Vintage Energy Limited Overview

Vintage Energy is a micro-capitalisation, Adelaide-based onshore gas explorer-producer whose economic core is a 50% operated interest in the Odin and Vali gas fields on the Southern Flank of the Nappamerri Trough in the Cooper/Eromanga Basins (licences PRL 211, South Australia, and ATP 2021, Queensland). Both fields are in long-term "appraisal production", tied into the South Australian Cooper Basin Joint Venture infrastructure and supplying AGL (Vali) and ENGIE/Mitsui-owned Pelican Point Power (Odin) under contracts that expire in December 2026. The company holds net 2P reserves of 12.5 MMboe (71 PJ sales gas), 95% undeveloped, alongside option-value assets: the Nangwarry food-grade CO₂ discovery (Otway Basin), the Cullen-1 well in EP 126 (Bonaparte Basin, NT), Galilee Basin "Deeps" acreage and PELA 679. Declining production, a $31.2m impairment, negative equity, a A$10m secured loan and a sub-A$4m market value frame Vintage today as a distressed, funding-constrained holder of uncommercialised reserves in a structurally short east-coast gas market.


Company's own description

In its filings Vintage states that it seeks to create shareholder value through the discovery, development and sale of oil and gas resources; principal activities include securing exploration projects, exploration, appraisal and evaluation of resources, planning and execution of developments, and contracting for production, processing and sale. It describes its operations as exploration, appraisal and commercialisation of onshore Australian hydrocarbon accumulations, focused on proven basins where drilling success rates, distance to market and proximity to infrastructure support rapid commercialisation (H1 FY2026 Financial Report, Directors' Report). The company website positions Vintage as having been formed to take advantage of the Australian energy and gas supply crisis, and states a vision to become a "unique, dynamic, financially strong, growth-focused energy company" (vintageenergy.com.au).

Independent characterisation

CustomerFieldContract termEnd-marketSource
AGL Wholesale Gas Ltd (AGL Energy)Vali (ATP 2021)To December 2026; A$15m prepayment (gross)Eastern Australian domestic gas (retail/industrial/power)H1 FY2026 report; Q2 FY2026 Quarterly
Pelican Point Power Ltd (ENGIE 72% / Mitsui 28%)Odin (PRL 211/ATP 2021)To December 2026Gas-fired power generation, South AustraliaH1 FY2026 report; SmallCaps Feb 2025
Vault Energy (prospective)Cullen-1 (EP 126)Heads of Agreement only (Apr 2026), subject to flow test and GSAGas-to-power for data centres ("well-to-wire")ASX release 21 Apr 2026

Vintage is best characterised as a single-hub, non-integrated upstream gas producer in the appraisal phase, whose revenue is generated almost entirely by sales of raw-gas-derived sales gas (plus small LPG and condensate volumes) from two small fields. It owns field-level separation and metering facilities (the Vali facility, Odin tie-in) but relies on third-party infrastructure — the South Australian Cooper Basin Joint Venture (SACBJV, operated by Santos, with Beach Energy a major participant) — for gathering, processing at Moomba and transport. This creates a structurally thin margin: in FY2025 gas processing fees consumed ~50% of revenue (A$2.35m of A$4.66m).

Business model mechanics:

Revenue model: 100% product sales (natural gas, ethane, LPG, condensate) under bilateral gas sales agreements (GSAs). No service, subscription or licensing revenue.

Pricing: Contract prices not publicly disclosed. A portion of Vali revenue is non-cash, recognised against a A$15m (gross; Vintage 50%) prepayment made by AGL under the Vali GSA for supply over calendar years 2022–2026; contract liabilities (deferred revenue) stood at A$6.77m at 31 Dec 2025 (H1 FY2026 Note 18). Since 1 July 2023, some production delivered in lieu of processing/transport fees is also accounted as non-cash revenue (Q2 FY2026 Quarterly).

Other income: Joint operations recoveries (operator overhead recoveries from JV partners) of A$1.44m in FY2025 and A$0.57m in H1 FY2026 — material relative to revenue.

Value chain position: Upstream exploration and production; operator of the Southern Flank JVs (Vintage 50%, Metgasco Ltd 25%, Bridgeport (Cooper Basin) Pty Ltd 25%).

Customer types and end-markets:

The end-market is therefore exclusively the Australian east-coast gas market (and prospectively Northern Territory behind-the-meter power). Revenue is generated entirely within Australia (H1 FY2026 Note 7).

Key asset portfolio (summary)

AssetBasin / StateVintage interestStatusSource
Vali gas field (ATP 2021)Cooper/Eromanga, QLD50%, operatorAppraisal production; Vali-1 producing (Patchawarra); Vali-2/3 Toolachee dewateringH1 FY2026 report
Odin gas field (PRL 211 / ATP 2021)Cooper/Eromanga, SA/QLD border50%, operatorAppraisal production from Odin-1 (since Sep 2023) and Odin-2 (since Oct 2024)H1 FY2026 report
PELA 679Cooper Basin, SA100% on awardAward pending native title land access agreement (Dieri Aboriginal Corporation); Sabre farm-out terminatedH1 FY2026 report
GSEL 672SA—Carrying value A$160,994 (31 Dec 2025)H1 FY2026 Note 15
PRL 249 (ex PEL 155) — Nangwarry CO₂Otway, SA50% (Otway Energy 50%, operator)Discovered Jan 2020; feasibility study with Beijing Maison pendingH1 FY2026 report
PEP 171Otway, VIC0% (25% sold to Beach Energy, completed Nov 2025)DivestedH1 FY2026 report
ATPs 743, 744, 1015 "Deeps" (PCAs 319–324)Galilee, QLD30% (Comet Ridge 70%, operator)Dormant since Covid-era cessationH1 FY2026 report
EP 126 (Cullen-1)Bonaparte, NT100%Suspended pending reserved-area resolution; NT government has indicated EMP applications may proceed; Vault HoAH1 FY2026 report; ASX 21 Apr 2026

Strategy

Stated strategy themes

Synthesised from the FY2025 Annual Report, H1 FY2026 report, quarterly reports and ASX releases (paraphrased):

  1. Value from discovered gas: monetise the three discoveries (Odin, Vali, Nangwarry) — the FY2025 Annual Report framed Odin, Vali and Nangwarry as the company's core value assets.

  2. From "aggressive appraisal" to cash-generating production: the MD's December 2025 quarter commentary described an intent to revitalise activity, drill wells and shift focus to cash-generating production.

  3. Southern Flank JV reformation: consolidate 100% of Odin/Vali and re-farm interests to new, funded partners (failed in March 2026; strategic intent persists).

