Company ProfilePremium

Voestalpine AG

Company Profile Analysis

Ticker: VOE.VI

ESOMAR 23 Corporate BadgeISO Certifications Badge
Voestalpine AG - Company showcase

Year Founded & Workforce

1938

48,777 Employees

Voestalpine AG logo

Voestalpine AG Employee Contacts

125 verified contactsNames, job titles, seniority and locations

View Employee Contacts

Voestalpine AG Overview

voestalpine is a vertically integrated European steel and technology group that combines premium materials production with deep downstream processing. Roughly half of revenue comes from integrated flat steel (Linz) and long-product steelmaking (Donawitz), and the balance from high-margin niches in which the group claims global leadership: complete railway infrastructure systems (rails, turnouts, signalling, digital monitoring), high-alloy tool and high-speed steels, special sections, precision strip, and high-bay warehouse systems, plus aerospace forgings and materials. Its distinctive thesis is the "materials plus processing" model — owning the metallurgy that feeds proprietary engineered products — which historically delivered superior through-cycle margins versus pure-play European steelmakers. The group is executing a EUR 1.5 billion decarbonisation programme ("greentec steel") replacing one blast furnace each at Linz and Donawitz with electric arc furnaces from 2027, while restructuring weak units (German automotive components, parts of High Performance Metals) and redeploying capital toward rail, aerospace and North American "local-for-local" growth.


Company's own description (Annual Report 2025/26)

In its Annual Report 2025/26 the company describes itself as a globally leading steel and technology group with a unique combination of materials and processing expertise, organised as a holding company plus four divisions. It positions itself as a leading partner to the automotive, energy, mechanical engineering, consumer goods and aerospace industries, and as world market leader in rail infrastructure systems, high-quality tool steel and special sections. The annual report emphasises that the broad customer base contributes to earnings stability in a cyclical environment (AR 2025/26, ESRS 2 SBM-1).

Business model

voestalpine's business model is the efficient production and downstream processing of high-quality steel and other high-performance metallic materials for demanding applications. Primary steel is produced in Austria (Linz, Donawitz, Kapfenberg), Sweden (Hagfors) and Brazil (Sumaré); further processing is globally distributed. Large production sites generate a significant share of their own electricity from process gases (AR 2025/26, SBM-1).

The model operates on three layers:

Upstream materials: blast furnace/BOF integrated steel (Linz flat, Donawitz long), electric-arc special steel (Kapfenberg, Hagfors, Sumaré).

Midstream transformation: hot/cold rolling, coating, heavy plate, wire rod, seamless tubes, forging, powder metallurgy, additive manufacturing.

Downstream systems: turnouts and complete track systems, signalling and digital monitoring ("zentrak" ecosystem), roll-formed sections, automotive body components, high-bay warehouse racking, welding consumables and equipment, aerospace logistics services.

Revenue model

Revenue is overwhelmingly product sales (B2B, contract and spot). Service revenues (heat treatment, coating, rail maintenance and monitoring, aerospace logistics, warehouse installation) are embedded within divisions and not separately disclosed. There is no material subscription or licensing revenue. The company does not disclose a product/service split; an indicative characterisation is >90% product, <10% services and project/installation (analyst estimate, not company-disclosed). Management is explicitly targeting more recurring service revenue in Railway Systems (CMD 22 September 2026).

Value-chain position and customers

DimensionCharacterisation
Upstream inputsIron ore, coal/coke, alloys, scrap (rising with EAF transition), HBI, electricity, natural gas
PositionIntegrated producer + downstream engineered-products supplier
Customer typesOEMs (automotive, aircraft, rail operators), Tier-1 suppliers, infrastructure owners (DB, SBB, ÖBB, Rail Baltica, Canadian National), energy companies, machine builders, tool-makers, distributors
Customer concentrationNo single external customer ≥10% of revenue (AR 2025/26, Note D.2)

End-markets (FY2025/26 revenue by industry, AR 2025/26 SBM-1)

Industry (EUR Mn)FY2024/25FY2025/26
Automotive4,772.24,560.7
Energy2,711.72,413.1
Railway systems2,266.22,211.0
Construction1,503.61,480.9
Mechanical engineering1,280.71,189.5
White goods / consumer goods651.2624.2
Aerospace543.4603.3
Other2,014.71,980.4

Automotive (30%), energy (16%) and rail (15%) together account for about 61% of FY2025/26 revenue. Aerospace was the only industry to grow (+11.0%), consistent with record Airbus-linked orders.

Independent characterisation

voestalpine is best understood as a "premium cyclical": a European integrated steelmaker whose earnings are partly de-cyclicalised by structurally growing, high-return downstream niches. The Steel Division remains the profit anchor (EBITDA EUR 810.5M, 14.1% margin in FY2025/26) — remarkable for a European BOF producer and attributable to a high share of automotive-grade and coated products. The weakest links have been commoditised or structurally challenged processing businesses (German automotive components, oil-country tubulars exposed to US tariffs, certain HPM plants), which the company has been divesting or restructuring since FY2023/24. The investment case pivots on (a) whether EU trade defence (CBAM, post-safeguard quotas) structurally lifts Steel Division margins, (b) execution of greentec steel on time and budget, and (c) mix-shift toward rail and aerospace.

Strategy

Stated strategy (Group Strategy 2030+, AR 2025/26)

The AR 2025/26 frames Group Strategy 2030+ around a guiding principle of shaping a better, safer and more sustainable future, and three pillars (paraphrased):

  1. Value-enhancing focused growth in attractive, high-yield processing fields — explicitly rail infrastructure, aerospace, special sections and warehouse technology — plus targeted internationalisation in growth regions.

  2. Active portfolio management, efficiency and resilience — strengthening site competitiveness and reorganising low-return units.

  3. Economically successful decarbonisation of blast-furnace steelmaking toward net zero by 2050, and expansion of the circular economy.

Supporting themes: decentralised divisional organisation for customer proximity; diversification across segments, regions and products; and strategic independence provided by a stable core shareholder structure.

