Terramin Australia Limited Overview
Terramin is an Adelaide Hills–based, pre-revenue base and precious metals developer whose value is concentrated in a single minority interest: a 49% stake, with management rights, in Bejaia Zinc and Lead Spa (BZL, formerly Western Mediterranean Zinc Spa), owner of the Tala Hamza zinc-lead project near Béjaïa on Algeria's Mediterranean coast. Tala Hamza is a 53Mt resource that the company describes as potentially a top-ten global zinc mine, with a mining permit (2023), a US$336m EPC contract with Sinosteel MECC (2024), and site preparation begun in March 2026. A second pillar, the 265koz, 12.6 g/t Bird in Hand gold deposit in South Australia, was refused a mining lease in 2023 but returned to Terramin's exploration licence by the Court of Appeal in March 2026. The group carries roughly A$54m of debt and accrued interest (mostly owed to its controlling shareholder), negative working capital of A$56m, and a going-concern material uncertainty — making it a high-risk, highly leveraged development option on Algerian zinc.
Company's own description
In its 2025 Annual Report, Terramin describes itself as engaged in the exploration, evaluation and development of base and precious metal projects, with a stated focus on building a production pipeline of projects that sit close to infrastructure and offer low capital and operating costs. It lists its major projects as the Tala Hamza Zinc Project (49%) and the Bird in Hand Gold Project (100%), plus regional South Australian interests in the Kapunda Copper Project joint venture and the South Gawler Ranges Project exploration program with JOGMEC.
Independent characterisation
Terramin is functionally a holding and management company for a portfolio of undeveloped mineral assets, with almost no operating revenue. Its economics are best understood in four layers:
-
Equity-accounted Algerian development interest. The 49% investment in BZL (carrying value A$46.2m at 30 Jun 2026) is about 72% of total assets. Terramin does not consolidate Tala Hamza, does not book its capital expenditure, and will receive value only through dividends, shareholder loans repayment, management/operator arrangements (if any are monetised), or a sale of the stake. Terramin retains management rights over the project, which gives it operational influence disproportionate to its minority equity.
-
Stranded Australian processing infrastructure. The Angas Zinc Mine and processing plant at Strathalbyn (on care and maintenance since mining ceased) was intended to process Bird in Hand ore into a gold concentrate. The plant carries rehabilitation obligations (provision A$5.79m at 30 Jun 2026) backed by A$5.67m of restricted cash.
-
Legally contested gold asset. Bird in Hand is a high-grade, small underground gold project adjacent to premium Adelaide Hills wineries. Its value rests on regulatory/legal outcomes rather than technical risk.
-
Farm-out exploration optionality. Kapunda (in-situ copper recovery, operated and funded by Environmental Copper Recovery) and South Gawler Ranges (funded by JOGMEC) give exposure to copper/IOCG discovery with minimal cash outlay by Terramin.
Revenue model
| Revenue type | Description | FY2025 (AUD K) | Share of revenue & other income |
|---|---|---|---|
| Revenue from contracts (operator/management fees) | Quarterly management fee received as operator under the JOGMEC South Gawler exploration agreement | 126 | 99% |
| Other income | Sundry | 1 | 1% |
| Product sales (metal/concentrate) | None since Angas ceased production | 0 | 0% |
| Subscription / licensing | — | 0 | 0% |
Source: 2025 Annual Report, Note 4. The business model today is therefore a capital-consumption model funded by shareholder loans and periodic equity raises; prospective revenue would derive from (a) Terramin's 49% share of Tala Hamza zinc and lead concentrate sales to smelters, and (b) gold concentrate from Bird in Hand if ever permitted.
Value-chain position and customers
Value-chain position: Upstream exploration and mine development (mining and concentrating). No smelting or refining.
Prospective customers: Zinc and lead smelters, chiefly in Europe (Béjaïa is about 15 km from a deep-water port) and potentially the existing small Algerian zinc smelter, which management has said it would support where possible (CEO Richard Taylor commentary, The Lead South Australia, c. 2019).
Current counterparties: JOGMEC (operator fee payer), ECR (farm-in partner), Algerian state entities ENOF and ORGM (JV partners), Sinosteel MECC (EPC contractor to BZL).
End-markets: Galvanised steel (construction, automotive, infrastructure), die-casting alloys, batteries (lead), and gold investment/jewellery demand.
Strategy
Stated strategy (themes paraphrased from the 2025 Annual Report and 2026 Interim Report)
-
Build a production pipeline of base and precious metal projects near infrastructure with low capital and operating costs.
-
Make Tala Hamza the primary development priority, followed by approval, funding and development of Bird in Hand.
-
Use partner-funded farm-outs (ECR, JOGMEC) to retain exposure to copper and IOCG discovery.
-
Pursue acquisitions of interests in advanced mining projects (business development noted in the H1 2026 report).
-
Use Algeria's 2025 mining law reforms (up to 80% foreign ownership) to participate in future Algerian projects.
