Company ProfilePremium

Stefanutti Stocks Holdings Limited

Company Profile Analysis

Ticker: SSK.JO

ESOMAR 23 Corporate BadgeISO Certifications Badge
Stefanutti Stocks Holdings Limited - Company showcase

Year Founded & Workforce

1971

5,507 Employees

Stefanutti Stocks Holdings Limited logo

Stefanutti Stocks Holdings Limited Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

Stefanutti Stocks Holdings Limited Overview

Stefanutti Stocks is a mid-sized, multidisciplinary South African construction contractor with annual contract revenue of R7.8 billion (FY2026) and a workforce of roughly 5,500–6,300 people. It executes civils and geotechnical works, roads and earthworks, building, mechanical-electrical-piping (MEP) and mining infrastructure, mainly for private-sector clients (69% of FY2026 revenue), across four regions: Inland, Coastal, Western Cape and Africa. After a six-year crisis driven by the Eskom Kusile power-station dispute, Covid-era disruption and a heavy lender loan, the group concluded its Restructuring Plan in late 2025 without a dilutive rights issue. It settled Kusile for R580 million, refinanced with a five-year R850 million Standard Bank facility (prepaid to R223 million by February 2026), exited Mozambique and Mauritius, and doubled its order book to R17.2 billion. It now positions itself as a normalised, positive-equity contractor with a 4–5% underlying operating margin and growing exposure to water, data centres, renewables and selected African markets.


Company's own description

In its FY2026 results, the group describes itself as a multidisciplinary construction group that delivers projects of any scale to diverse sectors of the built environment. Its footprint covers South Africa and other sub-Saharan African countries, and its stated mission is to deliver engineering solutions that improve people's lives. The FY2026 announcement carries the tagline "excellence in execution" [R26].

The FY2024 results gave the most granular self-description of capability. The group listed: building (industrial and commercial, including design-and-build cold rooms and full data-centre delivery covering civil-structural-architectural, MEP and 3D modelling); civils (including structural rehabilitation and water); geotechnical (lateral support and piling); roads, earthworks and mining infrastructure; renewable-energy infrastructure (civil and electrical balance of plant); electrical and instrumentation (including step-down substations); mechanical (including its proprietary S&P High-Rate Clarifier for dirty-water clarification); oil and gas (in-house pipe-spool fabrication and bulk tank construction); and mining services (materials handling and tailings management) [R24].

Independent characterisation

Stefanutti Stocks is a project-based engineering-and-construction (E&C) contractor. Revenue is recognised over time on construction contracts (IFRS 15 "contract revenue"). It does not sell products, subscriptions or licences in any material way. Its economic model is that of a general and specialist contractor: it bids competitively (or negotiates under framework agreements) for fixed-price, re-measurable or milestone-based contracts. It mobilises owned and leased plant, directly employed labour and subcontractors. It earns a thin margin on large revenue volumes, and its profitability depends on tender pricing discipline, claims management and cash management. Advance payments and milestone billing are a material source of funding: FY2026 "excess billings over work done" were R2.65 billion against cash of R1.11 billion [R26].

Revenue model mix (FY2026): Essentially 100% services (construction contracting). Within this, the disclosed discipline mix was Roads & Earthworks 38.7%, Civils & Geotechnical 32.4%, Building 17.5% (including the R448m Kusile settlement booked as Inland building revenue), Mechanical-Electrical-Piping 6.0% and Mining 5.4% [R26]. There is no subscription, licensing or recurring-product revenue. Some quasi-recurring work comes from framework agreements, plant shutdowns and maintenance (listed as capabilities in [R23]), but these are not separately quantified.

Value-chain position: Mid-tier Tier-1/Tier-2 contractor. It sits between consulting engineers and owners on one side and specialist subcontractors and material suppliers on the other. It is not vertically integrated into construction materials (unlike Raubex, which owns quarries and materials businesses). It does own a significant plant fleet: property, plant and equipment was R1,078m at Feb 2026 after R325m of additions in the year [R26].

Customer types: Private-sector clients (mining houses, petrochemical operators, data-centre developers, renewable IPPs, industrial and commercial property owners) accounted for R5,410m (69%) of FY2026 revenue. Public-sector clients (Eskom, SANRAL/provincial roads authorities, municipalities, water utilities, research institutions such as the National Research Foundation, and African governments) accounted for R2,430m (31%), or about R1,982m (27%) excluding the Kusile settlement [R26].

End-markets served (from FY2023 sector disaggregation, the last year this granularity was published): civils and earthworks (mines, rail, dams/water and sanitation, roads and bridges, bulk earthworks and geotechnical, power stations and transmission, marine, industrial process plants, oil and gas, pipelines); residential (low-cost and medium/high-end housing); and non-residential (office/commercial, retail, hospitals, sporting facilities, factories/warehouses, power-station buildings) [R23]. Management's November 2025 list of growth sectors was water, mining infrastructure, marine infrastructure, renewable energy, roads and data centres [DI, 25 Nov 2025]. The FY2026 operational review notes that the Electrical discipline has moved beyond petrochemical and mining into data centres and renewables [R26].

Strategy

Stated strategy themes (paraphrased from filings and management commentary)

  1. Return to a normalised trading environment. The CEO described the Standard Bank refinancing and the end of the historic lender arrangements as a significant turning point that brings the group into normal trading conditions [EN, 26 May 2026].

  2. Execution excellence and disciplined tendering. The tagline "excellence in execution" appears on all results materials. The Coastal turnaround is attributed to disciplined execution, overhead control and more targeted, risk-managed tendering [R26].

  3. Sector diversification into growth niches: water and wastewater, mining infrastructure, marine, renewable energy, roads and data centres [DI, 25 Nov 2025]; Electrical's move from petrochemical and mining into data centres and renewables [R26].

  4. Selective Africa: Exiting Mozambique and Mauritius to focus on core South African operations and selected African projects with stronger margins [BR, 15 May 2026], while growing the Africa order book to R4.1bn.

  5. Positioning for public-private partnerships (PPPs): Management is targeting South African PPP opportunities including border posts and Transnet-related work [FM].

  6. Capital discipline: Deleveraging via prepayments of the Standard Bank facility (R620m prepaid) and a stated dividend policy that ties distributions to profitability, cash generation, capital needs, funding obligations and financial position [R26].

