Synertec Corporation Limited Overview
| Metric | FY2025 | FY2026 |
|---|---|---|
| Employees (headcount, year end) | 103 | 117 |
| Female employees (%) | 21 | 24 |
FY2024 headcount is not disclosed in a verifiable primary source; the "over 140" figure from an industry directory pre-dates the FY25 restructure and redundancy program.
Synertec is a 30-year-old Melbourne engineering consultancy that has grafted a proprietary energy-technology platform onto a specialist automation and control-systems business. Its Engineering segment (approximately 88% of FY26 external revenue) delivers SCADA, operational technology, electrical and instrumentation, process, validation and functional-safety engineering to regulated critical-infrastructure owners in water, life sciences, energy, transport and defence, increasingly via multi-year panel agreements with clients such as Melbourne Water, Sydney Water, Water Corporation and ANSTO. Its Technology segment commercialises Powerhouse, an in-house-developed, AI-enabled solar-plus-battery microgrid and battery energy storage platform sold either as capital equipment or as "power-as-a-service" under Build-Own-Operate-Maintain rentals. Validated at Santos's GLNG coal seam gas fields with greater than 99.95% availability, Powerhouse has since won Shell QGC, TasNetworks and a 12MW/12MWh Santos Moomba order. The company is a sub-A$50 million micro-cap transitioning from loss-making turnaround to scaling, with FY27 revenue guidance of A$29.5–31.7 million.
Company's own description
In its FY2026 Annual Report, Synertec describes itself as a technology and engineering company enabling a low-carbon future, commercialising scalable, environmentally friendly and energy-efficient technology for global markets in energy, critical infrastructure and advanced manufacturing through partnerships with blue-chip customers. It characterises itself as a provider of engineering products and solutions that typically incorporate complex automated and highly instrumented systems designed to improve client productivity, efficiency and safety, delivered across Australia through offices in Melbourne, Sydney and Perth (FY26 Annual Report, Directors' Report, Principal Activities). The Chair's FY26 letter frames the strategy around markets with enduring structural demand drivers (critical infrastructure, water, energy, utilities, transport, defence, life sciences, cyber security and industrial automation), and argues the combination of engineering access and proprietary technology is the core competitive advantage.
Independent characterisation
Synertec is best understood as two businesses of very different maturity sharing one balance sheet:
(a) A profitable, cash-generative niche engineering consultancy. The Engineering segment generated A$20.9 million of segment revenue in FY26 (including A$2.5 million of intersegment services to Technology) and A$2.7 million of normalised EBITDA (FY26 Annual Report, segment note). Over 90% of external Engineering revenue is time-and-materials consultancy rather than fixed-price construction, a deliberate shift completed after loss-making fixed-price projects in earlier years. More than 88% of FY26 Engineering revenue came from existing customers, and the business holds positions on nine major panels. It competes as a specialist OT/SCADA/regulated-process house rather than a full-service design-and-construct firm.
(b) An early-commercial energy-technology platform. Powerhouse generated A$2.5 million of external revenue in FY26 (up 23%), almost entirely recurring BOOM rental income from Santos, which the company states is earned at greater than 90% EBITDA margin at the unit level. However, the Technology segment as a whole remained loss-making (normalised EBITDA loss of A$1.1 million in FY26) because of fixed platform costs, business development and engineering overhead. The company holds three units in the field and eight systems under design or construction at 30 June 2026, and its contracted order book expanded sharply in July–September 2026.
(c) A corporate cost centre (Board, executive, listing costs) that has been cut by approximately A$1.5 million in FY26 but remains material relative to group scale.
Business and revenue model
| Revenue stream | Segment | Model | Characteristics |
|---|---|---|---|
| Engineering consultancy (time and materials) | Engineering | Service, rate-based | Over 90% of external Engineering revenue; panel-driven; low capital intensity; debtor days 30–40 |
| Engineering projects (fixed price, incl. materials) | Engineering | Project | Small and declining share; higher execution risk |
| Powerhouse BOOM rentals ("Power-as-a-Service") | Technology | Recurring rental / subscription-like | Flat monthly fee; circa 90% unit EBITDA (company statement, 14 July 2026); 15-year asset life; capital funded by Synertec (debt-funded via Altor facility) |
| Powerhouse capital sales | Technology | Product sale plus commissioning | Introduced at scale with Santos Moomba (approx. A$6 million, delivery H1 FY28) and TasNetworks (six community batteries) |
| FEED / study engagements | Technology / Engineering | Service | e.g., Amplitude Energy Orbost FEED during H1 FY27 |
| Lifecycle support, monitoring, optimisation | Technology | Recurring service | Contemplated under both sale and BOOM models |
Approximate FY26 mix (analyst estimate from FY26 Annual Report data): engineering services approx. 88% of external revenue; recurring technology rental approx. 12%; product/licensing revenue negligible in FY26 but set to rise materially from FY27–FY28 with capital-sale contracts.
Value-chain position
Synertec sits in the design, integration and asset-owner-services layer. In Engineering it is a consultant to asset owners and their delivery partners (for example, supporting Service Stream on Urban Utilities programs in Brisbane). In Powerhouse it is a system architect and integrator: batteries and containerised battery systems are manufactured offshore to Synertec designs (partners include Ritar International Group), power-conversion technology is sourced from partners such as Hitachi Energy and Siemens, while Synertec retains system architecture, proprietary control software and Predictive Intelligence, Australian testing, cyber-secure remote operation and end accountability (FY26 Annual Report). The company states this delivery architecture can support at least 500 units per year.