-
Maintain commitments to environmental stewardship, community engagement and operational excellence (Chair's review; no quantified ESG targets).
Initiatives in the last 24 months
| Initiative | Date | Detail / target |
|---|---|---|
| Tala Hamza EPC with Sinosteel MECC | Nov 2024 | US$336m fixed scope; 18-month funding arrangements initially formalised |
| Geotechnical drilling and early works | Nov 2024–2026 | Shaft/raise boreholes; suspended in 2025 pending relocation; resumed 2026 |
| Revised 2.0Mtpa Mining Study | 30 Mar 2026 | US$415m capex; ~US$640m post-tax NPV8; 20-year life |
| AAPI strategic project registration | 25 Mar 2026 | Tax holiday, VAT/customs exemptions, free power connection |
| State-bank project debt | 2,026 | In-principle approval of a DZD 32.2bn, 15-year loan (5-year grace) for 75% of upfront capex; negotiations "close to finalisation" at Sep 2026 |
| Major works tendering | H1 2026 | Underground mine, process plant and infrastructure packages being tendered by the JV |
| Bird in Hand legal strategy | 2025–2026 | Appeal partly won (Proclamation set aside); options under review |
| Balance sheet recapitalisation | Oct 2025–Oct 2026 | Two rights issues (A$38.3m and A$28.65m targets) largely filled by debt conversion and underwriters |
| Incentive plan reinstated | Apr–May 2026 | 79m options at A$0.06 |
| Kapunda ISR trial | 2025–2026 | Full lixiviant trial; results expected later in 2026 |
Medium-term targets and guidance
Terramin does not issue financial guidance. Qualitative targets: Tala Hamza construction in 2026 (stated in the 2025 Annual Report), finalising state-bank financing, and drilling South Gawler targets in 2026. Algerian media and an advocacy report cited a July 2026 production start; this has clearly not been met, and the company has not confirmed a first-production date.
Products & Services
Terramin has no commercial products. Its "portfolio" is a set of mineral assets, catalogued below by segment.
Northern Africa
| Attribute | Detail | Source |
|---|---|---|
| Location | Oued Amizour, Béjaïa Province; ~15 km from Port of Béjaïa; ~200 km east of Algiers | Company website; The Lead SA |
| Mineral Resource | 53.0Mt (Measured, Indicated & Inferred) @ 5.3% Zn, 1.3% Pb (6.6% Zn+Pb) at 2.5% ZnEq cut-off, inclusive of Probable Reserve; ~3.5Mt contained zinc+lead | ASX 29 Aug 2018; 2026 Interim Report |
| Prior resource | 68.6Mt @ 4.6% Zn, 1.2% Pb (superseded) | African Mining Network |
| Exploitable reserve (per Algerian press) | ~34Mt over 234 ha | Algérie Eco, May 2023 |
| Permit | Mining Permit issued May 2023 for 2.0Mtpa | 2025 Annual Report |
| Land | ~234 ha acquired by Algerian state; cost in excess of US$25m (company) / ~US$30m (Ecofin); relocation complete Mar 2026 | 2025 AR; Ecofin 25 Mar 2026 |
| Mining method | Mechanised underhand drift-and-fill underground mine; deposit ~500 m below surface | 2026 study; The Lead SA |
| EPC | US$336m with Sinosteel MECC: 2.0Mtpa process plant, underground mine, backfill plant, civil works, dry-stack tailings, water ponds and wastewater treatment | ASX 4 Nov 2024 |
| Incentives | AAPI strategic project registration: up to 7-year corporate tax exemption from production start, customs duty and VAT exemption in construction, free electricity connection | 2025 AR; ASX 25 Mar 2026 |
| Status | Site preparation since Mar 2026; portal and magazine access, geotechnical drilling; major works tenders and state-bank financing negotiations "close to finalisation" | 2026 Interim Report |
| Parameter | 2018 DFS (1.3Mtpa) | Mar 2026 Revised Mining Study (2.0Mtpa) |
|---|---|---|
| Throughput | 1.32Mtpa | 2.0Mtpa |
| Mine life | 21 years | 20 years |
| Material mined | not compiled here | ~37Mt @ ~6% Zn, ~1.6% Pb |
| Zinc concentrate | 129,300 tpa @ 54% Zn (90% recovery) | ~178,000 tpa after ramp-up |
| Lead concentrate | 26,000 tpa @ 63% Pb (73% recovery) | ~33,000 tpa |
| C1 cash cost | US$0.53/lb (Crown/Modern Mining report) | US$0.56/lb payable Zn |
| AISC | US$0.61/lb | US$0.61/lb |
| Pre-production capex | US$341m | ~US$415m |
| Sustaining capex | LOM total capital US$486m | ~US$40m indicative |
| Post-tax NPV8 | not compiled here | ~US$640m (2026 Interim Report) |
| Pre-tax nominal NPV8 | — | ~US$790m (Mining Weekly, 29 May 2026) |
| IRR | — | ~23% post-tax; ~24% pre-tax |