Initiatives announced in the last 24 months (Oct 2024 – Oct 2026)

InitiativeDateDescriptionStatus / target
Lender loan extensionMar/Apr 2025Repayment profile and term extended to 30 Jun 2026Superseded by refinancing (Oct 2025) [R25]
Kusile Claim 6 submissionMay 2025Claim for delay events after 31 Dec 2019Resolved within the R580m global settlement [R26]
Disposal of SS Mozambique and SS Construction to East Africa Enterprises SPV FZCOAnnounced 9 Jul 2025; implemented 12 Dec 2025Restructuring and debt-reduction disposalCompleted; net loss R1m [R26]
R850m Standard Bank five-year term facilityConcluded by 31 Oct 2025Replaced the historic lender loan; JIBAR + 3.50%; 19 quarterly instalments Feb 2026–Aug 2030Outstanding R223m at 28 Feb 2026 [R26]
Kusile full and final settlement24 Nov 2025R580m ex VAT, mutual release of all claimsReceived; c.80% applied to facility prepayment [R26]; [DI]
Conclusion of Restructuring PlanOct–Dec 2025Four-year Metis-supported plan concludedCompleted [EN, 9 Dec 2025]
Eswatini joint-operation disposal9 Jan 2026Sale of 44% interest; R11m profitCompleted [R26]
Investor engagement / market update16 Feb 2026Disclosed order book R15.3bn; short-term potential awards R12.5bn; identified prospects R144bn[MU26]
Revaluation policy changeFY2026Land and buildings revaluation frequency shortened from five to four yearsImplemented [R26]
Plant fleet renewalFY2025–FY2026R776m of PPE additions over two yearsOngoing; capital commitments R147m at Feb 2026 [R26]
Board refreshJun–Oct 2026New chair; three new independent NEDsCompleted [BD26-06]; [BD26-10]
Release of guarantee providersPost Feb 2026Guarantee providers released from obligations under the facilityCompleted [R26]

Cost programmes with targets: No formal cost-reduction programme with quantified targets has been disclosed since the Restructuring Plan, which included reducing overheads and winding down unprofitable businesses [BT, 9 Dec 2025]. ESG commitments: Level 1 B-BBEE maintained; no emissions targets disclosed. Medium-term financial targets/guidance: None published. The group does not issue earnings guidance beyond JSE-mandated trading statements. The forward indicators provided are the order book (R17.2bn, of which R8.7bn falls in FY2027 and R8.5bn beyond) and the expectation of an about 70% reduction in FY2027 facility interest [R26]; [BR, 15 May 2026].

Products & Services

Stefanutti Stocks sells construction and engineering services, not products. The catalogue below lists every service line disclosed in the FY2023 and FY2024 results and the FY2026 operational review. Pricing is project-specific; the group does not publish rates, and contract forms (FIDIC, NEC, GCC, JBCC) are not systematically disclosed. "Launch year" is not meaningful for most service lines; the earliest disclosure year is given where known.

Product Portfolio

Service lineDescription and capabilitiesPrimary segment(s)Target customersNamed flagship / reference work (disclosed)First disclosed / status

Roads and earthworks

Road construction and rehabilitation, bulk earthworks, crushing and screening

Inland, Coastal, Africa

SANRAL, provincial roads departments, mines, private developers

FY2026 Inland growth led by Roads & Earthworks; a significant road-infrastructure receivable remained outstanding at FY2026 year-end [R26]

Long-standing; fastest-growing discipline FY2024–FY2026

Civils (general)

Concrete structures, structural civil works, transport and civil infrastructure

All regions

Public utilities, mines, industrial owners

—

Core legacy business

Structural rehabilitation / specialist concrete repairs

Repair and rehabilitation of concrete structures

Inland, Coastal

Municipalities, industrial owners, infrastructure owners

—

Disclosed in [R23]/[R24]

Water and wastewater

Water and wastewater treatment plants, dams, pipelines

Coastal, Inland, Western Cape

Municipalities, water boards, industrial clients

FY2026 contracts-in-progress increase driven mainly by a wastewater treatment project [R26]

Management-identified growth sector (Nov 2025)

Geotechnical

Lateral support, piling, ground anchors

Inland, Coastal

Building developers, infrastructure projects

—

Grew in FY2026 (Inland) [R26]

Marine infrastructure

Port and harbour works, marine structures

Coastal

Transnet, port operators, industrial owners

FY2023 revenue R54m in marine infrastructure [R23]

Growth sector per management

Rail infrastructure

Rail civil works

Africa (historically)

Rail authorities

FY2023 Africa rail infrastructure revenue R663m [R23]

Not disclosed separately after FY2023

Mining infrastructure

Mine infrastructure civils and earthworks, open-pit related works

Inland, Africa

Mining houses

FY2023 "Mines" revenue R1,088m [R23]; FY2026 Mining discipline R426m [R26]

Growth sector

Mining services – materials handling

Materials handling systems

Inland

Mines

A sale process failed in FY2022; operations refocused [R23]

Retained

Mining services – tailings management and hydraulic re-mining

Tailings storage facility construction and management, hydraulic re-mining, mine residue disposal

Inland

Mines

A tailings dam project receivable was recovered after FY2026 year-end [R26]

Retained

Renewable energy infrastructure

Civil and electrical balance-of-plant for solar and wind

Inland (Electrical), others

Independent power producers (REIPPPP and private wheeling)

—

Growth sector; Electrical discipline expanding into renewables [R26]

Electrical and instrumentation

E&I installation, design-and-build of high-voltage step-down (substation) facilities

Inland (MEP)

Petrochemical, mining, data-centre and renewables clients

—

Expanding into data centres [R26]

Mechanical

Mechanical installations, plant shutdowns and maintenance

Inland (MEP)

Petrochemical, industrial, mining

R90.7m arbitration award on a terminated Mechanical project (2023) [R23]

Retained

S&P High-Rate Clarifier (S&P HRC)

Proprietary turnkey dirty-water clarification system (described by the company as industry-leading)

Inland (Mechanical)

Mines and industrial water users

—

Disclosed in [R24]; only product-like proprietary offering

Oil and gas / piping

In-house pipe-spool fabrication, bulk tank construction, tank farms, clean-fuels plant upgrades

Inland (MEP)

Refineries, fuel terminals, petrochemical operators

FY2023 oil and gas revenue R439m [R23]

Retained

Building – industrial and commercial

Factories, warehouses, offices, retail, hospitals, sporting facilities

Coastal, Western Cape, Africa

Developers, retailers, public works

FY2023 included hospitals (R149m) and sporting facilities (R122m) in the Western Cape [R23]

Shrinking share after Mozambique exit

Building – cold rooms

One-stop design-and-build of cold-storage facilities

Building

Food and logistics companies

—

Disclosed in [R24]

Data centres

Complete data-centre offering: civil-structural-architectural, MEP, 3D modelling

Inland, Building

Hyperscale and colocation developers

Data-centre work cited as a growth driver [R26]; [FM]

Growth sector

Science / research facilities

Design, manufacture, installation and commissioning of facilities

Western Cape

National Research Foundation / SARAO

Phase 1 of the SKAO Science Processing Centre, iThemba LABS, Cape Town, R108.8m (award 4 Dec 2025; secondary source, eTenders data via Vuza)

Recent award

Residential

Low-cost housing; medium and high-end housing

Inland, Coastal

Developers, housing programmes

FY2023 residential revenue R141m [R23]

Small and declining

Power stations and transmission infrastructure

Power-station civils and buildings, transmission works

Inland

Eskom, utilities

Kusile Power Station (contract from 2008; finally settled Nov 2025)

Legacy

Framework agreements

Multi-year call-off contracts

Various

Industrial and public clients

—

Disclosed in [R23]

Design and build solutions

Integrated design-and-construct delivery

Various

Private clients

—

Disclosed in [R23]

Procurement (East Coast Procurement)

Import and export of goods and services for group projects

Group / Coastal

Internal and cross-border projects

Retained in FY2023 rather than sold with SS Mozambique [R23]

Internal support

Financial Narrative

Basis: Continuing operations unless stated. FY2022 is as restated in [R23]; FY2023 is as restated in [R24]; FY2024 is from [R24]/[R25]; FY2025 is from [R25]/[R26]; FY2026 is from [R26]. All amounts are in R m except per-share data (cents).