  4. Exploit the east-coast supply gap: repeatedly cites forecast shortfalls and uncontracted gas as a source of latent value.

  5. Cost discipline and portfolio pruning: December 2024 restructure; PEP 171 divestment to prioritise the Southern Flank.

  6. Option monetisation: Cullen-1 via Vault "well-to-wire"; Nangwarry CO₂ via third-party feasibility.

  7. Oil exploration: stated integration of oil prospect evaluation into strategy (2026 prospectus).

Strategic initiatives — last 24 months

InitiativeAnnouncedDescriptionTarget / economicsStatusSource
Galilee Energy mergerAug–Oct 2024All-scrip scheme (2 VEN : 1 GLL) to combine Cooper production with Galilee acreage~60/40 ownershipTerminated 12 Dec 2024ASX 12 Dec 2024
Corporate restructureDec 202441% cut in headcount and salaries~A$1.14m p.a. savingsImplementedSmallCaps
Production Uplift Program (Phase 1: scale management)Jan 2025Chemical treatment/scale removal at Odin-1/2; chemical injection in gas line~A$1m program; target lift from 2.1 to 5.6 MMscf/d (70–187% increase); <3-month payback claimedWells returned at higher rates post-treatment; scale recurringFNN May 2025; H1 FY2026 report
Production Uplift Program (Phase 2: Vali Toolachee)2,025Isolation of Patchawarra, dewatering of Toolachee at Vali-2/3; Vali-1 Toolachee attemptAdd Toolachee gasBelow expectations; Vali-2 shut in; Vali-3 ongoingQ2 FY2026 Quarterly
PEP 171 divestment16 Jun 2025Sale of 25% to Beach EnergyA$1.0m cash + A$0.25m waiverCompleted Nov 2025Q2 FY2026 Quarterly
Southern Flank JV reformation18 Nov 2025Acquire Metgasco and Bridgeport 25% stakes (A$5.9m each) then farm downRepay A$3m PURE tranche on successTerminated 31 Mar 2026Metgasco ASX 1 Apr 2026
SA Gas Incentive GrantsFeb 2026 (agreements Jun 2026)A$5m (gross) for Odin-3 and Vali-4, up to 50% of well costsDrill by 30 Sep 2028Grant agreements signed; Vintage share A$2.5m received/receivableASX 15 Jun 2026; SmallCaps
PURE facility amendment4 Mar 2026Maturity to 31 Jan 2028; rate unchanged; A$3m early repayment mechanism tied to JV reform; covenant to fall to A$1m on that repayment—ExecutedASX 4 Mar 2026; FNN
2026 Entitlement offer17 Mar 20261-for-4 at A$0.004 with two free options (A$0.005, expiring 24 Apr 2028) per share; target ~A$2.1mUse: working capital, oil prospects, Odin permanent connection, well preparationA$1.41m raisedKalkine; SmallCaps
Odin permanent connectionMar 2026Replace interim tie-in~A$0.35m p.a. opex saving (Vintage share)Funding allocated; completion not reportedSmallCaps Apr 2026
Vault Energy HoA (Cullen-1)21 Apr 2026Exclusive negotiation of GSA or other arrangement for Cullen-1 gas to power data centresSubject to flow testHoA stage; test to be farm-out fundedASX 21 Apr 2026; Grafa
Board renewal18 May 2026Appointment of capital-markets specialist Philipp Kin—CompletedASX 18 May 2026

ESG / sustainability commitments

No formal emissions targets or sustainability-linked commitments were identified. The Nangwarry CO₂ project would supply naturally occurring CO₂ to industrial users (replacing supply lost when the nearby Caroline field depleted in 2017, after 49 years), and gas-to-power for data centres is framed by the counterparty as dispatchable power — neither is presented by Vintage as an ESG target.

Guidance and medium-term targets

Vintage provides no formal production, revenue or earnings guidance and no medium-term financial targets. The only quantified forward-looking statements identified are the Production Uplift Program's targeted rate range (2.1 → 5.6 MMscf/d, May 2025) and the Odin connection opex saving (A$0.35m p.a.). The Q2 FY2026 Appendix 5B disclosed 1.6 quarters of funding available.

Products & Services

Vintage's "products" are hydrocarbon streams and the assets that generate them. Each is catalogued below.

Sales gas (including ethane)

Description: Pipeline-specification methane (plus ethane) produced from Odin and Vali, processed through SACBJV facilities at Moomba.

Volumes: H1 FY2026 sales gas & ethane production 132.9 TJ (H1 FY2025: 176.6 TJ, -25%). Quarterly: Q1 FY2026 73.2 TJ; Q2 FY2026 59.7 TJ. Sales gas accounted for 96–97% of total production in FY2026 quarters (Q2/Q3 FY2026 Quarterlies).

Customers: AGL (Vali), Pelican Point Power (Odin).

Pricing model: Fixed/contracted GSA pricing (prices not publicly disclosed); Vali includes prepaid volumes.

Contract horizon: Both contracts to December 2026.

LPG

Description: Propane/butane extracted in processing.

Volumes: H1 FY2026 34.6 tonnes (H1 FY2025: 32.5 t). Q2 FY2026 sales 34.5 t.

Pricing: Not disclosed.

Condensate

Description: Light liquid hydrocarbons.

Volumes: H1 FY2026 production 373.8 bbl (H1 FY2025: 369.9 bbl); H1 FY2026 sales 535.2 bbl.

Revenue: Condensate and other liquids A$78,937 in H1 FY2026.

Producing / appraisal assets ("platforms")

Vali gas field (ATP 2021, QLD). Located ~7 km east of the SA–QLD border; three completed wells (Vali-1 ST1, Vali-2, Vali-3) connected to the Moomba gathering network. Vali-1 produces from the Patchawarra Formation; in Q2 FY2026 it produced for 76.5 days at an average 0.37 MMscf/d, with the Vali facility recording >99% availability. Under Phase 2 of the Production Uplift Program, Vali-1 could not establish Toolachee flow; Vali-2 flowed ~0.12 MMscf/d of raw gas with ~40 bbl/d water (12 Oct–31 Dec 2025) and was shut in pending analysis; Vali-3 dewatering via capillary string and nitrogen lift continues. Planned: Vali-4 (grant-supported) and Vali-5 locations identified, plus a Vali-1 workover targeting Toolachee and Nappamerri sands (Q2 FY2026 Quarterly; H1 FY2026 report).

