Vintage Energy Limited Overview
Vintage Energy is a micro-capitalisation, Adelaide-based onshore gas explorer-producer whose economic core is a 50% operated interest in the Odin and Vali gas fields on the Southern Flank of the Nappamerri Trough in the Cooper/Eromanga Basins (licences PRL 211, South Australia, and ATP 2021, Queensland). Both fields are in long-term "appraisal production", tied into the South Australian Cooper Basin Joint Venture infrastructure and supplying AGL (Vali) and ENGIE/Mitsui-owned Pelican Point Power (Odin) under contracts that expire in December 2026. The company holds net 2P reserves of 12.5 MMboe (71 PJ sales gas), 95% undeveloped, alongside option-value assets: the Nangwarry food-grade CO₂ discovery (Otway Basin), the Cullen-1 well in EP 126 (Bonaparte Basin, NT), Galilee Basin "Deeps" acreage and PELA 679. Declining production, a $31.2m impairment, negative equity, a A$10m secured loan and a sub-A$4m market value frame Vintage today as a distressed, funding-constrained holder of uncommercialised reserves in a structurally short east-coast gas market.
Company's own description
In its filings Vintage states that it seeks to create shareholder value through the discovery, development and sale of oil and gas resources; principal activities include securing exploration projects, exploration, appraisal and evaluation of resources, planning and execution of developments, and contracting for production, processing and sale. It describes its operations as exploration, appraisal and commercialisation of onshore Australian hydrocarbon accumulations, focused on proven basins where drilling success rates, distance to market and proximity to infrastructure support rapid commercialisation (H1 FY2026 Financial Report, Directors' Report). The company website positions Vintage as having been formed to take advantage of the Australian energy and gas supply crisis, and states a vision to become a "unique, dynamic, financially strong, growth-focused energy company" (vintageenergy.com.au).
Independent characterisation
| Customer | Field | Contract term | End-market | Source |
|---|---|---|---|---|
| AGL Wholesale Gas Ltd (AGL Energy) | Vali (ATP 2021) | To December 2026; A$15m prepayment (gross) | Eastern Australian domestic gas (retail/industrial/power) | H1 FY2026 report; Q2 FY2026 Quarterly |
| Pelican Point Power Ltd (ENGIE 72% / Mitsui 28%) | Odin (PRL 211/ATP 2021) | To December 2026 | Gas-fired power generation, South Australia | H1 FY2026 report; SmallCaps Feb 2025 |
| Vault Energy (prospective) | Cullen-1 (EP 126) | Heads of Agreement only (Apr 2026), subject to flow test and GSA | Gas-to-power for data centres ("well-to-wire") | ASX release 21 Apr 2026 |
Vintage is best characterised as a single-hub, non-integrated upstream gas producer in the appraisal phase, whose revenue is generated almost entirely by sales of raw-gas-derived sales gas (plus small LPG and condensate volumes) from two small fields. It owns field-level separation and metering facilities (the Vali facility, Odin tie-in) but relies on third-party infrastructure — the South Australian Cooper Basin Joint Venture (SACBJV, operated by Santos, with Beach Energy a major participant) — for gathering, processing at Moomba and transport. This creates a structurally thin margin: in FY2025 gas processing fees consumed ~50% of revenue (A$2.35m of A$4.66m).
Business model mechanics:
Revenue model: 100% product sales (natural gas, ethane, LPG, condensate) under bilateral gas sales agreements (GSAs). No service, subscription or licensing revenue.
Pricing: Contract prices not publicly disclosed. A portion of Vali revenue is non-cash, recognised against a A$15m (gross; Vintage 50%) prepayment made by AGL under the Vali GSA for supply over calendar years 2022–2026; contract liabilities (deferred revenue) stood at A$6.77m at 31 Dec 2025 (H1 FY2026 Note 18). Since 1 July 2023, some production delivered in lieu of processing/transport fees is also accounted as non-cash revenue (Q2 FY2026 Quarterly).
Other income: Joint operations recoveries (operator overhead recoveries from JV partners) of A$1.44m in FY2025 and A$0.57m in H1 FY2026 — material relative to revenue.
Value chain position: Upstream exploration and production; operator of the Southern Flank JVs (Vintage 50%, Metgasco Ltd 25%, Bridgeport (Cooper Basin) Pty Ltd 25%).
Customer types and end-markets:
The end-market is therefore exclusively the Australian east-coast gas market (and prospectively Northern Territory behind-the-meter power). Revenue is generated entirely within Australia (H1 FY2026 Note 7).
