Tysan Holdings Limited Overview
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
| Employees at year end (number) | 790 | — | — | 733 | 631 |
Notes: FY2021 is "approximately 790" per Annual Report 2021. Year-end headcount for FY2022 and FY2023 was not captured. The interim data points were 793 (Jun 2022), 836 (Jun 2023), 752 (Jun 2024), 716 (Jun 2025) and ~614 (Jun 2026). The workforce has shrunk by roughly a quarter from its mid-2023 peak, consistent with lower piling volumes.
Tysan Holdings is a Blackstone-controlled, Bermuda-incorporated holding company whose economic substance is now almost entirely one business: foundation piling and associated geotechnical works in Hong Kong, delivered through Tysan Foundation Limited and Tysan Foundation Geotechnical Limited. Once a diversified contractor-developer with residential and investment property in Shanghai, Tianjin and Shenyang, the group divested its Mainland real-estate portfolio in 2019–2020 and returned the proceeds through very large special dividends. What remains is a mid-sized, asset-light-by-history, net-cash specialist subcontractor. It generates HK$2.0–2.7bn of annual revenue at very thin margins (gross margin 2–5%) and is highly concentrated on a handful of main-contractor customers. The equity story rests on three pillars: a balance sheet in which cash (≈HK$0.97bn at June 2026) approaches the market value; an aggressive distribution policy in which payouts have exceeded earnings; and optionality on Hong Kong's public-works pipeline, notably the Northern Metropolis.
What the company does
Tysan's operating activity is foundation construction in Hong Kong. Its subsidiaries act as specialist foundation subcontractors, and occasionally as direct contractors, for building and infrastructure projects. Descriptions in market databases, which mirror the company's activity disclosures, list the following services:
Foundation types: bored piling, driven piling, socketed H-piling, mini piling, pre-boring, pile caps and footings.
Basement and earth-retaining works: basement construction, shoring and diaphragm walls.
Wider geotechnical and civil works: ground investigation field works, site formation, demolition, landslip-prevention and slope works, road and drainage, and minor building works.
Equipment: historically, trading and leasing of tower cranes and construction machinery.
Machinery leasing has dwindled to a negligible line: HK$133k of rental income in FY2024 and HK$150k in H1 2025, with nil in H1 2026.
The formal reporting structure still carries three segments: Foundation Piling; Property Development and Investment; and Corporate and Others. However, 100% of external revenue in FY2023, FY2024, FY2025 and H1 2026 came from Foundation Piling and was earned in Hong Kong. Revenue is recognised over time under construction contracts (Interim Report 2026, note 4).
Company's own description (paraphrased from filings)
The 2026 interim notes describe the group's principal activities as foundation piling, site investigation, and property development and investment, with shares listed on the SEHK Main Board. The annual Report of the Directors states that the company itself is an investment holding vehicle and that its operations are carried out mainly by subsidiaries in Hong Kong. Its compliance perimeter covers Hong Kong, Bermuda, the British Virgin Islands, Mainland China and Macau. The corporate website notes that the group previously operated property development, investment and management businesses in Shanghai, Tianjin and Shenyang, and positions itself as one of Hong Kong's leading and largest foundation companies.
Independent characterisation
Business model. Tysan is a project-based specialist subcontractor. It wins foundation packages through competitive tender, mostly from main contractors and developers. Revenue is recognised on a percentage-of-completion basis, and value is captured through:
-
The tender margin.
-
Execution efficiency on plant, labour, materials (steel, concrete, bentonite) and subcontractors.
-
Variation and claims management.
There is no subscription, licensing or recurring revenue. The revenue model is approximately 100% service (construction services).
Value-chain position. Tysan sits at the front end of the construction cycle. Piling is among the first trades on site, so its order intake leads overall construction activity by 12–24 months. This makes it a leading indicator of the Hong Kong building cycle, but also among the first to suffer when land sales and private starts fall, as they did in 2023–2025.
Customer types.
-
Main contractors: the dominant channel.
-
Hong Kong government departments and statutory bodies, mostly indirectly through main contractors on public housing, police quarters, schools, markets and community facilities.
-
Private developers: residential, commercial and logistics projects.
Concentration is high. In FY2025 the five largest customers accounted for 71% of revenue and the largest alone 29% (Annual Report 2025). In FY2024 a single customer ("Customer A") contributed HK$1,023m, or 42.6% of revenue (FY2024 results announcement).
End-markets.
-
Public housing and public facilities, including Light Public Housing and rental housing at Fanling North and Tung Chung.
-
Private residential.
-
Commercial and office, for example at King's Road and Sai Yee Street.
-
Logistics and warehousing at Tsing Yi and Kwai Chung.
-
Institutional buildings such as schools and police quarters.
Capital intensity. Piling is plant-intensive. Depreciation of property, plant and equipment ran at HK$56.6–56.8m a year in FY2023–FY2024, and right-of-use depreciation at HK$13.6–15.3m. Capex has since been cut sharply, from HK$61.6m in FY2023 to HK$27.7m in FY2024, ≈HK$6m in FY2025 and ≈HK$1m in H1 2026. PP&E has shrunk from HK$167.9m (Dec 2023) to HK$65.6m (Jun 2026). This is the single most important strategic signal in the accounts: the fleet is being harvested rather than renewed.
Strategy
Stated strategy (themes paraphrased from AR2025 and Interim 2026)
-
Stay focused on foundation piling and look for suitable investment opportunities. This language appeared in AR2021 and has been repeated in substance since.
-
Remain vigilant in the near term while cautiously optimistic about the future. The aim is continuous improvement in operating efficiency and effectiveness, so the group is positioned to seize upcoming opportunities.
-
Lean on the public-sector pipeline. Management names the Northern Metropolis Development Bill, the San Tin Technopole, the Northern Link and steady public housing supply as the main demand drivers. It notes that private-sector tender flow remains muted despite a pick-up in property-market momentum (Interim 2026).
