VPower Group International Holdings Limited

Company Profile Analysis

Ticker: 1608.HK

ESOMAR 23 Corporate BadgeISO Certifications Badge
VPower Group International Holdings Limited - Company showcase

Year Founded & Workforce

2000

529 Employees

VPower Group International Holdings Limited logo

VPower Group International Holdings Limited Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

VPower Group International Holdings Limited Overview

VPower is a Hong Kong-headquartered distributed power generation (DPG) specialist. It designs, integrates and sells engine-based generator sets and power systems (System Integration, "SI"). It also invests in, builds and operates fast-deploy gas, diesel and biodiesel power stations for utilities and industrial off-takers in emerging markets (Investment, Building and Operating, "IBO").

Before 2021 it was a fast-growing private-sector IPP. It had a large Myanmar LNG-to-power position and revenue peaked at HK$5.1 bn in FY2021. Since then the Myanmar coup, receivable impairments and over-leverage have shrunk the business to roughly HK$1.2 bn of revenue, with recurring losses and defaulted bank debt.

In September 2023 the state-owned CNTIC (part of Genertec) took control. Since then VPower has acted as a Belt-and-Road distributed-power platform for its parent: it sells fleet assets to CNTIC, leases them back, and pivots towards Central Asia (Uzbekistan, Kazakhstan), Brazil and Indonesia. Its listed equity is now an option on a successful creditor scheme.


Company's own description

In every filing from FY2017 to H1 2026, VPower describes itself as principally engaged in two activities:

  • the design, integration, sale and installation of engine-based electricity generation units; and

  • the provision of distributed power solutions, including the design of, investment in, building and operation of distributed power generation stations.

The FY2023 annual report frames these as two business pillars, SI and IBO. It describes the group's rapid-delivery power solutions as providing stable electricity to emerging markets, while offering flexible, energy-efficient balancing power to developed markets integrating renewables. The FY2025 annual report and H1 2026 interim describe the company as a leading global distributed energy solutions provider. They target a balanced portfolio of natural gas, biodiesel and renewable-hybrid generation.

Business model and revenue model

Revenue streamSegmentNatureHow revenue is recognised (per filings)FY2025 HKD MnShare of FY2025 revenue (%)
Gen-set and power-system salesSIProduct sale; project-based, with some construction or installation servicesOn delivery of gen-sets and power systems to customers248.020.6
Electricity sales and capacity paymentsIBOLong-term service and offtake contracts (BOO/BOT-style power purchase arrangements)On actual electricity delivered (including fuel cost expensed on behalf of off-takers) plus contracted capacity made available954.679.4
Construction servicesSI (historical)EPC-type work for large power stationsNot material since FY2022 (it was approx. HK$1.2 bn lower in FY2022 vs FY2021)——

The FY2025 mix is roughly 80% service/contracted (IBO) and 20% product (SI). There is no material subscription or licensing revenue.

One quality-of-earnings point matters. Brazilian IBO revenue includes fuel costs expensed for off-takers, a largely pass-through element. This inflates reported revenue relative to value-added. It explains why IBO gross margin (13–21%) is lower than capacity-based IPPs typically report.

Value chain position

VPower sits mid-stream:

Upstream: it buys engines, alternators, radiators and ancillary equipment from global OEMs. The FY2025 outlook commits to rebuilding long-term partnerships with leading gen-set suppliers after supply shortages. A 2020 CMBI broker note references an MTU (Rolls-Royce Power Systems) distribution agreement for China.

Midstream: it adds value through proprietary system design, containerised packaging, controls integration and fast deployment.

Downstream: in IBO it owns and operates the plants. It sells power to state utilities (e.g., Myanmar's EPGE, historically), isolated-grid operators (Amazonas, Brazil), and industrial/captive users (Batam, Indonesia; oilfields in Kazakhstan).

Customer types and end-markets

Customer typeExamples / evidenceSegment
State utilities / grid operatorsMyanmar EPGE (via the CNTIC VPower JV); Uzbekistan grid (100 MW CHP since Sep 2025)IBO
Isolated-grid off-takersAmazonas State, Brazil. "Customer A" accounted for HK$775.9 M in FY2025, equal to 64.5% of revenue.IBO
Industrial / captive powerBatam, Indonesia (three stations, 150 MW contract capacity); Kazakhstan gas-processing 22 MWIBO
Data centres / AI computingSI backup power for regional data centres (FY2024 and FY2025 MD&A)SI
Equipment-rental fleetsSI customer category (FY2022, H1 2026)SI
Construction / engineering firms, real estate, telecomsSI customer categoriesSI
Controlling-shareholder groupCNTIC and CNTIC Capital as buyers and lessors of gen-set fleets (RMB1,613 M equipment purchase agreement, 2024)Related-party

Independent characterisation

VPower is best understood as a distressed, sub-scale, single-customer-concentrated distributed IPP with a shrinking equipment-trading arm, now operated as a captive vehicle of a Chinese central SOE. Its assets are mobile gen-set fleets that can be redeployed across jurisdictions, which is a genuine strategic advantage. Its liabilities, however, are fixed USD bank debt that is in default.

The core economic engine today is Brazil. Brazil produced HK$775.9 M of FY2025 revenue (64.5% of group revenue) and HK$463.0 M in H1 2026 (74.6%). Indonesia is the second leg.

Meanwhile:

  • The SI business has collapsed from HK$3.67 bn (FY2021) to HK$248 M (FY2025). Management attributes this to working-capital starvation and engine-supply constraints, not demand.

  • The Myanmar JV equity has been written to zero, but it restored about 500 MW of output in late 2025. It is an unpriced upside option.

  • Value creation from here depends on the creditor scheme and on CNTIC's continued financial support.

Strategy

Stated strategy themes (FY2025 annual results / AR, H1 2026 interim)

  1. Targeted IBO expansion by market.

    • Central Asia: replicate the Uzbekistan CHP model; enter associated-petroleum-gas power; develop data-centre and urban CHP projects.

    • Brazil: keep existing assets healthy and deepen hybrid-energy (solar-storage-diesel) upgrades.

    • Indonesia: expand the footprint with unified operation and maintenance, and explore gas-fired projects.

  2. Synergy with the controlling shareholder. Leverage CNTIC/Genertec's international network and financing. Management repeatedly cites this as the primary route to new projects.

