Company ProfilePremium

Terramin Australia Limited

Company Profile Analysis

Ticker: TZN.AX

ESOMAR 23 Corporate BadgeISO Certifications Badge
Terramin Australia Limited - Company showcase

Year Founded & Workforce

1993

30 Employees

Terramin Australia Limited logo

Terramin Australia Limited Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

Terramin Australia Limited Overview

Terramin is an Adelaide Hills–based, pre-revenue base and precious metals developer whose value is concentrated in a single minority interest: a 49% stake, with management rights, in Bejaia Zinc and Lead Spa (BZL, formerly Western Mediterranean Zinc Spa), owner of the Tala Hamza zinc-lead project near Béjaïa on Algeria's Mediterranean coast. Tala Hamza is a 53Mt resource that the company describes as potentially a top-ten global zinc mine, with a mining permit (2023), a US$336m EPC contract with Sinosteel MECC (2024), and site preparation begun in March 2026. A second pillar, the 265koz, 12.6 g/t Bird in Hand gold deposit in South Australia, was refused a mining lease in 2023 but returned to Terramin's exploration licence by the Court of Appeal in March 2026. The group carries roughly A$54m of debt and accrued interest (mostly owed to its controlling shareholder), negative working capital of A$56m, and a going-concern material uncertainty — making it a high-risk, highly leveraged development option on Algerian zinc.


Company's own description

In its 2025 Annual Report, Terramin describes itself as engaged in the exploration, evaluation and development of base and precious metal projects, with a stated focus on building a production pipeline of projects that sit close to infrastructure and offer low capital and operating costs. It lists its major projects as the Tala Hamza Zinc Project (49%) and the Bird in Hand Gold Project (100%), plus regional South Australian interests in the Kapunda Copper Project joint venture and the South Gawler Ranges Project exploration program with JOGMEC.

Independent characterisation

Terramin is functionally a holding and management company for a portfolio of undeveloped mineral assets, with almost no operating revenue. Its economics are best understood in four layers:

  1. Equity-accounted Algerian development interest. The 49% investment in BZL (carrying value A$46.2m at 30 Jun 2026) is about 72% of total assets. Terramin does not consolidate Tala Hamza, does not book its capital expenditure, and will receive value only through dividends, shareholder loans repayment, management/operator arrangements (if any are monetised), or a sale of the stake. Terramin retains management rights over the project, which gives it operational influence disproportionate to its minority equity.

  2. Stranded Australian processing infrastructure. The Angas Zinc Mine and processing plant at Strathalbyn (on care and maintenance since mining ceased) was intended to process Bird in Hand ore into a gold concentrate. The plant carries rehabilitation obligations (provision A$5.79m at 30 Jun 2026) backed by A$5.67m of restricted cash.

  3. Legally contested gold asset. Bird in Hand is a high-grade, small underground gold project adjacent to premium Adelaide Hills wineries. Its value rests on regulatory/legal outcomes rather than technical risk.

  4. Farm-out exploration optionality. Kapunda (in-situ copper recovery, operated and funded by Environmental Copper Recovery) and South Gawler Ranges (funded by JOGMEC) give exposure to copper/IOCG discovery with minimal cash outlay by Terramin.

Revenue model

Revenue typeDescriptionFY2025 (AUD K)Share of revenue & other income
Revenue from contracts (operator/management fees)Quarterly management fee received as operator under the JOGMEC South Gawler exploration agreement12699%
Other incomeSundry11%
Product sales (metal/concentrate)None since Angas ceased production00%
Subscription / licensing—00%

Source: 2025 Annual Report, Note 4. The business model today is therefore a capital-consumption model funded by shareholder loans and periodic equity raises; prospective revenue would derive from (a) Terramin's 49% share of Tala Hamza zinc and lead concentrate sales to smelters, and (b) gold concentrate from Bird in Hand if ever permitted.

Value-chain position and customers

Value-chain position: Upstream exploration and mine development (mining and concentrating). No smelting or refining.

Prospective customers: Zinc and lead smelters, chiefly in Europe (Béjaïa is about 15 km from a deep-water port) and potentially the existing small Algerian zinc smelter, which management has said it would support where possible (CEO Richard Taylor commentary, The Lead South Australia, c. 2019).

Current counterparties: JOGMEC (operator fee payer), ECR (farm-in partner), Algerian state entities ENOF and ORGM (JV partners), Sinosteel MECC (EPC contractor to BZL).

End-markets: Galvanised steel (construction, automotive, infrastructure), die-casting alloys, batteries (lead), and gold investment/jewellery demand.

Strategy

Stated strategy (themes paraphrased from the 2025 Annual Report and 2026 Interim Report)

  • Build a production pipeline of base and precious metal projects near infrastructure with low capital and operating costs.

  • Make Tala Hamza the primary development priority, followed by approval, funding and development of Bird in Hand.

  • Use partner-funded farm-outs (ECR, JOGMEC) to retain exposure to copper and IOCG discovery.

  • Pursue acquisitions of interests in advanced mining projects (business development noted in the H1 2026 report).

  • Use Algeria's 2025 mining law reforms (up to 80% foreign ownership) to participate in future Algerian projects.

  • Maintain commitments to environmental stewardship, community engagement and operational excellence (Chair's review; no quantified ESG targets).

