VibroPower Corporation Limited Overview
VibroPower is a Singapore-based micro-cap engineering contractor that designs, packages, installs, commissions and services stationary diesel generator sets and fuel systems, chiefly as a subcontractor on commercial, industrial, healthcare, infrastructure and government building projects in Singapore. After the November 2024 disposal of its Chinese coal-mine-methane power plant, Singapore accounted for 100% of FY2026 revenue of S$11.3 million. The Group is attempting a pivot toward recurring renewable-energy income through 40%-owned Malaysian associates developing an 11.5 MW empty-fruit-bunch biomass power plant in Sandakan, Sabah, backed by a renewable-energy power purchase agreement with Sabah Electricity Sdn Bhd, plus a 2 MW solar joint venture with Interra Resources. The company is controlled by its founder-CEO, carries a going-concern material uncertainty, faces two arbitrations with a former main contractor, and is selling its two principal properties to fund working capital and the biomass project. Governance, liquidity and project-execution risk dominate the investment case.
Company's own description
The latest filings describe the Group's principal activities as (a) supplying, designing, manufacturing, installation, commissioning and servicing of power generators and related spare parts and accessories, and (b) the development, operation and management of power generator projects [S1, Note 1; S2, Note 1]. The Projects segment is defined as the supply, design, manufacture, installation, commissioning and servicing of power generators used mainly in commercial and industrial buildings; the Others segment comprises rental income from a leasehold property and corporate expenses [S1, Note 4]. The company's stated mission statements, unchanged across annual reports since at least 2015, centre on building a global workforce for chosen markets, after-sales service, market development and exceeding shareholder expectations, framed by its "3-Powers" values of Passion, Pride and Possibilities [S3][S15].
Independent characterisation
| Revenue type | SGD K | % of total |
|---|---|---|
| Generator projects recognised over time | 10,577 | 93.6 |
| Goods/services recognised at a point in time (parts, servicing) | 301 | 2.7 |
| Rental income from leasehold property | 417 | 3.7 |
| Total | 11,295 | 100.0 |
In substance, VibroPower today is a project-based electrical-mechanical subcontractor rather than a generator manufacturer in the OEM sense. It procures engines and alternators, packages them into generator sets with controls, enclosures, fuel storage and associated works, and delivers them under subcontracts to main contractors, with revenue recognised predominantly over time as performance obligations are met. In FY2026, S$10.577M of S$10.878M contract revenue (97%) was recognised over time, and only S$0.301M at a point in time (spare parts and services) [S1, Note 7]. This revenue-recognition profile, combined with retention monies, progress certification and contract assets, makes earnings lumpy and highly sensitive to project timing, main-contractor disputes and margin erosion on fixed-price contracts.
Revenue model mix (FY2026, continuing operations) [S1, Note 7]:
There is no subscription or licensing revenue. Historically (FY2022–FY2025), electricity sales from the Shanxi coal-mine-methane plant provided a small recurring stream (S$3.6M over 15 months in FY2022; S$2.2M in FY2023) [S4], which ended with the disposal of Shanxi Weineng Coal Mine Gas Development Co., Ltd. (SXWN) in 2024 [S1, Note 13].
Value-chain position
VibroPower sits in the middle of the backup-power value chain: upstream are engine and alternator OEMs (brand partners not disclosed in recent filings); downstream are main contractors, developers and building owners. It competes as a packager/integrator and subcontractor, where differentiation rests on engineering customisation, delivery reliability, local after-sales service and price. The Group procures a material share of goods and subcontract services from companies controlled by the CEO's brother, Chen Siew Meng (Mason Industries Pte Ltd and Vibro Holdings Pte Ltd), under a shareholder-approved interested-person-transaction (IPT) mandate: S$2.663M (mandated) plus S$0.156M (non-mandated) with Mason Industries in FY2026 [S1, Other Information 6].
Customers and end-markets
End-markets (FY2026–1Q FY2027): Management attributes the growing order book to healthcare, infrastructure-related and government-sector projects in Singapore [S1, Other Information 4; S2, Other Information 4]. The FY2025 annual report also cites public infrastructure and data-centre pipelines as recovery drivers [S3].
Customer concentration: A single major customer contributed S$6.514M in FY2026 (57.7% of revenue), up from S$0.647M in FY2025 [S1, Note 4.4]. In 1Q FY2027, the largest customer contributed S$0.479M [S2, Note 4.3].
Historic end-markets: Earlier annual reports reference mining-sector power solutions (iron ore, coal, copper) and international markets including Hong Kong, China, India and Russia [S15].
Strategy
Stated strategy themes (AR2025 Chairman's Message; FY2026 and 1Q FY2027 commentary)
-
Defend and grow the core generator business in Singapore by pursuing higher value-added projects, improving manufacturing efficiency and supply-chain management, and exercising cost discipline amid intense competition from larger players and new entrants [S3].
-
Pivot to clean energy outside Singapore to create recurring revenue — specifically the Sabah biomass plant and the 2 MW solar JV — described as a cornerstone of future strategy [S3].
-
Exit non-core and overseas assets (SXWN disposal 2024; India liquidation 2026; Kluang land sale 2026) and redeploy proceeds [S1][S3][S7].
