Tilt Renewables Limited - Company showcase

Year Founded & Workforce

2016

Tilt Renewables Limited logo

Tilt Renewables Limited Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

Tilt Renewables Limited Overview

Tilt Renewables describes itself as Australia's largest owner and operator of wind and solar generation, and as the largest privately held renewable generator in the country. It runs about 1.9 GW of operating capacity across roughly a dozen wind, solar and battery assets in New South Wales, Victoria, Queensland and South Australia, and it has a development pipeline above 5 GW. It is backed by two of Australia's largest sovereign and state-linked infrastructure investors, QIC and the Future Fund. That gives it permanent, patient capital that differs from listed developers and from developers backed by private equity. The business model is long-term contracted ownership: it sells output through long-dated power purchase agreements with AGL, Newmont (Cadia) and Snowy Hydro, plus government support mechanisms such as Victoria's VRET and the Commonwealth Capacity Investment Scheme. Since late 2025 it has broken an industry-wide wind final investment decision drought, sanctioning Waddi (WA) and Palmer (SA). The gigawatt-scale Liverpool Range project (NSW) is its next major catalyst.


What the company does. Tilt Renewables develops, finances, builds, owns and operates utility-scale renewable generation and storage in Australia. Its activities cover the whole asset lifecycle:

  • site origination and acquisition of early-stage projects;

  • planning and environmental approvals (state development consent and federal EPBC Act approval);

  • grid connection;

  • offtake origination (PPAs);

  • procurement of turbines and balance-of-plant contracts;

  • construction management;

  • long-term asset operation and energy-market trading.

Company's own description. On its website, Tilt calls itself Australia's biggest producer of renewable energy and says it is committed to leading and growing the country's renewable future. Its 2025 Sustainability Report, announced by CEO Anthony Fowler, cites a 1.9 GW operating portfolio and a pipeline above 5 GW. The company name refers to wind turbines tilting to catch the wind and solar panels tilting towards the sun (Tilt "Our Story" page).

Business model and revenue model. Revenue comes almost entirely from selling electricity and environmental certificates, historically Large-scale Generation Certificates (LGCs). It comes through three channels:

There is no product, subscription or licensing revenue. Revenue is a function of installed capacity, wind and solar resource (P50 versus actual), contract prices, curtailment and network constraints, and spot prices.

Value chain position. Tilt sits in the generation and asset-owner segment of the electricity value chain. It is upstream of retailers (gentailers such as AGL, which are its customers) and downstream of equipment OEMs (Vestas) and EPC contractors (BMD, Decmil, RJE). It does not own transmission or sell to households.

Customer types.

  • Gentailers: AGL, plus Snowy Hydro historically.

  • Large industrial and mining buyers: Newmont/Newcrest Cadia.

  • State and Commonwealth counterparties under support schemes: Victorian Government VRET; Commonwealth CIS via AEMO Services.

End-markets served.

  • National Electricity Market (NEM): NSW, Victoria, Queensland, South Australia.

  • Wholesale Electricity Market (WEM / SWIS): Western Australia, from about 2028 when Waddi enters operation.

Independent characterisation. Tilt is best understood as a contracted infrastructure platform with development optionality. The operating base of about 1.9 GW is a cash-yielding, largely contracted portfolio. The development pipeline (Liverpool Range up to 1.3 GW, Palmer 288 MW, Waddi 108 MW, Snowtown BESS and several early-stage wind projects) is the growth engine. Its competitive edge is not technology; it is capital, scale, approvals and offtake relationships.

The AGL relationship is both its biggest strength and its main concentration risk. AGL is no longer a meaningful equity holder but remains its largest customer. Ownership by QIC and the Future Fund supports a low cost of capital and a long investment horizon. The trade-off is that the company has no public-market discipline or disclosure.

Strategy

Stated strategy themes. These are drawn from company communications; no annual report is publicly filed.

  1. Purpose: to drive Australia's renewable future while creating lasting benefits for communities, partners and the environment (Fowler, 2025 Sustainability Report release).

  2. Scale leadership: maintain the position as Australia's largest owner of wind and solar generation, with an emphasis on being Australian-owned.

  3. Pipeline conversion: move the 5 GW+ pipeline to FID. Two wind FIDs were achieved (Waddi in December 2025, Palmer in January 2026), and Liverpool Range is targeted next.

  4. Firming and storage: add batteries (Latrobe Valley BESS operating; Snowtown BESS in development).

  5. Community benefit sharing: in the 2025 report year, Tilt shared over A$1.1m with communities and provided over A$2.8m to local councils.

  6. Long-term sovereign capital: CEO Fowler cites long-term sovereign investors as the foundation for growth (RenewEconomy, November 2025).

