VDM Group Limited Overview
VDM Group Limited is a Perth-based former engineering, construction and consulting contractor that, after catastrophic contract losses between FY2009 and FY2013, was recapitalised by Chinese private investors (H&H Holdings and Australia Kengkong Investments) and repositioned as a mineral explorer. Its only material assets are contractual interests in two Angolan joint ventures — a 65% interest in the Cachoeiras do Binga (CdB) sediment-hosted copper project, which carries a JORC (2012) Mineral Resource of 18.4Mt at 1.0% Cu for ~183,845t contained copper, and a 55.25% interest in the Cage Bengo gold project. Both are halted by a dispute with licence-holder Pebric Mining and Consulting LDA. With A$2.2m cash, A$17.9m of current liabilities dominated by an on-demand related-party loan, negative equity, no revenue and no operating staff, VDM was removed from the ASX in November 2025. It is best characterised as a distressed, controlled shell whose residual value depends on resolving its Angolan rights or on a recapitalisation sponsored by its controlling lender.
Company's own description (latest annual report)
In its FY2024 Annual Report (signed 17 April 2025), the company describes itself simply as a mineral exploration company holding joint-venture interests relating to the Cachoeiras do Binga copper project and the Cage Bengo project, both in the Republic of Angola. The directors state that the company is identifying new project opportunities with a preference for critical minerals aligned to global decarbonisation, while remaining open to other commodities and industries, and that it is considering a recapitalisation. The FY2024 report also states that likely developments and expected results were "not able to be determined at this time."
The segment note in the same report continues to describe two operating divisions — (i) construction (reported as "Construction & Trading") and (ii) mining and exploration — a legacy of the pre-2016 structure. Data-vendor profiles (Morningstar, Market Index) still describe the company as "an operationally diverse company arranged under three business divisions of VDM Mining, VDM Construction and VDM Trading," which reflects the 2014–2017 strategy under then-Executive Chairman Dr Dongyi Hua rather than current activity.
Independent characterisation
On the evidence of the FY2022–FY2024 financial statements, VDM has no operating business:
Revenue: A$1k per year in each of FY2022, FY2023 and FY2024, consisting entirely of interest income. Revenue from contracts with customers was nil in all three years.
Activity: All on-ground exploration at both Angolan projects has been suspended since the end of calendar 2019 (initially due to COVID-19, then due to joint-venture funding disagreements, then due to the Pebric dispute).
Cash generation: The only cash inflows in FY2023 and FY2024 came from the disposal of legacy property assets (A$740k from the Quartz Estate land in FY2023; A$1.178m from a Mandurah apartment in FY2024).
Funding: The company is sustained by forbearance from its controlling shareholder-lender (Kengkong) and from a CdB joint-venture partner owed A$4.679m (net), both of whom have confirmed they will not demand repayment in the near term.
Business model: Pre-revenue exploration (project-generation and resource definition), historically financed by related-party loans and placements, with the intended monetisation route being development or sale of the CdB copper deposit. In practice, the model has been dormant for six years.
Revenue model mix (FY2024): 100% interest income; 0% product, service, subscription or licensing.
Value chain position: Upstream, earliest-stage mineral exploration (resource definition), without any development, processing or offtake arrangements.
Customer types / end-markets: None currently. Prospective end-market would be refined copper (electrical/energy-transition demand) via concentrate sales, but no offtake, scoping or feasibility work has been disclosed. Historically (2006–2015), the company served mining and resources clients (e.g., BHP Billiton Iron Ore, BHP Billiton Petroleum, BHP Billiton Nickel West, MCC Mining at Sino Iron), state road agencies (Queensland Department of Transport and Main Roads), property developers, and commercial building clients.
Strategy
Stated strategy (FY2023 and FY2024 Annual Reports)
The recurring strategic themes in the last two annual reports are: (1) identifying new project opportunities, preferably in critical minerals consistent with global decarbonisation, while remaining open to other commodities and industries; (2) resolving the Angolan impasse — in FY2023 framed as ongoing negotiation over exploration plans, funding and partner contributions, and in FY2024 hardened into a dispute in which VDM reserves its rights and has engaged Angolan legal counsel; (3) a recapitalisation of the company; and (4) preserving cash by selling non-core property (Mandurah apartment, Quartz Estate land).
