Company ProfilePremium

Sunrise Energy Metals Limited

Company Profile Analysis

Ticker: SRL.AX

ESOMAR 23 Corporate BadgeISO Certifications Badge
Sunrise Energy Metals Limited - Company showcase

Year Founded & Workforce

1989

37 Employees

Sunrise Energy Metals Limited logo

Sunrise Energy Metals Limited Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

Sunrise Energy Metals Limited Overview

Sunrise Energy Metals is a pre-revenue Australian critical-minerals developer whose investment case now rests almost entirely on the 100%-owned Syerston Scandium Project near Fifield in central-west New South Wales, which the company describes as the world's largest and highest-grade known mineable scandium deposit on a granted mining lease (ML1770). Its 2026 Feasibility Study (GR Engineering Services) outlines a 60 tpa high-purity (>99.9%) scandium oxide operation over a 32-year life at a life-of-mine C1 cost of US$534/kg, and a concept study for an expansion to 180 tpa is underway. The company has converted a decade-long nickel-cobalt battery-materials thesis into a defence-and-technology scandium thesis, anchored by a Lockheed Martin option over 15 tpa, a US EXIM letter of interest (US$67m) and a conditional US$400m, 25-year debt commitment from the US Department of War's Office of Strategic Capital. With A$115m cash, no debt and a market value above A$2.5bn, the company is priced as a strategic asset ahead of its final investment decision.


What the company does

Sunrise Energy Metals is a mineral development company with no operating revenue. According to its FY2026 Annual Report, its principal activities during the year were focused on the Syerston Scandium Project, located adjacent to the Sunrise Nickel-Cobalt Project in central New South Wales. Syerston activities included completing the updated Feasibility Study (January 2026), commencing process plant engineering, product marketing, planning for metallisation studies, infill resource drilling, tendering of long-lead equipment packages and other early works. Activity at the Sunrise Nickel-Cobalt Project was further reduced as resources were reallocated to Syerston, because the nickel-cobalt project remains uneconomic under current Indonesian-driven oversupply. The company also continued farm-in exploration at the Clonagh Trend Joint Venture in Queensland and maintained its NSW exploration tenements on a care basis.

Company's own description (paraphrased from FY2026 Annual Report)

The company describes itself as developing Syerston with the aim of delivering the world's first source of mineable, primary, high-grade scandium, while also owning the adjacent Sunrise Nickel-Cobalt Project, which it characterises as one of the largest and most cobalt-rich nickel laterite deposits globally. Its stated vision is to build a sustainable, long-term, value-creating business through innovation and disruptive change, underpinned by three core values: being "Invested", "Connected" and "Prepared to be different".

Independent characterisation

Sunrise is best understood as a single-asset, pre-construction development company with a small corporate team, a strategically placed US-aligned shareholder and lender base, and an emerging downstream ambition. Its economic value derives from three overlapping propositions:

  1. Primary scandium supply outside China. Global scandium is predominantly produced as a by-product (from titanium, alumina, nickel HPAL and rare-earth processing). Syerston would be a rare primary scandium mine. Management cites China controlling 80–85% of global supply, and China's Ministry of Commerce designating scandium a dual-use item requiring export approval from April 2025.

  2. Low-capital-intensity initial build with expansion optionality. The base case requires ~US$120m (AACE Class 3, ±15%), although the August 2026 revised scope (including a US metal refinery and infrastructure for expansion) lifts the estimate to A$450–475m (US$315–333m).

  3. Downstream participation. The FY2027 KPIs explicitly target a US scandium metallisation laboratory/production site and downstream investments (e.g., Agni Semiconductor), signalling a shift from pure miner toward a vertically integrated scandium supply-chain company.

Business model and revenue model

DimensionCurrent state (FY2026)Planned state (post-FID)
Revenue mixNo revenue from contracts with customers; income consists of interest (A$2.635m) and other income (A$0.112m)Product sales of scandium oxide (Sc2O3) and potentially scandium metal / compounds
Product vs service vs licensing—~100% product sales; possible downstream alloy / semiconductor exposure via equity investments
Pricing model—Not publicly disclosed; Lockheed Martin option is "subject to formalising offtake terms"
Value-chain positionExploration / developmentUpstream mine-to-oxide refinery; planned midstream metallisation (US)
Customer types targeted—Solid oxide fuel cell (SOFC) manufacturers, aerospace/defence alloy users, semiconductor (AlScN thin film) producers, government stockpiles
End-markets—AI data-centre power (SOFCs), defence and commercial aerospace, wireless RF filters, non-volatile memory

End-market framing (company view)

Sunrise estimates current global demand at roughly 50–60 tonnes per year of scandium oxide equivalent, having grown at an estimated 19% CAGR since 2017, and expects demand to rise to several hundred tonnes over the next decade, initially driven by SOFCs and later by advanced alloys (FY2026 Annual Report). Independent trade press (SMM, August 2026) put 2025 consumption at about 60 tonnes, up 50% year on year.

Strategy

Stated strategic themes (FY2026 Annual Report, paraphrased)

"Unlocking Value": (Annual Report theme): the company says it is in an upward growth phase focused on unlocking value for stakeholders over the next 24 months.