Income statement

Gross profit: Not publicly disclosed. The group presents EBITDA directly after revenue and does not report cost of sales or gross profit in its condensed results. A data-vendor "gross profit (TTM)" of R246.5m [iocharts, Feb 2026] cannot be reconciled to filings and is not used.

FY2026 normalised view (company-defined): Excluding the Kusile settlement (R448m revenue, R388m operating profit, R132m investment income, R492m after tax) and the R27m land and buildings impairment, FY2026 revenue was R7.4bn, operating profit R328m and EBITDA R464m [R26].

Per-share data

Sources: [R23]–[R26]; FY2025 NAV/share from [SHB]; FY2026 NAV/share derived as R593.2m / 167.24m shares. FY2022 continuing EPS of –162.30c is the restated figure in [R23]. FY2023 continuing EPS was –22.42c as originally reported and –21.91c after the [R24] restatement; the restated figure is shown. Weighted shares were 167,243,684 in every year. Diluted shares were 174.66m (FY2025) and 177.14m (FY2026), reflecting the FSP. Interim FY2027 data are not yet published. Interim H1 FY2026 (six months to 31 Aug 2025) for reference: revenue R3,656m, EPS 28.96c, HEPS 44.49c, continuing EPS 46.19c [SDO]; [DI].

Margins and growth

FY2022 growth is not computed (no comparable restated FY2021 base in sources). Normalised FY2026 margins: EBITDA 6.3%, operating 4.4% [R26]; [FM]. Revenue CAGR FY2022–FY2026: 7.1% reported (R5,968m to R7,840m); 5.5% normalised (to c.R7,392m).

Balance sheet

Notes: Total interest-bearing liabilities for FY2022 (R1,451m) and FY2023 (R1,354m) are company-stated figures [R23]; [R24]. The FY2023 current and non-current split sums to R1,335.8m; the R18m gap is not reconciled. The lender loan was c.R1.2bn at both FY2022 and FY2023 [R23]. Net debt = interest-bearing liabilities + overdrafts – bank balances (dossier calculation; includes instalment-sale and lease liabilities of R390m at FY2026). Net working capital matches the company's stated "current liabilities exceed current assets" figures (R1,141m FY2023; R1,136m FY2024; R1,302m FY2025; R133m FY2026). Intangibles other than goodwill: not separately disclosed (nil or immaterial in condensed statements).

Cash flow

Notes: Total PPE additions including instalment-sale and right-of-use additions were disclosed only for FY2024–FY2026 (FY2022 and FY2023 are shown as 0 meaning "not disclosed"). In FY2025, R238m of the R451m was financed via instalment sales and R64m was right-of-use assets; in FY2026, R102m and R97m respectively [R25]; [R26]. Cash capex therefore materially understates true reinvestment. The FY2026 "free cash flow" of R1.43bn includes the R580m Kusile receipt and a R947m working-capital inflow, mostly a R1.6bn increase in excess billings (advance payments) that will unwind as projects are delivered [R26]. Underlying sustainable free cash flow is far lower and is not separately disclosed. Open-market share purchases appear consistent with hedging FSP awards; the purpose is not stated in sources. No buyback programme has been announced.

Ratios

Notes: Return on equity and debt/equity are not meaningful for FY2022–FY2024, when equity was negative (shown as 0 so the table can be charted; read as "n/m"). FY2025 ROE of 806% (Profile's handbook shows 805.92) reflects a near-zero equity base. FY2026 normalised pre-tax ROCE is c.26% (R328m / R1,261m). An ROIC on an after-tax, invested-capital basis is not disclosed; the dossier estimate above is pre-tax and indicative.

Cash conversion cycle: Not publicly disclosed (inventory and payables days are not meaningful for a contractor, and trade receivables are not separated from other receivables in condensed results). As a proxy, days of revenue in trade and other receivables (current):

Commentary on trends, inflections and drivers

Revenue. Continuing revenue grew from R5.97bn (FY2022) to R7.84bn (FY2026), a 7.1% CAGR. The inflection came in FY2024 (+17%), when Inland Civils and Coastal Building awards converted and the Hyvec Mauritius contract ran at full activity. FY2025 (+8%) was led by Coastal (+61%) and a step-change in Roads & Earthworks. FY2026 reported growth of 2.4% hides an underlying decline of about 3.5% (to R7.4bn) once the R448m Kusile settlement is removed. Coastal fell 26% and Africa fell 28% (Eswatini private-sector scarcity, unrealised Botswana government spending, delayed Zambian awards), only partly offset by Inland's 20.5% underlying growth [R26]. Revenue is therefore range-bound around R7.4–7.7bn underlying. The doubled order book (R17.2bn, with R8.7bn secured for FY2027) is the main evidence that this plateau should end in FY2027 [R26]; [FM].

Profitability. Underlying operating margin has climbed each year: –1.8% (FY2022), 1.7%, 3.0%, 4.4% (FY2025) and a flat 4.4% normalised in FY2026. The FY2022 loss included R127m of impairments (including R106m goodwill) and R115m of restructuring and abnormal legal costs [R23]. These items fell away from FY2023, and expected-credit-loss reversals (R150m FY2022; R61m FY2023; R16m FY2024) flattered EBITDA in the early recovery years. FY2025's R333m included a net Kalabo settlement gain (R39m operating profit contribution after a R109m ECL). FY2026's reported 8.8% margin is entirely settlement-driven. The normalised margin of 4.4% is respectable for South African civils (Raubex Roads & Earthworks runs at about 8.6%; WBHO's African operations at about 6.1%), but it leaves little room for contract losses.

Below the line. Finance costs peaked at R151m in FY2024, when the lender loan carried prime plus 4.7% including fees [R24]. They eased to R127m in FY2025 and rose to R143m in FY2026 as instalment-sale and lease interest rose (R38m vs R25m), despite lower facility interest (R80m vs R115m) [R26]. With the facility at R223m (JIBAR + 3.50%) and management guiding to about a 70% reduction in facility interest in FY2027 [BR, 15 May 2026], FY2027 finance costs should fall materially, which is a structural earnings tailwind of roughly R50–60m (dossier estimate). The FY2026 effective tax rate was low (11%) because of assessed-loss utilisation and recognition of R35m of additional deferred tax assets; this will normalise towards 27% as assessed losses are consumed [R26].