Initiatives in the last 24 months (Oct 2024 – Oct 2026)
| Initiative | Status | Source |
|---|---|---|
| Search for critical-minerals project (uranium, copper, lithium, gold; Australia focus) to satisfy LR 12.1 | No transaction announced; failed to restore quotation before delisting | Quarterly reports (TipRanks summaries); ASX removal notice |
| Angolan legal review of VDM's rights and claims vs Pebric | Ongoing as at last disclosure; outcome not disclosed | FY2024 AR; Dec 2024 quarterly |
| Recapitalisation of the company | Under consideration; none executed | FY2024 AR |
| Catch-up of overdue periodic reporting (Dec 2023–Sep 2024 quarterlies on 15 Jan 2025; Dec 2023 half-year on 7 Mar 2025; FY2024 AR on 22 Apr 2025) | Completed, but too late to prevent removal | ASX via deListed |
| Board renewal (Tang appointment; Fry departure; Hardie as CoSec) | Completed mid-2025 | TipRanks; deListed |
Sustainability/ESG commitments: none disclosed. Cost programs: de facto (suspension of chair/overseas director fees since Feb 2021; cancellation of credit cards; no D&O premium expense in FY2024). Medium-term financial targets/guidance: none provided.
Products & Services
VDM has no products or services currently offered to customers. Its "portfolio" consists of two exploration assets and a legacy brand set.
Mining & Exploration — current assets
| Attribute | Detail | — | — |
|---|---|---|---|
| Location | Central coastal Angola, east of the regional capital and port city of Sumbe; ~385km south of Luanda; within the central West Congo Copper Belt | — | — |
| Area | ~3,854 km² (~32km E–W × ~129km N–S) | — | — |
| Deposit style | Sediment-hosted copper, typical of central African copper belts | — | — |
| Licence holder | Pebric Mining and Consulting LDA (designated holder on behalf of the CdB JV) | — | — |
| Contract basis | Mining Investment Contract with Angola's Ministry of Geology and Mining (negotiations concluded Sep 2015) | — | — |
| Historical work | USGS stream sampling (1920s–late 1950s); Institute of Geology of Angola (IGEO) mapping/drilling in the 1970s (Areas 1–3); UNDP re-evaluation in 1983 | — | — |
| VDM work | Phase One drilling 2018 (Areas 1–3); Phase Two drilling 2019 (Area 4 west, Area 5 south) | — | — |
| Database | 134 diamond core holes, 7 trenches, 1,658 sampled intervals (Geovia Surpac) | — | — |
| Mineral Resource (JORC 2012, 26 Nov 2020, 0.2% Cu cut-off) | See table below | — | — |
| Status | No on-ground work since end-2019; frozen by Pebric dispute | — | — |
| Encumbrances | A$4.875m purchase consideration payable to a CdB JV partner (less A$196k share of exploration costs = A$4.679m net) due within 21 days of the next significant capital raising; AOA 53,313,000 (~A$133.8k) bank guarantee to the Angolan government | — | — |
| CdB Resource category | Tonnes (Mt) | Grade (% Cu) | Contained Cu (t) |
| Measured | 0.875 | 1.62 | 14,179 |
| Indicated | 12.592 | 0.98 | 123,411 |
| Inferred | 4.937 | 0.94 | 46,355 |
| Total | 18.404 | 1.00 | 183,845 |
| Attribute | Detail |
|---|---|
| Location | North-west Angola between Uíge and Bengo provinces, ~300km north-east of Luanda |
| Area | ~9,904 km² |
| Commodity | Gold and other minerals |
| Acquisition | Mining Investment Contract executed August 2019; 650,000,000 VDM shares issued to Seabank Resources Ltd on 20 August 2019 |
| Tenure | Prospecting Title 048/07/03 issued 15 April 2020 |
| Licence holder | Pebric (on behalf of the Cage Bengo JV) |
| Resources | None reported |
| Status | No on-ground work; frozen by Pebric dispute |
A. Cachoeiras do Binga (CdB) Copper Project — 65% interest (Stockhead; FY2024 AR)
Source: FY2024 Annual Report (MRE first announced 26 November 2020).
B. Cage Bengo Gold Project — 55.25% interest
Note: The FY2023 and FY2024 shareholder letters mislabel the Cage Bengo paragraph as "The CdB Copper Project is located in the north-west of Angola…" — a drafting error; the location and area figures relate to Cage Bengo.
C. New project opportunities — The board has stated since FY2023 that it is reviewing critical-minerals opportunities (uranium, copper, lithium, gold referenced in quarterly reports), primarily in Australia. No transaction was announced before delisting.
