St George Mining Limited Overview

St George Mining is a Perth-headquartered critical-minerals developer. Its value rests almost entirely on the 100%-owned Araxá Rare Earths and Niobium Project in Minas Gerais, Brazil. Araxá sits on the Barreiro carbonatite next to CBMM, the world's dominant niobium producer. In August 2026 the company reported a JORC resource of 111.2 Mt at 3.57% TREO and 0.57% Nb₂O₅, with about 68% in the Measured and Indicated categories. St George describes this as the largest high-grade carbonatite-hosted rare earths deposit in South America and the Western Hemisphere.

The company has no revenue. It is pre-feasibility and pre-reserve, and funds itself with equity. Its distinguishing features are a high-profile cornerstone investor (Hancock Prospecting), free-digging mineralisation from surface, Brazilian state government support, and downstream alliances spanning the US (REalloys), Europe (Técnicas Reunidas) and Brazil (MagBras, Lima & Pergher). Together these position it as a prospective non-Chinese supplier of magnet rare earths and niobium. It still holds legacy nickel, lithium, copper and gold exploration ground in Western Australia.


What the company does

St George Mining is a mineral exploration and project development company. It does not produce or sell any product. Its activities fall into four groups:

  1. Resource definition and expansion drilling at Araxá, Brazil. More than 18,000 m of drilling was completed in FY2026.

  2. Metallurgical and process development. This covers beneficiation and flotation testwork, pilot-scale testing at CIT-SENAI, and construction of its own pilot plant at CEFET-MG in Araxá.

  3. Feasibility and permitting. Worley Engenharia is the feasibility technical adviser. The Environmental Impact Assessment (EIA/RIMA) was lodged with the state environmental foundation FEAM in August 2026.

  4. Downstream commercialisation. Non-binding MoUs and alliances cover rare earth refining, magnet making, ferroniobium technology and offtake.

It also holds a portfolio of early-stage exploration tenements in Western Australia: Mt Alexander, Lithium Star, Paterson, Ajana, Destiny and others. Little work was reported on these in FY2026.

Company's own description

The FY2026 Annual Report (released 29–30 September 2026) presents St George as an Australian resources company focused on exploring and developing rare earths and niobium projects for high-tech and clean-energy markets. It describes Araxá as the largest high-grade carbonatite rare earths deposit in South America and the Western Hemisphere. It also says that technical workstreams are running in parallel with environmental approvals, pilot plant development with CEFET-MG, and downstream alliances with MagBras, REalloys and Técnicas Reunidas.

Business and revenue model

DimensionCharacterisation
Current revenue modelNone. Reported "revenue" is interest and other income only (A$0.22m in FY2025 per TipRanks; A$0.40m in H1 FY2026 per the half-year report)
Intended model (post-development)Open-pit mining of weathered, free-digging carbonatite. Beneficiation into separate niobium and rare earth concentrates. Possible downstream conversion (mixed rare earth carbonate or oxalate; ferroniobium). Sales under offtake contracts
Product vs service vs subscriptionProspective commodity product sales only. No service, subscription or licensing revenue
Value chain position (target)Upstream (mine and concentrate), with stated ambitions in midstream processing in Brazil (the Minas Gerais Rare Earths Processing Centre with Lima & Pergher in Uberlândia)
Funding modelEquity placements: A$132m raised in FY2026. Earlier funding came from placements, option exercises and strategic investments (ATL, Jayson)

Target customers and end-markets

These are prospective customers, since none are under binding contract:

Rare earth magnet manufacturers and metal/alloy makers: REalloys (Ohio, USA) holds a potential offtake of up to 40% of Araxá rare earth production under an MoU. MagBras is building Brazil's first rare earth magnet facility.

Defence and aerospace supply chains: Press coverage links the strategy to the US Department of Defense rule barring Chinese-origin rare earth magnets in weapons systems from 31 December 2026.

Steelmakers: Niobium (as ferroniobium) is used in high-strength low-alloy steel. Liaoning Fangda Group signed a co-development MoU in 2024.

Battery, electrification and EV markets: These are relevant through NdPr magnets and, historically, through the WA lithium assets.

Independent characterisation

St George is a single-asset, pre-feasibility, equity-funded developer whose share price trades on resource growth and news flow. Its strengths are geological. The resource is large, grades are high, and mineralisation starts at surface in a jurisdiction with long niobium mining history and infrastructure.

Its weaknesses are commercial and technical, and not yet resolved:

  • No ore reserve or economic study has been published.

  • Combined niobium recovery in initial testwork was about 50.9%.

  • All offtake and processing relationships are non-binding.

  • The share register has been heavily diluted. Weighted average shares rose from 515 million in FY2021 to 1.67 billion in FY2025, and about 4.8 billion are on issue now (derived).

Strategy

Stated strategy (themes from the FY2026 Annual Report and releases)

  1. Advance Araxá to a Final Investment Decision (FID) as a dual-commodity (rare earths plus niobium) open-pit operation with long life and low cost.

  2. Grow and upgrade the resource. This includes infill to Measured and Indicated status, step-out drilling, and a maiden East Araxá resource in Q4 2026.