  3. Rebuild SI. Targeted capital investment, optimised procurement prepayments and renewed long-term partnerships with leading gen-set OEMs to secure engine capacity. Focus on data-centre and AI computing customers. Prudent risk stance in Europe.

  4. Asset optimisation. Sell and lease back gen-set fleets with CNTIC. Explore cross-regional leasing of idle gen-sets to raise utilisation and cut capex (H1 2026). Close underperforming stations.

  5. Low-carbon fuel mix. Natural gas, biodiesel and renewables hybrids. A 2050 carbon-neutrality commitment (FY2023 AR).

  6. Balance-sheet repair. A holistic debt restructuring via a Hong Kong scheme of arrangement, opposition to the winding-up petitions, and tapping parent resources.

Initiatives in the last 24 months (Oct 2024 to Oct 2026)

InitiativeDateDescriptionStatus
Equipment sale and lease-back with CNTICApproved at EGM 6 Nov 2024RMB1,613 M gen-set sale in three batches, with lease-back and EPC frameworksBatches 1 and 2 done; Batch 3 partly done (RMB85.6 M); HK$248.9 M of equipment still held for sale
Uzbekistan 100 MW CHPWon H2 2024; online Sep 2025First Central Asian IBO projectOperating
Kazakhstan 22 MW gas-processing powerSecured 2025Oilfield power demonstration projectTesting (H1 2026)
Indonesia biodiesel 23.5 MWCommercial operation H1 2026Low-carbon fuel IBOOperating, early-stage
Brazil hybrid retrofits2024 onwardsPhased solar-storage-diesel upgradesOngoing
SI European data-centre projectH1 2026Major project secured in EuropeIn execution
Restructuring Master Agreement14 Nov 2025HK$2,077 M offshore debt to be restated to about HK$1.38 bn, with a standstill and credit support from CNTIC and Energy GardenLapsed 14 May 2026
Hong Kong scheme of arrangementSummons 10 Jun 2026Court-supervised creditor compromiseConvening hearing 21 Oct 2026
Myanmar JV restartLate 2025500 MW back onlineOperating; no P&L uplift yet
Tamar Fund exitEnd-2025 / 2026Partial disposal of the Middle East investeeAgreements signed; terms not disclosed
Idle gen-set cross-regional leasingH1 2026New asset-light business model under evaluationExploratory

Medium-term targets and guidance

No quantitative medium-term revenue, margin, capacity or leverage targets are publicly disclosed. Qualitative H1 2026 guidance:

  • SI is expected to remain under pressure in H2 2026.

  • New IBO projects carry a lag before earnings contribution.

  • Management remains prudently optimistic on the long-term distributed-energy market.

Products & Services

VPower does not publish a priced product catalogue. The table below is built from disclosures in the FY2022–FY2025 results and the H1 2026 interim. Pricing is not publicly disclosed for any product.

SI segment

OfferingDescription / capabilitiesTarget customerLatest disclosurePricing model
Engine-based gen-sets (gas and diesel)Integration of third-party engines, alternators and radiators into gen-setsRental fleets, industrial, constructionAll years; H1 2026 notes tight upstream engine supplyPer-unit sale; not disclosed
Packaged power-generation systemsContainerised, fast-deploy power systems; proprietary system designUtilities, IPPs, oil and gasFY2024 ARProject sale; not disclosed
Data-centre and AI backup powerBackup and on-site generation for data centres and AI computing centresHyperscale and regional data-centre operatorsFY2024–H1 2026; a major European project secured in H1 2026Project sale; not disclosed
Biogas-to-power systemsGas engines adapted for biogasAgriculture and waste operatorsSales network expanded in FY2022—
Waste-heat-to-power systemsHeat recovery to improve efficiencyIndustrial usersFY2022—
Battery energy storage systems (R&D)R&D on BESS to diversify low-carbon offeringsHybrid-system buyersR&D commenced FY2022; no commercial launch disclosed—
Construction / EPC services (historical)Power-station construction for large projects (Myanmar JV)JV and affiliated projectsLast material in FY2021Contract-based

IBO segment: power-station portfolio

CountryAsset(s)Capacity (MW)Fuel / typeStatus (latest)Source
BrazilAmazonas State isolated-grid stations, including Autazes70.3 (gross, end-2024)Diesel/biodiesel, with solar-storage-diesel hybrid retrofit (first at Autazes, 2024)Operating; 74.6% of H1 2026 revenueFY2024 results; FY2024 AR; H1 2026 interim
IndonesiaBatam (three stations, 150 MW contract capacity); Teluk Lembu I/II; Rengat; Muko; Palu; Maluku; Dumai268 (wholly owned, end-2024)Gas/diesel; new 23.5 MW biodiesel project reached commercial operation in H1 2026Operating; remote underperforming small stations closed in H1 2026FY2022, FY2024, FY2025 results; H1 2026 interim
UzbekistanFirst gas-fired combined heat-and-power (CHP) project100 (contracted)Natural gas CHPGrid transmission since Sep 2025FY2024 and FY2025 results
KazakhstanOilfield gas-processing power project22Associated/processed gasTesting phase (H1 2026)FY2025 results; H1 2026 interim
ChinaShandong project14.4GasTemporarily suspended in H1 2026 because of the customer's fuel supplyFY2022 results; H1 2026 interim
Myanmar (wholly owned)Myingyan I/II, Yangon, Kyun Chaung (historical); 50 MW at end-202450 (end-2024)GasExited in 2025 (H1 2026 revenue nil)FY2024 and FY2025 results
Myanmar (50% JV, CNTIC VPower)Thaketa (477.1), Thanlyin (410.2), Kyauk Phyu III (172.2)1,059.5 grossLNG/gas-to-power500 MW restored in late 2025; equity carried at zeroFY2022 and FY2025 results
Peru (51% JV)Iquitos (Genrent del Peru / VPTM Iquitos)79.8ThermalOperating JV, equity-accountedFY2024 results; H1 2026 interim
Guatemala (55%)Petén flare/associated-gas project18.5Associated gasUnder construction at end-2022; later status not disclosedFY2022 results
United KingdomDoncaster20.3GasClosed in 2024FY2024 results
Sri LankaHistorical IBO——No revenue since FY2022FY2022 results

Investment platforms

VehicleDescriptionCarrying valueSource
Tamar VPower Energy Fund I, L.P.50/50 GP platform with CITIC Pacific. Portfolio: one Middle East company and two China companies. Partial disposal of the Middle East investee agreed with strategic investors (end-2025 / H1 2026).Cost HK$821.7 M; carrying value HK$702.6 M (12.7% of total assets) at 30 Jun 2026H1 2026 interim
CNTIC VPower Group Holdings50/50 JV with CNTIC (Myanmar)Investment HK$700.4 M, carried at nil; loss recognition discontinuedH1 2026 interim

Financial Narrative

Sources. FY2021–FY2022: FY2022 annual results announcement (19 Apr 2023). FY2023–FY2024: FY2024 annual results announcement (28 Mar 2025). FY2025: FY2025 annual results announcement (24 Apr 2026). All figures are HK$ M.