Strategic initiatives in the last 24 months.

Medium-term targets / guidance. No financial guidance is published. The operational target is first power at Palmer in December 2028 and Waddi COD in 2028.

Products & Services

Tilt's "products" are generation assets and the electricity and certificates they produce. The catalog below lists each operating asset and each disclosed development project. Capacity figures come from company sources and trade press where available. Ownership is 100% unless stated.

Development and Construction Pipeline

Services. Tilt does not offer third-party services commercially. Its O&M arrangements are largely contracted with OEMs; for example, Vestas will provide 30 years of service for Waddi.

Pricing. PPA prices are not publicly disclosed. The only historical reference points are listed-era NZ PPA prices of about NZ$64–68/MWh (Forsyth Barr), which are no longer relevant to the current platform.

Product Portfolio

AssetStateTechnologyCapacityCOD / statusKey offtake / notesSource

Coopers Gap Wind Farm

QLD

Onshore wind

453 MW

Operating (ex-PowAR)

Long-term offtake to AGL (part of about 1.6 GW AGL contracted capacity)

QIC via Rejobs; Tilt website

Rye Park Wind Farm

NSW

Onshore wind (66 Vestas V162-6.0 MW)

396 MW

Commenced operations / officially opened May 2025

About 55% to Newmont (Cadia) under a 15-year PPA; 45% to AGL under a 15-year PPA

RenewEconomy; ecogeneration; Tilt

Dundonnell Wind Farm

VIC

Onshore wind (80 Vestas V150-4.2 MW; 114 m hub, 150 m rotor)

336 MW

First generation March 2020; full operation 2022

VRET support agreement (about 37%) plus 15-year offtake (50%; Snowy Hydro)

Wikipedia; NZX 326016

Silverton Wind Farm

NSW

Onshore wind

199 MW

Operating (ex-PowAR)

AGL offtake

QIC via Rejobs

Boco Rock Wind Farm

NSW

Onshore wind (67 turbines)

113 MW

Operating since 2015; acquired 2025

Stage 2 (about 20 additional turbines) approved; not shown in website asset navigation at time of review

RenewEconomy, February 2025

Nyngan Solar Farm

NSW

Utility solar PV

102 MW

Operating (ex-PowAR)

AGL offtake

QIC via Rejobs

Latrobe Valley BESS

VIC

Battery storage

100 MW / 200 MWh

Officially opened September 2025

Merchant and ancillary services (contract structure not publicly disclosed)

Renewables Now

Snowtown Wind Farm (Stage 1)

SA

Onshore wind

About 98 MW

Commissioned 2008

Stage 2 sold to Palisade in 2019

Rejobs/Wikipedia

Salt Creek Wind Farm

VIC

Onshore wind

54 MW

COD July 2018

12.5-year offtake with Meridian (FY18 release)

FY18/FY19 results

Broken Hill Solar Farm

NSW

Utility solar PV

About 53 MW (capacity not confirmed in sources reviewed)

Operating (ex-PowAR)

AGL offtake

Tilt website

Blayney Wind Farm

NSW

Onshore wind

About 10 MW (capacity not confirmed in sources reviewed)

Operating

Not publicly disclosed

Tilt website

Crookwell Wind Farm

NSW

Onshore wind

5 MW (about 8 GWh/yr)

Commissioned 1998

Not publicly disclosed

Rejobs/Wikipedia

Total

——

About 1.9 GW

——

Tilt Sustainability Report 2025; Reuters, November 2025

ProjectStateTechnologyCapacityStatus (October 2026)Key factsSource

Liverpool Range Wind Farm

NSW (Central-West Orana REZ, near Coolah)

Onshore wind

Up to 1.3 GW (Stage 1 at least 634 MW)

Pre-FID; EPBC approved March 2025; CISA (Stage 1) October 2025; REZ access rights May 2025; FID targeted Q4 2026 per Tilt recruitment material

Construction cost over A$2bn; about 550 construction jobs, about 40 ongoing; about 2.5 Mt CO2 avoided per year; enough for about 570,000 homes

Tilt release, March 2025; Energy Global; Rejobs job ad

Palmer Wind Farm

SA (70 km east of Adelaide)

Onshore wind (40 Vestas turbines, down from 103 originally)

288 MW

FID January 2026; construction started July 2026; first power targeted December 2028

45% to AGL under a 15-year fixed-price PPA; BMD principal contractor; ElectraNet connection; Jacobs Owner's Engineer; over A$13m community benefits; about 142,000 homes

Energy Global; Energy Magazine; Reuters/DealStreetAsia

Waddi Wind Farm

WA (Shire of Dandaragan, about 150 km north of Perth)