Construction & Trading — legacy (no current offering)
| Legacy brand / business | Description | Status |
|---|---|---|
| VDM Construction / Keytown Constructions | Design-and-construct commercial buildings, warehouses, resorts, mine accommodation | Dormant; residual warranty provision A$11k and other contract obligations A$74k (FY2024) |
| VDM Construction (Eastern Operations) / Bellero Constructions | Queensland civil and road construction | Sold 8 Oct 2013 |
| Civmec Construction & Engineering | Structural/mechanical/piping, mine camps | Surplus assets and name sold (>A$2m) |
| Cape Crushing & Earthmoving | Crushing, screening, earthworks | Sold c. FY2012 (A$2.9m loss) |
| Ewing VDM / Van der Meer Consulting / BCA Consultants | Civil, structural, environmental engineering consulting | Consulting goodwill impaired (A$21.2m, H1 FY2011); dormant |
| EcOz Environmental Services / Belleng VDM | Environmental consulting | Dormant/divested; not separately disclosed |
| VDM Equipment | Equipment hire and sales | Closure announced July 2016 |
| VDM Trading | Export of Australian goods to Asia / import of Asian goods (2014–2017 strategy) | Dormant |
| VDM Developments / Burchill VDM | Property development and resort planning | Last property (Quartz Estate) sold FY2023 |
| Modular/residential construction (2014–2017 marketing) | High-rise, affordable/social housing, student accommodation, modular hotel rooms (per vendor profiles) | Never material; dormant |
Pricing models: not applicable / not publicly disclosed.
Product Portfolio
| Attribute | Detail | ||
|---|---|---|---|
Location | Central coastal Angola, east of the regional capital and port city of Sumbe; ~385km south of Luanda; within the central West Congo Copper Belt | ||
Area | ~3,854 km² (~32km E–W × ~129km N–S) | ||
Deposit style | Sediment-hosted copper, typical of central African copper belts | ||
Licence holder | Pebric Mining and Consulting LDA (designated holder on behalf of the CdB JV) | ||
Contract basis | Mining Investment Contract with Angola's Ministry of Geology and Mining (negotiations concluded Sep 2015) | ||
Historical work | USGS stream sampling (1920s–late 1950s); Institute of Geology of Angola (IGEO) mapping/drilling in the 1970s (Areas 1–3); UNDP re-evaluation in 1983 | ||
VDM work | Phase One drilling 2018 (Areas 1–3); Phase Two drilling 2019 (Area 4 west, Area 5 south) | ||
Database | 134 diamond core holes, 7 trenches, 1,658 sampled intervals (Geovia Surpac) | ||
Mineral Resource (JORC 2012, 26 Nov 2020, 0.2% Cu cut-off) | See table below | ||
Status | No on-ground work since end-2019; frozen by Pebric dispute | ||
Encumbrances | A$4.875m purchase consideration payable to a CdB JV partner (less A$196k share of exploration costs = A$4.679m net) due within 21 days of the next significant capital raising; AOA 53,313,000 (~A$133.8k) bank guarantee to the Angolan government | ||
CdB Resource category | Tonnes (Mt) | Grade (% Cu) | Contained Cu (t) |
Measured | 0.875 | 1.62 | 14,179 |
Indicated | 12.592 | 0.98 | 123,411 |
Inferred | 4.937 | 0.94 | 46,355 |
Total | 18.404 | 1.00 | 183,845 |
Financial Narrative
Primary sources: FY2023 Annual Report (lodged 5 Oct 2023) and FY2024 Annual Report (lodged 22 Apr 2025). FY2020–FY2021 net loss and net cash flow from Barchart (aggregating company filings); FY2019–FY2021 EBIT from the FY2023 Annual Report's five-year EBIT table. FY2025: not publicly disclosed.
Income statement (A$000)
Notes: EBIT for FY2019–FY2023 as stated in the FY2023 remuneration report (FY2019: A$(1,619)k). FY2024 EBIT derived as pre-tax continuing loss plus finance costs (A$(892)k + A$557k); a data vendor (Craft) shows A$(332)k. FY2022 EBITDA adds back A$1k depreciation. FY2022 legal expense was a net credit of A$13k. Gross, operating, EBITDA and net margins are not meaningful given ~A$1k revenue. Revenue CAGR: not meaningful.