| Payback / LOM FCF | — | ~4 years; ~US$2.19bn LOM free cash flow (Motley Fool via Webull) |
Tala Hamza Zinc-Lead Project (Terramin 49% via BZL; management rights)
Tala Hamza study comparison
Australia
| Attribute | Detail |
|---|---|
| Location | Woodside, Adelaide Hills, SA; ~30 km north of Angas plant; on Terramin freehold land |
| Resource | 265,000 oz Au @ 12.6 g/t; open at depth; "Bird in Hand Extended" assays averaged 25–31 g/t Au about 200 m from planned infrastructure |
| Feasibility (Jun 2020) | 44,700 oz/yr over ~4 years; C1 A$737/oz; AISC A$959/oz; pre-production capex A$54m; post-tax NPV8 A$141m; IRR 80.5% at A$2,300/oz (US$1,500/oz) |
| Gold price context | ~A$7,075/oz cited in the 2025 Annual Report (Mar 2026), roughly 3x the study price |
| Legal status | Mining lease refused Feb 2023 (upheld); 2023 Proclamation set aside 5 Mar 2026; deposit back within EL 6447; Terramin reviewing strategic, legal and development options; a miscellaneous purposes licence application referenced on the website for Angas processing use |
| Carrying value | Nil (impaired A$15.1m in FY2022) |
Bird in Hand Gold Project (100%, Terramin Exploration)
Angas Zinc Mine and Processing Facility (100%)
Former zinc-lead-copper-silver-gold underground mine and plant at Strathalbyn on Mining Lease 6229. On care and maintenance, complying with environmental obligations. Intended to treat Bird in Hand ore to a gold concentrate. Rehabilitation bond A$5.67m (cash-backed CBA guarantee); rehabilitation provision A$5.79m (30 Jun 2026, 4.46% discount rate). Plant carrying value is minimal (plant and equipment A$0.2m; freehold land A$3.46m across group).
Kapunda Copper Joint Venture (Terramin 25% + 1.5% royalty; ECR 75%, operator)
In-situ recovery (ISR) of copper from shallow oxide and secondary sulphide mineralisation around the historic Kapunda mine, ~90 km north of Adelaide. Combined ISR-amenable resource of 47.4Mt @ 0.25% Cu for 119,000t contained copper (0.05% cut-off, within 100 m of surface). ECR earned 50% (A$2m) by 2020 and a further 25% (A$4m) by early 2025. Full ISR lixiviant trial approved by DEM mid-2025, began late 2025 and has been extended, with recoveries of copper, cobalt and nickel reported as rising; a second test site is being evaluated. OZ Minerals (later BHP) funded A$2.5m of ECR's feasibility work.
South Gawler Ranges Project (Terramin 49.9% subject to JOGMEC option; JOGMEC-funded)
Eleven exploration licences totalling 4,524 km², ~100 km west of Port Augusta in the Gawler Craton; prospective for IOCG copper-gold and base metals. Hosts Menninnie Dam, described as the largest undeveloped lead-zinc deposit in South Australia: Inferred 7.7Mt @ 3.1% Zn, 2.6% Pb, 27 g/t Ag (JORC 2004, 2011 announcement). JOGMEC agreement: A$7.5m exploration funding to 31 Mar 2028 for up to 70%, plus an option to buy a further 6% for A$3m and a 0.5% NSR (buy-back A$1.5m). Discrepancy: the H1 2026 directors' report says JOGMEC has spent over A$5m and earned a 50.1% option, while Note 11 of the same report says over A$3.5m. 2025 drilling and an 850 m diamond hole in H1 2026 returned no significant mineralisation. Native Title Mining Agreement with Gawler Ranges Aboriginal Corporation covers the whole project area.
Adelaide Hills Project (100%)
Nine exploration tenements covering 2,839 km² from Lake Alexandrina to Kapunda (H1 2026; 2025 AR cited eight tenements, 2,179 km²). Prospective for gold, copper, lead, zinc and rare earths; includes Bird in Hand and Kapunda; also historic Golden Slope and Wheal Barton prospects (GlobalData). Wild Horse (EL 5846) earn-in with Newmont was terminated in 2022, with Terramin retaining 100%.
Financial Narrative
Sources: 2023 AR (FY2022–FY2023), 2025 AR (FY2024–FY2025), 2026 Interim Report (H1). FY2021 figures are partly from the opening balances in the 2023 AR and partly from the Kalkine Media aggregator (flagged). A$'000 unless stated.
Income statement
FY2022 continuing-operations EPS was -1.00 cent. Kalkine reports FY2025 EBITDA of -A$3.45m using a different definition; the derived figure above is EBIT plus D&A. Revenue CAGR FY2022–FY2025 is 26.4% (derived) but from a negligible base and driven by operator fees, so it carries no analytical weight. Margins (gross, operating, EBITDA, net) are not meaningful given revenue below A$0.2m: e.g. FY2025 net margin is about -7,020% (derived).