Initiatives in the last 24 months

InitiativeDateDetail / target
Tala Hamza EPC with Sinosteel MECCNov 2024US$336m fixed scope; 18-month funding arrangements initially formalised
Geotechnical drilling and early worksNov 2024–2026Shaft/raise boreholes; suspended in 2025 pending relocation; resumed 2026
Revised 2.0Mtpa Mining Study30 Mar 2026US$415m capex; ~US$640m post-tax NPV8; 20-year life
AAPI strategic project registration25 Mar 2026Tax holiday, VAT/customs exemptions, free power connection
State-bank project debt2,026In-principle approval of a DZD 32.2bn, 15-year loan (5-year grace) for 75% of upfront capex; negotiations "close to finalisation" at Sep 2026
Major works tenderingH1 2026Underground mine, process plant and infrastructure packages being tendered by the JV
Bird in Hand legal strategy2025–2026Appeal partly won (Proclamation set aside); options under review
Balance sheet recapitalisationOct 2025–Oct 2026Two rights issues (A$38.3m and A$28.65m targets) largely filled by debt conversion and underwriters
Incentive plan reinstatedApr–May 202679m options at A$0.06
Kapunda ISR trial2025–2026Full lixiviant trial; results expected later in 2026

Medium-term targets and guidance

Terramin does not issue financial guidance. Qualitative targets: Tala Hamza construction in 2026 (stated in the 2025 Annual Report), finalising state-bank financing, and drilling South Gawler targets in 2026. Algerian media and an advocacy report cited a July 2026 production start; this has clearly not been met, and the company has not confirmed a first-production date.

Products & Services

Terramin has no commercial products. Its "portfolio" is a set of mineral assets, catalogued below by segment.

Northern Africa

AttributeDetailSource
LocationOued Amizour, Béjaïa Province; ~15 km from Port of Béjaïa; ~200 km east of AlgiersCompany website; The Lead SA
Mineral Resource53.0Mt (Measured, Indicated & Inferred) @ 5.3% Zn, 1.3% Pb (6.6% Zn+Pb) at 2.5% ZnEq cut-off, inclusive of Probable Reserve; ~3.5Mt contained zinc+leadASX 29 Aug 2018; 2026 Interim Report
Prior resource68.6Mt @ 4.6% Zn, 1.2% Pb (superseded)African Mining Network
Exploitable reserve (per Algerian press)~34Mt over 234 haAlgérie Eco, May 2023
PermitMining Permit issued May 2023 for 2.0Mtpa2025 Annual Report
Land~234 ha acquired by Algerian state; cost in excess of US$25m (company) / ~US$30m (Ecofin); relocation complete Mar 20262025 AR; Ecofin 25 Mar 2026
Mining methodMechanised underhand drift-and-fill underground mine; deposit ~500 m below surface2026 study; The Lead SA
EPCUS$336m with Sinosteel MECC: 2.0Mtpa process plant, underground mine, backfill plant, civil works, dry-stack tailings, water ponds and wastewater treatmentASX 4 Nov 2024
IncentivesAAPI strategic project registration: up to 7-year corporate tax exemption from production start, customs duty and VAT exemption in construction, free electricity connection2025 AR; ASX 25 Mar 2026
StatusSite preparation since Mar 2026; portal and magazine access, geotechnical drilling; major works tenders and state-bank financing negotiations "close to finalisation"2026 Interim Report
Parameter2018 DFS (1.3Mtpa)Mar 2026 Revised Mining Study (2.0Mtpa)
Throughput1.32Mtpa2.0Mtpa
Mine life21 years20 years
Material minednot compiled here~37Mt @ ~6% Zn, ~1.6% Pb
Zinc concentrate129,300 tpa @ 54% Zn (90% recovery)~178,000 tpa after ramp-up
Lead concentrate26,000 tpa @ 63% Pb (73% recovery)~33,000 tpa
C1 cash costUS$0.53/lb (Crown/Modern Mining report)US$0.56/lb payable Zn
AISCUS$0.61/lbUS$0.61/lb
Pre-production capexUS$341m~US$415m
Sustaining capexLOM total capital US$486m~US$40m indicative
Post-tax NPV8not compiled here~US$640m (2026 Interim Report)
Pre-tax nominal NPV8—~US$790m (Mining Weekly, 29 May 2026)
IRR—~23% post-tax; ~24% pre-tax
Payback / LOM FCF—~4 years; ~US$2.19bn LOM free cash flow (Motley Fool via Webull)

Tala Hamza Zinc-Lead Project (Terramin 49% via BZL; management rights)

Tala Hamza study comparison

Australia

AttributeDetail
LocationWoodside, Adelaide Hills, SA; ~30 km north of Angas plant; on Terramin freehold land
Resource265,000 oz Au @ 12.6 g/t; open at depth; "Bird in Hand Extended" assays averaged 25–31 g/t Au about 200 m from planned infrastructure
Feasibility (Jun 2020)44,700 oz/yr over ~4 years; C1 A$737/oz; AISC A$959/oz; pre-production capex A$54m; post-tax NPV8 A$141m; IRR 80.5% at A$2,300/oz (US$1,500/oz)
Gold price context~A$7,075/oz cited in the 2025 Annual Report (Mar 2026), roughly 3x the study price
Legal statusMining lease refused Feb 2023 (upheld); 2023 Proclamation set aside 5 Mar 2026; deposit back within EL 6447; Terramin reviewing strategic, legal and development options; a miscellaneous purposes licence application referenced on the website for Angas processing use
Carrying valueNil (impaired A$15.1m in FY2022)

Bird in Hand Gold Project (100%, Terramin Exploration)

Angas Zinc Mine and Processing Facility (100%)

Former zinc-lead-copper-silver-gold underground mine and plant at Strathalbyn on Mining Lease 6229. On care and maintenance, complying with environmental obligations. Intended to treat Bird in Hand ore to a gold concentrate. Rehabilitation bond A$5.67m (cash-backed CBA guarantee); rehabilitation provision A$5.79m (30 Jun 2026, 4.46% discount rate). Plant carrying value is minimal (plant and equipment A$0.2m; freehold land A$3.46m across group).