-
Strengthen liquidity through property disposals, prudent working-capital management and exploring additional trade facilities, while building execution capacity (manpower) for a larger order book [S2].
Strategic initiatives in the last 24 months
| Initiative | Date | Detail | Status |
|---|---|---|---|
| SXWN disposal | Jul–Nov 2024 | ~S$5.478M consideration (RMB30M incl. RMB10M intercompany settlement); S$2.86M gain | Completed; S$913k deferred consideration due FY2028–FY2030 [S1][S3] |
| SESB REPPA | 10 Jan 2025 | 11.5 MW maximum capacity; SESB to buy up to ~9 MW | Signed; plant pre-COD [S3] |
| Board renewal and auditor change | Nov 2024–Jul 2025 | Three new directors over 2024–2025; Foo Kon Tan replaces Forvis Mazars | Completed [S3][S13] |
| Property held-for-sale plan | Mar 2026 | Decision to sell Singapore and Malaysia properties | In progress [S1] |
| UOB Malaysia biomass financing | 28 May 2026 | RM50.744M facilities offered to VBE for plant upgrading | LOO accepted; conditions precedent outstanding [S1][S2] |
| Tuas property sale | Jun 2026 | S$3.93M to Ecorecycling Pte Ltd | Binding contract; subject to EGM and JTC approval [S5][S6] |
| Kluang land sale | Jul 2026 | RM17.5M to SH Trading Co Kluang Sdn Bhd | Expected completion by Feb 2027 [S2][S7] |
| India exit | Feb 2026 | Liquidation of Indian subsidiary | Completed [S1] |
Sustainability/ESG commitments
The FY2025 Corporate Governance Report describes an ambition for the Group to become a net-zero-carbon, resilient, resource-efficient, socially responsible and high-governance business [S3]; no dated net-zero target or interim emissions targets were found. The FY2024 Sustainability Report introduced TCFD-aligned climate disclosures for the first time [S12].
Medium-term financial targets / guidance
None published. Management provides only qualitative outlook ("cautiously optimistic"; order book increased versus prior year) [S1][S2]. Profit guidance announcements are issued ad hoc ahead of losses (e.g., FY2025 loss guidance on 25 Apr 2025) [S18].
Products & Services
Disclosure limitation. VibroPower's recent filings describe offerings at category level only. Items below are limited to what is disclosed in filings and announcements.
Projects segment
| Offering | Description | Key specs / capabilities | Target customer | Launch / latest year | Pricing model | Flagship / references |
|---|---|---|---|---|---|---|
| Stationary diesel generator sets (standby/prime) | Design, packaging and supply of generator sets for buildings | Customisable configurations ("customised power solutions") [S15]; kVA range n/d; engine OEMs n/d | Main contractors, developers, building owners in commercial, industrial, residential, healthcare, infrastructure and government projects | Ongoing since 1995 | Fixed-price project contracts, revenue over time [S1] | Named projects n/d |
| Fuel storage systems | Supply and installation of fuel storage and related works bundled with gensets | Scope cited in Puretech subcontract [S9] | Main contractors | Ongoing | Part of subcontract value | Puretech projects (disputed) |
| Installation, testing and commissioning | Delivery, installation, testing and commissioning of generator systems | Per subcontract scope [S9] | Main contractors | Ongoing | Part of subcontract value | — |
| After-sales servicing and maintenance | Servicing of installed gensets | Mission emphasises after-sales service [S3] | Building owners/facility managers | Ongoing | Service fees (point-in-time revenue) | — |
| Spare parts and accessories | Sale of parts and accessories | Point-in-time revenue S$301k in FY2026 [S1] | Existing installed base | Ongoing | Per-unit sale | — |
| Engineering services to associates | Engineering services provided to associate company | Management fee income S$167k in FY2023 [S4] | Biomass associates | FY2023 | Management fee | Biomass project |
| Historic: Lister Petter Power Systems-related rights | FY2018 AR references rights relating to Lister Petter Power Systems; AR2019 references Lister Petter Power Systems Limited | Scope n/d | — | 2018–2019 | — | n/d [S15] |
Power Plant segment (discontinued)
| Offering | Description | Key specs | Customer | Years | Pricing | Status |
|---|---|---|---|---|---|---|
| Coal-mine-methane electricity | SXWN plant in Yangquan, Shanxi, using methane emitted from coal seams as fuel | Capacity n/d; fully operational Dec 2015; suspended Mar 2017 on gas supply instability; upgrade works from Apr 2019 [S15] | Shanxi State Grid (PPA) | 2015–2024 | Tariff under PPA | Disposed (Section 11) |
Renewable-energy pipeline (associates and JV; not consolidated revenue)
| Offering | Description | Key specs | Customer | Target date | Pricing | Status |
|---|---|---|---|---|---|---|
| Sandakan biomass power plant | Empty-fruit-bunch (palm oil milling waste) fuelled plant owned by VPGE, leased to and operated by VBE | Maximum capacity 11.5 MW; SESB obligated to purchase up to ~9 MW, excess at SESB's discretion [S3] | Sabah Electricity Sdn Bhd (REPPA dated 10 Jan 2025) | FY2025 AR targeted operations by 31 Oct 2026 [S3]; now expected completion by March 2028 [S1][S2] | Long-term REPPA tariff (rate n/d) | Pre-financial close; UOB Malaysia LOO for RM50.744M accepted 28 May 2026 [S1] |
| 2 MW solar farm (JV with Interra Resources) | Solar farm within the Malaysian biomass plant site in Sabah | 2 MW; budget S$3.0M; Interra funds S$1.5M via convertible bond, VibroPower funds excess; assets and profits shared 50:50 [S11] | Grid/offtaker n/d | — | — | Regulatory approvals stage as of July 2025 [S3] |
Others segment
| Offering | Description | FY2026 revenue | Status |
|---|---|---|---|
| Leasehold property rental | Rental of space at 11 Tuas Avenue 16 (company uses upper levels for document storage per disposal coverage) [S5 coverage] | S$417k [S1] | Will cease on completion of property sale |
Financial Narrative
Basis. FY2022 = 15 months to 31 Mar 2022 [S4]. FY2023 [S4]. FY2024: limited to figures disclosed in FY2025 AR highlights, FY2025 AR variance commentary, and FY2026 opening balances [S3][S1]; several FY2024 lines are derived (see notes). FY2025 and FY2026 are per FY2026 results announcement (FY2025 restated/re-presented; FY2026 unaudited at the time of the announcement) [S1]. Revenue for FY2025–FY2026 is continuing operations unless labelled otherwise.