Strategic initiatives announced in the last 24 months

InitiativeStatus / targetsSource / date
greentec steel phase 1Two EAFs (Linz, Donawitz), approx. EUR 1.5 billion; approx. 60% invested by 31 March 2026; core equipment delivered autumn 2026; start-up H1 2027 (Linz reported for February 2027); targeted -30% Scope 1+2 CO2 by 2029 vs 2019AR 2025/26; corporate news 3 June 2026
greentec steel Donawitz expansionApprox. EUR 100 million (Supervisory Board approved) for power infrastructure, third secondary-metallurgy line and scrap logistics; full electrified steelmaking at Donawitz from 2030, subject to fundingCorporate news 18 June and 5 August 2026
Railway Systems growthRevenue from approx. EUR 2.2 billion to approx. EUR 3 billion by 2030/31; focus on digital, services, India, North AmericaCMD 22 September 2026
Other growth fieldsAerospace, Warehouse & Rack Solutions, Tubes & Sections named as additional growth contributorsCMD 22 September 2026
North American local-for-localJeffersonville capacity doubling (approx. EUR 70M); Thorold plant; CN long-term supply agreementQ1 2026/27 release
India expansionRail (high-speed, freight, urban), aerospace, warehouse projectsCorporate news February 2026; CMD 2026
Automotive Components Germany reorganisationCapacity adjustment to secure long-term viabilityAR 2025/26
HPM portfolio restructuringBuderus sale, site consolidations, BÖHLER Bleche capacity cuts, BÖHLER Profil sale, Camtec closure; declared largely completeAR 2025/26; Q1 2026/27
Tubulars production adjustmentOutput reduced to demand under 50% US tariffsAR 2025/26
New dividend policy30% of EPS if net debt/EBITDA ≤2.0 after dividend; minimum EUR 0.40; extra distributions/buybacks possible when strongAR 2025/26 FAQ; effective from FY2025/26
Capital structureEUR 35M tap of 2028 convertible (April 2026), to be serviced from treasury sharesAd-hoc 2 March 2026; EQS 15 April 2026
Hy4Smelt / hydrogen R&DPilot technologies for hydrogen-based direct reduction and smelting (with partners)H1 2025/26 report feature

Medium-term financial targets and guidance

ItemTarget / guidance
FY2026/27 EBITDAEUR 1.60–1.85 billion (issued 3 June 2026; reaffirmed 5 August 2026)
Railway Systems revenueapprox. EUR 3 billion by FY2030/31
Leverage frameworkNet debt/EBITDA ≤2.0 after dividends (dividend policy anchor)
Climate-30% Scope 1+2 and -25% Scope 3 by 2029 vs 2019 (SBTi, well-below-2°C); net zero by 2050
CircularityIncrease scrap use by 50% by 2030
SafetyReduce accident frequency rate by 5.5% by 2030

No group-level revenue or margin targets beyond the annual EBITDA guidance were publicly disclosed.

Products & Services

Pricing models are not publicly disclosed for any line; steel products are typically priced via annual/quarterly contracts with automotive OEMs (often with raw-material escalators) and spot/short-term contracts elsewhere; rail and warehouse systems are project-priced.

Steel Division

Product lineDescription / capabilitiesTarget customersFlagship / notes
Hot-rolled stripHigh-strength, multiphase and micro-alloyed gradesAutomotive, tubes, machinerySupplies Group downstream units
Cold-rolled stripDeep-drawing and high-strength gradesAutomotive body-in-whitePremium European automotive supplier
Hot-dip galvanised & electrogalvanised stripZinc and zinc-magnesium coated sheetAutomotive exposed panels, white goods, constructionphs-ultraform (press-hardening steel, zinc-coated) — longstanding proprietary product
Organically coated strip ("colofer")Pre-painted stripConstruction, appliances—
Electrical steel stripNon-grain-oriented; isovac / compacore laminated coresE-mobility motors, generatorscompacore bonded stator/rotor stacks
Heavy plateThermomechanically rolled plate, sour-service gradesPipelines, offshore, windExposed to delayed energy projects (FY2026/27 outlook)
Foundry productsLarge steel castings (Linz)Turbines, power generation—
Steel & Service CenterSlitting, blanking, cut-to-lengthIndustrial customers—
Logistics ServicesRail/shipping logisticsInternal and external—
greentec steel productsCO2-reduced steel (initially via mass-balance; from 2027 EAF route)Automotive OEMs, appliancesProduction of approx. 2.5 Mt per year CO2-reduced steel from 2027 (press reports, March 2026)

High Performance Metals Division

Product lineDescription / capabilitiesTarget customersFlagship / notes
Tool steels (hot work, cold work, plastic mould)Global market leader; brands BÖHLER and UDDEHOLMDie-casting, forging, plastic-injection mould makersKapfenberg special steel plant (EAF; new plant inaugurated 2022 per prior company communications)
High-speed steelConventional and powder-metallurgical (PM)Cutting tools, sawsLeading global position
Special alloys (nickel-base, titanium)Forgings, bars, ringsAerospace engines, airframe, energyAerospace orders of approx. EUR 1 billion secured for the next five years, largely Airbus (April 2026)
Special steel parts / closed-die forgingsComplex forged componentsAerospace (landing gear, structural), energyBÖHLER Schmiedetechnik (Kapfenberg)
Powder metallurgy / additive manufacturingMetal powders, AM partsAerospace, tooling, medicalAM centres in Austria, Germany, USA, Singapore, Taiwan (per prior company disclosures; not re-verified)
Service centersMachining, heat treatment, coating, warehousingTool-making industryGlobal network
Aerospace logistics / processing hubsInventory management, cut-to-sizeAircraft OEMs and Tier-1sIncluded in Airbus package
Divested / restructuredBuderus Edelstahl (sold FY2024/25), voestalpine BÖHLER Profil (sold April 2026, profiles and industrial knives), BÖHLER Bleche Mürzzuschlag (capacity adjusted), voestalpine Camtec Linz (closure 2026)—Portfolio streamlining "largely complete" (AR 2025/26)

