Torrens Mining Limited Overview
1A. Historical entity: Torrens Mining Limited
| Field | Detail |
|---|---|
| Legal name | Torrens Mining Limited |
| Former names | None (Market Index states "no former company names") |
| Founded / incorporated | 2014; Perth, Western Australia |
| Founders | Steve Shedden (Managing Director), plus a co-founding executive director, "Mike" (a mining engineer and Royal School of Mines graduate; full surname not confirmed in the sources reviewed) |
| Headquarters | Perth, Western Australia (full street address not publicly disclosed in the sources reviewed) |
| Exchange / ticker | ASX: TRN (listed January 2021; delisted 2022 after compulsory acquisition) |
| IPO | A$10m raised at A$0.20 per share (50 million shares); lead manager Taylor Collison; shares closed at A$0.30 on debut (+50%) |
| ISIN | — |
| Fiscal year end | 30 June |
| Employees | Aggregators list 1–10 employees; not publicly disclosed in filings reviewed |
| Chairman / MD (at IPO) | Bill Bloking (Chair); Steve Shedden (MD) |
| Market capitalisation at takeover | About A$15m before the bid (Business News); the bid valued Torrens at about A$23m (A$0.202 per share implied) |
| Fate | Acquired by Coda Minerals; completion 28–29 April 2022 |
1B. Current profiled entity: Coda Minerals Ltd
| Field | Detail |
|---|---|
| Legal name | Coda Minerals Ltd |
| Former names | None reported |
| Origin | Wholly owned subsidiary of Gindalbie Metals; demerged in July 2019 alongside Ansteel's acquisition of Gindalbie |
| Incorporation | 2018 (directors Keith Jones and Chris Stevens appointed 26 April 2018); Australia |
| Registered office / HQ | 6 Altona Street, West Perth WA 6005, Australia |
| Exchange / ticker | ASX: COD |
| ASX admission | Admitted 26 October 2020; trading began 28 October 2020 after an A$8.5m IPO |
| ISIN | AU0000105330 |
| Fiscal year end | 30 June |
| Auditor | RSM Australia Partners, Perth (appointed 1 November 2022; lead partner Matthew Beevers) |
| Company Secretary | Susan Park (appointed 25 November 2020) |
| Employees | Not publicly disclosed. The KMP group is five people (three NEDs, the CEO and a contract CFO); one aggregator's "51–200 employees" figure looks unreliable |
| Share price (recent) | A$0.10–0.115 (late September to October 2026, per ASX trading data on HotCopper and Listcorp) |
| Shares on issue (derived) | About 426 million. Derived from 372,018,562 at 31 December 2025, plus the March 2026 rights conversion, the June 2026 Tranche 1 placement (about 37.95m shares), the August 2026 Tranche 2 placement (15,384,617 shares) and minor issues. This is a calculation, not a disclosed figure |
| Market capitalisation (derived) | About A$43–49m at A$0.10–0.115 per share |
| Cash | A$10,767,106 at 30 June 2026 (FY2026 Annual Report) |
| Website | www.codaminerals.com |
1C. Positioning statement
Coda Minerals is a South Australian copper-silver development company. Its 100%-owned flagship, the Elizabeth Creek Copper-Silver Project, sits in the Olympic Copper Province of the Eastern Gawler Craton. That is Australia's premier copper belt: the project lies about 100 km south of BHP's Olympic Dam, 15 km from BHP's Oak Dam West and 50 km west of Carrapateena.
Coda took full ownership of Elizabeth Creek by acquiring its former joint-venture partner, Torrens Mining, in 2022. The project hosts four JORC 2012 Mineral Resources totalling about 65.5 Mt and about 1.07 Mt of contained copper equivalent. Coda's August 2025 Scoping Study and March 2026 price update (US$10,500/t copper, US$60/oz silver) imply a post-tax NPV7 of about A$1.52bn and a post-tax IRR of 43%, against pre-production capex of A$472m.
Coda is pre-revenue and equity-funded. It is now running a Pre-Feasibility Study (PFS) targeted for Q1 2027, centred on a simplified whole-ore chloride-leach flowsheet. The equity market currently values the company at a small fraction of that modelled project value.
2A. Company's own description
Coda's FY2026 Annual Report describes the company as focused on discovering and developing minerals that are leveraged to the global energy transformation, through electrification and the adoption of renewable energy technologies. It names the 100%-owned Elizabeth Creek Copper-Silver Project as its flagship asset.
The report states that the company's principal activity was exploration and evaluation at Elizabeth Creek. Coda also continues to evaluate other projects and potential joint ventures, and holds:
-
the Kinloch Copper Project in South Australia, held under a mineral-rights-sharing arrangement with Boss Energy; and
-
the Cameron River Copper-Gold Project in Queensland.