Kapunda Copper Joint Venture (Terramin 25% + 1.5% royalty; ECR 75%, operator)

In-situ recovery (ISR) of copper from shallow oxide and secondary sulphide mineralisation around the historic Kapunda mine, ~90 km north of Adelaide. Combined ISR-amenable resource of 47.4Mt @ 0.25% Cu for 119,000t contained copper (0.05% cut-off, within 100 m of surface). ECR earned 50% (A$2m) by 2020 and a further 25% (A$4m) by early 2025. Full ISR lixiviant trial approved by DEM mid-2025, began late 2025 and has been extended, with recoveries of copper, cobalt and nickel reported as rising; a second test site is being evaluated. OZ Minerals (later BHP) funded A$2.5m of ECR's feasibility work.

South Gawler Ranges Project (Terramin 49.9% subject to JOGMEC option; JOGMEC-funded)

Eleven exploration licences totalling 4,524 km², ~100 km west of Port Augusta in the Gawler Craton; prospective for IOCG copper-gold and base metals. Hosts Menninnie Dam, described as the largest undeveloped lead-zinc deposit in South Australia: Inferred 7.7Mt @ 3.1% Zn, 2.6% Pb, 27 g/t Ag (JORC 2004, 2011 announcement). JOGMEC agreement: A$7.5m exploration funding to 31 Mar 2028 for up to 70%, plus an option to buy a further 6% for A$3m and a 0.5% NSR (buy-back A$1.5m). Discrepancy: the H1 2026 directors' report says JOGMEC has spent over A$5m and earned a 50.1% option, while Note 11 of the same report says over A$3.5m. 2025 drilling and an 850 m diamond hole in H1 2026 returned no significant mineralisation. Native Title Mining Agreement with Gawler Ranges Aboriginal Corporation covers the whole project area.

Adelaide Hills Project (100%)

Nine exploration tenements covering 2,839 km² from Lake Alexandrina to Kapunda (H1 2026; 2025 AR cited eight tenements, 2,179 km²). Prospective for gold, copper, lead, zinc and rare earths; includes Bird in Hand and Kapunda; also historic Golden Slope and Wheal Barton prospects (GlobalData). Wild Horse (EL 5846) earn-in with Newmont was terminated in 2022, with Terramin retaining 100%.

Financial Narrative

Sources: 2023 AR (FY2022–FY2023), 2025 AR (FY2024–FY2025), 2026 Interim Report (H1). FY2021 figures are partly from the opening balances in the 2023 AR and partly from the Kalkine Media aggregator (flagged). A$'000 unless stated.

Income statement

FY2022 continuing-operations EPS was -1.00 cent. Kalkine reports FY2025 EBITDA of -A$3.45m using a different definition; the derived figure above is EBIT plus D&A. Revenue CAGR FY2022–FY2025 is 26.4% (derived) but from a negligible base and driven by operator fees, so it carries no analytical weight. Margins (gross, operating, EBITDA, net) are not meaningful given revenue below A$0.2m: e.g. FY2025 net margin is about -7,020% (derived).

H1 2026 snapshot: other income A$56k; EBIT -A$1.83m; share of BZL loss -A$0.25m; net finance cost -A$1.70m; net loss -A$3.53m (H1 2025: -A$5.11m); basic EPS -0.16 cents; includes A$0.29m share-based payment expense from the first option grants since 2018.

Commentary. The P&L is dominated by two structural items: (1) interest at a fixed 12% on Asipac facilities, which accrues rather than being paid (interest on borrowings A$3.6m in FY2025), and (2) legal and consultant fees tied to the Bird in Hand litigation (legal, accounting and consultants A$1.78m in FY2025 versus A$0.30m in FY2022). The FY2022 result was distorted by the A$15.1m Bird in Hand impairment offset by the A$13.7m gain on WMZ deconsolidation. The inflection to watch is H1 2026, where legal costs halved to A$0.41m after the appeal concluded and a A$0.68m FX gain on the USD convertible note reduced finance costs.

Balance sheet

Notes: FY2021 total assets and current assets from Kalkine; FY2021 equity (A$35.6m including A$13.1m non-controlling interest; A$22.5m attributable) and PP&E from opening balances in the 2023 AR. Kalkine's FY2025 net debt (A$41.4m) excludes the convertible note.

30 Jun 2026: total assets A$64.27m; cash A$0.10m; Asipac borrowings plus accrued interest A$44.26m (principal A$31.41m of A$32.11m limit; accrued interest A$12.85m); convertible note A$10.10m now current (matures ~Jan 2027) plus A$1.10m derivative; total liabilities A$62.39m; equity A$1.88m; working capital -A$56.2m.