-
Prudent treasury. Surplus funds are kept as deposits with leading banks; borrowings are in HKD at floating rates; capex is funded internally.
-
Shareholder returns. The dividend policy (adopted 7 May 2019) sets no fixed payout ratio. Dividends are paid at the board's discretion after allowing for working capital and growth needs. The board attributed the 100% rise in the 2025 interim and the 20% rise in the 2025 final to profitability while retaining adequate reserves (AR2025).
-
Corporate culture. The company's business model and core values (sustainable development, quality assurance, professional training, continuous monitoring) are published on its website.
Initiatives in the last 24 months
| Date | Initiative | Detail / target |
|---|---|---|
| 20 Feb 2025 | Updated Shareholders' Communication Policy | Fully virtual AGMs with live Q&A |
| 1 Apr 2025 – 1 Jan 2026 | Leadership transition in the Foundation Division | Lau Kin Fai consolidates leadership of both divisions |
| 16 Dec 2025 | 2025 Master Agreement with the Fung Group (1 Jan 2026 – 31 Dec 2028) | Cross-subcontracting of foundation, building and E&M works with entities controlled by the Vice Chairman. H1 2026 cap utilisation ≈HK$24m (foundation) and ≈HK$23.6m (building and construction). Tysan Building Construction subcontracted ≈HK$47.6m of foundation works to TFGL in H1 2026 |
| 16 Dec 2025 | Workforce diversity policy; revised board diversity policy | Board female ratio ≥33% (currently ≈36%); workforce female ratio ≥15% (currently ≈21%) |
| 20 Mar 2026 | Revised whistleblowing policy | Oversight by the Audit Committee |
| FY2024–H1 2026 | Capex retrenchment | Capex down from HK$61.6m (FY2023) to HK$27.7m (FY2024), ≈HK$6m (FY2025) and ≈HK$1m (H1 2026). An implicit asset-light, harvest strategy; not articulated as a formal programme |
| FY2024–FY2026 | Escalating cash distributions | DPS: 3.5c (FY2024) → 5.0c (FY2025) → 3.0c interim (H1 2026) |
Medium-term targets and guidance
No numerical revenue, margin, order-intake or ROE targets are disclosed. Management gives only qualitative commentary. There are no ESG quantitative targets in the documents reviewed beyond the diversity ratios. There is no transformation programme, cost-programme target, digital platform investment or new business launch.
Products & Services
Tysan does not publish a product catalogue with specifications or prices. The following list is assembled from activity descriptions in market databases (Finnomena and Yahoo profiles derived from company disclosures) and named contracts in annual and interim reports. Pricing is contract-specific and not publicly disclosed for every line.
Foundation Piling segment
| Offering | Description | Target customer | Pricing model | Named flagship examples |
|---|---|---|---|---|
| Bored piling (large-diameter cast-in-place) | Deep foundations for high-rise and heavy structures, including socketing into rock | Main contractors and developers on high-rise residential, commercial and public housing | Tendered lump-sum or remeasured contracts (not disclosed) | Public rental housing at Fanling North Area 15 East (Phases 1–2) per Interim 2023 and FY2024 announcements |
| Driven piling (steel H-piles, precast) | Percussive or hydraulic driven piles for lighter structures and reclaimed ground | Contractors on low- to mid-rise and infrastructure jobs | — | Not specifically named |
| Socketed H-piling | Steel H-piles set in pre-bored rock sockets, a Hong Kong-specific solution for steep rockhead | High-rise jobs with shallow or variable rock | — | Not specifically named |
| Mini piling | Small-diameter piles for restricted sites, underpinning and slope works | Urban infill and site-constrained projects | — | Not specifically named |
| Pre-boring | Drilling through obstructions ahead of piling | Sites with boulders or old foundations | — | Not specifically named |
| Pile caps and footings | Reinforced-concrete transfer elements on pile groups | Integrated foundation packages | — | Included in integrated packages |
| Basement construction, excavation and lateral support (ELS) | Shoring, struts, sheet piling, bulk excavation | Commercial and residential with basements | — | Commercial projects at 734 King's Road and Sai Yee Street (AR2025, Interim 2026) |
| Diaphragm walls | Slurry-trench reinforced-concrete retaining walls | Deep basements and underground infrastructure | — | Not specifically named |
| Ground investigation field works | Drilling, sampling and in-situ testing | Government and consultants | — | Not specifically named |
| Site formation | Earthworks and platform preparation | Developers and government | — | Not specifically named |
| Demolition | Pre-foundation demolition | Redevelopment projects | — | Not specifically named |
| Landslip prevention and slope works | Soil nails, retaining structures | Government (GEO programmes) | — | Not specifically named |
| Road and drainage works; minor building works | Ancillary civil and building works | Government and contractors | — | Not specifically named |
| Machinery leasing and trading (incl. tower cranes) | Leasing of plant; historically a tower-crane business | Contractors | Rental | Rental income HK$133k (FY2024), HK$150k (H1 2025), nil (H1 2026) |
| Testing services | Listed in aggregator activity descriptions | Internal and external | — | — |
Contracts on hand as disclosed (chronological)
| Report | Major contracts named by the company |
|---|---|
| Interim 2023 | NKIL 6610 at Kai Tak Area 1E Site 1; IL 9065 at Gage Street/Graham Street; STTL 157 at Shap Sz Heung; FSSTL 278 and FSSTL 279 (Areas 24/25, Fanling-Sheung Shui); West Kowloon Cultural District Zones 2B and 2C; Fanling North Area 15 East public rental housing Phases 1–2 |
| FY2024 results (Mar 2025) | KIL 11273 (Sai Yee Street / Argyle Street, Mong Kok); Fanling North Area 15 East Phase 2; Tung Chung Area 42 rental housing; warehouse at Kwai Chung Container Terminal 2; Light Public Housing at Tuen Mun Area 54 and Sheung On Street / Sheung Ping Street, Chai Wan |
| Interim 2025 (Aug 2025) | Commercial project at Sai Yee Street; housing at Mei Tin, Shap Pat Heung, Choi Shun Street, Kwok Shui Road, Tung Chung Area 50, Rose Street, Kai Tak Area 2A Site 2; Western District married police quarters; Tseung Kwan O complex market |
| Annual Report 2025 (Mar 2026) | Logistics development at Tsing Yi; commercial at 734 King's Road and Sai Yee Street; housing at Queen's Hill, Choi Shun Street, Kwok Shui Road, Rose Street, Kai Tak Area 2A Site 2; a school at Tin Shui Wai; several community projects |
| Interim 2026 (Aug 2026) | Logistics at Tsing Yi; commercial at 734 King's Road and Sai Yee Street; housing at Kwu Tung South, Nga Tsin Wai Village, Sa Po Road, Cheung Sha Wan, Queen's Hill, Kwok Shui Road, Kai Tak Area 2A Site 2; school at Tin Shui Wai; community projects |
The aggregate order book value (backlog in HK$) is not publicly disclosed. This is a material information gap compared with peers such as Chinney Kin Wing, which disclosed 12 foundation projects with a HK$2.32bn contract sum at end-2025. The appearance of Kwu Tung South in 2026 is notable: it is a Northern Metropolis new development area and marks the group's first named NM-adjacent housing job in recent reports.