(Source: Coda FY2026 Annual Report, Directors' Report.)
2B. Independent characterisation
Coda is a single-asset, pre-revenue, study-stage copper-silver developer. It is not a producer, and it has no product, service, subscription or licensing revenue.
The business model follows the standard junior-developer value chain:
-
Discover and define resources.
-
Raise their confidence category through drilling.
-
De-risk processing through metallurgy.
-
Advance engineering and permitting through a sequence of studies (Scoping → PFS → Definitive Feasibility).
-
Monetise the asset through one of several routes: self-development with project finance, a strategic partnership or offtake-linked funding, streaming or royalty finance, or a corporate sale.
Value-chain position (planned). The current flowsheet is designed to produce copper cathode on site via solvent extraction and electrowinning (SX-EW), plus silver doré and a minor zinc carbonate by-product. This would put Coda further down the value chain than a typical concentrate producer. If it reaches production, its customers would be metal traders, cathode consumers (wire-rod and fabrication mills) and refiners or bullion buyers for the doré. No offtake agreements have been disclosed.
End-markets (prospective). Copper serves electrical infrastructure, grid expansion, electrification, EVs and data centres. Silver serves photovoltaics, electronics and investment demand. Cobalt (currently excluded from the base case) would serve battery cathodes.
2C. How the former Torrens business fits
Torrens was a diversified exploration portfolio company. Its assets were:
-
a 30% joint-venture interest in Elizabeth Creek (South Australia);
-
the Mt Piper gold project (Central Victoria; 1,609 km²);
-
the Club Terrace copper-gold project (Eastern Victoria and southern NSW);
-
the Balmoral gold project (Victoria); and
-
the Laloki copper-gold application (Papua New Guinea).
After the takeover, Coda kept only the Elizabeth Creek interest as core. It sold Mt Piper to Kalamazoo Resources in 2022. The other Torrens assets do not appear among Coda's current segments (Elizabeth Creek, Cameron River and Kinloch). Their current status is not publicly disclosed in the sources reviewed.
Strategy
10A. Stated strategy themes (FY2026 Annual Report: Chair's letter and CEO's report)
The themes below are paraphrased from the report.
-
Deliver a technically sound PFS. The PFS is to form the basis for development and financing decisions. The CEO describes few pieces of work as more consequential for a company at Coda's stage.
-
Set out a credible development path for Elizabeth Creek. This means integrating mining, processing, water, tailings and infrastructure choices into one coherent development plan.
-
Copper-silver base case with cobalt as upside. Reliance on cobalt marketing and processing assumptions is reduced.
-
Transparent, outcome-oriented disclosure. Each significant result is to be explained in terms of what it changes for the project.
-
Broaden commercial options. A strong PFS is meant to attract partners and funding providers. Coda's management has publicly discussed a potential 50% silver stream as a means of funding part of the A$472m pre-production capex (discoveryalert.com, October 2026). This is not a company guidance figure.
-
"Dual strategy." The FY2025 half-year report describes a dual approach: development of the sediment-hosted resources alongside exploration upside, including the Emmie IOCG system and Oakden.
10B. Strategic initiatives (last 24 months)
| Initiative | Date | Description | Status |
|---|---|---|---|
| Chloride-leach flowsheet adoption | Jun–Aug 2025 | Replaced the flotation–Albion circuit; Cu recovery 94.8% vs 82.8% | Base case; PFS trade-off continuing |
| Fourth Scoping Study update | 28 Aug 2025 | Pre-tax NPV7 A$1.29bn; capex cut by A$74m; processing opex down about A$7.50/t | Complete |
| PFS launch and funding | Oct 2025 | A$12.33m raised; owner's team and Study Manager appointed | Underway |
| PFS drilling | Oct 2025 – Feb 2026 | 19 PQ holes, 6,352 m; Emmie Bluff about 88% of metres | Complete |
| Price-deck economic update | 10 Mar 2026 | Pre-tax NPV7 A$2.25bn at US$10,500/t Cu and US$60/oz Ag | Complete |
| Critical on-ground studies | 18 May 2026 | Tailings siting, ecology, groundwater-dependent ecosystems | Underway |
| PFS acceleration funding | 1 Jun 2026 | A$6.7m for expanded metallurgy, hydrogeology and independent technical review | Complete (Tranche 2 issued August 2026) |
| LiDAR survey | Jul 2026 | 480 km² fixed-wing survey | Complete |
| Approvals: Scoping Report gazetted | 22 Jul 2026 | Sets the terms of reference for a future Mining Lease Application | Complete |
| Hydrogeological drilling | From 23 Jul 2026 | 6 bores (3 production, 3 monitoring), about 1,400 m | Underway |
| Process engineering appointment | Sep 2026 | Ausenco appointed principal process engineering consultant | Underway |
| Oakden exploration | Post-FY2026 | 5–6 shallow RC holes | Planned / underway |
| Cobalt recovery research | Ongoing | Leach-residue treatment options | Testwork |
10C. Medium-term targets and guidance
| Item | Target |
|---|---|
| PFS completion | First quarter of calendar 2027 |
| Mining Lease Application | After the PFS and associated project-definition work |
| PFS recovery expectation | Net metal recovery "close to" scoping estimates of 94.8% Cu and 98.2% Ag (21 September 2026 release) |
| Long-term commodity price deck | To be confirmed in the PFS. The CEO reportedly favours a long-term copper price in the low US$11,000s/t versus US$10,500/t in the March 2026 update (discoveryalert, October 2026) |
| Financial guidance | None (no revenue or earnings guidance issued) |
| ESG / sustainability targets | No quantified emissions targets disclosed |
Products & Services
Coda has no commercial products. Its "portfolio" is a set of mineral assets and the planned products from them, catalogued deposit by deposit below.