Commentary. Equity has collapsed from A$35.6m (FY2021) to A$1.9m (H1 2026) because losses are funded by debt rather than equity. The only material asset — the BZL investment — is supported by an impairment test based on project progress rather than an independent valuation since the 2022 fair-value exercise. Net debt is roughly 1.2x the current market capitalisation. The December 2025 debt-to-equity swap (A$8.9m of accrued interest converted) and the planned October 2026 conversion (~A$12.2m) are the principal deleveraging levers.

Cash flow

Notes: FY2022 investing outflow includes A$5.67m transfer to restricted cash. FY2023 WMZ working-capital contributions of A$0.63m were recognised in the investment note but not separately shown in investing cash flows. H1 2026: OCF -A$1.31m; investing -A$0.05m; financing +A$1.39m (A$1.0m rights-issue shortfall placement plus A$0.4m Asipac drawdown). Terramin also committed US$0.5m of further capital to BZL for the rest of 2026.

Commentary. Cash burn is modest (A$3–5m a year) but entirely externally funded; year-end cash has not exceeded A$0.4m since FY2022. The group operates on a hand-to-mouth basis, with a stated liquidity target of 45 days of planned expenditure in available facilities.

Ratios (analyst-derived)

ROIC, net debt/EBITDA and cash conversion cycle are not meaningful for a pre-revenue company with negative EBITDA and no inventory or receivables cycle; they are therefore not presented.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Income Statement and Margin Analysis (%)

Metric (AUD K)FY2021FY2022FY2023FY2024FY2025

Revenue and other income

—63106134127

Revenue from contracts

—6356132126

Raw materials and direct costs

—-170-173-100-147

Gross profit (derived)

—-107-6734-20

Employee benefits expense

—-799-731-743-955

Depreciation and amortisation

—-731-715-720-708

Other expenses

—-967-1,976-2,274-2,278

Bird in Hand impairment

—-15,099000

Share of associate loss (BZL/WMZ)

—-60-1190-1,179

Operating loss (EBIT, before net finance costs)

—-17,481-2,485-3,765-4,875

EBITDA (derived: EBIT + D&A)

—-16,750-1,770-3,045-4,167

Finance income

—74207305221

Finance costs

—-3,735-4,076-5,413-4,261

Loss before tax, continuing operations

—-21,142-6,354-8,873-8,915

Profit from discontinued operations (WMZ deconsolidation)

—13,695000

Net loss

-6,176-7,447-6,354-8,873-8,915

Basic EPS (A$ cents)

—-0.35-0.30-0.42-0.42

Diluted EPS (A$ cents)

—-0.35-0.30-0.42-0.42

Dividends per share (A$ cents)

00000

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Balance Sheet and Share Count (millions)

Metric (AUD K)FY2021FY2022FY2023FY2024FY2025

Cash and cash equivalents

—13137421472

Restricted cash (non-current)

—5,6705,6705,6705,670

Total current assets

5,887392580489280

Investment in associate (BZL/WMZ)

045,23545,74646,40946,380

Exploration and evaluation

—8,0388,1278,2088,283

Property, plant and equipment

6,4905,7465,0754,3713,679

Total assets

76,47465,33265,24965,19864,343

Short-term borrowings incl. accrued interest

—39,69046,24844,44741,971

of which drawn Asipac principal

—28,25831,25628,16830,985

of which accrued interest

—11,43214,99216,27910,986

Convertible note (long-term)

00010,36010,464

Embedded derivative

0001,0961,096

Total debt incl. accrued interest and note (derived)

—39,69046,24854,80752,435

Net debt (derived; total debt less unrestricted cash)

—39,55945,87454,59352,363

Total liabilities

—47,07453,34562,16760,112

Total equity

35,59618,25811,9043,0314,231

Goodwill and intangibles

00000

Working capital (derived)

—-40,913-47,673-44,734-42,698

Shares on issue (millions)

2,116.62,116.62,116.62,116.62,361.3

Balance Sheet

Metric (AUD K)FY2022FY2023FY2024FY2025

Operating cash flow

-2,139-3,006-4,249-2,946

Exploration and evaluation spend

-441-58-67-71

Cash contributions to BZL/WMZ

00-663-241

Free cash flow (derived: OCF less E&E and BZL contributions)

-2,580-3,064-4,979-3,258

Net investing cash flow

-6,114249-728-292

Proceeds from borrowings

2,6653,0001,0002,825

Proceeds from convertible note

009,8610

Repayment of borrowings, interest and fees

00-6,0440

Equity raised (net)

000271

Net financing cash flow

2,6653,0004,8173,096

Dividends paid

0000

Share buybacks

0000

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2022FY2023FY2024FY2025

ROE (%; net loss / average equity)

-27.7-42.1-118.8-245.5

ROA (%; net loss / average total assets)

-10.5-9.7-13.6-13.8

Current ratio (x)

0.0090.0120.0110.007

Debt / equity (x; total debt incl. accrued interest)

2.173.8918.0812.39

Interest coverage (x; EBIT / finance costs)

-4.68-0.61-0.70-1.14

Asset turnover (x; revenue / average assets)

0.0010.0020.0020.002

Revenue by geography (AUD K)

Revenue by geography (AUD K)FY2023FY2024FY2025

Australia

106134127

Algeria / Northern Africa

000

Rest of world

000

Growth (%)

Growth (%)FY2024FY2025

Australia revenue growth

26.4-5.2

Share Price History

DatePrice (AUD)ContextSource

~Mar 2025

~0.079 (implied)