Income statement
Notes:
-
FY2024 gross profit derived from FY2025 AR statement that FY2025 GP of S$0.847M was 59.4% lower YoY and FY2024 GP margin was 15.3% [S3].
-
FY2024 PBT shown as S$0.2M (rounded) in FY2025 AR five-year highlights [S3]; exact figure n/d.
-
FY2024 net profit attributable derived from movement in accumulated losses: −S$10.666M at 31 Mar 2023 [S4] to −S$10.484M at 1 Apr 2024 [S1, statement of changes in equity]. PitchBook's FY2024 net income of 135 (thousand, apparently USD) is consistent with ~S$182k [S16]. FY2024 EPS derived on 73,696,114 shares.
-
FY2022/FY2023 EBITDA derived = PBT + finance costs + depreciation (FY2022: 931 PPE + 167 ROU; FY2023: 717 + 135) [S4]. FY2025/FY2026 = company-reported "recurring EBITDA" for continuing operations [S1].
-
FY2025 PBT total includes continuing (−S$4.567M) and discontinued (+S$0.563M) [S1].
-
FY2026 finance costs include S$919k of non-cash unwinding interest from reclassifying amounts due from associates to non-current [S1, Note 5.2].
-
On a 12-month basis, FY2022 revenue was S$14.014M and net loss attributable S$2.083M (EPS −2.83 cents) [S4, voluntary disclosure].
Margins and growth
Notes: FY2022 margins on 15-month figures. FY2024 gross margin on continuing revenue [S3]. FY2025 margins on continuing revenue of S$5.058M. FY2023 growth vs 15-month FY2022 (−31.7% vs 12-month FY2022) [S4]. FY2024 growth per FY2024 Sustainability Report (revenue up 55% to S$14.8M) [S12]. FY2025 growth on continuing basis [S3]. Revenue CAGR (12-month FY2022 S$14.014M to FY2026 S$11.295M): −5.3% p.a. (derived; note that FY2022 includes Power Plant revenue no longer in the Group).
Balance sheet
Notes:
-
FY2024 total assets derived from FY2025 AR (non-current assets fell 33.1% to S$5.8M; current assets fell 20.4% to S$10.7M), consistent with AR five-year highlights of S$22.1M [S3]. FY2024 borrowings derived from FY2025 AR commentary (short-term borrowings fell S$1.8M; long-term fell S$0.1M) and are approximate. FY2024 working capital derived (current liabilities fell 25.7% to S$8.0M) [S3]. FY2024 cash S$385k per FY2026 cash-flow opening balance for FY2025 [S1]. FY2024 equity per FY2026 statement of changes in equity [S1]; NAV per share per FY2025 AR [S3].
-
FY2026 borrowings exclude S$902k of secured loans reclassified to "liabilities held for sale" with the Tuas property; including them, total borrowings were S$2.941M [S1, Note 18]. Excluding restricted deposits (S$2.010M), unrestricted cash was S$917k and net debt was S$1.122M (S$2.024M including held-for-sale loans) (derived).
-
No goodwill or intangible line appears in the balance sheets reviewed.
-
FY2026 current liabilities include provisions of S$2.960M (largely dispute-related) and contract liabilities (customer advances) of S$3.220M [S1].
Cash flow: notes and sources
Notes: FY2022 15 months [S4]. FY2025 operating cash flow as restated in FY2026 announcement (originally reported −S$0.910M) [S1, Note 25]. Related-party rows derived from investing cash flows: FY2026 payments of S$5.429M to and repayments of S$5.404M from the substantial shareholder-director; payments of S$2.133M to and repayments of S$0.865M from a related party (SG Greenovation Lab, per Note 6) [S1]. FY2025 equivalents: S$2.028M out / S$1.941M in; S$2.150M out / S$0.270M in [S1].