Customer types and end-markets
| End-market | Representative customers (disclosed) | Services / products |
|---|---|---|
| Water | Melbourne Water (over A$7 million FY26 revenue), Sydney Water (over A$2 million FY26), Water Corporation WA (over A$1 million FY26), South Gippsland Water, South East Water, Goulburn-Murray Water, Urban Utilities (via Service Stream) | OT maintenance, SCADA, RTU/radio upgrades, electrical and automation |
| Life sciences | ANSTO, CSIRO, CSL, Zoetis, Aspen Pharma, Ego Pharmaceuticals, Invetech, Australian Synchrotron | GMP process design, validation, hazardous area and dangerous goods consulting, BMS |
| Energy and resources | Santos, Shell QGC, AGL, Amplitude Energy, an east-coast gas transmission operator, a domestic gas storage operator, WA gas producers | SCADA, cyber (SOCI compliance), Powerhouse microgrids and BESS |
| Transport | Metro Trains Melbourne / Melbourne Metro Tunnel Project | Control and monitoring systems, functional safety |
| Defence and manufacturing | GrainCorp, Stolthaven Terminals, Eastern Group, defence primes | Automation, functional safety |
| Electricity networks | TasNetworks (ARENA-funded community batteries) | Powerhouse Urban Resilience BESS |
Strategy
Stated strategy (paraphrased themes from FY26 Annual Report)
-
Focus on structurally resilient markets — critical infrastructure sectors with government-regulated or government-supported funding that are relatively insensitive to economic cycles (water, energy, transport, defence, life sciences, cyber and automation).
-
Improve quality and durability of revenue — reduce reliance on one-off projects by building panel positions, framework agreements, recurring service engagements and technology-enabled annuity revenue.
-
Combined model as moat — Engineering provides trusted access and delivery credentials; Powerhouse provides differentiated IP; the Board argues the combination is hard to replicate.
-
Organisational resilience — balance sheet, access to capital, geographic diversity, reduced customer concentration, supply-chain resilience, IP protection, leadership depth.
-
Powerhouse: disciplined conversion and productisation — one configurable platform across four pillars (Remote, Urban Resilience, Industry Resilience, Grid Resilience); low-cost disaggregated global supply chain with IP retained in Australia; mix of capital sales (faster adoption, lower capital intensity) and BOOM (recurring revenue).
-
National expansion of Engineering — NSW and WA growth; positioning in South Australia.
Strategic initiatives in the last 24 months
| Initiative | Date | Description | Targets / status |
|---|---|---|---|
| Engineering restructure and "quality of earnings" reframe | H1 FY25 | Redundancies, company-wide restructure; adjusted go/no-go settings favouring higher-margin regulated work; exit from fixed-price exposure | A$1.1 million savings in H1 FY25; A$2.5 million annualised savings budgeted |
| Corporate cost reduction | FY26 | Corporate and management cost reductions | A$1.3 million YTD by Q3; A$1.5 million full year |
| Powerhouse global supply chain | FY25–FY26 | Offshore battery manufacturing to Synertec design (Ritar), dual-location QA, plug-and-play control cabinets, standardised containers | Capacity of at least 500 units per year; Unit 4 first built under model |
| Four-pillar Powerhouse market strategy | FY26 | Expansion from remote microgrids into community BESS, industrial firming and grid resilience | First contracts in three of four pillars by September 2026 |
| Hitachi Energy collaboration | 5 May 2026 | MoU to jointly pursue BESS and microgrid projects of 5–30MW across energy, data centres, mining and critical infrastructure | Non-binding; contributed to Orbost and Moomba positioning |
| Siemens relationship | FY26 | Control capability partner | Detail not disclosed |
| PHNXX strategic investment | March 2025 | A$0.5 million convertible note | A$0.34 million fair value gain in FY26 |
| NSW expansion | FY26 | Parramatta office, senior hires | Approx. A$3 million NSW projects secured; ANSTO win |
| Cyber security specialisation | FY26 | SOCI compliance assessments and OT cyber programs | Described as a growth area |
| ESG program | Ongoing | Sixth annual WEF-framework ESG report; social procurement | Social spend up 27% to approx. A$273,000 across 15 social enterprises |
| Debt consolidation | Post-August 2026 | Placement intended to facilitate consolidation of debt facilities and reduce borrowing costs | Outcome not yet disclosed |
Medium-term targets and guidance
| Guidance item | Value | Date | Status |
|---|---|---|---|
| FY27 revenue | A$29.5–31.7 million (40–50% growth) | 30 July 2026; reaffirmed 17 August and 31 August 2026 | Placed under review following the A$45.5 million ANSTO award (September 2026) |
| Contracted work in hand | A$20.9 million at 30 June 2026 (up 188%) | 30 July 2026 | Pre-ANSTO and pre-Moomba |
| Powerhouse pipeline | Approx. A$70 million submitted (H1 FY26); approx. A$122 million qualified pipeline (FY26 Q4 commentary); approx. A$400 million of EOIs and tenders (FY26 Annual Report) | Various | Pipeline, not backlog |
| EBITDA / margin targets | — | — | — |
This was the company's first formal earnings guidance (FY26 Annual Report).