Transition Syerston to construction: complete final engineering (GR Engineering as lead E&P contractor), external review of ion exchange and refinery engineering, final approvals for the mine, TSF and evaporation pond, placement of long-lead orders, mobilisation of owner's team, FID and construction start.

Commercialise: convert customer discussions into binding offtake for Sc2O3, notably formalising the Lockheed Martin option.

Move downstream: metallisation and fluorination process development; a permitted US laboratory/production site; downstream investments in scandium-enabled businesses.

Expand: high-level and concept studies for a 180 tpa operation and downstream integration.

Strategic initiatives (last 24 months)

InitiativeDateDetailStatus
Syerston FS updateFY2025–Mar 202660 tpa, US$120m capex, US$534/kg C1, 32-year lifeCompleted
FEED and refinery engineeringEarly 2026GR Engineering FEED; Clean TeQ Water cRIP IX and refinery designAdvanced; external review of IX/refinery ongoing
Long-lead procurementJune quarter 2026Critical long-lead packages (e.g., boilers, heater vessels) tendered; contracts priced early 2025 re-tendered prioritising Western supplyOngoing
Permitting transitionFY2026Heritage, environmental, biodiversity and revegetation plans for transition from larger Sunrise approval to Syerston; VPA variation approved by three councils (June 2026)Final mine/TSF/pond approvals outstanding
Power solutionFY2026Combined solar, battery storage and diesel solution being costed; relocation of a 22kV lineIn progress
Expansion to 180 tpa23 Jul 2026Concept-level study (GR Engineering) for +120 tpaIn progress
US metal refinery and chemical compounds10 Aug 2026Added to project scope with OSCScoping/FY2027 KPI
Agni Semiconductor investment15 Jun 2026US$5m equity in AlScN memory developerCommitted
US redomicile / Nasdaq listing10 Aug & 2 Oct 2026Scheme of arrangement; 1:1 Holdco shares/CDIsPending approvals
Geothermal option (I-Pulse)24 Mar 2026Carried 15% post earn-inActive

Management targets and guidance

TargetLatest guidanceEvolution
FIDBoard recommendation targeted 2H CY2026Earlier guided mid-2026 (21 Apr 2026) and Q2 2026 (press); then "September 2026 quarter" (press). Not announced as of 17 Oct 2026
Construction period24 monthsUnchanged
First productionCommissioning 1H CY2028 (Annual Report) / first production 2H 2028 (Aug 2026 materials)Discrepancy between sources
Capacity60 tpa Phase 1; potential 180 tpaExpansion added 2026
CapexUS$120m (FS base case) → A$450–475m (US$315–333m) expanded scopeRevised Aug 2026
FY2027 KPIs50% construction progress (≤15% over budget); 25% metallisation milestones; 25% downstream investmentsBoard-approved

No medium-term financial (revenue/EBITDA) targets are published.

Products & Services

Sunrise currently sells no products. The catalog below covers planned products and the asset/technology platforms underpinning them.

Syerston Scandium segment

Product / platformDescriptionKey specificationsTarget customerTimingPricing
High-purity scandium oxide (Sc2O3)Flagship product from Syerston mine and refinery>99.9% purity; 60 tpa Phase 1; ore throughput 64,000 tpa; recovery 88%; LOM grade 656ppm Sc (FS table) / 665ppm (highlights — discrepancy noted); ~690ppm first decadeSOFC makers, alloy producers, Lockheed Martin (option over 15 tpa for 5 years)Commissioning targeted 1H CY2028 (Annual Report); some company/press materials cite 2H 2028 first production—
Expansion Case (Train 2)Additional 120 tpa Sc2O3 to reach 180 tpa totalConcept-level study by GR Engineering (from July 2026)Western supply chains incl. US defence baseDependent on demand, offtake and financing—
Scandium metal and chemical-grade compoundsUS-located scandium metal refinery, modifiable to produce range of chemical-grade compoundsIncluded in OSC-related expanded scope (Aug 2026)Semiconductor (AlScN sputtering targets), alloy makersFY2027 KPI: permitted US lab/production site, fluorination and metallisation process development—
Aluminium-scandium alloy developmentTechnical programmes on high-strength, lightweight Sc-containing alloys (aerospace, military, automotive); historic pilot-scale extrusion trials—Aerospace/defence OEMsOngoing—

Sunrise Nickel-Cobalt segment

AssetDescriptionStatus
Sunrise Nickel-Cobalt Project (formerly Sunrise Battery Materials Complex)Large, cobalt-rich nickel laterite deposit; historic plan for integrated mine-to-precursor battery materials complex using Clean-iX continuous ion exchangeUneconomic at current prices; minimum holding costs; optionality preserved

Exploration and energy segment

AssetDescriptionStatus
Clonagh Trend JV (Qld)Base/precious metals targets north of Cloncurry; Sunrise earning up to 75% (initial 51% by sole funding A$2.8m within 24 months)31-hole air-core programme (871m) completed July 2025; MLEM survey Dec 2025 defined significant EM anomaly; targeted drilling commenced July 2026
Millungera Basin geothermal (Qld)Hot-granite geothermal target; farm-in with Greenvale Energy (Sunrise could earn 80% by spending A$5m) restructured with I-PulseI-Pulse to fund ≥A$5m and earn 80%; final JV: I-Pulse 65%, Greenvale 20%, SRL Hot Rocks 15%
NSW exploration licencesOwendale/Tout intrusive targets near SyerstonStatutory maintenance only