Income statement

Notes on the table:

Operating income: is gross profit plus other income, minus S&D, administrative, ECL and other expenses. It reconciles to reported pre-tax income once finance costs and JV share are added back (checked for all five years).

D&A: is depreciation of PPE plus depreciation of right-of-use assets plus amortisation. FY2023 excludes amortisation, which was not disclosed in the source reviewed.

EBITDA: excludes impairments only where they sit inside operating income. FY2023 EBITDA is therefore distorted by the HK$1,169.3 M ECL charge.

FY2021 DPS: is the interim dividend of 0.75 cents (with scrip alternative). The FY2020 final of 3.45 cents was paid in 2021 but relates to FY2020.

Margins and growth

FY2021 growth uses FY2020 revenue of about HK$3.39 bn, a secondary-source figure (TipRanks).

Revenue CAGR, FY2021 to FY2025: -30.3% per year (derived: HK$1,202.7 M / HK$5,094.1 M over 4 years).

Longer history (secondary/partial):

Sources: FY2017 and FY2019 results announcements. FY2018–FY2020 revenue is rounded from TipRanks.

Balance sheet

Notes:

  • The company reports FY2022 net debt as HK$2,763.9 M. The difference from the derived figure is that the company also deducts restricted cash and pledged deposits.

  • FY2025 receivables include HK$217.4 M of non-current originated credit-impaired receivables.

H1 2026 balance sheet (30 Jun 2026, unaudited):

  • Total assets HK$5,535.5 M; cash HK$307.4 M.

  • Borrowings HK$1,657.0 M, of which HK$1,639.7 M is current and HK$1,477.6 M is in repayment default.

  • Net current liabilities HK$448.0 M; total equity HK$1,382.8 M.

  • Net gearing 95.3%; liabilities-to-assets ratio 75.0%.

Cash flow

Notes:

Operating cash flow: The FY2025 going-concern note states net operating cash outflows of HK$222.7 M, while the auditor's extract states HK$212.2 M. The discrepancy is noted and has not been resolved. Operating cash flows for FY2021–FY2024 were not contained in the results announcements reviewed (not publicly disclosed in reviewed sources).

Dividends recognised in 2021: were HK$91.0 M (FY2020 final) plus HK$20.1 M (FY2021 interim). Both had a scrip alternative, so cash paid was lower but not disclosed.

Buybacks: Filings state no repurchases in FY2022–FY2025.

Equipment-sale proceeds: for FY2025 combine HK$652.0 M (Batch 1, received 2 Jan 2025), HK$713.8 M (Batch 2) and HK$92.6 M (part of Batch 3) — a derived sum.

Ratios (analyst-computed)

Notes:

  • FY2023 net debt / EBITDA is not meaningful because EBITDA was negative.

  • Days ratios use year-end balances. DSO includes non-current credit-impaired receivables in FY2025.

Commentary on trends, inflections and drivers

Revenue: three regimes.

  1. FY2021 peak (HK$5.1 bn). Revenue was inflated by SI construction services tied to building the Myanmar JV plants.

  2. FY2022–FY2023 collapse (-34% and then -55%). SI construction ended, the Myanmar business deteriorated after the coup, and Peru was deconsolidated in June 2022.

  3. FY2024–FY2025 stabilisation and shrinkage (HK$1.5 bn, then HK$1.2 bn). IBO grew modestly while SI fell a further 59% in FY2025 on working-capital and supply constraints.

H1 2026 revenue of HK$620.1 M (+1.3% YoY) suggests FY2026 revenue in the HK$1.2–1.3 bn range. That is an analyst inference, not guidance.

Profitability: FY2023 was the reckoning. In FY2023 VPower recognised:

  • HK$1,168.3 M of trade-receivable impairment, overwhelmingly Myanmar-related;

  • HK$705.9 M share of JV losses (CNTIC VPower);

  • a negative SI gross margin; and

  • about HK$100 M of asset write-offs and impairments.

The FY2023 loss of HK$2.85 bn wiped out about 40% of opening equity. Since then, losses have been about HK$200–230 M per year. Underlying operations are barely profitable: EBIT was HK$46.5 M in FY2025, and that relied heavily on HK$164.5 M of gains from selling fleet assets to CNTIC. Excluding disposal gains, FY2025 EBIT would have been negative (about -HK$118 M, derived). H1 2026 swung to a HK$41.0 M loss once disposal gains disappeared, finance costs rose 33.9% and IBO margins fell.

Leverage: debt is down, cash flow has not improved. Gross borrowings fell from HK$3.85 bn (FY2021) to HK$1.62 bn (FY2025). This was achieved mainly through the following, not through operating cash flow:

  • deconsolidating Peru, including its senior notes;

  • the 2023 CNTIC equity injection; and

  • about HK$1.46 bn of equipment-sale proceeds from CNTIC in 2025.

Interest coverage of 0.15x in FY2025 and an operating cash outflow show the business cannot service its remaining debt unaided. The average borrowing rate increased in H1 2026, consistent with default interest.