Odin gas field (PRL 211 SA / ATP 2021 QLD). Straddles the state border near SACBJV Beckler, Bow and Dullingari facilities. Odin-1 (online Sep 2023) completed in Epsilon, Toolachee and Patchawarra formations; Odin-2 (appraised Jun 2024, online Oct 2024). Q2 FY2026: Odin-1 online 73.7 days, Odin-2 60.1 days; average metered raw gas 1.91 MMscf/d while online (Q1: 2.16 MMscf/d). Scale accumulation in both wells addressed with chemical treatment. Odin-3 location selected; A$2.5m grant (gross) awarded. A "permanent connection" for Odin was a stated use of 2026 entitlement proceeds, with estimated opex savings of A$0.35m p.a. net to Vintage (SmallCaps, Apr 2026).

Reserves (the underlying "inventory")

Category (Vintage net, 30 Jun 2025)ValueSource
Proved + probable (2P) reserves12.5 MMboeH1 FY2026 report (citing FY2025 Annual Report)
of which sales gas71 PJSame
of which LPG13 kilotonnesSame
of which condensate0.3 MMbblSame
Undeveloped 2P11.9 MMboe (≈95% of net 2P)Same
Gross undeveloped 2P gas (Odin + Vali, 100% basis)>135 PJASX release 4 Mar 2026
Nangwarry CO₂ sales gas (best estimate)25.9 Bcf gross / 12.9 Bcf netASX 12 Jul 2021 via H1 FY2026 report
Nangwarry 2C hydrocarbon contingent resources1.6 Bcf gross / 0.8 Bcf netSame

Development / exploration "pipeline" offerings

ProjectDescriptionTarget customer / useStatus (Oct 2026)
Odin-3New production well to develop undeveloped 2PPelican Point / new buyersGrant agreement signed Jun 2026; drilling to occur by 30 Sep 2028; matching funding required
Vali-4New production wellAGL / new buyersAs above
Vali-1 workover; Vali-5Toolachee/Nappamerri access—Designed; unfunded
Nangwarry food-grade CO₂Processing and liquefaction of ~93% CO₂ raw gasHospitality, food & beverage, horticulture, medical, industrial usersBeijing Maison Engineering HoA for fully funded feasibility study; report not yet delivered
Cullen-1 flow test (EP 126)Test of 2014-drilled, cased and suspended well with oil and gas showsVault Energy — "well-to-wire" data-centre powerHoA signed; EMP applications permissible; testing intended to be funded via farm-out
Galilee DeepsLake Galilee Sandstone gasEast-coast market via proposed Galilee–Moranbah pipelineNo activity
PELA 679South-west Cooper Basin oil/gas exploration, south of Worrior oil field—Awaiting land access agreement
Oil prospectsCompany stated intent to evaluate oil prospects (use of 2026 raise proceeds)—Early-stage; details not disclosed

Financial Narrative

Income statement

Sources and notes: FY2023–FY2025 line items from the FY2024 and FY2025 Annual Reports (statements of profit or loss). FY2022 net loss (A$7.98m) and weighted shares from TipRanks (aggregator). FY2026 EPS (-A$0.0164) per Investing.com. FY2025 financing costs not captured in the retrieved excerpt; H1 FY2025 and H1 FY2026 were each A$0.944m (A$0.550m cash interest + A$0.394m amortisation), implying ~A$1.89m annualised. Analyst EBITDA = net loss + financing costs + depreciation (FY2025 assumes A$1.888m financing costs); FY2023 analyst calc (-A$8.81m) reconciles exactly to TipRanks' figure, but TipRanks' FY2024 (-A$22.59m) and FY2025 (-A$3.10m) EBITDA differ from analyst calc — discrepancy noted, analyst calc preferred.

Margins:

Revenue CAGR: FY2023→FY2026 ≈ +47% p.a. (off a part-year base); FY2024→FY2026 ≈ -23% p.a. (analyst calc). Gross-profit and operating-income lines as defined under US GAAP are not reported; the field margin is the closest analogue.

Commentary. The P&L tells a three-phase story. Phase 1 (FY2022–FY2023): pre-revenue build-out. FY2022 carried a ~A$8m loss with no revenue as Vali facilities were built (funded by the PURE A$10m facility and AGL prepayment); FY2023 delivered maiden revenue of A$0.95m from a delayed, flood-affected Vali start-up, but processing costs exceeded revenue and a A$4.6m impairment was booked. Phase 2 (FY2024): peak revenue, peak write-down. Odin-1 came online in September 2023, lifting revenue more than five-fold to A$5.15m and the field margin to A$1.86m, but the failure of Vali-2 and Vali-3 to contribute meaningful gas drove a A$19.4m impairment. Phase 3 (FY2025–FY2026): decline and retrenchment. Despite Odin-2 coming online (October 2024), revenue fell 10% in FY2025 and ~35% in FY2026 as natural decline, scale accumulation, downstream outages and the 2025 Cooper Basin floods eroded volumes. Management responded with cost reductions — employee benefits fell 47% from FY2023 to FY2025 and halved again on an annualised basis in H1 FY2026 — so the underlying (pre-impairment) loss has been held at roughly A$4.3–4.4m in each of FY2025 and FY2026. The FY2026 headline loss of A$35.6m is dominated by the A$31.2m impairment taken to mark the Southern Flank interests to the A$5.9m-per-25% price implied by the Bridgeport/Metgasco transactions — a market-referenced valuation that is far below the prior book value. Structural constraint: at current volumes, the fixed A$1.1m annual cash interest on the PURE facility and a corporate cost base of ~A$2–3m cannot be covered by a field margin of ~A$1–2m.

Balance sheet

Sources and notes: FY2025 balance sheet from H1 FY2026 Financial Report (comparative column, 30 Jun 2025). FY2024 cash (A$8,017,760), equity (A$29,659,977 opening 1 Jul 2024), E&E opening balance (A$35,098,156) and PP&E net (A$10,709,186 cost less A$1,478,135 accumulated depreciation) from H1 FY2026 notes. FY2025 working capital = current assets A$4.253m − current liabilities A$11.243m (PURE loan then classified current).

Interim reference point — 31 December 2025 (H1 FY2026 report): total assets A$17.04m; cash A$1.69m; E&E A$11.89m; PP&E A$2.51m; PURE loan carrying value A$9.67m (current); total liabilities A$22.98m; net assets −A$5.94m; working capital −A$9.19m; net debt (borrowings net of cash, company basis) A$8.33m.