Technology platforms

TechnologyRoleOwner/partner
Continuous resin-in-pulp (cRIP) ion exchange and multi-stage refineryCore Syerston extraction and purification flowsheetEngineering by Clean TeQ Water Limited (ASX: CNQ)
Hydrometallurgical leach + precipitation/calcinationProduction of Sc2O3GR Engineering (FS/FEED)
AlScN ferroelectric diode memoryDownstream exposure via Agni Semiconductor investmentAgni Semiconductor LLC (US)
G-Pulse pulsed-power drillingGeothermal drilling technology deployed at MillungeraI-Pulse / G-Pulse

Financial Narrative

Income statement

Sources: Net profit and distributions — FY2026 Annual Report (Remuneration Report five-year table). FY2025–FY2026 line items — FY2026 Annual Report P&L. FY2022–FY2024 other income — Stockopedia aggregate "total revenue" (consistent with company FY2025 figure of A$453k, implying it captures interest plus other income). Derived EBITDA = loss before tax + depreciation + finance costs (interest income included).

Commentary. Gross profit, operating margin, EBITDA margin and net margin are not meaningful for a pre-revenue developer; revenue CAGR is not applicable. The key inflection is FY2026, where the net loss more than doubled to A$15.2m as the company shifted from study to pre-development. Exploration and evaluation expense rose 3.8x to A$6.6m (Syerston FEED, drilling, early works), employee costs 2.4x to A$6.0m (owner's team build and a A$2.7m share-based payment charge largely related to the MD/CEO's performance rights), and legal/professional costs 2.5x to A$2.6m (financing, offtake, US listing preparation). Interest income rose ten-fold to A$2.6m on the enlarged cash balance, partially offsetting cost growth. FY2022's small profit (A$72k) reflected the year of the Clean TeQ Water demerger and associated items; the underlying run-rate loss of A$6–9m per year in FY2023–FY2025 reflected care-and-maintenance holding costs at Sunrise and limited study work.

FY2026 vs FY2025 expense bridge

Source: FY2026 Annual Report.

Balance sheet

Sources: FY2025–FY2026 FY2026 Annual Report; FY2022–FY2024 InvestSMART and Moomoo aggregations of company filings. Working capital FY2023–FY2024 derived.

Commentary. The balance sheet was transformed in FY2026: cash rose from A$10.7m to A$115.4m on A$115.2m net equity proceeds (three placements plus option exercises). There is no debt other than a trivial lease. Accumulated losses of A$328.6m reflect the long Clean TeQ/Sunrise development history, including historic Sunrise Project spending. Post-balance date, the company received a further ~A$48.2m from 15.17m options exercised up to the Annual Report date (and A$66.95m "during or since" the year from 33.97m options), so pro-forma liquidity in September 2026 likely exceeded A$150m before operating spend (derived; actual September quarter cash not yet reported — quarterly due ~23 October 2026).

Cash flow

Sources: FY2026 Annual Report cash flow statement; InvestSMART for FY2023–FY2024 OCF.

Commentary. Note that exploration and evaluation is expensed (not capitalised), so operating cash flow captures most project spending; capex of A$0.6m in FY2026 relates to plant and equipment. Free cash flow will turn sharply negative after FID, when construction capex (initial build US$120m in the FS; A$450–475m under the expanded OSC scope) begins.

Ratios

ROIC, net debt/EBITDA, interest coverage, asset turnover and cash conversion cycle are not meaningful for a pre-revenue entity with net cash and no borrowings. Commentary: ROE/ROA improved in FY2026 only because the denominator expanded with the equity raisings; absolute losses widened. The extraordinarily high current ratio reflects an over-funded pre-FID balance sheet designed to meet OSC conditions precedent requiring equity deployment.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Asset segment

Asset segmentContentsStatus (Oct 2026)Ownership

Syerston Scandium Project

ML1770 mining lease; freehold land; water rights; planned mine, hydrometallurgical plant (cRIP ion exchange) and refinery; planned US metallisation/refinery

Pre-FID; FEED, early works, long-lead tenders

100%

Sunrise Nickel-Cobalt Project

Large nickel-cobalt laterite deposit adjacent to Syerston; historic Sunrise Battery Materials Complex

Care and maintenance; holding costs minimised

100%

Queensland exploration

Clonagh Trend JV (earning up to 75%); Millungera Basin geothermal (farm-in with Greenvale; I-Pulse earn-in)

Active exploration (Clonagh drilling from July 2026)

Earning interests / 15% post I-Pulse earn-in

NSW exploration

Various exploration licences (e.g., EL4573)

Statutory maintenance only

100%

Strategic investments

Agni Semiconductor LLC (US$5m commitment)

Committed June 2026

Minority

Revenue by Segment

MetricFY2025FY2026

Other income incl. interest (AUD K)

4532,747

Exploration & evaluation expense (AUD K)

1,7276,622

R&D test work (AUD K)

12965

Loss before tax (AUD K)

-6,206-15,171

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Income Statement and Per-Share Data