H1 2026 snapshot: other income A$56k; EBIT -A$1.83m; share of BZL loss -A$0.25m; net finance cost -A$1.70m; net loss -A$3.53m (H1 2025: -A$5.11m); basic EPS -0.16 cents; includes A$0.29m share-based payment expense from the first option grants since 2018.
Commentary. The P&L is dominated by two structural items: (1) interest at a fixed 12% on Asipac facilities, which accrues rather than being paid (interest on borrowings A$3.6m in FY2025), and (2) legal and consultant fees tied to the Bird in Hand litigation (legal, accounting and consultants A$1.78m in FY2025 versus A$0.30m in FY2022). The FY2022 result was distorted by the A$15.1m Bird in Hand impairment offset by the A$13.7m gain on WMZ deconsolidation. The inflection to watch is H1 2026, where legal costs halved to A$0.41m after the appeal concluded and a A$0.68m FX gain on the USD convertible note reduced finance costs.
Balance sheet
Notes: FY2021 total assets and current assets from Kalkine; FY2021 equity (A$35.6m including A$13.1m non-controlling interest; A$22.5m attributable) and PP&E from opening balances in the 2023 AR. Kalkine's FY2025 net debt (A$41.4m) excludes the convertible note.
30 Jun 2026: total assets A$64.27m; cash A$0.10m; Asipac borrowings plus accrued interest A$44.26m (principal A$31.41m of A$32.11m limit; accrued interest A$12.85m); convertible note A$10.10m now current (matures ~Jan 2027) plus A$1.10m derivative; total liabilities A$62.39m; equity A$1.88m; working capital -A$56.2m.
Commentary. Equity has collapsed from A$35.6m (FY2021) to A$1.9m (H1 2026) because losses are funded by debt rather than equity. The only material asset — the BZL investment — is supported by an impairment test based on project progress rather than an independent valuation since the 2022 fair-value exercise. Net debt is roughly 1.2x the current market capitalisation. The December 2025 debt-to-equity swap (A$8.9m of accrued interest converted) and the planned October 2026 conversion (~A$12.2m) are the principal deleveraging levers.
Cash flow
Notes: FY2022 investing outflow includes A$5.67m transfer to restricted cash. FY2023 WMZ working-capital contributions of A$0.63m were recognised in the investment note but not separately shown in investing cash flows. H1 2026: OCF -A$1.31m; investing -A$0.05m; financing +A$1.39m (A$1.0m rights-issue shortfall placement plus A$0.4m Asipac drawdown). Terramin also committed US$0.5m of further capital to BZL for the rest of 2026.
Commentary. Cash burn is modest (A$3–5m a year) but entirely externally funded; year-end cash has not exceeded A$0.4m since FY2022. The group operates on a hand-to-mouth basis, with a stated liquidity target of 45 days of planned expenditure in available facilities.
Ratios (analyst-derived)
ROIC, net debt/EBITDA and cash conversion cycle are not meaningful for a pre-revenue company with negative EBITDA and no inventory or receivables cycle; they are therefore not presented.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Income Statement and Margin Analysis (%)
| Metric (AUD K) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue and other income | — | 63 | 106 | 134 | 127 |
Revenue from contracts | — | 63 | 56 | 132 | 126 |
Raw materials and direct costs | — | -170 | -173 | -100 | -147 |
Gross profit (derived) | — | -107 | -67 | 34 | -20 |
Employee benefits expense | — | -799 | -731 | -743 | -955 |
Depreciation and amortisation | — | -731 | -715 | -720 | -708 |
Other expenses | — | -967 | -1,976 | -2,274 | -2,278 |
Bird in Hand impairment | — | -15,099 | 0 | 0 | 0 |
Share of associate loss (BZL/WMZ) | — | -60 | -119 | 0 | -1,179 |
Operating loss (EBIT, before net finance costs) | — | -17,481 | -2,485 | -3,765 | -4,875 |
EBITDA (derived: EBIT + D&A) | — | -16,750 | -1,770 | -3,045 | -4,167 |
Finance income | — | 74 | 207 | 305 | 221 |
Finance costs | — | -3,735 | -4,076 | -5,413 | -4,261 |
Loss before tax, continuing operations | — | -21,142 | -6,354 | -8,873 | -8,915 |
Profit from discontinued operations (WMZ deconsolidation) | — | 13,695 | 0 | 0 | 0 |