Commentary. The P&L has been structurally loss-making at a run-rate of roughly A$0.7m–A$1.7m per year since the cessation of drilling at end-2019. The single largest recurring cost is interest accruing on the Kengkong loan (A$557k–A$610k p.a.), which alone exceeds the company's entire cash operating cost in FY2024. FY2022's loss was flattered by a A$641k impairment reversal on the Mandurah investment property (reclassified as held for sale); stripping that out, the underlying FY2022 loss was ~A$1.35m. FY2023's loss rose to A$1.43m on the A$256k loss on the Quartz Estate land sale and A$178k of unrealised FX losses on the USD-denominated tranche of the shareholder loan. FY2024 improved to A$0.93m mainly due to a A$97k write-back of historical employee leave provisions, minimal FX movement, and the elimination of the D&O insurance premium (insurance expense fell from A$56k to nil). Corporate overheads have been compressed to an irreducible minimum: KMP remuneration was A$129k in FY2024.
Balance sheet (A$000, as at 30 June)
Notes: FY2021 cash is the FY2022 opening balance. FY2022 figures are as restated in the FY2023 AR for the change in exploration accounting policy (previously reported exploration assets of A$13.622m at 30 June 2021 and 2022 were written off against accumulated losses). Restated accumulated losses at 30 June 2021 were A$(310,397)k (FY2023 AR Note 3), implying restated equity of approximately A$(12.5)m — derived, not separately reported; note a ~A$20k unreconciled difference against the FY2022 restated closing balance. Net debt = shareholder loan less cash. Aggregator Eulerpool reports "debt" of A$10.28m and A$10.56m labelled 2026/2025 — these match VDM's FY2024 and FY2023 net debt and appear to be mislabelled fiscal years.
Shareholder loan composition (FY2024 AR Note 18): A$6.099m AUD-denominated (FY2023: A$5.828m) and A$6.412m USD-denominated (FY2023: A$6.122m). Interest accrues at 6% p.a.; default rate 20% p.a.; immediately repayable on demand pending conversion into a contemplated secured one-year 6% facility; Kengkong holds first-ranking security over group assets.
Other payables: A$4.875m purchase consideration owed to a CdB JV partner less A$196k exploration cost share = A$4.679m, payable within 21 days of VDM's next significant capital raising or significant improvement in financial status.
Commentary. The balance sheet is insolvent on a book basis and wholly dependent on creditor forbearance. Contributed equity of A$297.4m has been almost entirely consumed by A$313.5m of accumulated losses — a permanent record of the scale of value destroyed between 2009 and 2014. The only non-cash asset of note left on the balance sheet is A$3k of leasehold improvements; the Angolan interests carry a nil book value following the FY2023 policy change. Cash rose in FY2024 only because the Mandurah apartment was sold. Liabilities grow mechanically by ~A$0.56m p.a. from capitalised interest.
Cash flow (A$000)
Commentary. Operating cash burn has fallen steadily (A$506k → A$477k → A$339k). No financing has been raised since at least FY2021; the company has funded itself by liquidating legacy property. With the property portfolio now exhausted, the A$2.229m cash balance at 30 June 2024 represented roughly 6–7 years of burn at the FY2024 rate — but only if Kengkong and the CdB partner continue to forbear and no exploration is funded. A March 2024 quarterly report cited cash of A$1.123m (TipRanks summary), consistent with the Mandurah proceeds arriving in Q4 FY2024.
Ratios
ROE, ROIC, debt/equity and net debt/EBITDA are not meaningful (negative equity and negative EBITDA). Asset turnover ≈ 0. Cash conversion cycle: not applicable (no trade receivables/inventory from operations; legacy trade receivables of A$891k are 100% impaired).
Long-run context — contractor era losses: notes and sources
Sources: FNN (FY2011), Business News (FY2012), Mining Monthly (FY2013). H1 FY2011 revenue was A$195.9m (Business News).
Tax attributes
Estimated carried-forward tax losses: A$138.275m (FY2024) vs A$137.470m (FY2023), unrecognised. The company believes it likely failed the Continuity of Ownership Test in FY2015 and would need to satisfy the Same Business Test to use pre-2016 losses. Franking account balance: A$3.459m (FY2024 AR Notes 8, 10).