Key asset portfolio (summary)
| Asset | Basin / State | Vintage interest | Status | Source |
|---|---|---|---|---|
| Vali gas field (ATP 2021) | Cooper/Eromanga, QLD | 50%, operator | Appraisal production; Vali-1 producing (Patchawarra); Vali-2/3 Toolachee dewatering | H1 FY2026 report |
| Odin gas field (PRL 211 / ATP 2021) | Cooper/Eromanga, SA/QLD border | 50%, operator | Appraisal production from Odin-1 (since Sep 2023) and Odin-2 (since Oct 2024) | H1 FY2026 report |
| PELA 679 | Cooper Basin, SA | 100% on award | Award pending native title land access agreement (Dieri Aboriginal Corporation); Sabre farm-out terminated | H1 FY2026 report |
| GSEL 672 | SA | — | Carrying value A$160,994 (31 Dec 2025) | H1 FY2026 Note 15 |
| PRL 249 (ex PEL 155) — Nangwarry CO₂ | Otway, SA | 50% (Otway Energy 50%, operator) | Discovered Jan 2020; feasibility study with Beijing Maison pending | H1 FY2026 report |
| PEP 171 | Otway, VIC | 0% (25% sold to Beach Energy, completed Nov 2025) | Divested | H1 FY2026 report |
| ATPs 743, 744, 1015 "Deeps" (PCAs 319–324) | Galilee, QLD | 30% (Comet Ridge 70%, operator) | Dormant since Covid-era cessation | H1 FY2026 report |
| EP 126 (Cullen-1) | Bonaparte, NT | 100% | Suspended pending reserved-area resolution; NT government has indicated EMP applications may proceed; Vault HoA | H1 FY2026 report; ASX 21 Apr 2026 |
Strategy
Stated strategy themes
Synthesised from the FY2025 Annual Report, H1 FY2026 report, quarterly reports and ASX releases (paraphrased):
-
Value from discovered gas: monetise the three discoveries (Odin, Vali, Nangwarry) — the FY2025 Annual Report framed Odin, Vali and Nangwarry as the company's core value assets.
-
From "aggressive appraisal" to cash-generating production: the MD's December 2025 quarter commentary described an intent to revitalise activity, drill wells and shift focus to cash-generating production.
-
Southern Flank JV reformation: consolidate 100% of Odin/Vali and re-farm interests to new, funded partners (failed in March 2026; strategic intent persists).
-
Exploit the east-coast supply gap: repeatedly cites forecast shortfalls and uncontracted gas as a source of latent value.
-
Cost discipline and portfolio pruning: December 2024 restructure; PEP 171 divestment to prioritise the Southern Flank.
-
Option monetisation: Cullen-1 via Vault "well-to-wire"; Nangwarry CO₂ via third-party feasibility.
-
Oil exploration: stated integration of oil prospect evaluation into strategy (2026 prospectus).
Strategic initiatives — last 24 months
| Initiative | Announced | Description | Target / economics | Status | Source |
|---|---|---|---|---|---|
| Galilee Energy merger | Aug–Oct 2024 | All-scrip scheme (2 VEN : 1 GLL) to combine Cooper production with Galilee acreage | ~60/40 ownership | Terminated 12 Dec 2024 | ASX 12 Dec 2024 |
| Corporate restructure | Dec 2024 | 41% cut in headcount and salaries | ~A$1.14m p.a. savings | Implemented | SmallCaps |
| Production Uplift Program (Phase 1: scale management) | Jan 2025 | Chemical treatment/scale removal at Odin-1/2; chemical injection in gas line | ~A$1m program; target lift from 2.1 to 5.6 MMscf/d (70–187% increase); <3-month payback claimed | Wells returned at higher rates post-treatment; scale recurring | FNN May 2025; H1 FY2026 report |
| Production Uplift Program (Phase 2: Vali Toolachee) | 2,025 | Isolation of Patchawarra, dewatering of Toolachee at Vali-2/3; Vali-1 Toolachee attempt | Add Toolachee gas | Below expectations; Vali-2 shut in; Vali-3 ongoing | Q2 FY2026 Quarterly |
| PEP 171 divestment | 16 Jun 2025 | Sale of 25% to Beach Energy | A$1.0m cash + A$0.25m waiver | Completed Nov 2025 | Q2 FY2026 Quarterly |
| Southern Flank JV reformation | 18 Nov 2025 | Acquire Metgasco and Bridgeport 25% stakes (A$5.9m each) then farm down | Repay A$3m PURE tranche on success | Terminated 31 Mar 2026 | Metgasco ASX 1 Apr 2026 |
| SA Gas Incentive Grants | Feb 2026 (agreements Jun 2026) | A$5m (gross) for Odin-3 and Vali-4, up to 50% of well costs | Drill by 30 Sep 2028 | Grant agreements signed; Vintage share A$2.5m received/receivable | ASX 15 Jun 2026; SmallCaps |
| PURE facility amendment | 4 Mar 2026 | Maturity to 31 Jan 2028; rate unchanged; A$3m early repayment mechanism tied to JV reform; covenant to fall to A$1m on that repayment | — | Executed | ASX 4 Mar 2026; FNN |
| 2026 Entitlement offer | 17 Mar 2026 | 1-for-4 at A$0.004 with two free options (A$0.005, expiring 24 Apr 2028) per share; target ~A$2.1m | Use: working capital, oil prospects, Odin permanent connection, well preparation | A$1.41m raised | Kalkine; SmallCaps |
| Odin permanent connection | Mar 2026 | Replace interim tie-in | ~A$0.35m p.a. opex saving (Vintage share) | Funding allocated; completion not reported | SmallCaps Apr 2026 |
| Vault Energy HoA (Cullen-1) | 21 Apr 2026 | Exclusive negotiation of GSA or other arrangement for Cullen-1 gas to power data centres | Subject to flow test | HoA stage; test to be farm-out funded | ASX 21 Apr 2026; Grafa |
| Board renewal | 18 May 2026 | Appointment of capital-markets specialist Philipp Kin | — | Completed | ASX 18 May 2026 |
ESG / sustainability commitments
No formal emissions targets or sustainability-linked commitments were identified. The Nangwarry CO₂ project would supply naturally occurring CO₂ to industrial users (replacing supply lost when the nearby Caroline field depleted in 2017, after 49 years), and gas-to-power for data centres is framed by the counterparty as dispatchable power — neither is presented by Vintage as an ESG target.