Net loss | -6,176 | -7,447 | -6,354 | -8,873 | -8,915 |
Basic EPS (A$ cents) | — | -0.35 | -0.30 | -0.42 | -0.42 |
Diluted EPS (A$ cents) | — | -0.35 | -0.30 | -0.42 | -0.42 |
Dividends per share (A$ cents) | 0 | 0 | 0 | 0 | 0 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansBalance Sheet and Share Count (millions)
| Metric (AUD K) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Cash and cash equivalents | — | 131 | 374 | 214 | 72 |
Restricted cash (non-current) | — | 5,670 | 5,670 | 5,670 | 5,670 |
Total current assets | 5,887 | 392 | 580 | 489 | 280 |
Investment in associate (BZL/WMZ) | 0 | 45,235 | 45,746 | 46,409 | 46,380 |
Exploration and evaluation | — | 8,038 | 8,127 | 8,208 | 8,283 |
Property, plant and equipment | 6,490 | 5,746 | 5,075 | 4,371 | 3,679 |
Total assets | 76,474 | 65,332 | 65,249 | 65,198 | 64,343 |
Short-term borrowings incl. accrued interest | — | 39,690 | 46,248 | 44,447 | 41,971 |
of which drawn Asipac principal | — | 28,258 | 31,256 | 28,168 | 30,985 |
of which accrued interest | — | 11,432 | 14,992 | 16,279 | 10,986 |
Convertible note (long-term) | 0 | 0 | 0 | 10,360 | 10,464 |
Embedded derivative | 0 | 0 | 0 | 1,096 | 1,096 |
Total debt incl. accrued interest and note (derived) | — | 39,690 | 46,248 | 54,807 | 52,435 |
Net debt (derived; total debt less unrestricted cash) | — | 39,559 | 45,874 | 54,593 | 52,363 |
Total liabilities | — | 47,074 | 53,345 | 62,167 | 60,112 |
Total equity | 35,596 | 18,258 | 11,904 | 3,031 | 4,231 |
Goodwill and intangibles | 0 | 0 | 0 | 0 | 0 |
Working capital (derived) | — | -40,913 | -47,673 | -44,734 | -42,698 |
Shares on issue (millions) | 2,116.6 | 2,116.6 | 2,116.6 | 2,116.6 | 2,361.3 |
Balance Sheet
| Metric (AUD K) | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
Operating cash flow | -2,139 | -3,006 | -4,249 | -2,946 |
Exploration and evaluation spend | -441 | -58 | -67 | -71 |
Cash contributions to BZL/WMZ | 0 | 0 | -663 | -241 |
Free cash flow (derived: OCF less E&E and BZL contributions) | -2,580 | -3,064 | -4,979 | -3,258 |
Net investing cash flow | -6,114 | 249 | -728 | -292 |
Proceeds from borrowings | 2,665 | 3,000 | 1,000 | 2,825 |
Proceeds from convertible note | 0 | 0 | 9,861 | 0 |
Repayment of borrowings, interest and fees | 0 | 0 | -6,044 | 0 |
Equity raised (net) | 0 | 0 | 0 | 271 |
Net financing cash flow | 2,665 | 3,000 | 4,817 | 3,096 |
Dividends paid | 0 | 0 | 0 | 0 |
Share buybacks | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
ROE (%; net loss / average equity) | -27.7 | -42.1 | -118.8 | -245.5 |
ROA (%; net loss / average total assets) | -10.5 | -9.7 | -13.6 | -13.8 |
Current ratio (x) | 0.009 | 0.012 | 0.011 | 0.007 |
Debt / equity (x; total debt incl. accrued interest) | 2.17 | 3.89 | 18.08 | 12.39 |
Interest coverage (x; EBIT / finance costs) | -4.68 | -0.61 | -0.70 | -1.14 |
Asset turnover (x; revenue / average assets) | 0.001 | 0.002 | 0.002 | 0.002 |
Revenue by geography (AUD K)
| Revenue by geography (AUD K) | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Australia | 106 | 134 | 127 |
Algeria / Northern Africa | 0 | 0 | 0 |
Rest of world | 0 | 0 | 0 |
Growth (%)
| Growth (%) | FY2024 | FY2025 |
|---|---|---|
Australia revenue growth | 26.4 | -5.2 |
Share Price History
| Date | Price (AUD) | Context | Source |
|---|---|---|---|
~Mar 2025 | ~0.079 (implied) | Market cap A$167.2m on 2,116.6m shares | TipRanks |
29 Oct 2025 | 0.045 | Pre-rights issue | InvestSMART |
30 Mar 2026 | 0.035 | After revised mining study (+12.9%) | Motley Fool via Webull |
22 Apr 2026 | 0.031 | March quarterly | InvestSMART |
9 Jun 2026 | 0.020 | — | InvestSMART |
4 Aug 2026 | 0.020 | Market cap A$52.5m (StockAnalysis) | StockAnalysis |
~11 Oct 2026 | 0.018 | At rights price | Investing.com |
Return (approx., price only) | Value | — | — |
1-year (Oct 2025 to Oct 2026) | approx. -60% (A$0.045 to A$0.018) | — | — |
52-week range | A$0.016–0.052 (StockAnalysis, Aug 2026); A$0.016–0.057 (Kalkine) | — | — |
Valuation Snapshot
