Tesoro Gold Limited Overview
Tesoro Gold is a single-asset, pre-revenue gold developer. Its sole material asset is the El Zorro Gold Project in Chile's Coastal Cordillera, where the company discovered the Ternera deposit. Management describes Ternera as the country's first recognised Intrusive Related Gold System.
Ternera now hosts a 1.82Moz open-pit-constrained Mineral Resource (51.6Mt at 1.10g/t Au, August 2026), of which 78% is Measured and Indicated. In September 2026 the company declared a maiden JORC Ore Reserve of 1.28Moz (42.8Mt at 0.93g/t Au) within a single open pit. That reserve supports a 13-year-plus, 3.0Mtpa carbon-in-pulp (CIP) operation.
Pre-feasibility-level economics at US$3,500/oz gold indicate:
-
post-tax NPV5 of US$994M
-
post-tax IRR of 57%
-
pre-production capital of US$276.5M
The project sits 13km from the Pacific coast at low altitude, near a port, sealed roads, grid power and desalinated water. Gold Fields is the cornerstone strategic shareholder.
The investment case now turns on three things: delivering the Definitive Feasibility Study (DFS) by end-CY2026, securing Chilean environmental approval (RCA), and funding a capex bill that is many times the company's current market value and cash.
What the company does
Tesoro Gold explores for and develops gold deposits in Chile. It generates no operating revenue; its only income is interest on cash deposits. Its activities fall into three workstreams:
-
Resource definition and conversion at Ternera. Infill and extensional diamond drilling, more than 160km since discovery according to management, used to upgrade resource classification and grow the deposit.
-
Project development of El Zorro. Metallurgy, mine planning, engineering, environmental baseline and permitting, infrastructure agreements for power and water, and contractor alliance, all aimed at a DFS by end-CY2026 and, eventually, a Final Investment Decision (FID).
-
District-scale discovery. Exploration along a gold corridor that management describes as more than 30km in the FY2025 Annual Report and more than 40km in the August 2026 materials. Targets include La Brea, Peña Blanca, Drone Hill NW, Falda, Kitsune, Calderillas, Toro Blanco and Ternera East.
Business model and revenue model
| Dimension | Characterisation |
|---|---|
| Current revenue model | None. Pre-production. The only income is interest: A$320,366 in FY2025 (FY2025 Annual Report). |
| Future revenue model (if developed) | 100% product revenue from sale of gold doré to refiners or offtakers at spot. No service, subscription or licensing component. |
| Product / service / licensing mix | Not applicable today. Prospectively 100% product (gold). |
| Value chain position | Upstream: exploration, development and, prospectively, mining and primary processing (crush–grind–gravity–CIP to doré). No refining, trading or downstream integration. |
| Funding model | Equity placements, including from strategic holder Gold Fields. The company is now preparing a project-finance package with BurnVoir Corporate Finance (debt adviser) and Thomsons (legal adviser). A vendor equipment lease of about US$52.2M is contemplated in the PFS. |
| Customer types (prospective) | Bullion refiners, banks and offtake counterparties. No offtake agreements are disclosed. |
| End-market | Global gold market: investment demand, central banks, jewellery and technology. Gold is a liquid, globally priced commodity, so marketing risk is low and price risk is high. |
Company's own description
In its FY2025 Annual Report, Tesoro describes itself as an Australian-listed company focused on acquiring, exploring and developing commercially significant resource projects in Chile, with a focus on gold. Its standard ASX boilerplate states that the company "has discovered and defined the first Intrusive Related Gold System in Chile." It emphasises the Coastal Cordillera's endowment, infrastructure and workforce. It also attributes its land position to its in-country network, which allowed it to consolidate concessions in an area historically fragmented by unconsolidated ownership.
Independent characterisation
Tesoro is a late-stage, single-asset gold developer at the hinge point between study and financing. Its distinguishing features are:
A simple flowsheet: Free-milling ore with about 41–45% gravity-recoverable gold and 94.5–95% overall recovery at a 125µm grind (FY2025 Annual Report; reserve release). No deleterious elements have been identified.
Exceptional logistics for a greenfield project: The site is about 600m above sea level, 13km from the coast, 55–57km by road from Caldera port, about 25km from a Tecnocap transmission line extension, and about 20km from the Totoralillo desalination plant.
A large, low-grade, bulk-tonnage open pit: Reserve grade is 0.93g/t, and the strip ratio was 8.0:1 in the September 2025 Scoping Study. The margin is therefore highly geared to the gold price and to unit mining costs.
Its key structural weakness is financial scale. Pre-production capital of US$276.5M (PFS) is roughly 2.5–3x the company's market capitalisation and about 25x its last reported cash. Significant dilution, a strategic transaction, or both are probable before first gold.
Strategy
Stated strategy (themes from FY2025 Annual Report and 2026 presentations)
-
Advance Ternera to build-readiness. Progress El Zorro through advanced technical studies and permitting to a future FID. The Board chose to skip a standalone PFS and go straight to a DFS, announced in February 2026.