Market cap A$167.2m on 2,116.6m shares

TipRanks

29 Oct 2025

0.045

Pre-rights issue

InvestSMART

30 Mar 2026

0.035

After revised mining study (+12.9%)

Motley Fool via Webull

22 Apr 2026

0.031

March quarterly

InvestSMART

9 Jun 2026

0.020—

InvestSMART

4 Aug 2026

0.020

Market cap A$52.5m (StockAnalysis)

StockAnalysis

~11 Oct 2026

0.018

At rights price

Investing.com

Return (approx., price only)

Value

——

1-year (Oct 2025 to Oct 2026)

approx. -60% (A$0.045 to A$0.018)

——

52-week range

A$0.016–0.052 (StockAnalysis, Aug 2026); A$0.016–0.057 (Kalkine)

——

Valuation Snapshot

MultipleValueComment

Market cap (13 Oct 2026, 2,432.1m shares at A$0.018)

~A$43.8m

Analyst calculation

Market cap pro forma (~3,666.7m shares)

~A$66.0m

Analyst calculation

Enterprise value pro forma

~A$98m

Analyst estimate: pro forma market cap plus ~A$54.3m debt (30 Jun 2026) less ~A$12.2m Asipac conversion and ~A$10m Feny cash

P/E

not meaningful (losses)

—

EV/EBITDA

not meaningful (negative EBITDA)

—

EV/Sales

~770x

Not meaningful

P/B

~23x on A$1.88m book equity (30 Jun 2026, pre-raise)

Distorted by tiny equity

Look-through to Tala Hamza

49% of ~US$640m post-tax NPV8 ≈ US$314m (unrisked, before Terramin's capex funding share)

Analyst calculation; illustrates the market's deep discount for funding and jurisdictional risk

Capital Markets

ItemStatus

Dividend history / policy

No dividends paid or declared; none expected before production

Credit ratings (Moody's/S&P/Fitch)

Not rated

Capital raisings 2025–26

1-for-2.1 at A$0.038 (Oct 2025); 1-for-1.5 at A$0.018 (Sep 2026)

Potential dilution

79m options (A$0.06); convertible note conversion at 90% of VWAP; underwriter shortfall shares

Capital Instruments

InstrumentLimitDrawn / carryingRateSecurityMaturity

Asipac Bird in Hand Facility

6,000

part of 27,184 secured

12% fixed, payable at termination

Mortgage over Bird in Hand land; GSA over Terramin Exploration; share security

30 Jun 2027

Asipac Standby Short-term Facility

21,184

part of 27,184 secured

12%

As above

30 Jun 2027

Asipac Standby Term (No.2) Facility

5500 (from 1 Sep 2026; was 4,925)

4,22512%

Unsecured

30 Jun 2027

Accrued interest on Asipac facilities

—12,847——

With facilities

Convertible note

US$6.68m

10102 (+1,096 derivative)

2.5% simple

Unsecured

~Jan 2027

Analyst Conclusions

Management guidance

No financial guidance. Management expects Tala Hamza construction to proceed during 2026, state-bank financing to be finalised, major works contracts to be awarded, Kapunda ISR results later in 2026, and continued South Gawler exploration. Bird in Hand options are under review following the March 2026 judgment.

Consensus

No sell-side coverage; consensus growth expectations are not available.

Bull case

  1. Algeria is visibly committed. The state has paid US$25–30m for land, relocated residents, created a dedicated mining ministry, registered the project for incentives, and given in-principle approval to lend 75% of capex; this materially de-risks permitting and financing relative to the 2018–2023 period.

  2. Deep discount to look-through value. A 49% interest in a project with a ~US$640m post-tax NPV8 trades inside a pro forma enterprise value of roughly A$98m; even heavy risking leaves room for re-rating if financing closes.

  3. Bird in Hand is a free option on record gold prices. With gold around A$7,000/oz versus a A$2,300/oz study price, and the reservation removed, any political or legal pathway to approval would be highly accretive given an existing processing plant.

Bear case

  1. Funding gap is existential. Terramin's notional 49% share of US$415m capex (~US$200m) is several times its market value, and the free float has shown almost no appetite (A$0.8m taken up of A$28.65m); value may accrue mostly to lenders, underwriters or state partners through dilution or carried-interest restructuring.

  2. Balance sheet and governance. Equity of A$1.9m, A$44m owed to the controlling shareholder at 12%, a USD note due around January 2027, and a controller approaching 47.5% create a structure in which minority shareholders bear dilution while the controller converts debt at depressed prices.

  3. Execution and jurisdiction. Construction has been "imminent" since at least 2019; first production claims (e.g. July 2026) have lapsed; social opposition in Kabylia and the SA government's firm stance on Bird in Hand show that permits do not guarantee progress.