Products & Services
Technology segment — Powerhouse platform
| Product / pillar | Description and capabilities | Target customer | Status / latest version | Pricing model | Flagship deployments |
|---|---|---|---|---|---|
| Powerhouse Remote | Off-grid, grid-forming solar plus BESS microgrid with no fossil-fuel backup; ultra-low maintenance; secure remote monitoring; relocatable | Oil and gas (CSG wells), mining, remote critical infrastructure | Gen 1 (2022), Gen 2 (early FY25), Gen 3 via global supply chain (Unit 4, deployed July 2026) | BOOM flat monthly rental, approx. 90% unit EBITDA; 15-year asset life | Santos GLNG (six units contracted; Unit 5: 250kW solar/1MWh; Unit 6: 300kW solar/1.5MWh); Shell QGC Surat Basin pilot |
| Powerhouse Urban Resilience | Compact, low-noise, front-of-meter community BESS with grid services, microgrid and islanded capability | Distribution network service providers, councils, communities | First program contracted March 2026 | Capital sale (ARENA co-funded program) | TasNetworks: six units of approx. 0.2MW/0.4MWh each |
| Powerhouse Industry Resilience | Fast-response battery and optimisation systems firming existing thermal generation; spinning reserve replacement; fuel-gas reduction | Gas processing plants, mining, data centres, critical facilities; 5–30MW range | First awards July–September 2026 | Capital sale or BOOM | Santos Moomba: two 6MW/6MWh units (12MW/12MWh) with 11kV step-up transformers, approx. A$6 million, delivery H1 FY28; Amplitude Energy Orbost: approx. 2MW solar plus 5MWh BESS concept, indicative value approx. A$4.5–5.5 million subject to FID |
| Powerhouse Grid Resilience | Edge-of-grid and weak-network solutions for reliability, power quality and energy orchestration (including VPP concepts) | DNSPs, remote communities | Pre-revenue; active bids | — | None contracted (FY26 Annual Report) |
| Powerhouse control software and Predictive Intelligence | Proprietary energy-management, forecasting and control platform; developed, installed and tested in Australia; plug-and-play control cabinets | Embedded in all pillars; potential standalone optimisation services | Continuously updated; control platform capability expanded in FY25 | Bundled; lifecycle support contemplated | All units |
| Advanced battery control system / community battery applications (proposals) | Adjacent applications of Powerhouse IP | Network and C&I customers | Proposals submitted FY25 | — | — |
Powerhouse is described in the FY26 Annual Report as a proprietary, AI-enabled, industrial-scale energy platform combining renewable generation, battery storage and advanced power conversion with in-house control software and "Predictive Intelligence". Units are containerised, relocatable and configured site by site, with fleet availability exceeding 99.95% over six years of cumulative operation and second-generation units at 99.99%. Commercial options: capital purchase or BOOM rental.
Technology segment — legacy and adjacent technologies
| Product | Description | Status |
|---|---|---|
| Land-based LNG Custody Transfer System (CTS) | Metering and sampling solution for LNG custody transfer | Referenced in FY23 Appendix 4E and IBISWorld profile; no recent revenue disclosure |
| Marine-based LNG Custody Transfer System | Ship-to-shore LNG custody transfer metering | As above |
| CDP | Technology referenced alongside Powerhouse and CTS in FY23 | No recent disclosure; detail not publicly disclosed |
| Metering and sampling solutions | Specialist engineered packages | Listed as a service line on company website/aggregators |
Engineering segment — service catalog
| Service line | Description | Target customers | Named flagship work (FY26 Annual Report) |
|---|---|---|---|
| Automation and control systems | PLC, RTU, HMI, DCS design, programming, upgrade | Water, energy, manufacturing | Laverton and Wiluna radio/RTU upgrades (Water Corporation) |
| SCADA and operational technology | OT maintenance, SCADA upgrades and integration | Water utilities, energy | Melbourne Water OTMPD contract (12-month extension); Port Kembla SCADA upgrade, Rouse Hill dewatering SCADA, Castle Hill ultrafiltration and odour control SCADA (Sydney Water); AGL SCADA upgrade (July 2026) |
| Electrical and instrumentation | Electrical design, hazardous area design, instrumentation | Water, energy, resources | Gwelup clearwater pump station upgrades; Greenhead PRV SCADA upgrades |
| Process and mechanical | Process design, GMP facility design | Life sciences, energy | ANSTO Nuclear Medicine Manufacturing Facility (process design and design integration lead) |
| Systems engineering | Requirements, integration, safety-critical software | Transport, defence | Melbourne Metro Tunnel Control and Monitoring System handed over for Day 1 operations |
| Validation engineering (CQV) | Commissioning, qualification and validation in GMP environments | Pharmaceutical, biotech | Zoetis Parkville systems implementation and CQV; CSL project engineering |
| Functional safety | IEC 61508/61511-style safety lifecycle services | Transport, defence, process industries | Australian Synchrotron beamlines refurbishment safety engineering |
| Hazardous area and dangerous goods consulting | HA/DG compliance | Pharma, terminals | Aspen Pharma, Ego Pharmaceuticals, Stolthaven Terminals |
| Cyber security for OT | SOCI Act compliance assessments, cyber implementation programs | Energy producers, utilities | SOCI assessments for major energy producers |
| Building management systems | BMS design and upgrades for research facilities | Research agencies | ANSTO Lucas Heights BMS upgrade |
| Engineering panel services | Multi-year panel call-offs | Government-owned utilities and agencies | Nine major panels incl. Sydney Water, Water Corporation Process Control Technologies Panel (five-year initial term), ANSTO engineering panel, South Gippsland Water, South East Water, Goulburn-Murray Water |
Pricing: Engineering is predominantly time-and-materials (rate-based); specific rates not publicly disclosed. The ANSTO contract is projected to yield contribution margins above 25% (Finimize summary of ASX filing).
