Strike Energy Limited Overview
Strike Energy is a small-cap, Perth-headquartered independent energy company. It is moving from being a single-asset onshore gas producer to a vertically integrated gas-and-power business in Western Australia's Perth Basin. Revenue currently comes from the 100%-owned Walyering gas and condensate field, which produced about 13 TJ/d in late FY2026 against a 20 TJ/d target and sells under firm domestic offtake.
Its second earnings stream is the 85 MW South Erregulla Peaking Power Station. This 100%-owned plant runs on gas from Strike's own field and sells capacity credits and spot energy into the South West Interconnected System. Practical completion is targeted for 31 October 2026.
Its third and largest prospective stream is a 50% interest in West Erregulla, which holds 251 PJ of net 2P reserves. West Erregulla is now on a defined pathway with partner and future operator Hancock Energy toward an FY2028 final investment decision and first gas in mid-2029.
The investment case rests on a structurally short WA domestic gas market, offset by execution, reserve and balance-sheet risk.
Company's own description
In its corporate materials, Strike describes itself as an independent Australian energy company focused on unlocking the Perth Basin's conventional gas resources. It notes that it became Western Australia's first new supplier of onshore gas since FY2013. Its historical vision statement was to be the lowest-cost onshore gas producer in Australia, so that affordable natural gas would support the energy transition.
The FY2026 results presentation (29 September 2026) recasts the company as a diversified energy group. That group is to be built on three converging revenue streams by 2029:
-
gas sales from Walyering
-
electricity and capacity sales from South Erregulla
-
larger-scale gas sales from West Erregulla
The 1 September 2026 investor presentation adds that the company operates all of its permits, holds about 3,000 km² of Perth Basin acreage, and has a reserves-and-resources base of 2,064 PJe.
Independent characterisation
Strike is best understood as a sub-scale upstream gas producer converting itself into a WA "gas-to-wire" utility-style business. The idea is to capture margin beyond the wellhead.
Walyering: is a conventional gas-condensate field. Reserves were sharply downgraded in August 2025, so it is a declining, cash-generative base asset rather than a growth engine.
South Erregulla: was reconfigured after the abandonment of the Project Haber urea concept. Rather than building a stand-alone gas plant and selling into a pipeline, Strike burns its own gas in a fast-start reciprocating-engine peaking plant connected to the 132 kV Geraldton–Three Springs transmission line. Revenue is anchored by AEMO Reserve Capacity Credits, which act as a quasi-regulated, availability-based payment, with upside from high-priced peak energy sales when renewable output falls.
West Erregulla: is the largest discovered gas resource in Strike's portfolio. After years of joint-venture friction and delays, it now has a processing route through Hancock Energy's proposed Belisama facility and a pre-FID funding framework.
Business and revenue model
| Revenue stream | Model type | Status (Oct 2026) | Contracting basis |
|---|---|---|---|
| Sales gas (Walyering) | Commodity product sales | Producing | Firm offtake agreements with WA domestic buyers (counterparties n/d) |
| Condensate (Walyering) | Commodity product sales | Producing | Trucked and sold (historical arrangements included trucking to Bonython, SA) |
| Capacity credits (South Erregulla) | Availability / capacity payment (quasi-contracted, regulated market) | Starting from capacity year 2026–27 | AEMO Reserve Capacity Mechanism; 85 MW Certified Reserve Capacity |
| Electricity energy sales (South Erregulla) | Merchant spot energy sales into the WEM | From first power (Q4 CY2026 target) | Wholesale Electricity Market balancing / spot |
| Ancillary / essential system services | Service fees | Potential | WEM ESS market |
| West Erregulla sales gas | Commodity product sales | Development; first gas targeted mid-2029 | Offtake arrangements under development |
There is no subscription or licensing revenue. The revenue mix is 100% product (commodity) today and will become product plus capacity/availability revenue from FY2027.
Value-chain position, customers and end markets
Strike operates in upstream exploration and production (gas and condensate), midstream processing (Walyering and the South Erregulla gas facilities), and, from FY2027, power generation. It does not operate transmission. Network connection is through Western Power, and market operation is through AEMO.
Its customers are WA domestic gas buyers, including industrial users and retailers (specific offtakers n/d), the WA Wholesale Electricity Market via AEMO, and condensate purchasers. Its end markets are the WA domestic gas market and the SWIS electricity market.