Catalysts and monitorables (next 12 months)

CatalystExpected timingWatch for
Underwriter shortfall allocation (Asipac, Feny)~21 Oct 2026Final Asipac %; Feny stake and any board seat
September 2026 quarterly23 Oct 2026Cash, Tala Hamza works, financing status
Convertible note maturity~Jan 2027Conversion, extension or repayment
Algerian state-bank loan finalisationNot dated ("close to finalisation")Signed facility; Terramin's equity funding obligation
Major works contract awards / full construction start2026–2027Notice to proceed under EPC
Kapunda ISR resultsLate 2026Copper grade in solution; second test site
Bird in Hand strategyNot datedNew applications, MPL for Angas, or monetisation
FY2026 Annual Report~Mar 2027Going-concern status; BZL carrying value
Asipac facility expiry30 Jun 2027Further extension or conversion

Analyst verdict

Terramin is best described as a leveraged, minority-interest option on a single Algerian zinc project, wrapped in a balance sheet that would not survive without its controlling shareholder. The asset itself has genuinely improved since 2023: Tala Hamza now has a mining permit, a land footprint acquired and cleared by the state, investment incentives, an EPC contractor, a revised 2.0Mtpa study showing roughly US$640m post-tax NPV and a 23% IRR, and an in-principle commitment from an Algerian state bank to fund three-quarters of upfront capex. Algeria's 2025 mining reforms and the creation of a dedicated mining ministry signal policy direction that favours the project. In Australia, the Court of Appeal's removal of the Bird in Hand reservation keeps a high-grade gold option alive at a time of exceptional A$ gold prices.

Yet the equity story is far weaker than the asset story. Terramin owns only 49%, cannot fund its share of a roughly US$415m build, and holds about A$0.1m of cash against about A$55m of debt and accrued interest. The free float has effectively declined to participate in two consecutive rights issues; recapitalisation is occurring through debt conversion by Asipac at A$0.018–0.038 and through a new Hong Kong underwriter, pushing control toward 47.5%. The board lacks majority independence and the auditor continues to flag material going-concern uncertainty. A US-dollar convertible note falling due around January 2027 is the next pressure point.

On balance, the shares price in substantial failure or dilution, and the look-through gap to project NPV is real. But realisation of that value depends on financing structures — carried interests, state-bank terms, or partner buy-ins — that are not yet disclosed and may transfer much of the upside to lenders and partners. We would characterise Terramin as speculative. Key confirmation signals are a signed project loan, clarity on how Terramin's equity share is funded, and resolution of the convertible note.


SOURCES CONSULTED

  • Terramin Australia Limited, 2025 Annual Report (ASX, 17 Mar 2026) — announcements.asx.com.au/asxpdf/20260317/pdf/06xj7kjk4wgmv0.pdf

  • Terramin Australia Limited, 2026 Interim Financial Report (4 Sep 2026) — bulletin.webull.com (ASX announcement mirror, 20260904)

  • Terramin Australia Limited, 2023 Annual Report (ASX, 19 Mar 2024) — announcements.asx.com.au/asxpdf/20240319/pdf/061nq39qkml328.pdf

  • Terramin Australia Limited, 2024 Annual Report (ASX, 19 Mar 2025) — announcements.asx.com.au/asxpdf/20250319/pdf/06gsqg1r9hbzl0.pdf

  • ASX announcements: EPC contract (4 Nov 2024); Rights issue results (15 Dec 2025); Rights issue update (22 Dec 2025); Dec 2025 quarterly (29 Jan 2026); Mar 2026 quarterly (22 Apr 2026); AGM presentation (May 2026); Finance facility updates (24 Jun 2026, 1 Sep 2026); Jun 2026 quarterly (28 Jul 2026); Rights issue (14 Sep 2026)

  • Company website: terramin.com.au (Tala Hamza and Bird in Hand project pages)

  • Secondary: TipRanks, Kalkine Media, InvestSMART, Investing.com, StockAnalysis, Morningstar, Yahoo Finance, Simply Wall St, MarketIndex, IBISWorld, GlobalData, Mining Weekly / Engineering News (29 May 2026), Creamer Media (27 Mar 2026), Ecofin Agency (25 Mar 2026), Mining.com.au, Miningnews.net, Mining Magazine Australia (10 Feb 2023), WBM Online (20 Jan 2025), Premier of South Australia media release, MEED, African Mining Network, The Lead South Australia, Algérie Eco, Algeria Invest, Team France Export (El Watan), Crown Publications / Modern Mining, UNPO Academy, AFR company page, Discovery Alert

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleAppointedIndependenceBackground

Feng (Bruce) Sheng

Executive Chair

Director 17 Apr 2013; Exec Chair 11 Jan 2018

Non-independent

Chair of Asipac Group; 25+ years in property and resources investment; former Vice Chair, Australia China Business Council (Victoria)

Alan Broome AM

Non-Executive Deputy Chair; chair of Audit, Risk & Compliance and Nominations & Remuneration committees

9 Sep 2024

Independent

Chair/director of New Age Exploration, Critical Minerals, iMine Data Analytics, Nuenz NZ, North West Phosphate; Emeritus Chair of Austmine (chair 22 years)

Angelo Siciliano

Non-Executive Director

2 Jan 2013

Non-independent

FIPA, registered tax agent; accountant and CFO for Asipac; runs own accounting practice

Martin Janes

Executive Director (de facto CEO)

Executive Officer from Jan 2020; Executive Director 1 Dec 2024

Non-independent

30+ years mining finance; ex-Newmont Australia/Normandy (corporate and project finance, treasury, offtake); BEc, GAICD

Junming Zhang

Non-Executive Director

6 Jul 2023

Classified independent

Mining engineer, 30+ years incl. Africa and Asia; Director and COO of PT Dairi Prima Mineral (controlled by China Nonferrous's NFC)

Jing Wang

Non-Executive Director

13 Feb 2025

Independent

Partner and Head of China Practice, Gadens; Bachelor's degrees in Law and Commerce, University of Melbourne