Balance sheet. The turnaround in solvency is the most important story in the numbers. Equity moved from –R90m (FY2022) to +R593m (FY2026), driven almost entirely by retained profits (no capital raised). Net working capital improved from –R1.46bn to –R0.13bn. Net debt swung from R1.04bn to net cash of R0.44bn. However, the net cash position is flattered by R2.65bn of excess billings (customer advances), which are effectively a non-interest-bearing liability. On a "cash net of advances" view the group remains a net user of client funding. The R272m goodwill (unchanged since the FY2022 impairment) means tangible equity was c.R321m at FY2026, or about 192c per share.

Cash flow. Operating cash flow has been positive since FY2023 but was modest before FY2026 (R149m–R333m a year) relative to debt service of R216m–R284m a year. This explains the repeated lender extensions in 2023, 2024 and 2025. The FY2026 operating cash flow of R1.56bn is non-recurring in character (Kusile plus advance billings). Reinvestment in plant has risen sharply (R451m of additions in FY2025; R325m in FY2026), much of it financed by instalment sales. This is a sign of confidence in work volumes, but it adds to depreciation (R134m vs R58m in FY2024) and to finance-lease obligations.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Income statement (ZAR Mn)

Income statement (ZAR Mn)FY2022FY2023FY2024FY2025FY2026

Contract revenue – continuing (ZAR Mn)

5,968.56,050.77,084.27,657.17,839.9

EBITDA – continuing (ZAR Mn)

102.1157.3270.2428.3852.1

Depreciation (ZAR Mn)

54.341.557.890.7133.6

Operating profit before investment income (ZAR Mn)

-106.6101.4209.7333.4689.1

Investment income (ZAR Mn)

19.028.743.649.8167.5

Finance costs (ZAR Mn)

112.9128.8150.8126.6142.8

Profit before tax – continuing (ZAR Mn)

-191.5-0.2100.5253.6712.9

Taxation (ZAR Mn)

79.936.574.344.680.7

Profit after tax – continuing (ZAR Mn)

-271.4-36.626.1209.0632.2

Profit after tax – discontinued (ZAR Mn)

-143.851.2-10.3-77.5-12.7

Profit attributable – total operations (ZAR Mn)

-415.214.615.9131.5619.5

FY2026 Normalisation Details

FY2026 normalisation (ZAR Mn)ReportedKusile effectImpairment add-backNormalised

Contract revenue

7,839.9-4480

c.7392

EBITDA

852.1-3880464

Operating profit

689.1-38827328

Investment income

167.5-1320

c.35

Profit after tax, continuing

632.2-492

c.20 (after tax, dossier estimate)

c.160 (dossier estimate)

Per-share data (cents)

Per-share data (cents)FY2022FY2023FY2024FY2025FY2026

Basic EPS – total operations (cents)

-248.278.729.5078.60370.44

Diluted EPS – total operations (cents)

-248.278.729.5075.26349.74

Basic EPS – continuing (cents)

-162.30-21.9115.63124.97378.01

HEPS – total operations (cents)

-97.07-38.73-55.73109.36359.26

HEPS – continuing (cents)

-82.88-27.29-5.52125.13381.38

Dividend per share (cents)

00000

Net asset value per share (cents)

-53.83-39.68-30.919.75354.67

Margins and growth (%)

Margins and growth (%)FY2022FY2023FY2024FY2025FY2026

EBITDA margin (%)

1.712.603.815.5910.87

Operating margin (%)

-1.791.682.964.358.79

Pre-tax margin – continuing (%)

-3.210.001.423.319.09

Net margin – total operations (%)

-6.960.240.221.727.90

Revenue growth – continuing (%)

01.3817.088.092.39

Balance Sheet

Balance sheet (ZAR Mn)FY2022FY2023FY2024FY2025FY2026

Total assets (ZAR Mn)

4,597.05,150.45,108.45,094.65,740.6

Property, plant and equipment (ZAR Mn)

466.3458.3528.7865.21,078.0

Goodwill (ZAR Mn)

272.4272.4272.4272.4272.4

Bank balances (ZAR Mn)

428.2578.4754.8493.61,109.1

Bank overdrafts (ZAR Mn)

18.917.80.023.60.0

Interest-bearing financial liabilities – total (ZAR Mn)

1,451.01,354.01,208.31,237.5667.6

Financial liabilities – current (ZAR Mn)

1,298.51,204.31,059.01,022.9236.7

Financial liabilities – non-current (ZAR Mn)

133.6131.5149.3214.6430.9

Of which lender loan / Standard Bank facility (ZAR Mn)

1,2001,200997849223

Net debt (ZAR Mn)

1,041.7793.4453.5767.5-441.5

Total equity (ZAR Mn)

-90.0-66.4-51.716.3593.2

Accumulated loss (ZAR Mn)

-1,224.6-1,209.2-1,193.3-1,061.9-386.4

Current assets excl. held-for-sale (ZAR Mn)

2,912.83,174.83,423.93,003.14,215.3

Current liabilities excl. held-for-sale (ZAR Mn)

4,375.14,315.94,559.74,305.54,347.9

Net working capital (ZAR Mn)

-1,462.3-1,141.1-1,135.8-1,302.5-132.6

Excess billings over work done – total (ZAR Mn)

909.61,212.11,264.61,196.72,650.1

Provisions (ZAR Mn)

598.2648.9966.1928.8827.3

Cash flow (ZAR Mn)

Cash flow (ZAR Mn)FY2022FY2023FY2024FY2025FY2026

Cash generated from operations (ZAR Mn)

-253.1512.3321.9402.81,676.3

Cash flow from operating activities (ZAR Mn)

-403.5332.8148.9210.51,557.6

Cash capex – maintaining plus expanding (ZAR Mn)

18.438.237.0149.3125.7

Free cash flow – CFO less cash capex (ZAR Mn)

-421.9294.6111.861.21,431.8

Total PPE additions incl. financed (ZAR Mn)

00117451325

Repayment of long-term financing (ZAR Mn)

163.998.4216.1284.4772.4

Dividends paid (ZAR Mn)

00000

Open-market share purchases (ZAR Mn)

0003.611.0

Taxation paid (ZAR Mn)

54.859.562.891.8148.0

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatiosFY2022FY2023FY2024FY2025FY2026

Return on closing equity (%)

000805.9104.4

Return on closing total assets – total ops (%)

-9.030.280.312.5810.79

Pre-tax ROCE – operating profit / (equity + interest-bearing debt) (%)

-7.87.918.126.654.7

Current ratio (x)

0.670.740.750.700.97

Interest-bearing debt / equity (x)

00075.871.13

Net debt / EBITDA (x)

10.215.041.681.79-0.52

Interest coverage – operating profit / finance costs (x)

-0.940.791.392.634.83

Asset turnover – revenue / closing total assets (x)