Guidance and medium-term targets
Vintage provides no formal production, revenue or earnings guidance and no medium-term financial targets. The only quantified forward-looking statements identified are the Production Uplift Program's targeted rate range (2.1 → 5.6 MMscf/d, May 2025) and the Odin connection opex saving (A$0.35m p.a.). The Q2 FY2026 Appendix 5B disclosed 1.6 quarters of funding available.
Products & Services
Vintage's "products" are hydrocarbon streams and the assets that generate them. Each is catalogued below.
Sales gas (including ethane)
Description: Pipeline-specification methane (plus ethane) produced from Odin and Vali, processed through SACBJV facilities at Moomba.
Volumes: H1 FY2026 sales gas & ethane production 132.9 TJ (H1 FY2025: 176.6 TJ, -25%). Quarterly: Q1 FY2026 73.2 TJ; Q2 FY2026 59.7 TJ. Sales gas accounted for 96–97% of total production in FY2026 quarters (Q2/Q3 FY2026 Quarterlies).
Customers: AGL (Vali), Pelican Point Power (Odin).
Pricing model: Fixed/contracted GSA pricing (prices not publicly disclosed); Vali includes prepaid volumes.
Contract horizon: Both contracts to December 2026.
LPG
Description: Propane/butane extracted in processing.
Volumes: H1 FY2026 34.6 tonnes (H1 FY2025: 32.5 t). Q2 FY2026 sales 34.5 t.
Pricing: Not disclosed.
Condensate
Description: Light liquid hydrocarbons.
Volumes: H1 FY2026 production 373.8 bbl (H1 FY2025: 369.9 bbl); H1 FY2026 sales 535.2 bbl.
Revenue: Condensate and other liquids A$78,937 in H1 FY2026.
Producing / appraisal assets ("platforms")
Vali gas field (ATP 2021, QLD). Located ~7 km east of the SA–QLD border; three completed wells (Vali-1 ST1, Vali-2, Vali-3) connected to the Moomba gathering network. Vali-1 produces from the Patchawarra Formation; in Q2 FY2026 it produced for 76.5 days at an average 0.37 MMscf/d, with the Vali facility recording >99% availability. Under Phase 2 of the Production Uplift Program, Vali-1 could not establish Toolachee flow; Vali-2 flowed ~0.12 MMscf/d of raw gas with ~40 bbl/d water (12 Oct–31 Dec 2025) and was shut in pending analysis; Vali-3 dewatering via capillary string and nitrogen lift continues. Planned: Vali-4 (grant-supported) and Vali-5 locations identified, plus a Vali-1 workover targeting Toolachee and Nappamerri sands (Q2 FY2026 Quarterly; H1 FY2026 report).
Odin gas field (PRL 211 SA / ATP 2021 QLD). Straddles the state border near SACBJV Beckler, Bow and Dullingari facilities. Odin-1 (online Sep 2023) completed in Epsilon, Toolachee and Patchawarra formations; Odin-2 (appraised Jun 2024, online Oct 2024). Q2 FY2026: Odin-1 online 73.7 days, Odin-2 60.1 days; average metered raw gas 1.91 MMscf/d while online (Q1: 2.16 MMscf/d). Scale accumulation in both wells addressed with chemical treatment. Odin-3 location selected; A$2.5m grant (gross) awarded. A "permanent connection" for Odin was a stated use of 2026 entitlement proceeds, with estimated opex savings of A$0.35m p.a. net to Vintage (SmallCaps, Apr 2026).