André van Driel

Finance Manager & Company Secretary

Employed 9 Aug 2018; CoSec 6 Mar 2020

KMP

CPA; 20+ years at Newmont Australia, BHP Billiton, Ramelius Resources

Mark Flynn

Investor Relations

——

Named IR contact on 2026 announcements

Eric Whittaker

Regional Exploration Manager (Competent Person)

——

AusIMM member

Directors' Remuneration

KMPFY2024 totalFY2025 total

Feng Sheng

100,000100,000

Alan Broome AM

21,77875,417

Angelo Siciliano

61,50061,000

Martin Janes

300,000153,800

Junming Zhang

00

Jing Wang

044,048

André van Driel

159,581180,956

Michael Kennedy (ceased 9 Sep 2024)

48,2220

Kevin McGuinness (ceased 30 Nov 2024)

50,4170

Total KMP

741,498615,221

Board & Management Changes

DateChange

6 Jul 2023

Lulu Shi (NFC) ceases; Junming Zhang appointed

9 Sep 2024

Michael Kennedy retires; Alan Broome AM appointed Deputy Chair

30 Nov 2024

Kevin McGuinness retires

1 Dec 2024

Martin Janes moves from Executive Officer to Executive Director

13 Feb 2025

Jing Wang appointed

Major Shareholders

HolderShares%Date / source

Asipac Group Pty Ltd (controlled by F. Sheng)

1,062,606,503 (Sheng relevant interest)

45.0

31 Dec 2025, 2025 AR

Asipac Group Pty Ltd

—

~45.5

14 Sep 2026 announcement

Asipac pro forma after shortfall allocation

~1,741.6m (analyst estimate: 1,062.6m + 679.0m)

~47.5 (cap)

Expected ~21 Oct 2026

Feny (Hong Kong) International Mining Limited

555,555,556 expected shortfall allocation

~15.2 pro forma (analyst estimate)

Expected ~21 Oct 2026

Angelo Siciliano

10,000,000 (+20m options)

0.4

31 Dec 2025

Martin Janes

1,595,962 (+20m options)

0.1

31 Dec 2025

Convertible noteholder (unnamed "strategic investor")

Convertible at 90% of VWAP after Jan 2026

—

2025 AR

Competitive Landscape

Competitors by Segment

SegmentCompetitor / peerRelative positioning (qualitative)

Global zinc mining (price setters)

Glencore

Largest integrated zinc miner/marketer; scale and smelter integration Terramin lacks

Global zinc mining

Hindustan Zinc (Vedanta)

Low-cost integrated producer in India

Global zinc mining

Teck Resources

Major zinc miner (Red Dog) and Trail smelter

Global zinc mining

Boliden

European miner-smelter; a natural potential offtaker for Mediterranean concentrate

Global zinc mining

MMG

Operates Dugald River and Rosebery in Australia

Global zinc mining

South32

Cannington producer; Hermosa developer in the US

Zinc smelting / trading

Nyrstar (Trafigura), Korea Zinc

Potential concentrate buyers rather than competitors

Zinc developers (capital competition)

Ironbark Zinc (Citronen, Greenland)

Large undeveloped deposit in a frontier jurisdiction; comparable funding challenge

Zinc developers / restarters

Develop Global (Woodlawn, NSW)

ASX-listed base-metals restart; competes for same investor pool

SA gold/copper explorers

Barton Gold, other SA juniors

Competing for SA investor and regulator attention

Peer Comparison FY2025

MetricTerraminGlencoreTeckBoliden

FY2025 revenue

A$0.13m

not compiled

not compiled

not compiled

Revenue growth FY2025

-5.2%

not compiled

not compiled

not compiled

Margins

not meaningful (pre-revenue)

not compiled

not compiled

not compiled

R&D intensity

0% disclosed

not compiled

not compiled

not compiled

Company Snapshot

30

Employees

1993

Founded

SWOT Analysis

Strengths

  • Large permitted resource: 53Mt @ 6.6% Zn+Pb with a Mining Permit issued May 2023 for 2.0Mtpa (2025 AR).
  • Signed EPC: US$336m contract with Sinosteel MECC (ASX 4 Nov 2024).
  • State-funded enablers: Algerian state acquired 234 ha of land at over US$25m and relocated residents; it is building power, road and port infrastructure (2025 AR; 2026 Interim Report).
  • Fiscal incentives: AAPI registration gives up to 7 years of corporate tax exemption and VAT/customs relief (ASX 25 Mar 2026).
  • Robust study economics: ~US$640m post-tax NPV8, ~23% IRR, AISC US$0.61/lb (2026 Interim Report).
  • High-grade gold optionality: 265koz @ 12.6 g/t, with a deposit now back within EL 6447 after the 5 Mar 2026 judgment, and a study price (A$2,300/oz) about one-third of the current A$ gold price.

Weaknesses

  • Insolvent-looking balance sheet: working capital -A$56.2m and equity A$1.88m at 30 Jun 2026; auditor's going-concern emphasis (2026 Interim Report).
  • Expensive related-party debt: A$44.3m owed to Asipac at a fixed 12%, with interest accruing (2026 Interim Report Note 14).
  • Minority stake: only 49% of BZL, deconsolidated since 2022, with no disclosed dividend policy at BZL level.
  • Negligible revenue: A$127k in FY2025, all from a JOGMEC operator fee (2025 AR Note 4).
  • Weak free-float demand: shareholders took up only A$0.37m of a A$38.3m offer (Dec 2025) and A$0.8m of a A$28.65m offer (Oct 2026).
  • Governance concentration: non-majority-independent board, executive chair from the controlling lender, and the controlling holder's stake rising toward 47.5% via debt conversions.