Onshore wind (18 Vestas V162-6.0 MW EnVentus, 125 m hub, 206 m tip)

108 MW

FID December 2025; construction started 2026 (formal sod-turning about August 2026); COD 2028

100% to AGL (Perth Energy) under a 15-year PPA; Decmil about A$51m contract; Western Power, RJE; capex over A$400m; 30-year Vestas service; about 68,000 homes

RenewEconomy; Green Review; Utility Magazine

Snowtown BESS

SA

Battery storage

Not publicly disclosed

Development

Co-located with Snowtown

Tilt website

Boco Rock Stage 2

NSW

Onshore wind

About 20 turbines (MW not disclosed)

Approved

Expansion of acquired asset

RenewEconomy

Central Midlands Wind Farm

—

Onshore wind

Not publicly disclosed

Development

Listed on website

Tilt website

Nonowie Wind Farm

SA (per website listing)

Onshore wind

Not publicly disclosed

Development

Listed on website

Tilt website

Triamble Wind Farm

—

Onshore wind

Not publicly disclosed

Development

Listed on website

Tilt website

Outback Energy

—

Not publicly disclosed

Not publicly disclosed

Development

Listed on website

Tilt website

Financial Narrative

Data availability. Tilt Renewables has not published financial statements since FY2021 (year ended 31 March 2021). The tables below cover FY2017–FY2021, the last five publicly reported fiscal years of Tilt Renewables Limited, in AUD. Post-2021 figures for the merged PowAR/Tilt platform are not publicly disclosed. One aggregator (Bitscale, November 2025) lists annual revenue of about US$/A$97.8m. That figure is unverified, of unclear currency and period, and inconsistent with a 1.9 GW contracted portfolio, so it is excluded. Similarweb's "A$25–50M revenue" is a web-traffic heuristic and is also excluded.

Income Statement

Sources: FY17 results presentation (revenue A$174.5m reported in release, presentation shows 174.6; EBITDAF A$124.0m; FY16 revenue A$162.2m); FY18 release (A$158.0m / A$103.8m; DPS 3.05c vs 5.25c); FY19 release (A$193.3m / A$134.8m); FY20 release (A$170.2m / A$117.5m; earnings after tax A$478m including the SWF2 gain); FY21 release and presentation (A$128.3m / A$74.9m; generation costs A$23.1m vs A$31.0m); NBR (FY21 NPAT A$67m, down 86%). Margins and growth rates are analyst calculations.

Revenue CAGR FY2017–FY2021: about -7.4% per year (analyst calculation). This is distorted by the December 2019 divestment of Snowtown Stage 2 and the commissioning-phase output of Dundonnell. It does not reflect underlying portfolio growth.

Balance Sheet and Leverage: notes and sources

Sources: FY18 release (net debt A$598m); FY19 release (net debt A$595m, gearing 48%); FY21 release (gearing 29%, year-end cash and financial assets A$313m, no refinancing until 2023); FY17 presentation (net debt/EBITDAF 4.4x vs 4.3x in FY16; EBITDAF/interest 5.8x vs 5.6x). FY20: term deposits exceeded total borrowings and finance lease liabilities at 31 March 2020 after the SWF2 sale proceeds (FY20 release).

Cash Flow: notes and sources

Source: FY19 release (A$112.4m, up 31% from A$85.9m). Forsyth Barr's October 2020 table shows operating cash flow of 85.0 and 50.2 for FY19 and FY20. The FY19 figure differs slightly from the company's A$112.4m, which suggests a different basis or currency, so the FY20 broker figure is not adopted. Capex, FCF, dividends paid and buybacks are not publicly disclosed in sources reviewed.

Ratios

ROE, ROA, ROIC, current ratio, debt/equity, asset turnover and cash conversion cycle could not be computed from verified primary data and are not publicly disclosed in this dossier. The available leverage metrics are in 6.2.

Post-2021 Financing Indicators (private platform)

Commentary on trends and drivers. Through FY2017–FY2021, listed-era earnings were driven by three factors:

  1. Wind resource variability. New Zealand production in FY18 was below P90, and the FY21 EBITDAF guidance was cut on weak wind (Forsyth Barr, April 2021).

  2. Australian price and constraint dynamics. South Australian system-strength constraints curtailed Snowtown, with about 41 GWh lost in 1H FY19.

  3. Portfolio recycling. The SWF2 sale delivered a A$478m after-tax result in FY20 but cut recurring revenue.

EBITDAF margins stayed structurally high (about 66–71%) except in the FY21 transition year. That is typical of contracted wind assets with low variable costs.