Reserves (the underlying "inventory")
| Category (Vintage net, 30 Jun 2025) | Value | Source |
|---|---|---|
| Proved + probable (2P) reserves | 12.5 MMboe | H1 FY2026 report (citing FY2025 Annual Report) |
| of which sales gas | 71 PJ | Same |
| of which LPG | 13 kilotonnes | Same |
| of which condensate | 0.3 MMbbl | Same |
| Undeveloped 2P | 11.9 MMboe (≈95% of net 2P) | Same |
| Gross undeveloped 2P gas (Odin + Vali, 100% basis) | >135 PJ | ASX release 4 Mar 2026 |
| Nangwarry CO₂ sales gas (best estimate) | 25.9 Bcf gross / 12.9 Bcf net | ASX 12 Jul 2021 via H1 FY2026 report |
| Nangwarry 2C hydrocarbon contingent resources | 1.6 Bcf gross / 0.8 Bcf net | Same |
Development / exploration "pipeline" offerings
| Project | Description | Target customer / use | Status (Oct 2026) |
|---|---|---|---|
| Odin-3 | New production well to develop undeveloped 2P | Pelican Point / new buyers | Grant agreement signed Jun 2026; drilling to occur by 30 Sep 2028; matching funding required |
| Vali-4 | New production well | AGL / new buyers | As above |
| Vali-1 workover; Vali-5 | Toolachee/Nappamerri access | — | Designed; unfunded |
| Nangwarry food-grade CO₂ | Processing and liquefaction of ~93% CO₂ raw gas | Hospitality, food & beverage, horticulture, medical, industrial users | Beijing Maison Engineering HoA for fully funded feasibility study; report not yet delivered |
| Cullen-1 flow test (EP 126) | Test of 2014-drilled, cased and suspended well with oil and gas shows | Vault Energy — "well-to-wire" data-centre power | HoA signed; EMP applications permissible; testing intended to be funded via farm-out |
| Galilee Deeps | Lake Galilee Sandstone gas | East-coast market via proposed Galilee–Moranbah pipeline | No activity |
| PELA 679 | South-west Cooper Basin oil/gas exploration, south of Worrior oil field | — | Awaiting land access agreement |
| Oil prospects | Company stated intent to evaluate oil prospects (use of 2026 raise proceeds) | — | Early-stage; details not disclosed |
Financial Narrative
Income statement
Sources and notes: FY2023–FY2025 line items from the FY2024 and FY2025 Annual Reports (statements of profit or loss). FY2022 net loss (A$7.98m) and weighted shares from TipRanks (aggregator). FY2026 EPS (-A$0.0164) per Investing.com. FY2025 financing costs not captured in the retrieved excerpt; H1 FY2025 and H1 FY2026 were each A$0.944m (A$0.550m cash interest + A$0.394m amortisation), implying ~A$1.89m annualised. Analyst EBITDA = net loss + financing costs + depreciation (FY2025 assumes A$1.888m financing costs); FY2023 analyst calc (-A$8.81m) reconciles exactly to TipRanks' figure, but TipRanks' FY2024 (-A$22.59m) and FY2025 (-A$3.10m) EBITDA differ from analyst calc — discrepancy noted, analyst calc preferred.
Margins:
Revenue CAGR: FY2023→FY2026 ≈ +47% p.a. (off a part-year base); FY2024→FY2026 ≈ -23% p.a. (analyst calc). Gross-profit and operating-income lines as defined under US GAAP are not reported; the field margin is the closest analogue.
Commentary. The P&L tells a three-phase story. Phase 1 (FY2022–FY2023): pre-revenue build-out. FY2022 carried a ~A$8m loss with no revenue as Vali facilities were built (funded by the PURE A$10m facility and AGL prepayment); FY2023 delivered maiden revenue of A$0.95m from a delayed, flood-affected Vali start-up, but processing costs exceeded revenue and a A$4.6m impairment was booked. Phase 2 (FY2024): peak revenue, peak write-down. Odin-1 came online in September 2023, lifting revenue more than five-fold to A$5.15m and the field margin to A$1.86m, but the failure of Vali-2 and Vali-3 to contribute meaningful gas drove a A$19.4m impairment. Phase 3 (FY2025–FY2026): decline and retrenchment. Despite Odin-2 coming online (October 2024), revenue fell 10% in FY2025 and ~35% in FY2026 as natural decline, scale accumulation, downstream outages and the 2025 Cooper Basin floods eroded volumes. Management responded with cost reductions — employee benefits fell 47% from FY2023 to FY2025 and halved again on an annualised basis in H1 FY2026 — so the underlying (pre-impairment) loss has been held at roughly A$4.3–4.4m in each of FY2025 and FY2026. The FY2026 headline loss of A$35.6m is dominated by the A$31.2m impairment taken to mark the Southern Flank interests to the A$5.9m-per-25% price implied by the Bridgeport/Metgasco transactions — a market-referenced valuation that is far below the prior book value. Structural constraint: at current volumes, the fixed A$1.1m annual cash interest on the PURE facility and a corporate cost base of ~A$2–3m cannot be covered by a field margin of ~A$1–2m.
Balance sheet
Sources and notes: FY2025 balance sheet from H1 FY2026 Financial Report (comparative column, 30 Jun 2025). FY2024 cash (A$8,017,760), equity (A$29,659,977 opening 1 Jul 2024), E&E opening balance (A$35,098,156) and PP&E net (A$10,709,186 cost less A$1,478,135 accumulated depreciation) from H1 FY2026 notes. FY2025 working capital = current assets A$4.253m − current liabilities A$11.243m (PURE loan then classified current).
Interim reference point — 31 December 2025 (H1 FY2026 report): total assets A$17.04m; cash A$1.69m; E&E A$11.89m; PP&E A$2.51m; PURE loan carrying value A$9.67m (current); total liabilities A$22.98m; net assets −A$5.94m; working capital −A$9.19m; net debt (borrowings net of cash, company basis) A$8.33m.