5A. Elizabeth Creek: JORC 2012 Mineral Resources
| Deposit | Style | Planned mining method / depth | Confidence | Cut-off | Tonnes (Mt) | Cu | Co (ppm) | Ag (g/t) | CuEq | Contained CuEq (kt) |
|---|---|---|---|---|---|---|---|---|---|---|
| Emmie Bluff (flagship) | Zambian-style sediment-hosted Cu-Co | Underground; about 400 m | 93% Indicated, 7% Inferred | 1.0% CuEq | 40.2 | 1.27% | 569 | 17 | 1.87% | 751 |
| MG14 | Zambian-style | Open pit; about 20 m | Indicated | 0.5% CuEq | 1.8 | 1.2% | 334 | 14 | 1.67% | 31 |
| Windabout | Zambian-style | Open pit; about 50–70 m | Indicated | 0.5% CuEq | 17.7 | about 0.8% | see note | see note | see note | 249 |
| Cattle Grid South | Copper breccia | Open pit; about 30 m | Inferred | 0.2% Cu | 5.8 | about 0.6% | see note | see note | — | 36 |
| Total | — | — | — | — | 65.5 | — | — | — | 1.63% (as reported) | 1,067 |
Notes:
-
Emmie Bluff also carries 0.17% Zn and contains about 510 kt Cu, 23 kt Co, 21.7 Moz Ag and 70 kt Zn (January 2024 MRE).
-
The Half-Year Report quotes Windabout as 18 Mt at 1.14% CuEq. The FY2026 Annual Report table shows 17.7 Mt and 249 kt contained CuEq, which implies about 1.4% CuEq. The CuEq grade, Co and Ag fields for Windabout and Cattle Grid South could not be reliably extracted from the published table. Readers should refer to the 26 October 2020 JORC confirmation statement.
-
Emmie Deeps, an IOCG system at about 800 m depth, has no JORC resource. Coda has drilled 21 holes into it, all but three returning significant mineralised widths, some above 3% Cu and 0.5 g/t Au.
(Source: FY2026 Annual Report, Operational Review; Half-Year Report to 31 December 2025.)
5B. Elizabeth Creek development case (Scoping Study level)
| Parameter | August 2025 Scoping Study | March 2026 price update (base) | Spot (11 Feb 2026) |
|---|---|---|---|
| Copper price (US$/t) | 9,260 | 10,500 | 13,108 |
| Silver price (US$/oz) | 30 | 60 | 82 |
| AUD:USD | 0.68 | 0.68 | 0.71 |
| LOM revenue (A$M) | 7,264 | 8,979 | 10,889 |
| Revenue mix: Cu / Ag / Zn | 85% / 12% / 3% | 78% / 20% / 2% | 77% / 21% / 2% |
| Pre-tax NPV7 (A$M) | 1,289 | 2,247 | 3,322 |
| Pre-tax IRR | 39% | 56% | 74% |
| Post-tax NPV7 (A$M) | 855 | 1,521 | 2,278 |
| Post-tax IRR | 30% | 43% | 57% |
| Payback (years from first production) | 3.25 | 2.50 | 1.75 |
| C1 cost (US$/lb Cu) | 1.90 | 1.30 | 0.97 |
| AISC (US$/lb Cu) | 2.15 | 1.60 | 1.33 |
Common physicals across scenarios:
-
Mine life: 15.5 years
-
Processing rate: 3 Mtpa
-
Feed: 87% from Indicated, 13% from Inferred resources
-
LOM production: 454 kt Cu and 20.3 Moz Ag
-
Steady state (years 5–15): 31.9 ktpa Cu and 1.4 Mozpa Ag (the August 2025 release quoted 31.4 ktpa)
-
Capex: A$472m pre-production plus A$143m post-production (A$615m total); financing requirement A$478m
(Source: FY2026 Annual Report; ASX releases of 28 August 2025 and 10 March 2026.)