Commentary. The balance sheet has moved from a capital-light, cash-backed explorer (A$8.0m cash, A$29.7m equity at June 2024) to a technically insolvent-on-book-value position (negative equity at December 2025), driven by impairments and operating losses rather than incremental borrowing — face debt has been flat at A$10m since June 2022. Two liabilities warrant special attention: (i) A$6.77m of contract liabilities representing AGL-prepaid gas not yet delivered, with the underlying GSA ending December 2026 — how this is settled or extended is a key unknown; (ii) A$4.81m restoration provisions, a real future cash call. The PURE facility carries a minimum cash covenant of A$1.5m (H1 FY2026 Note 19); reported cash fell to A$0.71m at 31 March 2026 and unrestricted cash was A$1.34m at 30 June 2026, both below that threshold.

Cash flow

Half-year detail (H1 FY2026 report):

Sources: FY2025 OCF (−A$3.00m) per financialfilings.com summary of the FY2025 Annual Report (aggregator); FY2025 E&E additions per H1 FY2026 Note 15; equity raised per FY2025 issued-capital note (417,382,364 shares, A$2,086,912 gross; costs A$237,560) and FY2026 Annual Report summary (352,422,144 shares at A$0.004 = A$1,409,689 gross).

Free cash flow has been negative in every year since listing; FY2025 FCF was at least −A$5.6m on an OCF-plus-E&E-additions basis (analyst approximation, mixing cash and accrual measures).

Ratios

Notes: ROE uses average equity FY2024–FY2025 (A$28.39m). ROIC is not meaningful (negative NOPAT; invested capital marked down). Net debt/EBITDA is not meaningful (negative EBITDA). Cash conversion cycle is not meaningful for a contract gas seller of this scale and is not disclosed. At 31 Dec 2025, the current ratio was 0.18x and debt/equity was negative (equity −A$5.94m). Yahoo Finance reported trailing ROE of −328.6% and ROA of −6.7% as of 2 Apr 2026 (aggregator; methodology differs).

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Income Statement and Per-Share Data

MetricFY2022FY2023FY2024FY2025FY2026

Revenue from customers (AUD Mn)

00.9495.1524.6603.020

Joint operations recoveries (AUD Mn)

—2.7952.3061.445—

Total income (AUD Mn)

—3.9967.5126.158—

Gas processing / production costs (AUD Mn)

—1.4932.9092.351—

Royalty expense (AUD Mn)

—0.0780.3840.356—

Field margin, revenue less processing and royalty (AUD Mn)

—-0.6211.8591.953—

Depreciation (AUD Mn)

—0.5611.0631.016—

Employee benefits expense (AUD Mn)

—4.3423.1402.302—

Director remuneration expense (AUD Mn)

—0.8220.4170.386—

Impairment expense (AUD Mn)

—4.63519.410031.244

Financing costs (AUD Mn)

—1.8881.888——

Pre-tax loss (AUD Mn)

-7.980-11.262-23.234-4.390-35.592

Income tax (AUD Mn)

00000

Net loss (AUD Mn)

-7.980-11.262-23.234-4.390-35.592

Net loss excluding impairment (AUD Mn)

—-6.627-3.824-4.390-4.348

EBITDA, analyst calc incl. impairment (AUD Mn)

—-8.813-20.283-1.486—

EBITDA excluding impairment, analyst calc (AUD Mn)

—-4.178-0.873-1.486—

Basic and diluted EPS (AUD cents)

-0.96-1.30-2.30-0.30-1.64

Dividends per share (AUD cents)

00000

Weighted average shares (M)

832.3903.31,020.01,740.0—

Margin

MarginFY2023FY2024FY2025

Field margin (%)

-65.436.141.9

EBITDA margin excl. impairment (%)

-440.3-16.9-31.9

Net margin (%)

-1,186.7-451.0-94.2

Balance Sheet

MetricFY2022FY2023FY2024FY2025FY2026

Total assets (AUD Mn)

———49.755—

Cash and cash equivalents (AUD Mn)

——8.0182.5911.340

Exploration and evaluation assets (AUD Mn)

——35.09837.041—

Property, plant and equipment, net (AUD Mn)

——9.2318.215—

Loan facility, PURE, carrying value (AUD Mn)

10.00010.00010.0009.278—

Loan facility, face value (AUD Mn)

10.00010.00010.00010.00010.000

Lease liabilities (AUD Mn)

———0.222—

Net debt, face value less cash (AUD Mn)

——1.9827.4098.660

Contract liabilities, deferred revenue (AUD Mn)

———6.808—

Restoration provisions (AUD Mn)

———4.810—

Total liabilities (AUD Mn)

———22.636—

Total equity (AUD Mn)

——29.66027.119—

Working capital (AUD Mn)

———-6.990—

Goodwill and intangibles (AUD Mn)

00000

Cash Flow

MetricFY2022FY2023FY2024FY2025FY2026

Operating cash flow (AUD Mn)

———-3.000—

Exploration and evaluation additions, accounting (AUD Mn)

———2.641—

Proceeds from tenement disposals (AUD Mn)

00001.000

Gross equity raised (AUD Mn)

———2.0871.410

Dividends paid (AUD Mn)

00000

Share buybacks (AUD Mn)

00000

Cash flow item (AUD Mn)

Cash flow item (AUD Mn)H1 FY2025H1 FY2026

Receipts from customers

1.8061.647

Payments to suppliers and employees

-3.451-2.517

Interest and finance costs paid

-0.552-0.274

Net operating cash flow

-2.174-1.137

Payments for exploration and evaluation

-3.172-0.692

Proceeds from disposal of tenements

01.000

Net investing cash flow

-3.1720.308

Lease principal

-0.073-0.075

Net change in cash

-5.419-0.904

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2024FY2025

Return on equity (%)

—-15.5

Return on assets (%)

—-8.8

Current ratio (x)

—0.38

Debt to equity, face debt (x)

0.340.37

Asset turnover (x)

—0.09

Interest coverage, EBITDA excl. impairment / financing costs (x)

-0.46-0.79

Revenue by Region

RegionFY2022FY2023FY2024FY2025FY2026

Australia revenue (AUD Mn)

00.9495.1524.6603.020

Rest of world revenue (AUD Mn)

00000

Market Valuation and Margin Analysis (%)

MetricCY2021CY2022CY2023CY2024CY2025

Market capitalisation at year-end (AUD Mn)

59.2567.2022.6210.0210.43

YoY change in market capitalisation (%)

53.3513.43-66.35-55.714.17

Valuation Multiples

MultipleVintageBasis

Market capitalisation

~A$3.7m

StockAnalysis

Enterprise value

~A$12.5m

Market cap + A$10m PURE face debt + ~A$0.15m leases − A$1.34m unrestricted cash

EV / Sales (FY2026)