Working capital: receivables are the core balance-sheet risk. Net receivables of HK$1.66 bn compare with an equity base of HK$1.40 bn. HK$1.44 bn of FY2025 net receivables were over 360 days old, and HK$1.29 bn still were at 30 June 2026. A cash conversion cycle above 500 days is unsustainable. Recoverability, which is likely linked to Myanmar off-takers, is the swing factor. The HK$97.1 M impairment reversal in H1 2026 shows collections are possible but lumpy.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Segment Overview

SegmentDefinition (per filings)Contents

System Integration (SI)

Designs, integrates, sells and installs engine-based electricity generation units

Gas and diesel gen-sets; packaged and containerised power systems; biogas and waste-heat-to-power systems; backup power for data centres; historical construction services

Investment, Building and Operating (IBO)

Designs, invests in, builds and operates distributed power generation stations

Owned power stations in Brazil, Indonesia, China, Uzbekistan and Kazakhstan; Myanmar (wholly owned, exited in 2025); JV interests (CNTIC VPower in Myanmar; Iquitos, Peru) are equity-accounted

Revenue by Segment and Segment Margins & Growth (%)

MetricFY2021FY2022FY2023FY2024FY2025

SI external revenue (HKD Mn)

3,665.91,945.4675.3602.9248.0

IBO revenue (HKD Mn)

1,428.21,415.9822.3917.6954.6

Total revenue (HKD Mn)

5,094.13,361.31,497.61,520.51,202.7

SI gross profit (HKD Mn)

404.5284.5-50.695.157.0

IBO gross profit (HKD Mn)

408.0377.496.7196.1147.9

SI gross margin (%)

11.014.6-7.515.823.0

IBO gross margin (%)

28.626.711.821.415.5

SI segment result (HKD Mn)

328.3146.9-1,399.7-0.3-4.7

IBO segment result (HKD Mn)

87.2-164.9-1,090.1179.0116.5

SI share of revenue (%)

72.057.945.139.720.6

IBO share of revenue (%)

28.042.154.960.379.4

SI intersegment sales (HKD Mn)

1,175.711.414.325.6105.3

Segment Margins & Growth (%)

MetricFY2022FY2023FY2024FY2025

SI revenue growth (%)

-46.9-65.3-10.7-58.9

IBO revenue growth (%)

-0.9-41.911.64.0

Group revenue growth (%)

-34.0-55.41.5-20.9

Revenue by Segment and Segment Margins & Growth (%) (Half-Yearly)

MetricH1 2025H1 2026

SI revenue (HKD Mn)

150.284.1

IBO revenue (HKD Mn)

461.9536.1

SI gross margin (%)

18.519.9

IBO gross margin (%)

20.513.3

SI segment result (HKD Mn)

8.672.3

IBO segment result (HKD Mn)

140.259.1

Income Statement and Per-Share Data

MetricFY2021FY2022FY2023FY2024FY2025

Revenue (HKD Mn)

5,094.13,361.31,497.61,520.51,202.7

Cost of sales (HKD Mn)

-4,281.6-2,699.4-1,451.5-1,229.2-997.8

Gross profit (HKD Mn)

812.5661.946.2291.3204.9

Other income and gains, net (HKD Mn)

12.07.94.3153.1203.9

Selling and distribution (HKD Mn)

-29.0-22.2-14.8-11.6-27.7

Administrative expenses (HKD Mn)

-408.6-377.7-398.1-268.5-269.8

ECL impairment, net (HKD Mn; included in other expenses before FY2023)

00-1,169.3-25.0-43.9

Other expenses, net (HKD Mn)

-79.2-154.5-301.2-19.3-20.9

Operating income, EBIT before JV (HKD Mn; derived)

307.7115.4-1,832.9120.046.5

Depreciation and amortisation (HKD Mn)

329.4273.2257.3151.5143.9

EBITDA (HKD Mn; derived, excl. JV)

637.1388.6-1,575.6271.5190.4

Finance costs (HKD Mn)

-210.4-232.8-316.2-341.5-304.7

Share of JV results (HKD Mn)

9.4-198.7-705.916.159.0

Pre-tax income (HKD Mn)

106.7-316.2-2,855.0-205.5-199.3

Income tax (HKD Mn)

-49.935.51.0-27.1-1.9

Net income incl. NCI (HKD Mn)

56.7-280.7-2,854.0-232.6-201.2

Net income attributable to owners (HKD Mn)

45.7-316.9-2,854.0-233.1-201.5

Basic EPS (HK cents)

1.72-11.78-76.18-3.49-3.02

Diluted EPS (HK cents)

1.72-11.78-76.18-3.49-3.02

Dividend per share (HK cents)

0.750000

Margin Analysis (%)

MetricFY2021FY2022FY2023FY2024FY2025

Gross margin (%)

16.019.73.119.217.0

Operating margin (%; derived)

6.03.4-122.47.93.9

EBITDA margin (%; derived)

12.511.6-105.217.915.8

Net margin, attributable (%)

0.9-9.4-190.6-15.3-16.8

Revenue growth YoY (%)

50.3-34.0-55.41.5-20.9

Income Statement

MetricFY2016FY2017FY2018FY2019FY2020

Revenue (HKD Mn)

1,531.01,746.02,4202,7903,390

Net profit (HKD Mn)

222.0331.3200.9282.3—

Balance Sheet and Margin Analysis (%)

MetricFY2021FY2022FY2023FY2024FY2025

Total assets (HKD Mn)

10,349.38,911.36,235.65,860.85,323.6

Cash and cash equivalents (HKD Mn)

462.4122.3131.2122.8369.2

Short-term borrowings incl. current senior notes (HKD Mn)

1,856.02,921.22,717.02,236.61,598.1

Long-term borrowings incl. senior notes (HKD Mn)

1,996.0050.235.623.6

Total borrowings (HKD Mn)

3,852.02,921.22,767.22,272.21,621.7

Net debt, borrowings minus cash (HKD Mn; derived)

3,389.62,798.92,636.02,149.41,252.6

Lease liabilities (HKD Mn)

117.7102.855.4228.4154.5

Total equity (HKD Mn)

3,532.43,140.11,883.51,581.41,405.0

Equity attributable to owners (HKD Mn)

3,475.53,139.41,883.51,580.91,404.3

Goodwill and intangibles (HKD Mn)

170.839.79.000

Net working capital, current assets minus current liabilities (HKD Mn)

467.7-1,081.4-1,305.9157.3-407.2

Trade and bills receivables, net (HKD Mn)

2,677.32,903.11,616.21,618.71,656.4

Inventories (HKD Mn)

1,263.01,169.51,029.5659.6601.5

Interests in JVs (HKD Mn)

1,746.11,736.1991.8888.5923.0

Assets held for sale (HKD Mn)

0014.3969.3340.4

Company-reported net gearing (%)

92.888.0139.2135.188.2

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Cash Flow

MetricFY2021FY2022FY2023FY2024FY2025

Operating cash flow (HKD Mn)

————-222.7

Capex on PPE (HKD Mn)

107.3156.899.376.2201.1

Additional right-of-use investment for IBO (HKD Mn)