  3. De-risk processing through staged metallurgy: lab flotation, then CIT-SENAI pilot work, then the company's own CEFET-MG pilot plant producing product samples for offtake qualification.

  4. Build an ex-China supply chain position. This means supplying magnet rare earths and niobium to US, European and Brazilian customers, with explicit reference to US defence procurement rules from 31 December 2026.

  5. Capture downstream value in Brazil through the Minas Gerais Rare Earths Processing Centre and support for MagBras.

  6. Social licence: the ASA (Araxá Socio-environmental Action) programme, local hiring and procurement.

Initiatives announced in the last 24 months (Oct 2024 to Oct 2026)

InitiativeDateDescription
Minas Gerais cooperation MoUOct 2024State support to speed up permitting (Invest Minas)
Downstream partnershipsDec 2024Initial niobium and REE downstream partnerships
Frankfurt listingAug 2025European investor access
REalloys strategic allianceSep 2025, later extendedTestwork, flowsheet optimisation, potential offtake of up to 40% of rare earths
CEFET-MG Technological CentreOct 2025Pilot plant, R&D and training; uses CEFET infrastructure and tax advantages
MagBras collaboration2025–26Oxalate samples for magnet-making tests. St George says it was the first rare earths company to deliver product to MagBras
IBRAM membershipMar 2026Industry positioning in Brazil
Técnicas Reunidas MoUMar 2026RARETECH refining testwork; possible flowsheet and industrial plant design
Boston Metal MoUApr 2026Molten Oxide Electrolysis for ferroniobium
Worley technical services agreementJun–Jul 2026Feasibility technical adviser covering engineering and project management
Lithium Star restructureJul 2026100% ownership; ATL becomes a parent-level shareholder
Environmental permittingAug 2026EIA/RIMA lodged with FEAM
Rare Earths Processing Centre (Uberlândia)Aug 2026Protocol of Intent with Lima & Pergher and the state of Minas Gerais
Pilot plant testworkSep 2026 onwardPilot beneficiation; own pilot plant to start Jan 2027

Management guidance and targets

ItemGuidanceSource
East Araxá maiden MREQ4 2026 (December quarter)Aug 2026 MRE release
CEFET-MG pilot plantCompletion Dec 2026; first operations Jan 2027 (earlier guidance said late Q4 2026)Sep 2026 Proactive report; Jun 2026 release
Economic / feasibility studiesInitially guided for Q2–Q3 2026. Now "through the remaining part of the year" with Worley; first feasibility results targeted laterJul 2026 assays release; press
Licensing (first stages)About 12 months from Aug 202625 Aug 2026 release
Construction start2H 202925 Aug 2026 release
Medium-term financial targetsNot publicly disclosed (no capex, opex, NPV or production guidance)—

Products & Services

St George has no commercial products. Its "portfolio" consists of mineral projects and planned product streams.

Brazil — Araxá Rare Earths & Niobium Project (flagship, 100%)

AttributeDetail
LocationAraxá, Alto Paranaíba region, Minas Gerais, Brazil. On the Barreiro carbonatite next to CBMM's niobium operations, with a Mosaic phosphate mine to the southwest
AcquisitionBought from Itafos Inc; completed February 2025; final payments 6 Nov 2025
HistoryExplored since 1965. Itafos did preliminary metallurgy and resource work in 2011–12. More than 500 historical intercepts above 1% Nb₂O₅
GeologyWeathered (lateritic) carbonatite profile; free-digging from surface. Fresh rock reached at about 198 m in at least one deep hole
Current MRE (11 Aug 2026, SRK)111.2 Mt at 3.57% TREO and 0.57% Nb₂O₅ (2% TREO cut-off). About 3.98 Mt contained TREO and about 630 kt Nb₂O₅. Measured and Indicated about 75.2 Mt (about 68%)
Niobium sub-statement (Aug 2026)Indicated resource reported as 75 Mt at 0.58% Nb₂O₅ for about 435,000 t contained Nb₂O₅
Prior MRE (3 Mar 2026)70.91 Mt at 4.06% TREO and 0.62% Nb₂O₅. M&I 29.49 Mt at 4.56% TREO and 0.75% Nb₂O₅. Plus an additional 24.56 Mt niobium-only resource at a 0.2% Nb₂O₅ cut-off
Maiden MRE (Apr 2025)40.6 Mt at 4.13% TREO; 41.2 Mt at 0.68% Nb₂O₅
Standout intercepts (FY2026)AXDD086: 178.7 m at 4.34% TREO and 0.75% Nb₂O₅ from surface. AXDD092: 165.3 m at 4.28% TREO and 0.61% Nb₂O₅. AXDD088: 150.2 m at 4.64% TREO. Also 199.5 m from surface (June 2026) and 20 m at 12.65% TREO from surface (29 Jul 2026)
MetallurgyFlotation produced separate niobium and rare earth concentrates. Combined niobium recovery about 50.9% including magnetic separation, which is within the typical range for Araxá-style pyrochlore. Pilot-scale flotation at CIT-SENAI (July 2026)
Pilot plantSt George Technological Centre at CEFET-MG Araxá campus. Completion targeted Dec 2026; first operations Jan 2027
PermittingEIA/RIMA lodged with FEAM (Aug 2026). Three-stage licensing; first stages expected within about 12 months
Development timingConstruction guided for 2H 2029 (Aug 2026 release). IBRAM's March 2026 profile said operations would start in 2028; the company's later guidance supersedes this
LifeIBRAM profile cites expected life of more than 20 years (not an ore reserve-based figure)
Pricing modelNot applicable; no offtake pricing disclosed
ProductDescriptionTarget customerStatus
Rare earth concentrate / mixed rare earth carbonate or oxalateMagnet REEs (NdPr), plus samarium and gadolinium cited in press coverageREalloys (US), MagBras (Brazil), European refiners via Técnicas ReunidasTestwork; oxalate samples delivered to MagBras and REalloys
Separated rare earth oxidesRefining and fractionation (Técnicas Reunidas RARETECH)Magnet and metal makersMoU / testwork
Niobium concentratePyrochlore flotation concentrateSteel and ferroalloy producersTestwork
FerroniobiumPossibly via Boston Metal's Molten Oxide ElectrolysisSteelmakers (e.g. Liaoning Fangda)MoU (Apr 2026)