MetricFY2022FY2023FY2024FY2025FY2026

Revenue from customers (AUD K)

———00

Other income incl. interest (AUD K)

9501,4809204532,747

Interest income (AUD K)

———2692,635

Exploration & evaluation expense (AUD K)

———1,7276,622

Employee benefits expense (AUD K)

———2,5145,958

Legal & professional expense (AUD K)

———1,0762,648

EBITDA derived (AUD K)

———-6,034-14,993

Loss before tax (AUD K)

———-6,206-15,171

Net profit after tax (AUD K)

72-9,120-7,858-6,206-15,171

EPS basic (AUD)

———-0.07-0.11

EPS diluted (AUD)

———-0.07-0.11

Dividends / capital returns per share (AUD)

0.390000

Expense line (AUD K)

Expense line (AUD K)FY2025FY2026

Exploration and evaluation

1,7276,622

Employee benefits

2,5145,958

Research and development test work

12965

Depreciation

162172

Legal and professional

1,0762,648

Occupancy

287368

Travel

166487

Impairment of investment

2000

Other expenses

505692

Finance costs

106

Balance Sheet

MetricFY2022FY2023FY2024FY2025FY2026

Total assets (AUD Mn)

25.9517.8010.0111.54117.38

Cash & equivalents (AUD Mn)

24.9116.838.7610.71115.44

Total current assets (AUD Mn)

25.3017.449.2911.12116.48

Total current liabilities (AUD Mn)

—1.500.951.084.05

Total liabilities (AUD Mn)

1.551.661.301.374.24

Borrowings excl. leases (AUD Mn)

00000

Lease liabilities (AUD Mn)

———0.220.02

Net debt (negative = net cash) (AUD Mn)

———-10.49-115.42

Total equity (AUD Mn)

24.4016.148.7110.17113.14

Goodwill & intangibles (AUD Mn)

00000

Working capital (AUD Mn)

—15.948.3410.04112.43

Issued capital (AUD Mn)

———305.40420.77

Accumulated losses (AUD Mn)

———-313.46-328.63

Cash Flow

MetricFY2022FY2023FY2024FY2025FY2026

Operating cash flow (AUD Mn)

—-7.94-7.89-5.58-9.76

Capex PP&E (AUD Mn)

———-0.009-0.627

Free cash flow derived (AUD Mn)

———-5.59-10.39

Equity issued net (AUD Mn)

———7.48115.21

Dividends paid (AUD Mn)

—0000

Buybacks (AUD Mn)

00000

Net change in cash (AUD Mn)

———1.96104.73

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2022FY2023FY2024FY2025FY2026

ROE on average equity derived (%)

0.3-45.0-63.2-65.7-24.6

ROA on average assets derived (%)

0.2-41.7-56.5-57.6-23.5

Current ratio derived (x)

—11.69.810.328.8

Debt to equity (x)

0000.020.00

Geographic Revenue

RegionFY2024FY2025FY2026

Australia revenue (AUD K)

000

Americas revenue (AUD K)

000

EMEA revenue (AUD K)

000

APAC ex-Australia revenue (AUD K)

000

Share Price and Market Valuation

MetricFY2022FY2023FY2024FY2025FY2026

Share price at FY end (AUD)

2.251.060.330.8117.23

Market capitalisation undiluted (AUD Mn)

2039530932,651

Dividends or capital returns (A$ per share)

0.390000

Share Price & Returns

PeriodApproximate performanceBasis

1-year

Roughly +160–170%

vs ~A$5.8 implied by Oct 2025 market cap of A$711.8m and ~123m shares (derived; approximate)

3-year

Roughly +1,400%

vs FY2023 close A$1.06 (approximate proxy)

5-year

Roughly +500–600%

vs FY2022 close A$2.25 (approximate proxy, before A$0.39 return)

YTD 2026

Up ~165% at 22 Sep 2026 (A$20.48) per Motley Fool; lower after October pullback

Press

Valuation Snapshot

MultipleValueComment

Market cap

~A$2.64bn

169.47m shares × A$15.57

Enterprise value

~A$2.5bn

Less estimated cash (A$115m at 30 June plus option proceeds less spend)

P/B

~23x

On 30 June 2026 equity of A$113.1m

EV / FS capex (US$120m ≈ A$182m)

~14x

Illustrative

Capital Markets

ItemDetail

Analyst consensus

Thin coverage. Stockopedia cites consensus target A$20.00 (Aug 2026). TipRanks cited a Hold with A$5.00 target in Oct 2025 (stale)

Dividend policy

No dividends; none paid or declared in FY2025–FY2026

Buybacks

None authorised

Credit ratings

Not rated by Moody's, S&P or Fitch

Debt maturity profile

No borrowings. Prospective OSC facility: up to US$400m, 25-year tenor, phased drawdown (conditional)

Options outstanding (report date)

995,513 @ A$0.40 (May 2027); 5,764,706 @ A$4.25 (Nov 2027)

Performance rights (30 June 2026)

5,419,976

Analyst Conclusions

Management guidance

FID recommendation targeted in 2H CY2026; 24-month construction; commissioning 1H CY2028 (Annual Report) or first production 2H 2028 (August 2026 materials); 60 tpa Phase 1 with potential 180 tpa; completion of financing via debt (OSC/EXIM) and capital raisings; US redomicile targeted around December 2026. No consensus revenue or earnings forecasts of substance are available.