~4.1x

EV / A$3.02m revenue

EV / net 2P

~A$1.0 per boe; ~A$0.18 per GJ of sales gas

EV / 12.5 MMboe; EV / 71 PJ

Capital Instruments

InstrumentAmount (AUD Mn)RateMaturityKey termsSource

PURE Asset Management secured loan facility

10.0 (fully drawn)

11.0% p.a. (step-down to 8.5% on operating cash-flow conditions, not met)

31 Jan 2028 (extended from 10 Jun 2026)

First-ranking security where JV terms permit; minimum cash covenant A$1.5m (to fall to A$1.0m if A$3m tranche repaid); optional A$3m early repayment before 31 Dec 2026 tied to JV reformation; additional fees on repayment depending on timing; early repayment penalty 1.5%–1.0%

H1 FY2026 Note 19; ASX 4 Mar 2026; FNN

Lease liabilities

~0.16 (Dec 2025)

—

≤2 years

Office lease

H1 FY2026 Note 19

Analyst Conclusions

Management guidance

No quantitative guidance. Management's stated near-term priorities are: securing funding and commercial agreements; preparing Odin-3 and Vali-4 for drilling with grant support; completing the Odin permanent connection; advancing the Cullen-1 test via farm-out; and pursuing new asset or corporate opportunities for recapitalisation (Q4 FY2026 Quarterly summary; SmallCaps).

Consensus expectations

None available (no analyst coverage).

Bull case

  1. Asset value far exceeds equity value. EV of ~A$12.5m against 71 PJ of net 2P sales gas (~A$0.18/GJ) is a deep discount even to the distressed A$5.9m-per-25% benchmark set in November 2025, which implies ~A$11.8m for Vintage's 50% before operatorship value.

  2. Contract reset into a structurally short southern market. With both GSAs ending December 2026 and AEMO forecasting a 46% decline in southern legacy production over five years, uncontracted Odin/Vali gas could be re-priced toward prevailing levels (Beach realised A$11.5/GJ in FY2026), materially improving field margins if volumes are sustained.

  3. Half-funded growth wells plus cheap options. A$5m of grant agreements covers up to half of Odin-3 and Vali-4; success would lift production from the ~0.05 PJe/quarter trough, while Cullen-1 (Vault) and Nangwarry provide non-correlated, partner-funded upside.

Bear case

  1. Funding gap is binding. The company could not fund A$11.8m of partner acquisitions, raised only A$1.41m against a ~A$2.1m target in 2026, and must still provide matching funds for the grant wells — all with cash of ~A$1.3m and a A$10m secured loan ahead of equity.

  2. Reservoir disappointment. Vali-2/3 underperformance and steady decline (H1 FY2026 −22%; Q4 FY2026 0.05 PJe) suggest the 95%-undeveloped reserve base may be costlier and slower to convert than certified volumes imply; the H1 FY2026 impairment is an explicit market verdict.

  3. Equity is subordinated and heavily diluted. Negative book equity, the going-concern material uncertainty, AGL prepayment liabilities (A$6.77m), restoration provisions (A$4.81m) and >1bn of outstanding options/warrants mean any recapitalisation is likely to transfer most value to new money or the lender.

Key catalysts and monitorables (next 12 months)

TimingCatalyst / monitorable
~29 Oct 2026Q1 FY2027 Quarterly & Appendix 5B — cash, funding runway, production trend, covenant commentary
30 Nov 2026AGM — election of Philipp Kin; director re-elections; any strategic update
By 31 Dec 2026Optional A$3m PURE repayment window (requires JV reformation — now unlikely)
Dec 2026Expiry of AGL (Vali) and Pelican Point (Odin) GSAs — new contracts, extensions, and treatment of A$6.77m AGL prepayment liability
H2 CY2026 – CY2027Farm-out or JV restructuring with Metgasco/Bridgeport or new entrants; funding of matching capital for Odin-3/Vali-4
~Feb–Mar 2027H1 FY2027 half-year report — going-concern status, equity position
7 Mar / 7 Jun 2027Expiry of A$0.009 options (deep out of the money)
2,027Cullen-1 EMP approval, farm-out and flow test; Vault GSA
OngoingNangwarry feasibility report (Beijing Maison); NT reserved-block amendments; PELA 679 land access
By 30 Sep 2028Grant deadline for drilling Odin-3 and Vali-4

Concluding analyst verdict

Vintage Energy is a case study in how a technically successful explorer can fail to convert discoveries into a self-funding business. The company found three accumulations in under three years, brought two Cooper Basin gas fields into production within roughly five years of listing, and secured blue-chip offtakers in AGL and ENGIE/Mitsui's Pelican Point. Yet the economics never reached scale: Vali's appraisal wells have not performed, Odin is in decline, tolling absorbs about half of revenue, and fixed interest on a A$10m loan consumes most of the field margin. The result is a A$35.6m FY2026 loss, a Southern Flank carrying value marked down to a third-party transaction price, negative equity and an auditor's going-concern warning.

The investment debate is therefore not about operating earnings — there are none to value — but about whether certified, infrastructure-adjacent gas (71 PJ net 2P) can be recapitalised before the balance sheet forces a resolution on terms unfavourable to shareholders. Several supports exist: a patient secured lender, A$5m of grant agreements, a southern market that regulators expect to tighten from winter 2027, contract expiries in December 2026 that permit re-pricing, and low-cost options in Cullen-1 and Nangwarry. Against these, the failed March 2026 JV reformation demonstrated that the company cannot currently mobilise even modest acquisition funding, and every equity raise since 2024 has been priced at sub-cent levels with attaching options.