Financial Narrative
Income statement
Sources: Revenue FY22–FY25 from StockAnalysis/TipRanks/Stockopedia historical series (consistent across providers); FY26 revenue of A$21.1 million excluding other income from FY26 Annual Report. NPAT FY22 and FY23 from FY23 Appendix 4E; FY24 derived from Simply Wall St (FY25 loss of A$7.64 million described as widening 5.3%), consistent with InvestSMART's A$7.3 million; FY25 and FY26 from FY26 Appendix 4E.
EPS FY23–FY25 from InvestSMART/Simply Wall St; FY26 EPS approx. -0.9 cents is a trailing figure from Investing.com and is consistent with a A$4.5 million loss on approx. 510 million weighted shares. Diluted EPS equals basic (loss-making). Dividends per share: nil in every year.
Sources: FY25 and FY26 from FY26 Annual Report reconciliation. FY24 normalised EBITDA of A$3.3 million loss from FY25 results summary (normalised EBITDA improved 15% to A$2.8 million loss versus A$3.3 million loss). FY24 reported EBITDA, D&A and finance costs are indicative only (D&A approx.
Normalisation items (A$ million, FY26 Annual Report):
Gross profit and operating income: Group gross profit and EBIT on a statutory basis are not separately presented in the materials reviewed; operating margin per InvestSMART was -34.2% (FY23), -30.8% (FY24) and -32.6% (FY25). FY26 EBIT approx. -A$2.9 million (reported EBITDA of -A$1.91 million less D&A of A$1.01 million; analyst calculation). Pre-tax income approximates NPAT given no material tax expense (R&D tax incentives historically recognised in other income).
Revenue CAGR: FY2022–FY2026 approx. 18.0% per annum; FY2021–FY2026 approx. 20.3% per annum (analyst calculation on revenue excluding other income).
Balance sheet
Sources: Equity FY23–FY24 and LTD FY23–FY25 from InvestSMART; FY25–FY26 equity from FY26 Annual Report. FY26 long-term debt is not separately disclosed in the material reviewed; the 4.0 figure is an indicative analyst placeholder and should not be relied on.
Source: FY26 Annual Report and Appendix 4E. Goodwill and intangibles: NTA per share closely tracks net assets per share, implying negligible goodwill/intangibles (StockAnalysis/Stockopedia price-to-book and price-to-tangible-book are identical).
Debt: Synertec's principal debt is a secured facility with Altor Capital Management. A$3.5 million was drawn at 31 December 2024 with a further A$11.5 million available (FY25 H1 results); the facility was extended by up to A$4 million on 29 August 2025; drawdowns were A$3.465 million in FY25 and A$3.0 million in FY26, fully invested in Powerhouse assets (FY26 Annual Report). Total available funding (cash plus undrawn facility) was A$16.8 million at 30 June 2026 (FY26 Q4 update). Net finance costs of A$1.6 million in FY26 imply a gross debt balance in the high single-digit millions at double-digit interest rates (analyst inference). Post-placement, management stated the stronger balance sheet should facilitate consolidation of debt facilities and potentially lower borrowing costs.
Pro forma liquidity: approx. A$7.5 million cash on settlement of the A$6 million placement (17 August 2026 announcement).
Working capital: Current ratio 0.77 and quick ratio 0.59 (StockAnalysis, trailing, pre-placement); debtor days 30–40 (FY26 Annual Report). A going-concern disclosure is referenced at Note 2.5 of the FY26 financial statements.
Cash flow: notes and sources
Source: FY26 Annual Report operating cash flow chart. Discrepancy: InvestSMART shows FY23 at -A$5.08 million and FY24 at -A$6.19 million; the company chart figure is used for FY23.
Ratios
Analyst calculations from FY26 Annual Report figures. ROE deteriorates in FY26 despite a smaller loss because equity has been depleted to A$0.9 million; this ratio is not meaningful as a performance signal. ROIC: not meaningful (negative NOPAT). Debt/equity: StockAnalysis reports 1.76x (trailing, likely on an earlier equity base); on 30 June 2026 equity of A$0.9 million, gearing is very high, but the A$6 million placement restores equity to approx. A$6.9 million pro forma. Net debt/EBITDA and interest coverage: not meaningful (negative EBITDA; StockAnalysis interest coverage -4.17x). Cash conversion cycle: not disclosed; debtor days 30–40 is the only disclosed component.
Commentary on trends, inflections and drivers
Revenue. Revenue roughly doubled between FY22 and FY24 as Engineering expanded (including large fixed-price projects such as the Melbourne Metro Tunnel CMS) and Powerhouse began earning rental income. FY25 saw an 8% decline in revenue and other income as management deliberately reduced fixed-price project exposure and the broader engineering sector cooled, prompting H1 FY25 redundancies. FY26 rebounded 18–19% on panel conversions (Sydney Water, Water Corporation, Melbourne Water), geographic expansion into NSW and WA, and 23% Powerhouse growth. The FY27 guidance of A$29.5–31.7 million (40–50% growth), set before the A$45.5 million ANSTO award and the approx. A$6 million Moomba order (delivery FY28), was placed under review after the ANSTO award.
Profitability. The decisive inflection is at the EBITDA line: four consecutive halves of improvement, from approx. -A$3.4 million (1H FY25) to -A$0.4 million (2H FY26) on a reported basis, with normalised EBITDA breakeven in 2H FY26. Drivers were a A$1.5 million corporate cost reduction, a 35% improvement in Engineering contribution margin, and the cessation of Powerhouse R&D spending (nil in FY26 versus A$0.9 million in FY25). Below EBITDA, rising net finance costs (A$1.6 million, up 84%) are a growing drag that the placement and debt consolidation are intended to address.
