, due by 9 December 2026. The company has used the two years since the August 2024 Court of Appeal decision productively. It has turned a modest 16-year project into a DFS-backed 26-year plan with a 93.5 Moz reserve and pre-tax NPV5 of A$1.04 billion at US$45/oz. It has removed both private royalties, bought strategic land and raised A$70 million, so it enters the decision period with an ungeared balance sheet and adequate liquidity. DPHI's repeated conclusion that the project is approvable gives the company its strongest regulatory footing since 2023.
That is still not enough to make the outcome certain, and the market price reflects this. At about 0.5x base-case NAV, investors are applying a probability discount consistent with a meaningful chance of refusal, onerous conditions or renewed litigation. The October 2026 hearing showed that local opposition remains intense and that the council has substantive concerns about housing and water. Even with a clean approval, the path to production requires about A$455 million of initial capital. That implies further dilution for a company whose share count is already rising quickly, and execution risk for a team that has not built a mine.
The equity therefore behaves as a leveraged, binary option on two variables: consent and the silver price. For investors positive on silver who accept permitting risk, SVL offers one of the clearest exposures to a large, OECD-jurisdiction primary silver development. Approval and an absence of successful challenge would likely drive a significant re-rating towards a development-stage multiple. Refusal or prolonged litigation would leave the company holding a stranded study and exploration optionality. Overall stance: high-risk, catalyst-driven speculative development equity. Position sizing should reflect binary permitting risk, and the 9 December 2026 determination is the gating monitorable.
APPENDIX B — DATA DISCREPANCIES LOG
| Item | Source A | Source B | Treatment |
|---|---|---|---|
| Auditor | Ernst & Young (company directory) | Crowe Sydney (Market Index) | Company directory preferred; Crowe likely the prior auditor |
| 2026 MRE grade basis | 173 Mt at 33 g/t Ag (Motley Fool) | 173 Mt at 33 g/t AgEq for 286 Moz (Mining.com.au; Kalkine) | Arithmetic supports 33 g/t Ag, with 286 Moz as AgEq |
| Fitzroy scrip issue date | Proposed 30 Nov 2026 (Appendix 3B via Kalkine) | Issued 29 Sep 2026 (completion notices) | Completion notices preferred |
| Land acquisition date | 29 Apr 2026 (Listcorp) | 26 May 2026 (InvestSMART) | Both shown |
| Employment | 300+ construction / 200+ operating (company) | about 320 / 228 (local press) | Both shown |
| Distance to Mudgee | about 26 km (company) | about 35 km (local press) | Both shown; different reference points |
| Free cash flow | TipRanks FCF series | OCF plus investing cash flow | TipRanks figures shown with caveat |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Background | Independence | Source |
|---|---|---|---|---|---|
Keith Gascoyne Perrett | Non-Executive Chairman | Director since 20 Jun 2016 | — | Independent non-executive | InvestSMART; corporate directory |
Jonathan (Jo) Battershill | Managing Director | 16 Jun 2017 | Over 25 years in mining, business development and finance. Senior operational and business development roles at WMC Resources; stockbroking and equity research at Hartleys, Citigroup and UBS in Sydney and London. Voted one of Australia's leading mining analysts by institutional investors in 2009–2015 | Executive | Market Index director profile |
Kristen Podagiel | Non-Executive Director | Not publicly disclosed in retrieved sources | Not publicly disclosed in retrieved sources | Non-executive | Corporate directory |
Robert (Rob) Dennis | Non-Executive Director | Not publicly disclosed in retrieved sources | — | Non-executive | Corporate directory |
Executive Leadership Team
| Name | Role | Notes |
|---|---|---|
Jo Battershill | Managing Director / CEO | Leads strategy, approvals and funding |
Trent Franklin | Company Secretary and Chief Financial Officer | Corporate directory |
Dr Michael Fletcher (GeoEndeavours Pty Ltd) | Consulting geologist; Competent Person for the California exploration results | 2025 Annual Report |