5C. Planned products and process
| Planned product | Process | Specification / recovery | Status |
|---|---|---|---|
| Copper cathode | Grind to P80 of 75 µm → whole-ore oxidative chloride leach at about 90°C → SX-EW | Scoping net recovery 94.8% Cu (vs 82.8% under the earlier flotation route); PFS variability tests averaged 94.4% Cu (24-hour leach), peaking at 97.2% | PFS testwork; final flowsheet selection pending |
| Silver doré | Recovered from the leach circuit | Scoping net recovery 98.2% Ag (vs 82.0% under flotation); PFS variability averaged 95.9%, peaking at 99.7% | As above |
| Zinc carbonate | Minor by-product | About 2–3% of revenue | As above |
| Cobalt (optional) | Excluded from the base case; residue treatment under study | PFS variability 24-hour extraction averaged 39.7% Co | Upside option only |
| Alternative route | Flotation followed by downstream processing | Being assessed in parallel as a trade-off | PFS trade-off study |
5D. Other assets
| Asset | Location | Commodity | Interest | Key facts |
|---|---|---|---|---|
| Kinloch Project | Northern Murray Basin, SA; about 130 km south of Boss Energy's Honeymoon mine | Copper (Coda); uranium (Boss) | Coda operates and holds 100% of base-metal rights; Boss operates and holds 100% of uranium rights | Four tenements, about 3,184 km², granted October 2023 through the South Australian Government's Exploration Release Area process |
| Cameron River | Queensland | Copper-gold | 100% | Farm-in with Wilgus Investments: 51% earned November 2022; February 2024 agreements to move to 100%. Carrying value of A$306,900 fully impaired in FY2026 |
| Oakden prospect | Within Elizabeth Creek tenure, about 15 km SSW of MG14 | Copper-cobalt-silver | 100% | Historical intercept of 6 m at 0.63% Cu from 39 m (including 3 m at 1.15% Cu); 5–6 hole RC programme announced after year end |
| Kalamazoo Resources shares | Listed investment | — | 1.525m shares (from the Mt Piper sale) | Fair value A$189,744 at 30 June 2026 |
| Mt Piper 1% NSR | Central Victoria | Gold / antimony | Royalty | Retained on the 2022 sale to Kalamazoo |
Pricing model. If developed, Coda would sell copper cathode at LME-linked prices and silver at LBMA-linked prices. No offtake or pricing terms have been disclosed.
Financial Narrative
6A. Income statement
Notes:
-
Source: FY2026 Annual Report, Remuneration Report (five-year table) and Consolidated Statement of Profit or Loss.
-
The remuneration table labels EPS as "cents/share", but the half-year statements present the same metric in dollars (e.g. "($0.02)"). Dollars per share is the consistent interpretation.
-
The FY2025 EBIT shown equals EBITDA in the source table, which looks like a presentation error (FY2025 depreciation in the P&L was A$160,784).
-
Gross, operating, EBITDA and net margins and revenue CAGR are not meaningful: revenue is nil in every year.
Commentary. Coda's losses follow its exploration and study intensity, not operating performance.
FY2022 (A$14.2m loss): The high point reflects the aggressive deep-IOCG drilling campaign at Emmie Deeps plus Torrens takeover costs.
FY2023–FY2025 (A$7.8m → A$4.3m): Losses fell as the company shifted from deep drilling to desktop study work. Capital was tight: the share price fell from A$0.26 to A$0.08 over this period.
FY2026 (A$10.9m, +153% year on year): The inflection reflects the funded PFS: E&E expense rose to A$8.1m, driven by the 6,352 m drilling programme, metallurgical testwork and consultant mobilisation. This is "good" spending under the explorer model, because it converts cash into technical de-risking, but it accelerates the funding cycle.
6B. Balance sheet
Notes:
-
FY2024 cash and equity are opening balances at 1 July 2024 (Half-Year Report, statement of changes in equity and cash flows).
-
FY2022 and FY2023 balance sheets were not publicly disclosed in the sources reviewed.