000208.90

Free cash flow, OCF minus PPE capex (HKD Mn; derived)

————-423.8

Dividends recognised (HKD Mn)

111.10000

Share buybacks (HKD Mn)

00000

Equipment-sale proceeds received from CNTIC group (HKD Mn)

00001,458.4

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2021FY2022FY2023FY2024FY2025

ROE, attributable NI / average attributable equity (%)

1.3-9.6-113.6-13.5-13.5

ROA, NI / average total assets (%)

0.5-2.9-37.7-3.8-3.6

ROIC, pre-tax EBIT / (equity + net debt) (%)

4.41.9-40.63.21.7

Current ratio (x)

1.10.80.71.00.9

Debt / equity (x)

1.090.931.471.441.15

Net debt / EBITDA (x)

5.37.2-1.77.96.6

Interest coverage, EBIT / finance costs (x)

1.460.50-5.800.350.15

Asset turnover (x)

0.490.350.200.250.22

Days sales outstanding (days)

191.8315.2393.9388.6502.7

Days inventory outstanding (days)

107.7158.1258.9195.9220.0

Days payables outstanding (days)

180.6276.6130.4149.4196.5

Cash conversion cycle (days)

118.9196.7522.4435.1526.2

Revenue by Region

RegionFY2021FY2022FY2023FY2024FY2025

Hong Kong and Mainland China (HKD Mn)

1,510.3201.3194.5408.1117.8

Other Asian countries (HKD Mn)

2,518.22,095.5571.3239.5297.7

Latin America (HKD Mn)

909.0974.8692.1736.7775.9

Other countries (HKD Mn)

156.589.739.8136.211.2

Region Margins & Growth (%)

RegionFY2022FY2023FY2024FY2025

Hong Kong and Mainland China growth (%)

-86.7-3.4109.8-71.1

Other Asian countries growth (%)

-16.8-72.7-58.124.3

Latin America growth (%)

7.2-29.06.45.3

Other countries growth (%)

-42.7-55.6242.2-91.7

Revenue by Region by SI Market

SI marketFY2021FY2022FY2023FY2024FY2025

Hong Kong, Macau and Mainland China (HKD Mn)

1,481.4174.1166.7389.6103.2

Other Asian countries (HKD Mn)

2,049.41,724.1473.278.7133.6

Other countries (HKD Mn)

135.147.235.5134.611.2

Revenue by Region by IBO Country

IBO countryFY2021FY2022FY2023FY2024FY2025

Brazil (HKD Mn)

424.4691.4692.1736.7775.9

Indonesia (HKD Mn)

68.342.619.991.0140.5

Myanmar (HKD Mn)

382.0328.878.269.923.7

Peru (HKD Mn)

484.7283.4000

Mainland China (HKD Mn)

28.927.227.818.514.6

United Kingdom (HKD Mn)

21.442.54.31.60

Sri Lanka (HKD Mn)

18.50000

Share Price & Returns

Reference pointPrice (HKD)Note

IPO (24 Nov 2016)

2.88

etnet

2 Dec 2025 (post-petition)

0.136

Down about 34% intraday (Tiger Brokers)

24 Apr 2026 (last quote before resumption)

0.109

etnet

Mid-Oct 2026 (indicative)

0.064

Zonebourse; shown as -53.6% year to date

52-week range (as of late 2025)

0.10–0.50

TipRanks

Valuation Snapshot

MultipleValueBasis

Market capitalisation

About HK$428 M

6,683.2 M shares × HK$0.064

Enterprise value

About HK$1.83 bn

Market cap + FY2025 net debt (HK$1,252.6 M) + leases (HK$154.5 M). Excludes minority interests (about HK$0.75 M).

EV / EBITDA

About 9.6x

FY2025 EBITDA HK$190.4 M (derived)

EV / Sales

About 1.5x

FY2025 revenue HK$1,202.7 M

P/B

About 0.30x

FY2025 attributable equity HK$1,404.3 M (about HK$0.21 per share)

Per-Share Data

MetricFY2021FY2022FY2023FY2024FY2025

DPS (HK cents)

0.750000

Capital Markets

ItemDetail

Credit ratings (Moody's / S&P / Fitch)

None; the company is not rated (not publicly disclosed)

Total borrowings (30 Jun 2026)

HK$1,657.0 M: USD 1,369.2; BRL 136.3; HKD 84.5; RMB 43.1; EUR 24.0

Maturity profile

HK$1,639.7 M current (including HK$1,477.6 M overdue or in default); HK$17.3 M non-current

Secured portion

HK$305.8 M of secured bank loans plus HK$79.4 M of secured other borrowings; the rest is unsecured (HK$1,271.7 M)

Security pledged

Inventories HK$66.1 M; PPE HK$110.8 M; pledged deposits HK$19.4 M; subsidiary equity; Genrent del Peru equity (for its senior notes)

Offshore debt under restructuring

About HK$2,077 M principal (Restructuring Master Agreement perimeter, which may include guarantees and other claims)

Lease liabilities

HK$119.7 M (30 Jun 2026)

Analyst Conclusions

Management guidance (H1 2026 interim, 24 Aug 2026)

SI: expected to remain under pressure in H2 2026 given gen-set inventory and replenishment lead times. The focus is on rebuilding supplier relationships, data-centre and computing opportunities, and premium customers.

IBO: localised development, parent synergy, and a steady advance in Southeast Asia, Central Asia and South America. New projects carry an earnings time lag. Cross-regional leasing of idle gen-sets is being evaluated.

Group: addressing debt pressure through a scheme of arrangement. Prudently optimistic on the long-term distributed-energy market.

No quantitative guidance: is given.

Consensus: not available (no active coverage identified).

Bull case

  1. A scheme crystallises debt relief. The lapsed Restructuring Master Agreement envisaged restating HK$2,077 M of offshore debt to about HK$1.38 bn, roughly a one-third haircut. A comparable scheme, backed by CNTIC credit support, would cut finance costs (HK$304.7 M in FY2025) and could restore positive pre-tax earnings, given IBO segment results of about HK$117–179 M per year.

  2. Hidden assets re-rate.

    • The Myanmar JV (HK$700.4 M cost, carried at nil) restored 500 MW.

    • The Tamar Fund (carrying value HK$702.6 M) is monetising.