Strategy
Stated strategy themes
FY2025 strategic review conclusion (Sep 2025): focus on vertically integrated gas and power projects in WA, delivering reliable and flexible energy to support the State's energy transition.
FY2026 results presentation (Sep 2026): build three converging revenue streams by 2029 from Walyering gas, South Erregulla power and capacity, and West Erregulla gas, moving from a single producing asset to a diversified energy group.
CEO Robertson (May–Jun 2026): strategic growth, disciplined and safe project delivery, and development into a significant integrated energy business in the Australian market, while growing the portfolio through exploration.
"West Erregulla Unlocked" (Sep 2026): use West Erregulla as a step-change in scale, supplying a WA gas market that AEMO's December 2025 Gas Statement of Opportunities projects to tighten.
Initiatives in the last 24 months
| Initiative | Date | Details / targets |
|---|---|---|
| South Erregulla 85 MW peaking power station | FID Nov 2024 | A$137m; about A$18.4m first-year capacity revenue, rising to about A$42m per year by CY2029 |
| A$217m Macquarie financing package | Mar 2025 | Funds South Erregulla; includes Tranche B2 (increased to A$30m and drawn Sep 2026) |
| Strategic review | Jan–Sep 2025 | Considered ownership and funding alternatives at project and corporate level; asset divestment not ruled out |
| Carnarvon strategic placement and SPP | Jul–Sep 2025 | About A$86–89m at A$0.12; SPP up to A$10–15m |
| Walyering production optimisation | FY2026 | Second heat exchanger, compression, field extension; Walyering West-1 discovery; target 20 TJ/d |
| West Erregulla reserves upgrade | Apr 2026 | About 20% increase to 251 PJ net 2P |
| Board and executive renewal | May–Oct 2026 | Smaller board; new CEO and CFO |
| West Erregulla processing and funding (Hancock) | Aug 2026 | Belisama route; up to A$30m pre-FID loan; Hancock operatorship at FID |
Management targets and guidance
| Item | Target |
|---|---|
| South Erregulla practical completion | 31 Oct 2026 |
| South Erregulla first power | Q4 CY2026 |
| Remaining South Erregulla capex | About A$11m |
| Walyering rate | 20 TJ/d target (about 13 TJ/d at the time of the Sep 2026 presentation) |
| West Erregulla upstream FID | FY2028 |
| West Erregulla first gas | Mid-CY2029 |
| Debt service | From operating cash flow; asset finance amortises from Oct 2026; Macquarie from Dec 2026 |
| Capacity revenue | About A$19m (CY2027), rising to up to about A$42m per year (CY2029) |
No formal FY2027 revenue or EBITDA guidance was found (n/d).
Products & Services
Natural gas: Walyering sales gas
| Attribute | Detail |
|---|---|
| Description | Pipeline-quality sales gas processed at the Walyering facility and delivered into the WA domestic market |
| Capability | Gross production capacity up to 33 TJ/d (corporate profile). FY2025 average about 25 TJ/d sales gas. Late FY2026 about 13 TJ/d, targeting 20 TJ/d |
| Target customers | WA domestic industrial and retail gas buyers (named offtakers n/d) |
| Launch year | First gas early CY2024 |
| Pricing | Firm offtake contracts; pricing n/d. Management illustrations use about A$8/GJ for WA gas |
| Flagship | Walyering-7 (FY2024 discovery, brought online), Walyering West-1 (Cattamarra Formation discovery, 2026) |
Condensate
| Attribute | Detail |
|---|---|
| Description | Liquids co-produced with Walyering gas |
| Logistics | Trucked; historically trucked to Bonython (SA) per ENB coverage |
| Pricing | Linked to oil benchmarks (terms n/d) |
Electricity capacity: South Erregulla Reserve Capacity Credits
| Attribute | Detail |
|---|---|
| Description | 85 MW of Certified Reserve Capacity in the SWIS, awarded in full by AEMO along with the requested Network Access Quantity |
| Pricing | Published 2026 capacity price of A$216,092 per MW per year, implying about A$18.4m of first-year firm capacity revenue |
| Ramp | Capacity payments of about A$19m in CY2027, rising to up to about A$42m per year by CY2029 (FY26 results presentation) |
| Customer | AEMO / WEM market participants via the Reserve Capacity Mechanism |
| Start | Capacity year 2026–27 |
Electricity energy: South Erregulla peaking generation
| Attribute | Detail |