Since 2021, the platform has grown from about 1.3 GW (pre-merger PowAR plus Tilt Australia) to about 1.9 GW through Rye Park, the Latrobe Valley BESS and Boco Rock. Revenue has almost certainly risen several-fold relative to the listed-era Australian segment, but the scale is not publicly disclosed. The forward capex programme is large: Waddi over A$400m, Palmer (cost not disclosed), and Liverpool Range over A$2bn. Leverage and debt quantum will therefore rise materially in 2026–2029, consistent with the about A$2.6bn financing sought.

Financial Detail

Function

FunctionLeaderScope

Development

Laurent Francisci, Chief Development Officer

Pipeline origination, approvals, construction delivery

Operations & Markets

Ross Edwards, EGM Operations & Markets

Asset operations, energy trading, portfolio optimisation

Finance

Hamish Irving, CFO

Treasury, project finance, reporting

Legal & Company Secretariat

Catherine Ahlberg

Legal, land contracts, governance

Corporate Affairs

Angela Catt

Government, media, sustainability, communities

People & Safety

Jenny Smith

HR, HSE

Revenue by Segment and Segment Margins & Growth (%)

MetricFY2019FY2020FY2021

Australia revenue (AUD Mn)

151129—

New Zealand revenue (AUD Mn)

4242—

Group revenue (AUD Mn)

193.3170.2128.3

Australia EBITDAF (AUD Mn)

10993—

New Zealand EBITDAF (AUD Mn)

2524—

Group EBITDAF (AUD Mn)

134.8117.574.9

Metric

FY2019

FY2020

Australia EBITDAF margin (%)

72.272.1

New Zealand EBITDAF margin (%)

59.557.1

Australia share of group revenue (%)

78.175.8

New Zealand share of group revenue (%)

21.724.7

Income Statement and Per-Share Data

MetricFY2017FY2018FY2019FY2020FY2021

Revenue (AUD Mn)

174.5158.0193.3170.2128.3

Generation costs (AUD Mn)

———31.023.1

EBITDAF (AUD Mn)

124.0103.8134.8117.574.9

Net financing costs (AUD Mn)

31.9————

Net profit after tax (AUD Mn)

———47867

Dividends per share (AUD cents)

5.253.05———

Metric

FY2017

FY2018

FY2019

FY2020

FY2021

EBITDAF margin (%)

71.165.769.769.058.4

Revenue growth YoY (%)

7.6-9.522.3-12.0-24.6

EBITDAF growth YoY (%)

-0.6-16.329.9-12.8-36.3

Key Financials and Margin Analysis (%)

MetricFY2017FY2018FY2019FY2020FY2021

Net debt (AUD Mn)

—598595——

Gearing (%)

——48—29

Cash and financial assets (AUD Mn)

————313

Net debt to EBITDAF (x)

4.4————

EBITDAF to interest expense (x)

5.8————

Cash Flow

MetricFY2017FY2018FY2019FY2020FY2021

Net operating cash flow (AUD Mn)

—85.9112.4——

Financial Analysis

ItemDetailSource

Acquisition debt (2021)

Pisa Acquisition SPV raised about A$1.2bn across multiple tenors

Infralogic

2023 refinancing

About A$1.5bn, including Coopers Gap-linked debt

Infralogic

April 2024

A$750m refinancing

Infralogic

August 2024

A$391m Asian term loan

Infralogic

2025 debt raise

Seeking about A$2.6bn (part refinancing, part greenfield for Waddi, Palmer and Liverpool Range)

Infralogic (about August 2025)

Equity valuation marker

AGL 20% stake book value A$321m at 30 June 2025, sold 19.9% for A$750m

AGL ASX, 10 November 2025

Revenue by Region and Region Margins & Growth (%)

RegionFY2019FY2020FY2021

Australia revenue (AUD Mn)

151129—

New Zealand revenue (AUD Mn)

4242—

Region

FY2019

FY2020

Australia revenue growth (%)

—-14.6

New Zealand revenue growth (%)

—0.0

Channel

ChannelFY2019FY2020

Australia spot revenue (AUD Mn)

3453

Australia PPA revenue (AUD Mn)

11776

State

StateApprox. operating capacity (MW)Share (%)

NSW (Rye Park, Silverton, Boco Rock, Nyngan, Broken Hill, Blayney, Crookwell)

About 878

About 46

Queensland (Coopers Gap)

453

About 24

Victoria (Dundonnell, Salt Creek, Latrobe Valley BESS)

490

About 26

South Australia (Snowtown Stage 1)

About 98

About 5

Western Australia

0 (Waddi under construction)

0

Marker

MarkerValueSource

Share price before the take-private announcement (19 October 2020)