-
Grow and upgrade the resource. Ternera remains open in all directions and at depth. The infill target of more than 85% Indicated was largely achieved, at 78% Measured and Indicated.
-
Pursue district-scale discovery. "Ternera is the first of many" (Reeves, Noosa 2026), with a major regional drilling campaign along the 40km corridor.
-
Keep the operation simple and leverage infrastructure. A rare single open pit with an off-the-shelf CIP plant, grid renewable power and desalinated water.
-
Lean on the jurisdiction. Management highlights Chile's 27% corporate tax rate, absence of a gold-specific royalty, and over US$56bn of mining investment in 2024.
Initiatives in the last 24 months
| Initiative | Date | Detail / target |
|---|---|---|
| 38,000m diamond drilling programme | H2 2025 – 2026 | About 20,000m infill (later about 27,000m completed), about 6,000m extensional and about 12,000m new discovery. Fully funded. |
| MT survey and geomechanical modelling | 2,025 | MT survey of 7.5km × 8.5km; extended the prospective corridor to more than 30km |
| Updated Scoping Study | 11 Sep 2025 | 111koz/yr; AISC US$1,216/oz |
| Share consolidation (15:1) | Dec 2025 | To align the capital structure with peers and broaden the institutional investor base |
| Direct-to-DFS decision | Feb 2026 | DFS by end-CY2026; FID targeted for end-2026 (subject to funding and permits) |
| Unmarketable parcel share sale facility | Jan – Mar 2026 | Reduce registry costs |
| OTCQX upgrade | 12 Jun 2026 | Improve North American investor access |
| BurnVoir appointed financial and debt adviser; Thomsons legal adviser | Q2 – Q3 2026 | Project-finance process under way with Australian and international lenders |
| STRACON alliance LOI | 1 Jul 2026 | Alliance-style mining contractor framework covering DFS support and potential operation |
| Environmental baseline and EIA | 2025 – 2027 | Pares & Alvarez. Baseline about 12 months, completing around August 2026. EIA submission in Q1 2027. Approval process of about 24 months; management targets mid-to-late 2027 permits. |
| Power: Tecnocap MoU and connection authorisation | 2025 – 2026 | About 25km line; about 90% renewable |
| Maiden Ore Reserve | 18 Sep 2026 | 1.283Moz |
Medium-term targets and guidance
| Target | Timing (company) | Status at 17 Oct 2026 |
|---|---|---|
| Updated MRE | Aug 2026 | Delivered 27 Aug 2026 |
| Maiden Ore Reserve | Sep 2026 | Delivered 18 Sep 2026 (then corrected) |
| DFS completion | End CY2026 | Pending |
| EIA / sectorial permit submission | Q1 2027 | About 75% complete (reported) |
| Permits granted | Mid-to-late 2027 (management) | Pending |
| FID | Originally "by end-2026" (FY2025 Annual Report) | At risk of slipping given the permitting timeline; financing not yet arranged |
| Production profile | >110koz/yr (Noosa, Scoping basis) | PFS-level annual rate not confirmed in the sources reviewed |
Products & Services
Tesoro has no commercial products. Its "portfolio" is its mineral assets and project concepts, catalogued below asset by asset.
Flagship: Ternera Gold Deposit (El Zorro Gold Project)
| Attribute | Detail |
|---|---|
| Location | Atacama Region, about 130km north of Copiapó, 13km inland from the Pacific, 57km by road to Caldera port, about 600m elevation |
| Deposit style | IRGS. Gold hosted in intermediate intrusions and quartz-sulphide veins within the faulted El Zorro Tonalite, which intrudes Permian basement. Low sulphide (<5%). Bi, W, As, Mo, Te and Sb association. |
| Mineralised dimensions | About 1,000m strike × 600m width; up to 600m below surface. Over 720m down-plunge extent; ore zones over 80m wide. |
| Drilling in MRE | 474 HQ diamond holes for 153,180m. Tesoro total to date: 501 holes for 159,762m. |
| Mineral Resource (27 Aug 2026) | 51.6Mt at 1.10g/t for 1,822koz at 0.30g/t cut-off, inside a US$3,500/oz pit shell |
| Ore Reserve (16 Sep 2026; announced 18 Sep 2026) | 42.8Mt at 0.93g/t for 1,283koz: Proved 93koz, Probable 1,190koz. Pit shell selected at US$3,000/oz. |
| Processing concept | 3.0Mtpa conventional crush–grind–gravity–CIP. Design by GR Engineering Services. |
| Metallurgy | 94.5% recovery at a 125µm grind (reserve basis). About 41% average gravity-recoverable gold. Bond Work Index 20.9 kWh/t. Cyanide below 0.2kg/t; lime about 8kg/t. Compatible with desalination bittern water. |
| Status | DFS underway; target completion end-CY2026. EIA and sectorial permit submission targeted for Q1 2027 (reported as about 75% complete). |
| Pricing model | Spot gold (prospective). No hedging or offtake disclosed. |