Balance sheet. Equity was eroded from A$12.1 million (FY24) to A$0.9 million (FY26) by cumulative losses and debt-funded Powerhouse asset build. The balance sheet was the principal vulnerability entering FY27; the August 2026 placement was necessary rather than opportunistic.
Cash flow. Operating cash flow turned positive (A$0.5 million) for the first time since FY19, driven by Engineering (A$2.8 million) and a halving of corporate cash burn. Free cash flow remains negative because BOOM rental units are capitalised on balance sheet; the shift toward capital-sale contracts (Moomba, TasNetworks) should reduce capital intensity per dollar of Powerhouse revenue.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Overview
| Segment | Contents | Key products / services |
|---|---|---|
Engineering Solutions ("Engineering") | Multi-discipline engineering consultancy and projects across five target sectors: Water, Transport, Energy & Resources, Life Sciences, Defence & Manufacturing | Automation and control systems; SCADA and OT; electrical and instrumentation; process and mechanical; systems engineering; validation/commissioning/qualification (GMP); functional safety; hazardous area and dangerous goods; cyber security (incl. SOCI compliance); metering and sampling solutions |
Technology and Future Business ("Technology") | Powerhouse platform and legacy/future technologies | Powerhouse Remote, Urban Resilience, Industry Resilience, Grid Resilience; historically LNG Custody Transfer Systems (land and marine), CDP |
Corporate (cost centre, not a segment) | Board, executive, listed-company governance, investor relations, corporate development | — |
Revenue by Segment
| Segment metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Engineering external revenue (AUD Mn) | 17.8 | 15.5 | 18.6 |
Technology external revenue (AUD Mn) | 1.07 | 2.04 | 2.50 |
Engineering segment revenue incl. intersegment and other income (AUD Mn) | 19.2 | 18.21 | 20.91 |
Technology segment revenue incl. other income (AUD Mn) | 1.4 | 2.32 | 2.57 |
Group revenue and other income (AUD Mn) | 19.8 | 18.21 | 21.55 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansResults by Segment and Segment Margins & Growth (%)
| Segment metric | FY2025 | FY2026 |
|---|---|---|
Engineering normalised EBITDA (AUD Mn) | 2.21 | 2.72 |
Technology normalised EBITDA (AUD Mn) | -1.79 | -1.11 |
Total segment normalised EBITDA before corporate (AUD Mn) | 0.42 | 1.61 |
Group normalised EBITDA after corporate (AUD Mn) | -2.78 | -0.80 |
Group reported EBITDA (AUD Mn) | -5.80 | -1.91 |
Engineering normalised EBITDA margin on segment revenue (%) | 12.1 | 13.0 |
Technology normalised EBITDA margin on segment revenue (%) | -77.3 | -43.1 |
Segment Margins & Growth (%) and Revenue by Segment (%)
| Metric | FY2025 | FY2026 |
|---|---|---|
Engineering external revenue growth YoY (%) | -13 | 20 |
Technology external revenue growth YoY (%) | 90 | 23 |
Engineering share of external revenue (%) | 88.4 | 88.2 |
Technology share of external revenue (%) | 11.6 | 11.8 |
Revenue by Segment (FY2025–FY2026)
| Sub-segment metric | FY2025 | FY2026 |
|---|---|---|
Engineering consultancy revenue (AUD Mn) | 14.3 | 17.1 |
Intersegment services Engineering to Technology (AUD Mn) | 2.4 | 2.5 |
Engineering pipeline at year end (AUD Mn) | 108.8 | 174 |
Revenue by Segment (Quarterly)
| Quarter metric | FY26 Q1 | FY26 Q2 | FY26 Q3 | FY26 Q4 |
|---|---|---|---|---|
Revenue and other income (AUD Mn) | 5.0 | 5.2 | 5.1 | 6.0 |
Operating cash flow (AUD Mn) | -0.6 | 1.1 | -1.0 | 1.0 |
Income Statement and Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue excl. other income (AUD Mn) | 10.89 | 14.81 | 18.95 | 17.80 | 21.1 |
Net profit after tax (AUD Mn) | -3.98 | -5.86 | -7.26 | -7.64 | -4.52 |
Net margin on revenue (%) | -36.5 | -39.6 | -38.3 | -42.9 | -21.4 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansIncome Statement and Per-Share Data
| Metric | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
Revenue and other income (AUD Mn) | 14.8 | 19.8 | 18.21 | 21.55 |
Normalised NPAT (AUD Mn) | -3.01 | -3.6 | -4.62 | -3.41 |
EPS basic (A$ cents) | -1.5 | -1.6 | -1.5 | -0.9 |
Income Statement and Margin Analysis (%) (FY2024–FY2026)
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Normalised EBITDA (AUD Mn) | -3.3 | -2.78 | -0.80 |
Reported EBITDA (AUD Mn) | -6.3 | -5.80 | -1.91 |
Depreciation and amortisation (AUD Mn) | 0.7 | 0.98 | 1.01 |
Net finance costs (AUD Mn) | 0.4 | 0.87 | 1.60 |