Commentary. The balance sheet has moved from a capital-light, cash-backed explorer (A$8.0m cash, A$29.7m equity at June 2024) to a technically insolvent-on-book-value position (negative equity at December 2025), driven by impairments and operating losses rather than incremental borrowing — face debt has been flat at A$10m since June 2022. Two liabilities warrant special attention: (i) A$6.77m of contract liabilities representing AGL-prepaid gas not yet delivered, with the underlying GSA ending December 2026 — how this is settled or extended is a key unknown; (ii) A$4.81m restoration provisions, a real future cash call. The PURE facility carries a minimum cash covenant of A$1.5m (H1 FY2026 Note 19); reported cash fell to A$0.71m at 31 March 2026 and unrestricted cash was A$1.34m at 30 June 2026, both below that threshold.
Cash flow
Half-year detail (H1 FY2026 report):
Sources: FY2025 OCF (−A$3.00m) per financialfilings.com summary of the FY2025 Annual Report (aggregator); FY2025 E&E additions per H1 FY2026 Note 15; equity raised per FY2025 issued-capital note (417,382,364 shares, A$2,086,912 gross; costs A$237,560) and FY2026 Annual Report summary (352,422,144 shares at A$0.004 = A$1,409,689 gross).
Free cash flow has been negative in every year since listing; FY2025 FCF was at least −A$5.6m on an OCF-plus-E&E-additions basis (analyst approximation, mixing cash and accrual measures).
Ratios
Notes: ROE uses average equity FY2024–FY2025 (A$28.39m). ROIC is not meaningful (negative NOPAT; invested capital marked down). Net debt/EBITDA is not meaningful (negative EBITDA). Cash conversion cycle is not meaningful for a contract gas seller of this scale and is not disclosed. At 31 Dec 2025, the current ratio was 0.18x and debt/equity was negative (equity −A$5.94m). Yahoo Finance reported trailing ROE of −328.6% and ROA of −6.7% as of 2 Apr 2026 (aggregator; methodology differs).
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue from customers (AUD Mn) | 0 | 0.949 | 5.152 | 4.660 | 3.020 |
Joint operations recoveries (AUD Mn) | — | 2.795 | 2.306 | 1.445 | — |
Total income (AUD Mn) | — | 3.996 | 7.512 | 6.158 | — |
Gas processing / production costs (AUD Mn) | — | 1.493 | 2.909 | 2.351 | — |
Royalty expense (AUD Mn) | — | 0.078 | 0.384 | 0.356 | — |
Field margin, revenue less processing and royalty (AUD Mn) | — | -0.621 | 1.859 | 1.953 | — |
Depreciation (AUD Mn) | — | 0.561 | 1.063 | 1.016 | — |
Employee benefits expense (AUD Mn) | — | 4.342 | 3.140 | 2.302 | — |
Director remuneration expense (AUD Mn) | — | 0.822 | 0.417 | 0.386 | — |
Impairment expense (AUD Mn) | — | 4.635 | 19.410 | 0 | 31.244 |
Financing costs (AUD Mn) | — | 1.888 | 1.888 | — | — |
Pre-tax loss (AUD Mn) | -7.980 | -11.262 | -23.234 | -4.390 | -35.592 |
Income tax (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Net loss (AUD Mn) | -7.980 | -11.262 | -23.234 | -4.390 | -35.592 |
Net loss excluding impairment (AUD Mn) | — | -6.627 | -3.824 | -4.390 | -4.348 |
EBITDA, analyst calc incl. impairment (AUD Mn) | — | -8.813 | -20.283 | -1.486 | — |
EBITDA excluding impairment, analyst calc (AUD Mn) | — | -4.178 | -0.873 | -1.486 | — |
Basic and diluted EPS (AUD cents) | -0.96 | -1.30 | -2.30 | -0.30 | -1.64 |
Dividends per share (AUD cents) | 0 | 0 | 0 | 0 | 0 |
Weighted average shares (M) | 832.3 | 903.3 | 1,020.0 | 1,740.0 | — |
Margin
| Margin | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Field margin (%) | -65.4 | 36.1 | 41.9 |
EBITDA margin excl. impairment (%) | -440.3 | -16.9 | -31.9 |
Net margin (%) | -1,186.7 | -451.0 | -94.2 |
Balance Sheet
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total assets (AUD Mn) | — | — | — | 49.755 | — |
Cash and cash equivalents (AUD Mn) | — | — | 8.018 | 2.591 | 1.340 |
Exploration and evaluation assets (AUD Mn) | — | — | 35.098 | 37.041 | — |
Property, plant and equipment, net (AUD Mn) | — | — | 9.231 | 8.215 | — |
Loan facility, PURE, carrying value (AUD Mn) | 10.000 | 10.000 | 10.000 | 9.278 | — |
Loan facility, face value (AUD Mn) | 10.000 | 10.000 | 10.000 | 10.000 | 10.000 |
Lease liabilities (AUD Mn) | — | — | — | 0.222 | — |
Net debt, face value less cash (AUD Mn) | — | — | 1.982 | 7.409 | 8.660 |
Contract liabilities, deferred revenue (AUD Mn) | — | — | — | 6.808 | — |
Restoration provisions (AUD Mn) | — | — | — | 4.810 | — |