Metal Engineering Division

Product lineDescription / capabilitiesTarget customersFlagship / notes
RailsHead-hardened premium rails up to 120 m lengths (Donawitz)Infrastructure managers, heavy-haulKoralmbahn (Austria) fully equipped
Turnout systemsHigh-speed, heavy-haul and urban turnouts; global leaderRail operators (DB, SBB, ÖBB, CN, Rail Baltica)Largest single order to date (>EUR 470M) for Rail Baltica high-speed line (16 June 2026); new crossing solutions PITSTOP and IMPACT launched at InnoTrans (18 September 2026)
Signalling and digital monitoringPoint machines, diagnostics, track condition monitoringRail operatorszentrak digital railway ecosystem
Rail servicesLifecycle services, maintenance, logisticsRail operatorsStrategic growth focus (CMD 2026)
Wire rod & drawn wirePremium wire for automotive (springs, fasteners), energyAutomotive suppliers, constructionDonawitz rolling-mill upgrade for new billet formats (press, late 2025)
Seamless tubes (Tubulars)Premium OCTG and industrial tubes (Kindberg)Oil & gas (mainly USA)Production reduced due to 50% US tariffs
Welding consumables & equipment (Böhler Welding)Filler metals, welding systemsEnergy, construction, fabricationEuropean leader in complete welding solutions

Metal Forming Division

Product lineDescription / capabilitiesTarget customersFlagship / notes
Special sections (roll-formed profiles)Custom profiles, global leader in special sectionsConstruction, agriculture, commercial vehicles, energy (solar)Jeffersonville (Indiana) capacity doubled — new facility for longitudinal truck-frame beams (approx. EUR 70M / USD 80M; full production expected mid-2027; 110 jobs)
Tubes & SectionsWelded precision tubes and sectionsAutomotive, machineryLost momentum during FY2025/26
Precision stripCold-rolled precision stripSaw blades, springs, knivesPerforming well
Automotive ComponentsPress-hardened, stamped and roll-formed body partsPremium European and US OEMsGerman unit under reorganisation
Warehouse & Rack SolutionsHigh-bay racking and turnkey warehouse structuresLogistics, retail, cold storageLargest high-bay order to date: 40-metre logistics hub in Istanbul (January 2026); growth driver

Financial Narrative

Sources: Annual Reports 2022/23, 2023/24, 2024/25 and 2025/26 (five-year overviews); FY2022/23 retroactively restated. Currency EUR millions unless stated.

Income statement

FY2024/25 PBT per corporate news (EUR 271M; FY2025/26 described as +116.9%). FY2025/26 PBT derived as PAT EUR 424.3M plus tax EUR 162.3M. FY2021/22 PAT includes discontinued Texas operations.

Margins

Revenue CAGR FY2021/22–FY2025/26 (4 years): +0.2% per annum (analyst calculation). Peak-to-latest (FY2022/23 to FY2025/26): -6.2% per annum.

Commentary. The five-year arc is a classic steel-cycle round trip overlaid with restructuring. FY2021/22–FY2022/23 benefited from post-COVID restocking, energy-crisis price spikes and record spreads (EBITDA margin 14–15%). FY2023/24–FY2024/25 saw European demand recession (automotive, construction), falling steel prices and EUR 360M of HPM impairments (FY2023/24), pushing EBIT margins below 4%. FY2025/26 marks an inflection: despite revenue falling 4.3% (Buderus disposal, automotive capacity cuts), EBIT rose 59% and PAT 138% on cost programmes, mix, the absence of large impairments and better steel trade protection. Q1 2026/27 extended the trend (EBITDA margin 12.4%, including approx. EUR 100M one-offs; underlying approx. 9.9%).

Quarterly run-rate (most recent)

Source: Q1 2026/27 interim report and corporate news (5 August 2026).

Balance sheet

Cash figures for FY2021/22 and FY2022/23 per boerse-express data feed (not company-verified). Gearing history per AR five-year overviews. At 30 June 2026 net financial debt fell to approx. EUR 1.0 billion, equity rose to approx. EUR 8.0 billion and gearing to 12.9% (Q1 2026/27).

Commentary. The balance sheet is the strongest in roughly two decades: gearing of 16.2% at FY-end is the lowest since FY2005/06, achieved while funding peak greentec capex. Two analytical caveats apply. First, supplier-finance liabilities (EUR 852M, +17% YoY) are a quasi-debt item outside reported net debt; including them would lift adjusted net debt to roughly EUR 2.1 billion. Second, pension obligations (EUR 817M) are material. The 2019–2026 EUR 500M bond matured in April 2026 (refinanced from cash and operating cash flow).

Cash flow

The company's FCF definition differs from simple OCF-minus-capex; FY2025/26 investing cash flow benefited from EUR 207.8M of financial-asset disposals.

Ratios (analyst calculations from AR 2025/26)

ROIC uses FY2025/26 effective tax rate of 27.7%. Receivables include other receivables; payables exclude supplier finance.

Commentary. Returns remain well below cost of capital (ROIC approx. 6% vs. a WACC likely 8–9%), which explains why the shares traded near book value despite the strong balance sheet. The improvement path relies on (i) Steel margins sustaining 13–15% under EU trade protection, (ii) HPM and Metal Forming normalisation post-restructuring, and (iii) capex falling after greentec peaks in FY2026/27. Working capital is heavy (inventory approx. 4.5 months of cost of sales), typical of special steel, and has been a key cash lever (EUR 790M released over two years).