Normalised EBITDA margin on revenue and other income (%) | -16.7 | -15.3 | -3.7 |
Key Financials
| Normalisation item | FY2025 | FY2026 |
|---|---|---|
Corporate development (AUD Mn) | 0.55 | 0.70 |
Transformation and share-based payments (AUD Mn) | 0.78 | 0.34 |
Bid development and growth bench (AUD Mn) | 0.76 | 0.41 |
Net fair value gain on financial asset (PHNXX note) (AUD Mn) | 0 | -0.34 |
Net technology R&D costs (AUD Mn) | 0.93 | 0 |
Balance Sheet
| Metric | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
Net assets / total equity (AUD Mn) | 11.5 | 12.1 | 4.81 | 0.90 |
Long-term debt (AUD Mn) | 1.2 | 1.8 | 1.3 | 4.0 |
Balance Sheet and Per-Share Data
| Metric | FY2025 | FY2026 |
|---|---|---|
Total assets (AUD Mn) | 16.88 | 18.16 |
Cash at bank (AUD Mn) | 3.70 | 2.02 |
Net assets (AUD Mn) | 4.81 | 0.90 |
NTA per share (A$ cents) | 1.00 | 0.17 |
Powerhouse asset additions before depreciation (AUD Mn) | 1.2 | 2.9 |
Cash Flow
| Metric | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
Net operating cash flow (AUD Mn) | -4.6 | -6.2 | -4.07 | 0.49 |
Cash Flow (FY2025–FY2026)
| Metric | FY2025 | FY2026 |
|---|---|---|
Cash receipts from customers (AUD Mn) | 19.32 | 23.69 |
Net operating cash flow (AUD Mn) | -4.07 | 0.49 |
Net investing cash flow (AUD Mn) | -1.47 | -3.21 |
Capex: purchases of PP&E (AUD Mn) | 1.2 | 3.0 |
Free cash flow (OCF less capex) (AUD Mn) | -5.27 | -2.51 |
Altor facility drawdown (AUD Mn) | 3.47 | 3.0 |
Dividends paid (AUD Mn) | 0 | 0 |
Share buybacks (AUD Mn) | 0 | 0 |
Key Financials by Segment OCF
| Segment OCF | FY2025 | FY2026 |
|---|---|---|
Engineering (AUD Mn) | 1.39 | 2.80 |
Technology (AUD Mn) | -2.14 | -1.20 |
Corporate (AUD Mn) | -3.33 | -1.11 |
Total (AUD Mn) | -4.07 | 0.49 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2025 | FY2026 |
|---|---|---|
ROE on average equity (%) | -90.4 | -158.6 |
ROA on closing assets (%) | -45.3 | -24.9 |
Asset turnover (revenue / closing assets, x) | 1.05 | 1.16 |
Net margin (%) | -42.9 | -21.4 |
Region Overview
| Region | FY2026 |
|---|---|
Victoria and other states revenue (AUD Mn) | 17.6 |
New South Wales revenue (AUD Mn) | 2.0 |
Western Australia revenue (AUD Mn) | 1.7 |
Region Overview — New South Wales qualified pipeline
| Region | FY2026 |
|---|---|
New South Wales qualified pipeline (AUD Mn) | 80 |
Victoria and other pipeline (AUD Mn) | 64 |
Western Australia pipeline (AUD Mn) | 30 |
Market Valuation
| Metric | CY2021 | CY2022 | CY2023 | CY2024 | CY2025 |
|---|---|---|---|---|---|
Market capitalisation at year end (AUD Mn) | 28.23 | 98.78 | 64.72 | 28.56 | 10.39 |
Share Price & Returns
| Period | Approximate performance | Basis |
|---|---|---|
1 year (to mid-October 2026) | Approx. +200% to +300% | Market cap +324.6% YoY to 2 October 2026 at A$0.093 (StockAnalysis); price subsequently eased to A$0.070 |
Year to date 2026 | Approx. +250% | Approx. A$0.02 at end-2025 versus A$0.070 |
3 years | Approx. -67% | MD sold shares at A$0.21 in October 2023 versus A$0.070 |
52-week range | Approx. A$0.02 – A$0.10 | Stockopedia (A$0.02, April 2026); Investing.com/Pearler (approx. A$0.099–0.10, 6 October 2026) |
Valuation Snapshot
| Multiple | Value | Notes |
|---|---|---|
Market cap | Approx. A$44.7 million | Analyst calculation |
EV | Approx. A$45–50 million | Pro forma cash approx. |
EV / FY26 revenue | Approx. 2.2x | On A$21.1 million |
EV / FY27 guidance midpoint revenue | Approx. 1.5x | On A$30.6 million |
P/B (pro forma) | Approx. 6.5x | Equity approx. A$6.9 million after placement |
Key Events
| Event | Date | Shares | Price | Proceeds |
|---|---|---|---|---|
Placement | August 2026 | Approx. 119.7 million | A$0.05 | Approx. A$6.0 million |
Placement | Circa 2022 | — | — | A$5 million |
Placement | Circa 2021 | — | — | A$7.1 million |
Analyst Conclusions
Management guidance
FY27 revenue guidance of A$29.5–31.7 million (40–50% growth) was issued on 30 July 2026, reaffirmed with the FY26 accounts, and subsequently placed under review following the A$45.5 million ANSTO award, which is expected to contribute approx. A$36 million over its first 26 months. The Moomba contract (approx. A$6 million) is scheduled for delivery in H1 FY28. Management expects continued revenue growth and improving financial performance (FY26 Annual Report outlook).
Consensus expectations
No current, verifiable consensus. Stale Stockopedia estimates (FY27E revenue A$35.9 million) are directionally consistent with a guidance upgrade scenario but should not be relied upon.