East Araxá

This discovery lies about 1 km east of the main resource. It was identified by auger drilling across a near-surface high-grade area, then confirmed by RC drilling in September 2025. Magnet and heavy rare earth grades are higher than in the main resource. Drilling continues around the clock, and a maiden resource is targeted for Q4 2026 (December quarter).

Western Australia portfolio

ProjectCommodityOwnershipNotes
Mt AlexanderNi-Cu-PGE; lithium100%, except E29/638 (75% SGQ / 25% IGO)Former flagship. Thick pegmatites; more than 16 km of pegmatite corridor next to the Copperfield Granite
Lithium Star (7 projects)Lithium100% since July 2026 (previously 90/10 with ATL)ATL holds a right to 25% of future lithium production at a preferred price
PatersonCu-Au100%Early stage
AjanaBase metals / other100%Early stage
DestinyGold / other100%Early stage
Broadview, Woolgangie, Mt HollandVariousReported historically—

The December 2025 quarterly reported no significant activity on the WA tenements.

Financial Narrative

Sources: TipRanks and MarketScreener (standardised from statutory accounts), InvestSMART/Morningstar, Google Finance, the H1 FY2026 half-year report (ASX, 13 Mar 2026), and quarterly reports. TipRanks labels its annual columns "Dec" but the values match the June fiscal years. All figures are A$ millions unless the row label says otherwise.

Income statement

Commentary.

FY2021–FY2024: Annual losses held in a narrow A$8–11m band. This reflects steady WA exploration spending of about A$5–8m and modest corporate overhead.

FY2025: This was the transition year. Exploration expense fell to A$4.45m because Araxá costs were partly capitalised as acquisition and evaluation assets. However, the first material share-based payments charge (A$4.38m) lifted the loss to A$11.34m.

FY2026: The inflection is clear. MarketScreener's FY2026 lines show exploration expense up about 3.7x to A$16.48m (the multi-rig Araxá campaign) and SG&A more than doubling to A$6.31m. Share-based payments rose to about A$23.0m, almost certainly tied to options, performance rights and capital-raising fees during a year with A$132m of placements. The H1 FY2026 statutory loss alone was A$24.95m, against A$3.54m in H1 FY2025.

Readers should take it from the FY2026 Annual Report (Appendix 4E). Margins and revenue CAGR cannot be meaningfully calculated for a pre-revenue company.

Balance sheet

Notes: - FY2025 total assets, liabilities, equity and shares come from Google Finance. The FY2024 total assets and liabilities are back-calculated from Google Finance's reported YoY changes (+1,553.76% and +2,084.33%) and are approximate.

  • The jump in FY2025 assets reflects capitalisation of the Araxá acquisition. The FY2025 liabilities of about A$21.8m are mainly the deferred Itafos consideration (about US$11m outstanding at 30 June 2025, paid 6 Nov 2025). This is an analyst inference consistent with the deal terms.

  • Short- and long-term debt: none. Lease liabilities, if any, are immaterial (TipRanks shows debt-to-equity below 0.01 at TTM).

  • Goodwill and intangibles: not disclosed. The acquisition is carried as capitalised exploration and evaluation.

  • FY2026 cash at 30 June 2026 was not separately verified. The June 2026 quarterly reports a cash position of about A$98m after the A$60m placement (Tranche 2 settled after the 10 July 2026 EGM).

  • Working capital: TipRanks shows a TTM current ratio of 0.24 and net current asset value of -A$18.7m. These are the 30 June 2025 figures, distorted by the deferred consideration. Working capital is now strongly positive given about A$98m in cash.

Cash flow

Commentary: Operating outflows have been remarkably steady at A$7–9m a year. This is because the company expenses most exploration through operating cash flow. FY2025 investing outflows of A$16.7m mainly reflect the US$10m initial acquisition payment. Financing inflows rose to A$24m in FY2025 and about A$132m gross in FY2026.

Barchart's US-dollar net cash flow series (FY2021 -1.94m; FY2022 -2.27m; FY2023 -0.77m; FY2024 -0.82m; FY2025 +0.24m) is broadly consistent with the A$ series.