Total liabilities (AUD Mn) | — | — | — | 22.636 | — |
Total equity (AUD Mn) | — | — | 29.660 | 27.119 | — |
Working capital (AUD Mn) | — | — | — | -6.990 | — |
Goodwill and intangibles (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | — | — | — | -3.000 | — |
Exploration and evaluation additions, accounting (AUD Mn) | — | — | — | 2.641 | — |
Proceeds from tenement disposals (AUD Mn) | 0 | 0 | 0 | 0 | 1.000 |
Gross equity raised (AUD Mn) | — | — | — | 2.087 | 1.410 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Cash flow item (AUD Mn)
| Cash flow item (AUD Mn) | H1 FY2025 | H1 FY2026 |
|---|---|---|
Receipts from customers | 1.806 | 1.647 |
Payments to suppliers and employees | -3.451 | -2.517 |
Interest and finance costs paid | -0.552 | -0.274 |
Net operating cash flow | -2.174 | -1.137 |
Payments for exploration and evaluation | -3.172 | -0.692 |
Proceeds from disposal of tenements | 0 | 1.000 |
Net investing cash flow | -3.172 | 0.308 |
Lease principal | -0.073 | -0.075 |
Net change in cash | -5.419 | -0.904 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2024 | FY2025 |
|---|---|---|
Return on equity (%) | — | -15.5 |
Return on assets (%) | — | -8.8 |
Current ratio (x) | — | 0.38 |
Debt to equity, face debt (x) | 0.34 | 0.37 |
Asset turnover (x) | — | 0.09 |
Interest coverage, EBITDA excl. impairment / financing costs (x) | -0.46 | -0.79 |
Revenue by Region
| Region | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Australia revenue (AUD Mn) | 0 | 0.949 | 5.152 | 4.660 | 3.020 |
Rest of world revenue (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Market Valuation and Margin Analysis (%)
| Metric | CY2021 | CY2022 | CY2023 | CY2024 | CY2025 |
|---|---|---|---|---|---|
Market capitalisation at year-end (AUD Mn) | 59.25 | 67.20 | 22.62 | 10.02 | 10.43 |
YoY change in market capitalisation (%) | 53.35 | 13.43 | -66.35 | -55.71 | 4.17 |
Valuation Multiples
| Multiple | Vintage | Basis |
|---|---|---|
Market capitalisation | ~A$3.7m | StockAnalysis |
Enterprise value | ~A$12.5m | Market cap + A$10m PURE face debt + ~A$0.15m leases − A$1.34m unrestricted cash |
EV / Sales (FY2026) | ~4.1x | EV / A$3.02m revenue |
EV / net 2P | ~A$1.0 per boe; ~A$0.18 per GJ of sales gas | EV / 12.5 MMboe; EV / 71 PJ |
Capital Instruments
| Instrument | Amount (AUD Mn) | Rate | Maturity | Key terms | Source |
|---|---|---|---|---|---|
PURE Asset Management secured loan facility | 10.0 (fully drawn) | 11.0% p.a. (step-down to 8.5% on operating cash-flow conditions, not met) | 31 Jan 2028 (extended from 10 Jun 2026) | First-ranking security where JV terms permit; minimum cash covenant A$1.5m (to fall to A$1.0m if A$3m tranche repaid); optional A$3m early repayment before 31 Dec 2026 tied to JV reformation; additional fees on repayment depending on timing; early repayment penalty 1.5%–1.0% | H1 FY2026 Note 19; ASX 4 Mar 2026; FNN |
Lease liabilities | ~0.16 (Dec 2025) | — | ≤2 years | Office lease | H1 FY2026 Note 19 |
Analyst Conclusions
Management guidance
No quantitative guidance. Management's stated near-term priorities are: securing funding and commercial agreements; preparing Odin-3 and Vali-4 for drilling with grant support; completing the Odin permanent connection; advancing the Cullen-1 test via farm-out; and pursuing new asset or corporate opportunities for recapitalisation (Q4 FY2026 Quarterly summary; SmallCaps).
Consensus expectations
None available (no analyst coverage).
Bull case
-
Asset value far exceeds equity value. EV of ~A$12.5m against 71 PJ of net 2P sales gas (~A$0.18/GJ) is a deep discount even to the distressed A$5.9m-per-25% benchmark set in November 2025, which implies ~A$11.8m for Vintage's 50% before operatorship value.
-
Contract reset into a structurally short southern market. With both GSAs ending December 2026 and AEMO forecasting a 46% decline in southern legacy production over five years, uncontracted Odin/Vali gas could be re-priced toward prevailing levels (Beach realised A$11.5/GJ in FY2026), materially improving field margins if volumes are sustained.
-
Half-funded growth wells plus cheap options. A$5m of grant agreements covers up to half of Odin-3 and Vali-4; success would lift production from the ~0.05 PJe/quarter trough, while Cullen-1 (Vault) and Nangwarry provide non-correlated, partner-funded upside.