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Overview
| Segment | What it contains (as disclosed) | Current activity |
|---|---|---|
Construction & Trading | Legacy construction contracting and trading businesses (VDM Construction Pty Ltd, Keytown Constructions Pty Ltd, VDM Trading Pty Ltd and others). Residual warranty and contract-obligation provisions | Dormant; no revenue since FY2021 |
Mining & Exploration | Interests in the Cachoeiras do Binga Copper JV (65%) and Cage Bengo Gold JV (55.25%) in Angola; holds the A$4.679m net payable to a CdB JV partner | Suspended since end-2019; no expenditure FY2022–FY2024 |
Unallocated | Corporate costs, cash, shareholder loan, interest | All revenue (interest) and all losses |
Revenue by Segment
| Segment | FY2022 | FY2023 | FY2024 |
|---|---|---|---|
Construction & Trading revenue (AUD K) | 0 | 0 | 0 |
Mining & Exploration revenue (AUD K) | 0 | 0 | 0 |
Discontinued operations revenue (AUD K) | 4 | 0 | 0 |
Unallocated revenue — interest (AUD K) | 1 | 1 | 1 |
Total reported revenue (AUD K) | 1 | 1 | 1 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansResults by Segment and Segment Assets & Liabilities
| Metric | FY2022 | FY2023 | FY2024 |
|---|---|---|---|
Construction & Trading segment result before tax (AUD K) | -10 | 0 | 0 |
Mining & Exploration segment result before tax (AUD K) | 0 | 0 | 0 |
Unallocated result before tax (AUD K) | -1,341 | -1,427 | -892 |
Construction & Trading total liabilities (AUD K) | 113 | 113 | 113 |
Mining & Exploration total liabilities (AUD K) | 4,679 | 4,679 | 4,679 |
Unallocated total liabilities (AUD K) | 11,863 | 12,563 | 13,117 |
Construction & Trading total assets (AUD K) | 41 | 41 | 0 |
Group Entities
| Entity | Country | Ownership | Deed of Cross Guarantee |
|---|---|---|---|
VDM Group Limited (parent) | Australia | — | Yes (head) |
VDM Trading Pty Ltd | Australia | 100% | Yes |
VDM Mining Pty Ltd | Australia | 100% | Yes |
VDM Equipment Pty Ltd | Australia | 100% | Yes |
VDM Construction Pty Ltd | Australia | 100% | Yes |
Keytown Constructions Pty Ltd | Australia | 100% | Yes |
VDM Developments Pty Ltd | Australia | 100% | Yes |
VDM Engineering (Eastern Operations) Pty Ltd | Australia | 100% | Yes |
Burchill VDM Pty Ltd | Australia | 100% | Yes |
VDM Group Limited International (Dubai Branch) Pty Ltd | Australia | 100% | Yes |
BCA Consultants Pty Ltd | Australia | 100% | Yes |
VDM Africa Holdings Ltd | British Virgin Islands | 100% | No |
The EB Trust | Australia | 100% | No |
Income Statement and Per-Share Data
| Metric | FY2020 | FY2021 | FY2022 | FY2023 | FY2024 |
|---|---|---|---|---|---|
Revenue — total incl. interest (AUD K) | — | — | 1 | 1 | 1 |
Revenue from contracts with customers (AUD K) | — | — | 0 | 0 | 0 |
Gross profit (AUD K) | — | — | 0 | 0 | 0 |
Employee benefits expense (AUD K) | — | — | 144 | 135 | 1 |
Legal expenses (AUD K) | — | — | -13 | 5 | 49 |
Other expenses (AUD K) | — | — | 603 | 427 | 279 |
of which foreign exchange losses (AUD K) | — | — | 381 | 178 | 4 |
Impairment reversal — investment property, gain (AUD K) | — | — | 641 | 0 | 0 |
Loss on sale of property (AUD K) | — | — | 0 | 256 | 0 |
EBIT (AUD K) | -1,211 | -465 | -103 | -832 | -335 |
EBITDA (AUD K) | — | — | -102 | -832 | -335 |
Finance costs — Kengkong loan interest (AUD K) | — | — | 610 | 595 | 557 |
Pre-tax loss, continuing (AUD K) | — | — | -711 | -1,426 | -892 |
Loss from discontinued operations (AUD K) | — | — | -1 | 0 | -37 |
Net loss attributable to owners (AUD K) | -1,719 | -927 | -712 | -1,426 | -929 |
Basic & diluted EPS (A$ cents) | — | — | -0.01 | -0.02 | -0.01 |