Ratios

Ratios not meaningful or not disclosed: ROIC, net debt/EBITDA, interest coverage, asset turnover, gross/operating/EBITDA/net margins and cash conversion cycle. All are undefined or meaningless for a pre-revenue explorer without debt.

Price-to-book. Simply Wall St cited a P/B of about 16.8x after the October 2025 raise, against an industry average of 2.3x. At today's market cap of about A$282m and an estimated post-raise book value well above A$100m, P/B is materially lower.

Key financial trends and drivers

  1. Step-change in spending. FY2026 is the first year in which St George spent like a developer. Exploration expense was about A$16.5m, plus drilling, metallurgy, Worley engagement, pilot plant construction and Brazilian staff.

  2. Funding capacity transformed. Cash went from A$2.76m (June 2025) to about A$98m (mid-2026). This gives an unusually long runway for a junior: at an assumed A$40–60m annual burn, roughly 1.5–2.5 years (analyst assumption, not company guidance).

  3. Dilution is the cost. Weighted average shares more than tripled from FY2021 to FY2025, and shares on issue have since roughly doubled again to about 4.8 billion (derived).

  4. Non-cash charges are rising. Share-based payments (A$23m in FY2026 per MarketScreener) now outweigh exploration expense in the income statement. This highlights the cost of equity-linked incentives and broker options.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Operating Area Details

Operating area (analyst-defined)ContentsProducts/servicesStatus

Brazil – Araxá Rare Earths & Niobium Project

Main Araxá deposit (MRE), East Araxá discovery, CEFET-MG pilot plant, St George Mining Brasil Ltda

Prospective rare earth concentrate or intermediates (carbonate/oxalate) and niobium concentrate or ferroniobium

Feasibility and permitting

Western Australia – Exploration

Mt Alexander (Ni-Cu-PGE, Li), Lithium Star (7 lithium projects), Paterson (Cu-Au), Ajana, Destiny, others

—

Early-stage exploration; minimal FY2026 activity

Results by Segment

MetricFY2024FY2025FY2026

Brazil segment revenue (AUD Mn)

000

Western Australia segment revenue (AUD Mn)

000

Group other income (AUD Mn)

0.0810.217—

Group net loss (AUD Mn)

-8.11-11.34—

Income Statement and Share Count (M)

MetricFY2021FY2022FY2023FY2024FY2025FY2026

Revenue and other income (AUD Mn)

000.0660.0810.217—

Exploration and evaluation expense (AUD Mn)

6.736.848.415.334.4516.48

SG&A / corporate expense (AUD Mn)

1.771.402.453.132.766.31

Share-based payments (AUD Mn)

00004.3823.0

EBITDA (AUD Mn)

-8.23-8.07-10.60-8.16-11.26—

Operating income (AUD Mn)

-8.32-8.17-10.79-8.37-11.49—

Pre-tax income (AUD Mn)

-8.32-8.18-10.73-8.28-11.41—

Net income (AUD Mn)

-8.32-8.18-10.73-8.11-11.34—

Weighted average shares (M)

515.46617.30776.20932.531,670—

EPS basic, derived (A$ cents)

-1.61-1.33-1.38-0.87-0.68—

Dividends per share (AUD)

000000

Balance Sheet and Share Count (M)

MetricFY2021FY2022FY2023FY2024FY2025FY2026

Cash and equivalents (AUD Mn)

6.374.103.342.522.76—

Total assets (AUD Mn)

———3.0650.56—

Total liabilities (AUD Mn)

———1.0021.81—

Total equity (AUD Mn)

————28.75—

Total financial debt (AUD Mn)

000000

Shares outstanding at year end (M)

————2,670—

Cash Flow

MetricFY2021FY2022FY2023FY2024FY2025FY2026

Operating cash flow (AUD Mn)

-8.37-7.45-8.75-7.92-7.04—

Investing cash flow (AUD Mn)

-0.076-0.030-0.568-0.491-16.69—

Financing cash flow (AUD Mn)

6.505.228.567.5923.97—

Free cash flow, OCF plus investing (AUD Mn)

-8.40-7.48-9.32-8.41-23.73—

Equity raised, gross (AUD Mn)

—————132

Dividends paid (AUD Mn)

000000

Buybacks (AUD Mn)

000000

Returns & Leverage Ratios (%) and Key Financials

MetricFY2021FY2022FY2023FY2024FY2025

ROE derived (%)

————-39.4

ROA derived (%)

————-22.4

Debt to equity (x)

00000

Net cash (AUD Mn)

6.374.103.342.522.76

Geographic Revenue

RegionFY2024FY2025FY2026

Brazil revenue (AUD Mn)

000

Australia revenue (AUD Mn)

000

Share Price & Returns

Reference pointPrice (AUD)Source

Aug 2024 placement price

0.025

Acquisition placement

Oct 2025 (post-Hancock announcement)

~0.12

Press (rose 4.4% to 12c)

Late Dec 2025

~0.10 (market cap ~A$380m; 52-week range 0.015–0.18)

Google Finance

Mar 2026

~0.063 (market cap ~A$301m) at one point; ~A$425m market value cited around 1 Apr 2026

Company X post; Resourcing Tomorrow

17 Jun 2026 (pre-raise)

~0.110; placement at 0.10

InvestSMART

31 Jul 2026

~0.077–0.078 (market cap ~A$343m)