NZ$3.97

Forsyth Barr

Market cap (October 2020)

NZ$1,493m

Forsyth Barr

Initial scheme price

NZ$7.80 per share

SIA, March 2021

Final scheme price

NZ$8.10 per share (about NZ$3bn implied market cap)

FY21 results

Implied FY22 EV/EBITDAF (whole TLT at NZ$7.80)

27.7x (NZ assets 15.4x; Australian assets 37.4x)

Forsyth Barr, March 2021

Implied NZD Mn per MW

3.7 (NZ 2.3; Australia 4.7)

Forsyth Barr

Implied 100% equity value from AGL 2025 sale

About A$3.77bn (analyst calculation: A$750m / 19.9%)

AGL ASX

Per-Share Data

MetricFY2017FY2018FY2019FY2020FY2021

DPS (AUD cents)

5.253.05———

Facility

FacilitySizeTimingSource

Acquisition debt (Pisa Acquisition)

About A$1.2bn

2021

Infralogic

Refinancing

About A$1.5bn

2023

Infralogic

Refinancing

A$750m

April 2024

Infralogic

Asian term loan

A$391m

August 2024

Infralogic

New facility sought

About A$2.6bn

2025

Infralogic

Maturity profile

Not publicly disclosed

——

Analyst Conclusions

Management guidance: No financial guidance is published. Operational milestones:

  • Waddi COD in 2028.

  • Palmer first power targeted December 2028.

  • Liverpool Range Stage 1 FID targeted Q4 2026.

Consensus: Not applicable (no sell-side coverage).

Bull case

  1. Capacity could roughly double by about 2030. Waddi (108 MW), Palmer (288 MW) and Liverpool Range Stage 1 (at least 634 MW) would add about 1 GW to the 1.9 GW base. Liverpool Range at full build (1.3 GW) and Boco Rock Stage 2 would add more.

  2. Contracted, policy-supported revenue. AGL PPAs (about 1.6 GW plus new projects), the Newmont PPA, and CIS underwriting for Liverpool Range give the bulk of new capacity revenue floors before FID.

  3. Valuation momentum. QIC and the Future Fund paid A$750m for 19.9%, about 2.3 times AGL's book value. Demand drivers (coal exits, data centres) support asset values.

Bear case

  1. Execution risk is stacking up. Three major builds overlap in 2026–2029, at a time when the industry suffered a wind FID drought driven by cost, planning and community issues. Liverpool Range alone costs over A$2bn.

  2. Concentration on AGL. AGL has exited the equity but remains the dominant offtaker. A deterioration in AGL's credit or appetite, or a dispute, would hit Tilt disproportionately.

  3. Leverage and opacity. About A$2.6bn of new debt and no public financial disclosure make it hard for outside stakeholders to assess risk. Curtailment and negative pricing could erode merchant earnings.

Key catalysts and monitorables (next 12 months)

Analyst verdict. Tilt Renewables today is a different entity from the dual-listed TLT that this request targeted. The trans-Tasman wind company was split in 2021. Its New Zealand assets went to Mercury, and its Australian business was merged into PowAR. The resulting platform is Australia's largest privately held wind and solar generator. In late 2025, AGL's sale of almost all its 20% stake brought the company effectively under full ownership of QIC and the Future Fund. The A$750m price, more than double AGL's book value, is the clearest public valuation marker since delisting. It implies an equity value of about A$3.8bn for the whole platform.

Strategically, Tilt has done what most Australian wind developers could not: it reached two wind FIDs (Waddi and Palmer) during the 2025 investment drought. It did so on the back of AGL's long-term offtake and Commonwealth support schemes. Its 1.9 GW operating base is high quality, geographically diversified across four NEM states, and largely contracted. Liverpool Range, with approvals, REZ access and a CISA already in place, gives it a credible path to roughly 3 GW of operating capacity by the end of the decade.

The main risks are concentration, execution and transparency. Tilt depends heavily on AGL as an offtaker. It is running a construction programme that will substantially increase leverage. And it publishes no audited financials, so lenders and shareholders hold an information advantage that public observers lack.

On balance, Tilt is best seen as a high-quality, long-duration infrastructure asset with substantial delivery risk over the next three years. Its sovereign ownership is both a funding strength and a governance constraint. The Liverpool Range FID, expected around Q4 2026, is the single most important near-term catalyst: success would confirm Tilt's position at the top of Australia's onshore wind sector, while delay would expose how much of its valuation depends on pipeline conversion.