Property Development and Investment segment (legacy)
No active products. Historic portfolio:
-
Shanghai: residential, including the Tysan Riverside project referenced in press, plus investment properties.
-
Tianjin: Tianjin International Building. etnet's structure data still shows a 46.6% interest, but this is stale aggregator data.
-
Shenyang: The Pinnacle.
All of these were disposed of in 2015–2020 per filings and press. The segment reported nil revenue and losses of under HK$1m a year in FY2023–H1 2026.
Financial Narrative
Income statement
Sources and notes:
-
FY2022–FY2024 line items are from the FY2023 (Chinese) and FY2024 results announcements.
-
FY2025 revenue, profit and EPS are from Annual Report 2025.
-
FY2025 gross profit and cost of sales are derived: Yahoo's trailing-twelve-month gross profit to June 2026 (HK$88.72m), minus H1 2026 gross profit (HK$38.4m), plus H1 2025 gross profit (HK$54.1m).
-
FY2021 revenue is from Stockopedia; FY2021 profit is from the AR2025 five-year summary (−HK$107k).
-
Operating profit = PBT + finance costs. EBITDA = operating profit excluding interest income + depreciation of PP&E and right-of-use assets (derived).
-
DPS: FY2022 = 1.0c interim + 1.5c final; FY2023 = nil interim + 1.5c final; FY2024 = 1.0c + 2.5c; FY2025 = 2.0c + 3.0c.
Margin profile (%)
Revenue CAGR FY2021–FY2025: −1.6% per year (derived). Revenue peaked in FY2023 at HK$2.70bn and has fallen 23% over two years. Stockopedia shows a −7.5% figure on a different averaging basis; the discrepancy reflects methodology, not data.
Commentary.
Revenue: The FY2022–FY2023 expansion was driven by a cluster of large public-housing and Kai Tak/West Kowloon packages. The FY2024–FY2025 contraction reflects the collapse in private-sector starts after Hong Kong's 2022–2024 property downturn and land-sale failures. The order book was progressively replaced at lower volumes. H1 2026 revenue was flat year on year (HK$1,151m vs HK$1,150m), which suggests revenue may be stabilising around HK$2.1–2.3bn annualised.
Gross margin: Margins are structurally thin. Piling subcontracting in Hong Kong is fiercely competitive, and Tysan's gross margin of 2–5% compares very unfavourably with Chinney Kin Wing (21.5% in FY2025, 14.7% in FY2024). That gap is too large to be explained by mix alone. It points to a combination of:
-
more aggressive bidding;
-
a cost structure in which most site labour and overhead sits in cost of sales;
-
legacy loss-making contracts (FY2023). The improvement to ≈5% in FY2025 was the best in the period. The H1 2026 decline to 3.3% (from 4.7%) shows how fragile it is.
Below the gross line: Interest income has been a crucial profit pillar: HK$23.3m in FY2023, HK$29.8m in FY2024, HK$14.3m in H1 2025 and HK$12.1m in H1 2026. In FY2024, interest income equalled 73% of pre-tax profit. Administrative expenses are sticky at ≈HK$71–74m a year (≈HK$37m in H1 2026). Falling HKD deposit rates are therefore a direct earnings headwind.
Tax: FY2022–FY2023 effective rates were distorted, since tax exceeded PBT in FY2023 because losses could not be relieved across entities. FY2024 and H1 2025/H1 2026 show small tax credits from deferred-tax releases.
Balance sheet
Sources and notes:
-
Totals for FY2021–FY2025 are from the AR2025 five-year summary.
-
FY2022 detail is from the comparative column of the 2023 interim balance sheet.
-
FY2023–FY2024 detail is from the FY2024 results announcement; FY2025 detail is from the comparative column of Interim Report 2026.
-
FY2022 cash of HK$770.3m is the company's "cash and cash equivalents" line. TipRanks reports HK$678.9m for the same date, probably due to a time-deposit reclassification; the company figure is used.
-
TipRanks shows HK$650.9m of cash and equivalents; borrowings were HK$90m at June 2021.
-
No goodwill or intangibles appear on any balance sheet reviewed.
Interim position at 30 June 2026:
-
Total assets HK$1,825m; total equity HK$1,069m.