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Segment Overview

SegmentContents

Steel Division

Hot- and cold-rolled strip; electrogalvanised, hot-dip galvanised and organically coated strip; electrical steel strip; heavy plate (energy sector, Linz); foundry products; Steel & Service Centers; Logistics Services

High Performance Metals

High-alloy tool steel and high-speed steel (global leader); special alloys incl. nickel-base and titanium for aerospace, oil & gas, energy; global service-center network (machining, heat treatment, coating); additive manufacturing; aerospace logistics/processing hubs in USA, Germany, UK, China, Singapore

Metal Engineering

Railway Systems (turnouts — global leader; rails; signalling; digital monitoring; services); Industrial Systems: wire rod and drawn wire, premium seamless tubes (Tubulars, Kindberg), welding consumables and machinery (Böhler Welding); own steelmaking at Donawitz

Metal Forming

Special sections, tubes and sections, precision strip, automotive components (pressed/punched/roll-formed parts), Warehouse & Rack Solutions (high-bay storage systems)

Holding & Group Services

voestalpine AG holding, US tax-group holdings, two financing entities, raw-materials purchasing company, personnel services, Group IT

Segment revenue (EUR Mn)

Segment revenue (EUR Mn)FY2023/24FY2024/25FY2025/26

Steel Division

6,087.85,799.15,730.6

High Performance Metals Division

—3,182.22,749.7

Metal Engineering Division

—4,167.94,054.7

Metal Forming Division

—3,125.13,030.1

Holding & Group Services

—1,012.4944.2

Reconciliation

—-1,543.0-1,446.2

Total Group

16,684.315,743.715,063.1

Segment EBITDA (EUR Mn)

Segment EBITDA (EUR Mn)FY2023/24FY2024/25FY2025/26

Steel Division

686.6743.8810.5

High Performance Metals Division

—83.0216.2

Metal Engineering Division

—461.1374.5

Metal Forming Division

—169.3218.1

Holding & Group Services

—-111.7-129.5

Segment EBIT (EUR Mn)

Segment EBIT (EUR Mn)FY2024/25FY2025/26

Steel Division

478.8559.1

High Performance Metals Division

-156.857.3

Metal Engineering Division

273.5184.0

Metal Forming Division

-15.373.5

Holding & Group Services

-126.0-146.2

Group

455.1723.5

Segment Overview — Steel

SegmentRevenue YoY %EBITDA margin %EBIT margin %Share of Group revenue %EBITDA YoY %

Steel

-1.214.19.8389.0

HPM

-13.67.92.118160.5

Metal Engineering

-2.79.24.527-18.8

Metal Forming

-3.07.22.42028.8

EBITDA margin by segment (%)

EBITDA margin by segment (%)FY2023/24FY2024/25FY2025/26

Steel Division

11.312.814.1

High Performance Metals Division

—2.67.9

Metal Engineering Division

—11.19.2

Metal Forming Division

—5.47.2

Segment Overview (2)

SegmentCapex (EUR Mn)Segment assets (EUR Mn)Employees (FTE)Net financial debt (EUR Mn)

Steel

536.95,593.510,7911,372.0

HPM

81.83,777.311,0621,709.3

Metal Engineering

293.24,211.714,9141,298.8

Metal Forming

147.82,482.710,698966.9

Holding & Group Services

9.511,146.51,312-4,009.0

Group

1,069.216,002.248,7771,263.7

Income Statement and Per-Share Data

MetricFY2021/22FY2022/23FY2023/24FY2024/25FY2025/26

Revenue (EUR Mn)

14,923.218,225.116,684.315,743.715,063.1

Gross profit (EUR Mn)

———2,838.23,014.9

EBITDA (EUR Mn)

2,291.32,544.61,668.41,346.41,485.6

EBIT / operating income (EUR Mn)

1,454.31,622.8569.3455.1723.5

Profit before tax (EUR Mn)

1,382.51,489.4383.4271.0586.6

Profit after tax incl. NCI (EUR Mn)

1,330.31,177.3207.1178.6424.3

Profit attributable to parent (EUR Mn)

———153.5424.7

EPS basic (EUR)

7.286.010.590.902.48

EPS diluted (EUR)

7.286.010.590.902.44

Dividend per share (EUR)

1.201.500.700.600.75

Margin (%)

Margin (%)FY2021/22FY2022/23FY2023/24FY2024/25FY2025/26

Gross margin

———18.020.0

EBITDA margin

15.414.010.08.69.9

EBIT margin

9.78.93.42.94.8

Net margin (PAT incl. NCI)

8.96.51.21.12.8

Income Statement and Margin Analysis (%)

MetricQ1 FY2025/26Q1 FY2026/27

Revenue (EUR Mn)

3,901.53,994.4

EBITDA (EUR Mn)

361.2495.0

EBITDA margin (%)

9.312.4

EBIT (EUR Mn)

171.5306.6

Profit before tax (EUR Mn)

139279

Profit after tax (EUR Mn)

106.3196.2

Free cash flow (EUR Mn)

188224

Effective tax rate (%)

23.429.6

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Balance Sheet and Margin Analysis (%)

MetricFY2021/22FY2022/23FY2023/24FY2024/25FY2025/26

Total assets (EUR Mn)

———15,734.316,002.2

Cash and cash equivalents (EUR Mn)

842.81,055.8—781.81,096.0

Short-term financial liabilities (EUR Mn)

———843.7963.8

Long-term financial liabilities (EUR Mn)

———1,911.51,524.0

Total financial debt (EUR Mn)

———2,755.22,487.8

Net financial debt (EUR Mn)

———1,650.01,263.7

Total equity (EUR Mn)

———7,464.77,800.6

Equity attributable to parent (EUR Mn)

———7,224.87,580.3

Goodwill (EUR Mn)

———999.4998.9

Other intangible assets (EUR Mn)

———310.2315.7

Inventories (EUR Mn)

———4,697.34,489.9

Working capital, current assets less current liabilities (EUR Mn)

———2,319.21,974.6

Gearing ratio, net debt / equity (%)

32.421.422.022.116.2

Pensions and employee obligations (EUR Mn)

———894.7816.6

Supplier finance liabilities (EUR Mn)

———729.5852.3

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Cash Flow

MetricFY2024/25FY2025/26

Operating cash flow (EUR Mn)

1,420.51,540.1

Net working capital release (EUR Mn)

480.1310.7

Capex, cash, PP&E and intangibles (EUR Mn)

1,108.6983.4

Capex, investments per segment table (EUR Mn)

1,243.11,069.2

Cash flow from investing (EUR Mn)