Ratios
Notes (all derived): FY2022 ratios on 15-month figures; FY2022 averages use 31 Dec 2020 total assets of S$30.910M and equity of S$17.658M [S20][S4]. FY2026 net debt/EBITDA on gross-cash basis; on unrestricted-cash basis 0.81x. FY2026 interest coverage excluding non-cash unwinding interest (S$919k): 2.4x. FY2026 debt/equity including held-for-sale loans: 0.55x. CCC = DSO (trade receivables net + contract assets) + DIO − DPO (trade payables and accruals), on FY revenue/cost of sales; FY2025 is distorted by low revenue. GuruFocus displays debt/equity 0.53, interest coverage 0.23, Piotroski 7/9 and Altman Z −0.95 on its own basis [S17].
Quarterly trajectory (most recent 5 quarters), S$'000
Derived from 1H FY2026 revenue of S$6.569M and profit of S$0.608M [S1, Other Information 7], 3Q FY2026 results (profit S$133k; 9M profit S$741k) [S1 search excerpt of 3Q announcement], 4Q FY2026 [S1] and 1Q FY2027 [S2]. 2Q and 3Q revenue derived. 1Q FY2027 profit attributable to owners S$945k.
Commentary on trends, inflections and drivers
Revenue. The Group's top line has been volatile, swinging from S$9.6M (FY2023) to S$14.8M (FY2024), down to S$5.1M continuing (FY2025) and back to S$11.3M (FY2026). Management attributes the FY2025 collapse to fewer project completions eligible for revenue recognition, more low-value projects and fewer large projects in progress [S3], and the FY2026 rebound to a higher volume of project deliveries [S1]. The rebound is highly concentrated: one customer contributed S$6.5M, or 58% of FY2026 revenue [S1]. 1Q FY2027 revenue grew 31.6% YoY to S$2.55M, with management citing a strengthening order book in healthcare, infrastructure and government projects [S2]. The order book value has never been quantified in the filings reviewed.
Gross margin. Margin troughed at 3.3% in FY2023, when the company delivered low-margin residential and small industrial projects secured before material costs surged [S4]. It recovered to 15–17% in FY2024–FY2025 and jumped to 31.9% in FY2026 on completion of higher-margin projects [S1]. 1Q FY2027 margin fell to 36% from 46% in 1Q FY2026 as lower-margin projects were completed [S2]. Margin sustainability at FY2026 levels is uncertain given management's own warnings on material, labour, financing and logistics costs.
Below-the-line items dominate. The FY2023 loss of S$7.1M was primarily driven by S$2.6M of ECL provisions (mainly unbilled revenue and retention on the terminated Puretech contract) and S$1.3M of back-charge and liquidated-damages provisions [S4]. FY2025 losses again included S$1.4M of back-charge provisions and S$0.8M of ECL [S3]. FY2026 was close to breakeven only after S$919k of non-cash unwinding interest, a S$361k loss on liquidating a subsidiary and S$244k of liquidated-damages provisions [S1]. 1Q FY2027 profit of S$944k was helped by S$703k of other credits, mainly from gensets returned by a customer in the October 2024 dispute that had previously been expensed as cost of goods sold [S2] — a non-recurring item that represents about three-quarters of quarterly profit.
Balance sheet. Equity attributable to owners has fallen 73% from S$14.7M (Mar 2022) to S$3.9M (Mar 2026) with no new equity raised since 2021, reflecting cumulative losses. Total borrowings declined from S$6.0M to S$2.0M (S$2.9M including held-for-sale loans) through repayments and the SXWN disposal. The S$1.5M Interra convertible bond (carrying value S$1.779M including the embedded derivative accounting) matures on 30 November 2026 [S2, Note 21], and S$2.0M of cash is restricted [S1]. Pending property sales (S$3.93M Tuas; ~S$5.55M Kluang) would materially improve liquidity if completed [S5][S7].
Cash flow. FY2026 operating cash flow of S$2.3M was the strongest in the five-year period, helped by customer advances (contract liabilities up S$1.47M) [S1]. However, S$3.0M of investing outflows included net payments to the controlling shareholder and to SG Greenovation Lab, and a S$2.0M increase in restricted deposits, so unrestricted cash fell from S$2.2M to S$0.9M [S1].