| Multiple | Value | Comment |
|---|---|---|
Market cap (13 Oct 2026, 2,432.1m shares at A$0.018) | ~A$43.8m | Analyst calculation |
Market cap pro forma (~3,666.7m shares) | ~A$66.0m | Analyst calculation |
Enterprise value pro forma | ~A$98m | Analyst estimate: pro forma market cap plus ~A$54.3m debt (30 Jun 2026) less ~A$12.2m Asipac conversion and ~A$10m Feny cash |
P/E | not meaningful (losses) | — |
EV/EBITDA | not meaningful (negative EBITDA) | — |
EV/Sales | ~770x | Not meaningful |
P/B | ~23x on A$1.88m book equity (30 Jun 2026, pre-raise) | Distorted by tiny equity |
Look-through to Tala Hamza | 49% of ~US$640m post-tax NPV8 ≈ US$314m (unrisked, before Terramin's capex funding share) | Analyst calculation; illustrates the market's deep discount for funding and jurisdictional risk |
Capital Markets
| Item | Status |
|---|---|
Dividend history / policy | No dividends paid or declared; none expected before production |
Credit ratings (Moody's/S&P/Fitch) | Not rated |
Capital raisings 2025–26 | 1-for-2.1 at A$0.038 (Oct 2025); 1-for-1.5 at A$0.018 (Sep 2026) |
Potential dilution | 79m options (A$0.06); convertible note conversion at 90% of VWAP; underwriter shortfall shares |
Capital Instruments
| Instrument | Limit | Drawn / carrying | Rate | Security | Maturity |
|---|---|---|---|---|---|
Asipac Bird in Hand Facility | 6,000 | part of 27,184 secured | 12% fixed, payable at termination | Mortgage over Bird in Hand land; GSA over Terramin Exploration; share security | 30 Jun 2027 |
Asipac Standby Short-term Facility | 21,184 | part of 27,184 secured | 12% | As above | 30 Jun 2027 |
Asipac Standby Term (No.2) Facility | 5500 (from 1 Sep 2026; was 4,925) | 4,225 | 12% | Unsecured | 30 Jun 2027 |
Accrued interest on Asipac facilities | — | 12,847 | — | — | With facilities |
Convertible note | US$6.68m | 10102 (+1,096 derivative) | 2.5% simple | Unsecured | ~Jan 2027 |
Analyst Conclusions
Management guidance
No financial guidance. Management expects Tala Hamza construction to proceed during 2026, state-bank financing to be finalised, major works contracts to be awarded, Kapunda ISR results later in 2026, and continued South Gawler exploration. Bird in Hand options are under review following the March 2026 judgment.
Consensus
No sell-side coverage; consensus growth expectations are not available.
Bull case
-
Algeria is visibly committed. The state has paid US$25–30m for land, relocated residents, created a dedicated mining ministry, registered the project for incentives, and given in-principle approval to lend 75% of capex; this materially de-risks permitting and financing relative to the 2018–2023 period.
-
Deep discount to look-through value. A 49% interest in a project with a ~US$640m post-tax NPV8 trades inside a pro forma enterprise value of roughly A$98m; even heavy risking leaves room for re-rating if financing closes.
-
Bird in Hand is a free option on record gold prices. With gold around A$7,000/oz versus a A$2,300/oz study price, and the reservation removed, any political or legal pathway to approval would be highly accretive given an existing processing plant.
Bear case
-
Funding gap is existential. Terramin's notional 49% share of US$415m capex (~US$200m) is several times its market value, and the free float has shown almost no appetite (A$0.8m taken up of A$28.65m); value may accrue mostly to lenders, underwriters or state partners through dilution or carried-interest restructuring.
-
Balance sheet and governance. Equity of A$1.9m, A$44m owed to the controlling shareholder at 12%, a USD note due around January 2027, and a controller approaching 47.5% create a structure in which minority shareholders bear dilution while the controller converts debt at depressed prices.
-
Execution and jurisdiction. Construction has been "imminent" since at least 2019; first production claims (e.g. July 2026) have lapsed; social opposition in Kabylia and the SA government's firm stance on Bird in Hand show that permits do not guarantee progress.