-1,254.6-794.9

Free cash flow, company definition (EUR Mn)

—537

OCF less cash capex, analyst (EUR Mn)

311.9556.7

Dividends paid incl. minorities (EUR Mn)

214.6123.9

Cash flow from financing (EUR Mn)

-699.5-429.9

Share buybacks (EUR Mn)

00

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2024/25FY2025/26

ROE, PAT / average equity (%)

2.45.6

ROA, PAT / average assets (%)

1.12.7

ROIC, NOPAT / (equity + net debt) (%)

3.65.8

Current ratio (x)

1.441.35

Debt / equity (x)

0.370.32

Net debt / EBITDA (x)

1.230.85

Interest coverage, EBIT / interest expense (x)

1.93.8

Asset turnover (x)

1.000.95

Inventory days

133136

Receivable days

4346

Payable days

7681

Cash conversion cycle (days)

100101

Revenue by Region

Region (EUR Mn)FY2023/24FY2024/25FY2025/26

European Union excl. Austria

—8,969.38,784.5

Austria

—1,083.21,074.4

USMCA (USA, Mexico, Canada)

—2,192.12,078.9

Asia

—1,430.51,193.5

South America

—528.0447.3

Rest of World

—1,540.61,484.5

Total

16,684.315,743.715,063.1

Region Overview

RegionFY2025/26 share %YoY growth %

EU excl. Austria

58-2.1

Austria

7-0.8

USMCA

14-5.2

Asia

8-16.6

South America

3-15.3

Rest of World

10-3.6

Revenue by Region and Region Assets & Liabilities

Geographic data (EUR Mn)Austria FY2024/25Austria FY2025/26EU FY2024/25EU FY2025/26Other FY2024/25Other FY2025/26

External revenue

1,083.21,074.48,969.38,784.55,691.25,204.2

Long-term assets

5,534.75,794.71,424.61,409.5971.2975.6

Capex

845.8819.8236.7125.1160.6124.3

Capital Markets

MeasureValueSource

Price 31 Mar 2025

EUR 22.86

AR 2025/26

Price 31 Mar 2026

EUR 37.82 (+65% FY2025/26, outperforming ATX and international benchmarks)

AR 2025/26

FY2025/26 high / low

EUR 49.02 / EUR 19.67

AR 2025/26 IR section

52-week high (intraday)

EUR 49.10 (25 Feb 2026)

Press

Latest

EUR 44.56 (Vienna close, 9 Oct 2026); approx. +18% YTD 2026

MarketScreener

Calendar 2025

Approx. doubled (press reports +107% YTD by December 2025)

Press

Share price, fiscal year-end (EUR)

FY2021/22

FY2022/23

Valuation Multiples

MultiplevoestalpineBasis

Trailing P/E

approx. 18.0x

FY2025/26 basic EPS EUR 2.48

Forward P/E

approx. 12x (FY2026/27e) / approx. 9x (FY2027/28e)

MarketScreener consensus

EV (approx.)

approx. EUR 8.9 billion

Market cap + net debt approx. EUR 1.0–1.3 billion + minorities

EV/EBITDA

approx. 5.2x

FY2026/27 guidance midpoint EUR 1.725 billion

EV/Sales

approx. 0.56x (FY2026/27e)

MarketScreener

P/B

approx. 1.0x

Equity attributable EUR 7.58 billion (31 Mar 2026)

Dividend yield

approx. 1.7% (EUR 0.75); approx. 2.3–2.7% forward (consensus)

boerse.de; MarketScreener

Analyst Ratings & Targets

BrokerRatingTarget (EUR)Date

UBS

Neutral (from Buy)

50

Jun 2026

Morgan Stanley

Equal-weight

48

Jun 2026

BofA

Buy (PT lowered)

—

21 Sep 2026

Erste Group

Accumulate (upgrade)

—

7 Aug 2026

Wiener Privatbank

Hold (from Sell)

—

Sep 2026

Barclays

Overweight

44

Jan 2026

JPMorgan

Overweight

40.60

Late 2025

Deutsche Bank

Buy

—

Feb 2026

Citigroup

Neutral

—

Jan 2026

BNP Paribas

Neutral

—

Jan 2026

“—” = not publicly disclosed.

Dividend per share (EUR)

Dividend per share (EUR)FY2021/22FY2022/23FY2023/24FY2024/25FY2025/26

DPS

1.201.500.700.600.75

Payout ratio, DPS / basic EPS (%)

16251196730

Capital Instruments

InstrumentISINAmountMaturityStatus

Corporate bond 2019–2026

AT0000A27LQ1

EUR 500M

April 2026

Repaid at maturity

Convertible bond 2023–2028

AT0000A33R11

EUR 250M + EUR 35M tap = EUR 285M

2028—

Schuldschein / bank loans / leases

—

Balance of EUR 2.49 billion gross financial liabilities at 31 Mar 2026

Various

—

Analyst Conclusions

Management guidance

FY2026/27 EBITDA of EUR 1.60–1.85 billion (midpoint EUR 1.725 billion, +16% vs FY2025/26), reaffirmed 5 August 2026. Assumptions: global economic environment similar to FY2025/26; positive regulatory effects (CBAM, post-safeguard) for Steel; sustainable and one-off positive effects from HPM restructuring; continued strong Railway Systems; no significant change in US tariff impact on seamless tubes; positive effects from Automotive Components reorganisation; offset partly by delays in heavy-plate energy projects. Q1 2026/27 EBITDA of EUR 495M (approx. EUR 395M underlying) implies the guidance requires a run-rate of approx. EUR 370–450M per quarter for the remainder of the year.

Consensus growth expectations

Sell-side models cited in the press imply EPS of approx. EUR 3.8 in FY2026/27 and approx. EUR 4.3 in FY2027/28 (vs EUR 2.48 in FY2025/26), with dividends rising toward EUR 1.10–1.30. Forward P/E of approx. 12x and 9x reflect these expectations.