| Category | Tonnes (Mt) | Grade (g/t Au) | Gold (koz) |
|---|---|---|---|
| Measured | 2.4 | 1.24 | 95 |
| Indicated | 37.9 | 1.13 | 1,371 |
| Inferred | 11.3 | 0.98 | 356 |
| Total | 51.6 | 1.10 | 1,822 |
| Unconstrained (0.30g/t) | 55.9 | 1.07 | 1,927 |
| Cut-off (g/t) | Tonnes (Mt) | Grade (g/t) | Gold (koz) |
|---|---|---|---|
| 0.30 | 51.6 | 1.10 | 1,822 |
| 0.50 | 43.5 | 1.26 | 1,767 |
| 0.70 | 32.4 | 1.49 | 1,553 |
| 1.00 | 19.6 | 1.92 | 1,209 |
| 1.50 | 9.7 | 2.64 | 824 |
| 2.00 | 5.6 | 3.33 | 595 |
| 3.00 | 2.4 | 4.57 | 345 |
| Metric | Jul-2021 | May-2022 | Mar-2023 | Aug-2025 | Aug-2026 |
|---|---|---|---|---|---|
| Total MRE (koz) | 660 | 1,100 | 1,282 | 1,816 | 1,822 |
| Indicated + Measured (koz) | 0 | 0 | 802 | 1,123 | 1,466 |
Mineral Resource by classification (27 Aug 2026, 0.30g/t cut-off, US$3,500/oz shell)
Grade–tonnage sensitivity (constrained, Aug 2026)
Resource evolution (total Ternera MRE, koz)
Note: the Indicated split for July 2021 and May 2022 is not available in the sources reviewed, so 0 denotes "not disclosed" in those cells rather than a true zero. Pit-shell gold price assumptions changed across estimates: US$1,800/oz for the 2023 open-pit portion, US$3,000/oz in 2025 and US$3,500/oz in 2026. Growth therefore reflects both drilling and economics.
Development concept history (studies)
| Parameter | Scoping Study (Sep 2025) | PFS-level / Reserve (Sep 2026) |
|---|---|---|
| Ore tonnage (Mt) | 40.7 | 42.8 |
| Head grade (g/t) | 1.02 | 0.93 (1.16 first 10 years) |
| Throughput (Mtpa) | 3.0 | 3.0 |
| Mine life (years) | 13.5 | >13 |
| Steady-state production (koz/yr) | 111 | Not stated in the coverage reviewed. A derived estimate of about 106koz/yr in years 1–10 (3.0Mt × 1.16g/t × 94.5%) is an analyst calculation, not company guidance. |
| Recovery (%) | 94.5 | 94.5 |
| Gold price for economics (US$/oz) | 2,750 base / 3,300 spot | 3,500 |
| Upfront capex (US$M) | 247.9 (180.1 plant + 26.4 mining + 41.4 pre-strip) | 276.5 (including ≈52.2 via 7-year vendor lease) |
| AISC (US$/oz) | 1,216 | 1,572 |
| Post-tax NPV (US$M) | 663 (7.5% discount) | 994 (5% discount) |
| Post-tax IRR (%) | 51 | 57 |
| Payback (months) | 20 | 17 |
| Accuracy | ±35% | ±35% |
Exploration pipeline (El Zorro District)
| Target | Location relative to Ternera | Stage | Key data |
|---|---|---|---|
| Ternera extensions (north, south, down-plunge) | Contiguous | Drilling | 68.23m at 1.18g/t (ZDDH0370); 53.5m at 1.17g/t (south); 8.84m at 3.54g/t including 1m at 27.70g/t from 576m (ZDDH0411), about 400m down-plunge of the pit resource |
| Ternera East | Adjacent | Drilling (2 rigs, Jul 2026) | Interpreted as a possible repeat of the main orebody. Discovery reported in 2024. |
| Drone Hill NW | Within 2km | Target generation | From MT survey and geomechanical modelling |
| Falda | Within 2km | Target generation | As above |
| Peña Blanca | About 6km south | Channel sampling | Three discrete gold targets identified, announced 6 Nov 2025 |
| La Brea | About 15km north | Maiden drilling done (5 holes, 1,117m) | Four NW trends up to 200m wide and 4km long. Channel samples include 1m at 22.10g/t. Peak drill interval 0.60m at 4.19g/t. |
| Kitsune, Calderillas, Toro Blanco | District | Drill-ready / follow-up | Part of the 12,000m New Discovery programme |
Infrastructure "products" (enabling agreements)
| Item | Counterparty | Status |
|---|---|---|
| Grid power | Tecnocap S.A. (CAP group), with a transmission line of about 175 MVA capacity and an extension to Totoralillo about 25km away | Non-binding MoU, 9 May 2025. Connection authorisation submitted (June 2026 Quarterly). Management cites about 90% renewable supply at about A$0.12/kWh. |
| Process water | AguasCap, Totoralillo desalination plant (brine/bittern) | MoU. Metallurgical tests with bittern successful. |
| Mining contractor | STRACON Chile SpA | Non-binding LOI, 1 Jul 2026. Alliance-style framework; STRACON is the preferred contractor. |
| Process engineering | GR Engineering Services (GRES) | Engaged for process design |
| Environmental (EIS) | Pares & Alvarez Ingeniería y Proyectos SA | 12-month baseline completed around August 2026. EIA submission targeted for Q1 2027. |
Financial Narrative
Basis: FY2025 Annual Report (including its audited five-year summary), TY2024 comparatives, H1 2026 data from Quartr and the June 2026 quarterly, and StockAnalysis for income lines not in the five-year summary. All figures are A$ thousands unless noted. TY2024 covers six months only.