|---|---|
| Description | Fast-start, flexible gas-fired peaking power station fuelled by Strike's own South Erregulla gas |
| Specification | 85 MW; 20 Jenbacher gas engines; connected through the existing 132 kV Geraldton–Three Springs line |
| Gas supply | South Erregulla 45 PJ 2P reserves and 37 PJ 2C resources (100%) |
| Utilisation | FID modelling raised expected utilisation from 18.8% to a minimum of 30% |
| Capex | A$137m at FID; about A$11m remaining as of the FY26 results |
| FID-era revenue guide | A$50–55m per year over the first five years from energy and capacity combined (Nov 2024) |
| Timing | Mechanical completion June 2026; practical completion forecast 31 Oct 2026; first power Q4 CY2026 |
Development product: West Erregulla gas
| Attribute | Detail |
|---|---|
| Description | Conventional Permian gas, 50% Strike / 50% Hancock Energy |
| Reserves | 251 PJ net 2P to Strike (about 20% upgrade in 2026 after seismic interpretation) |
| Processing | Hancock's proposed Belisama facility (Hancock estimates Belisama could supply up to 20% of WA domestic demand over 25 years) |
| Pre-FID work | WE-6 development drilling; completions; workovers of WE-2, WE-3 and WE-4 |
| Timing | Upstream FID FY2028; first gas mid-CY2029 |
| Illustrative value | About A$127m per year of indicative revenue at A$8/GJ (FY26 presentation) |
Exploration products and concepts
| Project | Status |
|---|---|
| Erregulla Deep-1 | High-deliverability, low-impurity gas discovery adjacent to West Erregulla (FY2025) |
| Ocean Hill / Ocean Hill South | Exploration and appraisal |
| Kadathinni | Exploration |
| Perth Basin Geothermal | Concept-stage |
| Project Haber (urea) | Historical concept (TechnipFMC studies; relocated to South Erregulla around 2023). Superseded by the gas-to-power pivot; not part of the FY2025–26 strategy |
| Wind, solar and carbon farm (Mid West) | Earlier diversification concept reported by ENB; current status n/d |
Financial Narrative
Sources: FY2024–FY2026 company results releases and presentations. FY2022–FY2023 income items and all balance-sheet history are from the Investing.com aggregator. Ratios are derived by the analyst using year-end balances. All figures are A$m unless stated.
Income statement
Notes on the income statement:
-
FY2022–FY2023 revenue is shown as 0 because Strike was pre-production (no gas sales before Walyering first gas in early CY2024). Aggregators show no revenue for these years.
-
The FY2025 impairment of A$117.7m includes A$103.3m for Walyering.
-
FY2026 underlying EBITDA is from the FY26 results. FY2026 EPS was not available; a TTM EPS of -A$0.049 was reported by Investing.com before the FY26 results.
Margins
Revenue CAGR (derived): 17.4% per year from FY2024 to FY2026 (two years). A five-year CAGR is not meaningful because Strike was pre-revenue in FY2022.
Balance sheet
Notes on the balance sheet:
-
FY2025 net debt is derived (80.8 less 41.1). FY2026 net debt is company-reported.
-
The company reports FY2026 total borrowings at book value of A$157.7m. The aggregator shows A$159.17m, which likely includes leases. All covenants were complied with.
-
The debt split is from Alpha Spread (aggregator).
-
Strike has no goodwill.
-
Working capital is derived.
Cash flow
Notes on cash flow:
-
FY2025 operating cash flow is shown as the "net cash inflows" of A$42.6m reported in the FY2025 results; the classification should be confirmed against the cash flow statement.
-
FY2026 free cash flow is not reported. It is clearly negative given capex of A$151.3m against underlying EBITDA of A$17.6m.
-
FY2026 equity raised is the Q1 FY2026 amount (Carnarvon Tranche 2 plus the SPP).
Commentary
FY2022–FY2023 (pre-production build). Strike ran annual losses of A$15–18m while funding appraisal at West Erregulla, Walyering development and Project Haber studies. Total assets more than doubled in FY2023, to A$341.9m, as equity raisings swelled cash. Current assets reached A$130.9m, and working capital peaked at A$108m.
FY2024 (inflection to production). First gas at Walyering and the Talon acquisition, which took Strike to 100% of Walyering, lifted revenue to A$45.6m. Strike posted its only recent net profit, A$8.58m. Total assets peaked at A$527.2m.