Bull case

  1. Strategic scarcity: A permitted, high-grade, low-cost primary scandium deposit in a Five Eyes jurisdiction, backed by up to US$400m of US government debt and a Lockheed Martin option, is a rare asset as Western governments build non-Chinese supply chains.

  2. Funding largely solved: A$115m+ cash, nil debt and conditional OSC/EXIM debt potentially cover the expanded A$450–475m build with modest further equity.

  3. Optionality beyond Phase 1: 180 tpa expansion, US metallisation, AlScN semiconductors and Nasdaq access could re-rate the company from miner to integrated scandium supply-chain platform.

Bear case

  1. Market-size problem: Phase 1's 60 tpa roughly equals today's entire global demand; with NioCorp (~100 tpa planned) and Rio Tinto expanding, oversupply and price compression are plausible unless SOFC/alloy demand scales as forecast.

  2. Execution and cost slippage: FID has slipped beyond mid-2026, capex has risen from US$120m to US$315–333m under expanded scope, and no binding offtake has yet been signed.

  3. Valuation leaves no margin of safety: At ~A$2.6bn, the market cap is ~14x the FS capex and >20x book, while financing remains conditional and a 5.6% Pengxin sell-down overhang exists.

Catalysts and monitorables (next 12 months)

  • September 2026 quarterly report (~23 October 2026): cash, option proceeds, FID timing.

  • AGM (per 12 October 2026 notice) and scheme booklet; scheme meeting and Court approval; FIRB and SEC effectiveness; Nasdaq listing.

  • Board FID recommendation and construction start.

  • Binding offtake with Lockheed Martin and other eligible customers (OSC condition precedent).

  • Definitive OSC loan documentation; EXIM progress.

  • Final approvals for mine, TSF and evaporation pond.

  • Expansion concept study results; US metallisation site selection.

  • Pengxin sell-down execution; new substantial holder identity.

  • Scandium pricing and Chinese export-control developments; NioCorp financing/FID.

Analyst verdict

Sunrise Energy Metals has executed one of the most dramatic re-ratings on the ASX: from a A$30m market capitalisation at 30 June 2024 to roughly A$2.6bn today. That re-rating is not a speculative bubble built on nothing; it rests on tangible de-risking events delivered within eighteen months — an updated reserve, a completed feasibility study by a credible engineer, A$98m of equity at rising prices, a Lockheed Martin option, a US EXIM letter and a conditional US$400m commitment from the US Department of War's Office of Strategic Capital. Few junior developers achieve that sequence, and the asset's grade, permitting status and jurisdiction justify a strategic premium.

However, the valuation now discounts substantial success while the critical conversions remain outstanding. The OSC facility is conditional on due diligence, definitive documents, equity deployment and binding offtakes; the Lockheed arrangement is an option, not a contract; and Lockheed has since signed a parallel non-binding arrangement with NioCorp. The FID — originally guided to mid-2026 and tied to management KPIs — has slipped into the second half, and the capital estimate has roughly tripled in US-dollar terms as scope expanded toward a US refinery and 180 tpa readiness. Most fundamentally, the scandium market remains tiny: Phase 1 production alone would approximate today's global consumption, making the investment case contingent on demand growth materialising in SOFCs, aerospace alloys and semiconductors.

Our assessment is that Sunrise is a high-quality strategic asset with a well-funded balance sheet but an execution- and demand-dependent equity story priced near the optimistic end of plausible outcomes. The next two quarters — FID, binding offtake, OSC documentation and the Nasdaq redomicile — will determine whether the company graduates from strategic option to funded developer. Investors should treat the stock as a high-volatility, event-driven position, sized for binary financing and offtake outcomes, rather than as a de-risked producer proxy.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleAppointedIndependenceBackgroundEducationShareholding (AR)

Robert Friedland

Chairman, NED (sole Chair from 6 May 2026)

Co-Chair 8 Sep 2016

Not independent (major shareholder)

Founder/Executive Co-Chair Ivanhoe Mines; Executive Chair Ivanhoe Electric; Chair/CEO I-Pulse; Chair Ivanhoe Capital; Voisey's Bay and Oyu Tolgoi discoveries

BA Political Science, Reed College

33,654,272 shares; 1,176,471 options

Sam Riggall

Managing Director & CEO

Board 4 Jun 2013; MD contract 1 Jul 2015

Executive

Ex-Rio Tinto industrial minerals; head of strategy, Ivanhoe Mines; director Clean TeQ Water

LLB (Hons), B.Com (Melbourne), MBA (MBS); FAusIMM

2,370,937 shares; 3,983,335 performance rights

Stefanie Loader

Lead Independent NED

1 Jul 2017

Independent

Ex-MD Northparkes (CMOC); Rio Tinto exploration/CEO office; director OceanaGold

BSc Hons Geology (UWA); Grad Cert Applied Statistics; GAICD

32,000 shares

Eric Finlayson

Independent NED

16 Sep 2015

Independent

24 years Rio Tinto incl. Global Head of Exploration; Head of Exploration, Pure Lithium

BSc Hons Applied Geology

75,000 shares

Trevor Eton

NED (CFO Sep 2024–Aug 2026)

1 Jul 2021

Not independent (recent executive)

CFO/Co Sec Panoramic Resources 2003–2020

BA Hons Economics (VUW); PG Dip Mgmt (MBS); AFAIM

22,000 shares

Peter Arnell

Independent NED

12 May 2026

Independent

Founder Arnell Group; Chairman/CCO PETERARNELL; described as Chief Brand Architect of the USA

—

Nil

Jiang Zhaobai

Former Co-Chairman

Retired 6 May 2026

—

Founder and head of Pengxin International Group

——

“—” = not publicly disclosed.