Income statement
Notes:
-
Margins (gross, operating, EBITDA, net) and revenue CAGR are not meaningful, because sales revenue is zero in every period.
-
The attributable-loss figures for FY2022–FY2024 come from StockAnalysis; the group figures come from the Annual Report.
-
The EPS series appears restated for the December 2025 15:1 consolidation in the FY2025 Annual Report. The FY2022 EPS of -12.54c would be about -0.84c on a pre-consolidation basis.
FY2025 expense composition (A$ thousands; FY2025 Annual Report)
Commentary.
Most of the FY2025 loss was non-cash or one-off: The A$5.17M loss is dominated by three items: share-based payments (A$1.55M), legal and professional fees (A$1.08M, linked to the Wanaco litigation, the capital raisings and the consolidation), and a A$0.93M provision against Chilean VAT receivables. Underlying cash overhead is modest: operating cash outflow was A$2.86M.
Exploration is capitalised, not expensed: Accounting losses therefore understate total cash burn materially. FY2025 exploration cash payments were A$13.57M against an operating outflow of A$2.86M.
The FY2024 loss was unusually low: The A$0.29M loss reflects a non-operating gain of about A$0.97M (StockAnalysis "other non-operating income"). Its nature is not detailed in the sources reviewed.
Balance sheet
"n/d" means not disclosed in the sources reviewed. The June 2026 term deposit matured on 5 June 2026 and was folded into cash (June 2026 Quarterly).
The June 2026 net cash figure is on a cash-only basis; the lease balance at that date is not disclosed.
Commentary. The balance sheet is simple and debt-free. Capitalised E&E of A$55.2M is the dominant asset; it rose by A$12.9M in FY2025 and by about A$13.2M more in H1 2026. Equity almost doubled in FY2025 to A$85.8M on A$45.1M of gross equity raised. No impairment has been recorded on the E&E asset.
Cash flow
In H1 2026, cash fell by about A$6.9M on a reported basis. Including the matured A$8.0M term deposit, total liquidity fell by about A$14.9M (from A$30.2M to A$15.29M), consistent with about A$7M per quarter of total spend.
Quarterly liquidity trajectory
Q1-2026 is the approximate A$22M cash figure management cited at Noosa. Q4-2025 includes the term deposit, per the audited accounts. Management indicated a burn of about A$7M per quarter, which implies September 2026 quarter-end cash of roughly A$8M. That figure is an analyst inference, not publicly disclosed at the dossier date. One aggregator (goldstockdata) shows "~A$2.1M cash" as of 6 October 2026.
Ratios
TY2024 return ratios are for six months and are not annualised. "n.m." means not meaningful for a pre-revenue company.
Trend and inflection commentary. The decisive financial inflection was the A$45.1M raised in FY2025: A$11.1M in June 2025 and A$34M in December 2025. That moved the company from near-cash-exhaustion (A$0.3M cash at June 2024) to a funded DFS programme. Spend has since accelerated sharply, to about A$7M per quarter, with five rigs running in early 2026 and the DFS, EIA and engineering workstreams under way.
The company remained unlevered through H1 2026. The next inflection is a funding event in late 2026 or 2027, because:
-
cash is falling towards single-digit millions by the September 2026 quarter, on the guided burn rate;
-
the performance-rights hurdles for FY2026 include a capital raise of at least A$20M by 31 December 2026, which signals Board expectations;
-
project capex of about US$276.5M will need a debt/equity/lease package.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Revenue
| Segment (as reported) | Contents | Products / services | Revenue FY2023 | Revenue FY2024 | Revenue FY2025 | Segment result |
|---|---|---|---|---|---|---|
Exploration & evaluation – Chile (El Zorro) | Ternera deposit; El Zorro concessions (~570 km²); Tesoro Mining Chile SpA; El Zorro SCM | Gold resources and reserves (no sales) | 0 | 0 | 0 | Not separately disclosed in the documents reviewed; group loss used below |
Corporate – Australia | Parent entity, treasury, listing and governance | — | 0 | 0 | 0 | — |
“—” = not publicly disclosed.