Catalysts and monitorables (next 12 months)
| Catalyst | Expected timing | Watch for |
|---|---|---|
| Underwriter shortfall allocation (Asipac, Feny) | ~21 Oct 2026 | Final Asipac %; Feny stake and any board seat |
| September 2026 quarterly | 23 Oct 2026 | Cash, Tala Hamza works, financing status |
| Convertible note maturity | ~Jan 2027 | Conversion, extension or repayment |
| Algerian state-bank loan finalisation | Not dated ("close to finalisation") | Signed facility; Terramin's equity funding obligation |
| Major works contract awards / full construction start | 2026–2027 | Notice to proceed under EPC |
| Kapunda ISR results | Late 2026 | Copper grade in solution; second test site |
| Bird in Hand strategy | Not dated | New applications, MPL for Angas, or monetisation |
| FY2026 Annual Report | ~Mar 2027 | Going-concern status; BZL carrying value |
| Asipac facility expiry | 30 Jun 2027 | Further extension or conversion |
Analyst verdict
Terramin is best described as a leveraged, minority-interest option on a single Algerian zinc project, wrapped in a balance sheet that would not survive without its controlling shareholder. The asset itself has genuinely improved since 2023: Tala Hamza now has a mining permit, a land footprint acquired and cleared by the state, investment incentives, an EPC contractor, a revised 2.0Mtpa study showing roughly US$640m post-tax NPV and a 23% IRR, and an in-principle commitment from an Algerian state bank to fund three-quarters of upfront capex. Algeria's 2025 mining reforms and the creation of a dedicated mining ministry signal policy direction that favours the project. In Australia, the Court of Appeal's removal of the Bird in Hand reservation keeps a high-grade gold option alive at a time of exceptional A$ gold prices.
Yet the equity story is far weaker than the asset story. Terramin owns only 49%, cannot fund its share of a roughly US$415m build, and holds about A$0.1m of cash against about A$55m of debt and accrued interest. The free float has effectively declined to participate in two consecutive rights issues; recapitalisation is occurring through debt conversion by Asipac at A$0.018–0.038 and through a new Hong Kong underwriter, pushing control toward 47.5%. The board lacks majority independence and the auditor continues to flag material going-concern uncertainty. A US-dollar convertible note falling due around January 2027 is the next pressure point.
On balance, the shares price in substantial failure or dilution, and the look-through gap to project NPV is real. But realisation of that value depends on financing structures — carried interests, state-bank terms, or partner buy-ins — that are not yet disclosed and may transfer much of the upside to lenders and partners. We would characterise Terramin as speculative. Key confirmation signals are a signed project loan, clarity on how Terramin's equity share is funded, and resolution of the convertible note.
SOURCES CONSULTED
-
Terramin Australia Limited, 2025 Annual Report (ASX, 17 Mar 2026) — announcements.asx.com.au/asxpdf/20260317/pdf/06xj7kjk4wgmv0.pdf
-
Terramin Australia Limited, 2026 Interim Financial Report (4 Sep 2026) — bulletin.webull.com (ASX announcement mirror, 20260904)
-
Terramin Australia Limited, 2023 Annual Report (ASX, 19 Mar 2024) — announcements.asx.com.au/asxpdf/20240319/pdf/061nq39qkml328.pdf
-
Terramin Australia Limited, 2024 Annual Report (ASX, 19 Mar 2025) — announcements.asx.com.au/asxpdf/20250319/pdf/06gsqg1r9hbzl0.pdf
-
ASX announcements: EPC contract (4 Nov 2024); Rights issue results (15 Dec 2025); Rights issue update (22 Dec 2025); Dec 2025 quarterly (29 Jan 2026); Mar 2026 quarterly (22 Apr 2026); AGM presentation (May 2026); Finance facility updates (24 Jun 2026, 1 Sep 2026); Jun 2026 quarterly (28 Jul 2026); Rights issue (14 Sep 2026)
-
Company website: terramin.com.au (Tala Hamza and Bird in Hand project pages)
-
Secondary: TipRanks, Kalkine Media, InvestSMART, Investing.com, StockAnalysis, Morningstar, Yahoo Finance, Simply Wall St, MarketIndex, IBISWorld, GlobalData, Mining Weekly / Engineering News (29 May 2026), Creamer Media (27 Mar 2026), Ecofin Agency (25 Mar 2026), Mining.com.au, Miningnews.net, Mining Magazine Australia (10 Feb 2023), WBM Online (20 Jan 2025), Premier of South Australia media release, MEED, African Mining Network, The Lead South Australia, Algérie Eco, Algeria Invest, Team France Export (El Watan), Crown Publications / Modern Mining, UNPO Academy, AFR company page, Discovery Alert
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Independence | Background |
|---|---|---|---|---|
Feng (Bruce) Sheng | Executive Chair | Director 17 Apr 2013; Exec Chair 11 Jan 2018 | Non-independent | Chair of Asipac Group; 25+ years in property and resources investment; former Vice Chair, Australia China Business Council (Victoria) |