1.301.171.391.501.37

Working Capital (Days)

Receivables days proxyFY2023FY2024FY2025FY2026

Trade and other receivables / revenue x 365 (days)

11610384106

Geographic revenue – continuing (ZAR Mn)

Geographic revenue – continuing (ZAR Mn)FY2022FY2023FY2024FY2025FY2026

Within South Africa (ZAR Mn)

4,113.53,905.94,729.05,979.96,600.8

Outside South Africa (ZAR Mn)

1,855.02,144.82,355.21,677.21,239.0

Outside South Africa share (%)

31.135.433.221.915.8

Geographic revenue growth (%)

Geographic revenue growth (%)FY2023FY2024FY2025FY2026

Within South Africa (%)

-5.021.126.510.4

Within South Africa excl. Kusile (%)

-5.021.126.52.9

Outside South Africa (%)

15.69.8-28.8-26.1

Segment Overview

SegmentWithin South AfricaOutside South AfricaPrivate sectorPublic sector

Inland

4295.0 (incl. Kusile 448)

173.5 (Zimbabwe contract)

3,888.7

579.8 (incl. Kusile 448)

Coastal

1,445.70831.3614.4

Western Cape

860.20154.1706.1

Africa

01,065.6535.9529.7

Total

6,600.81,239.05,410.02,429.9

Revenue by client sector (ZAR Mn)

Revenue by client sector (ZAR Mn)FY2022FY2023FY2024FY2025FY2026

Private sector (ZAR Mn)

4,043.64,067.75,327.35,758.25,410.0

Public sector (ZAR Mn)

1,924.91,982.91,757.01,898.92,429.9

Share price at period end (cents)

Share price at period end (cents)FY2022FY2023FY2024FY2025

Price at February year end (cents)

48146112374

Financial-year high (cents)

60175165494

Financial-year low (cents)

24479292

Share Price & Returns

Reference pointPrice (R)Date

Cycle low

0.13–0.14

Dec 2019 / May 2020

Interim period end

3.84

31 Aug 2025

Trading-statement day

7.39

15 May 2026

Post-results

7.12

26 May 2026

52-week high

7.802026

52-week low

3.54

late 2025

Latest

5.50

14 Oct 2026

Valuation Multiples

MultipleBasis: 167.24m net sharesBasis: 188.08m issued sharesPeer reference

P/E – reported EPS 370.44c (x)

1.51.5

Investing.com peer average 6.6x

P/E – normalised (c.96c EPS, dossier estimate) (x)

5.75.7

Financial Mail cited c.8x normalised at R1.3bn market cap (Jun 2026)

EV/Sales (x)

0.060.08

Investing.com shows a P/S of 0.1x vs 0.4x for peers

P/B – equity R593m (x)

1.551.74

Investing.com peer P/B 1.9x

Capital Markets

Item (ZAR Mn, at 28 Feb 2026)AmountTermsSource

Standard Bank term facility – outstanding capital

223

Five-year facility from Oct 2025; 3-month JIBAR + 3.50% compounded quarterly; 19 equal quarterly instalments Feb 2026 – Aug 2030; partially supported by guarantees (providers released after year end); customary security

[R26]

Financial liabilities – current

236.7

Includes the current portion of the facility, instalment-sale agreements and lease liabilities

[R26]

Financial liabilities – non-current

430.9

Facility (non-current portion), instalment sales and leases (24–36-month terms typical for plant finance)

[R26]; [R24]

Instalment-sale and lease liabilities (total)

390

Plant finance

[R26]

Implied quarterly facility instalment after prepayments (dossier estimate)

c.12.4

R223m over the remaining 18 instalments, if prepayments reduce instalments pro rata (not confirmed)

Derived

Capital Markets Data

Historic lender loan balance (ZAR Mn)FY2022FY2023FY2024FY2025FY2026

Lender loan / facility outstanding (ZAR Mn)

1,2001,200997849223

Interest on loan / facility (ZAR Mn)

9711513411580

Analyst Conclusions

Management guidance and expectations

No numerical revenue or earnings guidance has been issued. Forward indicators provided by management:

  • Order book of R17.2bn, of which about R8.7bn is secured for FY2027 and R8.5bn for later periods; R6.0bn of the total is outside South Africa [R26].

  • Short-term potential awards of R12.5bn and identified prospects of R144bn (Feb 2026) [MU26].

  • An expected reduction of about 70% in FY2027 facility interest [BR, 15 May 2026].

  • Strategic focus on water, mining, marine, renewables, roads, data centres and PPPs [DI]; [FM].

Financial Mail estimated that converting the FY2027 book at a 4.4% margin would lift operating profit from R328m to about R383m [FM]. No sell-side consensus is available.

Bull case (grounded in the data)

  1. Visibility plus deleveraging compounding. The FY2027 secured order book (R8.7bn) already exceeds normalised FY2026 revenue (R7.4bn) by about 18%. At a stable 4.4% margin this yields about R383m of operating profit, while facility interest falls by about R55m (dossier estimate, from R80m). Normalised pre-tax profit could therefore rise by 40–50% in FY2027 before any new awards.

  2. Undemanding valuation for a now-solvent contractor. At R5.50 the shares trade at about 5.7x normalised earnings and about 1.0–1.3x normalised EV/EBITDA (on the operating-liability treatment of advances), versus peer P/Es of about 6.6x. That is a discount to Raubex, which trades at a premium for its materials annuity, despite superior order-book cover (2.2x revenue vs about 1.4x).

  3. Optionality on dividends and Africa. With equity of R593m, net cash, covenants met and a formal dividend policy now articulated, a first dividend since 2012 is a plausible re-rating catalyst. The R6.0bn outside-SA order book (six times the prior year) could restore Africa to its FY2025 profitability (R92m).

Bear case (grounded in the data)

  1. The FY2026 cash and earnings are not repeatable. R492m of the R620m profit and R580m of the cash inflow came from Kusile. A further R1.6bn of excess billings (advances) inflated the year's working-capital inflow and will unwind as projects deliver, potentially turning operating cash flow negative in FY2027–FY2028 [R26].

  2. Execution risk on a doubled book, with a track record of project losses. Underlying revenue fell about 3.5% in FY2026; Africa swung to a loss; Coastal revenue fell 26%. The FY2024 Hyvec loss (R78m) shows how one contract can wipe out a year's normalised profit for a 4.4%-margin business. Ramping from R7.4bn to R8.7bn or more with a refreshed but still finance-leased fleet adds strain.

  3. Governance transition and limited market support. The chair changed and three new independent directors joined within four months (Jun–Oct 2026). Coverage is minimal (one analyst), liquidity is thin (about 1m shares a week), and the share price has fallen about 29% from its R7.80 peak to R5.50, suggesting the market is already discounting normalisation risk.