InvestSMART; company X post

13 Oct 2026

0.059 (market cap ~A$282m; 52-week low)

Halo Technologies

Metric

1Y

3Y

Total return, approximate (%)

-50—

Valuation Multiples

MultipleSGQComment

P/E

n/m

Loss-making

EV/EBITDA

n/m

Negative EBITDA

EV/Sales

n/m

No revenue

EV (derived)

~A$185m

A$282m market cap less ~A$98m cash (mid-2026 cash; current cash lower after spending)

EV per tonne contained TREO (derived)

~A$46/t

A$185m ÷ 3.98 Mt TREO; ignores niobium

Capital Markets

ItemStatus

Dividend history and policy

None paid; no policy (pre-revenue)

Credit ratings (Moody's / S&P / Fitch)

Not rated

Debt maturity profile

No debt

Share Price & Returns by Date

DateRaise (AUD Mn)Price (AUD)Key participants

Aug 2024

21.250.025

Institutional and sophisticated investors

Jul 2025

5.0—

Placement

Oct 2025

72.50.10

Hancock (A$22.5m), institutions

Jun 2026

60.00.10

Hancock (A$20m), institutions; Macquarie Capital adviser

Analyst Conclusions

Management guidance (summary)

  • East Araxá maiden resource in Q4 2026.

  • CEFET-MG pilot plant completed in December 2026, operating from January 2027.

  • Worley-led feasibility workstreams through late 2026 into 2027.

  • First stages of environmental licensing within about 12 months of August 2026.

  • Construction in 2H 2029.

  • No production, capex or financial guidance.

Consensus

Consensus growth expectations are not publicly disclosed. Coverage is limited to 1–3 analysts plus sponsored research.

Bull case

  1. Tier-1 scale at low EV. At about A$185m EV (derived) for 3.98 Mt contained TREO plus about 630 kt Nb₂O₅, the market ascribes little value to the niobium co-product or to East Araxá. A credible study could re-rate the stock sharply.

  2. Strategic scarcity. The US defence deadline of 31 December 2026, REalloys' 40% offtake option and Brazilian downstream policy put Araxá on Western supply-chain maps. Hancock's repeated investment (A$42.5m) signals the potential for deeper strategic funding.

  3. Funded de-risking. About A$98m cash pays for the pilot plant, feasibility and permitting without near-term dilution, and each milestone (East Araxá MRE, pilot product, study) is a catalyst.

Bear case

  1. Processing is the hard part. Carbonatite REE-niobium flowsheets are complex. A 50.9% combined niobium recovery and unproven rare earth recoveries could translate into high capex and opex, especially compared with ionic clay peers in the same state.

  2. Timeline and capital. Construction in 2H 2029 implies years of cash burn. Development capex is probably far above current cash, implying further heavy dilution at depressed prices (now A$0.059 versus A$0.10 raise prices), unless strategic funding arrives.

  3. Commercial uncertainty. All offtakes are MoUs; CBMM controls the niobium market; rare earth prices are policy-driven and volatile; and governance is thin for a company approaching FID.

Catalysts and monitorables (next 12 months)

TimingCatalyst
Late Oct 2026September 2026 quarterly: cash burn and cash balance
Nov 2026AGM (board renewal, remuneration votes, option resolutions)
Q4 2026East Araxá maiden MRE
Dec 2026 / Jan 2027Pilot plant completion and first operation
31 Dec 2026US defence rare earth magnet sourcing deadline (demand signal)
H1 2027Feasibility outputs (flowsheet, capex, opex, mine plan); conversion of REalloys or other offtake MoUs to binding terms
Feb 2027Expiry of large option series (reported about 854m options)
2,027Progress on licensing (FEAM preliminary licence)

Analyst verdict

St George Mining has changed in under two years from a sub-A$50m WA nickel and lithium explorer into the owner of one of the Western Hemisphere's largest rare earths and niobium resources. The geology is no longer the main question. A 111.2 Mt resource, two-thirds Measured and Indicated, with mineralisation from surface and next to the world's dominant niobium producer, is a real asset. The capital needed to define it has been raised: A$132m in FY2026, with Hancock Prospecting as a repeat cornerstone.

What the market is now pricing is execution risk. The share price has roughly halved over the past year to about A$0.059, despite a 57% resource upgrade, the start of permitting and a strong cash position. That gap between technical progress and market value reflects three things investors cannot yet underwrite. First, the economics are unknown: there is no study, reserve or capex estimate. Second, processing is unproven, with niobium recoveries around 50% in early tests and rare earth flowsheets still in MoU-backed testwork. Third, construction is guided for 2H 2029, so further equity issuance is likely before any revenue.

On a derived enterprise value of about A$185m, investors are paying less than A$50 per tonne of contained TREO, with niobium included at no cost. If the January 2027 pilot plant produces saleable concentrates and the Worley-led study shows competitive costs, a re-rating is plausible. Conversion of REalloys' 40% option into binding terms, or strategic funding from Hancock or a downstream partner, would strengthen the case.