On balance, Vintage should be viewed as a high-risk, binary recapitalisation situation. Upside for existing shareholders depends on a farm-in, merger or re-contracting outcome within the next two to three quarters that injects capital without wholesale dilution; absent that, value is likely to accrue primarily to new capital providers and the secured lender. Monitoring priorities are the October 2026 quarterly cash position, the December 2026 contract outcomes and any announced counterparty for the Southern Flank.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleAppointedBackgroundIndependenceSource

Reginald (Reg) George Nelson

Non-Executive Chairman

10 Feb 2017

Former Managing Director of Beach Energy (to 2015); former Director of Mineral Development for South Australia; APPEA director for eight years and APPEA Chairman 2004–2006; awarded APPEA's Reg Sprigg Medal; member of risk committee

Non-executive; significant shareholder (indirect holding ~50.7m shares plus ~28.4m options per Apr 2026 notice)

Market Index; InvestSMART; InDaily

Neil Gibbins

Managing Director

——

Executive, non-independent

FY2024 Annual Report; Kalkine profile

Ian Andrew Howarth

Non-Executive Director

9 Nov 2015 per InvestSMART (BusinessNews records a NED appointment in Nov 2020 — discrepancy)

—

Non-executive; shareholder via Howzat Services Pty Ltd (33.9m shares, Jan 2026)

InvestSMART; Q2 FY2026 Quarterly

Philipp Kin

Non-Executive Director

18 May 2026 (stands for election at Nov 2026 AGM)

Lead WA LNG Asset Economist at Shell (incl. support to Gorgon LNG FID); Head of Oil & Gas Research, Royal Bank of Scotland; Senior IR Adviser, Oil Search; Director of Corporate Finance, Baillieu Holst; Director, energy debt advisory; currently Managing Director of Helios Energy Ltd

Non-executive

ASX release 18 May 2026; Market Index

Executive Leadership Team

NameTitleBackgroundSource

Neil Gibbins

Managing Director

See above

ASX releases

Simon Jeremy Newton Gray

Chief Financial Officer and Company Secretary

BEc, Chartered Accountant; born 1959

Kalkine company profile

Directors' Remuneration

MetricFY2023FY2024FY2025

Director remuneration expense (AUD Mn)

0.8220.4170.386

Employee benefits expense (AUD Mn)

4.3423.1402.302

Major Shareholders

RankHolderShares%
1

J P Morgan Nominees Australia Pty Ltd

165,300,0007.92
2

Kygem Super Fund Pty Ltd

122,750,0005.88
3

Geelle Pty Ltd (GD Brereton Family A/C)

87,379,3014.19
4

Vintage Underwriting Investments Pty Ltd

69,569,3573.33
5

Dawney & Co Ltd

58,012,8322.78
6

Lillicrap Super Pty Ltd

51,959,0412.49
7

Ita Vero Pty Ltd (The Richmond A/C)

49,846,1542.39
8

Mr Philip Kidman Reid

34,600,0001.66
9

Howzat Services Pty Ltd (Howarth Super Fund A/C)

33,905,4931.62
10

Mr Antonios Syrianos

30,000,0001.44
12

N M Gibbins

26,926,4431.29
17

Aurelius Resources Pty Ltd (The Nelson Super Fund A/C)

22,027,2721.06
20

Mr Reginald George & Mrs Susan Margaret Nelson (Groundhog A/C)

18,572,1180.89
—

Top 20 total

937,853,97344.94

Competitive Landscape

Key Competitors

CompetitorTickerOverlap with VintageLatest revenueRelative positioningSource

Santos Ltd

ASX: STO

SACBJV operator; dominant Cooper Basin producer; also Vintage's infrastructure provider

US$4.9bn sales revenue (CY2025)

Integrated major; price-setter

Santos 2025 FY Results

Beach Energy Ltd

ASX: BPT

Major Cooper Basin producer, SACBJV participant; buyer of Vintage's PEP 171 stake

A$1,801m sales revenue (FY2026); underlying NPAT A$355m

Mid-cap producer; infrastructure owner

Beach FY2026 results

Metgasco Ltd

ASX: MEL

Same fields (25% partner); competes for capital and the same uncontracted gas

~A$2.16m (trailing; aggregator)

Peer micro-cap, non-operator

TipRanks

Bridgeport (Cooper Basin) Pty Ltd

Private

Same fields (25% partner)

—

Private non-operator

Q2 FY2026 Quarterly

Galilee Energy Ltd

ASX: GLL

East-coast junior gas (Glenaras CSG); failed merger partner

—

Pre-revenue developer

ASX 12 Dec 2024

Comet Ridge Ltd

ASX: COI

Galilee Basin (Vintage JV operator); Bowen Basin gas developer

—

Developer

H1 FY2026 report

Amplitude Energy Ltd (formerly Cooper Energy)

ASX: AEL

Southern-states gas supplier (Otway/Gippsland)

—

Producer

—

Elixir Energy Ltd

ASX: EXR

Queensland gas appraisal (Taroom Trough)

—

Explorer

—

Tamboran Resources

ASX/NYSE: TBN

NT gas (Beetaloo); relevant to Cullen/NT supply

—

Developer

—

Grand Gulf Energy Ltd; Triangle Energy (Global) Ltd

ASX: GGE / TEG

Listed by TipRanks as nearest small-cap peers

—

Micro-cap E&Ps

TipRanks

“—” = not publicly disclosed.

Peer Comparison FY2026

MetricVintage Energy (FY2026)Beach Energy (FY2026)Santos (CY2025)Metgasco (FY2025, trailing)

Revenue

A$3.0m

A$1,801m

US$4.9bn

A$2.16m

Revenue growth (YoY)

−35%−10%

Not computed

−9%

Profitability

Net loss A$35.6m (pre-impairment ~A$4.3m)

Underlying NPAT A$355m; underlying EBITDA A$1,040m

Underlying NPAT US$898m

—

Net margin

Deeply negative

~19.7% underlying

~18% underlying

—

R&D intensity

Not reported (nil)

Not reported separately

Not reported separately

—

2P reserves

12.5 MMboe net

156 MMboe

1,484 MMboe

—

Net debt / gearing

~A$8.7m net debt vs negative equity

Net gearing 10.6%

——

“—” = not publicly disclosed.

Company Snapshot

2015

Founded

Goodwood, Australia

Headquarters

SWOT Analysis

Strengths

  • Certified reserve base far exceeding market value: net 2P of 12.5 MMboe including 71 PJ sales gas (30 Jun 2025), against a market capitalisation of ~A$3.7m (Sep 2026).
  • Operator status on both producing licences, generating A$1.44m of JV recoveries in FY2025 and control over the Odin-3/Vali-4 program.
  • Connected infrastructure: both fields are tied into SACBJV facilities; the Vali facility achieved >99% availability in Q2 FY2026.
  • Non-dilutive grant funding: A$5m (gross) SA Gas Incentive Grant agreements signed June 2026, covering up to 50% of two wells.
  • Supportive secured lender: PURE extended maturity 19 months to 31 Jan 2028 with no rate change (Mar 2026) and has invested A$551,500 of equity (2025).
  • Demonstrated cost discipline: employee benefits expense down 47% FY2023→FY2025 and a further ~45% decline in H1 FY2026 vs H1 FY2025 (A$0.76m vs A$1.38m).