Bear case
-
Funding gap is binding. The company could not fund A$11.8m of partner acquisitions, raised only A$1.41m against a ~A$2.1m target in 2026, and must still provide matching funds for the grant wells — all with cash of ~A$1.3m and a A$10m secured loan ahead of equity.
-
Reservoir disappointment. Vali-2/3 underperformance and steady decline (H1 FY2026 −22%; Q4 FY2026 0.05 PJe) suggest the 95%-undeveloped reserve base may be costlier and slower to convert than certified volumes imply; the H1 FY2026 impairment is an explicit market verdict.
-
Equity is subordinated and heavily diluted. Negative book equity, the going-concern material uncertainty, AGL prepayment liabilities (A$6.77m), restoration provisions (A$4.81m) and >1bn of outstanding options/warrants mean any recapitalisation is likely to transfer most value to new money or the lender.
Key catalysts and monitorables (next 12 months)
| Timing | Catalyst / monitorable |
|---|---|
| ~29 Oct 2026 | Q1 FY2027 Quarterly & Appendix 5B — cash, funding runway, production trend, covenant commentary |
| 30 Nov 2026 | AGM — election of Philipp Kin; director re-elections; any strategic update |
| By 31 Dec 2026 | Optional A$3m PURE repayment window (requires JV reformation — now unlikely) |
| Dec 2026 | Expiry of AGL (Vali) and Pelican Point (Odin) GSAs — new contracts, extensions, and treatment of A$6.77m AGL prepayment liability |
| H2 CY2026 – CY2027 | Farm-out or JV restructuring with Metgasco/Bridgeport or new entrants; funding of matching capital for Odin-3/Vali-4 |
| ~Feb–Mar 2027 | H1 FY2027 half-year report — going-concern status, equity position |
| 7 Mar / 7 Jun 2027 | Expiry of A$0.009 options (deep out of the money) |
| 2,027 | Cullen-1 EMP approval, farm-out and flow test; Vault GSA |
| Ongoing | Nangwarry feasibility report (Beijing Maison); NT reserved-block amendments; PELA 679 land access |
| By 30 Sep 2028 | Grant deadline for drilling Odin-3 and Vali-4 |
Concluding analyst verdict
Vintage Energy is a case study in how a technically successful explorer can fail to convert discoveries into a self-funding business. The company found three accumulations in under three years, brought two Cooper Basin gas fields into production within roughly five years of listing, and secured blue-chip offtakers in AGL and ENGIE/Mitsui's Pelican Point. Yet the economics never reached scale: Vali's appraisal wells have not performed, Odin is in decline, tolling absorbs about half of revenue, and fixed interest on a A$10m loan consumes most of the field margin. The result is a A$35.6m FY2026 loss, a Southern Flank carrying value marked down to a third-party transaction price, negative equity and an auditor's going-concern warning.
The investment debate is therefore not about operating earnings — there are none to value — but about whether certified, infrastructure-adjacent gas (71 PJ net 2P) can be recapitalised before the balance sheet forces a resolution on terms unfavourable to shareholders. Several supports exist: a patient secured lender, A$5m of grant agreements, a southern market that regulators expect to tighten from winter 2027, contract expiries in December 2026 that permit re-pricing, and low-cost options in Cullen-1 and Nangwarry. Against these, the failed March 2026 JV reformation demonstrated that the company cannot currently mobilise even modest acquisition funding, and every equity raise since 2024 has been priced at sub-cent levels with attaching options.
On balance, Vintage should be viewed as a high-risk, binary recapitalisation situation. Upside for existing shareholders depends on a farm-in, merger or re-contracting outcome within the next two to three quarters that injects capital without wholesale dilution; absent that, value is likely to accrue primarily to new capital providers and the secured lender. Monitoring priorities are the October 2026 quarterly cash position, the December 2026 contract outcomes and any announced counterparty for the Southern Flank.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Background | Independence | Source |
|---|---|---|---|---|---|
Reginald (Reg) George Nelson | Non-Executive Chairman | 10 Feb 2017 | Former Managing Director of Beach Energy (to 2015); former Director of Mineral Development for South Australia; APPEA director for eight years and APPEA Chairman 2004–2006; awarded APPEA's Reg Sprigg Medal; member of risk committee | Non-executive; significant shareholder (indirect holding ~50.7m shares plus ~28.4m options per Apr 2026 notice) | Market Index; InvestSMART; InDaily |