The 12-month view is speculative and depends on milestones. The asset quality and funding position are better than most ASX juniors. However, governance (a three-person board with a combined Chair/CEO) and dilution risk need to improve before institutional investors will price Araxá as a development project rather than an exploration story. Investors should treat East Araxá, pilot plant output and first study results as the decisive tests.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleAppointedBackgroundCompensation (latest available)

John Prineas

Executive Chairman (no separate CEO)

Director since 19 Oct 2009

BEc, LLB. Company founder.

Simply Wall St total about A$1.73m. Yahoo Finance shows A$394k base pay (year not specified). Holds about 1.34%

Sarah Shipway

Non-Executive Director and Company Secretary (classified independent by Simply Wall St)

12 Jun 2015

B.Com, Chartered Accountant

Simply Wall St total about A$648k; Yahoo shows A$160.7k. Holds about 0.36% before her July 2026 purchase

John Dawson

Non-Executive Director

2 Jan 2019

—

Simply Wall St total about A$555k. Holds about 0.72%

Kecheng Cai (former)

Non-Executive Director (Jayson nominee)

1 Jan 2024 to 6 Aug 2024

Senior executive of Shanghai Jayson

—

Board of Directors — Thiago Amaral

NameTitleNotes

Thiago Amaral

Executive Director, St George Brazil

Named at the 27 Aug 2026 Minas Gerais signing

Dave Mahon

Exploration Manager

Per Yahoo Finance profile

Not named

Director of Corporate Development; Director of ESG & Technical Development – Brazil; Director of Mining Operations – Brazil

Roles listed by Simply Wall St with tenures of about 1.2–1.6 years. A November 2024 release mentions a team with a combined 40 years' experience in niobium mining and the Araxá region

Major Shareholders

HolderStakeSource / date

Hancock Prospecting Pty Ltd

10.3%

June 2026 quarterly. It invested A$22.5m in Oct 2025 and A$20m in Jun 2026, rising from about 6% to about 10%

Itafos Inc

Received 266m shares, 86m options at 4c and 11m performance rights at completion

Acquisition terms (2024).

Amperex Technology Ltd (ATL; TDK subsidiary)

12.5m shares (about 0.3%)

Lithium Star restructure, July 2026

Shanghai Jayson

11.73% at 2023 investment; now heavily diluted

—

John Prineas

About 1.34%

Simply Wall St

John Dawson

About 0.72%

Simply Wall St

Sarah Shipway

About 0.36% plus 12m shares bought Jul 2026

Simply Wall St; Appendix 3Y

Competitive Landscape

Key Competitors

CompanyTickerSegment overlapPositioning relative to SGQ

CBMM (Companhia Brasileira de Metalurgia e Mineração)

Private

Niobium; neighbour at Araxá

Benchmark for Araxá pyrochlore processing; potential competitor or partner

CMOC (Niobras, Catalão, Goiás)

HKEX/SSE: 3993 / 603993

Niobium

Second Brazilian niobium producer

Lynas Rare Earths

ASX: LYC

Rare earths (Mt Weld, WA)

Largest producer outside China; integrated separation; benchmark for ex-China REE

MP Materials

NYSE: MP

Rare earths (Mountain Pass, USA)

US champion; St George benchmarks Araxá against Mountain Pass

Iluka Resources

ASX: ILU

Rare earths refining (Eneabba)

Government-backed refinery; potential feed competitor or customer

Arafura Rare Earths

ASX: ARU

Rare earths (Nolans, NT)

Development peer, further advanced on financing

Meteoric Resources

ASX: MEI

Rare earths (Caldeira, Minas Gerais – ionic clay)

Direct Brazilian rare earths peer in the same state

Viridis Mining & Minerals

ASX: VMM

Rare earths (Colossus, Minas Gerais – ionic clay)

Direct Brazilian peer

Brazilian Rare Earths

ASX: BRE

Rare earths (Bahia)

Brazilian hard-rock / monazite peer

Aclara Resources

TSX: ARA

Heavy rare earths (Carina, Goiás)

Brazilian heavy REE peer

Serra Verde

Private

Rare earths (Goiás, ionic clay)

Brazil's first ionic clay producer

NioCorp Developments

NASDAQ: NB

Niobium-scandium-titanium (Elk Creek, USA)

Western niobium development peer

WA1 Resources

ASX: WA1

Niobium (Luni, WA)

ASX niobium peer

Peer Comparison FY2026

AttributeSt George (SGQ)Lynas (LYC)MP Materials (MP)Meteoric (MEI)

Stage

Pre-feasibility

Producer

Producer

Pre-feasibility / PFS

Deposit type

Hard-rock carbonatite (weathered)

Carbonatite (laterite)

Carbonatite (bastnäsite)

Ionic clay

Co-product

Niobium

———

R&D intensity

n/m

——

n/m

Company Snapshot

2009

Founded

West Perth, Australia

Headquarters

SWOT Analysis

Strengths

  • Resource scale. 111.2 Mt at 3.57% TREO and 0.57% Nb₂O₅, with about 3.98 Mt contained TREO and about 630 kt Nb₂O₅ (11 Aug 2026 MRE).
  • Rising confidence. About 68% of the resource (about 75.2 Mt) is Measured and Indicated, up 155% from the March 2026 MRE.
  • From-surface intercepts. Examples include 199.5 m (Jun 2026), 178.7 m at 4.34% TREO (AXDD086) and 20 m at 12.65% TREO from surface (Jul 2026).
  • Balance sheet. About A$98m cash and no debt (June 2026 quarterly).
  • Strategic backers. Hancock Prospecting at 10.3% after A$42.5m invested in eight months; ATL; Worley engaged.
  • Location. Next to CBMM in a mining town with infrastructure. State government MoUs (Oct 2024, Aug 2026).