-
Cash on hand ≈HK$974m (HK$602.3m cash and equivalents plus HK$372.0m time deposits).
-
Borrowings HK$37.7m; lease liabilities HK$16.3m.
-
Contract assets HK$478.0m; trade receivables HK$159.0m.
-
Trade and retention payables, accruals and provisions HK$605.0m; provisions rose to HK$46.8m from HK$7.4m.
-
After 30 June, the HK$101.0m interim dividend was paid on 25 Sept 2026, implying pro-forma cash of roughly HK$870m before operating flows (derived).
Commentary. Three features dominate.
-
Cash approaches market value. Net cash of ≈HK$0.96bn at FY2025 and ≈HK$0.94bn at June 2026 is 80–85% of market capitalisation.
-
Working capital is unwinding into cash. Contract assets fell from HK$829m (FY2022) to HK$358m (FY2025) as the large FY2022–FY2023 jobs were certified and paid. This release, not earnings, is what funded rising dividends. The reversal in H1 2026 is a warning: contract assets rose by HK$120m and trade receivables by HK$100m, offset by a HK$235m rise in payables and accruals.
-
The equity base is shrinking. Equity fell from HK$1,415m to HK$1,150m over FY2021–FY2025, and to HK$1,069m by June 2026, because distributions exceed profits. The 2025 final dividend was charged partly to contributed surplus (HK$54.0m) and partly to retained profits (HK$47.0m). Retained profits were HK$152.5m and contributed surplus HK$584.4m at June 2026. Distributable reserves were HK$679.8m at end-2025 under the Bermuda Companies Act.
Cash flow
Sources and notes:
-
Operating cash flow and free cash flow for FY2021–FY2024 are from TipRanks.
-
Capex is company-stated: FY2022 from AR2022, FY2023 from segment capital expenditure, FY2024 from the FY2024 results, FY2025 from AR2025.
-
Dividends paid are derived from DPS × 3,366.0m shares: FY2023 = 2022 final; FY2024 = 2023 final + 2024 interim; FY2025 = 2024 final (HK$84.2m) + 2025 interim (HK$67.3m).
-
No buybacks were made in FY2024 or FY2025 (Report of the Directors).
Half-year cash flow:
For FY2026, the company is distributing HK$202m in cash dividends (2025 final plus 2026 interim), against first-half profit of HK$19.2m.
Ratios
All ratios are derived from the tables above. ROE for FY2025 (5.13%) matches Yahoo Finance. The FY2022 payout reflects DPS of 2.5c against EPS of 0.13c. Negative net debt/EBITDA indicates net cash. ROIC uses a 16.5% Hong Kong tax rate.
Interpretation. Returns on equity are low (≤5%) even in good years, because the large cash pile earns deposit rates and the operating margin is thin. Excluding cash, the operating business earns a mid-single-digit return on a shrinking capital base of ≈HK$0.2–0.5bn. The payout ratio of ~275–290% for FY2024–FY2025 is plainly unsustainable on earnings alone. It is a deliberate capital-return policy funded by the cash surplus and contributed-surplus reserves.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Overview
| Segment | Contents | Status |
|---|---|---|
Foundation Piling | Bored, driven, socketed H and mini piling; pre-boring; pile caps and footings; ELS and basements; diaphragm walls; site investigation; associated civil works; plant leasing (de minimis). Operating subsidiaries include Tysan Foundation Limited and Tysan Foundation Geotechnical Limited (wholly owned) | Sole revenue-generating segment |
Property Development and Investment | Residual legacy entities from the former Shanghai, Tianjin and Shenyang property business | Dormant: nil revenue, small losses |
Corporate and Others | Head office, treasury, listed-company costs; historically some machinery trading and other income | Cost centre |
Revenue by Segment
| Segment | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Foundation Piling revenue (HKD Mn) | 2,164.1 | 2,458.7 | 2,703.3 | 2,402.8 | 2,070.5 |
Corporate and Others revenue (HKD Mn) | 41.7 | 16.3 | 0 | 0 | 0 |
Property Development and Investment revenue (HKD Mn) | 0 | 0 | 0 | 0 | 0 |
Total group revenue (HKD Mn) | 2,204.1 | 2,473.6 | 2,703.3 | 2,402.8 | 2,070.5 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansResults by Segment and Segment Margins & Growth (%)
| Segment | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Foundation Piling segment result (HKD Mn) | — | — | 25.5 | 53.0 | 72.0 |
Property Development and Investment result (HKD Mn) | — | — | -0.8 | -0.9 | — |
Corporate and Others result (HKD Mn) | — | — | -38.3 | -35.9 | — |
Interest income, unallocated (HKD Mn) | — | — | 23.3 | 29.8 | — |
Foundation Piling segment margin (%) | — | — | 0.94 | 2.21 | 3.48 |