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Overview
| Segment | Content | Status |
|---|---|---|
Projects | Supply, design, manufacture, installation, commissioning and servicing of power generators for commercial and industrial buildings | Continuing; core business |
Power Plant | Supply of electricity to the grid via SXWN's Shanxi CMM plant | Discontinued operation in FY2025 (SFRS(I) 5); segment dropped from FY2027 reporting |
Others | Rental income from leasehold property; corporate expenses | Continuing; rental will cease on completion of property disposals |
Revenue by Segment
| Segment (SGD K) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Projects revenue (SGD K) | 11,566 | 7,338 | 13,199 | 4,665 | 10,878 |
Power Plant revenue (SGD K) | 3,628 | 2,238 | 1,218 | 609 | 0 |
Others revenue (SGD K) | 0 | 0 | 428 | 393 | 417 |
Total revenue incl. discontinued (SGD K) | 15,194 | 9,576 | 14,845 | 5,667 | 11,295 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansSegment share (%)
| Segment share (%) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Projects share of total revenue (%) | 76.1 | 76.6 | 88.9 | 82.3 | 96.3 |
Power Plant share of total revenue (%) | 23.9 | 23.4 | 8.2 | 10.7 | 0.0 |
Others share of total revenue (%) | 0.0 | 0.0 | 2.9 | 6.9 | 3.7 |
Results by Segment
| Segment PBT (SGD K) | FY2022 | FY2023 | FY2025 | FY2026 |
|---|---|---|---|---|
Projects PBT (SGD K) | -3,984 | -6,609 | -3,899 | -3,550 |
Power Plant PBT (SGD K) | 987 | -84 | 563 | 0 |
Others PBT (SGD K) | -263 | -339 | -668 | 3,348 |
Group PBT (SGD K) | -3,268 | -7,083 | -4,004 | -202 |
Segment recurring EBITDA (SGD K)
| Segment recurring EBITDA (SGD K) | FY2025 | FY2026 |
|---|---|---|
Projects recurring EBITDA (SGD K) | -3,195 | -2,077 |
Others recurring EBITDA (SGD K) | -786 | 3,461 |
Total continuing recurring EBITDA (SGD K) | -3,981 | 1,384 |
Group Entities
| Entity | Country | Ownership | Function | Status |
|---|---|---|---|---|
VibroPower Corporation Limited | Singapore | Listed parent | Investment holding | Active |
VibroPower Pte Ltd | Singapore | Subsidiary | Owns 11 Tuas Avenue 16 leasehold property (under sale) | Active [S1][S5] |
VibroPower Sales and Services (S) Pte Ltd | Singapore | Wholly owned | Project contracting; party to Puretech arbitrations | Active [S3][S9] |
GMTM Holdings Pte Ltd | Singapore | Subsidiary | — | Listed in AR2025 [S3] |
Scott & English Pte Ltd | Singapore | Subsidiary | — | Listed in AR2025 [S3] |
VibroPower Generators Sdn Bhd | Malaysia (Shah Alam) | Subsidiary | Malaysian operations | Listed in AR2025 [S3] |
Agrimal Project Sdn Bhd | Malaysia (Johor Bahru) | Subsidiary (non-wholly owned; disposal gain stated after non-controlling interests) | Holds Kluang freehold land (under sale) | Active [S3][S7] |
VibroPower (HK) Limited | Hong Kong | Subsidiary | Hong Kong sales | Listed in AR2025 [S3] |
China Shanghai VibroPower Generators Equipment Co Ltd | China (Shanghai) | Subsidiary | China operations | Listed in AR2025 [S3] |
VibroPower Generators (India) Pvt Ltd | India (Mumbai) | Subsidiary | India sales | Liquidated 25 Feb 2026 [S1] |
Shanxi Weineng Coal Mine Gas Development Co Ltd | China (Yangquan, Shanxi) | Formerly 100% | CMM power plant | Disposed 2024 [S1] |
Indamex (F.E.) Pte Ltd | Singapore | Former subsidiary | — | Listed in AR2020; absent from AR2025 [S15][S3] |
VibroPower Green Energy Sdn Bhd (VPGE) | Malaysia | 40% associate | Owns biomass power plant (Sandakan, Sabah) | Active [S1, Note 14] |
Vibro Biomass Energy Sdn Bhd (VBE) | Malaysia | 40% associate | Leases and operates the biomass plant; SESB REPPA counterparty | Active [S1][S3] |
Vibro Bio Energy Sdn Bhd | Malaysia | 40% associate | Construction of power plant | Active [S1] |
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue reported, total (SGD K) | 15,194 | 9,576 | 14,845 | 5,667 | 11,295 |
Revenue continuing operations (SGD K) | — | — | 13,627 | 5,058 | 11,295 |
Cost of sales (SGD K) | -13,100 | -9,258 | — | -4,211 | -7,697 |
Gross profit (SGD K) | 2,094 | 318 | 2,086 | 847 | 3,598 |
Administrative expenses (SGD K) | -2,675 | -2,384 | — | -2,827 | -2,167 |
Impairment/ECL on financial and contract assets (SGD K) | -996 | -2,594 | — | -803 | -58 |
Finance costs (SGD K) | -559 | -387 | — | -567 | -1,426 |
EBIT derived = PBT + finance costs (SGD K) | -2,709 | -6,696 | — | -4,000 | 1,224 |
EBITDA derived / recurring EBITDA (SGD K) | -1,611 | -5,844 | — | -3,981 | 1,384 |
Profit before tax, total (SGD K) | -3,268 | -7,083 | 200 | -4,004 | -202 |
Net profit attributable to owners (SGD K) | -3,321 | -7,054 | 182 | -3,851 | -198 |
Basic and diluted EPS (S$ cents) | -4.51 | -9.57 | 0.25 | -5.23 | -0.27 |
Dividend per share (S$ cents) | 0 | 0 | 0 | 0 | 0 |
Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Gross margin (%) | 13.8 | 3.3 | 15.3 | 16.7 | 31.9 |
EBIT margin derived (%) | -17.8 | -69.9 | — | -79.1 | 10.8 |