Key catalysts and monitorables (next 12 months)

TimingCatalyst / monitorableWhat to watch
c.25 Nov 2026 (unconfirmed)H1 FY2027 interim resultsRevenue growth vs R3.66bn (H1 FY2026); normalised margin vs 4.4%; Africa profitability; operating cash flow as advances unwind; order book vs R17.2bn
QuarterlyFacility covenantsLeverage ≤2.50x, interest cover ≥2.00x as covenants tighten from 1 Mar 2027
OngoingMajor awards (SENS or press)Conversion of the R12.5bn short-term potential awards; data-centre, water, PPP and Transnet wins
OngoingAfrica executionZambia and Botswana award timing; kwacha and rand moves
Feb 2027Possible voluntary market update (as in Feb 2026)Order-book run-rate
May 2027FY2027 results and dividend decisionFirst dividend since 2012; tax rate normalisation towards 27%
Aug 2027AGM under the new chairRemuneration outcomes; FSP settlement and dilution
OngoingSite disruption, fuel costs, Middle East and US trade shocksMargin pressure indicators

Analyst verdict

Stefanutti Stocks has completed one of the more remarkable balance-sheet recoveries in South African construction. Between FY2022 and FY2026 it moved from negative equity of R90m, a R1.2bn lender loan and a material going-concern uncertainty to positive equity of R593m, net cash of about R440m, a conventional R850m bank facility (prepaid to R223m) and an unqualified, unemphasised auditor review. It did this without a dilutive rights issue, relying on asset sales, cost discipline, lender forbearance and, decisively, the R580m Kusile settlement. With the order book doubled to R17.2bn, the group has better revenue visibility than at any time in the past decade.

The investment case now turns on whether the underlying business can grow, not on whether it survives. The evidence is mixed. Normalised operating margin has held at 4.4% for two years, which shows execution discipline, and Inland, the largest region, is growing at about 20%. But underlying group revenue was flat to slightly down in FY2026, the Africa Region slipped into loss, and the exceptional FY2026 cash flow was flattered by customer advances that will reverse. The thin margin structure leaves little buffer against a single problem contract, as the Hyvec episode showed.

At R5.50 the market is pricing the shares at about 5.7x normalised earnings and about 1.6x book. This is not distressed, but it is undemanding for a contractor entering a period of falling interest costs and rising volumes. Upside depends on converting the FY2027 book at or above a 4.4% margin and on a first dividend. The principal risks are working-capital reversal and cross-border execution. The November 2026 interim results, specifically operating cash flow and the Africa result, are the decisive near-term test. Confidence in this verdict is constrained by the absence of sell-side consensus and of the full FY2026 Integrated Annual Report.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Executive Leadership Team

NameTitleTenurePrior roles / backgroundEducationTotal remuneration (latest)

Russell W. Crawford

Chief Executive Officer, executive director

CEO since 1 Jun 2019 (CEO-designate from 1 Jul 2018)

Previously Managing Director of the group's construction and mining business unit [EN, 28 Jun 2018]

—

Not disclosed in sources reviewed (see FY2026 Integrated Annual Report remuneration report)

Y. du Plessis

Chief Financial Officer, executive director

Supervised results publication since at least FY2023 (start date not disclosed)

—

CA(SA)

—

Michael Sikhakhane

Role not specified in source; stepped down from the Social and Ethics Committee on 6 Oct 2026 and remains a standing invitee

————

William Somerville

Company Secretary

————

“—” = not publicly disclosed.

Board of Directors

NameRoleIndependenceTenure / notesSource

Howard J. Craig

Chairman (from 7 Aug 2026); chair of NOMCO; REMCO member

Independent

On board since at least FY2023; relinquished ARCO and SECO roles on becoming chair

[BD26-06]; [R23]

Bharti Harie

Independent NED; REMCO chair (from 2026)

Independent

Re-elected at the 1 Aug 2025 AGM

[BD26-06]; AGM results 2025

Errol Tate

Independent NED; ARCO, REMCO and NOMCO member

Independent

Appointed 18 Jun 2026; 42 years in civil engineering construction, including 17 years as operations director of a large listed construction company

[BD26-06]; FilingReader

Shirley Machaba

Independent NED; ARCO and SECO member; SECO chair from 15 Oct 2026

Independent

Appointed 6 Oct 2026

[BD26-10]

Zaida Adams

Independent NED; ARCO and SECO member

Independent

Appointed 6 Oct 2026

[BD26-10]

Major Shareholders

HolderStake (%)DateNotesSource

M J Schwegmann

11.03

28 Feb 2025

Largest disclosed holder

[SHB]

Stefanutti Stocks Investments (Pty) Ltd

7.66

28 Feb 2025

Group treasury-share subsidiary (14,407,132 shares)

[SHB]; [R26]

The Windsor Drive Property Trust

5.82

28 Feb 2025

Financial Mail separately reports that Apex Partners Holdings holds 5.82%; the two disclosures likely refer to the same position, but this is not confirmed

[SHB]; [FM]

Stefanutti Stocks share trust

c.3.42

FY2026

Treasury shares (6,429,930) held for the share incentive scheme

[R26]

Competitive Landscape

Key Competitors

CompetitorListing / statusOverlap with Stefanutti StocksLatest scale indicatorSource

Raubex Group

JSE (RBX)

Roads & earthworks, infrastructure, materials, Rest of Africa

FY2026 (Feb) revenue c.R22bn; operating profit R1.74bn; order book R31.46bn

Raubex SENS / [EN, 11 May 2026]

Wilson Bayly Holmes-Ovcon (WBHO)

JSE (WBO)

Building, civils, roads & earthworks, mining infrastructure, Rest of Africa

—

[BR, 9 Sep 2025]

Aveng (incl. Moolmans contract mining)

JSE (AEG)

Mining services, civils

—

[SAS]

Murray & Roberts

Business rescue (late 2024)

Historically mining and engineering; now a much weakened competitor

Not applicable

[BR, 26 Nov 2024]

Calgro M3

JSE (CGR)

Residential and integrated housing (limited overlap)

—

[SAS]

Group Five

Business rescue (historical)

Building, civils, energy (legacy)

Not applicable

[BR, 2021]

Basil Read

Business rescue (historical)

Roads, building (legacy)

Not applicable

[BR, 2021]

Concor

Unlisted

Building and civils

——

Esorfranki (geotechnical, pipelines)

Unlisted

Geotechnical, piling

—

Competition Commission records (2013)

Haw & Inglis

Unlisted

Civils, roads (Coastal, Western Cape)

—

Competition Commission records (2013)

Chinese state-owned contractors (e.g. CRBC, CRCC, CHEC)

Various

Cross-border roads, rail and marine in Africa

Not publicly disclosed (segment level)

—

Mota-Engil Africa

Euronext Lisbon (parent)

Cross-border civils and mining in southern Africa

——

“—” = not publicly disclosed.