Foundation Piling revenue YoY growth (%) | — | 13.6 | 9.9 | -11.1 | -13.8 |
Foundation Piling share of revenue (%) | 98.2 | 99.4 | 100 | 100 | 100 |
Results by Segment and Segment Margins & Growth (%) (Half-Yearly)
| Metric | H1 2022 | H1 2023 | H1 2024 | H1 2025 | H1 2026 |
|---|---|---|---|---|---|
Group revenue (HKD Mn) | 1,018 | 1,426 | 1,009 | 1,150 | 1,151 |
Foundation Piling segment result (HKD Mn) | 43 | -22 | 19 | 38 | 24 |
Profit attributable (HKD Mn) | -3 | -41 | 11 | 34 | 19 |
Gross profit (HKD Mn) | — | — | — | 54.1 | 38.4 |
Gross margin (%) | — | — | — | 4.71 | 3.34 |
Income Statement and Per-Share Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue (HKD Mn) | 2,204.1 | 2,473.6 | 2,703.3 | 2,402.8 | 2,070.5 |
Cost of sales (HKD Mn) | — | 2,391.6 | 2,640.1 | 2,320.6 | 1,966.1 |
Gross profit (HKD Mn) | — | 82.0 | 63.1 | 82.2 | 104.4 |
Other income and gains (HKD Mn) | — | 30.1 | 31.5 | 40.9 | — |
Administrative expenses (HKD Mn) | — | 73.7 | 73.3 | 71.2 | — |
Other expenses, net (HKD Mn) | — | 10.3 | 11.2 | 5.5 | — |
Operating profit incl. interest income (HKD Mn) | — | 28.2 | 10.1 | 46.4 | — |
Operating profit excl. interest income (HKD Mn) | — | — | -13.2 | 16.7 | — |
Depreciation and amortisation (HKD Mn) | — | — | 70.1 | 72.1 | — |
EBITDA excl. interest income (HKD Mn) | — | — | 56.9 | 88.7 | — |
Finance costs (HKD Mn) | — | 2.3 | 7.7 | 6.6 | — |
Profit before tax (HKD Mn) | — | 25.9 | 2.4 | 39.8 | — |
Income tax expense (credit) (HKD Mn) | — | 21.4 | 15.4 | -1.0 | — |
Net profit attributable (HKD Mn) | -0.1 | 4.5 | -13.0 | 40.8 | 61.3 |
EPS basic (HK cents) | -0.003 | 0.13 | -0.39 | 1.21 | 1.82 |
EPS diluted (HK cents) | -0.003 | 0.13 | -0.39 | 1.21 | 1.82 |
Dividend per share declared (HK cents) | — | 2.5 | 1.5 | 3.5 | 5.0 |
Margin Analysis (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Gross margin (%) | — | 3.32 | 2.34 | 3.42 | 5.04 |
Operating margin incl. interest income (%) | — | 1.14 | 0.37 | 1.93 | — |
EBITDA margin excl. interest income (%) | — | — | 2.10 | 3.69 | — |
Pre-tax margin (%) | — | 1.05 | 0.09 | 1.66 | — |
Net margin (%) | 0.00 | 0.18 | -0.48 | 1.70 | 2.96 |
Balance Sheet
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Total assets (HKD Mn) | 2,080.7 | 2,128.2 | 1,914.8 | 1,915.5 | 1,706.8 |
Total liabilities (HKD Mn) | 665.6 | 785.0 | 631.5 | 676.3 | 556.6 |
Total equity (HKD Mn) | 1,415.1 | 1,343.2 | 1,283.3 | 1,239.2 | 1,150.1 |
Cash on hand incl. time deposits (HKD Mn) | — | 770.3 | 747.1 | 886.6 | 1,043.9 |
Interest-bearing borrowings, current (HKD Mn) | — | 24.0 | 24.0 | 24.5 | 24.7 |
Interest-bearing borrowings, non-current (HKD Mn) | — | 128.5 | 104.5 | 80.0 | 55.2 |
Total borrowings (HKD Mn) | — | 152.5 | 128.6 | 104.5 | 80.0 |
Lease liabilities (HKD Mn) | — | 13.7 | 13.3 | 23.2 | 21.3 |
Net cash, excl. leases (HKD Mn) | — | 617.8 | 618.5 | 782.1 | 963.9 |
Goodwill and intangibles (HKD Mn) | — | 0 | 0 | 0 | 0 |
Property, plant and equipment (HKD Mn) | — | 173.9 | 167.9 | 130.5 | 84.2 |
Right-of-use assets (HKD Mn) | — | 101.7 | 97.7 | 103.9 | 98.1 |
Contract assets (HKD Mn) | — | 828.7 | 639.9 | 563.8 | 358.4 |
Trade receivables (HKD Mn) | — | 124.1 | 125.1 | 148.2 | 59.2 |
Net current assets / working capital (HKD Mn) | — | 1,208.7 | 1,131.7 | 1,100.4 | 1,036.1 |
Cash Flow
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Operating cash flow (HKD Mn) | 25.1 | 170.5 | 119.7 | 255.0 | — |
Capex, machinery and equipment (HKD Mn) | — | 53.0 | 61.6 | 27.7 | 6.0 |
Free cash flow, as reported by TipRanks (HKD Mn) | -9.3 | 122.3 | 48.1 | 228.1 | — |
Dividends paid (HKD Mn) | — | — | 50.5 | 84.2 | 151.5 |
Share buybacks (HKD Mn) | — | — | — | 0 | 0 |
Financial Analysis
| Item | H1 2025 | H1 2026 |
|---|---|---|
Net operating cash flow | HK$136.2m | HK$65.3m |
Purchases of PP&E | HK$3.6m | HK$1.4m |
Bank borrowings repaid | HK$102.3m | HK$42.4m |
New bank borrowings | HK$90.0m | nil |
Dividends paid | HK$84.2m | HK$101.0m |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
ROE on average equity (%) | 0.33 | -0.99 | 3.23 | 5.13 |
ROA on average assets (%) | 0.22 | -0.64 | 2.13 | 3.39 |
ROIC, after-tax op. profit excl. interest income / (equity + debt − cash) (%) | — | -1.7 | 3.0 | — |
Current ratio (x) | 2.89 | 3.22 | 2.92 | 3.14 |
Debt to equity (x) | 0.11 | 0.10 | 0.08 | 0.07 |
Net debt to EBITDA (x) | — | -10.9 | -8.8 | — |
Interest coverage, operating profit / finance costs (x) | 12.1 | 1.3 | 7.0 | — |
Asset turnover (x) | 1.18 | 1.34 | 1.25 | 1.14 |
DSO incl. contract assets (days) | — | 103 | 108 | 74 |