EBITDA margin (%) | -10.6 | -61.0 | — | -78.7 | 12.3 |
Net margin attributable (%) | -21.9 | -73.7 | 1.2 | -76.1 | -1.8 |
Revenue growth YoY, reported basis (%) | n/m | -37.0 | 55.0 | -62.9 | 123.3 |
Balance Sheet and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total assets (SGD K) | 28,260 | 22,092 | 22,086 | 16,484 | 17,499 |
Cash and cash equivalents incl. restricted (SGD K) | 915 | 768 | 385 | 2,221 | 2,927 |
Restricted deposits (SGD K) | 0 | 0 | 0 | 0 | 2,010 |
Short-term loans and borrowings (SGD K) | 2,137 | 2,993 | 2,199 | 399 | 2,039 |
Long-term loans and borrowings (SGD K) | 3,819 | 2,311 | 2,682 | 2,582 | 0 |
Total loans and borrowings excl. leases (SGD K) | 5,956 | 5,304 | 4,881 | 2,981 | 2,039 |
Net debt, gross-cash basis (SGD K) | 5,041 | 4,536 | 4,496 | 760 | -888 |
Equity attributable to owners (SGD K) | 14,660 | 7,115 | 6,815 | 4,033 | 3,894 |
Non-controlling interests (SGD K) | 1,643 | 1,486 | 1,373 | 1,443 | 1,486 |
Total equity (SGD K) | 16,303 | 8,601 | 8,188 | 5,476 | 5,380 |
Goodwill and intangibles (SGD K) | 0 | 0 | 0 | 0 | 0 |
Working capital, current assets less current liabilities (SGD K) | 9,098 | 1,639 | 2,660 | 2,689 | 927 |
NAV per share (S$ cents) | 19.89 | 9.65 | 9.25 | 5.47 | 5.28 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (SGD K) | -296 | 438 | — | 107 | 2,306 |
Capital expenditure (SGD K) | -794 | -8 | — | -8 | -28 |
Free cash flow derived (SGD K) | -1,090 | 430 | — | 99 | 2,278 |
Dividends paid (SGD K) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (SGD K) | 0 | 0 | 0 | 0 | 0 |
Net payments to substantial shareholder-director (SGD K) | — | — | — | -87 | -25 |
Net payments to related party SGG (SGD K) | — | — | — | -1,880 | -1,268 |
Returns & Leverage Ratios (%)
| Ratio | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROE on average attributable equity (%) | -20.6 | -64.8 | 2.6 | -71.0 | -5.0 |
ROA on average total assets (%) | -11.2 | -28.0 | 0.8 | -20.0 | -1.2 |
ROIC (%)
| ROIC (%) | n/m | n/m | n/d | n/m | n/d |
|---|---|---|---|---|---|
Current ratio (x) | 2.19 | 1.15 | 1.25 | 1.34 | 1.08 |
Debt to total equity (x) | 0.37 | 0.62 | 0.60 | 0.54 | 0.38 |
Net debt to EBITDA (x) | n/m | n/m | — | n/m | -0.64 |
Interest coverage, EBIT / finance costs (x) | n/m | n/m | — | n/m | 0.86 |
Asset turnover (x) | 0.51 | 0.38 | 0.67 | 0.26 | 0.66 |
Cash conversion cycle (days) | — | — | — | -38 | 90 |
Income Statement
| Metric | 1Q FY2026 | 2Q FY2026 | 3Q FY2026 | 4Q FY2026 | 1Q FY2027 |
|---|---|---|---|---|---|
Revenue (SGD K) | 1,940 | 4,629 | 2,339 | 2,387 | 2,553 |
Net profit after tax (SGD K) | 97 | 511 | 133 | -943 | 944 |
Revenue by Region
| Region (SGD K) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Singapore revenue (SGD K) | 9,958 | 6,880 | 12,761 | 4,556 | 11,295 |
Asia ex-Singapore revenue, continuing (SGD K) | 5,236 | 2,696 | 866 | 502 | 0 |
Asia ex-Singapore revenue, discontinued Power Plant (SGD K) | 0 | 0 | 1,218 | 609 | 0 |
Total revenue incl. discontinued (SGD K) | 15,194 | 9,576 | 14,845 | 5,667 | 11,295 |
Revenue by Region (%) and Region Margins & Growth (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Singapore share of total revenue (%) | 65.5 | 71.8 | 86.0 | 80.4 | 100.0 |
Singapore revenue growth YoY (%) | n/m | -30.9 | 85.5 | -64.3 | 147.9 |
Asia ex-Singapore continuing revenue growth YoY (%) | n/m | -48.5 | n/m | -42.0 | -100.0 |
Share Price and Market Valuation
| Metric | FY2025 | FY2026 | FY2027 YTD |
|---|---|---|---|
Reference share price (SGD) | 0.020 | 0.040 | 0.049 |
Implied market capitalisation (SGD Mn) | 1.47 | 2.95 | 3.61 |
Valuation Multiples
| Multiple | VibroPower |
|---|---|
P/E (FY2026) | n/m (loss) |
P/E (trailing 4 quarters to 30 Jun 2026; net attributable S$650k derived) | 5.6x |
P/B (31 Mar 2026 equity S$3.894M) | 0.93x |
EV/Sales (FY2026) | 0.49x |
EV/EBITDA (FY2026 recurring EBITDA S$1.384M) | 4.0x |
Capital Markets
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Dividend per share (S$ cents) | 0 | 0 | 0 | 0 | 0 |
Debt item at 30 Jun 2026
| Debt item at 30 Jun 2026 | Carrying amount (SGD K) | Maturity / terms | Source |
|---|---|---|---|
Redeemable convertible bond (Interra) | 1,779 | 30 Nov 2026; 8.5% p.a. | S2 |
Loans from spouse of KMP | 78 | Jul–Aug 2026; 2% per month + 5% fee | S2 |
Other fixed-rate loans | 37 | Jul 2026; 2% per month | S2 |
Secured bank loan (in held-for-sale liabilities; secured on leasehold property) | 827 | Corporate guarantee expiring 2028 | S2 |
Lease liabilities (incl. held-for-sale) | 402 | — | S2 |
Analyst Conclusions
Management guidance
Management offers no quantitative guidance. Its stated outlook is cautiously optimistic: the order book has increased, supported by healthcare, infrastructure and government projects in Singapore; cost pressures persist; property-sale proceeds will fund liquidity, order-book execution and the biomass project; and the biomass plant is expected to achieve completion by March 2028 [S1][S2].