Bull case
-
Backlog step-change de-risks growth: work in hand of A$20.9 million at 30 June 2026, plus ANSTO (A$45.5 million) and Moomba (approx. A$6 million), gives multi-year visibility that the company has never had; ANSTO alone is 2.4x FY26 external Engineering revenue at above-25% contribution margin.
-
Operating leverage is visible: four consecutive halves of EBITDA improvement, normalised EBITDA breakeven in 2H FY26, and positive operating cash flow; incremental Engineering gross profit should fall largely to EBITDA given a fixed corporate base.
-
Powerhouse is broadening beyond one customer and one use-case: contracts across Remote (Santos, Shell), Urban (TasNetworks) and Industry Resilience (Moomba, Orbost), with a claimed A$400 million of EOIs and tenders and a Hitachi Energy channel into 5–30MW projects.
Bear case
-
Balance-sheet fragility and dilution: equity fell to A$0.9 million before a 23% dilutive placement; BOOM growth requires further debt or equity, and finance costs already exceed A$1.6 million.
-
Execution and capacity risk: a 117-person firm must absorb a 40–50%-plus revenue ramp, a major nuclear-medicine design program and an order of magnitude larger Powerhouse build simultaneously; labour shortages are a stated risk.
-
Technology concentration and conversion risk: Powerhouse revenue remains essentially Santos-only; Shell QGC is delayed by redesign, Orbost and Santos Unit 6 depend on customer FIDs, the LOI is non-binding, and partners such as Hitachi Energy could compete.
Key catalysts and monitorables (next 12 months)
| Catalyst / monitorable | Expected timing |
|---|---|
| FY27 Q1 4C and possible guidance revision | Approx. 29 October 2026 |
| 2026 AGM (remuneration, director re-election) | Likely November 2026 |
| Debt consolidation / refinancing terms | FY27 H1 |
| Shell QGC unit redesign, deployment and pilot outcome | FY27 |
| Santos Units 5 and 6 installation; Unit 6 final sanction | H1 FY27 |
| Amplitude Energy Orbost FID and sale-versus-BOOM decision | Post-FEED, H1–H2 FY27 |
| Conversion of the confidential energy-operator LOI to a definitive contract | FY27 |
| TasNetworks community battery commissioning | FY27 |
| ANSTO design-phase mobilisation and NSW hiring | From September 2026 |
| FY27 H1 results (EBITDA turning positive at group level?) | Late February 2027 |
| Moomba manufacturing progress toward H1 FY28 delivery | Through FY27 |
Analyst verdict
Synertec has crossed the most dangerous point in a micro-cap turnaround: it has demonstrated that its core business can fund itself. FY26 delivered 19% revenue growth, a 41% narrower statutory loss, normalised EBITDA breakeven in the second half and the first positive operating cash flow since FY19, all audited by Grant Thornton. The subsequent contract run — Santos Units 5 and 6, Amplitude's Orbost selection, the 12MW/12MWh Moomba order and, above all, the A$45.5 million ANSTO program — has transformed revenue visibility from quarter-to-quarter to multi-year. On approximately 1.5x EV to FY27 guidance-midpoint revenue, the market is still pricing Synertec largely as an engineering consultancy, with modest credit for Powerhouse optionality.
The investment debate now turns on three questions. First, can a 117-person organisation execute a near-doubling of activity without margin leakage, given the company's history of fixed-price overruns before FY25? Second, can Powerhouse evolve from a Santos-dependent rental fleet into a multi-customer product line, with the Shell QGC redesign and the Orbost FID the nearest tests? Third, can the balance sheet — repaired but still thin after the A$6 million placement — fund BOOM growth without serial dilution, and will debt consolidation materially lower the A$1.6 million finance cost burden?
On balance, the evidence supports a constructive but high-risk stance. The combination of panel-anchored engineering cash flow, a sovereign-capability anchor contract, and a field-proven energy platform with Tier-One references is unusual among ASX micro-caps. However, the stock has already rerated roughly four-fold in twelve months, governance and disclosure processes have attracted ASX scrutiny, and consensus coverage is effectively absent. Investors should treat the FY27 Q1 update and any guidance revision as the next proving point, size positions for binary execution outcomes, and monitor group-level EBITDA turning sustainably positive in FY27 as the key confirmation signal.