Weaknesses

  • Declining production: H1 FY2026 output down 22% YoY to 0.14 PJe; Q4 FY2026 at 0.05 PJe.
  • Vali well underperformance: Vali-2 and Vali-3 have not delivered commercial rates since completion; Vali-2 shut in after flowing 0.12 MMscf/d with 40 bbl/d water (Q2 FY2026).
  • Negative equity: net assets −A$5.94m at 31 Dec 2025 after A$31.24m impairment.
  • Going-concern material uncertainty highlighted by Grant Thornton in the H1 FY2026 review report.
  • Thin field economics: gas processing fees equal to ~50% of FY2025 revenue (A$2.35m of A$4.66m).
  • Persistent cash burn and liquidity: cash of A$0.71m at 31 Mar 2026; 1.6 quarters of funding reported at Dec 2025.

Opportunities

  • Re-contracting into a tighter post-2026 market: both GSAs expire Dec 2026, creating the opportunity to sell uncontracted gas at current pricing (cf. Beach realised A$11.5/GJ in FY2026); AEMO forecasts a 46% decline in southern legacy production over five years.
  • Odin-3 and Vali-4 drilling to convert undeveloped reserves (11.9 MMboe net undeveloped), half-funded by grants (deadline 30 Sep 2028).
  • Farm-down of Southern Flank interests to a funded partner — the A$5.9m-per-25% market reference provides a price anchor.
  • Cullen-1/Vault "well-to-wire" — monetisation of a stranded NT well via data-centre demand, now with an NT-government pathway for EMP submission.
  • Nangwarry CO₂ — 12.9 Bcf net CO₂ sales gas; third-party-funded feasibility study pending.
  • Odin permanent connection delivering an estimated A$0.35m p.a. opex saving (Vintage share).

Threats

  • Funding failure: the Metgasco/Bridgeport transactions collapsed (31 Mar 2026) because Vintage could not secure funding commitments.
  • Lender covenant risk: minimum cash covenant of A$1.5m vs reported cash of A$0.71m (Mar 2026) and A$1.34m unrestricted (Jun 2026); no waiver disclosure located.
  • Third-party infrastructure downtime: Odin-1 and Odin-2 were online only 73.7 and 60.1 days respectively in Q2 FY2026, largely due to non-Vintage downstream issues and maintenance.
  • Severe dilution: 2025 raise at A$0.005 and 2026 raise at A$0.004, each with free options; ~2.4bn shares now on issue.
  • Climatic/flood risk: 2025 Cooper Basin flooding restricted access and delayed the uplift program.
  • Settlement of AGL prepayment obligations: A$6.77m of contract liabilities against a contract ending Dec 2026 could become a cash or volume obligation if not delivered (analyst assessment; terms not disclosed).

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
30 Apr 2025Q3 FY2025 report: sales revenue A$1.2m; cash A$2.0m; third consecutive improvement in cash outflow FNNPre-flood run-rate reference
May 2025PURE Resources Fund subscribes A$551,500 in shortfall offer; total entitlement + shortfall proceeds A$1.15m at that point FNNLender doubling as equity backstop
26 May 2025Quotation of 16.8m new shares TipRanksCompletion of raise tranche
28 May 2025Shortfall offer closes FNN; FY2025 AR2025 recapitalisation complete (~A$2.09m gross for FY2025 issues)
16 Jun 2025Sale of 25% PEP 171 to Beach Energy announced Q2 FY2026 QuarterlyPortfolio pruning; A$1.25m value
2025 (H2 CY)Cooper Basin flooding restricts field access TipRanks (1 Sep 2025 summary)Delayed uplift work
1 Sep 2025Positive interim results from Production Uplift Program after access restored TipRanksTemporary production improvement
25–26 Sep 2025FY2025 Annual Report: revenue A$4.66m, loss A$4.39m; Corporate Governance Statement FY2025 AR; TipRanksUnderlying loss stabilised
30 Sep 2025AGM date (19 Nov 2025) announced TipRanksGovernance
17 Oct 2025Interim results, Phase 2 uplift (Toolachee at Vali) TipRanksEarly signal of Vali-2 underperformance
30 Oct 2025Q1 FY2026 report (revenue A$0.90m); Simon Gray resigns as alternate director Market Index; H1 FY2026 reportContinued decline
Nov 2025PEP 171 sale completes; A$1.0m cash received H1 FY2026 Note 12Liquidity support
17–18 Nov 2025Southern Flank JV reformation: HoA with Metgasco and commitment to consider Bridgeport deemed offer (A$5.9m each) Q2 FY2026 QuarterlyTransaction value implies large write-down of book value
19 Nov 20252025 AGM (MinterEllison, Adelaide) TipRanksGovernance
12 Dec 2025Petroleum Title Sale Agreement executed with Metgasco Metgasco releasesConditional on Vintage funding
23 Dec 2025Target dates amended (Bridgeport acceptance to 28 Feb 2026; completion 31 Mar 2026) ASX 23 Dec 2025Funding not yet secured
14 Jan 2026Metgasco shareholders approve sale Q2 FY2026 QuarterlyCounterparty condition satisfied
30 Jan 2026Q2 FY2026 report (revenue A$0.78m; cash A$1.67m; 1.6 quarters of funding) and corrected re-lodgement; Metgasco commitment date extended to 28 Feb Q2 FY2026 Quarterly; Metgasco ASX 30 Jan 2026Liquidity warning
20 Feb 2026SA government announces A$5m grants for Odin-3 and Vali-4 H1 FY2026 Note 24Non-dilutive capital for new wells
2 Mar 2026Metgasco announces updated completion target of 31 Mar 2026 Metgasco ASX 1 Apr 2026Last extension
4 Mar 2026PURE facility extended to 31 Jan 2028 ASX 4 Mar 2026Removes June 2026 maturity cliff
16 Mar 2026H1 FY2026 report: loss A$33.17m incl. A$31.24m impairment; negative equity; going-concern material uncertaintyMajor value reset
17–20 Mar 20261-for-4 entitlement offer at A$0.004 announced; prospectus lodged Kalkine; Vintage websiteDilutive survival raise
31 Mar / 1 Apr 2026Metgasco PTSA terminated; MEL to repay A$255k Metgasco ASX 1 Apr 2026JV reformation fails
21 Apr 2026Vault Energy HoA for Cullen-1 gas ASX 21 Apr 2026First commercial pathway for EP 126
24 Apr 2026Entitlement offer completes: A$1.35m raised; shortfall of 184.6m shares opened ASX 24 Apr 2026Undersubscribed
29 Apr 2026Q3 FY2026 report: production 0.06 PJe; cash A$0.71m InvestSMARTCash below PURE covenant level
18 May 2026Philipp Kin appointed NED ASX 18 May 2026Capital-markets expertise added
15 Jun 2026Grant agreements signed for A$5m InvestSMARTGrants unlocked (subject to matching funding)
26 Jun 2026Quotation of 30,373,490 shortfall shares TipRanksAdditional equity
10 Jul 2026Quotation of 1,000,000 shares TipRanksMinor
13 Jul 2026"Vale Nick Smart" — founder died 12 Jul 2026 InDaily; InvestSMARTLoss of founding figure
14 Jul 2026Shortfall offer closure announced InvestSMART; KalkineTotal 2026 raise A$1.41m
27 Jul 2026Change of Director Interest Notices (two) InvestSMARTInsider participation
30 Jul 2026Q4 FY2026 report: revenue ~A$0.6m (−20% QoQ); production 0.05 PJe; unrestricted cash A$1.34m; operating inflow A$2.26m (grant-assisted) InvestSMARTProduction at multi-year low
31 Jul 2026Two responses to ASX Appendix 3Y queries InvestSMARTCompliance matter (likely late lodgement)
30 Sep 2026FY2026 Annual Report: loss A$35.59m; Appendix 4G KalkineConfirms value reset
6 Oct 2026AGM set for 30 Nov 2026; director nominations close 13 Oct 2026 TipRanksKin's election; re-election of directors