SOURCES

  • Tilt Renewables website: Our Leaders, Our Story, asset listings (tiltrenewables.com)

  • Tilt Renewables media releases: Rye Park opening (May 2025); Liverpool Range EPBC (6 March 2025); chair appointment (October 2025); 2025 Sustainability Report; CEO appointment (2024)

  • Tilt Renewables Limited market announcements: FY17 results presentation; FY18 results (10 May 2018); FY19 results (9 May 2019); FY20 results; FY21 results and annual report; Liverpool Range acquisition (7 March 2019); board appointments (July 2019, March 2020); March 2021 quarterly production

  • NZX announcements 326016 (Dundonnell FID / 1H FY19) and 334309 (FY19 results)

  • Forsyth Barr research: "Snowtown 2 Takes Wind Out of 1H21" (October 2020); "Tilting Up Up and Away" (March 2021); "FY21 Winds Down With Weak Wind" (April 2021)

  • AGL Energy ASX announcement, 10 November 2025 (via InvestSMART); Reuters via DealStreetAsia and World Ports, November 2025; The Nightly, November 2025

  • RenewEconomy: AGL stake sale; Waddi FID; Boco Rock acquisition; Rye Park opening; Waddi construction; 2021 takeover; Dundonnell FID

  • Energy Magazine: Palmer FID; AGL contribution to 2021 acquisition; CEO appointment (December 2023)

  • Energy Global: Palmer FID (January 2026); Liverpool Range CISA (October 2025); Waddi construction start (7 August 2026)

  • ESD News: Tilt Renewables tag listing and articles (chair, AGL sale, Rye Park, Latrobe BESS)

  • Infralogic / ION Analytics: AGL considering sale; co-owners prepare to buy; Tilt seeks A$2.6bn debt

  • pv magazine Australia: Tilt takeover completion (4 August 2021); Rye Park financial close

  • InDaily Qld (March 2021); FS Sustainability (August 2021)

  • Utility Magazine; Green Review; Finance News Network; ecogeneration; Renewables Now; Proximo; Infrastructure Pipeline; WA State of Energy

  • Wikipedia: Tilt Renewables; Powering Australian Renewables Fund; Dundonnell Wind Farm

  • Secondary / unverified profiles, used only where flagged: CB Insights; Bitscale; Similarweb; Rejobs (recruitment listings)

Executive Leadership

Executive Leadership Team

NameTitleTenure startPrior rolesEducation

Anthony Fowler

Chief Executive Officer

February 2024

CEO, Lochard Energy (about 8 years); Group Executive, AGL (generation portfolio, trading, C&I retail)

BSc (Hons), MAppFin; Harvard AMP

Hamish Irving

Chief Financial Officer

Not disclosed

Deputy CFO, Interim CFO and Head of Strategy & Commercial Finance at EnergyAustralia; senior finance and IR roles at Telstra; Centrica (UK)

BA, BCom (Univ. of Melbourne), CA, GAICD

Catherine Ahlberg

General Counsel & Company Secretary

November 2022

SNC-Lavalin, Viva Energy Australia, Royal Dutch Shell

LLM, LLB (Hons), BCom, GAICD

Laurent Francisci

Chief Development Officer

May 2024

COO, Neoen; leadership roles at Suez

MSc (Civil Eng), MBA, GAICD

Angela Catt

EGM Corporate Affairs (also styled EGM Government & Sustainability)

September 2024

Global Chief Sustainability & Financial Officer, Sims Lifecycle Services; Executive Director Energy Delivery, NSW Government; GM Commercial & Government, AGL New Energy

BSc, CA, GAICD

Ross Edwards

EGM Operations & Markets

September 2025

Executive, Trading and Transition, EnergyAustralia (7 years; 5 GW portfolio gross margin)

BCom, BEng (Univ. of Melbourne)

Jenny Smith

EGM People and Safety

June 2026

GM People, Safety & Sustainability, Lochard Energy; Origin Energy; AGR

BA, MAppSc, MA, PhD

Board of Directors

NameRoleAppointedAffiliation / backgroundIndependence

Philip Bainbridge

Independent Chairman

October 2025

Chair of Sims Limited, Global CCS Institute and Sino Gas & Energy; former director of Beach Energy and Newcrest; ex-Pacific National; BSc (Hons) Mech Eng, GAICD, INSEAD

Independent

Alison Andrew

Director

June 2025

Former CEO, Transpower NZ (10+ years); director, Port of Tauranga; ex-Genesis Energy director; ex-Orica Global Head of Chemicals

Status not stated (likely independent; not confirmed)

Paul Maguire

Director

May 2024

Partner, QIC Infrastructure; ex-Engie APAC head, Senoko Energy CEO, Simply Energy, Lumea

Shareholder nominee (QIC)

Patrick Mulholland

Director

Not disclosed

Partner, QIC Infrastructure (Energy & Utilities); ex-J.P. Morgan VP

Shareholder nominee (QIC)