Results by Segment
| Metric (AUD K) | FY2022 | FY2023 | FY2024 | TY2024 | FY2025 |
|---|---|---|---|---|---|
Interest and other income | 0 | 40 | 20 | 108 | 320 |
Loss after tax | -5,349 | -2,869 | -289 | -922 | -5,166 |
Group Entities
| Entity | Jurisdiction | Ownership | Role |
|---|---|---|---|
Tesoro Gold Limited | Australia | Listed parent | Holding company, corporate and treasury |
Tesoro Mining Chile SpA | Chile | 95% owned by Tesoro Gold | Holds the El Zorro joint-venture interest |
El Zorro SCM (Sociedad Contractual Minera) | Chile | 95.4% owned by Tesoro Mining Chile SpA per the FY2025 Annual Report and May 2026 AGM boilerplate. The August 2026 MRE release and September 2026 reserve coverage state 94.5%; see discrepancy note below. | Owns the El Zorro concessions. Joint-venture partner: Wanaco SpA (minority). |
Effective interest metric | Value | Source | — |
Effective group interest in El Zorro | ≈90.6% | FY2025 Annual Report | — |
Non-controlling interest in equity, 31 Dec 2025 (AUD K) | 1,979 | FY2025 Annual Report | — |
Income Statement and Per-Share Data
| Metric (AUD K) | FY2022 | FY2023 | FY2024 | TY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue (sales) | 0 | 0 | 0 | 0 | 0 |
Interest and other income | 0 | 40 | 20 | 108 | 320 |
Gross profit | 0 | 0 | 0 | 0 | 0 |
EBITDA | -5,436 | -2,823 | -245 | -975 | -5,361 |
EBIT (operating income proxy) | -5,374 | -2,891 | -307 | -1,004 | -5,487 |
Pre-tax income | -5,349 | -2,869 | -289 | -922 | -5,166 |
Net loss after tax (group) | -5,349 | -2,869 | -289 | -922 | -5,166 |
Net loss attributable to members | -5,063 | -3,150 | -340 | -932 | -4,978 |
Basic EPS (A$ cents) | -12.54 | -4.78 | -0.45 | -0.93 | -4.05 |
Diluted EPS (A$ cents) | -12.54 | -4.78 | -0.45 | -0.93 | -4.05 |
Dividends per share (A$ cents) | 0 | 0 | 0 | 0 | 0 |
H1 2026 Metric Details
| H1 2026 metric | Value |
|---|---|
Net loss after tax (AUD) | 2,411,923 |
Total comprehensive loss (AUD) | 4,796,103 (implies a negative FX translation movement) |
Basic / diluted loss per share (A$ cents) | -1.35 |
E&E expenditure capitalised in the half (AUD Mn) | 13.15 |
Expense line
| Expense line | TY2024 | FY2025 |
|---|---|---|
Equity-based payments | 41 | 1,545 |
Legal and professional fees | 196 | 1,079 |
VAT bad-debt provision (net) | -53 | 930 |
Employee-related expenses | 252 | 650 |
Corporate and compliance | 288 | 537 |
Administration | 125 | 294 |
Consultants | 137 | 261 |
Depreciation | 29 | 126 |
Balance Sheet
| Metric (AUD K) | Jun-2024 | Dec-2024 | Dec-2025 | Jun-2026 |
|---|---|---|---|---|
Cash and cash equivalents | 302 | 3,857 | 22,171 | 15,290 |
Term deposits (other current assets) | 0 | 0 | 8,031 | 0 |
Trade and other receivables | — | 684 | 1,650 | — |
Capitalised exploration and evaluation | — | 42,241 | 55,182 | — |
Total assets | — | 47,431 | 87,641 | — |
Total liabilities | — | 1,133 | 1,846 | — |
Lease liabilities (total) | — | 262 | 220 | — |
Borrowings (short / long) | 0 | 0 | 0 | 0 |
Total equity | 36,987 | 46,298 | 85,794 | — |
Goodwill and intangibles | 0 | 0 | 0 | 0 |
Working capital | — | 3,628 | 30,181 | — |
Net cash metric (AUD K)
| Net cash metric (AUD K) | Dec-2024 | Dec-2025 | Jun-2026 |
|---|---|---|---|
Net cash (cash + term deposits − lease liabilities) | 3,595 | 29,982 | 15,290 |
Cash Flow
| Metric (AUD K) | TY2024 | FY2025 |
|---|---|---|
Operating cash flow | -676 | -2,857 |
Exploration and evaluation payments (capex) | -4,918 | -13,565 |
Purchase of plant and equipment | -8 | -89 |
Free cash flow (OCF − E&E − PP&E) | -5,601 | -16,511 |
Placement in term deposits | 0 | -8,031 |
Proceeds from share issues | 9,715 | 45,270 |
Share issue costs | -600 | -2,423 |
Dividends paid | 0 | 0 |
Buybacks | 0 | 0 |
Net change in cash | 3,485 | 18,246 |
Key Financials
| Metric (AUD Mn) | Q4-2025 | Q1-2026 | Q2-2026 |
|---|---|---|---|
Cash and term deposits | 30.2 | 22.0 | 15.29 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | TY2024 | FY2025 |