Inventory days (days) | — | 13 | 7 | 5 |
Payables days, trade + retention (days) | — | 38 | 48 | 31 |
Cash conversion cycle (days) | — | 78 | 67 | 48 |
Dividend payout ratio (%) | 1,923 | — | 289 | 275 |
Revenue by Region and Region Margins & Growth (%)
| Region | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Hong Kong revenue (HKD Mn) | 2,210.2 | 2,473.6 | 2,703.3 | 2,402.8 | 2,070.5 |
Mainland China revenue (HKD Mn) | — | — | 0 | 0 | 0 |
Macau revenue (HKD Mn) | — | — | 0 | 0 | 0 |
Hong Kong YoY growth (%) | — | 11.9 | 9.3 | -11.1 | -13.8 |
Valuation Snapshot
| Metric | Value | Basis |
|---|---|---|
Market capitalisation | ≈HK$1,144m | 3,366.0m shares × HK$0.34 (derived) |
Enterprise value | ≈HK$224m (on 30 Jun 2026 balance sheet), or ≈HK$325m pro forma after the HK$101m Sep 2026 interim dividend | Market cap − cash HK$974m + borrowings HK$38m + leases HK$16m (derived) |
P/E, FY2025 | ≈18.7x | HK$0.34 / EPS 1.82c (derived) |
P/E, trailing 12 months to Jun 2026 | ≈24.6x | TTM profit HK$46.4m (61.3 − 34.1 + 19.2) (derived) |
P/B | ≈1.07x | Equity HK$1,069m at Jun 2026 (derived) |
EV/Sales, TTM | ≈0.11–0.16x | TTM revenue HK$2,071m (derived) |
EV/EBITDA, TTM | ≈3.8–5.5x | TTM EBITDA ≈HK$59.1m (Yahoo Finance) |
Dividend yield, trailing | ≈17.6% | 2025 final 3.0c + 2026 interim 3.0c |
Share Price & Returns
| Period | Performance | Basis |
|---|---|---|
1 year | Roughly +30% to +40% | Share prices implied by TipRanks market caps (≈HK$0.25–0.28 in May–Aug 2025) versus HK$0.34 now. MarketScreener showed +32% on a 1-year view. |
Long-term reference | 2019 Blackstone offer price HK$3.00/share, before ≈HK$3.19/share of 2019–2020 dividends (HK$2.95 in 2019 + HK$0.24 in 2020) | Absolute price comparisons across 2019–2020 are distorted by capital returns |
Capital Markets
| Metric | Tysan (687) | Chinney Kin Wing (1556) | Build King (240) |
|---|---|---|---|
FY2025 net profit (HKD Mn) | 61.3 | 133.1 | 449.9 |
FY2025 EPS (HK cents) | 1.82 | 8.88 | — |
Share price (HKD) | 0.34 (16 Oct 2026) | — | ≈1.50 (29 Jul 2026, StockAnalysis) |
P/E FY2025 (x) | ≈18.7 | — | — |
Per-Share Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Interim DPS (HK cents) | 1.0 | 1.0 | 0 | 1.0 | 2.0 |
Final DPS (HK cents) | — | 1.5 | 1.5 | 2.5 | 3.0 |
Total DPS (HK cents) | — | 2.5 | 1.5 | 3.5 | 5.0 |
Analyst Conclusions
Management guidance
There is no quantitative guidance. Management's latest qualitative view (Interim Report 2026):
-
The construction industry still faces challenges in H2 2026.
-
Tender flow for new projects is muted.
-
The public sector, particularly the Northern Metropolis, remains the main demand driver.
-
The group will stay vigilant in the short term while cautiously optimistic, and will pursue continuous operational improvement.
Consensus
No consensus estimates exist. The H1 2026 run-rate implies FY2026 profit below FY2025's HK$61.3m. If H2 2026 matches H2 2025's HK$27.2m, full-year profit would be ≈HK$46m (analyst arithmetic, not a forecast).
Bull case
-
Cash-backed downside. Net cash of ≈HK$0.87bn after the September 2026 dividend covers roughly three-quarters of market capitalisation. The operating business is valued at an EV of roughly HK$0.2–0.3bn, or about 4–5x TTM EBITDA.
-
Northern Metropolis optionality. A multi-year public-works ramp (San Tin Technopole, Northern Link, NDAs) could lift volumes from HK$2.1bn back toward the HK$2.5–2.7bn achieved in FY2022–FY2023. Kwu Tung South is already in hand.
-
Corporate-action catalyst. Blackstone's seven-year holding and strategic holders on the register (CCCC 5.08%, Nan Fung 6.98%) make a take-out or privatisation plausible. Any premium to a cash-heavy NAV of ≈HK$0.32/share would be value-accretive (speculative).
Bear case
-
Margin fragility. H1 2026 gross profit fell 29% on flat revenue. A structural 3–4% gross margin leaves almost no buffer against a single loss-making contract, as FY2023 showed.
-
Dividends exceed earnings. HK$202m of FY2026 cash dividends against ≈HK$40–50m of earnings capacity means the yield is partly a return of capital. Equity has fallen from HK$1,415m (FY2021) to HK$1,069m (Jun 2026). At this pace the distribution must eventually be cut.
-
Competitive erosion. A shrinking fleet (PP&E −62% since FY2022) and thin margins sit against a re-equipping peer earning 21.5% gross margins. Combined with falling deposit income and rising compliance costs, Tysan risks losing share and relevance in the very NM cycle the bull case depends on.