Alan Broome AM | Non-Executive Deputy Chair; chair of Audit, Risk & Compliance and Nominations & Remuneration committees | 9 Sep 2024 | Independent | Chair/director of New Age Exploration, Critical Minerals, iMine Data Analytics, Nuenz NZ, North West Phosphate; Emeritus Chair of Austmine (chair 22 years) |
Angelo Siciliano | Non-Executive Director | 2 Jan 2013 | Non-independent | FIPA, registered tax agent; accountant and CFO for Asipac; runs own accounting practice |
Martin Janes | Executive Director (de facto CEO) | Executive Officer from Jan 2020; Executive Director 1 Dec 2024 | Non-independent | 30+ years mining finance; ex-Newmont Australia/Normandy (corporate and project finance, treasury, offtake); BEc, GAICD |
Junming Zhang | Non-Executive Director | 6 Jul 2023 | Classified independent | Mining engineer, 30+ years incl. Africa and Asia; Director and COO of PT Dairi Prima Mineral (controlled by China Nonferrous's NFC) |
Jing Wang | Non-Executive Director | 13 Feb 2025 | Independent | Partner and Head of China Practice, Gadens; Bachelor's degrees in Law and Commerce, University of Melbourne |
André van Driel | Finance Manager & Company Secretary | Employed 9 Aug 2018; CoSec 6 Mar 2020 | KMP | CPA; 20+ years at Newmont Australia, BHP Billiton, Ramelius Resources |
Mark Flynn | Investor Relations | — | — | Named IR contact on 2026 announcements |
Eric Whittaker | Regional Exploration Manager (Competent Person) | — | — | AusIMM member |
Directors' Remuneration
| KMP | FY2024 total | FY2025 total |
|---|---|---|
Feng Sheng | 100,000 | 100,000 |
Alan Broome AM | 21,778 | 75,417 |
Angelo Siciliano | 61,500 | 61,000 |
Martin Janes | 300,000 | 153,800 |
Junming Zhang | 0 | 0 |
Jing Wang | 0 | 44,048 |
André van Driel | 159,581 | 180,956 |
Michael Kennedy (ceased 9 Sep 2024) | 48,222 | 0 |
Kevin McGuinness (ceased 30 Nov 2024) | 50,417 | 0 |
Total KMP | 741,498 | 615,221 |
Board & Management Changes
| Date | Change |
|---|---|
6 Jul 2023 | Lulu Shi (NFC) ceases; Junming Zhang appointed |
9 Sep 2024 | Michael Kennedy retires; Alan Broome AM appointed Deputy Chair |
30 Nov 2024 | Kevin McGuinness retires |
1 Dec 2024 | Martin Janes moves from Executive Officer to Executive Director |
13 Feb 2025 | Jing Wang appointed |
Major Shareholders
| Holder | Shares | % | Date / source |
|---|---|---|---|
Asipac Group Pty Ltd (controlled by F. Sheng) | 1,062,606,503 (Sheng relevant interest) | 45.0 | 31 Dec 2025, 2025 AR |
Asipac Group Pty Ltd | — | ~45.5 | 14 Sep 2026 announcement |
Asipac pro forma after shortfall allocation | ~1,741.6m (analyst estimate: 1,062.6m + 679.0m) | ~47.5 (cap) | Expected ~21 Oct 2026 |
Feny (Hong Kong) International Mining Limited | 555,555,556 expected shortfall allocation | ~15.2 pro forma (analyst estimate) | Expected ~21 Oct 2026 |
Angelo Siciliano | 10,000,000 (+20m options) | 0.4 | 31 Dec 2025 |
Martin Janes | 1,595,962 (+20m options) | 0.1 | 31 Dec 2025 |
Convertible noteholder (unnamed "strategic investor") | Convertible at 90% of VWAP after Jan 2026 | — | 2025 AR |
Competitive Landscape
Competitors by Segment
| Segment | Competitor / peer | Relative positioning (qualitative) |
|---|---|---|
Global zinc mining (price setters) | Glencore | Largest integrated zinc miner/marketer; scale and smelter integration Terramin lacks |
Global zinc mining | Hindustan Zinc (Vedanta) | Low-cost integrated producer in India |
Global zinc mining | Teck Resources | Major zinc miner (Red Dog) and Trail smelter |
Global zinc mining | Boliden | European miner-smelter; a natural potential offtaker for Mediterranean concentrate |
Global zinc mining | MMG | Operates Dugald River and Rosebery in Australia |
Global zinc mining | South32 | Cannington producer; Hermosa developer in the US |
Zinc smelting / trading | Nyrstar (Trafigura), Korea Zinc | Potential concentrate buyers rather than competitors |
Zinc developers (capital competition) | Ironbark Zinc (Citronen, Greenland) | Large undeveloped deposit in a frontier jurisdiction; comparable funding challenge |
Zinc developers / restarters | Develop Global (Woodlawn, NSW) | ASX-listed base-metals restart; competes for same investor pool |
SA gold/copper explorers | Barton Gold, other SA juniors | Competing for SA investor and regulator attention |
Peer Comparison FY2025
| Metric | Terramin | Glencore | Teck | Boliden |
|---|---|---|---|---|
FY2025 revenue | A$0.13m | not compiled | not compiled | not compiled |
Revenue growth FY2025 | -5.2% | not compiled | not compiled | not compiled |
Margins | not meaningful (pre-revenue) | not compiled | not compiled | not compiled |
R&D intensity | 0% disclosed | not compiled | not compiled | not compiled |