Bull case

  1. Trade-defence margin uplift: CBAM plus halved import quotas could lift Steel Division EBITDA margins sustainably above 14% (FY2025/26: 14.1%) and support group EBITDA above EUR 1.8 billion.

  2. Mix-shift to high-return niches: Rail (to approx. EUR 3 billion), aerospace (EUR 1 billion order book) and warehousing raise the share of stable, higher-margin earnings, warranting a re-rating toward diversified-industrial multiples.

  3. FCF inflection post-greentec: with approx. 60% of phase-1 spent and Austria-centric capex peaking, FCF could exceed EUR 700M by FY2027/28, enabling the 30%-plus payout, extra distributions or buybacks from a gearing of approx. 13%.

Bear case

  1. Cash-flow squeeze: greentec phase 2 (Donawitz expansion), higher electricity costs and ETS phase-out may keep FCF subdued — the explicit reason for UBS and Morgan Stanley downgrades in June 2026.

  2. Auto and energy weakness: automotive (30% of revenue) and energy (16%) remain soft; heavy-plate project delays and US tariffs on Tubulars persist.

  3. Low returns and one-off reliance: underlying ROIC of approx. 6% is below WACC; FY2025/26–Q1 2026/27 improvement relied partly on absence of impairments and disposal gains (approx. EUR 100M in Q1).

Catalysts and monitorables (next 12 months)

TimingCatalyst / monitorable
11 Nov 2026H1 2026/27 results — underlying EBITDA ex one-offs; guidance confirmation or narrowing
Q4 2026 – Q1 2027EU steel market response to post-safeguard regime; import volumes and spreads
Feb 2027Q1–Q3 2026/27 results; early commissioning updates
H1 2027EAF start-up in Linz (reported for February 2027) and Donawitz — on-time, on-budget execution
2,027Clarity on public funding for Donawitz phase 2; EU ETS free-allocation path
OngoingUS tariff developments; Middle East energy prices; Railway Systems order intake (India, North America); FCF vs capex; any bolt-on M&A in rail/aerospace
Jun 2027FY2026/27 results and first dividend under full-year policy application with higher EPS

Concluding analyst verdict

voestalpine enters late 2026 at a genuine inflection point. After two years of restructuring-burdened earnings, FY2025/26 delivered EUR 1.49 billion EBITDA, a 59% EBIT increase and the strongest balance sheet in two decades, while the order book in rail and aerospace reached record levels. Most importantly, the European policy regime has shifted decisively in favour of domestic steelmakers: CBAM is live, and the post-safeguard quota regime materially curbs imports. For a producer whose Steel Division already earns 14% EBITDA margins, this is a meaningful structural tailwind.

The market has priced much of this. The shares roughly doubled in 2025 and have added about 18% in 2026, trading at approximately 12x forward earnings, approximately 5x EV/EBITDA on guidance and roughly 1x book — no longer the deep-value multiple of 2024, yet still below what a group with a EUR 2–3 billion rail business, global tool-steel leadership and aerospace franchise could command if returns normalised.

The swing factor is cash, not earnings. Greentec steel phase 1 is on time and on budget, but phase 2 at Donawitz, rising power needs and the gradual withdrawal of free ETS allowances mean capital intensity stays elevated, and group ROIC (approximately 6%) still trails its cost of capital. Underlying profitability also needs to be separated from one-offs: approximately EUR 100 million of Q1 2026/27 EBITDA was non-recurring.

Our synthesis is constructive but selective: a quality European steel-and-technology compounder in transition, with downside protected by balance-sheet strength and regulatory support, and upside dependent on demonstrating that post-restructuring HPM and Metal Forming margins, plus Railway Systems growth, can lift group EBITDA sustainably toward EUR 1.8–2.0 billion with falling capex from FY2027/28. The H1 2026/27 results on 11 November 2026 and the 2027 EAF start-ups are the decisive proof points.


Principal sources consulted

  • voestalpine Annual Report 2025/26 (online report: FAQs; Note D.2 Operating segments; Note D.32 Earnings per share; Statement of Financial Position; Cash flows; ESRS 2 SBM-1; Management Board; IR section PDF).

  • voestalpine Annual Reports 2022/23, 2023/24, 2024/25 (five-year overviews).

  • voestalpine corporate news / EQS: 12 Nov 2025; 11 Feb 2026; 2 Mar 2026; 18 Mar 2026; 15 Apr 2026; 3 Jun 2026; 1 Jul 2026; 5 Aug 2026; 22 Sep 2026; 5 Jun 2024.

  • voestalpine Q1 2026/27 interim report (key figures).

  • voestalpine Capital Markets Day 2026 page.

  • Kadant Inc. Forms 8-K, 10-K and 10-Q (2026) — BÖHLER Profil transaction.

  • Press and data: Reuters (via onvista/MarketScreener), RTTNews/Nasdaq, APA/Der Standard, GMK Center, SteelOrbis, SteelRadar, boerse-express, trading-treff, finanztrends, boerse.de, MarketScreener, MarketBeat, industriemagazin, tips.at, getquin.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Executive Leadership Team

NameRoleBornOn board sinceTerm endsBackground

Herbert Eibensteiner (Dipl.-Ing.)

Chairman / CEO; corporate development, R&D strategy, HR strategy, communications, legal, compliance, M&A, sustainability strategy, IR, internal audit

1,963

1 Apr 2012 (CEO since 3 Jul 2019)

31 Mar 2029

Joined 1989 as maintenance engineer in Linz; previously headed Metal Forming and Steel divisions; mechanical engineering and business studies, TU Wien

Gerald Mayer (Mag.)

CFO; accounting, controlling, treasury, tax, risk, insurance, IT

1,971

1 Apr 2024

31 Mar 2032 (extended Mar 2026)

—

Franz Kainersdorfer (Dipl.-Ing. Dr.)

Head of Metal Engineering Division; Group energy supply

1,967

1 Jul 2011

31 Mar 2029

Metallurgist; long Donawitz/Metal Engineering career

Reinhard Nöbauer (Dipl.-Ing. Dr.)