Dividends per share (A$ cents) | 0 | 0 | 0 | 0 | 0 |
Balance Sheet
| Metric | FY2021 | FY2022 | FY2023 | FY2024 |
|---|---|---|---|---|
Cash & cash equivalents (AUD K) | 1,633 | 1,127 | 1,390 | 2,229 |
Security deposits (AUD K) | — | 20 | 20 | 0 |
Assets held for sale (AUD K) | — | 1,215 | 1,215 | 0 |
Development properties (AUD K) | — | 996 | 0 | 0 |
Total current assets (AUD K) | — | 2,379 | 2,649 | 2,274 |
Total assets (AUD K) | — | 3,378 | 2,652 | 2,277 |
Trade & other payables (AUD K) | — | 5,251 | 5,180 | 5,274 |
Shareholder loan — Kengkong, current (AUD K) | — | 11,177 | 11,950 | 12,511 |
Long-term debt (AUD K) | — | 0 | 0 | 0 |
Provisions (AUD K) | — | 227 | 225 | 124 |
Total current liabilities (AUD K) | — | 16,654 | 17,355 | 17,909 |
Total liabilities (AUD K) | — | 16,655 | 17,355 | 17,909 |
Net debt (AUD K) | — | 10,050 | 10,560 | 10,282 |
Total equity / (deficit) (AUD K) | — | -13,277 | -14,703 | -15,632 |
Goodwill & intangibles (AUD K) | — | 0 | 0 | 0 |
Exploration & evaluation assets, restated (AUD K) | 0 | 0 | 0 | 0 |
Working capital (AUD K) | — | -14,275 | -14,706 | -15,635 |
Contributed equity (AUD K) | — | 297,360 | 297,360 | 297,360 |
Accumulated losses (AUD K) | — | -311,129 | -312,555 | -313,484 |
Cash Flow
| Metric | FY2020 | FY2021 | FY2022 | FY2023 | FY2024 |
|---|---|---|---|---|---|
Operating cash flow (AUD K) | — | — | -506 | -477 | -339 |
Capital expenditure (AUD K) | — | — | 0 | 0 | 0 |
Free cash flow (AUD K) | — | — | -506 | -477 | -339 |
Proceeds from asset sales (AUD K) | — | — | 0 | 740 | 1,178 |
Financing cash flow (AUD K) | — | — | 0 | 0 | 0 |
Dividends paid (AUD K) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (AUD K) | 0 | 0 | 0 | 0 | 0 |
Net change in cash (AUD K) | -2,637 | -965 | -506 | 263 | 839 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2022 | FY2023 | FY2024 |
|---|---|---|---|
ROA (net loss / total assets, %) | -21.1 | -53.8 | -40.8 |
Current ratio (x) | 0.14 | 0.15 | 0.13 |
Interest coverage (EBIT / interest, x) | -0.17 | -1.40 | -0.60 |
Net debt / total assets (x) | 2.98 | 3.98 | 4.52 |
Book value per share (A$ cents) | -0.19 | -0.21 | -0.23 |
Key Financials
| Metric | FY2011 | FY2012 | FY2013 |
|---|---|---|---|
Net loss after tax (AUD Mn) | -35.5 | -54.8 | -84.4 |
Revenue by Region
| Region | FY2022 | FY2023 | FY2024 |
|---|---|---|---|
Australia revenue — interest (AUD K) | 1 | 1 | 1 |
Angola revenue (AUD K) | 0 | 0 | 0 |
Rest of world revenue (AUD K) | 0 | 0 | 0 |
Per-Share Data
| Metric | FY2019 | FY2020 | FY2021 | FY2022 | FY2023 |
|---|---|---|---|---|---|
Closing share price at 30 June (A$ cents) | 0.2 | 0.2 | 0.2 | 0.1 | 0.1 |
Valuation Multiples
| Multiple | VDM | Comment |
|---|---|---|
Market cap at last trade | ~A$6.93m | 6.93bn shares × A$0.001 |
Enterprise value (at last trade, FY2024 balance sheet) | ~A$17.2m | A$6.93m + A$10.28m net debt (excl. A$4.68m JV payable) |
P/E | n/m | Losses |
EV/EBITDA | n/m | Negative EBITDA |
EV/Sales | n/m | ~A$1k revenue |
P/B | n/m | Negative book value |
EV per tonne contained Cu (65% attributable ~119.5kt) | ~A$144/t | Illustrative only; based on stale price and disputed interest |
Distribution Details
| Distribution | Amount | Franking | Ex-date | Paid |
|---|---|---|---|---|
Interim | 5c | 100% | 24 Apr 2008 | 30 May 2008 |
Final | 5c | 100% | 27 Oct 2008 | 28 Nov 2008 |
Final | 2c | 100% | 29 Sep 2010 | 13 Oct 2010 |
Analyst Conclusions
Management guidance: None. The FY2024 Annual Report states likely developments were not able to be determined. Consensus growth expectations: None (no coverage).