Kay Stuart

Director

November 2025

Executive Director, Energy Transition, Future Fund; ex-APA Group GM; ex-RBC Capital Markets MD

Shareholder nominee (Future Fund)

Board & Management Changes

DateChange

December 2023 / February 2024

Anthony Fowler announced and commenced as CEO

May 2024

Paul Maguire joins board; Laurent Francisci joins as CDO

September 2024

Angela Catt joins

June 2025

Alison Andrew joins board

September 2025

Ross Edwards joins

2 October 2025

Philip Bainbridge appointed chair; Cheryl Bart AO (PowAR board from June 2017, chair from July 2019) retires

November 2025

Kay Stuart (Future Fund) joins board

June 2026

Jenny Smith joins

Major Shareholders

HolderStake (post-AGL sale)Notes

QIC-led vehicles (QIC Global Infrastructure Fund I and co-investors: Aware Super, Brighter Super, Hostplus, MLC, Telstra Super)

About 50% (exact split not publicly disclosed)

QIC held 40% before the deal; co-investors could exercise pre-emptive rights independently (Infralogic)

Future Fund (Australian sovereign wealth fund)

About 50% (exact split not publicly disclosed)

40% before the deal

AGL Energy (ASX: AGL)

About 0.1%

Retained residual stake after selling 19.9%

Competitive Landscape

Key Competitors

CompetitorOwnershipAustralian focusRelative positioning vs Tilt

Neoen Australia

Brookfield (since 2024/25)

Large wind, solar and battery portfolio; active in WA (Narrogin, Collie BESS)

Larger battery fleet; strong in WA; direct pipeline competitor

Squadron Energy

Andrew Forrest (Tattarang)

Wind (Uungula 414 MW, overtaking Rye Park as NSW's largest); bought CWP

Seller of Boco Rock to Tilt; aggressive NSW builder

ACCIONA Energía

Listed (Spain)

MacIntyre (923 MW, QLD)

Larger single-site QLD wind

Iberdrola Australia

Iberdrola SA

Wind, solar, firming plus retail

Vertically integrated

ENGIE Australia

ENGIE SA

Renewables and firming

Bid for Tilt in 2021

APA Group

ASX-listed

Energy infrastructure, some renewables

Bid for Tilt in 2021

Origin Energy

ASX-listed gentailer

Partnerships for new wind and solar; batteries

Offtaker and competitor for projects

AGL Energy

ASX-listed gentailer

Owns batteries; buys wind and solar via PPAs

Largest customer and residual shareholder

Ark Energy (Sumitomo/Korea Zinc)

Private

Owns Epuron; wind development

Upstream developer competitor

RES Australia

Private

Developer (Dulacca 240 MW)

Developer competitor

Atmos Renewables, Synergy, Alinta

Mixed

WA wind

Competitors in the WEM

Peer Comparison FY2021

MetricTilt RenewablesNeoen AustraliaSquadron EnergyACCIONA Energía Australia

Operating capacity

About 1.9 GW

———

Pipeline

5 GW+

———

Ownership

QIC / Future Fund

Brookfield

Private (Forrest)

Listed parent

Revenue / margins / R&D intensity

Not publicly disclosed

Not publicly disclosed (Australian segment)

Not publicly disclosed

Not publicly disclosed (Australian segment)

Recent Developments

Fewer than 25 discrete public entries were identifiable. As a private company, Tilt issues fewer announcements than listed peers.*

Company Snapshot

2016

Founded

Melbourne, Australia

Headquarters

SWOT Analysis

Strengths

  • Scale leadership: about 1.9 GW operating, which the company describes as Australia's largest wind and solar owner (2025 Sustainability Report; Reuters, November 2025).
  • Sovereign-grade shareholders: QIC and the Future Fund paid A$750m for 19.9%, more than double AGL's A$321m book value. That signals strong owner conviction and capital access (AGL ASX, November 2025).
  • Contracted cash flows: about 1.6 GW is contracted to AGL under long-term PPAs, and about 55% of Rye Park is contracted to Newmont for 15 years.
  • Proven ability to reach FID in a hard market: Waddi (December 2025) and Palmer (January 2026) were early wind FIDs in a drought year.
  • Advanced flagship pipeline: Liverpool Range has EPBC approval, a CISA and REZ access rights.
  • Experienced leadership drawn from AGL, EnergyAustralia, Neoen and Lochard, with a board that includes the former Transpower CEO.