Head of HPM Division; procurement strategy

1,963

1 Apr 2024

31 Mar 2030 (extended Mar 2026)

—

Carola Richter (Dr.)

Head of Metal Forming Division; health & safety

1,973

1 Apr 2024

31 Mar 2032 (extended Mar 2026)

Recruited externally from industry; first woman on the Management Board

Hubert Zajicek (Dipl.-Ing., MBA)

Head of Steel Division; raw materials supply

1,968

4 Jul 2019

31 Mar 2029

Long Steel Division career

Board & Management Changes

DateChange

29 Aug 2023

Supervisory Board extends CEO Eibensteiner by five years (to March 2029); announces successors for Robert Ottel (CFO) and Peter Schwab (Metal Forming)

1 Apr 2024

Mayer (CFO), Nöbauer (HPM) and Richter (Metal Forming) join the Management Board

18 Mar 2026

Mandates of Mayer and Richter extended to 31 March 2032; Nöbauer to 31 March 2030 (effective from 1 April 2027); contracts of Eibensteiner, Zajicek and Kainersdorfer unchanged (to 31 March 2029)

11 May 2026

Eva Aigner appointed CFO of the Metal Engineering Division (divisional, not Management Board)

By Aug 2026

Head of IR changed from Peter Fleischer to Dino Malkic

Board of Directors

NameRoleNotes

Wolfgang Eder

Chair

Former CEO (2004–2019); confirmed as chair in March 2026 press materials

Major Shareholders

HolderStakeSource

Raiffeisenlandesbank Oberösterreich Invest GmbH & Co OG

<15%

AR 2025/26 FAQ

voestalpine Mitarbeiterbeteiligung Privatstiftung (employee foundation)

14.0%

AR 2025/26 FAQ

Oberbank AG

8%

AR 2025/26 FAQ

Treasury shares

approx. 3.98% (7,098,547 shares)

AR 2025/26

Other holders above 4% notification threshold

Not publicly disclosed in retrieved sources

—

Competitive Landscape

Competitors by Segment

SegmentKey competitors

Steel (flat, automotive, plate)

ArcelorMittal, thyssenkrupp Steel Europe, Salzgitter, Tata Steel Nederland, SSAB, U. S. Steel/Nippon Steel (in some markets), Dillinger (plate)

HPM (tool steel, special alloys, aerospace)

Swiss Steel Group (Deutsche Edelstahlwerke), Proterial (formerly Hitachi Metals), Daido Steel, Carpenter Technology, ATI, Aubert & Duval (Eramet group, now French-state-led consortium), Alleima

Metal Engineering — Railway Systems

Vossloh, Pandrol (Delachaux), Progress Rail (Caterpillar), Wabtec, Schwihag, ArcelorMittal and Nippon Steel (rails), British Steel (rails)

Metal Engineering — Tubulars, wire, welding

Tenaris, Vallourec (tubes); Lincoln Electric, ESAB, voestalpine Böhler Welding peers (welding)

Metal Forming — automotive & sections

Gestamp, Benteler, Magna, Kirchhoff; Warehouse: Mecalux, SSI Schäfer, Stow (racking)

Peer Comparison FY2024

CompanyFYRevenueRevenue growth %EBITDA margin %R&D intensity %

voestalpine

FY2025/26

EUR 15.1 bn

-4.39.91.5

ArcelorMittal

FY2024

approx. USD 62 bn

approx. -9

approx. 11

approx.

thyssenkrupp (group)

FY2023/24

approx. EUR 35 bn

approx. -6

approx. 4 (adj.)

approx.

Salzgitter

FY2024

approx. EUR 10 bn

approx. -6

approx. 4

—

Vossloh (rail peer)

FY2024

approx. EUR 1.2 bn

approx. +5

approx. 14

—

Company Snapshot

$16,982.1M

Revenue

48,777

Employees

1938

Founded

Linz, Austria

Headquarters

SWOT Analysis

Strengths

  • Best-in-class European steel margin: Steel Division EBITDA margin of 14.1% in FY2025/26 (AR 2025/26 Note D.2).
  • Balance-sheet strength: gearing 16.2% at 31 March 2026, lowest since FY2005/06; 12.9% at 30 June 2026.
  • Cash generation: OCF EUR 1,540M in FY2025/26 (+8.4%) despite peak greentec capex.
  • Global leadership in rail: largest-ever single order (Rail Baltica, >EUR 470M) and EUR 500M DB/SBB orders in 2026.
  • Aerospace order visibility: approx. EUR 1 billion five-year orders (April 2026); aerospace revenue +11% in FY2025/26.
  • Diversification: no customer ≥10% of revenue; eight end-markets, six regions (AR 2025/26).

Weaknesses

  • Low returns: analyst ROIC approx. 5.8% and ROE 5.6% in FY2025/26 — below cost of capital.
  • Revenue erosion: revenue down 17% from FY2022/23 peak (EUR 18.2 billion to EUR 15.1 billion).
  • Automotive concentration: 30% of revenue from automotive (AR 2025/26).
  • Persistent restructuring: impairments of EUR 360M (FY2023/24) and EUR 128M (FY2024/25); further closures in 2026.
  • Working-capital intensity: inventories EUR 4.5 billion (approx. 136 days).
  • Quasi-debt: supplier-finance liabilities rose to EUR 852M (+17%).

Opportunities

  • EU trade defence: CBAM and post-safeguard quotas expected to positively influence European steel market and the Steel Division (FY2026/27 outlook).
  • Railway Systems scale-up: target approx. EUR 3 billion revenue by 2030/31 (+36% vs approx. EUR 2.2 billion).
  • North American local-for-local: Jeffersonville expansion and Thorold plant, CN agreement.
  • Green steel premium: approx. 2.5 Mt per year CO2-reduced steel from 2027 for OEMs with Scope 3 targets.
  • Capex normalisation: greentec phase-1 approx. 60% spent; FCF could step up after FY2026/27.
  • Dividend upside: new 30% payout with possible extra distributions/buybacks when net debt/EBITDA <2.