Bull case
-
Rights restored: A negotiated settlement with Pebric reinstating VDM's 65% CdB and 55.25% Cage Bengo interests would reconnect shareholders to a JORC resource of ~184kt Cu, currently carried at nil.
-
Sponsor recapitalisation: Kengkong, as ~30% holder and secured lender, has the incentive and structural position to convert A$12.5m of debt to equity and fund a relisting or new-project acquisition, removing the A$0.56m p.a. interest drag.
-
Asset sale optionality: Even a modest per-tonne valuation for an attributable ~119.5kt Cu resource could exceed net liabilities excluding the related-party loan, if title can be confirmed.
Bear case
-
Title risk: Licences are held by Pebric; VDM's interest is contractual and disputed, with Pebric seeking to dilute it — the asset may be unrecoverable.
-
Structural subordination of equity: A$17.9m of liabilities, including a secured on-demand loan and a A$4.7m JV payable that falls due on any significant raise, rank ahead of shareholders; any recapitalisation is likely to be highly dilutive.
-
No platform: Delisting, absence of management, six years of inactivity and repeated reporting failures make third-party capital improbable.
Key catalysts and monitorables (next 12 months)
-
Any disclosure (via ASIC filings or shareholder communications) of a Pebric settlement, arbitration or Angolan court outcome.
-
Lodgement of FY2025 and FY2026 financial reports with ASIC (unlisted public companies retain reporting obligations).
-
Any Kengkong demand, enforcement of security, debt-for-equity proposal, or appointment of administrators/receivers.
-
Any change of name or acquisition indicating use of the entity as a vehicle for a new project.
-
Shareholder communications regarding capital-loss crystallisation or unmarketable-parcel processes.
Analyst verdict
VDM Group Limited is no longer an investable listed company in any conventional sense. It is the residue of a once-substantial Western Australian engineering and construction contractor that destroyed close to A$300m of contributed capital through goodwill impairments, contract disputes and successive restructurings between 2009 and 2014, and that was subsequently repurposed by its Chinese private backers as an Angolan copper explorer. That second strategy produced one tangible achievement — a 2020 JORC resource of 18.4Mt at 1.0% Cu at Cachoeiras do Binga — but has delivered no field work since 2019.
The present position is defined by three facts. First, the company's only assets of value are contractual JV interests whose underlying licences are held by a partner that is actively seeking to dilute VDM; their recoverability is uncertain and they carry nil book value. Second, the capital structure is inverted: A$17.9m of current liabilities against A$2.3m of assets, with the controlling shareholder also the sole secured lender, accruing interest at 6% and entitled to demand repayment at any time. Third, the company has lost its ASX listing after failing to demonstrate an adequate level of operations for two years, removing its principal mechanism for raising risk capital and leaving minority holders without liquidity.
Any residual equity value is therefore an option on two low-probability, sponsor-dependent events — a favourable settlement in Angola, and a Kengkong-led recapitalisation that leaves something for minorities. Absent evidence of either, the most defensible assessment is that the ordinary shares have little or no realisable value, consistent with third-party registry assessments. For creditors and the controlling shareholder, the CdB resource and the tax losses may retain strategic value; for outside investors, the appropriate stance is to treat VDM as a distressed, controlled, unlisted shell and to monitor ASIC filings and any Angolan developments rather than to ascribe a valuation.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Tenure | Background | Holding |
|---|---|---|---|---|
Luk Hiuming | Non-Executive Chairman | Director since 21 Mar 2014; Chairman since 29 Jan 2015 | Chairman of Australia Kengkong Investments Co Pty Ltd; experience across textiles, pharmaceuticals, steel, real estate, manufacturing, mining, new energy, oil & gas, primarily mainland China. Age/education not disclosed | 2,070,000,000 shares (indirect, via Kengkong) |