It is not investment advice.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Prior roles | Education | Shareholding |
|---|---|---|---|---|---|
Johannes Risseeuw | Independent Non-Executive Chair | Director 29 Oct 2024; Chair 28 Feb 2025 | Executive Chair of Damstra Technology (led 2019 IPO); Director of Shell Australia; VP M&A Asia-Pacific at Shell; CIO Questus Energy; COO Skilled Group; NED of SciDev (ASX: SDV) since April 2025 and Fanplayr Inc. | University of Sydney (undergraduate) | 6,445,957 shares plus 4,000,000 options |
Michael Carroll | Managing Director and CEO; founder | 8 Aug 2017 (founder 1996) | Built and sold two engineering consultancies in Asia; MAICD | BAppSc (Applied Chemistry); postgraduate qualification in Chemical Engineering; AI studies, University of Sydney | 42,398,496 shares held via Kensington Trust Singapore Ltd (largest individual shareholder) |
Peter Lamell | Independent Non-Executive Director | 1 Sep 2023 | 25+ years at Royal Dutch Shell incl. Board of Shell Australia; turnaround CEO; 25+ boards; FAICD | Senior Executive MBA (Melbourne Business School); Hons Chemistry; LBS Corporate Finance; Cambridge sustainability course | 1,083,501 shares |
Ian Campbell | Independent Non-Executive Director | 1 Dec 2023 | 23 years in banking, ending at Citi as MD, Vice Chair Debt Capital Markets and Head of Sustainability and Corporate Transition ANZ; CEO of Janus Electric (ASX: JNS) | BCom (ANU); GAICD | 939,000 shares plus options |
Governance Overview
| Feature | Detail |
|---|---|
Board size | Four (three independent NEDs, one executive) |
Independence | 75% independent |
Chair/CEO separation | Yes (independent Chair) |
Committees | Audit and Risk Committee (Risseeuw, Lamell, Campbell; three meetings FY26); Nomination and Remuneration Committee (three members; two to three meetings FY26) |
FY26 Board meetings | Nine; full attendance except one absence by Peter Lamell (eight of nine) |
Gender diversity on Board | 0% female (all-male Board) |
NED options | 9.6 million options issued to NEDs subject to vesting conditions (announced 30 October 2024) |
Executive Leadership Team
| Name | Title | Notes |
|---|---|---|
Michael Carroll | Managing Director and CEO | Founder |
Yash Gala | Chief Financial Officer | Investor relations contact |
David Harris | Head of Technology Solutions | Newly created role announced with FY25 results (August 2025) |
Stefan Ross (Vistra) | Company Secretary | Since 28 October 2024 |
Joern Buelter | Chief Operating Officer (appointed November 2020 per Business News WA) | Current status not confirmed in FY26 materials |
General Manager of Engineering | Name not disclosed in materials reviewed | Chairs WaterAid Victorian fundraising committee |
Board & Management Changes
| Date | Change |
|---|---|
1 Sep 2023 | Peter Lamell joins Board |
1 Dec 2023 | Ian Campbell joins Board |
28 Oct 2024 | Stefan Ross appointed Company Secretary |
29 Oct 2024 | Johannes Risseeuw appointed director and Chair-elect |
28 Feb 2025 | Chair Dennis Lin retires (indirect interest of 2,173,913 shares via D3C Pty Ltd at cessation); Risseeuw becomes Chair |
Aug 2025 | David Harris appointed Head of Technology Solutions |
FY26 | No Board changes |
Major Shareholders
| Holder category / holder | Stake | Source |
|---|---|---|
Michael Carroll (via Kensington Trust Singapore Ltd) | 42.4 million shares, approx. 6.6% post-placement | FY26 Annual Report; analyst calculation |
Johannes Risseeuw | 6.4 million shares, approx. 1.0% | FY26 Annual Report |
Peter Lamell | 1.1 million shares, approx. 0.2% | FY26 Annual Report |
Ian Campbell | 0.9 million shares, approx. 0.1% | FY26 Annual Report |
Insiders (aggregate, pre-placement) | 10.95% | StockAnalysis |
Institutions (aggregate, pre-placement) | 9.65% | StockAnalysis |
Competitive Landscape
Key Competitors
| Competitor | Listing | Overlap with Synertec | Relative positioning |
|---|---|---|---|
Worley | ASX: WOR | Energy, resources, process engineering | Global multi-billion-dollar scale; competes on large programs; Synertec wins niche OT/regulated packages |
Jacobs | NYSE: J | Water, transport, government | Global scale; tier-1 water program partner |
GHD | Private (employee-owned) | Water, energy, infrastructure | Dominant Australian water consultancy |
Aurecon | Private | Water, energy, transport | Large multidisciplinary rival |
Stantec | NYSE/TSX: STN | Water, energy | Global scale |
Service Stream | ASX: SSM | Utilities maintenance and OT | Also a Synertec delivery partner (co-opetition) |
Southern Cross Electrical Engineering | ASX: SXE | Electrical and instrumentation, SCADA | Larger electrical contractor |
Verbrec | ASX: VBC | Energy and infrastructure engineering, automation | Closest listed micro-cap engineering peer |
Lycopodium | ASX: LYL | Process engineering (resources, pharma) | Larger; overlap in process design |
Specialist OT/systems integrators (e.g., Rockwell/Schneider system integrator networks, ABB) | Various | Automation and SCADA delivery | Vendor-aligned versus Synertec's vendor-neutral positioning |
Aggreko | Private | Temporary and hybrid remote power | Incumbent rental power provider with hybrid solar/BESS offerings |
EDL Energy | Private | Remote hybrid power stations, BOO model | Larger BOO remote-power incumbent |
Zenith Energy | Private | Remote hybrid power for mining | Large-scale BOO competitor |
Tesla (Megapack) | NASDAQ: TSLA | BESS hardware | Hardware-dominant at utility scale |
Fluence Energy | NASDAQ: FLNC | Grid and industrial BESS | Utility-scale integrator |
Wärtsilä Energy Storage | Nasdaq Helsinki: WRT1V | BESS and hybrid plant | Global integrator |
Hitachi Energy | Part of Hitachi (TSE: 6501) | Power conversion, BESS | Partner (MoU) and potential competitor |
5B | Private | Prefabricated solar for remote sites | Solar-array specialist; complementary or competitive |
Ampcontrol / other Australian integrators | Private | Industrial power systems | Domestic integrators |
Competitor Detail
| Metric | Synertec (FY26) |
|---|---|
Revenue scale | A$21.1 million |
Revenue growth | 19% |
EBITDA margin | -3.7% normalised; -8.9% reported |
R&D intensity | 0% (FY26); 5.2% (FY25) |
Proprietary technology | Yes (Powerhouse) |