-
The capitalised E&E carrying value of A$17.6m at Elizabeth Creek largely reflects acquisition-date fair values, including the scrip consideration for Torrens. Coda expenses ongoing E&E spend rather than capitalising it, so this carrying value understates the cumulative investment in the project.
6C. Cash flow
Notes:
-
Operating cash flow totals are computed by summing the disclosed line items in the FY2026 Annual Report cash flow statement, whose net total was truncated in the extracted copy.
-
Free cash flow is approximately equal to operating cash flow, because capex is negligible.
6D. Ratios
Not meaningful: ROIC (negative earnings on equity-funded capital), net debt/EBITDA (net cash and negative EBITDA), interest coverage (EBIT negative; only lease interest of A$21,995 in FY2026), asset turnover (nil revenue) and cash conversion cycle (no trading operations).
Cross-check: Yahoo Finance shows a trailing ROE of -43.46%, consistent with the calculation above, and a trailing ROA of -26.34%, which uses a different definition.
Cash runway. Cash was A$10.77m at 30 June 2026. About A$2.0m (gross) from the Tranche 2 placement arrived in August 2026. Against an FY2026 operating burn of about A$8.4m, and a likely higher burn rate while the PFS is in full swing, the company appears funded into calendar 2027. A further raise or strategic transaction would probably be needed around PFS completion (targeted Q1 2027). The FY2026 accounts were prepared on a going-concern basis, with no material-uncertainty paragraph noted in the audit opinion.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Income Statement (AUD) and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue (AUD) | 0 | 0 | 0 | 0 | 0 |
Other income (AUD) | — | — | — | 34,109 | 556,464 |
Exploration & evaluation expense (AUD) | — | — | — | 2,001,519 | 8,135,371 |
Administration expense (AUD) | — | — | — | 2,180,658 | 2,809,573 |
EBITDA (AUD) | -14,070,685 | -7,762,070 | -4,511,866 | -4,118,703 | -10,924,212 |
EBIT (AUD) | -14,218,215 | -7,924,530 | -4,674,734 | -4,118,703 | -11,087,807 |
Pre-tax income (AUD) | -14,210,882 | -7,762,665 | -4,565,582 | -4,286,895 | -10,856,225 |
Net income (AUD) | -14,210,882 | -7,762,665 | -4,565,582 | -4,286,895 | -10,856,225 |
Total comprehensive loss (AUD) | -14,210,882 | -7,846,540 | -4,631,674 | -4,289,621 | -10,810,648 |
Basic & diluted EPS (A$ per share) | -0.14 | -0.06 | -0.03 | -0.02 | -0.03 |
Dividends per share (AUD) | 0 | 0 | 0 | 0 | 0 |
Balance Sheet (AUD)
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Total assets (AUD) | — | 22,934,187 | 29,510,440 |
Cash & equivalents (AUD) | 3,426,744 | 3,963,790 | 10,767,106 |
Exploration & evaluation assets (AUD) | — | 17,926,175 | 17,619,275 |
Intangible assets (AUD) | — | 91,220 | 77,887 |
Goodwill (AUD) | 0 | 0 | 0 |
Short-term debt: lease liabilities (AUD) | — | 100,525 | 112,497 |
Long-term debt: lease liabilities (AUD) | — | 113,347 | 9,355 |
Total debt incl. leases (AUD) | — | 213,872 | 121,852 |
Net cash (AUD) | — | 3,749,918 | 10,645,254 |
Total equity (AUD) | 21,596,929 | 22,118,773 | 27,838,908 |
Working capital (AUD) | — | 3,605,951 | 9,513,525 |
Accumulated losses (AUD) | 39,146,682 | 43,097,577 | 53,953,802 |
Cash Flow (AUD)
| Metric | FY2025 | FY2026 |
|---|---|---|
Operating cash flow (AUD) | -3,883,398 | -8,371,765 |
E&E payments within operating cash flow (AUD) | -1,924,521 | -7,169,167 |
Admin & corporate payments (AUD) | -2,127,343 | -1,976,377 |
Interest received (AUD) | 168,466 | 239,670 |
Grants / tax incentives received (AUD) | 0 | 534,109 |
Gross equity raised (AUD) | 5,091,353 | 17,265,462 |
Dividends paid (AUD) | 0 | 0 |
Share buybacks (AUD) | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2025 | FY2026 |
|---|---|---|
ROE (%, on average equity) | -19.6 | -43.5 |
ROA (%, on average assets) | -18.7 | -41.4 |
Current ratio (x) | 6.44 | 6.72 |
Debt / equity (%, leases only) | 0.97 | 0.44 |
Geographic revenue (AUD)
| Geographic revenue (AUD) | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Australia: South Australia | 0 | 0 | 0 |