FY2025 (growth and write-down). Revenue rose 59% to A$72.7m, and underlying EBITDA reached A$41.6m, a 57% margin. However, the August 2025 reserves downgrade at Walyering forced a A$103.3m impairment, part of A$117.7m in total impairments. The result was a A$157.3m net loss, and equity fell from A$452m to A$296m. Debt rose to A$80.8m as the Macquarie facility began to fund South Erregulla.
FY2026 (investment year). Revenue fell 14% to A$62.8m as Walyering declined, with production down 36%. Underlying EBITDA fell to A$17.6m and the net loss narrowed to A$27.2m. Capex of A$151.3m, mainly for South Erregulla, was funded by Carnarvon and SPP equity (about A$87.7m) and Macquarie debt.
As a result, borrowings roughly doubled to A$157.7m and net debt reached A$111.4m. Net debt to trailing underlying EBITDA stood at about 6.3x. Working capital compressed to about A$4.8m. Debt service begins with asset-finance amortisation in October 2026 and Macquarie amortisation in December 2026.
The balance sheet therefore depends heavily on South Erregulla starting on time. Capacity revenue of about A$18–19m a year, plus energy sales, is needed to rebuild EBITDA coverage.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Business Units
| Unit | Contents | Equity | Licence | Status |
|---|---|---|---|---|
Walyering | Gas and condensate field and processing facility, compression, Walyering West discovery | 100% | L23 / EP447 | Producing |
South Erregulla (Power) | 85 MW peaking power station (20 Jenbacher gas-engine units), upstream gas facilities, South Erregulla-1 well | 100% | L24 (Precinct, about 3,500 ha) | Commissioning; practical completion targeted 31 Oct 2026 |
West Erregulla | Conventional Permian gas field, JV with Hancock Energy | 50% | L25 / L26 production licences | Pre-FID; FID FY2028; first gas mid-2029 |
Erregulla Deep | Gas discovery (Erregulla Deep-1) adjacent to West Erregulla | n/d (Greater Erregulla acreage) | — | Appraisal |
Exploration | Ocean Hill, Ocean Hill South, Kadathinni, Perth Basin geothermal | Operated | Various EPs | Exploration |
Revenue by Segment
| Segment / Product (AUD Mn) | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Total gas and condensate sales revenue | 45.6 | 72.7 | 62.8 |
Power revenue (South Erregulla) | 0 | 0 | 0 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansSegment Margins & Growth (%) and Revenue by Segment (%)
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Revenue YoY growth (%) | n/m (first production year) | 59.5 | -13.7 |
Walyering contribution to revenue (%) | 100 | 100 | 100 |
Q1 FY26 by Quarter
| Quarter (AUD Mn) | Q1 FY26 | Q2 FY26 | Q3 FY26 | Q4 FY26 |
|---|---|---|---|---|
Sales revenue | 18.81 | 17.19 | 13.72 | 13.08 |
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue (AUD Mn) | 0 | 0 | 45.6 | 72.7 | 62.8 |
Gross profit (AUD Mn) | — | — | 17.32 | 3.46 | — |
Operating income (AUD Mn) | -11.62 | -17.29 | 2.63 | -126.91 | — |
Underlying EBITDA (AUD Mn) | — | — | — | 41.6 | 17.6 |
Impairment expense (AUD Mn) | — | — | — | 117.7 | 2.7 |
Net income (AUD Mn) | -15.73 | -18.36 | 8.58 | -157.33 | -27.19 |
EPS basic (AUD) | — | — | 0.0032 | -0.0549 | — |
EPS diluted (AUD) | — | — | 0.0031 | -0.0549 | — |
Dividends per share (AUD) | 0 | 0 | 0 | 0 | 0 |
Margin Analysis (%)
| Metric (%) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Gross margin | n/m | n/m | 38.0 | 4.8 | — |
Operating margin | n/m | n/m | 5.8 | -174.6 | — |
Underlying EBITDA margin | n/m | n/m | — | 57.2 | 28.0 |
Net margin | n/m | n/m | 18.8 | -216.4 | -43.3 |
Balance Sheet
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total assets (AUD Mn) | 158.75 | 341.87 | 527.19 | 426.63 | 591.75 |