    • Receivables of HK$1.29 bn over 360 days old are partly recoverable; H1 2026 already reversed HK$97.1 M of impairment.

    • Against a market cap of about HK$0.43 bn, these are large relative values.

  3. A parent-driven Central Asian pipeline. Uzbekistan (100 MW) and Kazakhstan (22 MW) are proof points. Genertec's network and SOE financing could scale IBO capacity in gas-rich, grid-weak markets while data-centre demand lifts SI.

Bear case

  1. Equity is structurally subordinated. Borrowings of HK$1.66 bn sit in default, alongside other payables and accruals of HK$1.63 bn and a disputed CRRC claim. Interest coverage is 0.15x. A scheme could involve debt-for-equity conversion that heavily dilutes minorities. A failed scheme could lead to a winding-up order.

  2. Earnings quality is poor. FY2024 and FY2025 relied on HK$94.6 M and HK$164.5 M of disposal gains from fleet sales to the parent. Without them, H1 2026 shows a loss even after a HK$97.1 M impairment reversal. IBO gross margin fell to 13.3%.

  3. Concentration and execution. 64.5–74.6% of revenue comes from one Brazilian customer. SI is starved of capital and engines. Repeated reporting delays and suspensions (2023, 2024, 2026) signal governance and control fragility.

Catalysts and monitorables (next 12 months)

CatalystTimingWhat to watch
Scheme convening hearing21 Oct 2026Leave to convene creditor meetings; scheme terms (haircut, equity conversion, CNTIC support)
Winding-up petition hearingOn or after 22 Oct 2026Further adjournment, dismissal or settlement with CRRC
Scheme creditor meeting and sanctionLate 2026 to H1 2027 (estimated)Voting thresholds; sanction hearing
FY2026 annual resultsBy 31 Mar 2027 (statutory)Going-concern opinion; whether results are on time
Myanmar JV contributionFY2026–27Reversal of carrying value; cash distributions
Tamar Fund exit proceeds2026–27Cash realisation vs HK$702.6 M carrying value
Kazakhstan commercial operationH2 2026Revenue start
SI order intake (data centres)OngoingRestored supplier credit; backlog
Receivable collectionsOngoingFurther impairment reversals

Analyst verdict

VPower is no longer an operating-growth story. It is a restructuring situation wrapped around a modest but real distributed-power franchise.

The franchise has substance. Brazil generates more than HK$900 M of annualised revenue. Indonesia, Uzbekistan and the incoming Kazakhstan asset provide diversification. The fleet's mobility has already allowed an orderly retreat from Myanmar. Under CNTIC/Genertec control, the strategic logic is coherent: VPower becomes the listed distributed-generation arm of a central SOE with Belt-and-Road reach.

The capital structure is broken. Substantially all bank debt is overdue. Finance costs consume six times FY2025 operating profit. Operating cash flow is negative. Two consensual restructuring attempts have failed, and a creditor petition remains live. Recent "profits" depended on selling assets to the parent and leasing them back. That source of cash is finite: about HK$249 M of equipment remains held for sale.

For equity holders, the outcome is binary and largely outside the company's control. It hinges on the scheme terms (to be revealed from the 21 October 2026 hearing onward) and on CNTIC's willingness to keep underwriting liquidity. At about HK$0.43 bn of market value, the equity trades at about 0.3x book. That book carries receivables of HK$1.66 bn, with HK$1.29 bn aged over a year, and contingent upside from the Myanmar JV and Tamar Fund.

Our assessment is speculative / high-risk. The risk-reward favours waiting for scheme terms rather than pre-positioning. A creditor-friendly scheme with debt-to-equity conversion could leave limited residual value for minorities despite the asset backing. Conversely, a parent-supported compromise that preserves equity, combined with Myanmar JV and fund realisations, could re-rate the shares meaningfully from distressed levels. Key monitorables are, in order: scheme terms; the CRRC petition outcome; the FY2026 audit opinion; and collections on aged receivables.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleAppointed / tenureBackground (as disclosed)AgeRemuneration

Dr. Chen Shengguang

Chairman, executive director, Nomination Committee chair

7 Jul 2026 (term to 31 Dec 2028)

Former CFO of Genertec International; PhD in public finance

46

Waived (no remuneration from the Company)

Mr. Lam Yee Chun

Executive director; founder

Founder; CEO until 28 Jul 2026; formerly Executive Chairman and Co-CEO

Founder of VPower. Holds 57.6% of Sharkteeth Investments, the owner of VPower Technology Company Limited (a connected person).

Not disclosed in reviewed docs

Not disclosed in reviewed docs

Mr. Wang Jiachang

CEO (from 28 Jul 2026), executive director (from 1 Jan 2025)

1 Jan 2025

Previously a general manager within the CNTIC/Genertec group (full biography truncated in source)

Not disclosed in reviewed docs

Employment contract, no fixed term; amount not disclosed

Mr. Liu Ruikun

Executive director

1 Sep 2025 (replaced Lu Weijun)

CNTIC nominee (inferred)

Not disclosed in reviewed docs

Not disclosed in reviewed docs

Mr. Jin Jiantang

Executive director

2023–24 (post-CNTIC)

CNTIC nominee (inferred)

Not disclosed in reviewed docs

Not disclosed in reviewed docs

Mr. Wong Kwok Yiu

Non-executive director

Pre-2023 (on the board at FY2022)

Not disclosed in reviewed docs

Not disclosed in reviewed docs

Not disclosed in reviewed docs

Mr. Suen Wai Yu

Independent non-executive director

Pre-2023 (on the board at FY2022)

Not disclosed in reviewed docs

Not disclosed in reviewed docs

Not disclosed in reviewed docs

Dr. Wang Zheng

Independent non-executive director

Post-2023

Not disclosed in reviewed docs

Not disclosed in reviewed docs

Not disclosed in reviewed docs

Dr. Lin Tun

Independent non-executive director

Post-2023

Not disclosed in reviewed docs

Not disclosed in reviewed docs

Not disclosed in reviewed docs

Board & Management Changes

DateChangeContext

5 Dec 2023

Dr. Kang Hubiao appointed chairman and executive director

Post-CNTIC takeover

16 Aug 2024

Kang resigns; Gao Zhan (age 50; MBA, University of the Philippines; ex-CNTIC deputy GM; GM, director and Chief Risk Officer of Genertec International) becomes chairman

Other work commitments

1 Jan 2025

Li Haifeng resigns as executive director; Wang Jiachang appointed

CNTIC personnel rotation

1 Sep 2025

Lu Weijun resigns as executive director; Liu Ruikun appointed

Rotation

7 Jul 2026

Gao Zhan resigns; Dr. Chen Shengguang becomes chairman

Other work commitments; a finance-heavy profile suited to the restructuring

28 Jul 2026

Lam Yee Chun ceases to be CEO; Wang Jiachang appointed CEO

Founder transition completed

Major Shareholders

HolderStakeNotesSource

CNTIC (Genertec group)

About 59.6% implied (about 3.98 bn shares issued on 26 Sep 2023, out of 6.68 bn).