Neil Gibbins | Managing Director | — | — | Executive, non-independent | FY2024 Annual Report; Kalkine profile |
Ian Andrew Howarth | Non-Executive Director | 9 Nov 2015 per InvestSMART (BusinessNews records a NED appointment in Nov 2020 — discrepancy) | — | Non-executive; shareholder via Howzat Services Pty Ltd (33.9m shares, Jan 2026) | InvestSMART; Q2 FY2026 Quarterly |
Philipp Kin | Non-Executive Director | 18 May 2026 (stands for election at Nov 2026 AGM) | Lead WA LNG Asset Economist at Shell (incl. support to Gorgon LNG FID); Head of Oil & Gas Research, Royal Bank of Scotland; Senior IR Adviser, Oil Search; Director of Corporate Finance, Baillieu Holst; Director, energy debt advisory; currently Managing Director of Helios Energy Ltd | Non-executive | ASX release 18 May 2026; Market Index |
Executive Leadership Team
| Name | Title | Background | Source |
|---|---|---|---|
Neil Gibbins | Managing Director | See above | ASX releases |
Simon Jeremy Newton Gray | Chief Financial Officer and Company Secretary | BEc, Chartered Accountant; born 1959 | Kalkine company profile |
Directors' Remuneration
| Metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Director remuneration expense (AUD Mn) | 0.822 | 0.417 | 0.386 |
Employee benefits expense (AUD Mn) | 4.342 | 3.140 | 2.302 |
Major Shareholders
| Rank | Holder | Shares | % |
|---|---|---|---|
| 1 | J P Morgan Nominees Australia Pty Ltd | 165,300,000 | 7.92 |
| 2 | Kygem Super Fund Pty Ltd | 122,750,000 | 5.88 |
| 3 | Geelle Pty Ltd (GD Brereton Family A/C) | 87,379,301 | 4.19 |
| 4 | Vintage Underwriting Investments Pty Ltd | 69,569,357 | 3.33 |
| 5 | Dawney & Co Ltd | 58,012,832 | 2.78 |
| 6 | Lillicrap Super Pty Ltd | 51,959,041 | 2.49 |
| 7 | Ita Vero Pty Ltd (The Richmond A/C) | 49,846,154 | 2.39 |
| 8 | Mr Philip Kidman Reid | 34,600,000 | 1.66 |
| 9 | Howzat Services Pty Ltd (Howarth Super Fund A/C) | 33,905,493 | 1.62 |
| 10 | Mr Antonios Syrianos | 30,000,000 | 1.44 |
| 12 | N M Gibbins | 26,926,443 | 1.29 |
| 17 | Aurelius Resources Pty Ltd (The Nelson Super Fund A/C) | 22,027,272 | 1.06 |
| 20 | Mr Reginald George & Mrs Susan Margaret Nelson (Groundhog A/C) | 18,572,118 | 0.89 |
| — | Top 20 total | 937,853,973 | 44.94 |
Competitive Landscape
Key Competitors
| Competitor | Ticker | Overlap with Vintage | Latest revenue | Relative positioning | Source |
|---|---|---|---|---|---|
Santos Ltd | ASX: STO | SACBJV operator; dominant Cooper Basin producer; also Vintage's infrastructure provider | US$4.9bn sales revenue (CY2025) | Integrated major; price-setter | Santos 2025 FY Results |
Beach Energy Ltd | ASX: BPT | Major Cooper Basin producer, SACBJV participant; buyer of Vintage's PEP 171 stake | A$1,801m sales revenue (FY2026); underlying NPAT A$355m | Mid-cap producer; infrastructure owner | Beach FY2026 results |
Metgasco Ltd | ASX: MEL | Same fields (25% partner); competes for capital and the same uncontracted gas | ~A$2.16m (trailing; aggregator) | Peer micro-cap, non-operator | TipRanks |
Bridgeport (Cooper Basin) Pty Ltd | Private | Same fields (25% partner) | — | Private non-operator | Q2 FY2026 Quarterly |
Galilee Energy Ltd | ASX: GLL | East-coast junior gas (Glenaras CSG); failed merger partner | — | Pre-revenue developer | ASX 12 Dec 2024 |
Comet Ridge Ltd | ASX: COI | Galilee Basin (Vintage JV operator); Bowen Basin gas developer | — | Developer | H1 FY2026 report |
Amplitude Energy Ltd (formerly Cooper Energy) | ASX: AEL | Southern-states gas supplier (Otway/Gippsland) | — | Producer | — |
Elixir Energy Ltd | ASX: EXR | Queensland gas appraisal (Taroom Trough) | — | Explorer | — |
Tamboran Resources | ASX/NYSE: TBN | NT gas (Beetaloo); relevant to Cullen/NT supply | — | Developer | — |
Grand Gulf Energy Ltd; Triangle Energy (Global) Ltd | ASX: GGE / TEG | Listed by TipRanks as nearest small-cap peers | — | Micro-cap E&Ps | TipRanks |
“—” = not publicly disclosed.
Peer Comparison FY2026
| Metric | Vintage Energy (FY2026) | Beach Energy (FY2026) | Santos (CY2025) | Metgasco (FY2025, trailing) |
|---|---|---|---|---|
Revenue | A$3.0m | A$1,801m | US$4.9bn | A$2.16m |
Revenue growth (YoY) | −35% | −10% | Not computed | −9% |
Profitability | Net loss A$35.6m (pre-impairment ~A$4.3m) | Underlying NPAT A$355m; underlying EBITDA A$1,040m | Underlying NPAT US$898m | — |
Net margin | Deeply negative | ~19.7% underlying | ~18% underlying | — |
R&D intensity | Not reported (nil) | Not reported separately | Not reported separately | — |
2P reserves | 12.5 MMboe net | 156 MMboe | 1,484 MMboe | — |
Net debt / gearing | ~A$8.7m net debt vs negative equity | Net gearing 10.6% | — | — |
“—” = not publicly disclosed.