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

2 charts
Income Statement: Revenue & Gross Profit: Revenue from customers rose from AUD 0 Mn in FY2022 to AUD 3 Mn in FY2026.
Vintage Energy Limited — Income Statement: Revenue & Gross Profit
Series (AUD Mn)FY2022FY2023FY2024FY2025FY2026
Revenue from customers00.95.24.73
Field margin, revenue less processing and royalty—-0.61.92—

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. Vintage Energy Ltd — Financial Report for the half year ended 31 December 2025 (ASX, 16 Mar 2026) (announcements.asx.com.au)
  2. Vintage Energy Ltd — Quarterly Report for period ended 31 December 2025 (revised, 30 Jan 2026) (bulletin.webull.com)
  3. Vintage Energy Ltd — Annual Report 2025 (ASX, 26 Sep 2025) (announcements.asx.com.au)
  4. Vintage Energy Ltd — Annual Report 2024 (ASX, 30 Sep 2024) (announcements.asx.com.au)
  5. Vintage Energy Ltd — Annual Report 2023 (ASX, 28 Sep 2023) (announcements.asx.com.au)
  6. Vintage Energy — PURE loan facility agreement amendment (4 Mar 2026) (bulletin.webull.com)
  7. Vintage Energy — Completion of Entitlement Offer (24 Apr 2026) (bulletin.webull.com)
  8. Vintage Energy — Vintage and Vault sign HoA on gas sales from Cullen-1 (21 Apr 2026) (bulletin.webull.com)
  9. Vintage Energy — Non-executive director appointment (18 May 2026) (bulletin.webull.com)
  10. Vintage Energy — Amended target dates for Southern Flank gas interest acquisitions (23 Dec 2025) (bulletin.webull.com)
  11. Metgasco — Termination of Sale Agreement with Vintage (1 Apr 2026) (bulletin.webull.com)
  12. Metgasco — Sale of Assets of Metgasco (18 Nov 2025) (bulletin.webull.com)
  13. Metgasco — Sale Agreement with Vintage, Updated Timetable (30 Jan 2026) (bulletin.webull.com)
  14. Galilee Energy / Vintage — Termination of Scheme Implementation Deed (12 Dec 2024) (announcements.asx.com.au)
  15. Kalkine Media — Vintage Energy Reports $35.6M Operating Loss for FY2026 (30 Sep 2026) (kalkinemedia.com)
  16. InvestSMART — VEN FY26 Q4 Quarterly summary (investsmart.com.au)
  17. InvestSMART — VEN FY26 Q3 Quarterly summary (investsmart.com.au)
  18. InvestSMART — VEN grant agreements summary (investsmart.com.au)
  19. InvestSMART — VEN company page and announcements (investsmart.com.au)
  20. TipRanks — VEN income statement (tipranks.com)
  21. TipRanks — Vintage Energy Sets AGM Date (6 Oct 2026) (tipranks.com)
  22. StockAnalysis — VEN market cap history (stockanalysis.com)
  23. Listcorp — VEN share price and news (listcorp.com)
  24. Investing.com — Vintage Energy (investing.com)
  25. Yahoo Finance — VEN.AX (finance.yahoo.com)
  26. financialfilings.com — Vintage Energy filings (financialfilings.com)
  27. Market Index — Reginald Nelson; Philipp Kin director profiles · marketindex.com.au
  28. Kalkine — VEN company profile (kalkinemedia.com)
  29. ABN Newswire — Vintage Energy (ISIN) (abnnewswire.net)
  30. InDaily — SA oil and gas founder dies (14 Jul 2026) (indailysa.com.au)
  31. SmallCaps — Vintage terminates Metgasco deal (smallcaps.com.au)
  32. SmallCaps — Vintage extends PURE loan facility (smallcaps.com.au)
  33. SmallCaps — Vintage restructure (australia.beta.smallcaps.com.au)
  34. SmallCaps — Vintage completes entitlement offer (2025) (smallcaps.com.au)
  35. FNN — Vintage Energy receives funding for production (2025) (finnewsnetwork.com.au)
  36. FNN — Vintage secures loan facility extension (2026) (finnewsnetwork.com.au)
  37. Grafa — Vintage Energy, Vault sign Bonaparte Basin gas deal (grafa.com)
  38. KeyFacts Energy — Vintage completes $10 million debt facility (2022) (keyfactsenergy.com)
  39. Vintage Energy — website and Reports & Presentations · vintageenergy.com.au
  40. Beach Energy — FY26 full year results (6 Aug 2026) (announcements.asx.com.au)
  41. Kalkine — Beach Energy FY26 results summaries (kalkinemedia.com)
  42. Motley Fool — Beach Energy FY26 broker view (fool.com.au)
  43. Santos — 2025 Full-Year Results (santos.com)
  44. Santos — 2025 Annual Reserves Statement (santos.com)
  45. TipRanks — Metgasco revenue (tipranks.com)
  46. AEMO — 2026 Gas Statement of Opportunities (aemo.com.au)
  47. APO — GSOO March 2026 summary (apo.org.au)
  48. ACCC — Storage vital to meeting winter demand in Q3 2026 (accc.gov.au)
  49. ACCC — East coast gas market well supplied in Q4 2026 (accc.gov.au)