Key catalysts and monitorables (next 12 months)
| Item | Timing | What to watch |
|---|---|---|
| FY2026 results and final dividend | ≈Mar 2027 | H2 gross margin recovery versus H1's 3.3%; whether the final DPS is held at 3.0c |
| Order-book replenishment | Ongoing | New NM, public-housing and logistics awards named in the FY2026 report |
| Provisions and contract assets | FY2026 balance sheet | Whether the HK$46.8m provision (Jun 2026) signals a loss-making job; contract-asset rebuild |
| Interest income | Each half | HIBOR trajectory and its sensitivity on ≈HK$0.9bn of deposits |
| Capex | FY2026–FY2027 | Any fleet reinvestment, a precondition for competing on NM bored-pile packages |
| Blackstone / shareholder actions | Any time | Changes in Times Holdings II's 68.07%, placements, offers |
| Regulatory changes after Wang Fuk Court | 2026–2027 | Site-safety and supervision rules that raise costs |
| Governance | 2027 AGM | INED refreshment (two INEDs over 9 years); CEO appointment; succession for the Vice Chairman |
Concluding analyst verdict
Tysan Holdings today is less an operating growth story than a cash-rich, Blackstone-controlled distribution vehicle wrapped around a mid-sized Hong Kong piling contractor. The operating franchise is real: three decades of track record, an HKCA Council seat, a public-housing-heavy order book now including Northern Metropolis work, and the bonding capacity that a ≈HK$1bn cash pile confers. But its economics are poor. Gross margins of 2–5% trail the closest listed peer, Chinney Kin Wing, by more than 15 percentage points on comparable revenue. Interest income has supplied a large share of pre-tax profit. And the plant fleet is being run down rather than renewed.
The FY2024–FY2025 recovery, with profit reaching HK$61.3m, was genuine but flattered by contract-asset unwinding and high deposit rates. Both tailwinds are fading. The H1 2026 profit warning, with gross profit down 29% on flat revenue, confirms how thin the margin of safety is.
What sustains the equity is the balance sheet and the payout. At HK$0.34 the market capitalisation is about HK$1.14bn, against June 2026 equity of HK$1.07bn and net cash of roughly HK$0.87–0.94bn, depending on the September 2026 dividend. The implied value of the operating business is modest, and the trailing yield of about 17.6% is exceptional. However, distributions of 275–290% of earnings are consuming reserves. Investors are effectively being paid to wait, with their own capital, for one of two outcomes: a Northern Metropolis-driven volume and margin upturn, or a corporate event initiated by Blackstone.
The asymmetry is reasonable given the cash floor. The base case, however, is continued erosion of equity and an eventual dividend reset unless gross margins sustainably return to the ≥5% achieved in FY2025.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Age | Joined board / tenure | Background (paraphrased from AR2025) |
|---|---|---|---|---|
Justin WAI | Chairman, NED; Chairman of Nomination Committee; member of Remuneration Committee | 42 | NED 2014–2016; rejoined 11 Apr 2019 (≈6.7 yrs current stint) | Senior Managing Director, Blackstone Real Estate (Hong Kong); at Blackstone since 2007, focused on Greater China real-estate acquisitions and management. BSc |
FUNG Chiu Chak, Victor | Vice Chairman, ED; member of Nomination and Remuneration Committees | 71 | Since May 1994 (≈31.7 yrs) | Responsible for business development, strategy and general/project management. Over 46 yrs in consulting engineering, construction management and property development. BASc Civil Engineering; MHKIE. Indirectly owns 5.00% via Dragon's Eye Pacific Ltd. Controls Tysan Building Construction Co. Ltd (connected party) |
LAU Kin Fai | ED; President of Foundation Division and of Property Development & Investment Division | 64 | Joined group Jul 2008; ED 2010–2017, reappointed Jul 2020 | Quantity surveyor (FHKIS, FRICS) with ≈42 yrs in QS and property. HK Construction Association council member representing Tysan Foundation |
CHO Wen Wai, Mark | NED | 50 | From 11 Mar 2025 | Managing Director, Blackstone Real Estate (Shanghai); head of asset management for Blackstone's China real estate. BSc Economics, MBA |
YUEN Pak Man | NED; member of Nomination and Remuneration Committees | 37 | From Apr 2019 | Managing Director, Blackstone Real Estate (HK). MS Management Science & Engineering and BS Computer Science, Stanford |
GU Ye | NED | 35 | From Apr 2020 | Managing Director, Blackstone Real Estate (HK); at Blackstone since 2013, Greater China and Japan acquisitions |
HOU Xiangjia | NED | 42 | From Apr 2020 | Senior Vice President, Blackstone; manages Asian tax for Blackstone Real Estate. CA ANZ; BCom |
LUNG Chee Ming, George | INED; Chairman of Remuneration Committee; member of Audit and Nomination Committees | 69 | From Aug 2007 (≈18.4 yrs) | Senior executive regional director at Manulife (International). SBS, JP. Former CPPCC National Committee member (10th–13th) |
LI Kit Chee | INED; Chairman of Audit Committee | 71 | From Mar 2013 (≈12.8 yrs) | CPA (FCPA HK, FCCA); managing director of Arthur Li, Yau & Lee CPA Ltd. BSocSc (HKU) |
Jennifer KWOK | INED; member of Audit, Remuneration and Nomination Committees | 59 | ED 1998–2014; INED from Jul 2020 | Former Tysan ED for corporate finance, strategy and governance; ex-investment banker. MSc Management, MIT Sloan |