Cash and equivalents (AUD Mn) | — | — | — | 41.1 | 46.3 |
Total debt (AUD Mn) | 18.46 | 30.73 | 23.9 | 80.8 | 159.17 |
Current portion of debt (AUD Mn) | 0.12 | 13.8 | 16.1 | 1.3 | — |
Long-term debt (AUD Mn) | 18.3 | 16.9 | 7.8 | 79.5 | — |
Net debt (AUD Mn) | — | — | — | 39.7 | 111.4 |
Total liabilities (AUD Mn) | 41.87 | 55.03 | 74.75 | 130.16 | 236.17 |
Total equity (AUD Mn) | 116.87 | 286.85 | 452.44 | 296.47 | 355.58 |
Intangible assets (AUD Mn) | 1.6 | 1.3 | 0.96 | 0 | — |
Current assets (AUD Mn) | 16.72 | 130.91 | 62.82 | 56.99 | 60.32 |
Current liabilities (AUD Mn) | 10.75 | 22.82 | 45.14 | 27.78 | 55.5 |
Working capital (AUD Mn) | 5.97 | 108.09 | 17.68 | 29.21 | 4.82 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | — | — | — | 42.6 | — |
Capex (AUD Mn) | — | — | — | — | 151.3 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Equity raised (AUD Mn) | — | — | — | — | 87.67 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROE (%) | -13.5 | -6.4 | 1.9 | -53.1 | -7.6 |
ROA (%) | -9.9 | -5.4 | 1.6 | -36.9 | -4.6 |
Current ratio (x) | 1.56 | 5.74 | 1.39 | 2.05 | 1.09 |
Debt / equity (x) | 0.16 | 0.11 | 0.05 | 0.27 | 0.45 |
Net debt / underlying EBITDA (x) | n/m | n/m | — | 0.95 | 6.33 |
Asset turnover (x) | 0 | 0 | 0.09 | 0.17 | 0.11 |
Revenue by Region
| Region (AUD Mn) | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Australia – Western Australia | 45.6 | 72.7 | 62.8 |
Rest of world | 0 | 0 | 0 |
Growth (%)
| Growth (%) | FY2025 | FY2026 |
|---|---|---|
Western Australia | 59.5 | -13.7 |
Capital Markets
| Item | Value | Date / source |
|---|---|---|
Share price | A$0.100 | 15 Oct 2026 (StockAnalysis) |
Recent range | A$0.096 (early Aug 2026) to A$0.120 (Sep 2026) | Kalkine; Investing.com |
Earlier reference points | About A$0.21 (Jan 2025); A$0.12 (Carnarvon issue price, Jul 2025) | Capital Brief; Carnarvon |
Market cap | About A$360m at A$0.100 (derived); A$414m at A$0.110 (28 Sep 2026) | — |
Enterprise value | About A$471m (A$360m plus A$111.4m net debt; derived) | — |
P/E | Negative (about -2 TTM) | StockInvest / Investing.com |
EV / underlying EBITDA (FY2026) | About 26.8x (derived) | — |
EV / Sales (FY2026) | About 7.5x (derived) | — |
P/B | About 1.0x (A$360m / A$355.6m equity; derived) | — |
Dividend | None paid; no dividend policy | — |
Credit ratings | Not rated by Moody's, S&P or Fitch | — |
Change by Period
| Period | Change |
|---|---|
1-year | Reported as down about 39% versus the sector (Market Index); +9% on Investing.com's measure. Sources conflict |
3-year | n/d. Directionally, a large decline from FY2023–24 levels above A$0.20 |
Analyst Ratings & Targets
| Broker | Rating | Target (AUD) | Date |
|---|---|---|---|
RBC Capital | Hold | 0.10 | 30 Jan 2026 |
Goldman Sachs | Neutral | 0.16 | Sep 2025 |
Consensus (Investing.com) | — | 0.146–0.156 | 2026 |
Capital Markets — Total borrowings
| Item | Detail |
|---|---|
Total borrowings | A$157.7m book value (30 Jun 2026) |
Lender | Macquarie Bank (A$217m package, including Tranche B2 of A$30m) plus asset finance |
Amortisation | Asset finance from Oct 2026; Macquarie from Dec 2026 |
Covenants | Complied with (Jun 2026) |
Prospective debt | Hancock pre-FID loan of up to A$30m (conditional) |
Analyst Conclusions
Guidance summary
Management's near-term guidance is:
-
practical completion of South Erregulla on 31 October 2026, with first power in Q4 CY2026
-
capacity revenue of about A$19m in CY2027, rising to about A$42m per year by CY2029
-
Walyering at about 13 TJ/d, targeting 20 TJ/d (about A$52m per year of revenue under firm offtake)
-
West Erregulla FID in FY2028 and first gas in mid-2029
No consensus FY2027 revenue or EBITDA figures were verified.