Peer Comparison FY2026

MetricStefanutti Stocks (FY Feb 2026)Raubex (FY Feb 2026)WBHO (FY Jun 2025)

Revenue (ZAR Bn)

7.84 reported / c.7.39 normalised

c.22.0

28.5

Revenue growth (%)

+2.4 reported / c.–3.5 normalised

+4.6+4

Operating profit (ZAR Mn)

689 reported / 328 normalised

1,740

c.1,400

Operating margin (%)

8.8 reported / 4.4 normalised

c.7.9

c.4.9

Order book (ZAR Bn)

17.231.4637.6

Order book / revenue (x)

c.2.2

c.1.4

c.1.3

Dividend

—

Paid (FY2026 final declared)

320c final (FY2025)

Company Snapshot

5,507

Employees

1971

Founded

Chloorkop, South Africa

Headquarters

SWOT Analysis

Strengths

  • Restored solvency without dilution. Equity rose from –R90.0m (FY2022) to +R593.2m (FY2026) purely from retained earnings; no rights issue was required [R23]; [R26]; [FM].
  • Record order book. R17.2bn at Feb 2026, double the R8.6bn a year earlier, with R8.7bn falling in FY2027 and R8.5bn beyond [R26].
  • Net cash and low leverage. Bank balances of R1.11bn against interest-bearing liabilities of R668m; facility capital reduced to R223m; all four covenants met [R26].
  • Stable underlying margin. A normalised operating margin of 4.4% in both FY2025 and FY2026 shows execution consistency after years of losses [R26]; [FM].
  • Diversified discipline mix. No single discipline above 39% of revenue in FY2026; growing Mining (R426m) and Roads & Earthworks (R3.03bn) [R26].
  • Level 1 B-BBEE contributor with 55.12% black ownership, a procurement advantage in South Africa [R26].
  • Improving safety record. LTIFR 0.06 and recordable case rate 0.26 in FY2026, both better than FY2025 [R26].

Weaknesses

  • Earnings quality in FY2026. R492m of the R620m total profit came from the non-recurring Kusile settlement [R26].
  • Underlying top-line contraction. Normalised FY2026 revenue of c.R7.4bn was below FY2025's R7.66bn; Coastal (–26%) and Africa (–28%) shrank [R26].
  • Africa Region loss. An operating loss of R38m in FY2026 versus a R92m profit in FY2025 [R26].
  • Liquidity reliant on client advances. Excess billings of R2.65bn exceed bank balances of R1.11bn; the R947m FY2026 working-capital inflow will reverse as projects progress [R26].
  • Residual accounting deficits. An accumulated loss of R386m and net current liabilities of R133m persisted at Feb 2026 [R26].
  • Low cash reinvestment visibility and rising fixed charges. Depreciation up from R58m (FY2024) to R134m (FY2026); instalment-sale and lease interest up to R38m [R24]; [R26].
  • Small scale versus peers. Revenue is about one-third of Raubex's (c.R22bn) and about a quarter of WBHO's (R28.5bn) [EN]; [BR].

Opportunities

  • Conversion of the record pipeline. R12.5bn of short-term potential awards and R144bn of identified prospects [MU26].
  • Data centres and renewables. The Electrical discipline has already entered both markets [R26].
  • PPP programme. Border posts and Transnet-related opportunities targeted by management [FM].
  • Cross-border growth. The order book beyond South Africa jumped from R1.0bn to R6.0bn [R26].
  • Interest-cost savings. About a 70% reduction in FY2027 facility interest (facility interest was R80m in FY2026) [BR, 15 May 2026]; [R26].
  • Capacity to resume dividends. The policy is now formally articulated, and the group's last dividend was 12c in July 2012 [R26]; [SHB].
  • Water and wastewater. A growing Coastal exposure, and a wastewater project materially increased contracts in progress [R26].

Threats

  • Execution risk on a doubled order book. The history of the onerous Hyvec Mauritius contract (FY2024 loss R78m; onerous provision R48m) shows how a single project can hit earnings [R24].
  • Cross-border political and currency risk. Mozambique insurgency and post-election unrest drove a R51m fair-value write-down in FY2025; Zambian kwacha strength squeezed FY2026 margins [R25]; [R26].
  • Site disruption by "business forums." A recurring factor in every results statement from FY2023 to FY2026 [R23]–[R26].
  • Covenant ratchet. Financial covenants tighten each year on 1 March (leverage ≤2.50x; interest cover ≥2.00x; debt-service cover ≥1.00x; cumulative ≥1.30x) [R26].
  • Public-sector award delays. Botswana government investment did not materialise and Zambian awards were delayed in FY2026; the Western Cape was affected by implementation delays [R26].
  • Input-cost inflation. Middle East-driven fuel and shipping costs, plus a US tariff shock to sector confidence [R25]; [R26].
  • Collapse-prone sector. Peers Murray & Roberts, Group Five and Basil Read all entered business rescue [BR, 26 Nov 2024].