Paul Hardie | Non-Executive Director; Company Secretary (from ~1 Sep 2025) | Director since 15 Jul 2023 | LLB, BEc; practising commercial lawyer; 20+ years as general counsel/company secretary across resources, construction, manufacturing and financial services; member AICD, Fellow Governance Institute of Australia; member Law Society of WA | Nil |
Pinky Tang | Non-Executive Director | Since 11 Jun 2025 | M&A, accounting, finance and corporate advisory experience; previously Summit Lawyers and KPMG Australia | Nil (initial notice) |
Board of Directors — Michael Fry
| Name | Role | Tenure | Notes |
|---|---|---|---|
Michael Fry | Executive Director; acting CFO; Company Secretary | Director 3 Jun 2011 – 17 Jun 2025; CoSec 12 Feb 2018 – 31 Aug 2025 | B.Com; Chartered Accountant (KPMG Perth); Deloitte Melbourne; Troika Securities; CFO/Finance Director Swick Mining Services 2006–2011; director/CFO/CoSec Cauldron Energy (ASX: CXU); CoSec APC Minerals; formerly CFO/CoSec Lindian Resources. Held 1,000,000 shares |
Colin Noid | NED (ex-Construction Manager) | NED 1 Apr 2021 – 31 Aug 2023 | Civil engineer; ex-John Holland and Henry Walker Eltin |
Dr Dongyi Hua | Executive Chairman/MD/Executive Director | 28 Aug 2013 – 22 Jun 2023 | Doctorate of Engineering; ex-Vice President, Executive Chairman and CEO of CITIC Pacific Mining (Oct 2009–Apr 2013); ex-ED/CEO Frontier Services Group (HKEX) to Mar 2021. Interest in H&H Holdings (1,085,110,976 shares). Salary suspended Feb 2021 |
Huadong Guo | NED | 23 Feb 2021 – 30 May 2023 | Doctorate in Electrical Engineering (Tongji University); business owner across East/Central Africa incl. Angola and Congo for ~40 years. Held 600,000,000 shares |
Ming Guo | NED | 4 May 2022 – 29 Nov 2022 | Chairman/shareholder of an Angolan marble mine; interest in H&H Holdings |
Sam Diep | CEO | 29 Feb 2016 – 29 Aug 2017 | Ex-BGC Contracting |
Michael Perrott | Chairman | 2 Jul 2009 – 7 Aug 2014 | Chair through the 2011–2014 crisis |
Andrew Broad | Managing Director/CEO | 16 Jan 2012 – 23 Aug 2013 | Stepped down on H&H transaction |
Directors' Remuneration
| Person | Base salary & fees | Super | Bonus / equity | Total |
|---|---|---|---|---|
M Fry (Executive Director/acting CFO/CoSec) | 85,536 | 5,337 | 0 | 90,873 |
P Hardie (NED, from 15 Jul 2023) | 34,500 | 0 | 0 | 34,500 |
C Noid (NED, to 31 Aug 2023) | 4,000 | 0 | 0 | 4,000 |
H Luk (Chairman) | 0 | 0 | 0 | 0 |
Total KMP | 124,036 | 5,337 | 0 | 129,373 |
Metric | FY2022 | FY2023 | FY2024 | — |
Total KMP remuneration (AUD) | 125,739 | 121,217 | 129,373 | — |
Major Shareholders
| Holder | Shares | % of 6,927,660,952 | Basis / date |
|---|---|---|---|
Australia Kengkong Investments Co Pty Ltd (Luk Hiuming) | 2,070,000,000 | 29.88 | Director interest, FY2024 AR |
H&H Holdings Pty Ltd (Dr Hua / Mr Guo interests) | 1,085,110,976 | 15.66 | — |
Seabank Resources Ltd (issued Aug 2019) | 650,000,000 | 9.38 | — |
CF International Development Limited | 600,000,000 | 8.66 | Substantial holder, 29 Sep 2023 |
Thriving Treasure Limited | 520,000,000 | 7.51 | Substantial holder, 29 Sep 2023 |
Sino Plant Holding Limited | 250,000,000 | 3.61 | Market Index top holders |
Briston Holdings Limited | 200,000,000 | 2.89 | Market Index top holders |
Seawire Limited | 130,000,000 | 1.88 | Market Index top holders |
Citicorp Nominees Pty Limited | 126,621,061 | 1.83 | Market Index top holders |
M Fry (former director) | 1,000,000 | 0.01 | FY2024 AR |
Competitive Landscape
Peer Comparison FY2025
| Metric | VDM Group (FY2024) | Monadelphous (FY2025) | NRW Holdings (FY2025) |
|---|---|---|---|
Revenue (AUD Mn) | 0.001 | 2,270 (incl. JV share) | 3,267.7 |
Revenue growth (YoY) | n/m | +12% | +12.2% |
Net profit after tax (AUD Mn) | -0.929 | 83.7 | 127.2 (underlying); 27.7 (statutory) |
Net margin | n/m | ~3.7% | ~3.9% (underlying) |
R&D intensity | 0% | — | — |
Order book / pipeline | nil | ~A$2.5bn new contracts/extensions secured in FY2025 | A$6.1bn order book (FY2025) |
“—” = not publicly disclosed.