Board Committees

CommitteeChairMembersMeetings held

Audit, Finance and Risk Committee

Eric Finlayson

Stefanie Loader, Trevor Eton

3

People, Governance and Sustainability Committee

Stefanie Loader

Eric Finlayson, Trevor Eton

4

Board

Robert Friedland

All directors

4 (Friedland attended 4; Finlayson 3; others 4)

Executive Leadership Team

NameTitleStartPrior roles

Sam Riggall

MD & CEO

2013 (Board)

Rio Tinto, Ivanhoe Mines

John Mullumby

CFO

24 Aug 2026 (announced 22 Jul 2026)

CFO Gold Road Resources (until Gold Fields acquisition); 7+ years Newcrest (incl. Lihir); Nyrstar (US/Switzerland); 10+ years Deloitte; CA; B.Com (Melbourne)

Geoffrey Newcombe

Syerston Project Director

1 Dec 2025

Not detailed in sources reviewed

Lynden Polonsky

Chief Development Officer

1 Jan 2026 (previously part-time Corporate Finance Manager)

Led equity strategy for CY2025 raisings

Trevor Eton

Former part-time CFO

1 Sep 2024 – 23 Aug 2026

Panoramic Resources

Ben Stockdale

Former CFO

Resigned 31 Aug 2024

—

Directors' Remuneration

NameSalary/feesCash bonusSuperLong-term benefitsShare-basedTotal

Sam Riggall (MD/CEO)

483,13383,64030,0008,8742,694,7913,300,438

Lynden Polonsky (CDO)

175,400123,03015,00014,95212,263340,645

Geoffrey Newcombe (Project Director)

178,50023,79017,50006,785226,575

Trevor Eton (CFO role)

122,00015,000000137,000

Trevor Eton (director fees)

58,92907,0710066,000

Stefanie Loader

83,000000083,000

Eric Finlayson

65,17907,8210073,000

Robert Friedland

70,000000070,000

Jiang Zhaobai (to 6 May 2026)

64,167000064,167

Peter Arnell (from 12 May 2026)

8,22600008,226

Total

1,308,534245,46077,39223,8262,713,8394,369,051

Major Shareholders

HolderSharesStakeDate / source

Robert Friedland / Ivanhoe Capital Holdings Pte Ltd (relevant interest)

33,654,272

~19.9% of 169.47m (derived)

FY2026 Annual Report (interest at report date); Ivanhoe Capital substantial notice 18.90% (Jul 2025)

Pengxin International Mining Co., Ltd (Pengxin Global Resources, SSE: 600490)

10,451,8886.17%

Pengxin disclosure 11 Sep 2026 (board authorised sale of up to 9.48m shares)

SailingStone Capital Partners LLC

8,892,9105.71%

Investing.com (as at 18 Jun 2026)

Kiril Sokoloff

Not current (became substantial at 5.21% with 6.0m shares in 2025; bought further 1.54m Jan 2026)

~

TipRanks; Simply Wall St

Sam Riggall

2,370,937

~1.4%

FY2026 Annual Report

Other directors combined

<0.1%

—

FY2026 Annual Report

New substantial holder (15 Oct 2026)

—

≥5%

ListCorp announcement list

Competitive Landscape

Key Competitors

CompetitorSegmentSource of scandium / assetScale (as disclosed)Positioning vs Sunrise

Chinese producers (multiple)

Sc2O3 and alloys

By-product of titanium dioxide, rare earth and other processing

China controls 80–85% of supply (company estimate)

Incumbents; export-restricted since April 2025

Rio Tinto (RTFT, Sorel-Tracy, Quebec)

Sc2O3

By-product from TiO2 waste streams

Initial ~3 tpa module (2021, ~20% of then-market); Canada Growth Fund backing expansion to 9 tpa (USGS MCS 2026); DLA purchase of up to 6.4t over 5 years

Credible Western by-product supplier; small scale vs Syerston's 60 tpa

Sumitomo Metal Mining (Taganito, Philippines/Japan)

Sc2O3

By-product from nickel HPAL; refined in Japan

—

Leading non-Chinese supplier to US imports (USGS: 89% of US imports from Japan)

NioCorp Developments (Elk Creek, Nebraska)

Niobium-scandium-titanium

Primary polymetallic

~100 tpa Sc2O3 planned; seeking up to US$800m; no FID; US$10m US award

Most direct US-domestic competitor; also courting Lockheed

Rusal (Russia)

Sc oxide / Al-Sc

Red mud by-product

—

Sanctions-constrained in West

Scandium International Mining Corp (Nyngan, NSW)

Sc2O3

Primary laterite

—

Smaller NSW peer

Platina/Owendale and other NSW laterite projects

Sc

Primary laterite

—

Early-stage

Imperial Mining (Crater Lake, Quebec)

Sc

Primary

—

Early-stage

Nickel-cobalt developers (e.g., Indonesian HPAL producers)

Ni/Co (Sunrise Project)

Laterite HPAL

Dominant

Render Sunrise Ni-Co uneconomic

“—” = not publicly disclosed.