Weaknesses

  • Customer concentration: AGL buys about 1.6 GW and takes 100% of Waddi and 45% of Palmer and Rye Park.
  • No public financial disclosure since FY2021, which limits transparency for lenders and stakeholders beyond the bank group.
  • Exposure to wind resource variability: listed-era FY21 EBITDAF guidance was cut by about 10% on weak wind (Forsyth Barr, April 2021).
  • Historical curtailment in SA: about 41 GWh lost at Snowtown in 1H FY19 due to system-strength constraints.
  • Limited storage scale relative to peers: only one operating BESS (100 MW / 200 MWh).
  • Leadership churn: the chair, CDO, Corporate Affairs, Operations and People heads all changed in 2024–2026.

Opportunities

  • Liverpool Range (up to 1.3 GW; FID targeted Q4 2026) could add about 68% to operating capacity.
  • WA market entry via Waddi (108 MW) as WA retires coal.
  • Storage and hybrid build-out: Snowtown BESS and battery retrofits at existing sites.
  • Brownfield expansions: Boco Rock Stage 2 (about 20 turbines approved).
  • Data-centre-driven demand and corporate PPAs (Reuters, November 2025).
  • Further Commonwealth CIS tenders to underwrite more pipeline (5 GW+).

Threats

  • Construction cost inflation and supply-chain risk across three concurrent builds (Waddi over A$400m, Palmer, Liverpool Range over A$2bn).
  • Planning and community opposition: Palmer took more than a decade to reach FID.
  • Refinancing and interest-rate exposure: the platform is seeking about A$2.6bn of debt.
  • Grid connection delays and transmission build risk in REZs.
  • Policy reversal risk if federal support schemes change after future elections.
  • Merchant price compression from solar saturation and negative prices.

Key Developments

DateEventSignificance
March 2025 (context)Liverpool Range EPBC approval; Palmer revised approval; NREPL listingsSets up 2025–26 FIDs
May 2025Rye Park (396 MW) officially opened by NSW Minister Penny SharpeLargest operating NSW wind farm at the time; takes fleet towards 1.9 GW
May 2025Liverpool Range awarded access rights to Central-West Orana REZRemoves a key grid hurdle
June 2025Alison Andrew (ex-Transpower CEO) joins boardAdds grid and transmission expertise
About August 2025Reported to be seeking about A$2.6bn of debtFunds the pipeline and refinances 2021 acquisition debt
August 2025AGL flags sale process for its Tilt stake in FY25 resultsOwnership change signal
4–5 September 2025Latrobe Valley BESS (100 MW / 200 MWh) openedFirst Tilt battery; firming capability
September 2025Ross Edwards joins as EGM Operations & MarketsStrengthens trading capability
30 September 202515-year AGL PPA for 45% of PalmerKey FID enabler
2 October 2025Philip Bainbridge appointed chair; Cheryl Bart AO retiresGovernance transition
About 10 October 2025CISA for Liverpool Range Stage 1 (at least 634 MW)Commonwealth revenue underwriting for the largest project
24 October 2025Waddi EPBC approvalFinal approval for WA entry
30 October 2025AGL 15-year PPA for 100% of WaddiOfftake fully contracted
10 November 2025AGL agrees to sell 19.9% to QIC and Future Fund for A$750mValuation marker well above A$321m book value; consolidated sovereign ownership
November 2025Kay Stuart (Future Fund) joins boardShareholder representation
~2025First Annual Sustainability Report releasedESG disclosure baseline
17 December 2025Waddi FID; Decmil about A$51m contractDescribed as Australia's first wind FID of 2025
8 January 2026Palmer FID (288 MW); Vestas, BMD, ElectraNetSecond wind FID in weeks
January–March 2026 (guided)Expected completion of AGL stake saleCompletion not confirmed in public sources reviewed
Early 2026Waddi early works begin (WA State of Energy)Construction mobilisation
June 2026Jenny Smith appointed EGM People and SafetyCompletes executive team
2 July 2026Jacobs appointed Owner's Engineer for PalmerDelivery oversight
8 July 2026Construction begins at PalmerConstruction phase; first power targeted December 2028
~7 August 2026Formal Waddi sod-turning with Assistant Energy Minister Josh Wilson; about 2-year build18 turbines, 206 m tip height
2026 (recruitment)Liverpool Range FID targeted Q4 2026Major near-term catalyst

Financial Performance

Income Statement: Revenue fell from AUD 174.5 Mn in FY2017 to AUD 128.3 Mn in FY2021.
Tilt Renewables Limited — Income Statement
Series (AUD Mn)FY2017FY2018FY2019FY2020FY2021
Revenue174.5158193.3170.2128.3
Generation costs———3123.1
EBITDAF124103.8134.8117.574.9
Net financing costs31.9————
Net profit after tax———47867

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.