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
Mar–Apr 2025 (SENS 28 Mar and 30 Apr 2025)Lenders extend the historic loan's repayment profile and term to 30 Jun 2026 [R25]Bought time for the Kusile outcome and disposals
Apr 2025US imposes a 30% tariff on South African exports and cuts foreign aid; disclosed as a post-balance-sheet event affecting sector confidence and infrastructure spend (group not significantly hit by tariffs) [R25]Macro headwind
May 2025Kusile Claim 6 (delays after 31 Dec 2019) submitted [R25]Expanded claim universe; later folded into settlement
27 May 2025FY2025 results: revenue R7.66bn (+8%), operating profit R333m, EPS 78.60c (+727%); equity turns positive; going-concern material uncertainty emphasis retained by auditors [R25]Confirmed operating recovery
Jun 2025Eskom signals it will deliver a delay-damages claim for late completion at Kusile [R25]Raised counter-claim risk
9 Jul 2025Agreements signed with East Africa Enterprises SPV FZCO to buy SS Mozambique and SS Construction [R26]Unlocked a five-year-stalled exit
1 Aug 2025AGM: all resolutions passed; Harie and Silwanyana re-elected; Craig appointed to SECO; 59.81% of issued shares represented [SDO]Governance continuity
17 Oct 2025DAB issues its Sub-clause 20.4 decision awarding R685m (ex VAT) on Kusile Claim 5; Eskom issues a notice of dissatisfaction and threatens a High Court challenge [R26]Crystallised claim value
31 Oct 2025Historic loan fully settled; new five-year R850m Standard Bank facility; Restructuring Plan and lender arrangements terminated [R26]Funding normalised
Nov 2025Initial interest-only payment of R6.7m on the new facility [R26]Facility live
24 Nov 2025Full and final Kusile settlement with Eskom for R580m (ex VAT), payable by 12 Dec 2025 [R26]; [DI]Removed the group's largest contingent asset and risk
25 Nov 2025H1 FY2026 interim results: revenue R3.66bn (+0.8%); operating profit before finance costs R170.9m (+8.4%); profit R77.25m (+52.7%); order book R13.2bn [DI]; [SDO]Steady underlying performance
4 Dec 2025Awarded Phase 1 of the SKAO Science Processing Centre, Cape Town (R108.8m) by the NRF eTenders via VuzaHigh-profile public-sector win (secondary source)
9 Dec 2025Metis announces completion of its four-year restructuring mandate; group cites 6,336 employees and more than R2bn annual wages [EN, 9 Dec 2025]; [BT]Third-party validation of turnaround
12 Dec 2025SS Mozambique and SS Construction disposal implemented; Kusile funds received [R26]; [BR]Exit of Mozambique and Mauritius
9 Jan 2026Sale of 44% interest in an Eswatini joint operation (R11m profit) [R26]Portfolio pruning
3 Feb 2026Facility reduced from R850m to R250m by end-January 2026; about 70% reduction in FY2027 facility interest expected [MU26]; [BR]Deleveraging
16 Feb 2026Voluntary market update: order book R15.3bn (R1.4bn FY2026, R8.0bn FY2027, R5.9bn FY2028+); short-term potential awards R12.5bn; identified prospects R144bn [MU26]Strong visibility; investor engagement
28 Feb 2026Year end: covenants met; land and buildings revaluation (R27m impairment); revaluation cycle shortened to four years [R26]Covenant headroom confirmed
Mar–May 2026Guarantee providers released from facility obligations after year end [R26]Further normalisation
15 May 2026Trading statement: HEPS up 195–215%; EPS from continuing operations 362.41–387.41c; share price rises 8.68% to R7.39 [BR, 15 May 2026]Market re-rating
26 May 2026FY2026 results: revenue R7.84bn, operating profit R689m, EPS 370.44c, cash R1.1bn, order book R17.2bn; no dividend; unmodified review conclusion with no going-concern emphasis [R26]Turnaround confirmed
25 Jun 2026Financial Mail analysis: normalised P/E about 8x at a R1.3bn market cap; no longer a distressed bargain [FM]Valuation debate
18–19 Jun 2026Errol Tate appointed independent NED; Matlala to retire at the AGM; Craig to become chair; Harie to chair REMCO [BD26-06]Board refresh
7 Aug 2026AGM; Matlala retires; Craig becomes chairman [BD26-06]Leadership transition
Aug 2026Vesting of the 10.1m FSP shares awarded in Aug 2023 (settlement option could lift the weighted share count to about 177.3m) [R26]Potential dilution or treasury use
21 Aug 2026Publication of the 2026/27 B-BBEE certificate and compliance report [SAS]Level 1 maintained
21 Aug, 28 Aug, 1 Sep 2026Director and subsidiary-director share dealings, including FSP vesting and settlement [SAS]–
Sep 2026Share price trades R5.84–R6.00 (2 Sep: R5.85; 24 Sep: R6.00), well below the 52-week high of R7.80 [INV]Post-results de-rating
6–8 Oct 2026Shirley Machaba and Zaida Adams appointed independent NEDs (effective 6 Oct); Busisiwe Silwanyana resigns (effective 15 Oct); Machaba to chair SECO [BD26-10]Board composition refreshed
14 Oct 2026Shares close at R5.50 (down 6.78% on the day) [SAS]Weak sentiment ahead of interims
c.25 Nov 2026 (unconfirmed)H1 FY2027 interim results expected [SAS]Key catalyst

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

5 charts
Income Statement: Revenue & Gross Profit: Contract revenue – continuing rose from ZAR 5,968.5 Mn in FY2022 to ZAR 7,839.9 Mn in FY2026.
Stefanutti Stocks Holdings Limited — Income Statement: Revenue & Gross Profit
Series (ZAR Mn)FY2022FY2023FY2024FY2025FY2026
Contract revenue – continuing5,968.56,050.77,084.27,657.17,839.9

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. R26Stefanutti Stocks – Reviewed condensed consolidated results, 12 months to 28 Feb 2026 (SENS 26 May 2026) · sharedata.co.za
  2. R25Reviewed condensed consolidated results, 12 months to 28 Feb 2025 (SENS 27 May 2025) (senspdf.jse.co.za)
  3. R24Reviewed condensed consolidated results, 12 months to 29 Feb 2024 (SENS 23 May 2024) (senspdf.jse.co.za)
  4. R23Reviewed condensed consolidated results, 12 months to 28 Feb 2023 (SENS 25 May 2023) (senspdf.jse.co.za)
  5. MU26Voluntary market update (SENS 16 Feb 2026) (senspdf.jse.co.za)
  6. BD26-06Changes to the Board of Directors (SENS 19 Jun 2026); FilingReader summary · filingreader.com
  7. BD26-10Board and committee changes (SENS 8 Oct 2026, via SA Shares) (sashares.co.za)
  8. SHBProfile's Stock Exchange Handbook 2026 Issue 2, p.188 (sharedata.co.za)
  9. SDOShareData Online company page; AGM results 2024 and 2025 · sharedata.co.za · sharedata.co.za
  10. FMFinancial Mail / Investors Monthly, "Is there more upside after Stefanutti's rise from the rubble?" (25 Jun 2026) (financialmail.businessday.co.za)
  11. ENEngineering News: FY2026 results (26 May 2026); restructuring completion (9 Dec 2025); CEO succession (28 Jun 2018); chair changes (2014); collusion settlements (2 Aug 2013); Raubex FY2026 (11 May 2026); WBHO (11 Sep 2024) · engineeringnews.co.za · engineeringnews.co.za · engineeringnews.co.za · engineeringnews.co.za · engineeringnews.co.za · engineeringnews.co.za · engineeringnews.co.za
  12. BTBusinessTech (9 Dec 2025; 26 May 2026) · businesstech.co.za
  13. BRBusiness Report / IOL / BusinessDay (15 May 2026; 26 Nov 2024; 25 Nov 2022; 12 Aug 2013; 9 Sep 2025; 11 May 2026) · businessday.co.za · iol.co.za · iol.co.za · iol.co.za
  14. DIDaily Investor (25 Nov 2025; FY2025 coverage) (dailyinvestor.com)
  15. INVInvesting.com SSKJ quote pages · il.investing.com · cn.investing.com
  16. SASSA Shares – SSK page (price 14 Oct 2026; recent SENS list) (sashares.co.za)
  17. OtherSAnews – Competition Commission settlement (24 Jun 2013) (sanews.gov.za)
  18. OtherPolity / Creamer Media – R323m proposed penalty (13 May 2013) (polity.org.za)
  19. OtherMail & Guardian – World Cup stadium collusion referral (13 Nov 2014) (mg.co.za)
  20. OtherStefanutti Stocks Annual Report 2011 (via ShareData) (sharedata.co.za)
  21. OtherIntegrated Report 2015 summary (sustainabilityreports.com)
  22. OtherValue Investors Club – Stefanutti Stocks (2018; secondary) (valueinvestorsclub.com)
  23. OthereTenders award notice via Vuza – SKAO SPC (4 Dec 2025) (getvuza.com)
  24. OtherSimply Wall St – SSK company information (simplywall.st)

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.