Key Competitors by Company

CompanyRevenuePlanned Sc capacity (tpa)

Sunrise Energy Metals

0 (pre-revenue)

60 (→180)

NioCorp

0 (pre-revenue)

~100

Rio Tinto (scandium line)

—

~3 → 9

“—” = not publicly disclosed.

Company Snapshot

37

Employees

1989

Founded

Melbourne, Australia

Headquarters

SWOT Analysis

Strengths

  • Deposit quality: Ore Reserve of ~2.03Mt at 644ppm Sc (1,311t Sc; 2,011t Sc2O3), with ~690ppm average feed in the first decade (21 Oct 2025 ORE; FY2026 AR).
  • Low cost position: FS life-of-mine C1 cost of US$534/kg Sc2O3 (3 Mar 2026 FS).
  • Permitting maturity: Granted ML1770, freehold land, water rights; key permits and majority of approvals secured; VPA variation approved June 2026 (FY2026 AR).
  • Funding strength: A$115.4m cash, nil debt at 30 June 2026, plus ~A$48.2m option proceeds post year-end (FY2026 AR).
  • US government backing: OSC conditional US$400m 25-year facility (10 Aug 2026) and EXIM LOI US$67m (Oct 2025).
  • Defence offtake signal: Lockheed Martin option over ~25% of Phase 1 output (24 Oct 2025).
  • Sponsor and network: Chairman Robert Friedland's ~20% interest and Ivanhoe track record (FY2026 AR).

Weaknesses

  • Pre-revenue, single asset: No revenue in FY2025–FY2026; loss widened to A$15.2m (FY2026 AR).
  • Missed timeline: FID targeted by 30 June 2026 (Project Director KPI) and mid-2026 (Apr 2026 guidance) not achieved; now 2H 2026 (FY2026 AR; 21 Apr 2026).
  • Capex escalation: Base case US$120m vs expanded-scope A$450–475m (US$315–333m), with re-tendered contracts reflecting higher costs (10 Aug 2026).
  • No binding offtake: Lockheed option still "subject to formalising offtake terms"; binding offtakes are an OSC condition precedent (FY2026 AR Note 2).
  • Board independence: Only 3 of 6 directors independent; former CFO sits as NED (FY2026 AR).
  • Small team: ~37 employees (PitchBook) for a project moving to construction.
  • Data inconsistencies: LOM grade presented as 656ppm and 665ppm; first production stated as 1H28 and 2H28 across materials.

Opportunities

  • Expansion to 180 tpa (concept study launched 23 Jul 2026).
  • Downstream metallisation in the US (FY2027 KPI, 25% weighting).
  • AlScN semiconductor growth via Agni investment (15 Jun 2026).
  • Nasdaq listing broadening investor base (SID 2 Oct 2026).
  • Stockpile procurement: US DLA buying scandium oxide (DLA 6.4t Rio contract) and company comments on supplying US stockpile (Reuters, Feb 2026).
  • Sunrise Ni-Co optionality if nickel/cobalt prices recover (FY2026 AR).
  • Exploration upside at Clonagh (EM anomaly; drilling from July 2026).