Immediate holding company

FY2023 AR; derived

Shares held under the share award scheme

About 13.7 M shares (6,683.2 M issued minus 6,669.5 M weighted)

Excluded from EPS

Derived

Institutional top-10 holders

Not publicly disclosed in reviewed sources (illiquid free float)

——

Competitive Landscape

Key Competitors

CompetitorSegment overlapPositioning vs VPower

Aggreko (private, owned by TDR Capital / I Squared Capital since 2021)

IBO / temporary and distributed power

Global leader in mobile power rental; far larger scale and investment-grade-style funding

APR Energy (Atlas Corp)

IBO fast-track power

Turbine-based fast power for utilities; competes for emergency and bridging tenders

Karpowership (Karadeniz Holding)

IBO powerships

Floating power for emerging-market utilities; competes in Asia, Africa and Latin America

Wärtsilä Energy

SI and IBO (engine power plants, EPC)

Engine OEM and EPC; supplies utility-scale engine plants; a technology leader

Caterpillar (incl. Solar Turbines) and its dealers

SI

Engine and gen-set OEM; also an upstream supplier

Cummins Power Systems

SI

Engine and gen-set OEM; strong in data-centre backup

Rolls-Royce Power Systems (mtu)

SI (data centres)

Premium gen-sets; historically linked as supplier and distributor

Weichai Power / Yuchai (China)

SI

Low-cost Chinese engines and gen-sets

Jakson Group / Kirloskar (India)

SI

Regional gen-set integrators

Rehlko (formerly Kohler Energy) / Himoinsa

SI

Gen-set integrators competing in rental and backup

Local IPPs and state utilities (e.g., PLN subsidiaries in Indonesia; Brazilian isolated-system thermal operators)

IBO

Incumbents bidding for the same PPAs

Peer Comparison FY2025

CompanyFY revenueRevenue growthMargin indicatorR&D intensity

VPower (FY2025)

HK$1,202.7 M (about US$155 M)

-20.9%

Gross 17.0%; operating 3.9% (derived)

—

Wärtsilä (FY2024)

About €6.4 bn

Low single digit

Comparable operating margin about 11%

About 3% of sales

Cummins (FY2024)

About US$34 bn

About flat

EBITDA margin in the mid-teens

About 4% of sales

Caterpillar (FY2024)

About US$65 bn

About -3%

Operating margin about 20%

About 3% of sales

“—” = not publicly disclosed.

Company Snapshot

$154.4M

Revenue

529

Employees

2000

Founded

Kowloon, Hong Kong

Headquarters

SWOT Analysis

Strengths

  • State-owned controlling shareholder: CNTIC (Genertec, under SASAC) became controller on 26 Sep 2023. It provides going-concern financial support (FY2025 note 3) and bought RMB1.36 bn of equipment in 2024–25.
  • Stable Brazilian cash generator: Brazil IBO revenue rose from HK$692.1 M (FY2023) to HK$775.9 M (FY2025) and HK$463.0 M in H1 2026 (+30.5% YoY)
  • Ability to redeploy mobile assets: Myanmar wholly owned capacity downsized and equipment reallocated to new markets (FY2024 MD&A)
  • Improved SI unit economics: SI gross margin was 23.0% in FY2025 vs -7.5% in FY2023, and 19.9% in H1 2026
  • New-market execution: Uzbekistan 100 MW online in Sep 2025; Kazakhstan 22 MW testing; Indonesian biodiesel 23.5 MW at commercial operation
  • Lower gross debt: Borrowings fell from HK$3,852 M (FY2021) to HK$1,622 M (FY2025)
  • Embedded JV option value: Myanmar JV restored 500 MW (late 2025), with equity carried at zero (FY2025 results)

Weaknesses

  • Bank debt in default: HK$1,477.6 M of borrowings overdue at 30 Jun 2026; no waivers obtained
  • Negative operating cash flow: FY2025 operating outflow of HK$222.7 M (or HK$212.2 M per the auditor)
  • Interest burden exceeds operating earnings: FY2025 EBIT HK$46.5 M vs finance costs HK$304.7 M (0.15x coverage)
  • Customer concentration: One customer accounted for 64.5% of FY2025 revenue
  • Aged receivables: HK$1,290 M of net receivables over 360 days old at 30 Jun 2026; DSO about 500 days
  • SI collapse: SI revenue down 93% from FY2021 to FY2025 (HK$3,666 M to HK$248 M)
  • Recurring audit and reporting delays: Trading suspensions for delayed results in April 2023, April 2024 and April 2026

Opportunities

  • Data-centre and AI power demand: Management targets data-centre and AI computing SI projects; a major European project was secured in H1 2026
  • Central Asia pipeline through the parent: FY2025 outlook: associated petroleum gas, data-centre and urban CHP projects in Central Asia
  • Debt compromise via the scheme: The earlier Restructuring Master Agreement envisaged restating HK$2,077 M of debt to about HK$1.38 bn, a reference point for the scheme
  • Hybrid and renewable retrofits: Brazil solar-storage-diesel roll-out; alignment with local energy-transition policy
  • Myanmar JV recovery: Management signals it may revalue the investment (HK$700.4 M cost) if performance improves
  • Tamar Fund monetisation: Carrying value HK$702.6 M; Middle East partial disposal under way
  • Asset-light leasing of idle fleet: H1 2026 plan for cross-regional leasing of idle gen-sets