Australia: Queensland | 0 | 0 | 0 |
Rest of world | 0 | 0 | 0 |
Capital Markets Data (AUD)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Share price at start of year (AUD) | 1.25 | 0.26 | 0.21 | 0.11 | 0.08 |
Share price at end of year (AUD) | 0.26 | 0.21 | 0.11 | 0.08 | 0.11 |
Performance window (to about October 2026; computed from year-end data and recent trading) | Approximate return | — | — | — | — |
1-year (FY2026: A$0.08 → A$0.11) | +38% | — | — | — | — |
3-year (30 Jun 2023 A$0.21 → about A$0.10–0.11) | about -50% | — | — | — | — |
5-year (1 Jul 2021 A$1.25 → about A$0.10–0.11) | about -91% | — | — | — | — |
Valuation Snapshot
| Multiple | Value |
|---|---|
P/E | Not meaningful (loss-making) |
EV/EBITDA | Not meaningful (negative EBITDA) |
EV/Sales | Not meaningful (nil sales) |
P/B (derived: about A$43–49m market cap ÷ A$27.8m book equity) | about 1.5–1.8x |
EV / post-tax NPV7 at base case (derived) | about 2% |
EV / post-tax NPV7 at the August 2025 deck (third-party) | about 3% (discoveryalert, October 2026) |
EV per tonne of contained CuEq (derived: about A$33m ÷ 1,067 kt) | about A$31/t CuEq, vs about A$60/t implied in the 2022 Torrens deal (Shaw and Partners) |
Capital Markets
| Item | Status |
|---|---|
Analyst consensus | Thin and unreliable. Aggregators show stale targets (Stockopedia A$0.90; TradingView A$0.51 single estimate), likely legacy figures. No current verified consensus |
Dividend history / policy | Never paid; none expected before production |
Credit ratings (Moody's / S&P / Fitch) | Not rated |
Debt maturity profile | No borrowings; lease liabilities only (A$112,497 current; A$9,355 non-current at 30 June 2026) |
Option overhang | Listed options at A$0.15 expiring 28 March 2029 (more than 130m outstanding across issues); 7.7m unquoted at A$0.26 expiring 10 August 2029; employee performance rights about 18m+ |
Share Price & Returns
| Date | Type | Amount (AUD) | Price (AUD) | Attaching securities |
|---|---|---|---|---|
Oct–Nov 2024 | Entitlement offer + placement | 5,091,353 | 0.07 | 1-for-2 options at A$0.15 |
Oct 2025 | Entitlement offer (underwritten) | 8,331,832 | 0.10 | 1-for-4 options at A$0.15 |
Nov–Dec 2025 | Placement | 4,000,000 | 0.105 | 1-for-4 options at A$0.15 |
Jun–Aug 2026 | Placement (two tranches) | 6,700,000 | 0.13 | Options at A$0.15 |
Analyst Conclusions
22A. Management guidance
-
PFS completion targeted for Q1 calendar 2027.
-
Mining Lease Application to follow the PFS.
-
PFS net recoveries expected to remain close to scoping estimates (94.8% Cu, 98.2% Ag).
-
No financial guidance.
22B. Consensus expectations
No credible current sell-side consensus. Growth expectations cannot be quantified from consensus sources.
22C. Bull case
-
Severe valuation dislocation. The derived EV of about A$33m is roughly 2% of the base-case post-tax NPV7 (A$1.52bn), and the spot-price scenario is higher still. Even a heavily risked PFS outcome could support a materially higher valuation.
-
Metallurgy is de-risking in the right direction. PFS variability tests (94.4% Cu, 95.9% Ag average) confirm the scoping recoveries using site water. This underpins the chloride-leach case that removed A$74m of capex and lifted payable metal.
-
Strategic scarcity and location. An Indicated-dominated, 1 Mt+ CuEq resource 15 km from BHP's Oak Dam West, with a gazetted approvals pathway, is the kind of asset majors and streamers seek in a record-price copper market.
22D. Bear case
-
Financing gap and dilution. A A$478m financing requirement against a market capitalisation below A$50m implies heavy dilution, or a partner deal on terms that could capture much of the NPV.
-
Scoping-to-PFS erosion. Scoping capex (A$615m) carries wide accuracy bands. Hydromet chloride circuits and underground development at 400 m are prone to cost escalation, and 13% Inferred feed adds uncertainty.
-
Execution track record. Legacy LTIs tied to a PFS and DFS by June 2026 lapsed unmet, and the share price has fallen about 91% over five years. Repeated timetable slippage could recur.