Board & Management Changes
| Date | Director | Instrument | Quantity | Value / price | Source |
|---|---|---|---|---|---|
17 Jan 2024 | J. Battershill | Options/securities issued | 12,000,000 | A$1,619,162 (valued at A$0.135) | Market Index |
8 Dec 2022 | J. Battershill | Options issued | 500,000 | A$125,000 (A$0.25) | Market Index |
30 Jun 2025 (latest notice) | J. Battershill | Holdings | 1,687,500 indirect shares; 5,000,000 options | — | Market Index |
Sep 2026 | Directors (collectively) | Placement participation, Tranche 2 | 689,656 shares | At A$0.145; subject to AGM approval 26 Nov 2026 | Mining.com.au, 23 Sep 2026 |
Major Shareholders
| Holder | Shares | Stake (%) | Source / date |
|---|---|---|---|
Franklin Resources, Inc. | 106,700,000 | 4.98 | Simply Wall St (ASX), Mar 2026 |
Van Eck Associates Corporation | 75,085,970 | 3.51 | Simply Wall St (ASX), Mar 2026 |
Mirae Asset Global Investments (Global X) | 72,077,669 | 3.36 | Simply Wall St (ASX), Mar 2026 |
ALPS Advisors, Inc. | 44,622,246 | 2.08 | Simply Wall St (ASX), Mar 2026 |
Tidal Investments LLC (Amplify ETFs) | 44,342,611 | 2.07 | Simply Wall St (ASX), Mar 2026 |
Konwave AG (Gold 2000) | 38,368,149 | 1.79 | Simply Wall St, Mar 2026 |
Outcrop Silver & Gold Corporation | 22,090,000 | 1.03 | Simply Wall St; Motley Fool / Morningstar |
Fitzroy River Corporation (via royalty sale scrip) | about 51,724,138 | about 2.1 post-issue | Fitzroy royalty completion, 29 Sep 2026 (A$7.5M at A$0.145) |
| — | — | ≥5 | "Becoming a substantial holder" notice, 19 Jun 2026 (InvestSMART) |
Major Shareholders by Ownership Category
| Ownership category | Shares | % | Source |
|---|---|---|---|
Institutions | 477,451,256 | 22.3 | Simply Wall St, Mar 2026 |
General public (retail) | 1,579,049,632 | 73.7 | Simply Wall St |
Private companies | 34,458,334 | 1.6 | Simply Wall St |
Individual insiders | 29,047,002 | 1.4 | Simply Wall St |
Public companies | 22,090,000 | 1.0 | Simply Wall St |
Competitive Landscape
Key Competitors
| Company (ticker) | Flagship asset / jurisdiction | Stage | Relative positioning versus SVL |
|---|---|---|---|
Investigator Silver (ASX: IVR) | Paris Silver, South Australia | Development / studies | Smaller Australian silver developer; competes for the same domestic capital pool |
Sun Silver (ASX: SS1) | Maverick Springs, Nevada, USA | Exploration / resource | ASX-listed with US silver exposure; competes with SVL's California strategy |
Andean Silver (ASX: ASL) | Chile | Exploration / development | ASX silver peer |
Thomson Resources (ASX: TMZ) | NSW silver hub (Webbs, Conrad) | Exploration | Same state jurisdiction |
Sunshine Silver Mining & Refining (SSMR) | Sunshine Mine, Idaho, USA | Restart / development; IPC in 2026 with US$288.7M cash at Jun 2026 | Much better funded US peer (StockTitan) |
Vizsla Silver (TSX/NYSE) | Panuco, Mexico | Development | — |
Discovery Silver (TSX) | Cordero, Mexico, plus Ontario gold | Development / production | Large open-pit silver development comparable |
Dolly Varden Silver (TSXV/NYSE) | Kitsault Valley, British Columbia | Exploration | Jurisdictional peer (OECD) |
Silver Tiger Metals (TSXV) | El Tigre, Mexico | Development | Developer peer |
Aya Gold & Silver (TSX) | Zgounder, Morocco | Producer | Benchmark for re-rating after production |
Hecla Mining (NYSE) | Greens Creek, Lucky Friday, Keno Hill | Major producer | Potential acquirer / benchmark |
Silvercorp Metals (TSX/NYSE) | China; Ecuador development | Producer | Potential acquirer / benchmark |
Peer Comparison FY2026
| Dimension | Silver Mines (Bowdens) | Typical ASX silver developer | North American silver developer |
|---|---|---|---|
Contained silver reserve | 93.5 Moz (DFS 2026) | Usually resource-stage only | Varies; often larger resources |
Study stage | DFS completed Jul 2026 | Scoping / PFS | PFS / FS |
Mine life | 26 years | Shorter / undefined | Varies |
Initial capex | A$455M | Lower (smaller scale) | US$300M–1bn+ |
Jurisdiction | NSW, Australia (OECD) | Australia / Americas | Mexico / US / Canada |
Key gating item | IPC consent redetermination (by 9 Dec 2026) | Studies / funding | Permits / financing |
Revenue / margins / R&D intensity | Nil / not meaningful | Nil | Nil (developers) |