|---|---|---|
ROE (%, attributable loss / average equity) | -2.3 | -7.8 |
ROA (%, loss / average assets) | -2.2 | -7.6 |
Current ratio (x) | 4.97 | 19.06 |
Debt / equity (x, leases only) | 0.006 | 0.003 |
Net debt / EBITDA
| Net debt / EBITDA | n.m. (net cash) | n.m. (net cash) |
|---|---|---|
Asset turnover | 0 | 0 |
Region revenue (AUD K)
| Region revenue (AUD K) | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Australia (interest and other income) | 40 | 20 | 320 |
Chile (sales revenue) | 0 | 0 | 0 |
Region asset (AUD K)
| Region asset (AUD K) | Dec-2024 | Dec-2025 |
|---|---|---|
Chile – capitalised E&E (El Zorro) | 42,241 | 55,182 |
Group cash and term deposits (largely Australia) | 3,857 | 30,202 |
Share Price
| Metric | FY2022 | FY2023 | FY2024 | TY2024 | FY2025 |
|---|---|---|---|---|---|
Period-end share price (A$, consolidation-adjusted) | 0.75 | 0.405 | 0.45 | 0.30 | 1.31 |
Return metric
| Return metric | Value | Basis |
|---|---|---|
Latest price (AUD), 15 Oct 2026 | 0.89 | StockInvest |
YTD 2026 (%) | -32 | From A$1.31 to A$0.89 |
1-year (%), Noosa reference, Jul 2026 | 85 | Investing.com |
1-year (%), USD basis, 20 Sep 2026 | 0 | Mining Forum Americas |
3-year (%), from 30 Jun 2023 | 120 | From A$0.405 to A$0.89 |
5-year | Not computed | — |
Valuation Snapshot
| Metric | Value |
|---|---|
Market capitalisation (AUD Mn) | 160 |
Last reported cash (AUD Mn, Jun 2026) | 15.3 |
Enterprise value (AUD Mn) | 145 |
Attributable reserve (Moz, at 90.6% effective) | 1.16 |
EV per attributable reserve ounce (A$/oz) | 125 |
Attributable resource (Moz) | 1.65 |
EV per attributable resource ounce (A$/oz) | 88 |
P/NPV (market cap vs attributable PFS NPV) | 0.12 |
P/e Details
| P/E | n.m. (loss) |
|---|---|
P/B (x, A$160M / A$83.8M equity to owners at Dec 2025) | 1.9 |
Capital Markets
| Item | Status |
|---|---|
Dividend history | None paid or declared, ever |
Dividend policy | None (pre-revenue) |
Credit ratings (Moody's / S&P / Fitch) | Not rated |
Debt maturity profile | No debt. Lease liabilities of A$220k (Dec 2025). |
Potential dilution instruments | 1,000,000 options at A$0.54 (expire Jun 2028); 6,344,000 performance rights; 123,751 share rights |
Placement capacity | LR 7.1 plus LR 7.1A (approved at the 29 May 2026 AGM) |
Analyst Conclusions
Management guidance
| Item | Guidance |
|---|---|
| DFS completion | End-CY2026 |
| EIA submission | Q1 2027 |
| Permits | Mid-to-late 2027 |
| Capex | Below US$350M (Noosa); PFS US$276.5M including lease |
| AISC | US$1,300–1,350/oz guided at Noosa vs US$1,572/oz at PFS |
| Production | More than 110koz/yr over about 13 years (Scoping basis) |
No consensus revenue or EPS forecasts are publicly available for the pre-production period.
Bull case
-
Deep value against NPV. The market values Tesoro at about 0.12x attributable PFS NPV, and about A$125 per attributable reserve ounce, despite a reserve designed at US$3,000/oz against spot of about US$4,400/oz. Typical re-rating through DFS, permitting and financing could multiply the valuation.
-
Infrastructure-led de-risking. Coastal access, grid renewable power and desalinated water make El Zorro one of the logistically simplest greenfield gold builds in South America. That supports both lower capex risk and faster construction.
-
Organic growth and a strategic floor. The unconstrained resource is 1.93Moz, there are deep high-grade intercepts, and a 30–40km IRGS corridor remains largely untested. Gold Fields' strategic stake provides a natural acquirer or funding partner.
Bear case
-
Funding overhang. About A$15M cash (June 2026) against about A$7M/quarter burn and US$276.5M capex. Near-term equity raises are likely at, or below, current prices, and the eventual build financing could be heavily dilutive.
-
Thin margins at lower gold. The AISC of US$1,572/oz on a 0.93g/t reserve has already risen about 29% from the Scoping Study. NPV halves (to US$557M) at −20% gold, and cost creep through the DFS is plausible.