22E. Catalysts and monitorables (next 12 months)
| Expected timing | Catalyst |
|---|---|
| 29 Oct 2026 | September quarterly: cash burn and PFS progress |
| 11 Nov 2026 | AGM: strategy commentary; votes on equity incentives |
| Q4 2026 – Q1 2027 | Updated Mineral Resource Estimate using PFS drilling |
| Q4 2026 – Q1 2027 | Final flowsheet selection (chloride leach vs flotation trade-off) |
| Q4 2026 | Hydrogeology results (water supply and dewatering) |
| Q4 2026 | Oakden RC drilling results |
| Q1 2027 | PFS release: capex, opex, price deck, reserves (if declared) |
| 2,027 | Funding: partner, streaming or equity; cash expected to run low around PFS delivery |
| 2,027 | Native Title Mining Agreement negotiations; Mining Lease Application lodgement |
| Ongoing | LME copper and LBMA silver prices |
22F. Concluding analyst verdict
Torrens Mining's legacy lives on almost entirely in one asset: Elizabeth Creek. Torrens acquired the project in 2015, brought Coda in as a farm-in partner in 2017, and sold its remaining 30% to Coda in 2022 for about A$23m in scrip. Investors who held Torrens through the takeover became Coda shareholders. Their outcome now depends on whether Coda can turn a highly attractive scoping-level project into a financeable development.
The technical story has clearly improved over the past 18 months. The move to whole-ore chloride leaching raised modelled recoveries by double-digit percentage points and cut capital costs. PFS variability testwork has so far confirmed those gains. Approvals have advanced, with the Scoping Report formally gazetted. The commodity backdrop, with copper above US$13,000/t and silver near record levels, is exceptionally supportive. On management's own March 2026 base case, the project carries a post-tax NPV7 of about A$1.5bn.
The market's valuation of about 2% of that figure is not an oversight. It reflects the real distance between a scoping study and a funded mine. The obstacles are an A$478m financing requirement, an underground deposit at about 400 m, a chloride hydrometallurgical circuit still to be engineered at scale, Native Title agreements still to be negotiated, and a history of timetable slippage and dilutive raisings. Coda's balance sheet (about A$10.8m cash at June 2026) funds the PFS but not much beyond it.
Our assessment: Coda is a high-risk, high-optionality copper-silver development vehicle. The Q1 2027 PFS is the decisive binary event. A study that holds scoping capex within about 20%, confirms the recoveries and supports a credible streaming or strategic-partner pathway could drive a sharp re-rating. A study showing material cost escalation would likely force further deeply discounted equity raises. Position sizing should reflect a speculative, catalyst-driven exposure, and investors should monitor quarterly cash burn closely.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Background | Qualifications |
|---|---|---|---|---|
Keith F. Jones | Non-Executive Chair; chairs the Nomination & Remuneration Committee | 26 Apr 2018 | Former Chairman of Deloitte Australia (10 years on its board) and 15 years as Managing Partner of Deloitte WA; former Chair of Gindalbie Metals and Cannings Purple; former NED of Ora Banda Minerals; NED of EcoGraf (May 2023 to 31 Dec 2025) | BBus, FCA, FAICD |
Chris Stevens | CEO and Executive Director | 26 Apr 2018 | Former CEO of Gindalbie Metals (from 2016); WA Mining Consulting Lead at PwC; GM Commercial at Asia Iron; 19+ years working with Chinese companies; fluent Mandarin speaker | BA (Hons), MA (Oxon), MSc Mineral Economics (Curtin), GAICD, FAusIMM |
Andrew (Robin) Marshall | Non-Executive Director | 19 Jul 2019 | Project Director, Vale Inco Goro Nickel; VP Asset Development Projects, BHP Billiton Iron Ore; Technical Steering Committee member for the Gruyere gold project | I Eng (UK), MAICD |
Paul Hallam | Non-Executive Director; chairs the Audit & Risk Committee | 21 Aug 2019 | Former Director of Operations at Fortescue; EGM Developments & Projects at Newcrest; Director of Victorian Operations at Alcoa; NED of Greatland Gold plc (since September 2021) | BE (Hons) Mining (Melbourne), FAICD, FAusIMM |
Chris Burton | Chief Financial Officer (contract, via Omnia Corporate Pty Ltd) | 24 Mar 2025 | Replaced Kudzai Mtsambiwa | — |
Susan Park | Company Secretary | 25 Nov 2020 | Governance professional | BCom, ACA, F Fin, FGIA, FCIS, GAICD |
“—” = not publicly disclosed.