Opportunities

  • Algerian mining law reform (June 2025) allowing up to 80% foreign ownership could open new Algerian projects or a restructured stake.
  • State-bank project debt of DZD 32.2bn covering 75% of upfront capex (2025 AR going-concern note).
  • Bird in Hand re-application: removal of the Proclamation allows a fresh approach under the Mining Act, potentially after a change of SA government or policy.
  • Kapunda ISR success: rising copper, cobalt and nickel recoveries in the extended trial (2026 Interim Report), with a 1.5% royalty on all metals.
  • Resource growth: Tala Hamza open to the east and south-east (Mining Weekly, May 2026).
  • New strategic shareholder: Feny (Hong Kong) International Mining's ~A$10m commitment may bring further funding or technical capacity.

Threats

  • Convertible note maturity around January 2027 (US$6.68m plus 2.5% interest, repayable in USD) with A$0.1m cash at 30 Jun 2026.
  • Social licence in Kabylia: advocacy groups (e.g. UNPO commentary) frame the project as environmentally and politically contentious; relocation already delayed 2025 works.
  • SA government opposition: the Minister restated in Jan 2025 that he would not risk wineries for a short-term mine; refusal of the lease was upheld on appeal.
  • Massive dilution risk: Terramin's 49% share of US$415m capex (~US$200m) dwarfs its ~A$44–66m market capitalisation.
  • Zinc price / treatment charge downturns would erode the 23% IRR.
  • Creeping control: Asipac can approach 47.5% through underwriting conversions, which may limit takeover premium for minorities.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
23 May 2025Asipac Standby (No.2) facility raised to A$4.925m; facilities extended to 30 Jun 2026Funding runway
29 May 20252025 AGM; remuneration report passed (99.55%)Governance
18 Jun 2025Geotechnical drilling update at Tala Hamza; two holes completed, rest scheduled Q3 2025Early works
Jun 2025Algerian parliament lifts foreign ownership cap to 80%; single 30-year permitPositive regulatory reform
2025Early construction suspended to allow relocation of affected residentsDelay
10 Sep 2025H1 2025 loss A$5.11m; net assets negative (-A$0.92m)Balance-sheet stress
29 Oct 2025A$38.3m rights issue announced at A$0.038; Asipac underwrites up to A$15mRecapitalisation
3 Nov 2025Bird in Hand appeal heardLegal
Nov 2025Martin Janes buys shares on market (~A$0.036–0.037)Insider confidence signal
24 Nov 2025Rights-issue closing extended to 8 Dec 2025Weak take-up
15 Dec 2025Rights issue raises only A$0.37m from shareholdersMinimal free-float demand
30 Dec 2025Asipac issued 235.1m shares for A$8.9m debt; holding 45%Creeping control
29 Jan 2026December 2025 quarterly; cash A$0.1mLiquidity
Early 2026Algerian President directs acceleration of land acquisition and construction startSovereign support
5 Mar 2026Court of Appeal sets aside Bird in Hand Proclamation; other grounds dismissedPartial legal win
8 Mar 2026Shortfall offer closes; A$1.0m placedFunding
10 Mar 2026"Retraction Statement" lodged with ASXinvestors should read the filing
17 Mar 20262025 Annual Report; going-concern uncertainty; DZD 32.2bn in-principle bank loan disclosedFinancing progress
24 Mar 2026Site preparation commences at Tala Hamza; Algerian PM visits siteKey milestone
25 Mar 2026AAPI registration secures incentivesProject economics
30 Mar 2026Revised 2.0Mtpa Mining Study; shares rise ~13% to A$0.035Re-rating catalyst (later faded)
7 Apr / 21 May 202679m incentive options grantedRemuneration
22 Apr 2026March 2026 quarterlyUpdate
21 May 20262026 AGM and presentationGovernance
H1 2026Algeria creates Ministry of Mines and Mining Industries (Minister Mourad Hanifi)Institutional support
H1 2026South Gawler 850 m diamond hole: no significant mineralisationExploration setback
24 Jun 2026Asipac facilities extended to 30 Jun 2027Runway
28 Jul 2026June 2026 quarterlyUpdate
1 Sep 2026Standby (No.2) facility increased to A$5.5mRunway
4 Sep 2026H1 2026 loss A$3.53m; working capital -A$56.2m; going-concern emphasisFinancial
14 Sep 2026A$28.65m 1-for-1.5 rights issue at A$0.018; Feny joins as underwriterRecapitalisation; new strategic holder
6 Oct 2026Rights offer closes—
13 Oct 2026Applications for only 44.4m shares (~A$0.8m); shortfall of 1,547.4m shares; 555.6m to Feny and 679.0m to Asipac expectedUnderwriters to take most of the issue
23 Oct 2026 (scheduled)September 2026 quarterly reportNext catalyst

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

2 charts
Income Statement: Revenue & Gross Profit: Revenue and other income rose from AUD 0.1 Mn in FY2022 to AUD 0.1 Mn in FY2025.
Terramin Australia Limited — Income Statement: Revenue & Gross Profit
Series (AUD Mn)FY2022FY2023FY2024FY2025
Revenue and other income0.10.10.10.1
Revenue from contracts0.10.10.10.1
Gross profit-0.1-0.10-0

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.