Consensus
None (no analyst coverage).
Bull case
-
Operating inflection is real: Revenue more than doubled in FY2026, gross margin reached 32%, recurring EBITDA turned positive and four of the last five quarters were profitable, with 1Q FY2027 revenue up 31.6% [S1][S2].
-
Balance-sheet repair via asset sales: Contracted disposals worth ~S$9.5M compare with a market cap of ~S$3.6M and equity of S$3.9M; completion would retire debt, release liquidity and crystallise gains [S5][S7].
-
Optionality in renewables: A 40% stake in an 11.5 MW biomass plant with a signed SESB REPPA and a bank letter of offer provides long-dated recurring income that is not reflected in a sub-1x P/B valuation [S1][S3].
Bear case
-
Governance overhang: Multi-million-dollar payments to the controlling shareholder and a related company outside Audit Committee approval, high-cost related-party loans and IPT-heavy procurement create regulatory and minority-shareholder risk that may persist regardless of operating results [S1].
-
Fragile, concentrated earnings: 58% of FY2026 revenue came from one customer; 1Q FY2027 profit relied on a S$703k one-off credit; dispute-related provisions recur [S1][S2].
-
Liquidity and dispute risk: Going-concern uncertainty, a November 2026 bond maturity, restricted cash and unresolved arbitrations with Puretech could overwhelm a S$3.9M equity base if property sales slip or awards go against the company [S1][S2][S10].
Catalysts and monitorables (next 12 months)
-
EGM approvals and completion of the Tuas (JTC approval) and Kluang (State Authority approval) disposals; proceeds use.
-
Repayment, extension or conversion of the S$1.5M Interra bond by 30 Nov 2026.
-
Conclusion of the Audit Committee review and any SGX response.
-
Outcome of the FY2026 AGM (deadline 29 Sep 2026) and board composition (third independent director/AC chair).
-
Arbitration developments (awards, settlements, performance bond calls).
-
Biomass plant financial close under the UOB Malaysia facility.
-
Quarterly results (2Q FY2027 due ~Nov 2026): margin trend and order-book commentary.
-
Removal of the going-concern material uncertainty in FY2027 audit.
Analyst verdict
VibroPower is a founder-controlled micro-cap whose operating trajectory has genuinely improved but whose investment case remains dominated by governance, liquidity and legal risk. On operations, FY2026 marked the strongest recovery in five years: revenue rose 123% to S$11.3M, gross margin doubled to 32%, recurring EBITDA turned positive and operating cash flow reached S$2.3M. The 1Q FY2027 quarter delivered S$0.9M of net profit and management reports a strengthening order book in Singapore healthcare, infrastructure and government work. On paper, the shares look inexpensive — under 1x book and roughly 4x FY2026 EBITDA at the implied July 2026 valuation — and contracted property sales worth about 2.6 times market capitalisation could transform the balance sheet if completed.
Those positives are offset by issues that a quantitative screen will miss. The FY2026 accounts disclose S$7.6M of payments to the controlling shareholder and a related company made without prior Audit Committee approval, with the review unresolved; the Group has relied on related-party loans priced at 2% per month; salaries to insiders were paid late; and auditors have flagged material going-concern uncertainty in three of the last four years. Earnings remain concentrated in a single customer and exposed to recurring disputes with a former main contractor, and the biomass project that underpins the "recurring income" narrative has already slipped by roughly 17 months to a March 2028 completion target.