Weaknesses

  • No economic study or ore reserve. The project's economics are unquantified (no NPV, capex or opex disclosed).
  • Moderate early recoveries. Combined niobium recovery was about 50.9% in initial testwork (June 2026 quarterly).
  • Dilution. Weighted shares rose from 515m (FY2021) to 1.67bn (FY2025), with about 4.8bn on issue now (derived).
  • Board. Three directors with at most one independent; combined Chair/CEO.
  • Rising non-cash costs. Share-based payments of about A$23.0m in FY2026 (MarketScreener), on top of an H1 statutory loss of A$24.95m.
  • Grade dilution. Head grade fell from 4.06% to 3.57% TREO between the March and August 2026 MREs as tonnage grew.

Opportunities

  • East Araxá. A maiden resource is due in Q4 2026, with higher magnet and heavy REE grades than the main deposit.
  • REalloys offtake. A potential offtake of up to 40% of rare earth production into US defence supply chains.
  • Brazilian downstream integration. MagBras and the Uberlândia processing centre.
  • Niobium upside. Boston Metal MOE and a possible steelmaker partnership with Liaoning Fangda.
  • Product samples. The pilot plant (Jan 2027) will enable offtake qualification.
  • WA optionality. The Lithium Star lithium portfolio carries ATL's 25% offtake right.

Threats

  • CBMM. Its dominance in niobium could limit pricing and market access.
  • Ionic clay competition in the same state (Meteoric, Viridis) and from Serra Verde.
  • Permitting and timeline. Construction guidance of 2H 2029 sits against earlier "operations 2028" messaging (IBRAM, Mar 2026).
  • Funding. Development capex will likely exceed current cash many times over, implying further dilution or project financing.
  • Price volatility in rare earths and niobium, and exposure to Chinese policy.
  • Share price. About A$0.059 versus A$0.10 placement prices (Oct 2025 and Jun 2026), which weakens the cost of future equity.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
Apr 2025Maiden JORC MRE: 40.6 Mt at 4.13% TREO; 41.2 Mt at 0.68% Nb₂O₅Established a resource weeks after acquisition
25 Jul 2025A$5m placementFunded scaled-up drilling
Jul 2025East Araxá auger discoveryNew high-grade target 1 km east
Aug 2025Frankfurt (S0G) listing; release of voluntarily escrowed sharesEuropean liquidity; escrow overhang
10 Sep 2025REalloys alliance and offtake option (up to 40%)First US downstream pathway; share price rose about 25% (Simply Wall St)
Sep 2025East Araxá RC drilling confirms thick high-grade mineralisationResource growth potential with higher heavy and magnet REE grades
Oct 2025A$72.5m raise at A$0.10; Hancock A$22.5mTransformational funding; Rinehart validation
Oct 2025CEFET-MG Technological Centre agreementPilot plant pathway
6 Nov 2025Final Itafos payments (about US$11m)Unencumbered ownership
24 Nov 2025Drilling results: resource expansion and upgrades to IndicatedFeeds the March 2026 MRE
26 Nov 2025AGMHancock tranche approved
9 Jan 2026December 2025 quarterlyA$72.5m raise completed; no WA activity
17 Feb 2026Record 164 m interceptThickness and continuity
3 Mar 2026MRE up 75% to 70.91 Mt at 4.06% TREOM&I up 218%
3 Mar 2026Joins IBRAMBrazilian industry positioning
13 Mar 2026H1 FY2026 report: loss A$24.95mSpending step-up and share-based charges
Mar 2026Added to S&P/ASX All OrdinariesIndex inclusion
~Mar 2026Técnicas Reunidas MoUEuropean processing route
~1 Apr 2026Boston Metal MoU; market value cited at about A$425mNiobium technology
2 Jun 2026About 2.5m shares issued on option conversionsOngoing dilution
10 Jun 2026Beneficiation results: separate Nb and REE concentratesKey technical de-risking step
15–17 Jun 2026Trading halt, then A$60m placement at A$0.10 (about 9% discount); Hancock A$20mFunding to feasibility
30 Jun 2026199.5 m from surface (thickest intercept)Open-pit scale
2 Jul 2026Director Sarah Shipway buys 12m shares (A$1.13m)Insider confidence signal
10 Jul 2026EGM approves Tranche 2 and ATL share issueFunding completed
Jul 2026Lithium Star restructure with ATLPortfolio simplification
Jul 2026CIT-SENAI one-month pilot flotation programmeRecovery optimisation
20–22 Jul 2026Investor webinar; Noosa Mining Conference presentationInvestor marketing
29 Jul 2026Further assays (e.g. 20 m at 12.65% TREO from surface); footprint extended up to 140 mInput to August MRE
30–31 Jul 2026June quarterly: cash about A$98m; Worley appointed; Hancock at 10.3%Strongest balance sheet in company history
11 Aug 2026MRE up 57% to 111.2 Mt at 3.57% TREO and 0.57% Nb₂O₅; M&I up 155%Scale confirmed; grade diluted versus March MRE
25 Aug 2026EIA/RIMA lodged with FEAM; construction guided for 2H 2029Formal permitting begins; timeline later than earlier "2028 operations" messaging
27 Aug 2026Rare Earths Processing Centre Protocol with Lima & PergherBrazil downstream strategy
~Sep 2026Pilot plant beneficiation testwork starts; own pilot plant on track for Dec 2026 / Jan 2027Product samples for offtake
29–30 Sep 2026FY2026 Annual ReportA$132m raised in FY2026; more than 18,000 m drilled
Oct 2026Share price reaches 52-week low of about A$0.059 (market cap about A$282m)Sentiment weak despite technical progress