-
Timeline and legal risk. Permitting is not expected before mid-to-late 2027, and the Wanaco appeal is pending. The "FID by end-2026" ambition stated in March 2026 looks unachievable on the company's own permitting schedule.
Catalysts and monitorables (next 12 months)
| Expected timing | Catalyst / monitorable |
|---|---|
| By 31 Oct 2026 | September 2026 quarterly: cash balance and burn |
| Q4 2026 – Q1 2027 | Equity raise: size, price, and Gold Fields participation |
| End-CY2026 | DFS: capex, AISC and production profile versus the PFS |
| Q1 2027 | EIA / sectorial permit lodgement |
| 2026 – 2027 | Definitive power agreement (Tecnocap) and water agreement (AguasCap) |
| 2026 – 2027 | STRACON alliance formalisation |
| 2026 – 2027 | Debt term sheets (BurnVoir process) |
| Ongoing | Ternera East, La Brea and Peña Blanca drilling results |
| Ongoing | Wanaco appeal outcome |
| Ongoing | Gold price and AUD/USD |
| Ongoing | Any strategic approach |
Analyst verdict
Tesoro Gold has done what most junior explorers never manage. It discovered a new deposit style in a premier jurisdiction, grew it methodically to 1.82Moz, converted 1.28Moz to a JORC reserve, and assembled a credible development concept anchored by simple metallurgy and outstanding infrastructure. The September 2026 reserve marks the transition from explorer to developer. The headline PFS-level economics are compelling at current gold prices, even after acknowledging the ±35% accuracy band: a post-tax NPV of about US$1bn and a 57% IRR against a market capitalisation of about A$160M.
Yet the equity is priced at a steep discount to NPV for identifiable reasons. The company is a single-asset developer with weeks-to-months of runway rather than years. It needs to fund a capex bill about 25 times its cash, and it faces a Chilean permitting process that its own schedule puts into mid-to-late 2027. Cost estimates have drifted upward with each study: AISC went from US$1,216 to US$1,572/oz, and capex guidance has been revised. Governance is lean, with no committees and limited board independence, and disclosure has required correction twice in 2026.
On balance, Tesoro offers asymmetric, gold-levered exposure. The most likely near-term path is a sizeable equity raise around the DFS. That raise is likely to be at least partly supported by Gold Fields, whose stake and board seat make it the obvious long-term strategic counterparty.
For investors, the key test is the DFS. If it holds capex near US$280M and AISC below about US$1,600/oz, and if financing is secured with tolerable dilution, a substantial re-rating towards 0.3–0.5x NPV is plausible. If costs slip further or the raise is deeply discounted, the stock will likely remain range-bound. In short: a fundamentally sound asset whose value realisation hinges on funding execution and permitting time.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Title | Appointed | Background | Education |
|---|---|---|---|---|
Mark Connelly | Non-Executive Chairman | 3 Jun 2024 | Resource finance and commercial executive. Involved in the sale of Papillon Resources (about US$570M) and the Endeavour Mining/Adamus Resources consolidation (US$597M). Current boards: Catalyst Metals (from 2 Mar 2026), BeMetals, Renegade Exploration, Antares Metals. Several recent former directorships. | — |
Zeffron (Zeff) Reeves | Managing Director | 29 Jan 2020 | Geologist with over 25 years' experience. Former MD of Metallum Ltd (Chile projects); roles at Cleveland Mining and Ashburton Minerals (Brazil). Director of Culpeo Minerals. | BAppSc (Hons) Applied Geology; MBA (Curtin); MAIG |
Linton Putland | Executive Director – Mining & Development | 14 Sep 2021 | Mining engineer with over 35 years' experience. Prior roles at IAMGOLD, AurionGold, Delta Gold and Pancontinental. Principal of LJ Putland & Associates. Former director of Podium Minerals and Breaker Resources. | BEng (Mining, WASM); MSc Mineral Economics (WASM); MAusIMM; GAICD |
Geoffrey McNamara | Non-Executive Director | 29 Jan 2020 | Geologist with over 30 years' experience (Ivanhoe Mines, LionOre, WMC). Private equity background; former director of Société Générale's Mining Finance team in New York. Director of Culpeo Minerals. | BSc Applied Geology; GradDip Applied Finance (FINSIA); FAusIMM; MAICD |
Alan Gibson | Non-Executive Director (Gold Fields nominee) | 30 Aug 2023 | M&A lawyer; VP Legal – Corporate Development at Gold Fields. Worked on the Gold Road, Osisko and Gruyère transactions and on Salares Norte funding. | LLB, BEcon (Murdoch) |
Emma Curnow | Chief Financial Officer | 22 Jul 2025 | Former CFO and Company Secretary of ASX- and AIM-listed miners | — |
Sarah Wilson | Company Secretary (contract) | 31 Oct 2025 | Over 12 years in listed-company governance; Director of Magnolia Corporate | — |
“—” = not publicly disclosed.