Threats

  • Winding-up order: CRRC petitions (28 Nov 2025) are still pending, repeatedly adjourned
  • Scheme failure: The Restructuring Master Agreement lapsed twice (Feb and May 2026); scheme terms are not yet public
  • Equity dilution or wipe-out: A scheme may include debt-to-equity conversion. Terms are not disclosed; this is a risk, not a fact.
  • Engine supply constraints: H1 2026 cites tight upstream engine supply limiting SI
  • Geopolitical and sanctions exposure: Myanmar operations under international scrutiny; Europe market-access barriers cited in FY2025
  • FX volatility: FY2025 and H1 2026 cite FX-driven cost increases in Indonesia and Brazil; USD debt of HK$1,369 M
  • Rising default interest: H1 2026 finance costs +33.9% on higher average rates

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
15 May 2025Equipment Purchase Agreement longstop extended to 30 Jun 2025Delays CNTIC asset-sale proceeds
12 Jun 20252025 AGM held (scheduled date)Routine
2025 (during year)Batch 2 equipment sale (RMB660.8 M) and part of Batch 3 (RMB85.6 M) completedAbout HK$806 M of cash; disposal gain HK$164.5 M
2025 (during year)Kazakhstan 22 MW gas-processing project securedCentral Asia expansion
28 Aug 2025H1 2025 results: revenue HK$612.1 M (-25%); net profit HK$21.1 MProfit driven by disposal gains
1 Sep 2025Lu Weijun resigns as executive director; Liu Ruikun appointedBoard rotation
Sep 2025Uzbekistan 100 MW CHP begins grid transmissionFirst Central Asia revenue asset
14 Nov 2025Restructuring Master Agreement signed: offshore debt of HK$2,077 M to be restated to about HK$1.38 bnProposed debt relief of about HK$0.7 bn
28 Nov 2025CRRC Hongkong Capital Management files winding-up petitions against the Company and VGHLExistential legal threat
1 Dec 2025Petitions disclosed; claim about US$31.9 M; company opposesDisclosure
2 Dec 2025Shares fall about 34% intraday to HK$0.136Market reaction
17 Dec 2025Supplemental disclosure: VPT is owned by Sharkteeth (Lam 57.6%, spouse 19.2%, CRRC HK 4.0%)Connected-person dimension
Late 2025CNTIC VPower restores 500 MW in MyanmarPotential JV value recovery
End-2025Tamar Fund agrees a partial disposal of its Middle East investeePossible liquidity source
21 Jan 2026Petition hearing adjourned from 11 Feb to 13 May 2026 (announced 27 Jan)Time for restructuring
11 Feb 2026Court grants validation order for share transfersShares remain tradable
14–15 Feb 2026Restructuring Master Agreement lapses at its first longstop; negotiations continueSetback
31 Mar / 1 Apr 2026FY2025 results delayed; trading suspendedAuditor going-concern scrutiny
2 Apr 2026Deed of extension: longstop moved to 14 May 2026Restructuring revived
24 Apr 2026FY2025 results: revenue HK$1,202.7 M (-20.9%); loss attributable HK$201.5 M; going-concern material uncertaintyConfirms distress
27 Apr 2026Trading resumesLiquidity restored
30 Apr 20262025 Annual Report published; petition hearing adjourned to 17 Jun 2026Procedural
12 May 2026Clarification of the audit delay: auditors required stakeholder interviews and supporting documentsGovernance transparency
14 May 2026Restructuring Master Agreement lapses definitivelyConsensual path fails
2 Jun 2026Petition hearing adjourned to 26 Aug 2026Procedural
10 Jun 2026Ex parte originating summons filed for a Hong Kong scheme of arrangementShift to a court-led restructuring
11 Jun 20262026 AGM (scheduled)Routine
7 Jul 2026Dr. Chen Shengguang (ex-Genertec International CFO) becomes chairmanFinance-led leadership
28 Jul 2026Wang Jiachang becomes CEO; founder Lam steps back to executive directorEnd of the founder era
21 Aug 2026Scheme convening hearing adjourned to 22 Oct 2026; joint application to adjourn the petitionsProcedural
24 Aug 2026H1 2026 results: revenue HK$620.1 M (+1.3%); net loss HK$41.0 M; finance costs +33.9%Deterioration excluding disposal gains
H1 202623.5 MW Indonesian biodiesel project reaches commercial operation; major European SI project; China project suspendedOperational mixed bag
11 Sep 20262026 Interim Report publishedRoutine
7–8 Oct 2026Court reschedules the convening hearing to 21 Oct 2026Key near-term catalyst

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

7 charts
Income Statement: Revenue & Gross Profit: Revenue fell from HKD 5,094.1 Mn in FY2021 to HKD 1,202.7 Mn in FY2025.
VPower Group International Holdings Limited — Income Statement: Revenue & Gross Profit
Series (HKD Mn)FY2021FY2022FY2023FY2024FY2025
Revenue5,094.13,361.31,497.61,520.51,202.7
Cost of sales-4,281.6-2,699.4-1,451.5-1,229.2-997.8
Gross profit812.5661.946.2291.3204.9

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. VPower — Announcement of Annual Results FY2025 and Resumption of Trading (24 Apr 2026), hkexnews.hk/listedco/listconews/sehk/2026/0424/2026042404208.pdf
  2. VPower — Interim Results Announcement H1 2026 (24 Aug 2026), hkexnews.hk/listedco/listconews/sehk/2026/0824/2026082401981.pdf
  3. VPower — Announcement of Annual Results FY2024 (28 Mar 2025), hkexnews.hk/listedco/listconews/sehk/2025/0328/2025032804926.pdf
  4. VPower — Announcement of Annual Results FY2022 and Resumption (19 Apr 2023), hkexnews.hk/listedco/listconews/sehk/2023/0419/2023041901279.pdf
  5. VPower — Annual Report 2023 (30 Apr 2024): Annual Report 2024 (28 Apr 2025) · Annual Report 2025 (30 Apr 2026)
  6. VPower — Interim results H1 2023, H1 2024 and H1 2025: FY2017 and FY2019 annual results announcements
  7. VPower — Change of Chairman (7 Jul 2026): Change of CEO (27 Jul 2026) · Changes of Directors (15 Aug 2024; 20 Dec 2024) · Board meeting notices (16 Mar 2026; 12 Aug 2026) · Inside Information on Restructuring (8 Oct 2026) · Profit warnings (18 Mar 2024; 19 Mar 2025) · EPA longstop extension (15 May 2025)
  8. Secondary: FilingReader · Tiger Brokers / itiger · Webull/PUBT · TipRanks; etnet · Zonebourse · ACN Newswire · GlobalCapital · Business & Human Rights Resource Centre · Global Restructuring Review