Bull case
-
Earnings step-change: South Erregulla adds about A$18–19m of near-contracted capacity revenue plus energy margin from FY2027. That roughly doubles the FY2026 underlying EBITDA of A$17.6m, assuming Walyering holds steady.
-
West Erregulla de-risked: the Hancock deal removes the processing and funding bottleneck that stalled the asset since around 2022. The 251 PJ net 2P could generate about A$127m per year at A$8/GJ.
-
Asset-backed valuation: the market prices reserves at about A$0.68/GJ, with P/B around 1.0x. A tightening WA gas market, flagged by AEMO's 2025 Gas Statement of Opportunities, supports a re-rating.
Bear case
-
Balance-sheet stress: net debt of A$111.4m (about 6.3x EBITDA) with amortisation starting in late 2026. Any commissioning delay or weak peaking prices could force further dilutive equity raising.
-
Reserve credibility: the Walyering downgrade, with a A$103.3m impairment and production down 36%, undermines confidence in other reserve estimates.
-
Partner and policy dependence: Hancock becomes operator at FID, the funding is conditional, and WA and federal gas policy remains in flux. West Erregulla FID has slipped repeatedly since 2024.
Catalysts and monitorables (next 12 months)
| Expected timing | Catalyst |
|---|---|
| 28 Oct 2026 | Q1 FY2027 quarterly report |
| 31 Oct 2026 | South Erregulla practical completion; AEMO compliance testing |
| Nov 2026 | AGM (17 Nov); final capacity price |
| Q4 CY2026 | First power; finalisation of the Hancock loan and Macquarie consent |
| Dec 2026 | Start of Macquarie amortisation |
| H2 FY2027 | Walyering West appraisal; Walyering rate against the 20 TJ/d target |
| Feb 2027 | H1 FY2027 results, the first period with power revenue |
| 2,027 | West Erregulla pre-FID drilling (WE-6) and workovers; offtake progress |
| Ongoing | Strategic direction under new CEO Robertson and CFO Hughes |
Analyst verdict
Strike Energy sits at the most consequential inflection point in its 29-year history. FY2026 was explicitly a build year, and the numbers show it. Revenue fell to A$62.8m, underlying EBITDA to A$17.6m, and net debt rose to A$111.4m after A$151.3m of capex. Those figures describe a company that has spent its balance-sheet flexibility on a single conversion event: switching on the 85 MW South Erregulla peaking plant. Mechanical completion in June 2026 and full commissioning of all 20 units substantially de-risk the engineering. What remains is grid integration with Western Power and AEMO, and the target has already slipped by a month.
If first power arrives in Q4 CY2026, Strike gains an availability-based revenue stream of about A$18–19m that is largely insulated from the reservoir risk that hurt Walyering. In effect, Strike becomes a small hybrid generator-producer.
The more important development of 2026 is the Hancock agreement. It gives West Erregulla, which holds about 80% of Strike's 2P value, a credible processing route and a funded path to an FY2028 FID. The trade-off is ceding operatorship to Hancock, which should be viewed as a sensible exchange of control for certainty.
The case is not without scars. The 2025 reserves downgrade, four CEOs in 18 months, an ISS governance score of 9, and a discounted 2025 equity raise all justify a risk discount. Leverage near 6x EBITDA leaves little margin for error.