Directors' Remuneration
| KMP | Salary & fees (AUD) | Bonus (AUD) | Super (AUD) | Share-based (AUD) | Other (AUD) | Total (AUD) | % performance-linked |
|---|---|---|---|---|---|---|---|
Keith F. Jones | 100,000 | 0 | 12,000 | 0 | 0 | 112,000 | 0 |
Andrew Marshall | 50,000 | 0 | 6,000 | 0 | 0 | 56,000 | 0 |
Paul Hallam | 50,000 | 0 | 6,000 | 0 | 0 | 56,000 | 0 |
Chris Stevens (CEO) | 373,760 | 94,934 | 30,000 | 245,072 | 38,643 | 782,409 | 43 |
Chris Burton (CFO) | 123,690 | 0 | 0 | 61,916 | 0 | 185,606 | 33 |
Total | 697,450 | 94,934 | 54,000 | 306,988 | 38,643 | 1,192,015 | — |
Directors' Remuneration (Annual)
| CEO total remuneration (AUD) | FY2025 | FY2026 |
|---|---|---|
Chris Stevens | 575,641 | 782,409 |
Governance Overview
| Feature | Detail |
|---|---|
Board size | 4 (3 NEDs, 1 executive) |
Independence | Three non-executive directors (Jones, Marshall, Hallam). The chair, Keith Jones, also chaired Gindalbie, Coda's former parent, and holds about 14.5m shares. |
Chair / CEO separation | Yes |
Committees | Audit & Risk (Hallam chair; Jones, Marshall); Nomination & Remuneration (Jones chair; Marshall, Hallam) |
FY2026 meeting attendance | Board: 8 held. Jones, Marshall and Stevens attended 8; Hallam 7 |
NED fee pool | A$950,000 (approved July 2019); actual base fees A$200,000 plus superannuation |
Gender diversity | All four directors are male; the Company Secretary is female |
ASX Corporate Governance Principles | Board states it has "substantially adhered" |
Directors' Shareholdings
| Director holdings (date of FY2026 report) | Shares | Listed options | Performance rights |
|---|---|---|---|
Keith F. Jones | 14,467,398 | 2,485,044 | 0 |
Paul Hallam | 3,633,490 | 731,785 | 0 |
Andrew Marshall | 1,555,063 | 449,593 | 0 |
Chris Stevens | 1,354,510 | 539,675 | 11,166,025 |
Chris Burton | 0 | 0 | 2,000,000 |
Board of Directors — Bill Bloking
| Name | Role | Notes |
|---|---|---|
Bill Bloking | Chair | Led the 2021 IPO |
Steve Shedden | Managing Director, co-founder | Previously founded Gindalbie Metals (1993), Oroya Mining (2002) and Argentina Mining (2010) |
"Mike" (surname not confirmed) | Co-founder; executive director, later NED | Mining engineer and minerals geologist with 40 years' experience; Royal School of Mines graduate |
Competitive Landscape
Key Competitors
| Competitor / peer | Segment overlap | Relative positioning vs Coda |
|---|---|---|
BHP (Olympic Dam, Oak Dam West, Carrapateena, Prominent Hill) | Same province; the dominant regional producer | Major and a potential acquirer or infrastructure neighbour; Oak Dam West is about 15 km away |
Tasman Resources (ASX: TAS), Lake Torrens JV with Fortescue | Gawler Craton IOCG exploration | Earlier-stage explorer; no resource-based development case |
Fortescue (Lake Torrens JV partner) | SA IOCG exploration | Major diversifier entering SA copper exploration |
Hillgrove Resources (Kanmantoo, SA) | SA copper | Producer; different scale and stage |
Taruga Minerals (SA sediment-hosted copper) | Similar deposit style | Exploration stage |
Boss Energy | Partner at Kinloch | Uranium producer; collaborator, not a competitor |
Kalamazoo Resources | Ex-Torrens asset holder | Victorian gold; not a direct competitor |
AIC Mines (Queensland copper) | Australian copper development / production | Producer; competes for copper-equity capital |
Caravel Minerals (WA copper) | Australian large-scale copper developer | Peer for development-capital allocation |
Hot Chili (copper, Chile; ASX-listed) | ASX copper developer peer | Peer for copper-developer capital |
Competitor Detail
| Benchmark metric | Coda (FY2026) |
|---|---|
Revenue (AUD) | 0 |
Net loss (AUD) | -10,856,225 |
Cash (AUD) | 10,767,106 |
Contained CuEq resource (kt) | 1,067 |
Post-tax NPV7, base case (AUD Mn) | 1,521 |
Derived EV (AUD Mn, approx.) | 33 |
Derived EV / post-tax NPV7 (%) | 2.2 |