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

1 chart
Results by Segment: Group other income rose from AUD 0.1 Mn in FY2024 to AUD 0.2 Mn in FY2025.
St George Mining Limited — Results by Segment
Series (AUD Mn)FY2024FY2025
Group other income0.10.2
Group net loss-8.1-11.3

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. ASX: St George release, 11 Aug 2026 – Araxá MRE upgrade (announcements.asx.com.au)
  2. ASX: St George release, 3 Mar 2026 – Major resource upgrade (announcements.asx.com.au)
  3. ASX: Half-Year Report to 31 Dec 2025 (announcements.asx.com.au)
  4. ASX: A$60m placement, 17 Jun 2026 (announcements.asx.com.au)
  5. ASX: Drill results, 29 Jul 2026 (announcements.asx.com.au)
  6. ASX: Rare Earths Processing Centre, 27 Aug 2026 (announcements.asx.com.au)
  7. ASX: REalloys alliance, 10 Sep 2025 (announcements.asx.com.au)
  8. ASX: September 2025 quarterly (announcements.asx.com.au)
  9. ASX: Drill results, 24 Nov 2025 (announcements.asx.com.au)
  10. ASX: Araxá acquisition update, 5 Nov 2024 (announcements.asx.com.au)
  11. ASX: Half-Year Report Dec 2023 (announcements.asx.com.au)
  12. ASX: Annual Report 2023 (announcements.asx.com.au)
  13. ASX: Annual Report 2022 (announcements.asx.com.au)
  14. Kalkine Media: FY2026 Annual Report summary (kalkinemedia.com)
  15. Kalkine Media: June 2026 quarterly summary (kalkinemedia.com)
  16. St George Mining on X: FY2026 Annual Report and June quarter posts · x.com
  17. InvestSMART: Price-sensitive announcement summaries (6 Nov 2025; 9 Jan 2026; 17 Jun 2026; 31 Jul 2026; 25 Aug 2026), directors and financials (investsmart.com.au)
  18. Proactive Investors: Beneficiation results (Jun 2026); June quarter (Jul 2026); 199 m intercept (Jun 2026) — ; /1096331 ; /1094749 (proactiveinvestors.com)
  19. Yahoo Finance / Proactive: Pilot-scale testwork (Sep 2026); 164 m intercept (Feb 2026) · au.finance.yahoo.com
  20. The Motley Fool Australia: MRE upgrade (11 Aug 2026); June quarter (31 Jul 2026) · fool.com.au
  21. SmallCaps: MRE 70.91 Mt; East Araxá; Liaoning Fangda (smallcaps.com.au)
  22. Skillings: Araxá resource analysis (skillings.net)
  23. Resourcing Tomorrow: Boston Metal MoU (resourcingtomorrow.com)
  24. Mining Technology: Técnicas Reunidas MoU (mining-technology.com)
  25. Técnicas Reunidas press release (www-pre.tecnicasreunidas.es)
  26. Itafos: Sale of Araxá project (5 Aug 2024) (itafos.com)
  27. Nasdaq / Scoop: Acquisition terms and A$21.25m placement · scoop.co.nz
  28. Stocks Down Under / Colitco / Techleap: Hancock investments · colitco.com
  29. IRW-Press / Börse Online: A$60m raise; ATL restructure (boerse-online.de)
  30. CNN Brasil: ATL shareholder deal (cnnbrasil.com.br)
  31. Business News WA: ATL Lithium Star investment (businessnews.com.au)
  32. Stockhead: Jayson investment (stockhead.com.au)
  33. IBRAM: St George membership (Mar 2026) (ibram.org.br)
  34. Börse Express: News headlines (US defence deadline, options, REalloys extension) (boerse-express.com)
  35. TipRanks: Income statement, cash flow, ratios · tipranks.com
  36. MarketScreener: Financials incl. FY2026 expense lines (ca.marketscreener.com)
  37. Google Finance: SGQ (google.com)
  38. Simply Wall St: Management, health, valuation (simplywall.st)
  39. Halo Technologies: SGQ price and market cap (13 Oct 2026) (halo-technologies.com)
  40. Listcorp: SGQ price history (listcorp.com)
  41. Yahoo Finance: Company profile (au.finance.yahoo.com)
  42. CB Insights: Funding history (cbinsights.com)
  43. Barchart: Financial summary (barchart.com)