Directors' Remuneration
| Name | Salary / fees | Superannuation | Performance rights (share-based) | Total | % performance-based |
|---|---|---|---|---|---|
Zeffron Reeves (MD) | 322,075 | 32,700 | 367,755 | 722,530 | 50.9 |
Linton Putland (ED) | 357,484 | 35,250 | 263,252 | 655,986 | 40.13 |
Geoffrey McNamara (NED) | 50,000 | 0 | 189,269 | 239,269 | 79.1 |
Mark Connelly (Chair) | 67,265 | 7,904 | 97,836 | 173,005 | 56.55 |
Alan Gibson (NED) | 0 | 0 | 0 | 0 | 0 |
Total | 796,824 | 75,854 | 918,112 | 1,790,790 | — |
Governance Overview
| Attribute | Status |
|---|---|
Board size | 5 |
Independent NEDs | Connelly (independent Chair). McNamara receives consulting fees via Tanamera and has a long-standing association with Reeves via Culpeo, so his independence is debatable. Gibson is a nominee of a substantial shareholder, so not independent under ASX guidance. On a strict reading, only 1 of 5 directors is clearly independent. |
Chair / CEO separation | Yes (Connelly / Reeves) |
Committees | None. The full Board performs the nomination, remuneration, audit and risk functions (FY2025 Annual Report). |
Gender diversity | No women on the Board at 31 Dec 2025. The CFO and contract Company Secretary are women. |
Board meetings, FY2025 | 5; 100% attendance |
Board & Management Changes
| Date | Change |
|---|---|
3 Jun 2024 | Connelly appointed Chair |
22 Jul 2025 | Curnow appointed CFO, replacing Graeme Morissey |
31 Oct 2025 | Wilson appointed Company Secretary, replacing Sue Wong (Source Governance) |
Q2 2026 | In-country team strengthened with construction and development personnel from Chilean and Peruvian projects (names not disclosed) |
Major Shareholders
| Holder | Shares | Approx. % | Source / date |
|---|---|---|---|
Gold Fields Limited (via Corporate International Holdings) | 23,017,783 | 12.8 | Simply Wall St (Oct 2026 data) |
Collins St Asset Management | 19,041,159 | 10.6 | Simply Wall St |
Ruffer LLP | 9,476,998 | 5.3 | Simply Wall St (one view shows 6.31%) |
Aigle Royal Consolidated Pty Ltd | 5,600,000 | 3.1 | Simply Wall St |
Zeffron Reeves (Palin Trust) | 5,048,294 | 2.8 | FY2025 Annual Report (post 700k conversion) |
Konwave AG (Gold 2000) | 3,866,666 | 2.1 | Simply Wall St |
Geoffrey McNamara (Tanamera Resources) | 2,368,060 | 1.3 | FY2025 Annual Report |
Kenneth Hall | 1,949,383 | 1.1 | Simply Wall St |
Michael Piperoglou | 1,074,429 | 0.6 | Simply Wall St |
Katepip Investments Pty Ltd | 953,630 | 0.5 | Simply Wall St |
Competitive Landscape
Key Competitors
| # | Competitor | Listing | Segment overlap | Positioning vs Tesoro |
|---|---|---|---|---|
| 1 | Gold Fields (Salares Norte) | JSE/NYSE: GFI | Chilean gold production; also Tesoro's strategic holder | Major producer. Salares Norte is a high-altitude Andean project, a logistical contrast to coastal El Zorro. |
| 2 | Kinross Gold (La Coipa / Maricunga) | TSX/NYSE: K | Chilean gold operations | Major; Andean high-altitude assets |
| 3 | Rio2 Ltd (Fenix Gold) | TSX: RIO | Chilean heap-leach gold developer/producer (Maricunga belt) | Closest Chilean junior analogue; lower-grade heap leach at altitude |
| 4 | Austral Gold | ASX/TSXV: AGLD | Chilean/Argentine gold-silver producer | Small producer |
| 5 | Torres del Paine / other Coastal Cordillera juniors | Various | Coastal Cordillera exploration | Exploration-stage; Tesoro is more advanced |
| 6 | Barton Gold | ASX: BGD | ASX gold developer (South Australia) | Comparable capital-markets peer |
| 7 | Astral Resources | ASX: AAR | ASX open-pit developer (WA) | Comparable scale and study stage |
| 8 | Turaco Gold | ASX: TCG | ASX developer (Côte d'Ivoire) | Comparable: multi-Moz open-pit developer in a foreign jurisdiction |
| 9 | Brightstar Resources | ASX: BTR | ASX developer/producer (WA) | Capital-markets peer |
| 10 | Culpeo Minerals | ASX: CPO | Chilean copper explorer | Shares directors (Reeves, McNamara); not a direct competitor but competes for the same investor pool |
Competitor Detail
| Metric | Tesoro Gold |
|---|---|
Stage | DFS (maiden reserve Sep 2026) |
Revenue FY2025 (AUD Mn) | 0 |
Resource (Moz) | 1.82 constrained / 1.93 unconstrained |
Reserve (Moz) | 1.28 |