Threats

  • US tariffs: 50% steel tariffs cost high double-digit million euros in FY2025/26.
  • Energy and geopolitics: renewed Middle East escalation affecting energy prices, inflation and rates (Q1 2026/27 outlook).
  • EU ETS free-allocation phase-out: CEO publicly argues free allowances remain necessary (Reuters, 2026).
  • Execution risk: building two steel mills within running plants is logistically complex (CEO comment, June 2026).
  • Chinese and Indian price pressure: cited as a reason for Camtec closure (2026).
  • Analyst skepticism on cash flow: UBS and Morgan Stanley downgrades in June 2026 on lower FCF expectations.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
4 Jun 2025US 50% steel tariffs take effectNegative FY2025/26 earnings impact in the high double-digit million euros; Tubulars hardest hit
Jun 2025FY2024/25 results; FY2025/26 EBITDA guidance EUR 1.40–1.55 billionBase-year reset after impairments
Jul 2025AGM approves EUR 0.60 dividendLowest payout in the recent cycle
Aug 2025Q1 2025/26: revenue EUR 3.9 billion, EBITDA EUR 361M, FCF EUR 188MGearing lowest since FY2006/07
12 Nov 2025H1 2025/26: EBITDA EUR 722M, EBIT EUR 345M, OCF doubled to EUR 783MGuidance confirmed
17 Nov 2025UBS upgrades to BuyStart of analyst re-rating
Late 2025JPMorgan upgrades to Overweight (PT EUR 40.60); Deutsche Bank adds to TOP10 Germany basketRally momentum; share price roughly doubled in calendar 2025
1 Jan 2026EU CBAM definitive phase startsStructural tailwind for Steel Division
Jan 2026Barclays PT raised to EUR 44 (EPS est. FY2025/26 2.58, FY2026/27 3.83)Consensus upgrades
15 Jan 2026Largest-ever high-bay warehouse order (40 m logistics hub, Istanbul)Warehouse & Rack Solutions growth
29 Jan 2026Agreement to sell BÖHLER Profil to Kadant (EUR 157M)Portfolio streamlining
11 Feb 2026Q1–Q3 2025/26: EBITDA EUR 1.0 billion (+7.2%), PBT +46.5%, net debt EUR 1.4 billionBeat expectations
25 Feb 2026Share hits 52-week high EUR 49.10Peak of rally
2 Mar 2026Ad-hoc: convertible bond tap up to EUR 35M; shares fall approx. 6%Dilution concerns (serviced from treasury shares)
Mar 2026Inclusion in ATX five effective 23 MarchIndex demand
Mar 2026Workforce reduction of up to 209 of 650 jobs at an affected site by May 2026 (press)Restructuring continues
18 Mar 2026Board mandates extended (Mayer, Richter to 2032; Nöbauer to 2030)Leadership continuity
Mar–Apr 2026voestalpine Camtec Linz closure announcedHPM clean-up
9 Apr 2026Aerospace orders approx. EUR 1 billion, largely AirbusRecord aerospace backlog
15–22 Apr 2026EUR 35M convertible tap completed (total EUR 285M)Low-cost funding
Apr 20262019–2026 EUR 500M bond maturesDebt reduction
30 Apr 2026BÖHLER Profil sale closesapprox. EUR 150M cash; Q1 one-off gain
2026 (spring)DB and SBB orders totalling EUR 500MRail backlog
11 May 2026Eva Aigner appointed Metal Engineering divisional CFODivisional leadership
3 Jun 2026FY2025/26 results: EBITDA EUR 1.49 billion, EBIT +59%, PAT EUR 424M, FCF EUR 537M; FY2026/27 guidance EUR 1.60–1.85 billion; dividend EUR 0.75 proposedEarnings inflection
Early Jun 2026UBS downgrades to Neutral (PT EUR 50); Morgan Stanley to Equal-weight (PT EUR 48)Cash-flow concerns from greentec capex
16 Jun 2026Rail Baltica order (>EUR 470M), largest single order everRail leadership
18 Jun 2026Donawitz greentec expansion plans (approx. EUR 100M; full electrification by 2030)Phase-2 decarbonisation
23 Jun 2026Stahlwelt Linz reopensBrand/visitor centre
1 Jul 2026AGM approves EUR 0.75 dividend (ex-date 9 July, payment 14 July)+25% YoY
Jul 2026EU post-safeguard regime: quotas roughly halved, 50% out-of-quota tariff (per press)Major Steel Division tailwind
5 Aug 2026Q1 2026/27: EBITDA EUR 495M (incl. approx. EUR 100M one-offs), PAT EUR 196M, net debt approx. EUR 1.0 billion; Jeffersonville and Canada expansion; guidance reaffirmedStrong start
7 Aug 2026Erste Group upgrades to AccumulateSell-side support
31 Aug 2026Railway Systems expands in Canada (Thorold), InnoTrans previewNorth America growth
18 Sep 2026PITSTOP and IMPACT crossing solutions launched at InnoTransProduct innovation
21 Sep 2026BofA lowers PT, reaffirms Buy; Wiener Privatbank upgrades Sell to HoldMixed sell-side
Sep 2026EAF core equipment (790 t) arrives in Linzgreentec on schedule
22 Sep 2026Capital Markets Day Berlin: Railway Systems target approx. EUR 3 billion by 2030/31Medium-term growth narrative
11 Nov 2026 (scheduled)H1 2026/27 resultsNext catalyst

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

3 charts
Revenue by Segment: Total Group fell from EUR 16,684.3 Mn in FY2023/24 to EUR 15,063.1 Mn in FY2025/26.
Voestalpine AG — Revenue by Segment
Series (EUR Mn)FY2023/24FY2024/25FY2025/26
Total Group16,684.315,743.715,063.1
Steel Division6,087.85,799.15,730.6
High Performance Metals Division—3,182.22,749.7
Metal Engineering Division—4,167.94,054.7
Metal Forming Division—3,125.13,030.1
Holding & Group Services—1,012.4944.2
Reconciliation—-1,543-1,446.2

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.