YANG Jing | INED; member of Audit, Remuneration and Nomination Committees | 44 | From Sep 2023 | Former Vice President of JD.com (2011–2023) and CFO of JINGDONG Property (2020–2023); formerly PwC. Member of the Chinese Institute of CPAs |
Executive Leadership Team
| Name | Role | Age | Joined | Background |
|---|---|---|---|---|
YIP Pui Shan | Financial Controller (since Jan 2020) | 47 | Nov 2010 | HKU accounting and finance; ≈10 yrs at an international audit firm; HKICPA member |
LAI Kok Wai | Director of Tysan Foundation Ltd, Tysan Foundation Geotechnical Ltd and other subsidiaries; technical head of Foundation Division | 67 | Jul 1994 | ≈45 yrs in civil and foundation engineering; MHKIE, MICE |
WONG Suk Han, Kitty | Company Secretary; Director of Corporate Affairs | 62 | Jun 2007 | Solicitor (Hong Kong; England & Wales); over 28 yrs in corporate finance and legal work |
Directors' Remuneration
| Attribute | Detail |
|---|---|
Board size | 11 (2 ED, 5 NED, 4 INED) after Chiu Chin Hung's retirement on 1 Jan 2026 |
Independence | 4/11 INEDs (36%), above the one-third Listing Rule minimum. Two INEDs (Lung, Li) have served more than 9 years |
Chair / CEO separation | Chair is a non-executive Blackstone representative; no CEO; Vice Chairman is executive |
Gender | 4 of 11 female (≈36%); target ≥33% |
Audit Committee | 4 INEDs, chaired by Li Kit Chee; 4 meetings in FY2025 |
Remuneration Committee | 7 members, INED chair (Lung); 4 meetings in FY2025 |
Nomination Committee | 7 members, chaired by Board Chairman Wai; 4 meetings in FY2025 |
Board meetings | 5 in FY2025 |
Internal audit | Outsourced to an independent consultant; no significant control failings reported for FY2025 |
CG deviations | Chairman absent from the 26 May 2026 AGM (Code F.1.3 / C.1.5 deviation, Interim 2026). Two NEDs absent from the 2024 AGM (Code C.1.6) |
Board & Management Changes
| Date | Change |
|---|---|
11 Mar 2025 | Vikram Garg (Blackstone) resigns as NED; Cho Wen Wai, Mark appointed |
1 Apr 2025 | Chiu Chin Hung hands the Foundation Division presidency to Lau Kin Fai |
1 Jan 2026 | Chiu Chin Hung retires as ED |
Major Shareholders
| Holder | Shares | % of issued | Notes |
|---|---|---|---|
Blackstone (aggregate deemed interest) | 2,356,146,781 | 70.00 | Via Times Holdings II Ltd (68.07%) and Tides Holdings II Ltd (balance ≈1.93%) |
— of which Times Holdings II Limited (BREP Asia II) | 2,291,316,850 | 68.07 | Immediate holding company (Cayman) |
Gavast Estates Ltd (Nan Fung / Chen's Group; estate of Chen Din Hwa) | 235,106,000 | 6.98 | Strategic legacy holder |
香港海事建設有限公司 (now 香港海洋投資發展有限公司), ultimately China Communications Construction Co. | 171,000,000 | 5.08 | State-owned construction group stake |
Dragon's Eye Pacific Ltd (Fung Chiu Chak, Victor) | 168,380,000 | 5.00 | Insider holding |
Public / other | ≈435,400,000 (derived) | ≈12.9 (derived) | Company states public float is at least 25% under Listing Rule definitions |
Competitive Landscape
Key Competitors
| Competitor | Ownership / listing | Positioning vs Tysan | Revenue (latest available) |
|---|---|---|---|
Chinney Kin Wing Holdings (1556.HK) | 74.5% owned by Chinney Alliance | Closest listed pure-play: foundation plus drilling and site investigation. Much higher margins; heavy recent fleet investment | HK$2,272.9m FY2025 (−8.6%); gross profit HK$487.7m; profit HK$133.1m |
Intrafor | Subsidiary of Gammon Construction (Jardine Matheson / Balfour Beatty JV) | Tier-1 specialist foundation contractor with captive main-contractor demand | — |
Bachy Soletanche Group (Hong Kong) | Soletanche Freyssinet / VINCI | Global geotechnical technology leader; diaphragm walls, deep foundations | — |
China State Construction foundation arm (e.g. China Overseas Foundation Engineering) | Within China State Construction International (3311.HK) | Vertically integrated SOE with captive public-works demand | Segment not separately disclosed in sources reviewed |
Chun Wo foundation businesses | Asia Allied Infrastructure (711.HK) | Integrated contractor with foundation capability | — |
Build King Holdings (240.HK) | Wai Kee group | Civil-engineering main contractor; customer and competitor in civil foundations | HK$13,842.7m FY2025; profit HK$449.9m |
Wan Kei Group (1718.HK) | GEM/Main Board small-cap | Socketed H-piles, mini piles, ground investigation; sub-scale | HK$186.9m in H1 FY2026 (6m to Sep 2025) |
Kwong Luen Engineering (1413.HK) | Small-cap | ELS, pile caps, site formation | HK$618.2m FY ended Mar 2024 (aggregator) |
Vibro (HK) and other private specialist piling contractors | Various private | Mid-tier piling | — |
CCCC-affiliated marine and foundation contractors | China Communications Construction (also a 5.08% Tysan holder) | SOE competitor in marine and infrastructure foundations | — |
“—” = not publicly disclosed.
Peer Comparison FY2025
| Metric | Tysan (687) | Chinney Kin Wing (1556) | Build King (240) | Wan Kei (1718) |
|---|---|---|---|---|
Revenue (HKD Mn) | 2,070.5 | 2,272.9 | 13,842.7 | 186.9 (H1 FY26) |
Revenue growth YoY (%) | -13.8 | -8.6 | -3.7 | 4.6 (H1 vs H1) |
Gross margin (%) | 5.0 (derived) | 21.5 | 7.5 | — |
Net profit (HKD Mn) | 61.3 | 133.1 | 449.9 | 1.1 (H1 FY26) |
Net margin (%) | 3.0 | 5.9 | 3.3 | 0.6 |
Employees (year end) | 631 | 628 | — | — |
Net cash position | ≈HK$964m | HK$742m cash, debt-free (plus HK$250m related-party loan receivable) | — | — |
DPS FY2025 (HK cents) | 5.0 | 2.0 | — | nil (H1) |
Recent Developments
The company does not announce individual contract wins.