The overall assessment is a high-risk special situation: the equity offers asymmetric upside if the property sales close, the bond is refinanced, the governance review concludes without sanction and order-book growth is sustained — but each of those conditions is unresolved, the stock is illiquid and controlled at 58.85%, and minority shareholders have limited influence. Monitoring should prioritise completion of the disposals, the Audit Committee's conclusions and the November 2026 bond maturity before placing weight on operating momentum.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | First appointed | Age | Education / qualifications | Prior / other roles | FY2025 remuneration |
|---|---|---|---|---|---|---|
Benedict Chen Onn Meng | Executive Director & CEO; controlling shareholder | 23 May 2000 (MD & CEO from 22 Aug 2000) | 65 (AR2025) | Diploma in Mechanical Engineering, Singapore Polytechnic | Co-founder of Group (1995); director of GMTM Holdings, Scott & English, SG Greenovation Lab, VibroPower Pte Ltd, VibroPower Sales and Services | S$506k (salary S$496k; allowances S$10k; no bonus) |
Tan Poh Chye Allan | Independent Non-Executive Chairman (from 9 Apr 2025); NC Chairman; AC and RC member | 12 Nov 2020 | — | LLB (Hons), University of Buckingham; Master's in Law, London Guildhall University; Barrister-at-law, Gray's Inn | Lawyer (corporate finance, regulatory, compliance); ID of Ecowise Holdings and Don Agro International; past ID of CNMC Goldmine and Nico Steel; director at Altum Law Corporation; joined Nine Yards Chambers LLC as director on 16 Jan 2026 | S$45k fees (plus S$81k professional fees to him and his law firm) |
Lok Pei San (Lu Peishan) | Independent Non-Executive Director; RC Chairman; AC and NC member | 1 Apr 2025 | 46 | Bachelor of Accountancy, NTU; Chartered Accountant (ISCA); Accredited Director (SID) | CFO, Bromat Holdings; former CFO of Goodpack and dnata Singapore; former Corporate Controller, Zuellig Pharma | Appointed after FY2025 |
Hew Koon Chan | Independent Non-Executive Director; AC Chairman | 18 Nov 2024 – retired at AGM 31 Jul 2025 | — | B.Eng (Mechanical), NUS; Senior Accredited Director (SID) | ID of Oiltek International, Resources Global Development, Shopper360; MD, Integer Capital | S$15k (pro-rated) |
Executive Leadership Team
| Name | Role | FY2025 remuneration |
|---|---|---|
Benedict Chen Onn Meng | CEO | S$506k |
Sia Huai Peng | Company Secretary (disclosed as the only key management personnel who is not a director) | S$144k (salary S$130k; benefits S$14k) |
Acting Group Financial Controller | Provides CEO/finance assurance to the Board (name n/d) | — |
Board & Management Changes
| Date | Change |
|---|---|
30 Sep 2024 | Toh Shih Hua ceases as Lead ID |
18 Nov 2024 | Hew Koon Chan appointed ID and AC Chairman |
31 Dec 2024 | Ernest Balasubramaniam steps down as Non-Executive Chairman |
1 Apr 2025 | Lok Pei San appointed ID |
9 Apr 2025 | Allan Tan appointed Chairman |
31 Jul 2025 | Hew Koon Chan retires at AGM; auditor change to Foo Kon Tan LLP |
Major Shareholders
| Holder | Shares | % of issued shares (ex-treasury) | Notes |
|---|---|---|---|
Benedict Chen Onn Meng | 35,922,769 | 48.7 | 35,747,569 direct + 175,200 via CPF account [S3][S14] |
Chen Siew Meng | 7,450,520 | 10.1 | Brother of CEO; concert party [S14] |
Wong Kim Siong | 7,000,000 | 9.5 | [S14] |
Ong Ai Ling | 6,208,100 | 8.4 | [S14] |
Lim Sim Beng | 2,749,000 | 3.7 | [S14] |
Lim Eng Tiong | 2,522,900 | 3.4 | [S14] |
Top 15 holders combined | — | 98.1 | Per Simply Wall St [S14] |
Competitive Landscape
Key Competitors
| Competitor | Segment overlap | Group scale (approx., FY2024) | Relative positioning vs VibroPower |
|---|---|---|---|
Cummins Inc. (Power Systems; Cummins Sales & Service Singapore) | Gensets, service | ~US$34B revenue | Integrated engine OEM with direct sales/service; far superior scale and brand |
Caterpillar Inc. (incl. FG Wilson, Perkins; dealer Tractors Singapore) | Gensets, service | ~US$65B revenue | Dominant brand; dealer network; mission-critical data-centre specification strength |
Rolls-Royce Power Systems (mtu) | Large standby gensets, data centres | Rolls-Royce group ~£18B underlying revenue | Premium large-kVA standby for data centres and hospitals |
Rehlko (formerly Kohler Energy; incl. SDMO) | Gensets | n/d (private) | Global standby brand with Asian distribution |
Generac Holdings (incl. Pramac) | Gensets | ~US$4.3B revenue | Strong in residential/commercial; growing C&I in Asia via Pramac |
Atlas Copco (Power Technique) | Mobile/rental gensets | ~SEK 177B group revenue | Mobile power and rental; overlaps on temporary power |
Aggreko | Rental/temporary power | n/d (private) | Rental model; competes on temporary and project power |
Himoinsa (Yanmar group) | Gensets | — | Mid-market packager with Asian presence |
Mitsubishi Heavy Industries (engines/gensets) | Engines and gensets | n/d at segment level | Engine supply and large gensets |
Local Singapore packagers and M&E subcontractors | Packaging, installation | — | Direct price competitors; AR2025 cites "new entrants" in a saturated market [S3] |
Malaysian biomass/IPP developers (renewables) | Biomass/solar power | — | Compete for SESB/SEDA allocations and financing |
Peer Comparison FY2026
| Metric | VibroPower FY2026 | Cummins FY2024 | Caterpillar FY2024 | Generac FY2024 |
|---|---|---|---|---|
Revenue | S$11.3M | ~US$34B | ~US$65B | ~US$4.3B |
Revenue growth | +123.3% | — | — | — |
Gross margin | 31.9% | — | — | — |
Net margin | −1.8% | — | — | — |
R&D intensity | n/d (no R&D disclosed) | — | — | — |