Threats

  • Competing Western supply: NioCorp targets ~100 tpa and secured a Lockheed non-binding deal (Aug 2026); Rio Tinto expanding to 9 tpa (USGS 2026).
  • Chinese policy reversal: easing of export controls could collapse ex-China premiums.
  • Demand concentration: Phase 1 alone equals approximately all of current global demand (~60 tpa).
  • Financing conditionality: OSC loan subject to due diligence, definitive documents, equity deployment and offtakes (FY2026 AR).
  • Share overhang: Pengxin authorised to sell up to 9.48m shares (5.59%) (Sep 2026).
  • Valuation/volatility: Shares fell from A$23.65 high to A$15.57 within weeks (Oct 2026); price/book >20x (derived).
  • Geopolitical/US political dependency: Financing and listing strategy tied to US administration policy.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
Apr 2025China designates scandium a dual-use export-controlled itemStructural demand catalyst for non-Chinese supply
22 Apr 2025A$7.5m capital raising with $0.40 options (options granted June 2025)Funded FS update; options later exercised (~24.0m)
23 Jun 2025Friedland acquires 10m shares; SailingStone 5m shares (per insider data)Insider/anchor support at ~A$0.30
17 Jul 2025Ivanhoe Capital stake diluted to 18.90%Register change
8 Sep 2025FY2025 Annual ReportLoss A$6.2m; cash A$10.7m
9 Sep 2025Updated Mineral Resource Estimate — contained scandium approximately doubledUnderpins larger reserve and expansion
Oct 2025US EXIM letter of interest up to US$67mFirst US government financing signal
21 Oct 2025Updated Ore Reserve: 2.03Mt @ 644ppm ScSupports 32-year life
24 Oct 2025Lockheed Martin option (15 tpa, 5 years)Defence offtake anchor
Nov 2025Syerston Project Director appointed (effective 1 Dec 2025)Execution capability
12 Nov 2025AGMRemuneration report 97.89% support
17 Nov 2025~A$46m placement at A$4.25 with 1:1 optionsFunds early works
22 Nov 2025Millungera farm-in with GreenvaleGeothermal option
3 Dec 2025~A$19m placement at A$4.90Further funding
16 Dec 2025~A$33m placement at A$6.50 with A$7.25 optionsFurther funding
1 Jan 2026Lynden Polonsky appointed Chief Development OfficerCorporate development
22 Jan 2026General Meeting approves placements/related-party participationCompletes ~A$98m raising
29 Jan 2026December quarterly: cash A$47.9mStatus update
24 Feb 2026Trading haltAhead of FS release
3 Mar 2026Feasibility Study announced: 60 tpa, US$120m, US$534/kgDe-risking milestone
12 Mar 2026Half-year reportEarly works planning commenced
Mar 2026Joins S&P/ASX All OrdinariesLiquidity/visibility
24 Mar 2026I-Pulse partnership at MillungeraCarried geothermal exposure
Apr–Jun 2026VPA variation exhibited; approved by councils early JunePermitting progress
21 Apr 2026March quarterly; FID guided mid-2026Timeline guidance
6 May 2026Co-Chairman Jiang Zhaobai retiresReduced Chinese board representation
12 May 2026Peter Arnell appointed NEDUS-linked board addition
15 Jun 2026US$5m Agni Semiconductor investmentDownstream diversification
June qtr 2026Long-lead packages issued for tenderPre-FID execution
9 Jul 2026June quarterly: cash A$115.44mFunded to FID
22 Jul 2026John Mullumby named CFO (effective 24 Aug)Financial capability upgrade
23 Jul 2026Expansion study for 180 tpaScale optionality
6 Aug 2026Lockheed signs non-binding 15 tpa deal with NioCorp (competitor)Competitive signal
10 Aug 2026OSC conditional US$400m loan; US listing intention; capex revised to A$450–475mTransformational financing; cost escalation
8 Sep 2026FY2026 Annual Report: loss A$15.2m; cash A$115.4mResults
9 Sep 2026Pengxin authorises sale of up to 9.48m SRL sharesOverhang risk
22 Sep 2026ASX 200 inclusion; shares +~12% intraday to ~A$20.3–20.5Index demand
2 Oct 2026Scheme Implementation Deed for Delaware redomicile and Nasdaq primary listingStructural change
7 & 12 Oct 2026Quotation of new securities; s708A cleansing noticeOption exercises / issuance
12 Oct 2026Notice of AGM and proxy formGovernance calendar
13–14 Oct 2026Shares fall 6.5% and 4.0% to A$15.57Volatility amid sector weakness
15 Oct 2026Register change

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

1 chart
Revenue by Segment: Other income incl. interest rose from AUD 0.5 Mn in FY2025 to AUD 2.7 Mn in FY2026.
Sunrise Energy Metals Limited — Revenue by Segment
Series (AUD Mn)FY2025FY2026
Other income incl. interest0.52.7
Exploration & evaluation expense1.76.6
R&D test work01
Loss before tax-6.2-15.2

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. Sunrise Energy Metals FY2026 Annual Report (8 Sep 2026) — bulletin.webull.com/qbd/announcement/20260908/499500720/1d677e9fa1f7f1cf475226e7aabbabdc.pdf
  2. ASX announcement, OSC US$400m conditional loan (10 Aug 2026) — announcements.asx.com.au/asxpdf/20260810/pdf/072l1673ycxhhl.pdf
  3. ASX announcement, Redomicile to the US and Nasdaq listing (2 Oct 2026) — marketindex.com.au
  4. ASX announcement, CFO appointment (22 Jul 2026) — bulletin.webull.com
  5. March 2026 quarterly / FS summary (21 Apr 2026) — otcmarkets.com
  6. FY2026 Half-Year Report (12 Mar 2026) — announcements.asx.com.au/asxpdf/20260312/pdf/06xbdsrjzjqhg0.pdf
  7. InvestSMART summaries of quarterlies (Jan, Apr, Jul 2026)
  8. Reuters via The Standard / WSAU (2 Oct 2026): Baker McKenzie (Oct 2026)
  9. Motley Fool Australia (10 Aug 2026; 23 Sep 2026): Kalkine (Jun–Sep 2026) · Mining.com.au (Aug 2026)
  10. Pengxin Global Resources disclosure (11 Sep 2026)
  11. USGS Mineral Commodity Summaries 2026 — Scandium
  12. SMM (6 Aug 2026) on Lockheed–NioCorp: Rio Tinto / Business Wire (2021) on Sorel-Tracy
  13. Clean TeQ ASX announcements (2014–2015, 2021): Clean TeQ Water FY2022 Annual Report
  14. ListCorp, StockAnalysis, Stockopedia, PitchBook, Simply Wall St, TipRanks, Investing.com (market data; aggregator figures flagged where used)

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.