On balance, the stock trades close to book value and well below the in-ground value of its reserves. That is a speculative but asymmetric set-up for investors able to tolerate execution risk. The view is Neutral to Speculative Positive, contingent on first power and the binding Hancock documentation by early 2027. Failure on either would likely trigger further dilution.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Title | Since | Background | Disclosed remuneration |
|---|---|---|---|---|
Shelley Robertson | Managing Director & CEO | 1 Jun 2026 | More than 30 years across oil and gas, mining, energy, infrastructure and renewables | n/d (FY2027 remuneration report) |
Felicity Hughes | Chief Financial Officer | Effective 2 Nov 2026 | More than 25 years in finance; Hess Corporation; Newmont (Regional CFO Australia; Global Finance Integration Lead) | — |
Tim Cooper | CFO (departed) | 5 May 2025 – 29 Sep 2026 | — | A$287.28k (Yahoo Finance, likely FY2025) |
Kevin Craig | Chief Operating Officer | Apr 2021 | — | A$282.22k (Yahoo Finance) |
Michaela Stanton-Cook | Company Secretary | Mar 2026 | — | — |
Emma Alexander | Investor Relations | May 2023 | — | — |
Lucy Gauvin | General Counsel (listing may be dated) | 2019 | — | — |
Peter Stokes (former) | MD & CEO | 9 Jun 2025 – May 2026 | Born 1965 | A$640.79k (Yahoo Finance) |
Board of Directors
| Director | Role | Board since | Notes |
|---|---|---|---|
Neville (Nev) Power | Independent Non-Executive Chair | Board Sep 2019; Chair 1 Jul 2026 | Former Fortescue CEO; formerly chaired the National COVID-19 Commission Advisory Board; age about 68 |
Stephen Bizzell | Non-Executive Director; Audit Committee Chair | Oct 2020 (audit chair since 2021) | Age about 58 |
Jillian (Jill) Hoffmann | Non-Executive Director | Apr 2023 | Acting CEO Jan–Jun 2025; 12 years in senior executive roles at Woodside |
Will Barker | Non-Executive Director | Aug 2025 | Appointment coincided with Carnarvon's board-representation right; nominee status not confirmed |
Shelley Robertson | Managing Director | Jun 2026 | — |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
16 Jan 2025 | CEO Stuart Nicholls resigns; Hoffmann acting CEO | Share-price weakness after exploration disappointment; strategic review launched |
May 2025 | Tim Cooper replaces the previous CFO | — |
9 Jun 2025 | Peter Stokes appointed CEO | Outcome of the CEO search |
May 2026 | Stokes resigns immediately; Robertson appointed from 1 Jun 2026 | Board refresh; Poynton and Hackett retire; Power becomes Chair |
Jun 2026 | Cooper to depart 29 Sep 2026 | Announced alongside the commissioning update |
8 Oct 2026 | Felicity Hughes appointed CFO from 2 Nov 2026 | Completes the refreshed leadership team |
Major Shareholders
| Holder | Stake | Source |
|---|---|---|
Carnarvon Energy Ltd (ASX: CVN) | About 19.9% at completion of Tranche 2 (Sep–Oct 2025); may be modestly diluted by later issues | Carnarvon quarterly, Oct 2025 |
Neville Power (indirect) | 26,709,573 shares (about 0.7%) | Director notice, 1 Oct 2026 |
Jillian Hoffmann | 302,000 direct and 250,000 indirect | Director notice, Apr 2026 |
Shelley Robertson | No shares disclosed (as of Jun 2026) | Market Index |
Other top-10 holders | n/d (refer to the top-20 holder list in the FY2026 Annual Report) | — |
Competitive Landscape
Key Competitors
| Competitor | Arena | Relative positioning vs Strike |
|---|---|---|
Hancock Energy (private) | Perth Basin gas; Belisama | Partner and competitor; far larger balance sheet |
Beach Energy / Mitsui (Waitsia) | Perth Basin gas | Larger producer; LNG export flexibility |
Mitsui E&P Australia | Perth Basin gas | Major Waitsia stakeholder |
Mineral Resources (Perth Basin gas interests) | Perth Basin gas | Diversified miner with gas ambitions |
Woodside Energy | WA domestic gas (offshore) | Dominant WA domgas supplier |
Santos | WA domestic gas (offshore) | Major supplier |
Chevron Australia (Gorgon / Wheatstone domgas) | WA domestic gas | Major supplier |
Pilot Energy / Triangle Energy (Perth Basin juniors) | Perth Basin E&P | Smaller juniors |
Synergy (state-owned) | SWIS generation, including peakers | Dominant generator-retailer |
Alinta Energy | SWIS generation | Large gas generator |
Frontier Energy (ASX: FHE) | SWIS capacity | AEMO peaking approval alongside Strike |
Competitor Detail
| Metric | Strike (FY2026) |
|---|---|
Revenue | A$62.8m |
Revenue growth | -13.7% |
Underlying EBITDA margin | 28.0% |



